JPH0431963B2 JP59062466A JP6246684A JPH0431963B2 JP H0431963 B2 JPH0431963 B2 JP H0431963B2 JP 59062466 A JP59062466 A JP 59062466A JP 6246684 A JP6246684 A JP 6246684A JP H0431963 B2 JPH0431963 B2 JP H0431963B2
Authority
JP
Japan
Prior art keywords
cylinder
garbage
rod
press
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP59062466A
Other languages
Japanese (ja)
Other versions
JPS60209402A (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP6246684A priority Critical patent/JPS60209402A/en
Publication of JPS60209402A publication Critical patent/JPS60209402A/en
Publication of JPH0431963B2 publication Critical patent/JPH0431963B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Refuse-Collection Vehicles (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、塵芥投入箱(以下投入箱という)内
に投入された塵芥を圧縮圧潰し、塵芥収容箱(以
下収容箱という)内に押込む塵芥積込み装置を投
入箱に備え、収容箱の後方開口に連接して設けた
投入箱を傾動上昇して該塵芥積込み装置により収
容箱内に収容された塵芥を収容箱外に排出するよ
うにした塵芥収集車に関するものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention compresses and crushes the garbage thrown into a garbage input box (hereinafter referred to as the input box) and pushes it into the garbage storage box (hereinafter referred to as the storage box). A garbage loading device is provided in the input box, and the input box provided in connection with the rear opening of the storage box is tilted upward, and the garbage stored in the storage box is discharged from the storage box by the garbage loading device. This is related to garbage collection vehicles.

〔従来の技術〕[Conventional technology]

従来この種の装置として、本願出願人は先に、
収容箱の後方開口部に連接された投入箱の塵芥投
入口上方にリンクの基端を軸支し、該リンクの先
端をパツカプレートの上方に軸支すると共に、該
パツカプレートの下端にプレスプレートの基端を
回動自在に連結し、該プレスプレートの中央部に
ロツドを軸支したプレスシリンダの基端を上記リ
ンクとパツカプレートとの連結軸から変位した上
記リンク上の点に回動自在に連結すると共に上記
投入箱の下方に基端を軸支したパツカシリンダの
ロツドを上記パツカプレートと上記リンクとの連
結軸に連結したことを特徴とする塵芥収集車にお
ける塵芥積込み装置を提案している。
As a conventional device of this type, the applicant has previously developed
The base end of the link is pivotally supported above the garbage inlet of the input box connected to the rear opening of the storage box, the tip of the link is pivotally supported above the packer plate, and the base of the press plate is attached to the lower end of the packer plate. The base end of a press cylinder whose ends are rotatably connected and a rod is pivotally supported in the center of the press plate is rotatably connected to a point on the link that is displaced from the connecting axis between the link and the packer plate. The present invention also proposes a garbage loading device for a garbage collection vehicle, characterized in that a rod of a packer cylinder whose base end is pivotally supported below the input box is connected to a connecting shaft between the packer plate and the link.

この提案の塵芥積込み装置では、塵芥を投入箱
内へ投入する際の第1工程において、プレスシリ
ンダのロツドとパツカシリンダのロツドとが共に
最伸長した状態からプレスシリンダのロツドを最
縮小の状態にする。そして、投入箱内に投入され
た塵芥を圧縮圧潰する第2工程において、第1工
程の最終状態からパツカシリンダのロツドが最縮
小しかつプレスシリンダのロツドが僅かに伸長し
た状態にする。その後、投入箱内で塵芥を更に圧
縮圧潰する第3工程において、第2工程の最終状
態からプレスシリンダのロツドが最伸長した状態
にする。そして最後の、投入箱内で圧縮圧潰した
塵芥を収容箱の開口部へ向つてかき上げていく第
4工程において、第3工程の最終状態からパツカ
シリンダのロツドが最伸長した状態にすることに
より、投入箱に投入された塵芥を圧縮圧潰して収
容箱に押込む。
In the proposed garbage loading device, in the first step when loading garbage into the dumping box, the rod of the press cylinder and the rod of the packer cylinder are both changed from the fully extended state to the most contracted state. . Then, in the second step of compressing and crushing the garbage thrown into the dumping box, the rod of the packer cylinder is brought into a state of being minimized and the rod of the press cylinder being slightly expanded from the final state of the first step. Thereafter, in the third step of further compressing and crushing the garbage in the input box, the rod of the press cylinder is brought into a state of maximum extension from the final state of the second step. Finally, in the fourth step of scraping up the compressed and crushed garbage in the input box toward the opening of the storage box, the rod of the packing cylinder is brought into the fully extended state from the final state of the third step. The garbage placed in the input box is compressed and crushed and pushed into the storage box.

ところで、この塵芥積込み装置は、プレスシリ
ンダの作動に伴うプレスプレートの回動により塵
芥を圧縮圧潰し、かつプレスシリンダの基端をリ
ンクに取付けて収容箱への押込み時におけるプレ
スプレートの回動角度を増大させたので、塵芥の
収容量を大幅に増大することができ、有効性の高
いものである。
By the way, this garbage loading device compresses and crushes the garbage by rotating the press plate as the press cylinder operates, and the base end of the press cylinder is attached to a link to adjust the rotation angle of the press plate when pushing it into the storage box. , the amount of garbage that can be accommodated can be greatly increased, making it highly effective.

一方、収容箱内に押込み収容した塵芥を排出す
るに当たつては、まず収容箱の後部開口部に開閉
自在に設けられた投入箱のロツク締付を解除し、
その後投入箱を回動上昇させてから収容箱内の排
出板を後方に移動することにより塵芥を収容箱外
に排出する。
On the other hand, when discharging the garbage that has been pushed into the storage box, first release the lock on the input box that is provided at the rear opening of the storage box so that it can be opened and closed.
Thereafter, the input box is rotated upward and the discharge plate inside the storage box is moved rearward to discharge the garbage out of the storage box.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかし、上述した塵芥積込み装置においては、
パツカシリンダとプレスシリンダの両ロツドが最
伸長状態にあるときに塵芥排出動作が行われる
と、投入箱に投入されたがまだ収集箱に押込まれ
ておらず投入箱内に残つている塵芥は、上昇され
た投入箱から排出されずに塵芥排出動の終了後も
そのままとなるという問題があつた。
However, in the above-mentioned garbage loading device,
If the dust discharge operation is performed when both the padsuka cylinder and press cylinder rods are in the fully extended state, the dust that has been thrown into the input box but not yet pushed into the collection box and remains in the input box will rise. There was a problem in that the garbage was not discharged from the garbage disposal box and remained there even after the garbage discharge operation was completed.

よつて本発明は、上述した従来の問題点を解消
するため成されてもので、その目的とするところ
は、塵芥排出動作に当たつて投入箱を回動上昇さ
せたときに、パツカシリンダとプレスシリンダの
両ロツドが最伸長状態にあり、上昇された投入箱
に内に塵芥が残つても、これを投入箱外に確実に
排出できるようにした塵芥収集車を提供すること
にある。
Therefore, the present invention has been made to solve the above-mentioned conventional problems, and its purpose is to prevent the packing cylinder and the press from collapsing when the input box is rotated and raised during the garbage discharge operation. To provide a garbage collection vehicle in which both rods of a cylinder are in the most extended state and even if the garbage remains inside the raised charging box, it can be surely discharged outside the charging box.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的を達成するため本発明により成された
塵芥収集車は、上端が揺動自在に支持され下端が
所定軌道17を移動するように案内されたパツカ
プレート6と、該パツカプレート6の下端に上端
が回動自在に支持されたプレスプレート5と、ロ
ツド13aの伸縮により前記パツカプレート6を
上下動させるパツカシリンダ13と、ロツド15
aの伸縮により前記プレスプレート5を前記パツ
カプレート6に対して回動させて自由端を下方及
び上方に動かすプレスシリンダ15とを備え、投
入口2aから塵芥を塵芥投入箱2内へ投入する際
の第1工程で、前記プレスシリンダ15のロツド
15a及び前記パツカシリンダ13のロツド13
aが共に最伸長した状態から前記プレスシリンダ
15のロツド15aを最縮小の状態にし、塵芥投
入箱2内に投入された塵芥を圧縮圧潰する第2工
程で、前記第1工程の最終状態から前記パツカシ
リンダ13のロツド13aが最縮小しかつ前記プ
レスシリンダ15のロツド15aが僅かに伸長し
た状態にし、塵芥投入箱2内で塵芥を更に圧縮圧
潰する第3工程で、前記第2工程の最終状態から
前記プレスシリンダ15のロツド15aが最伸長
した状態にし、塵芥投入箱2内で圧縮圧潰した塵
芥を塵芥収容箱1の開口部1aへ向つてかき上げ
ていく第4工程で、前記第3工程の最終状態から
前記パツカシリンダ13のロツド13aが最伸長
した状態にするようにした塵芥積込み装置を有す
る塵芥投入箱2を塵芥収容箱1の開口部1aに傾
動上昇自在に設けてなる塵芥収集車において、前
記プレスシリンダ15のロツド15aの最伸長及
び最縮小状態をそれぞれ検出する第1及び第2の
検出手段LS−2B,LS−4と、前記パツカシリ
ンダ13のロツド13aの最伸長及び最縮小状態
をそれぞれ検出する第3及び第4の検出手段LS
−1,LS−3と、前記塵芥投入箱2の所定位置
への上昇を検出する第5の検出手段LS−10,
LS−10Bと、第1及び第2の状態への操作が
行われる手動スイツチ手段SW−4と、前記第5
の検出手段LS−10,LS−10Bが前記塵芥投
入箱2の所定位置への上昇を検出しているときの
前記手動スイツチ手段SW−4の第1の状態への
操作に応じて、前記第1及び第3の検出手段LS
−2B,LS−1が前記プレスシリンダ15及び
パツカシリンダ13のロツド15a,13aの最
伸長状態をそれぞれ検出するまで、前記プレスシ
リンダ15及びパツカシリンダ13の両ロツド1
5a,13aの同時伸長動作を行わせる回路を形
成する手段CR−12,CR−2と、前記第5の検
出手段LS−10,LS−10Bが前記塵芥投入箱
2の所定位置への上昇を検出しているときの前記
手動スイツチ手段SW−4の第2の状態への操作
に応じて、前記第2及び第4の検出手段LS−1,
LS−3が前記プレスシリンダ15及びパツカシ
リンダ13のロツド15a,13aの最縮小をそ
れぞれ検出するまで、前記プレスシリンダ15及
びパツカシリンダ13の両ロツド15a,13a
の同時縮小動作を行わせる回路を形成する手段
CR−13,CR−1と、前記シリンダ15,13
の同時動作時における前記パツカシリンダ13へ
の油圧を前記プレスシリンダ15の排出油により
供給するように油圧路を切り換えるソレノイドバ
ルブV−1,V−2とを備え、かつ前記プレスシ
リンダ15の伸長に要する油量を前記パツカシリ
ンダ13よりも小さくしたことを特徴としてい
る。
In order to achieve the above object, a garbage collection vehicle made according to the present invention includes a packer plate 6 whose upper end is swingably supported and whose lower end is guided to move on a predetermined track 17, and a packer plate 6 whose upper end is attached to the lower end of the packer plate 6. The press plate 5 is rotatably supported, the packer cylinder 13 moves the packer plate 6 up and down by the expansion and contraction of the rod 13a, and the rod 15
It is equipped with a press cylinder 15 that rotates the press plate 5 with respect to the packing plate 6 by the expansion and contraction of a, and moves the free end downward and upward. In the first step, the rod 15a of the press cylinder 15 and the rod 13 of the packer cylinder 13 are
In the second step, the rods 15a of the press cylinder 15 are brought into the most contracted state from the state in which both rods a are fully extended, and the garbage thrown into the garbage input box 2 is compressed and crushed. In the third step, the rod 13a of the packing cylinder 13 is minimized and the rod 15a of the press cylinder 15 is slightly expanded, and the garbage is further compressed and crushed in the garbage input box 2, from the final state of the second step. In the fourth step, the rod 15a of the press cylinder 15 is fully extended, and the compressed and crushed garbage in the garbage input box 2 is scraped up toward the opening 1a of the garbage storage box 1. In a garbage collection vehicle, a garbage charging box 2 is provided in an opening 1a of a garbage storage box 1 so as to be tiltable and upward, which has a garbage loading device that allows the rod 13a of the packing cylinder 13 to be in the most extended state from the final state. First and second detection means LS-2B and LS-4 detect the most extended and most contracted states of the rod 15a of the press cylinder 15, respectively, and the most extended and most contracted states of the rod 13a of the packer cylinder 13, respectively. Third and fourth detection means LS to detect
-1, LS-3, and a fifth detection means LS-10 for detecting the rise of the garbage disposal box 2 to a predetermined position.
LS-10B, manual switch means SW-4 for operating into the first and second states, and the fifth
In response to the operation of the manual switch means SW-4 to the first state when the detection means LS-10 and LS-10B are detecting the rise of the garbage disposal box 2 to the predetermined position, 1 and 3rd detection means LS
-2B, LS-1 detects the maximum extension state of the rods 15a, 13a of the press cylinder 15 and the snapper cylinder 13, respectively.
Means CR-12, CR-2 forming a circuit for simultaneous extension operations of 5a, 13a and the fifth detection means LS-10, LS-10B prevent the garbage input box 2 from rising to a predetermined position. In response to the operation of the manual switch means SW-4 to the second state during detection, the second and fourth detection means LS-1,
Both the rods 15a, 13a of the press cylinder 15 and the packer cylinder 13 are pressed until the LS-3 detects the minimum contraction of the rods 15a, 13a of the press cylinder 15 and the packer cylinder 13, respectively.
Means for forming a circuit that performs simultaneous reduction operations of
CR-13, CR-1 and the cylinders 15, 13
includes solenoid valves V-1 and V-2 that switch the hydraulic pressure path so that the hydraulic pressure to the press cylinder 13 is supplied by the discharged oil of the press cylinder 15 during the simultaneous operation of It is characterized in that the amount of oil is smaller than that of the packing cylinder 13.

〔作用〕[Effect]

上記構成により、第5の検出手段LS−10,
LS−10Bが塵芥投入箱2の所定位置への上昇
を検出しているときに手動スイツチ手段SW−4
が第1の状態に操作されると、これに応じて、第
1及び第3の検出手段LS−2B,LS−4がプレ
スシリンダ15及びパツカシリンダ13のロツド
15a,13aの最伸長状態をそれぞれ検出する
まで、プレスシリンダ15及びパツカシリンダ1
3の両ロツド15a,13aの同時伸長動作を行
わせることができる。また、第5の検出手段LS
−10,LS−10Bが塵芥投入箱2の所定位置
への上昇を検出しているときに手動スイツチ手段
SW−4が第2の状態に操作されると、これに応
じて、第2及び第4の検出手段LS−1,LS−3
がプレスシリンダ15及びパツカシリンダ13の
ロツド15a,13aの最縮小をそれぞれ検出す
るまで、プレスシリンダ15及びパツカシリンダ
13の両ロツド15a,13aの同時縮小動作を
行わせる。従つて、投入箱2内に残つた塵芥をプ
レスプレート5によつてかき出して投入箱2外に
排出することができる。
With the above configuration, the fifth detection means LS-10,
When the LS-10B detects that the garbage disposal box 2 has risen to a predetermined position, the manual switch means SW-4
When the is operated to the first state, the first and third detection means LS-2B and LS-4 detect the maximum extension state of the rods 15a and 13a of the press cylinder 15 and the packer cylinder 13, respectively. Press cylinder 15 and Patsuka cylinder 1 until
It is possible to simultaneously extend both the three rods 15a and 13a. Further, the fifth detection means LS
-10, When the LS-10B detects the rise of the garbage disposal box 2 to the predetermined position, the manual switch means
When SW-4 is operated to the second state, the second and fourth detection means LS-1, LS-3 are activated accordingly.
Simultaneous contraction of both the rods 15a, 13a of the press cylinder 15 and the packer cylinder 13 is performed until the rods 15a, 13a of the press cylinder 15 and packer cylinder 13 are respectively detected to be at their minimum contraction. Therefore, the garbage remaining in the input box 2 can be scraped out by the press plate 5 and discharged to the outside of the input box 2.

しかも、プレスシリンダ15の伸長に要する油
量をパツカシリンダ13よりも小さくし、かつ両
シリンダ15,13の同時動作時におけるパツカ
シリンダ13への油圧をプレスシリンダ15の排
出油により供給するようにしているので、両シリ
ンダ15,13が同時に最縮小する際にプレスプ
レート5の先端が描く円弧軌跡は小さく、両シリ
ンダ15,13が同時に最縮小する際にプレスシ
リンダ15の縮小がパツカシリンダ13よりも先
に完了してプレスプレート5の先端が描く円弧軌
跡は小さくなり、両シリンダ15,13が同時に
最伸長する際にプレスシリンダ15の伸長がパツ
カシリンダ13よりも先に完了してプレスプレー
ト5の先端が描く円弧軌跡は大きくなり、かき出
し時にプレスプレート5の先端が投入箱2の内面
に接近した軌跡をとるようになつて塵芥の排出が
効果的に行われる。
Moreover, the amount of oil required to extend the press cylinder 15 is smaller than that of the press cylinder 13, and the hydraulic pressure to the press cylinder 13 when both cylinders 15 and 13 are operated simultaneously is supplied by the oil discharged from the press cylinder 15. , when both cylinders 15 and 13 are simultaneously minimized, the arc locus drawn by the tip of press plate 5 is small, and when both cylinders 15 and 13 are simultaneously minimized, press cylinder 15 completes its contraction before Patsuka cylinder 13. As a result, the arc locus drawn by the tip of the press plate 5 becomes smaller, and when both cylinders 15 and 13 simultaneously reach the maximum extension, the extension of the press cylinder 15 is completed before the pad cylinder 13, and the arc drawn by the tip of the press plate 5 becomes smaller. The trajectory becomes larger, and the tip of the press plate 5 follows a trajectory closer to the inner surface of the input box 2 during scraping, so that garbage can be effectively discharged.

〔実施例〕〔Example〕

以下本発明による装置の実施例を図面に基づい
て説明するが、図中同一の部材には同一符号を付
してある。
Embodiments of the apparatus according to the present invention will be described below based on the drawings, in which the same members are denoted by the same reference numerals.

第1図は本発明による塵芥収集車を示し、塵芥
収集車Aの車台aに収容箱1が搭載されている。
そして収容箱1の後方開口部には投入箱2が連接
され、投入箱2内には塵芥積込み装置の第2図乃
至第5図に示すような機構部が収納されている。
FIG. 1 shows a garbage collection vehicle according to the present invention, in which a storage box 1 is mounted on a chassis a of the garbage collection vehicle A.
A charging box 2 is connected to the rear opening of the storage box 1, and a mechanical part of the garbage loading device as shown in FIGS. 2 to 5 is housed within the charging box 2.

図において、投入箱2は、収容箱1の後部にピ
ン3により傾動可能に連接されており、通常、収
容箱1の後方開口部1aに連通するように自動ロ
ツク装置54によつて図示の状態に保持されてい
る。
In the figure, the input box 2 is tiltably connected to the rear part of the storage box 1 by a pin 3, and is normally locked in the illustrated state by an automatic locking device 54 so as to communicate with the rear opening 1a of the storage box 1. is maintained.

また、上記投入箱2は、後方に塵芥投入口2a
が設けられると共に円弧面2b1及び2b2が連続形
成された底部2bを有し、該投入箱2内には、塵
芥を圧縮圧潰し、収容箱1内に押込む塵芥積込み
装置の機構部が収納されている。
The input box 2 also has a garbage input port 2a at the rear.
is provided, and has a bottom portion 2b in which circular arc surfaces 2b 1 and 2b 2 are continuously formed, and inside the input box 2 is a mechanical part of a garbage loading device that compresses and crushes the garbage and pushes it into the storage box 1. It is stored.

また第2図において、5は投入箱2の両側壁内
面に接する横巾を有するプレスプレートで、該プ
レート5の上端に平板状にして、プレスプレート
5と同一巾を有するパツカプレート6の下端が軸
7により互に回動自在に連結されている。
Further, in FIG. 2, reference numeral 5 denotes a press plate having a width that touches the inner surfaces of both side walls of the input box 2. A flat plate is attached to the upper end of the plate 5, and the lower end of a press plate 6 having the same width as the press plate 5 is attached to the shaft. 7, they are rotatably connected to each other.

而して、上記パツカプレート6の上下両側端
は、投入口2aの上方において投入箱2の両側壁
内面に上下に離隔して夫々基端が軸支された一対
づつの第1リンク8、第2リンク9の先端と軸1
0,11により回動自在に連結されると共に、上
記軸10には、投入箱2の下方に設けた軸12に
基端を揺動自在に軸支されたパツカシリンダ13
のロツド13aの先端が回動自在に連結されてい
る。
The upper and lower ends of the packer plate 6 are connected to a pair of first links 8 and a pair of second links whose base ends are pivotally supported on the inner surfaces of both side walls of the input box 2 above the input opening 2a and spaced apart vertically. Tip of link 9 and shaft 1
A pack cylinder 13 is rotatably connected to the shaft 10 by 0 and 11, and its base end is rotatably supported by a shaft 12 provided below the input box 2.
The tip of the rod 13a is rotatably connected.

また、上記第1リンク8にはパツカプレート6
との連結軸10と変位を介して設けた軸14に
プレスシリンダ15の基端が揺動自在に連結さ
れ、該シリンダ15のロツド15aの先端が上記
プレスプレート5の中央部に設けた軸16に回動
自在に連結されている。
Further, the first link 8 has a patch plate 6.
The base end of a press cylinder 15 is swingably connected to a shaft 14 provided through displacement with a connecting shaft 10, and the tip of a rod 15a of the cylinder 15 connects to a shaft 16 provided in the center of the press plate 5. is rotatably connected to.

17は上記プレスプレート5とパツカプレート
6との連結軸7に設けたローラ(図示せず)のガ
イドレールであり、18は収容箱1の開口部1a
の上方を遮蔽する遮蔽板である。
17 is a guide rail for a roller (not shown) provided on the connecting shaft 7 between the press plate 5 and the packing plate 6; 18 is a guide rail for a roller (not shown);
This is a shielding plate that shields the upper part of the

而して、上記パツカプレート6の上下を連結す
る第1,第2の各リンク8,9の基端軸支点は、
パツカプレート6の前面が遮蔽板18の下端と一
定の間隙を保ちながら移動しうるように設定され
ている。
Therefore, the base end shaft fulcrum of each of the first and second links 8 and 9 connecting the upper and lower parts of the above-mentioned Patchka plate 6 is as follows.
The front surface of the cover plate 6 is configured to be movable while maintaining a constant gap from the lower end of the shielding plate 18.

次に、第2図〜第5図により塵芥積込み装置の
機構部の作動行程について説明する。
Next, the operation process of the mechanical part of the garbage loading device will be explained with reference to FIGS. 2 to 5.

投入口2aから塵芥を投入箱2内へ投入する第
1行程では、第2図に示すように、プレスシリン
ダ15のロツド15aとパツカシリンダ13のロ
ツド13aが共に最伸長した状態から第3図に示
すようにプレスシリンダ15のロツド15aは最
縮小の状態に、またパツカシリンダ13のロツド
13aは最伸長の状態にし、この行程の終了時に
おいてプレスプレート5は略水平状態に保持され
ると共に、パツカプレート6は最上昇の位置に保
持される。
In the first step of inputting garbage into the input box 2 from the input port 2a, the rod 15a of the press cylinder 15 and the rod 13a of the packer cylinder 13 are both in the fully extended state as shown in FIG. 3, as shown in FIG. As shown, the rod 15a of the press cylinder 15 is in the most contracted state, and the rod 13a of the packer cylinder 13 is in the most extended state, and at the end of this stroke, the press plate 5 is held in a substantially horizontal state, and the packer plate 6 is in the most extended state. It is held in the highest position.

次いで、投入された塵芥の圧縮圧潰しのための
第2行程では、第3図〜第4図に示すように、パ
ツカシリンダ13を作動してロツド13aを縮小
させると、パツカプレート6は第1,第2の各リ
ンク8,9の反時計方向の回動によりガイドレー
ル17に沿つて降下すると共に、プレスプレート
5も略水平状態で降下し、投入箱2の底部2bと
の間で塵芥を包み込むようにして圧縮圧潰してゆ
くが、このときパツカシリンダ13のロツド13
aの半縮小状態においてはプレスシリンダ15を
作動してロツド15aを若干伸長せしめている。
Next, in the second step for compressing and crushing the input garbage, as shown in FIGS. 3 and 4, when the packer cylinder 13 is operated to reduce the rod 13a, the packer plate 6 is moved to the first and second stages. The counterclockwise rotation of the links 8 and 9 of 2 causes the press plate 5 to descend along the guide rail 17, and the press plate 5 also descends in a substantially horizontal state, so as to enclose the garbage between it and the bottom 2b of the input box 2. At this time, the rod 13 of the packing cylinder 13
In the semi-reduced state of a, the press cylinder 15 is operated to slightly extend the rod 15a.

次いで、投入箱2内で塵芥を更に圧縮圧潰する
ための第3行程では、第4図〜第5図に示すよう
に、プレスシリンダ15のロツド15aを最伸長
状態にすると、プレスプレート5はパツカプレー
ト6との連結軸7の回りに時計方向に回動する。
Next, in the third step for further compressing and crushing the garbage in the input box 2, as shown in FIGS. 4 and 5, when the rod 15a of the press cylinder 15 is brought to the maximum extension state, the press plate 5 is moved to the compressor plate. It rotates clockwise around a connecting shaft 7 with 6.

したがつて、プレスプレート5の先端縁は投入
箱2の底部円弧面2b1に摺接しつつ回動して塵芥
を(プレスプレート5と)円弧面2b2の間で圧縮
圧潰する。
Therefore, the tip edge of the press plate 5 rotates while slidingly contacting the bottom arcuate surface 2b1 of the input box 2, compressing and crushing the garbage between the press plate 5 and the arcuate surface 2b2 .

続く第4行程では、プレスシリンダ15のロツ
ド15aが最伸長状態になつた後にパツカシリン
ダ13を作動してロツド13aを伸長させてパツ
カプレート6は第1,第2の各リンク8,9の時
計方向の回動によりガイドレール17に沿つて上
昇する。
In the subsequent fourth stroke, after the rod 15a of the press cylinder 15 reaches the maximum extension state, the locking cylinder 13 is operated to extend the rod 13a, and the locking plate 6 moves the first and second links 8 and 9 in the clockwise direction. The rotation moves it upward along the guide rail 17.

したがつて、プレスプレート5の先端縁は投入
箱2の底部円弧面2b2に摺接しつつ上昇し、圧縮
圧潰した塵芥を開口部1aへ向つてかき上げてゆ
く。この第4行程の終了時では、第2図に示すよ
うにパツカシリンダ13のロツド13aが最伸長
の状態となり、プレスプレート5により塵芥を収
容箱1内へ押込み、開口部1aを閉塞する。
Therefore, the leading edge of the press plate 5 rises while slidingly contacting the bottom arcuate surface 2b2 of the input box 2, and scrapes up the compressed and crushed garbage toward the opening 1a. At the end of this fourth stroke, the rod 13a of the packer cylinder 13 is at its maximum extension as shown in FIG. 2, and the press plate 5 pushes the garbage into the storage box 1, closing the opening 1a.

而して、この状態で収集車は走行し、次の収集
場所においてプレスシリンダ15を作動してロツ
ド15aを最縮小状態になし、プレスプレート5
を略水平状態に引き上げ、再び上記各行程により
塵芥を積込むものである。
In this state, the collection vehicle travels, and at the next collection location, the press cylinder 15 is operated to bring the rod 15a to the minimum contracted state, and the press plate 5 is
is raised to a substantially horizontal position, and garbage is loaded again through each of the above steps.

再び第1図に戻り説明すると、投入箱2内に収
納されている塵芥積込み装置の機構部によつて積
込まれた塵芥によつて一杯になつた収容箱1から
塵芥を排出する場合には、まず投入箱2を軸3に
ついて傾動上昇させるが、このために基端が収容
箱1に回動自在に軸支したリフトシリンダ51の
ロツド51aを投入箱2に回動自在に連結してい
る。また、この投入箱2が上昇した状態で、収容
箱1内の塵芥を排出するため、収容箱1内に排出
シリンダ52によつて駆動される排出板53が収
納されている。
Returning to FIG. 1 again, when discharging garbage from the storage box 1 which is full of garbage loaded by the mechanical part of the garbage loading device stored in the input box 2, First, the loading box 2 is tilted upward about the shaft 3. For this purpose, a rod 51a of a lift cylinder 51 whose base end is rotatably supported on the storage box 1 is rotatably connected to the loading box 2. . Further, in order to discharge the garbage in the storage box 1 while the input box 2 is raised, a discharge plate 53 driven by a discharge cylinder 52 is housed in the storage box 1.

なお、投入箱2が上述のように上昇される以前
には、シリンダ73(後述)で駆動される自動ロ
ツク装置54によつて投入箱2と収容箱1が図示
の状態に完全に締付け保持されているので、上記
上昇に当つてはこの自動ロツク装置54による締
付の解除が必要である。
Note that before the input box 2 is raised as described above, the input box 2 and the storage box 1 are completely tightened and held in the state shown in the figure by the automatic locking device 54 driven by the cylinder 73 (described later). Therefore, it is necessary to release the tightening by the automatic locking device 54 in order to raise the lock.

一方、運転室b内には、パワーテイクオフ
(PTO)切換ハンドル55とスイツチパネル56
とが設けられている。スイツチパネル56は、電
源切換スイツチ、投入箱操作スイツチ、排出板操
作スイツチ、単独操作スイツチなどを有する。そ
して、投入箱2の左側には、「積込」押ボタン、
「停止」押ボタン及び「ブザー」押ボタンを有す
る積込操作盤57が、右側には(第1図では見な
えい)、「緊急停止」押ボタンからなる操作盤がそ
れぞれ取付けられている。
On the other hand, inside the driver's cab b, there is a power take-off (PTO) switching handle 55 and a switch panel 56.
and is provided. The switch panel 56 includes a power changeover switch, a loading box operation switch, a discharge plate operation switch, an individual operation switch, and the like. Then, on the left side of the input box 2, there is a "load" button,
A loading operation panel 57 having a "stop" push button and a "buzzer" push button is mounted on the right side (not visible in FIG. 1), and an operation panel consisting of an "emergency stop" push button is mounted on the right side (not visible in FIG. 1).

第6図は本発明による塵芥収集車の油圧回路を
示し、図において、61は塵芥収集車A(第1図)
のエンジン、62はPTO切換ハンドル55によ
つて接断されるPTO装置、63はギヤポンプ、
64はオイルタンク、65はサクシヨンフイル
タ、66a,66bはインラインチエツクバル
ブ、67a,67bはパイロツトオペレータチエ
ツクバルブ、68a,68bは締り付チエツクバ
ルブである。V−1〜V−7はソレノイドバル
ブ、71a,71bはリリーフバルブ、72はリ
ターンフイルタ、73は上記自動ロツク装置54
を作動する締付シリンダである。ギヤポンプ63
の作動によつて発生された油圧は、ソレノイドバ
ルブV−1〜V−7のそれぞれが有するソレノイ
ドの切換動作によりシリンダ13,15,51,
52,73に選択的に供給されて、これらのシリ
ンダが作動される。
FIG. 6 shows the hydraulic circuit of the garbage collection vehicle according to the present invention, and in the figure, 61 is the garbage collection vehicle A (FIG. 1).
, 62 is a PTO device connected and disconnected by PTO switching handle 55, 63 is a gear pump,
64 is an oil tank, 65 is a suction filter, 66a, 66b are in-line check valves, 67a, 67b are pilot operator check valves, and 68a, 68b are tightening check valves. V-1 to V-7 are solenoid valves, 71a and 71b are relief valves, 72 is a return filter, and 73 is the automatic locking device 54.
It is a tightening cylinder that operates. gear pump 63
The hydraulic pressure generated by the operation of the solenoid valves V-1 to V-7 is applied to the cylinders 13, 15, 51,
52 and 73 to operate these cylinders.

なお、ソレノイドバルブV−1はソレノイド
SOL−4及びSOL−5を有し、ソレノイドSOL
−4及びSOL−5の通電により油圧をパツカシ
リンダ13に供給してそのロツド13aをそれぞ
れ伸長及び縮小する。ソレノイドバルブV−2は
ソレノイドSOL−2及びSOL−3を有し、ソレ
ノイドSOL−2及びSOL−3の通電により油圧
をプレスシリンダ15に供給してそのロツド15
aをそれぞれ縮小及び伸長する。ソレノイドバル
ブV−3はソレノイドSOL−9及びSOL−10
を有し、排出板排出ソレノイドSOL−9及び排
出板戻しソレノイドSOL−10の通電により排
出シリンダ52に油圧を供給してそのロツドをそ
れぞれ伸長及び縮小する。ソレノイドバルブV−
4はソレノイドSOL−7及びSOL−8を有し、
ソレノイドSOL−7及びSOL−8の通電により
リフトシリンダ51に油圧を供給してそのロツド
をそれぞれ伸長及び縮小する。ソレノイドバルブ
V−5はロツク締付開ソレノイドSOL−11を
有し、該ソレノイドSOL−11の通電前ロツク
シリンダ73のロツドを縮小状態にして締付け状
態を保持する自動ロツク装置54の締付をソレノ
イドSOL−11の通電によりロツクシリンダ7
3のロツドを伸長して解除する。ソレノイドバル
ブV−6はソレノイドSOL−6を有し、該ソレ
ノイドSOL−6の通電によりパツカシリンダ1
3に供給している油圧の一部をプレスシリンダ1
5に供給してそのロツド15aを伸長する。ソレ
ノイドV−7はソレノイドSOL−12及びSOL
−13を有し、該ソレノイドSOL−12の通電
によりソレノイドバルブV−3を通じて供給され
る油圧を排出シリンダ52に供給してそのロツド
を伸長する。一方、ソレノイドSOL−13の通
電により切換わり、排出シリンダ52のロツドに
外部から加わるロツドを縮小しようとする力によ
つて上昇するシリンダ52内の油圧をリリーフバ
ルブ71bを通じて逃がすように働く。
In addition, solenoid valve V-1 is a solenoid
Has SOL-4 and SOL-5, solenoid SOL
By energizing SOL-4 and SOL-5, hydraulic pressure is supplied to the packer cylinder 13 to extend and contract the rod 13a, respectively. The solenoid valve V-2 has solenoids SOL-2 and SOL-3, and when the solenoids SOL-2 and SOL-3 are energized, hydraulic pressure is supplied to the press cylinder 15 to press the rod 15.
Shrink and expand a, respectively. Solenoid valve V-3 is solenoid SOL-9 and SOL-10
By energizing the discharge plate discharge solenoid SOL-9 and the discharge plate return solenoid SOL-10, hydraulic pressure is supplied to the discharge cylinder 52 to extend and contract the rod, respectively. Solenoid valve V-
4 has solenoids SOL-7 and SOL-8,
By energizing the solenoids SOL-7 and SOL-8, hydraulic pressure is supplied to the lift cylinder 51 to extend and contract the rod, respectively. The solenoid valve V-5 has a lock tightening/opening solenoid SOL-11, and before the solenoid SOL-11 is energized, the lock cylinder 73 rod is contracted and the automatic locking device 54 that maintains the tightened state is tightened by the solenoid. Lock cylinder 7 is locked by energizing SOL-11.
Extend and release the rod in step 3. The solenoid valve V-6 has a solenoid SOL-6, and when the solenoid SOL-6 is energized, the Patsuka cylinder 1
A part of the hydraulic pressure supplied to press cylinder 1 is transferred to press cylinder 1.
5 and extend the rod 15a. Solenoid V-7 is solenoid SOL-12 and SOL
-13, and when the solenoid SOL-12 is energized, hydraulic pressure supplied through the solenoid valve V-3 is supplied to the discharge cylinder 52 to extend the rod. On the other hand, it is switched by energizing the solenoid SOL-13, and acts to release the hydraulic pressure inside the cylinder 52, which increases due to the force applied to the rod of the discharge cylinder 52 from the outside to reduce the rod, through the relief valve 71b.

第7図は本発明による塵芥収集車の電気回路を
示し、図中LS−1〜LS−13は塵芥収集車Aの
各所に設けられたマイクロスイツチである。マイ
クロスイツチLS−1,LS−2A,LS−2Bは第
8図及び第9図に示すように、パツカプレート6
に取付けられ、プレスプレート5にリンク81に
よつて連動された作動レバー82によつて切換え
られるようになつていて、マイクロスイツチLS
−1は塵芥積込時及び投入箱上昇時においてプレ
スシリンダ15のロツド15aの縮みを検出する
ために使用され、マイクロスイツチLS−2A,
LS−2Bは塵芥積込時においてプレスシリンダ
15の伸びを検出するために使用される。
FIG. 7 shows the electric circuit of the garbage collection vehicle according to the present invention, and in the figure, LS-1 to LS-13 are micro switches provided at various locations in the garbage collection vehicle A. The micro switches LS-1, LS-2A, and LS-2B are connected to the switch plate 6 as shown in Figures 8 and 9.
The micro switch LS
Micro switch LS-2A,
LS-2B is used to detect the elongation of the press cylinder 15 when loading garbage.

マイクロスイツチLS−3〜LS−5は投入箱2
の左側に取付けられ、パツカプレート6を支えて
いる第2のリンク9に連動して回動して作動カム
83によつて切換えられているようになつてい
て、マイクロスイツチLS−5はプレスシリンダ
15のロツド15aの伸び始めの位置を検出する
ため、マイクロスイツチLS−4は塵芥積込時及
び投入箱上昇時にパツカシリンダ13のロツド1
3aの伸びを検出するため、及びマイクロスイツ
チLS−3はパツカシリンダ13のロツド13a
の縮みを検出するためにそれぞれ使用される。
Micro switches LS-3 to LS-5 are in input box 2
The micro switch LS-5 is attached to the left side of the press cylinder 15, rotates in conjunction with the second link 9 supporting the press cylinder 6, and is switched by an operating cam 83. In order to detect the position where the rod 15a of the packer cylinder 13 starts to extend, the micro switch LS-4 switches the rod 1 of the packer cylinder 13 when loading garbage and when raising the loading box.
In order to detect the elongation of the rod 13a, the micro switch LS-3 is
are used to detect the shrinkage of .

マイクロスイツチLS−7は収容箱1内に設け
られ、投入箱2の降下時と上昇時において排出板
53の戻り位置でその一方の接点がオン、他方が
オフとなる。マイクロスイツチLS−10,LS−
10B,LS−11は収容箱1と投入箱2の丁番
部に取付けられ、LS−10,LS−10Bは排出
板53の作動時に投入箱2の上昇角度45°以上で
オンして角度を確認し排出板53を動作可能に、
LS−11は投入箱2の降下時にオフして自動ロ
ツク装置54の締付を動作させるためにそれぞれ
使用される。マイクロスイツチLS−13はPTO
切換ハンドル55の部分に設けられ、PTO装置
62の接時に電源をオンするためのものである。
The micro switch LS-7 is provided in the storage box 1, and when the input box 2 is lowered and raised, one contact is turned on and the other is turned off at the return position of the discharge plate 53. Micro switch LS-10, LS-
10B and LS-11 are attached to the hinges of storage box 1 and input box 2, and when the discharge plate 53 is activated, LS-10 and LS-10B are turned on when input box 2 is at an upward angle of 45° or more, and the angle is changed. Check and make the discharge plate 53 operable.
LS-11 is turned off when the input box 2 is lowered, and is used to operate the automatic locking device 54. Micro switch LS-13 is PTO
It is provided at the switching handle 55 and is used to turn on the power when the PTO device 62 is connected.

PB−1〜PB−4は押釦スイツチであり、これ
らは「緊急停止」、「停止」、「積込」及び「ブザ
ー」の押ボタンによつてそれぞれ操作される。
SW−1〜SW−4は3位置トグルスイツチであ
り、これらは運転室内のスイツチパネル56の電
源切換、投入箱操作、排出板操作、単独操作の各
スイツチにそれぞれ対応している。なお、スイツ
チSW−1を除き他のスイツチは手動操作力を加
えているときのみ切換えられ手を離すと中立位置
に戻るようになつている。
PB-1 to PB-4 are push button switches, which are operated by push buttons for "emergency stop", "stop", "loading" and "buzzer", respectively.
SW-1 to SW-4 are three-position toggle switches, which respectively correspond to the power changeover, input box operation, discharge plate operation, and single operation switches on the switch panel 56 in the driver's cab. It should be noted that the other switches, except for switch SW-1, are switched only when manual operation force is applied, and return to the neutral position when the hand is released.

CR−1〜CR−13はコントロールリレーであ
り、これらのリレーの常開、常閉接点を同一の符
号で指示している。T−1〜T−6はタイマで、
通電により起動後各タイマについて予め設定した
時間経過した時点で同一符号で指示した接点をオ
ンし、その状態を通電がなくなるまで保持する。
SOL−1〜SOL−13はソレノイドであり、ソ
レノイドSOL−1はエンジンの回転を適正な一
定値に保つガバナ装置を働らかせるためのもの、
ソレノイドSOL−2,SOL−3はソレノイドバ
ルブV−2用、ソレノイドSOL−4,SOL−5
はソレノイドバルブV−1用、ソレノイドSOL
−6はソレノイドバルブV−6用、ソレノイド
SOL−7,SOL−8はソレノイドバルブV−4
用、ソレノイドSOL−9,SOL−10はソレノ
イドバルブV−3用、ソレノイドSOL−11は
ソレノイドバルブV−5用、ソレノイドSOL−
12,SOL−13はソレノイドバルブV−7用
のものである。そして、SOL−2,SOL−3の
通電によりプレスシリンダ15のロツド15aの
縮み、伸び動作、SOL−4,SOL−5の通電に
よりパツカシリンダ13のロツド13aの縮み、
伸び動作、SOL−7,SOL−8の通電により投
入箱2の上昇、降下動作、SOL−9,SOL−1
0の通電により排出板53の排出、戻し動作、及
びSOL−11の通電により自動ロツク装置54
の締付開動作をそれぞれ行い、SOL−12の通
電により排出板53の排出動作を可能にし、
SOL−13の通電により排出板53の自動戻り
を可能にする。
CR-1 to CR-13 are control relays, and the normally open and normally closed contacts of these relays are designated by the same code. T-1 to T-6 are timers,
When a preset time has elapsed for each timer after activation by energization, the contacts indicated by the same symbols are turned on, and this state is maintained until the energization is removed.
SOL-1 to SOL-13 are solenoids, and solenoid SOL-1 is for operating the governor device to keep the engine rotation at a constant constant value.
Solenoid SOL-2, SOL-3 is for solenoid valve V-2, solenoid SOL-4, SOL-5
is for solenoid valve V-1, solenoid SOL
-6 is for solenoid valve V-6, solenoid
SOL-7, SOL-8 are solenoid valve V-4
Solenoid SOL-9, SOL-10 is for solenoid valve V-3, solenoid SOL-11 is for solenoid valve V-5, solenoid SOL-
12, SOL-13 is for solenoid valve V-7. Then, by energizing SOL-2 and SOL-3, the rod 15a of the press cylinder 15 contracts and extends, and by energizing SOL-4 and SOL-5, the rod 13a of the packer cylinder 13 contracts,
Extension operation, raising and lowering operation of input box 2 by energizing SOL-7 and SOL-8, SOL-9 and SOL-1
When SOL-11 is energized, the ejection plate 53 is ejected and returned, and when SOL-11 is energized, the automatic locking device 54 is activated.
perform the tightening and opening operations respectively, and enable the ejection operation of the ejection plate 53 by energizing SOL-12,
The automatic return of the discharge plate 53 is enabled by energizing SOL-13.

なお、D−1〜D23は電流の流れる方向を規
制するダイオード、Fはヒユーズ、BZはブザー、
PLはパイロツトランプである。
In addition, D-1 to D23 are diodes that regulate the direction of current flow, F is a fuse, BZ is a buzzer,
PL is a pilot lamp.

以上のような油圧回路及び電気回路を備える本
発明による塵芥収集車について、以下その動作を
第10図及び第11図のタイムチヤートを参照し
ながら説明する。
The operation of the garbage collection vehicle according to the present invention, which is equipped with the above-mentioned hydraulic circuit and electric circuit, will be described below with reference to time charts shown in FIGS. 10 and 11.

今、パツカプレート6及びプレスプレート5が
第2図に示すような位置にあつてパツカシリンダ
13のロツド13a及びプレスシリンダ15のロ
ツド15aが共に最伸長状態にあるとする。この
とき、マイクロスイツチLS−1〜LS−5は第1
0図に示すような状態にある。
It is now assumed that the packer plate 6 and the press plate 5 are in the positions shown in FIG. 2, and the rod 13a of the packer cylinder 13 and the rod 15a of the press cylinder 15 are both in the most extended state. At this time, micro switches LS-1 to LS-5 are
The situation is as shown in Figure 0.

このような状態において、積込み動作を行わせ
るに当つてPOT切換レバー55を「接」にした
後電源スイツチであるトグルスイツチSW−1を
「積込」側に倒し、続いて積込押ボタンPB−3を
押圧すると、上記TPO切換レバー55によりま
ずマイクロスイツチLS−13が開から閉になり、
リレーCR−2、リレーCR−12が通電する。ま
た、このスイツチSW−1の切換えと押ボタン
PB−3の操作により、リレーCR−3も通電す
る。そして、リレーCR−3の通電によりリレー
CR−5が通電する。
In such a state, to perform the loading operation, after turning the POT switching lever 55 to "on", turn the power switch, toggle switch SW-1, to the "loading" side, and then press the loading pushbutton PB. When -3 is pressed, the TPO switching lever 55 first changes the micro switch LS-13 from open to closed.
Relay CR-2 and relay CR-12 are energized. In addition, the switching and push button of this switch SW-1
By operating PB-3, relay CR-3 is also energized. Then, by energizing relay CR-3, the relay
CR-5 is energized.

このリレーCR−5の通電により、ガバナソレ
ノイドSOL−1が通電すると共に、プレス縮ソ
レノイドSOL−2が通電してプレスシリンダ1
5のロツド15aが縮み動作する。なお、このと
き、タイマT−1にも通電してその起動が行われ
る。タイマT−1はその起動から約1秒後に接点
がオンする。
By energizing relay CR-5, governor solenoid SOL-1 is energized and press contraction solenoid SOL-2 is energized to press cylinder 1.
The rod 15a of No. 5 is retracted. Note that at this time, timer T-1 is also energized and activated. The contact of timer T-1 turns on approximately 1 second after its activation.

上述のようにプレスシリンダ15のロツド15
aが縮められると、それまでオンとなつていたマ
イクロスイツチLS−2A,LS−2Bがオフとな
る。そして、プレスシリンダ15のロツド15a
の縮みによつて、プレスプレート5が移動される
第1行程の反転動作が行われてついには第3図に
示すような状態となり、これに応じてマイクロス
イツチLS−1が開から閉になる。
As mentioned above, the rod 15 of the press cylinder 15
When a is shortened, microswitches LS-2A and LS-2B, which had been on until then, are turned off. Then, the rod 15a of the press cylinder 15
Due to the contraction of the press plate 5, the reversal operation of the first stroke is performed, and finally the state shown in Fig. 3 is reached, and accordingly, the micro switch LS-1 changes from open to closed. .

このマイクロスイツチLS−1の閉により、該
スイツチを通じてリレーCR−1に通電が行われ
る。このリレーCR−1の通電によりリレーCR−
6が通電し、かつリレーCR−6の通電によりリ
レーCR−7が通電すると共にリレーCR−5の通
電がなくなる。また、上記リレーCR−1の通電
によりプレス縮ソレノイドSOL−2の通電がな
くなり、かつリレーCR−7の通電によりパツカ
縮ソレノイドSOL−4が通電してパツカシリン
ダ13のロツド13aの縮み動作が行われる。
By closing this microswitch LS-1, relay CR-1 is energized through this switch. By energizing this relay CR-1, relay CR-
When relay CR-6 is energized, relay CR-7 is energized and relay CR-5 is de-energized. Further, the energization of the relay CR-1 de-energizes the press compression solenoid SOL-2, and the energization of the relay CR-7 energizes the packer compression solenoid SOL-4, causing the rod 13a of the packer cylinder 13 to retract. .

このロツド13aの縮み動作により、それまで
オンであつたマイクロスイツチLS−4がオフと
なり、これに応じてリレーCR−2の通電がなく
なる。このリレーCR−2の通電がなくなること
によりリレーCR−6の通電もなくなり、これに
応じてタイマT−2が通電して起動される。タイ
マT−2はその起動からパツカシリンダ13のロ
ツド13aの縮み時間より長目の約4秒後に接点
がオンする。
This retracting action of rod 13a turns off microswitch LS-4, which had been on until then, and accordingly, relay CR-2 is no longer energized. As the relay CR-2 is de-energized, the relay CR-6 is also de-energized, and in response, the timer T-2 is energized and activated. The contact of the timer T-2 turns on approximately 4 seconds after activation, which is longer than the contraction time of the rod 13a of the packer cylinder 13.

パツカシリンダ13のロツド13aの縮みが約
半分まで進むと、それまでオフであつたマイクロ
スイツチLS−5がオンし、これに応じてリレー
CR−9が通電すると共にタイマT−3が通電し
て起動する。このリレーCR−9の通電によりプ
レス伸ソレノイドSOL−3が通電してプレスシ
リンダ15のロツド15aの伸び動作が開始す
る。タイマT−3はその起動からプレスシリンダ
15のロツド15aの伸び時間より長目の約3秒
後にその接点がオンする。
When the rod 13a of the pack cylinder 13 has been compressed to about half, the micro switch LS-5, which had been off until then, turns on, and the relay
When CR-9 is energized, timer T-3 is energized and activated. The press extension solenoid SOL-3 is energized by this energization of the relay CR-9, and the extension operation of the rod 15a of the press cylinder 15 is started. The contact of the timer T-3 turns on about 3 seconds after activation, which is longer than the extension time of the rod 15a of the press cylinder 15.

この様にまずパツカシリンダ13のロツドの縮
み動作が開始し、その後プレスシリンダ15のロ
ツド15aの伸び動作が開始して以後両動作が同
時に進行する第2行程の1次圧縮動作が行われて
ついには第4図に示すような状態となるが、上記
プレスシリンダ15のロツド15aの伸び動作の
開始に応じてマイクロスイツチLS−1がオフと
なる。そして第4図の状態になると、マイクロス
イツチLS−3がオフからオンになる。
In this way, the rod of the packer cylinder 13 first begins to compress, then the rod 15a of the press cylinder 15 begins to extend, and then the primary compression operation of the second stroke in which both operations proceed simultaneously is performed, and finally The state shown in FIG. 4 is reached, and the microswitch LS-1 is turned off in response to the start of the stretching operation of the rod 15a of the press cylinder 15. When the state shown in Fig. 4 is reached, the micro switch LS-3 is turned on from off.

このマイクロスイツチLS−3のオンにより、
リレーCR−13が通電し、これに応じてリレー
CR−7とタイマT−2の通電がなくなる。そし
てリレーCR−7の通電がなくなることによりパ
ツカ縮ソレノイドSOL−4の通電がなくなつて
パツカシリンダ13のロツド13aの縮み動作が
終了する。このとき依然リレーCR−9が通電し
ているので、プレス伸ソレノイドSOL−3が通
電し続けてプレスシリンダ15のロツド15aが
伸び続ける第3行程の2次圧縮動作が行われ、つ
いには第5図の状態になる。
By turning on this micro switch LS-3,
Relay CR-13 is energized, and the relay
CR-7 and timer T-2 are de-energized. Then, as the relay CR-7 is de-energized, the packer compression solenoid SOL-4 is de-energized, and the retracting operation of the rod 13a of the packer cylinder 13 is completed. At this time, the relay CR-9 is still energized, so the press extension solenoid SOL-3 continues to be energized, and the second compression operation of the third stroke, in which the rod 15a of the press cylinder 15 continues to extend, is performed, and finally the fifth stroke. It will be in the state shown in the figure.

プレスシリンダ15のロツド15aが伸び終る
と、マイクロスイツチLS−2Aがオン、LS−2
Bがオンになる。このマイクロスイツチLS−2
AのオンによりリレーCR−10とタイマT−4
が通電し、マイクロスイツチLS−2Bのオンに
よりリレーCR−12が通電する。このリレーCR
−10の通電により、プレス伸ソレノイドSOL
−3の通電がなくなり、この代りにパツカ伸ソレ
ノイドSOL−5と自動戻りソレノイドSOL−1
3が通電してパツカシリンダ13のロツド13a
の伸び動作が開始する。
When the rod 15a of the press cylinder 15 finishes extending, the micro switch LS-2A turns on and the LS-2
B turns on. This micro switch LS-2
When A is turned on, relay CR-10 and timer T-4 are activated.
is energized, and when micro switch LS-2B is turned on, relay CR-12 is energized. This relay CR
-10 is energized, press extension solenoid SOL
-3 is no longer energized, and instead of this, Patsuka extension solenoid SOL-5 and automatic return solenoid SOL-1
3 is energized and the rod 13a of the cylinder 13 is turned on.
begins to stretch.

このパツカシリンダ13のロツド13aの伸び
により、投入箱2内の塵芥を収容箱1内に押込む
塵芥押込み動作が行われるが、このとき収容箱1
内の排出板53を駆動する排出シリンダ52のロ
ツドに力が加わり、ロツドを縮めようとする。こ
のため排出シリンダ52の油圧が上昇するが、こ
のときの油圧がリリーフ弁71bの設定圧を越え
ると、シリンダ52内の油がソレノイドバルブV
−7、リリーフ弁71bを介して流出し、このこ
とによつて排出板53の戻りが行われるようにな
る。この排出板53の戻り動作は、シリンダ52
内の油圧がリリーフ弁71bの設定圧以下となつ
たところで停止する。
Due to the extension of the rod 13a of the packer cylinder 13, a garbage pushing operation is performed to push the garbage in the input box 2 into the storage box 1.
Force is applied to the rod of the ejection cylinder 52 that drives the ejection plate 53 inside, and the rod tends to be compressed. For this reason, the oil pressure in the discharge cylinder 52 increases, but when the oil pressure at this time exceeds the set pressure of the relief valve 71b, the oil in the cylinder 52 is drained from the solenoid valve V.
-7, it flows out through the relief valve 71b, thereby allowing the discharge plate 53 to return. This return movement of the discharge plate 53 is performed by the cylinder 52.
It stops when the oil pressure inside becomes less than the set pressure of the relief valve 71b.

なお、上記タイマT−4はその通電による起動
からパツカシリンダ13のロツド13aの伸び時
間より長目の約5秒後にその接点がオンする。
The contact of the timer T-4 turns on approximately 5 seconds after activation by energization, which is longer than the extension time of the rod 13a of the packer cylinder 13.

上記パツカシリンダ13のロツド13aの伸び
に応じてマイクロスイツチLS−3がオフし、こ
のことによりリレーCR−13の通電がなくなる。
その後パツカシリンダ13のロツド13aが伸び
る第4行程の押込動作が行われ、ついには第2図
に示す状態になる。
Micro switch LS-3 is turned off in response to the extension of rod 13a of packer cylinder 13, and as a result, relay CR-13 is no longer energized.
Thereafter, a fourth stroke of pushing operation is performed in which the rod 13a of the packer cylinder 13 is extended, and finally the state shown in FIG. 2 is reached.

この第2図に示すパツカシリンダ13のロツド
13aが伸びきつた状態ではマイクロスイツチ
LS−4がオンし、これに応じてリレーCR−2が
通電する。このリレーCR−2の通電により、リ
レーCR−5が通電し、これに応じてタイマT−
1が通電する。またリレーCR−5の通電により
パツカ伸ソレノイドSOL−5の通電がなくなつ
てパツカシリンダ13のロツド13aの伸び動作
が終了し、この代りにプレス縮ソレノイドSOL
−2が通電してプレスシリンダ15のロツド15
aの縮み動作が開始する。
When the rod 13a of the packer cylinder 13 is fully extended as shown in FIG.
LS-4 is turned on, and relay CR-2 is energized accordingly. By energizing relay CR-2, relay CR-5 is energized, and timer T-
1 is energized. In addition, due to the energization of relay CR-5, the energization of the pusher extension solenoid SOL-5 is stopped, and the extension operation of the rod 13a of the pusher cylinder 13 is completed, and instead of this, the press contraction solenoid SOL
-2 is energized and the rod 15 of the press cylinder 15
The contraction movement of a starts.

このプレスシリンダ15のロツド15aの縮み
開始に応じてマイクロスイツチLS−2A,LS−
2Bがオフになり、以後プレスシリンダ15のロ
ツド15aが縮む第1行程を行い、上述の場合と
同様に次の第2行程,第3行程……と動作を繰返
し行う。
In response to the start of contraction of the rod 15a of this press cylinder 15, the micro switches LS-2A and LS-
2B is turned off, and thereafter the first stroke in which the rod 15a of the press cylinder 15 is retracted is performed, and the next second stroke, third stroke, and so on are repeated in the same manner as in the above case.

今、第4行程の終了近くで「停止」押ボタンを
操作して押釦スイツチPB−2をオフにすると、
この時点でリレーCR−12を除くリレー、タイ
マ及びソレノイドの通電がなくなり、装置の動作
が停止する。
Now, near the end of the 4th stroke, operate the "Stop" pushbutton and turn off pushbutton switch PB-2.
At this point, the relays, timers, and solenoids other than relay CR-12 are de-energized, and the operation of the device is stopped.

この動作停止時点でのマイクロスイツチの状態
で、マイクロスイツチLS−2A,LS−2Bがオ
ンで他の全てがオフであるとして、再度「積込」
押ボタンを操作して押釦スイツチPB−1を作動
したときの動作を以下に説明する。
Assuming that the micro switches LS-2A and LS-2B are on and all others are off in the state of the micro switches at the time of this operation stop, "loading" is started again.
The operation when the push button switch PB-1 is activated by operating the push button will be described below.

スイツチPB−1の作動によりまずリレーCR−
3が通電し、これに応じてリレーCR−5とタイ
マT−1が通電する。このリレーCR−5の通電
により、ガバナソレノイドSOL−1とプレス縮
ソレノイドSOL−2が通電してプレスシリンダ
15のロツド15aの縮み動作が開始する。その
後1秒経過すると、タイマT−1の接点がオンし
てリレーCR−4が通電し、これに応じてパツカ
伸ソレノイドSOL−5が通電して伸びきつてい
ないパツカシリンダ13のロツド13aの伸び動
作が行われる。
When switch PB-1 is activated, relay CR- is first activated.
3 is energized, and in response, relay CR-5 and timer T-1 are energized. By energizing relay CR-5, governor solenoid SOL-1 and press contraction solenoid SOL-2 are energized, and the rod 15a of press cylinder 15 starts to compress. After one second has elapsed, the contact of timer T-1 is turned on, relay CR-4 is energized, and in response, energization is applied to Patch Extension solenoid SOL-5, which causes the rod 13a of Patch Cylinder 13, which is not fully extended, to extend. will be held.

このパツカシリンダ13のロツド13aの伸び
動作中にプレスシリンダ15のロツド15aが縮
みきると、これに応じてマイクロスイツチLS−
1がオンし、かつこのマイクロスイツチLS−1
のオンによりリレーCR−1が通電する。このリ
レーCR−1の通電により、プレス縮ソレノイド
SOL−2の通電がなくなつてプレスシリンダ1
5のロツド15aの縮み動作が終了する。
When the rod 15a of the press cylinder 15 is completely compressed during the extension operation of the rod 13a of the packer cylinder 13, the micro switch LS-
1 is on, and this micro switch LS-1
Relay CR-1 is energized by turning on. By energizing this relay CR-1, the press contraction solenoid
SOL-2 is de-energized and press cylinder 1
The contraction operation of the rod 15a of No. 5 is completed.

そしてパツカシリンダ13のロツド13aが伸
びきると、マイクロスイツチLS−4がオンし、
これに応じてリレーCR−2が通電する。このリ
レーCR−2の通電により、リレーCR−4の通電
がなくなる代りにリレーCR−6が通電する。こ
のリレーCR−6の通電によりリレーCR−7が通
電する代りにリレーCR−5の通電がなくなつて
タイマT−1の通電もなくなる。
When the rod 13a of the locking cylinder 13 is fully extended, the micro switch LS-4 is turned on.
In response to this, relay CR-2 is energized. By energizing relay CR-2, relay CR-6 is energized instead of de-energizing relay CR-4. When relay CR-6 is energized, relay CR-7 is energized, but relay CR-5 is de-energized and timer T-1 is also de-energized.

また、上記リレーCR−7の通電によりパツカ
縮ソレノイドSOL−4が通電し、これに応じて
パツカシリンダ13のロツド13aを縮ます第2
行程が開始し、以後第3,第4,第1……と行程
を繰返し実行する。
In addition, the energization of the relay CR-7 energizes the packer contraction solenoid SOL-4, which in turn retracts the rod 13a of the packer cylinder 13.
The process starts, and thereafter the process is repeated in the order of 3rd, 4th, 1st, etc.

今、上述の第2行程の途中で塵芥によりプレー
トの動作が停止したとすると、タイマT−2の起
動から約4秒後にその接点がオンすることによ
り、リレーCR−8及びCR−10とタイマT−4
が通電する。リレーCR−8の通電によりパツカ
縮ソレノイドSOL−4、リレーCR−10の通電
によりプレス伸ソレノイドSOL−3の通電がな
くなるのに対し、リレーCR−10の通電により
パツカ伸ソレノイドSOL−5が通電すると共に
タイマT−5も通電して起動する。
Now, suppose that the operation of the plate stops due to dust in the middle of the above-mentioned second process, the contact of timer T-2 turns on approximately 4 seconds after starting, and relays CR-8 and CR-10 and timer T-2 are activated. T-4
is energized. When the relay CR-8 is energized, the press expansion solenoid SOL-4 is de-energized, and when the relay CR-10 is energized, the press extension solenoid SOL-3 is de-energized, but when the relay CR-10 is energized, the press expansion solenoid SOL-5 is energized. At the same time, timer T-5 is also energized and activated.

タイマT−5の起動後約1秒経過すると、その
接点がオンしてリレーCR−11が通電し、これ
に応じてソレノイドSOL−6が通電する。この
ソレノイドSOL−6によつてソレノイドバルブ
V−6が作動し、パツカシリンダ13への油圧の
一部がプレスシリンダ15に供給され、プレスシ
リンダ15のロツド15aの伸び動作も同時に行
われる。これはプレートの状態を第4行程の実行
後の状態にするための動作である。
When approximately one second has elapsed after the timer T-5 is activated, its contact is turned on, relay CR-11 is energized, and in response, solenoid SOL-6 is energized. This solenoid SOL-6 operates the solenoid valve V-6, and part of the hydraulic pressure to the press cylinder 13 is supplied to the press cylinder 15, and the rod 15a of the press cylinder 15 is also extended at the same time. This is an operation to bring the state of the plate to the state after execution of the fourth step.

ところで、このパツカシリンダ13のロツド1
3aの伸び動作の途中でプレートが塵芥により停
止した場合、タイマT−4の起動から約5秒後に
その接点がオンすることにより、リレーCR−5
が通電し、これに応じてタイマT−1とプレス縮
ソレノイドSOL−2が通電すると共に、パツカ
伸ソレノイドSOL−5とタイマT−5の通電が
なくなり、タイマT−5の接点がオフとなる。タ
イマT−5の接点のオフにより、ソレノイド
SOL−6の通電もなくなる。
By the way, rod 1 of this packer cylinder 13
If the plate stops due to dust during the extension operation of 3a, its contact turns on approximately 5 seconds after the start of timer T-4, and relay CR-5 is activated.
is energized, and in response, timer T-1 and press compression solenoid SOL-2 are energized, and power is removed from patch extension solenoid SOL-5 and timer T-5, and the contact of timer T-5 is turned off. . By turning off the timer T-5 contact, the solenoid
Power to SOL-6 also disappears.

上記タイマT−1の起動後約1秒後にその接点
がオンすると、リレーCR−4が通電し、これに
応じてパツカ伸ソレノイドSOL−5が通電する。
すなわち、プレスシリンダ15のロツド15aの
縮動作から約1秒後に、伸びきつていなかつたパ
ツカシリンダ13のロツド13aの伸び動作が行
われる。そしてプレスシリンダ15のロツド15
aが縮みきり、マイクロスイツチLS−1がオン
してリレーCR−1が通電し、これに応じてプレ
ス縮ソレノイドSOL−2の通電がなくなる。
Approximately 1 second after the timer T-1 is started, its contact is turned on, relay CR-4 is energized, and in response, Patch extension solenoid SOL-5 is energized.
That is, about one second after the rod 15a of the press cylinder 15 is retracted, the rod 13a of the packer cylinder 13, which has not been fully extended, is extended. And the rod 15 of the press cylinder 15
When a is completely compressed, the micro switch LS-1 is turned on and the relay CR-1 is energized, and in response, the press contraction solenoid SOL-2 is de-energized.

その後パツカシリンダ13のロツド13aが伸
びきると、第1行程の終了状態となりマイクロス
イツチLS−4がオンし、これに応じてリレーCR
−2が通電する。
After that, when the rod 13a of the locking cylinder 13 is fully extended, the first stroke is completed and the micro switch LS-4 is turned on, and in response, the relay CR is turned on.
-2 is energized.

リレーCR−2がオンするとリレーCR−6が通
電する代りにリレーCR−4とパツカ伸ソレノイ
ドSOL−5の通電がなくなる。そしてリレーCR
−6が通電するとリレーCR−8,CR−9及び
CR−10の通電がなくなる。このリレーCR−8
の通電がなくなることに応じてパツカ縮ソレノイ
ドSOL−4が通電して第2行程におけるパツカ
シリンダ13のロツド13aの縮み動作が開始す
る。
When relay CR-2 is turned on, relay CR-6 is energized, but relay CR-4 and Patsuka extension solenoid SOL-5 are de-energized. and relay CR
-6 is energized, relays CR-8, CR-9 and
CR-10 loses power. This relay CR-8
In response to the de-energization, the packer contraction solenoid SOL-4 is energized and the retracting operation of the rod 13a of the packer cylinder 13 in the second stroke begins.

上記第2行程の終了後第3行程を行つている途
中でプレスプレートが塵芥によつてその移動を停
止すると、タイマT−3の起動後約3秒経過した
時点でその接点がオンすることにより、リレー
CR−10が通電すると共にタイマT−4が起動
する。そしてリレーCR−10の通電によりパツ
カ伸ソレノイドSOL−5とタイマT−5が通電
し、パツカ伸ソレノイドSOL−5の通電により
パツカシリンダ13のロツド13aの伸び動作が
開始する。タイマT−5は約1秒後にその接点が
オンしてリレーCR−11を通電し、これに応じ
てソレノイドSOL−6が通電する。
If the press plate stops moving due to dust during the third step after the end of the second step, the contact will turn on approximately 3 seconds after the start of timer T-3. ,relay
When CR-10 is energized, timer T-4 is activated. Then, the energization of the relay CR-10 energizes the pucker extension solenoid SOL-5 and the timer T-5, and the energization of the pucker extension solenoid SOL-5 starts the extension operation of the rod 13a of the pucker cylinder 13. After about one second, the contact of timer T-5 is turned on, energizing relay CR-11, and in response, solenoid SOL-6 is energized.

このソレノイドSOL−6の通電によりプレス
シリンダ15に油圧が供給されてそのロツド15
aが伸び動作を行い、その伸び動作が終る第4行
程の終了時点でマイクロスイツチLS−2A及び
LS−2Bがそれぞれオンとなり、これに応じて
リレーCR−11、ソレノイドSOL−6及びタイ
マT−5の通電がなくなる。ソレノイドSOL−
6の通電がなくなることにより、プレスシリンダ
15への油圧の供給がなくなる。
By energizing this solenoid SOL-6, hydraulic pressure is supplied to the press cylinder 15, and the rod 15 is
a performs an extension action, and at the end of the fourth stroke when the extension action ends, the micro switch LS-2A and
LS-2B is turned on, and accordingly relay CR-11, solenoid SOL-6 and timer T-5 are de-energized. Solenoid SOL−
6 is no longer energized, hydraulic pressure is no longer supplied to the press cylinder 15.

その後パツカシリンダ13のロツド13aの伸
びが進行し、ロツド13aが伸びきると、マイク
ロスイツチLS−4がオンとなり、これに応じて
リレーCR−2が通電する。このリレーCR−2の
通電により、リレーCR−5とプレス縮ソレノイ
ドSOL−2が通電し、タイマT−1が起動する
と共にプレスシリンダ15のロツド15aの縮み
動作が開始する。すなわち第1行程が開始する。
以後第2,第3,第4行程……と各行程を順番に
繰返して行う。
Thereafter, the extension of the rod 13a of the packer cylinder 13 progresses, and when the rod 13a is fully extended, the micro switch LS-4 is turned on, and in response, the relay CR-2 is energized. By energizing relay CR-2, relay CR-5 and press contraction solenoid SOL-2 are energized, timer T-1 is started, and rod 15a of press cylinder 15 starts to compress. That is, the first process starts.
Thereafter, the second, third, fourth steps, etc. are repeated in order.

続いて、収容箱1に収容した塵芥を排出すると
きの動作を説明する。
Next, the operation when discharging the garbage stored in the storage box 1 will be explained.

まず排出動作を行わせるためPTO切換レバー
55を接にし、その後スイツチSW−1を「排
出」側に倒す。このときプレスシリンダ15のロ
ツド15aが最縮小状態になく、すなわち縮みき
つておらず、かつパツカシリンダ13のロツド1
3aが最伸長状態になく、すなわち伸びきつてい
ないとすると、マイクロスイツチLS−1,LS−
2B,LS−3及びLS−4は共にオフになつてい
てリレーCR−1,CR−2,CR−12及びCR−
13は共に通電していない。
First, the PTO switching lever 55 is brought into contact to perform the ejection operation, and then the switch SW-1 is turned to the "ejection" side. At this time, the rod 15a of the press cylinder 15 is not in the most contracted state, that is, it is not fully compressed, and the rod 15a of the packer cylinder 13 is
If 3a is not in the fully extended state, that is, it is not fully extended, the micro switches LS-1 and LS-
2B, LS-3 and LS-4 are all off and relays CR-1, CR-2, CR-12 and CR-
13 are not energized.

このような状態でスイツチSW−2を「上昇」
側に倒すと、タイマT−6、排出ソレノイド
SOL−9、締付開ソレノイドSOL−11が通電
する。このソレノイドSOL−11の通電により、
投入箱2のロツクが外れて上昇可能となる。ま
た、タイマT−6はその起動から約1秒後にその
接点がオンする。このタイマT−6の接点のオン
によりリレーCR−11が通電し、これに応じて
上昇ソレノイドSOL−7が通電してリフトシリ
ンダ51に油圧を供給し、そのロツドを伸長して
投入箱2を上昇する。
In this state, switch SW-2 is set to “up”
When tilted to the side, timer T-6 and discharge solenoid
SOL-9 and tightening/opening solenoid SOL-11 are energized. By energizing this solenoid SOL-11,
The input box 2 is unlocked and can be raised. Further, the contact of timer T-6 is turned on approximately 1 second after its activation. When the contact of timer T-6 is turned on, relay CR-11 is energized, and in response, lift solenoid SOL-7 is energized to supply hydraulic pressure to lift cylinder 51, which extends the rod and opens loading box 2. Rise.

なお、上記排出ソレノイドSOL−9の通電は、
ソレノイドバルブV−7において油路をブロツク
することにより、自動ロツク装置54のシリンダ
73に大きな油圧を供給し、ロツクの確実な解除
を可能にするためのものであるが、これは上述の
タイマT−6による約1秒のタイマ時間後になく
なる。
In addition, the energization of the above discharge solenoid SOL-9 is as follows:
By blocking the oil passage in the solenoid valve V-7, a large hydraulic pressure is supplied to the cylinder 73 of the automatic locking device 54, and the lock can be reliably released. -6 will disappear after about 1 second timer time.

この投入箱2の上昇開始により、マイクロスイ
ツチLS−11がオンする。また投入箱2が45゜以
上の所定位置まで上昇するとマイクロスイツチ
LS−10,LS−10Bがオンする。所定位置ま
で投入箱2が上昇したところでスイツチSW−2
の操作を止めると、スイツチSW−2は中立位置
に戻る。
As the input box 2 starts to rise, the micro switch LS-11 is turned on. Also, when the input box 2 rises to a predetermined position of 45 degrees or more, the micro switch is activated.
LS-10 and LS-10B turn on. When the input box 2 has risen to the specified position, switch SW-2
When the operation is stopped, switch SW-2 returns to the neutral position.

以上の状態で、スイツチSW−4をプレス伸及
びパツカ伸側に倒すと、プレス伸ソレノイド
SOL−3とパツカ伸ソレノイドSOL−5が通電
してプレスシリンダ15のロツド15aとパツカ
シリンダ13のロツド13aの伸び動作が同時に
行われ、プレスシリンダ15のロツド15aが伸
びきるとマイクロスイツチLS−2Bがオンして
リレーCR−12が通電し、パツカシリンダ13
のロツド13aが伸びきるとマイクロスイツチ
LS−4がオンしてリレーCR−2が通電する。
In the above condition, when switch SW-4 is tilted to the press extension and patch extension side, the press extension solenoid will be activated.
When the SOL-3 and the pin extension solenoid SOL-5 are energized, the rod 15a of the press cylinder 15 and the rod 13a of the pin cylinder 13 are extended simultaneously, and when the rod 15a of the press cylinder 15 is fully extended, the micro switch LS-2B is turned on. Then, relay CR-12 is energized, and Patsuka cylinder 13
When the rod 13a is fully extended, the micro switch
LS-4 turns on and relay CR-2 is energized.

このリレーCR−12,CR−2の通電によりプ
レス伸ソレノイドSOL−3、パツカソレノイド
SOL−5の通電がなくなり、各シリンダの伸び
動作が終了する。この状態は第4行程すなわち押
込動作を終つた状態であり、このときマイクロス
イツチLS−1,LS−3は共にオフとなつてい
る。
By energizing these relays CR-12 and CR-2, the press expansion solenoid SOL-3 and the press expansion solenoid
SOL-5 is no longer energized and the extension operation of each cylinder is completed. This state is the state where the fourth stroke, that is, the pushing operation has been completed, and at this time, both microswitches LS-1 and LS-3 are off.

このような状態で今度スイツチSW−4をプレ
ス縮及びパツカ縮側に倒すと、プレス縮ソレノイ
ドSOL−2とパツカ縮ソレノイドSOL−4が通
電しプレスシリンダ15とパツカシリンダ13の
両ロツドの縮み動作が同時に行われる。そしてプ
レスシリンダ15のロツド15aが縮みきるとマ
イクロスイツチLS−1がオンしてリレーCR−1
が通電し、パツカシリンダ13のロツド13aが
縮みきるとマイクロスイツチLS−3がオンして
リレーCR−13が通電する。この両リレーCR−
1,CR−13の通電により、プレス縮ソレノイ
ドSOL−2、パツカ縮ソレノイドSOL−4の通
電がなくなり、各シリンダの縮み動作が終了す
る。
In this state, when the switch SW-4 is next turned to the press compression and patch compression sides, the press compression solenoid SOL-2 and the patch compression solenoid SOL-4 are energized, and both the press cylinder 15 and patch cylinder 13 are compressed. done at the same time. When the rod 15a of the press cylinder 15 is completely compressed, the micro switch LS-1 is turned on and the relay CR-1 is turned on.
is energized, and when the rod 13a of the packer cylinder 13 is completely retracted, the micro switch LS-3 is turned on and the relay CR-13 is energized. Both relays CR−
1. By energizing CR-13, the press contraction solenoid SOL-2 and the pack compression solenoid SOL-4 are de-energized, and the contraction operation of each cylinder is completed.

なお、上述のプレスシリンダ15及びパツカシ
リンダ13のロツドの同時伸長及び縮小時におい
て、パツカシリンダ13への油圧が第6図の油圧
回路から明らかなようにプレスシリンダ15の排
出油によつて供給される。このような状態で、プ
レスシリンダ15のロツド15aを伸縮するのに
要する油量がパツカシリンダ13のロツド13a
を伸縮するのに要する油量より小さくすると、両
シリンダ15,13の縮小時のプレスプレート5
の軌跡が第12図にXで示すように投入箱2の底
部2bの円弧面2b2から離れているのに対し、両
シリンダ15,13の伸長時の軌跡は同図にYで
示すように円弧面2b2に接近するようになり、投
入箱2の上昇時に投入箱2内に残つていた塵芥の
落下を効果的に行うことができる。
Incidentally, when the rods of the press cylinder 15 and the press cylinder 13 are simultaneously extended and contracted, the hydraulic pressure to the press cylinder 13 is supplied by the discharged oil of the press cylinder 15, as is clear from the hydraulic circuit in FIG. In this state, the amount of oil required to expand and contract the rod 15a of the press cylinder 15 is the same as that of the rod 13a of the press cylinder 13.
is smaller than the amount of oil required for expansion and contraction, the press plate 5 when both cylinders 15 and 13 are contracted.
The locus of is away from the arcuate surface 2b2 of the bottom 2b of the input box 2, as shown by X in FIG. It comes to approach the circular arc surface 2b 2 , and the garbage remaining in the input box 2 when the input box 2 is raised can be effectively dropped.

上述のようにスイツチSW−4の手動操作によ
る投入箱2内の塵芥の落下に前後して又は同時に
スイツチSW−3を排出側に倒すと、オンとなつ
ているマイクロスイツチLS−10を介して排出
ソレノイドSOL−9と排出板作動ソレノイド
SOL−12が通電し、このことによりソレノイ
ドバルブV−3,V−7を介して排出シリンダ5
2に油圧が供給されてそのロツドが伸長し、排出
板53が後退される。この排出板53の後退によ
り、収容箱1内の塵芥がその開口部1aから外に
排出される。
As mentioned above, when the switch SW-3 is turned to the discharge side before, after, or at the same time as the garbage in the input box 2 falls by manual operation of the switch SW-4, Discharge solenoid SOL-9 and discharge plate actuation solenoid
SOL-12 is energized, which causes the discharge cylinder 5 to flow through the solenoid valves V-3 and V-7.
Hydraulic pressure is supplied to the rod 2 to extend the rod, and the discharge plate 53 is retracted. By retreating the discharge plate 53, the garbage inside the storage box 1 is discharged to the outside through the opening 1a.

なお、排出板53が所定位置より収容箱1の開
口部寄りに移動するとマイクロスイツチLS−7
は図示のような状態になる。
Note that when the discharge plate 53 moves from the predetermined position to the opening of the storage box 1, the micro switch LS-7
will be in the state shown in the figure.

ところで、上述の塵芥排出動作時に、塵芥が途
中でひつかかり排出板53の移動が停止すること
がある。このような場合、スイツチSW−3を戻
し側に倒して排出板53を若干戻してから再度排
出動作させると、排出板53が勢いよく移動して
塵芥のひつかかりに打ち勝つことができるように
なる。
By the way, during the above-mentioned garbage discharge operation, the movement of the discharge plate 53 may be stopped because the garbage gets caught in the middle. In such a case, if you move the switch SW-3 to the return side, return the discharge plate 53 slightly, and then operate the discharge operation again, the discharge plate 53 will move vigorously and be able to overcome the accumulation of garbage. .

塵芥排出が完全に終了したことを確認してから
次にスイツチSW−2を降下側に倒すと、マイク
ロスイツチLS−7を介して戻しソレノイドSOL
−10と排出板作動ソレノイドSOL−12が同
時に通電されて排出板53の戻し動作が行われ
る。排出板53が所定位置まで戻るとマイクロス
イツチLS−7が図とは反対側に切換わり、この
ことによつて排出板53の戻り動作が停止される
と共に、降下ソレノイドSOL−8が通電して投
入箱2の降下動作が行われる。このとき、締付開
ソレノイドSOL−11がマイクロスイツチLS−
11を介して通電しているため、自動ロツク装置
54は開となつており、降下してくる投入箱2は
自動ロツク装置54を越えて降下移動できる。そ
して、投入箱2が十分降下したところで、マイク
ロスイツチLS−11がオフとなることにより締
付開ソレノイドSOL−11の通電がなくなり、
このことによつて自動ロツク装置54による締付
が働いて投入箱2のロツクが行われる。
After confirming that the dust discharge is completely completed, turn the switch SW-2 to the lowering side, and the solenoid SOL returns via the micro switch LS-7.
-10 and the discharge plate operating solenoid SOL-12 are simultaneously energized to return the discharge plate 53. When the discharge plate 53 returns to the predetermined position, the micro switch LS-7 switches to the opposite side as shown in the figure, thereby stopping the return operation of the discharge plate 53 and energizing the lowering solenoid SOL-8. A lowering operation of the input box 2 is performed. At this time, the tightening/opening solenoid SOL-11 is activated by the micro switch LS-
11, the automatic locking device 54 is open, and the dropping box 2 can move downwardly beyond the automatic locking device 54. Then, when the input box 2 is sufficiently lowered, the micro switch LS-11 is turned off, and the tightening/opening solenoid SOL-11 is no longer energized.
This causes the automatic locking device 54 to tighten and lock the input box 2.

〔効果〕〔effect〕

以上説明したように本発明によれば、収容箱か
ら塵芥を排出するに当たつて投入箱を上昇したと
き、その状態でプレスプレートとパツカプレート
とを通常の積込み時と異なる所定の軌道を通つて
同時に移動できるようになつているため、投入箱
上昇状態で投入箱内に残つている塵芥を短時間に
効率よくかつ確実に落下排出させることができる
ようになる。
As explained above, according to the present invention, when the input box is raised to discharge garbage from the storage box, the press plate and the packing plate are moved through a predetermined trajectory different from that during normal loading. Since they can be moved at the same time, the garbage remaining in the input box can be dropped and discharged efficiently and reliably in a short time when the input box is in the raised state.

【図面の簡単な説明】[Brief explanation of drawings]

図面は本発明の実施例を示し、第1図は本発明
による塵芥収集車を示す側面図、第2図乃至第5
図は本発明による塵芥収集車の機構部の異なる動
作状態を示す断面図、第6図は本発明による塵芥
収集車の油圧回路図、第7図は本発明による塵芥
収集車の電気回路を示す電気回路図、第8図及び
第9図は第7図中のマイクロスイツチの配置を示
す図、第10図及び第11図は本発明による装置
の動作を説明するためのタイムチヤート図及び第
12図は本発明による塵芥収集車の動作を示す図
である。 1…塵芥収容箱、1a…開口部、2…塵芥投入
箱、2a…投入口、5…プレスプレート、6…パ
ツカプレート、17…ガイドレール(所定軌道)、
13…パツカシリンダ、13a…ロツド、15…
プレスシリンダ、15a…ロツド、LS−2B…
マイクロスイツチ(第1の検出手段)、LS−1…
マイクロスイツチ(第2の検出手段)、LS−4…
マイクロスイツチ(第3の検出手段)、LS−3…
マイクロスイツチ(第4の検出手段)、LS−1
0,LS−10B…マイクロスイツチ(第5の検
出手段)、SW−4…スイツチ(手動スイツチ手
段)、CR−1,CR−2,CR−12,CR−13
…リレー(手段)、V−1,V−2…ソレノイド
バルブ。
The drawings show embodiments of the present invention, and FIG. 1 is a side view showing a garbage collection vehicle according to the present invention, and FIGS.
The figures are cross-sectional views showing different operating states of the mechanical parts of the garbage collection vehicle according to the invention, FIG. 6 is a hydraulic circuit diagram of the garbage collection vehicle according to the invention, and FIG. 7 is an electric circuit of the garbage collection vehicle according to the invention. FIGS. 8 and 9 are electrical circuit diagrams showing the arrangement of the microswitches in FIG. 7, and FIGS. 10 and 11 are time charts and FIGS. The figure is a diagram showing the operation of the garbage collection vehicle according to the present invention. DESCRIPTION OF SYMBOLS 1... Garbage storage box, 1a... Opening, 2... Garbage input box, 2a... Input port, 5... Press plate, 6... Packer plate, 17... Guide rail (predetermined track),
13...Pack cylinder, 13a...Rod, 15...
Press cylinder, 15a...rod, LS-2B...
Micro switch (first detection means), LS-1...
Micro switch (second detection means), LS-4...
Micro switch (third detection means), LS-3...
Micro switch (fourth detection means), LS-1
0, LS-10B...Micro switch (fifth detection means), SW-4...Switch (manual switch means), CR-1, CR-2, CR-12, CR-13
...Relay (means), V-1, V-2...Solenoid valve.

Claims (1)

【特許請求の範囲】 1 上端が揺動自在に支持され下端が所定軌道1
7を移動するように案内されたパツカプレート6
と、該パツカプレート6の下端に上端が回動自在
に支持されたプレスプレート5と、ロツド13a
の伸縮により前記パツカプレート6を上下動させ
るパツカシリンダ13と、ロツド15aの伸縮に
より前記プレスプレート5を前記パツカプレート
6に対して回動させて自由端を下方及び上方に動
かすプレスシリンダ15とを備え、投入口2aか
ら塵芥を塵芥投入箱2内へ投入する際の第1工程
で、前記プレスシリンダ15のロツド15a及び
前記パツカシリンダ13のロツド13aが共に最
伸長した状態から前記プレスシリンダ15のロツ
ド15aを最縮小の状態にし、塵芥投入箱2内に
投入された塵芥を圧縮圧潰する第2工程で、前記
第1工程の最終状態から前記パツカシリンダ13
のロツド13aが最縮小しかつ前記プレスシリン
ダ15のロツド15aが僅かに伸長した状態に
し、塵芥投入箱2内で塵芥を更に圧縮圧潰する第
3工程で、前記第2工程の最終状態から前記プレ
スシリンダ15のロツド15aが最伸長した状態
にし、塵芥投入箱2内で圧縮圧潰した塵芥を塵芥
収容箱1の開口1aへ向かつてかき上げていく第
4工程で、前記第3工程の最終状態から前記パツ
カシリンダ13のロツド13aが最伸長した状態
にするようにした塵芥積込み装置を有する塵芥投
入箱2を塵芥収容箱1の開口部1aに傾動自在に
設けてなる塵芥収集車において、 前記プレスシリンダ15のロツド15aの最伸
長及び最縮小状態をそれぞれ検出する第1及び第
2の検出手段LS−2B,LS−1と、 前記パツカシリンダ13のロツド13aの最伸
長及び最縮小状態をそれぞれ検出する第3及び第
4の検出手段LS−4,LS−3と、 前記塵芥投入箱2の所定位置への上昇を検出す
る第5の検出手段LS−10,LS−10Bと、 第1及び第2の状態への操作が行われる手動ス
イツチ手段SW−4と、 前記第5の検出手段LS−10,LS−10Bが
前記塵芥投入箱2の所定位置への上昇を検出して
いるときの前記手動スイツチ手段SW−4の第1
の状態への操作に応じて、前記第1及び第3の検
出手段LS−2B,LS−4が前記プレスシリンダ
15及びパツカシリンダ13のロツド15a,1
3aの最伸長状態をそれぞれ検出するまで、前記
プレスシリンダ15及びパツカシリンダ13の両
ロツド15a,13aの同時伸長動作を行わせる
回路を形成する手段CR−12,CR−2と、 前記第5の検出手段LS−10,LS−10Bが
前記塵芥投入箱2の所定位置への上昇を検出して
いるときの前記手動スイツチ手段SW−4の第2
の状態への操作に応じて、前記第2及び第4の検
出手段LS−1,LS−3が前記プレスシリンダ1
5及びパツカシリンダ13のロツド15a,13
aの最縮小をそれぞれ検出するまで、前記プレス
シリンダ15及びパツカシリンダ13の両ロツド
15a,13aの同時縮小動作を行わせる回路を
形成する手段CR−13,CR−1と、 前記シリンダ15,13の同時動作時における
前記パツカシリンダ13への油圧を前記プレスシ
リンダ15の排出油により供給するように油圧路
を切り換えるソレノイドバルブV−1,V−2と
を備え、 かつ前記プレスシリンダ15の伸長に要する油
量を前記パツカシリンダ13よりも小さくした ことを特徴とする塵芥収集車。
[Claims] 1. The upper end is swingably supported and the lower end is on a predetermined track 1
Patuka plate 6 guided to move 7
, a press plate 5 whose upper end is rotatably supported by the lower end of the packer plate 6, and a rod 13a.
and a press cylinder 15 that rotates the press plate 5 relative to the packer plate 6 and moves the free end downward and upward by the expansion and contraction of the rod 15a. In the first step when putting garbage into the garbage input box 2 from the opening 2a, the rod 15a of the press cylinder 15 is fully extended from the state in which both the rod 15a of the press cylinder 15 and the rod 13a of the packer cylinder 13 are fully extended. In the second step of compressing and crushing the garbage thrown into the garbage input box 2, the packing cylinder 13 is compressed from the final state of the first step.
In the third step, the rod 13a of the press cylinder 15 is brought into a state where it is minimized and the rod 15a of the press cylinder 15 is slightly expanded, and the garbage is further compressed and crushed in the garbage input box 2. In the fourth step, the rod 15a of the cylinder 15 is in the most extended state, and the compressed and crushed garbage in the garbage input box 2 is scraped up toward the opening 1a of the garbage storage box 1, from the final state of the third step. In the garbage collection vehicle, the garbage collection vehicle is provided with a garbage input box 2 having a garbage loading device that allows the rod 13a of the press cylinder 13 to be in a fully extended state and is tiltably provided in the opening 1a of the garbage storage box 1, wherein the press cylinder 15 first and second detection means LS-2B, LS-1 for detecting the most extended and most contracted states of the rod 15a of the packer cylinder 13, respectively; and a third detecting means for detecting the most extended and most contracted states of the rod 13a of the packer cylinder 13, respectively and fourth detection means LS-4, LS-3; fifth detection means LS-10, LS-10B for detecting the rise of the garbage disposal box 2 to a predetermined position; and the first and second states. manual switch means SW-4, which is operated when the fifth detection means LS-10, LS-10B detects the rise of the garbage disposal box 2 to a predetermined position; SW-4 1st
In response to the operation to the state, the first and third detection means LS-2B, LS-4 detect the rods 15a, 1 of the press cylinder 15 and the packing cylinder 13.
means CR-12, CR-2 forming a circuit for simultaneously extending both the rods 15a, 13a of the press cylinder 15 and the locking cylinder 13 until the maximum extension state of the rods 3a is detected, respectively; The second manual switch means SW-4 when the means LS-10 and LS-10B detect the rise of the garbage disposal box 2 to a predetermined position.
In response to the operation to the state, the second and fourth detection means LS-1 and LS-3 detect the press cylinder 1.
5 and the rods 15a, 13 of the packer cylinder 13
means CR-13, CR-1 for forming a circuit for simultaneously reducing the rods 15a, 13a of the press cylinder 15 and the packer cylinder 13 until the maximum reduction of the cylinders 15, 13 is detected, respectively; It is equipped with solenoid valves V-1 and V-2 that switch the hydraulic path so that the hydraulic pressure to the press cylinder 13 during simultaneous operation is supplied by the discharge oil of the press cylinder 15, and the oil required for the expansion of the press cylinder 15 is provided. A garbage collection vehicle characterized in that the volume of the garbage cylinder 13 is smaller than that of the garbage cylinder 13.
JP6246684A 1984-03-30 1984-03-30 Garbage wagon Granted JPS60209402A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6246684A JPS60209402A (en) 1984-03-30 1984-03-30 Garbage wagon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6246684A JPS60209402A (en) 1984-03-30 1984-03-30 Garbage wagon

Publications (2)

Publication Number Publication Date
JPS60209402A JPS60209402A (en) 1985-10-22
JPH0431963B2 true JPH0431963B2 (en) 1992-05-28

Family

ID=13201007

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6246684A Granted JPS60209402A (en) 1984-03-30 1984-03-30 Garbage wagon

Country Status (1)

Country Link
JP (1) JPS60209402A (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59138510A (en) * 1983-01-28 1984-08-09 新明和工業株式会社 Emission control device for garbage collection vehicles

Also Published As

Publication number Publication date
JPS60209402A (en) 1985-10-22

Similar Documents

Publication Publication Date Title
US5678478A (en) Oil filter crushing apparatus and system
JPH045601B2 (en)
JPH0479921B2 (en)
JPH0431962B2 (en)
JPH0121042B2 (en)
JPS62269802A (en) Garbage loading control device for garbage collection vehicles
JPS60209403A (en) Garbage wagon
JPS60209406A (en) Garbage wagon
JP7107761B2 (en) garbage truck
JP5202397B2 (en) Waste collection vehicle, its discharge control device and discharge control method
JPS60209402A (en) Garbage wagon
JP3987173B2 (en) Garbage truck
JPS60209404A (en) Garbage wagon
JPS606003Y2 (en) garbage collection truck
JP4010628B2 (en) Loading control device in garbage truck
JPH0130724B2 (en)
JPH0439201A (en) Discharge control device for garbage collecting truck
JP7650614B2 (en) Refuse collection truck
GB2318341A (en) Refuse handling system
JPS6010962B2 (en) Scraping operation control device for garbage collection vehicles
JPS5931603Y2 (en) garbage collection truck
JPS5945561B2 (en) Garbage treatment actuation device of garbage collection vehicle
JPH0259081B2 (en)
JP2010076890A (en) Garbage collection vehicle
JPH0620733Y2 (en) Safety equipment for garbage trucks