JPH04323496A - Stabilizing method for working face and device thereof - Google Patents
Stabilizing method for working face and device thereofInfo
- Publication number
- JPH04323496A JPH04323496A JP18062091A JP18062091A JPH04323496A JP H04323496 A JPH04323496 A JP H04323496A JP 18062091 A JP18062091 A JP 18062091A JP 18062091 A JP18062091 A JP 18062091A JP H04323496 A JPH04323496 A JP H04323496A
- Authority
- JP
- Japan
- Prior art keywords
- casing pipe
- core material
- core
- rod
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
【0001】0001
【産業上の利用分野】本発明は、軟弱地盤の改良構築物
の基礎の造成に関するもので、特に、トンネル坑道等の
、横杭掘削時に崩落を防止するための、切羽安定工法及
びその装置に関するものである。[Field of Industrial Application] The present invention relates to the creation of foundations for improved structures on soft ground, and in particular to a face stabilization method and device for preventing collapse during horizontal pile excavation of tunnels, etc. It is.
【0002】0002
【従来の技術】従来、トンネル工事に伴い、天端付近に
アーチ状の水平式硬化剤噴射工法(以下、FP工法と略
称する)を地表変形防止、地山崩壊防止、及び切羽対策
等のため施工してきた。この場合、トンネル地山が非常
に軟弱な場合、また、掘削工法が、全断面掘進工法の場
合等において、該FP工法だけでは、切羽安定に極度の
不安があることから、以下のような手段にて、アーチ状
の地盤改良体(杭)の内側に、単坑的配置にて、芯材を
水平打設していた。即ち、図6に示すようにアーチの内
側に水平打設した改良体50の中心部に該当改良体の硬
化前または、硬化後にスパイラル掘削ロッド51を使用
することにより、形成したスパイラル溝に機械的又は手
動的に芯材を打設していた。[Prior Art] Traditionally, in tunnel construction, an arch-shaped horizontal hardener injection method (hereinafter referred to as FP method) was used near the crown to prevent ground surface deformation, prevent ground collapse, and as a countermeasure against the face. It has been constructed. In this case, if the tunnel ground is very soft or if the excavation method is a full-section excavation method, there is extreme concern about the stability of the face if the FP method alone is used, so the following measures may be taken: Core material was driven horizontally inside an arch-shaped ground improvement body (pile) in a single-pit arrangement. That is, as shown in FIG. 6, by using a spiral drilling rod 51 at the center of the improved body 50 horizontally cast inside the arch, before or after the improved body is cured, the spiral groove formed therein is mechanically drilled. Alternatively, the core material was placed manually.
【0003】0003
【発明が解決しようとする課題】しかしながら、上述の
従来の技術では、芯材の打設に手間取るのみならず、失
敗も多かった。特に、掘削そして芯材の打ち込み、とい
う工法の繰り返しが必要となり、手間取る結果、多くの
経費を要した。また、該芯材は、一定の距離しか打ち込
めなかったため、連結する必要性が生じたときは、連結
部にウレタン等を使用し、連結していたが、連結部に十
分なアンカー材としての効果がなかった。そこで、本発
明の技術的課題は、上記欠点に鑑み、切羽を安定するた
めの芯材の打ち込みに際し、確実性を伴って簡易、迅速
かつ経済的に必要に応じて連結可能なアンカーボルト的
効果を有する芯材を提供することにある。[Problems to be Solved by the Invention] However, with the above-mentioned conventional techniques, not only was it time-consuming to cast the core material, but there were also many failures. In particular, the construction method required repeated excavation and core material driving, which was time-consuming and resulted in a large amount of expense. In addition, since the core material could only be driven a certain distance, when it became necessary to connect it, urethane, etc. was used for the connection part, but it was not effective enough as an anchor material for the connection part. There was no. Therefore, in view of the above drawbacks, the technical problem of the present invention is to provide an anchor bolt-like effect that can be connected easily, quickly, and economically as needed with certainty when driving a core material for stabilizing a face. The object of the present invention is to provide a core material having the following properties.
【0004】0004
【課題を解決するための手段】本発明によれば、水平式
硬化剤噴射装置により硬化剤を噴射後、地山に形成した
改良体である杭の中心部に芯材を挿嵌するための工法に
おいて、該芯材がケーシングパイプからなり、その芯材
が、打ち込まれるべき所要の長さに応じ、ねじ手段にて
、無限に連結可能なケーシングパイプであって該ケーシ
ングパイプの内側に設けた引き込み用凸部により挿嵌用
ロッド、掘削用ロッド又は、硬化材噴射ロッド等にて、
所定の場所まで芯材として打ち込まれることを特徴とす
る切羽安定工法とその装置が得られる。[Means for Solving the Problems] According to the present invention, after injecting a hardening agent with a horizontal hardening agent injection device, a core material is inserted into the center of a pile which is an improved pile formed in a ground. In the construction method, the core material is a casing pipe, and the core material is a casing pipe that can be connected infinitely by screw means according to the required length to be driven, and the core material is provided inside the casing pipe. The retracting convex part allows insertion rods, drilling rods, hardening material injection rods, etc.
A face stabilization method and its device are obtained, which are characterized in that the core material is driven to a predetermined location.
【0005】[0005]
【作用】芯材をケーシングパイプとすることから、挿嵌
用ロッドにより又は、掘削用ロッド及び硬化剤噴射ロッ
ド等の使用に際し、同時に該芯材を打ち込むことができ
るので、確実または迅速に上記目的を達成することがで
きる。[Function] Since the core material is a casing pipe, the core material can be driven in simultaneously with an insertion rod or when using an excavation rod, a hardening agent injection rod, etc., so the above purpose can be achieved reliably or quickly. can be achieved.
【0006】[0006]
【実施例】次に本発明の実施例を図面を参照しつつ説明
する。図1は、本発明に係る第1実施例であり、芯材で
あるケーシングパイプの連結状態を示している。即ち、
1つの芯材用ケーシングパイプ10は、一端部にボルト
部12と他端にナット部11を有しており、両端部はい
ずれもボルト及びナットとして機能すべく螺刻されてい
る。従って、本図で、明らかなように、2以上の部材を
螺嵌させることによって、必要距離用に連結伸長するこ
とができる。経験によれば、芯材は、長いほどいわゆる
アンカー材として適している。何故ならば、従来の短い
芯材をウレタンでもって連結した場合、アンカー材とし
ての効果が認められなかったからである。Embodiments Next, embodiments of the present invention will be described with reference to the drawings. FIG. 1 shows a first embodiment of the present invention, and shows a state in which a casing pipe, which is a core material, is connected. That is,
One core casing pipe 10 has a bolt portion 12 at one end and a nut portion 11 at the other end, and both ends are threaded to function as a bolt and a nut. Therefore, as is clear from this figure, by threading two or more members together, it is possible to connect and extend the required distance. Experience has shown that the longer the core material, the more suitable it is as a so-called anchor material. This is because when conventional short core materials were connected using urethane, they were not effective as anchor materials.
【0007】また、当該ケーシングパイプ10は、各部
材の先端部に引き込み用凸部14を有している。従って
、地山に形成した地盤改良体の中心部に、該改良体硬化
前であればそのままの状態で又は硬化後であればスパイ
ラル掘削ロッドにて穿いた削孔に引き込み用ロッドにて
、該ケーシングパイプを挿入することができる。尚、当
該ケーシングパイプ10は、芯材としてアンカーボルト
的効果を有する必要があるので、グラスファイバーやプ
ラスチックが望ましい。この芯材は切羽安定のための引
張性に優れている必要があるからである。但し、該パイ
プ10は、掘削用ロッド又は、噴射用ロッド等の掘進に
応じて、地盤中に引き込まれるに足るだけの強度を有し
、かつ、トンネル内部を掘削するための掘削機(バック
ホウ)によって破砕される程度の弱さを有する材質から
なることを要する。一方、切羽掘削時には、簡単に地山
とともに掘削、小片化でき、ズリと共に排土することが
できる性質が求められる。The casing pipe 10 also has a retracting convex portion 14 at the tip of each member. Therefore, in the center of the ground improvement body formed in the ground, if the improvement body has not yet hardened, it can be left as it is, or if it has hardened, it can be inserted into the hole drilled with a spiral drilling rod using a pulling rod. A casing pipe can be inserted. Incidentally, since the casing pipe 10 needs to have an anchor bolt-like effect as a core material, glass fiber or plastic is preferable. This is because this core material needs to have excellent tensile properties to stabilize the face. However, the pipe 10 must have sufficient strength to be pulled into the ground as a drilling rod or injection rod excavates, and must be suitable for use with an excavator (backhoe) for excavating the inside of the tunnel. It is necessary that the material be made of a material that is weak enough to be crushed by. On the other hand, when excavating a face, it is required that the material be able to be easily excavated together with the ground, cut into small pieces, and discharged together with the waste.
【0008】図2は、上記第1実施例に係るケーシング
パイプ10の連結状態、並びに掘削用ロッド15による
引き込み状態を示す概略断面図である。即ち、ボルト部
12とナット部11が螺嵌されている状態の拡大図であ
り、連結された状態を外部からみれば、連結部13が線
としてのみ見え、外部には凹凸は存在しない。従って、
引き込まれる際に地山により障害が起きることがなく、
スムーズに地山に挿入される。また、内部に設けられて
いる引き込み用凸部14は掘削用ロッド15のボディー
部に1又は2以上設けられた挿嵌ストッパ16により、
引っ掛けられることになり、当該ロッドの進行に伴って
順次挿入ないし打ち込まれることとなる。そして、当該
掘削用ロッド15の先端部には折畳み可能なS型ビット
17が設けられているので、所定距離まで掘削した後は
、当該ビット17を折畳み、ケーシングパイプ10の中
を該パイプを置き去りにして切羽口まで戻ることとなる
。その場合、S型ビット17が畳まれた状態の径は該ケ
ーシングパイプ10の中空の径よりも無論小さいものと
する。FIG. 2 is a schematic sectional view showing the connected state of the casing pipe 10 and the retracted state by the excavating rod 15 according to the first embodiment. That is, it is an enlarged view of a state where the bolt part 12 and the nut part 11 are screwed together, and when the connected state is viewed from the outside, the connecting part 13 is visible only as a line, and there are no irregularities on the outside. Therefore,
There is no obstruction caused by the ground when it is pulled in,
It is inserted smoothly into the ground. Moreover, the retraction convex portion 14 provided inside is connected to the insertion stopper 16 provided one or more on the body portion of the excavation rod 15.
It will be hooked, and will be sequentially inserted or driven in as the rod advances. A foldable S-shaped bit 17 is provided at the tip of the excavation rod 15, so after excavating to a predetermined distance, the bit 17 is folded and the pipe is left inside the casing pipe 10. Then we returned to the tuyere. In that case, the diameter of the S-shaped bit 17 in the folded state is of course smaller than the hollow diameter of the casing pipe 10.
【0009】以上の図1および図2におけるケーシング
パイプ10の場合は、そのまま芯材ないしアンカー材と
して使用することも可能であるが、特に軟弱地盤の場合
、上記の掘削用ロッド15に係る硬化剤噴射用ロッドに
て該ケーシングパイプ10内に硬化剤を噴射することに
よって該ケーシングパイプ10を補強することができる
。その場合、硬化剤があまりに強度のものであってはな
らず、また、硬化剤の噴射圧がいわゆる超高圧のもので
あってもならない。何故ならば、前者の場合、トンネル
アーチの内側にあってのものであれば、後述の如く、ト
ンネル掘削の際に掘削機(バックホウ)によって当該ケ
ーシングパイプを粉砕しなければならないからである。
後者の場合、いわゆる超高圧であっては、ケーシングパ
イプ10が粉砕してしまうからである。但し、ケーシン
グパイプ10内に、強硬な硬化剤を充填する場合は、ト
ンネンルアーチの外側における地盤改良ないし安定に役
立つ。その場合、当該ケーシングパイプ10を径の大小
によって、地山ないし用途に応じて適宜用いることが可
能となる。また、当該ケーシングパイプ10に、複数孔
を設けたものについては、後述のとおりである。
尚、掘削用ロッドの挿嵌ストッパ16を利用したケーシ
ングパイプ10の引き込み手段並びに当該ケーシングパ
イプ10を骨材料として粉砕利用する場合で、超高圧に
て硬化剤を噴射しつつ、該ロッドが該パイプの中を引き
返しつつ該パイプを粉砕する手段については、同一人の
平成3年4月17日付出願にて開示済である。In the case of the casing pipe 10 shown in FIGS. 1 and 2 above, it is possible to use it as it is as a core material or anchor material, but especially in the case of soft ground, a hardening agent for the above-mentioned excavation rod 15 may be used. The casing pipe 10 can be reinforced by injecting a hardening agent into the casing pipe 10 using an injection rod. In this case, the curing agent must not be too strong, and the injection pressure of the curing agent must not be so-called ultra-high pressure. This is because in the former case, if the casing pipe is located inside the tunnel arch, the casing pipe must be crushed by an excavator (backhoe) during tunnel excavation, as will be described later. In the latter case, the casing pipe 10 will be crushed under so-called ultra-high pressure. However, if the casing pipe 10 is filled with a strong hardening agent, it will help improve or stabilize the ground outside the tunnel arch. In that case, the casing pipe 10 can be used as appropriate depending on the size of the diameter or the purpose. Further, the casing pipe 10 provided with a plurality of holes will be described later. In addition, in the case where the casing pipe 10 is pulled in using the insertion stopper 16 of the drilling rod and the casing pipe 10 is crushed and used as bone material, the rod is inserted into the pipe while injecting a hardening agent at an ultra-high pressure. The means for crushing the pipe while turning back inside the pipe has already been disclosed in an application filed by the same person on April 17, 1991.
【0010】図3は、本発明の切羽安定装置に係る他の
実施例であって、ケーシングパイプ10に適宜複数孔1
8を設けたものである。この複数孔18は、多すぎる場
合には、このケーシングパイプ10が、軟弱なものとな
るか、噴射する硬化剤の吐出により、切羽口があまりに
強硬なものとなり、掘削工事が困難なものになる可能性
があるので適しない。しかし、このようなケーシングパ
イプ10をトンネルアーチ上のいわゆるアーチ状地盤改
良体19を形成するために用いれば、非常に強硬な地盤
改良体を形成することができる。ひいては、切羽部の安
定化対策上にも好ましいものといえる。すなわち、既に
形成した改良体の芯体として使用する場合は、該改良体
の中心部がより強硬になるであろうし、改良体形成前の
使用であれば、そのケーシングパイル10を硬化剤ロッ
ドにて引き込むや否や、S型ビットを畳み回転かつ後戻
りしつつ該ケーシング内で硬化剤を噴射すれば、該複数
孔からも硬化剤が噴射され強力ないし独特な改良体形成
が可能となる。但し、この場合は、簡単に破砕されない
ような材質のケーシングパイルが望ましい。本発明にか
かる手段は、当該ケーシングパイプ10を硬化剤の噴射
により粉砕しない手法であるが、内部から超高圧噴射剤
を噴射しつつ順次当該ケーシングパイプを粉砕しつつ噴
射ロッドを引き抜く手段は、上記のとおり、同一出願人
にかかる別件発明により用いられている。従って、本実
施例に係るケーシングパイプをトンネルアーチ内部の切
羽工事に使用する場合は、当該複数孔18は、一般に、
トンネルアーチ外部のものに比し小さくかつ少数のもの
が適している。FIG. 3 shows another embodiment of the face stabilizing device of the present invention, in which a plurality of holes 1 are suitably formed in the casing pipe 10.
8. If there are too many holes 18, the casing pipe 10 will become soft, or the jetting hardening agent will make the face too hard, making excavation work difficult. It is not suitable because there is a possibility. However, if such a casing pipe 10 is used to form a so-called arch-shaped ground improvement body 19 on a tunnel arch, a very strong ground improvement body can be formed. Furthermore, it can be said that it is preferable from the viewpoint of stabilizing the face portion. That is, when used as a core of an improved body that has already been formed, the center of the improved body will become stronger, and when used before the formation of the improved body, the casing pile 10 is attached to the hardener rod. As soon as the S-shaped bit is folded and retracted, the hardening agent is injected into the casing while rotating and moving backwards, and the hardening agent is also injected from the plurality of holes, making it possible to form a strong and unique improved body. However, in this case, it is desirable to use a casing pile made of a material that is not easily crushed. The means according to the present invention is a method in which the casing pipe 10 is not crushed by injecting a hardening agent, but the means for pulling out the injection rod while sequentially crushing the casing pipe while injecting an ultra-high pressure propellant from inside is a method described above. As shown, it is used in a separate invention belonging to the same applicant. Therefore, when the casing pipe according to this embodiment is used for face construction inside a tunnel arch, the plurality of holes 18 are generally
It is suitable to have smaller and fewer numbers than those outside the tunnel arch.
【0011】図4は、本発明に係る切羽安定工法及び装
置を用いて、アーチ状地盤改良体19とトンネル支保2
2内部に、切羽部地盤改良体20を形成した状態を示し
ている。これらの地盤改良体は、切羽部の安定化という
点においては共通するが、終局的用途が異なるので、上
述の異なった装置又は工法により大きさの異なったもの
である。次に、切羽掘削に移行するわけであるが、図5
に示すように、切羽部を掘削機(バックホウ)23にて
、掘削し、ケーシングパイプ10と共に形成された切羽
部地盤改良体20を、地山と共に掘削かつ小片化するこ
ととなる。切羽部地盤改良体破片21は、ズリと共に排
土される。FIG. 4 shows the construction of an arch-shaped ground improvement body 19 and tunnel support 2 using the face stabilization method and device according to the present invention.
2 shows a state in which a face ground improvement body 20 is formed inside. These ground improvement bodies have a common feature of stabilizing the face, but because their ultimate purpose is different, they differ in size due to the different equipment or construction methods mentioned above. Next, we move on to face excavation, as shown in Figure 5.
As shown in FIG. 2, the face is excavated with an excavator (backhoe) 23, and the face ground improvement body 20 formed together with the casing pipe 10 is excavated and broken into small pieces together with the ground. The face ground improvement body fragments 21 are discharged together with shear.
【0012】図7は、図6に示された従来の工法により
構成された地盤改良体50の形成状態を示している。従
来工法は、本発明に係る工法並びに装置と相違するので
、トンネルアーチの外部と内部の地盤改良体の大きさに
相違はない。FIG. 7 shows the state of formation of the ground improvement body 50 constructed by the conventional construction method shown in FIG. Since the conventional construction method is different from the construction method and device according to the present invention, there is no difference in the size of the external and internal ground improvement bodies of the tunnel arch.
【0013】[0013]
【発明の効果】本発明によれば、特にトンエネル地山が
とくに軟質な場合、あるいは、トンネル掘削方法が全断
面掘進工法の場合において、アンカーボルト的効果が期
待できるので、切羽安定に寄与することができる。切羽
安定化が達成できるということは、ひいては、地表変位
防止、地山崩壊防止等にも寄与することになる。当然な
がら、安全対策上も不可欠の方法といえる。更に、従来
の工法では、芯材の最後部を叩き込む作業を余儀なくさ
れていたが、本工法によれば、そのような作業は全く不
必要となり、総合的にみれば、簡易、迅速、かつ経済的
に所期の目的を達成することができる。[Effects of the Invention] According to the present invention, an anchor bolt-like effect can be expected, which contributes to face stability, especially when the tunnel ground is particularly soft or when the tunnel excavation method is a full-section excavation method. Can be done. Achieving face stabilization also contributes to prevention of ground surface displacement, rock collapse, etc. Of course, this is an essential method for safety measures. Furthermore, in the conventional method, it was necessary to hammer in the last part of the core material, but with this method, such work is completely unnecessary, and overall, it is simple, quick, and economical. can achieve the intended purpose.
【0014】[0014]
【図1】 本発明の第1実施例であり、連結された、
ケーシングパイプの概略断面図である。FIG. 1 is a first embodiment of the present invention, in which connected
It is a schematic sectional view of a casing pipe.
【図2】 上記第1実施例の連結部の概略拡大断面図
である。FIG. 2 is a schematic enlarged sectional view of the connecting portion of the first embodiment.
【図3】 本発明の第2実施例であり、ボディー部に
複数孔を示す該略図である。FIG. 3 is a second embodiment of the present invention, and is a schematic diagram showing a plurality of holes in the body part.
【図4】 地盤改良体造成後の切羽口を示す正面該略
図である。FIG. 4 is a schematic front view showing the tuyere after the construction of the ground improvement structure.
【図5】 切羽の掘削状態を示す該略図である。FIG. 5 is a schematic diagram showing the state of excavation of the face.
【図6】 従来の芯材の挿入工法に係る概略断面図で
ある。FIG. 6 is a schematic cross-sectional view of a conventional core material insertion method.
【図7】 従来の工法による地盤改良体を示す該略図
である。FIG. 7 is a schematic diagram showing a ground improvement body using a conventional construction method.
10 ケーシングパイプ11
ナット部
12 ボルト部
13 連結部
14 引き込み用凸部
15 掘削用ロッド
16 挿嵌ストッパ
17 S型ビット
18 孔
19 アーチ状地盤改良体20
切羽部地盤改良体21 切羽部
地盤改良体破片22 トンネル支保部
23 掘削機(バックホウ)50、52
地盤改良体10 Casing pipe 11
Nut part 12 Bolt part 13 Connecting part 14 Retraction convex part 15 Excavation rod 16 Fitting stopper 17 S-shaped bit 18 Hole 19 Arch-shaped ground improvement body 20
Face ground improvement body 21 Face ground improvement body fragments 22 Tunnel support 23 Excavator (backhoe) 50, 52
ground improvement body
Claims (3)
噴射後、地山に形成した改良体である杭の中心部に芯材
を挿嵌するための工法において、当該芯材がケーシング
パイプからなることを特徴とする切羽安定装置。Claim 1: In a construction method for inserting a core material into the center of a pile, which is an improved pile formed in the ground, after injecting a hardening agent with a horizontal hardening agent injection device, the core material is removed from a casing pipe. A face stabilizing device characterized by:
の工法において、その芯材が打ち込まれるべき所要の長
さに応じ、螺子手段にて、無限に連結可能なケーシング
パイプであって該ケーシングパイプの内側に設けた引き
込み用凸部により挿嵌用ロッド、掘削用ロッド、又は硬
化剤噴射ロッド等にて、所定の場所まで、芯材として打
ち込まれることを特徴とする切羽安定工法。[Claim 2] In the method for inserting a core material according to claim 1, the casing pipe can be connected infinitely by screw means according to the required length to which the core material is to be driven. A face stabilization construction method characterized in that the core material is driven into a predetermined location using an insertion rod, excavation rod, hardening agent injection rod, etc. through a drawing convex portion provided on the inside of the casing pipe. .
定間隔にて、複数孔を有することを特徴とする切羽安定
装置。3. A face stabilizing device, wherein the casing pipe according to claim 1 has a plurality of holes at regular intervals.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3180620A JPH0768845B2 (en) | 1991-04-19 | 1991-04-19 | Face stabilization method and its equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3180620A JPH0768845B2 (en) | 1991-04-19 | 1991-04-19 | Face stabilization method and its equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH04323496A true JPH04323496A (en) | 1992-11-12 |
| JPH0768845B2 JPH0768845B2 (en) | 1995-07-26 |
Family
ID=16086402
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3180620A Expired - Fee Related JPH0768845B2 (en) | 1991-04-19 | 1991-04-19 | Face stabilization method and its equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0768845B2 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06228940A (en) * | 1993-02-05 | 1994-08-16 | Toyo Kensetsu Kk | Ground stabilization method |
| JPH0742159A (en) * | 1993-07-30 | 1995-02-10 | Railway Technical Res Inst | Large-diameter bending tensile reinforcement and its construction method |
| JP2002294701A (en) * | 2001-04-04 | 2002-10-09 | Nisshoku Corp | Tensile material insertion method |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5927830A (en) * | 1982-08-09 | 1984-02-14 | Cosmo Co Ltd | Antitumor glycoproteinic substance |
-
1991
- 1991-04-19 JP JP3180620A patent/JPH0768845B2/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5927830A (en) * | 1982-08-09 | 1984-02-14 | Cosmo Co Ltd | Antitumor glycoproteinic substance |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06228940A (en) * | 1993-02-05 | 1994-08-16 | Toyo Kensetsu Kk | Ground stabilization method |
| JPH0742159A (en) * | 1993-07-30 | 1995-02-10 | Railway Technical Res Inst | Large-diameter bending tensile reinforcement and its construction method |
| JP2002294701A (en) * | 2001-04-04 | 2002-10-09 | Nisshoku Corp | Tensile material insertion method |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0768845B2 (en) | 1995-07-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100934274B1 (en) | Acupressure Soil Nail and Its Application Method | |
| US6457909B1 (en) | Multi-purpose anchor bolt assembly | |
| JPH02232500A (en) | Method and device for reinforcing bedrock | |
| KR101233794B1 (en) | Tunnel reinforcing method by multi-forepoling | |
| KR100986548B1 (en) | Slope reinforcing earth anchor and earth anchor construction method using the same | |
| US6120214A (en) | Process for constructing reinforced subterranean columns | |
| KR101191289B1 (en) | The method of a dual helical pile according to the subsidence for decreasing negative friction | |
| KR100797800B1 (en) | Tip anchorage of permanent anchor | |
| KR101488721B1 (en) | Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same | |
| KR101000569B1 (en) | Slope reinforcement nailing of roads and complexes and slope reinforcement method using the same | |
| KR102464394B1 (en) | Driving rod for forming reinforced part of piles | |
| KR100616359B1 (en) | Insertion Support Tube for Soil Nailing | |
| KR20130029906A (en) | An expanding device of frictional force | |
| KR101302143B1 (en) | Method construction anchor rock pressure style use the hole which widens double | |
| KR101241351B1 (en) | The nail with high anchorage and the nailing construction method thereof | |
| KR101620876B1 (en) | The device for excavating a ground | |
| KR100720685B1 (en) | Nailing device | |
| JP3429025B2 (en) | Slope reinforcement anchor and construction method | |
| JP5504463B2 (en) | Reinforcing method of concrete frame | |
| JP4884276B2 (en) | Rotating press pile construction method and slope construction equipment | |
| JP4223337B2 (en) | Ground reinforcement method and ground reinforcement structure by the method | |
| KR200263955Y1 (en) | Nailing device that use spiral style pipe | |
| KR100609335B1 (en) | Reinforcement construction method in the ground | |
| JPH0768845B2 (en) | Face stabilization method and its equipment | |
| JPH04194227A (en) | Earth reinforcing method with tubular reinforcement |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |