Heat accumulating amount calculating method

Info

Publication number
JPH043832A
JPH043832A JP2100252A JP10025290A JPH043832A JP H043832 A JPH043832 A JP H043832A JP 2100252 A JP2100252 A JP 2100252A JP 10025290 A JP10025290 A JP 10025290A JP H043832 A JPH043832 A JP H043832A
Authority
JP
Japan
Prior art keywords
heat
amount
tank
heat storage
predicted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2100252A
Other languages
Japanese (ja)
Inventor
Akira Kato
晃 加藤
Tatsuo Inooka
猪岡 達夫
Fumio Sakurai
桜井 文雄
Yoshikazu Tsuyukuchi
露口 嘉和
Kazuyuki Kamimura
一幸 神村
Fusachika Miyasaka
宮坂 房千加
Nobuhiko Yamada
山田 伸彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nikken Sekkei Ltd
Kansai Electric Power Co Inc
Azbil Corp
Original Assignee
Nikken Sekkei Ltd
Kansai Electric Power Co Inc
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikken Sekkei Ltd, Kansai Electric Power Co Inc, Azbil Corp filed Critical Nikken Sekkei Ltd
Priority to JP2100252A priority Critical patent/JPH043832A/en
Publication of JPH043832A publication Critical patent/JPH043832A/en
Pending legal-status Critical Current

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

PURPOSE:To eliminate useless operation of a heat source device by a method wherein a heat accumulating amount in a heat accumulating tank is determined based on a difference between a tank water temperature and a predicted return water temperature from a heat emitter and a tank water amount. CONSTITUTION:A thermal load amount Qi at an n-step before a present time is predicted, a thermal load factor Xi being a ratio between a predicted thermal load amount Qi and a plan maximum thermal load amount Qpeak is determined, and an allowable water feed temperature TC to an air conditioner is decided. After, through comparison of a tank water temperature TST with an allowable feed water temperature TC, it is conformed that the tank water temperature TST exceeds the allowable feed water temperature TC, a difference DELTAT between the tank water temperature TST and a predicted temperature TSR of return water from an air conditioner is determined by using a thermal load factor Xi. A heat accumulating amount QST in a heat accumulating tank is calculated by multiplying DELTAT and a tank water amount FST in a heat accumulating tank. This method provides an accurate effective quantity of heat and performs use less operation of a heat source device.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、蓄熱槽での蓄熱量を算出する蓄熱量算出方
法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a heat storage amount calculation method for calculating the heat storage amount in a heat storage tank.

〔従来の技術〕[Conventional technology]

ビルディングの空調システムでは蓄熱槽を備えたものが
一般的になりつつある。熱エネルギは貯蔵が可能である
から空調システムに蓄熱槽を採用することにより、エネ
ルギの有効利用に貢献できる。
Building air conditioning systems equipped with heat storage tanks are becoming more common. Since thermal energy can be stored, adopting a heat storage tank in an air conditioning system can contribute to the effective use of energy.

蓄熱槽まわりの概略的な構成例を第6図に示す。FIG. 6 shows a schematic configuration example around the heat storage tank.

同図において、1は熱源機器としてのヒートポンプ、2
は熱放出器としての空調機、3は水を媒体とした蓄熱槽
である。蓄熱槽3は第1蓄熱槽3〜第100蓄熱槽3−
1゜。を備え、蓄熱槽3−1〜3゜。は仕切通路しl〜
4−99にて連通されている。
In the figure, 1 is a heat pump as a heat source device, 2
3 is an air conditioner as a heat radiator, and 3 is a heat storage tank using water as a medium. The heat storage tank 3 is the first heat storage tank 3 to the 100th heat storage tank 3-
1°. and a heat storage tank 3-1~3°. There is a partitioned passageway.
4-99.

すなわち、蓄熱槽3−1ooからの温水が、ヒートポン
プ1により加熱されてから蓄熱槽3−1へ吐出され、蓄
熱槽3−2〜3−7.を経て蓄熱槽3−1゜。へ至り、
このルートを循環することにより、蓄熱が行われる。こ
れに対して、蓄熱槽3−5からの温水が、空調機2によ
り放熱されてから蓄熱槽3−3゜。へ吐出され、蓄熱槽
3−7.〜3−2を経て蓄熱槽り、へ至り、このルート
を循環することにより、暖房が行われる。このため、蓄
熱槽3−1側が高温槽、蓄熱槽3−5゜。側が低温槽と
なる。
That is, the hot water from the heat storage tank 3-1oo is heated by the heat pump 1 and then discharged to the heat storage tank 3-1, and the hot water from the heat storage tank 3-2 to 3-7. After that, the heat storage tank 3-1°. It led to
Heat is stored by circulating through this route. On the other hand, after the hot water from the heat storage tank 3-5 is radiated by the air conditioner 2, it is heated to the heat storage tank 3-3°. and is discharged to the heat storage tank 3-7. ~ 3-2 to the heat storage tank, and by circulating through this route, heating is performed. Therefore, the heat storage tank 3-1 side is a high temperature tank, and the heat storage tank 3-5°. The side will be a low temperature chamber.

第7図は、蓄熱槽3−2〜3−10゜の槽順位を横軸と
して、縦軸にその槽水温度を示した図である。
FIG. 7 is a diagram in which the horizontal axis represents the tank order of the heat storage tanks 3-2 to 3-10°, and the vertical axis represents the tank water temperature.

この図において、蓄熱槽下限温度TLを定めれば、蓄熱
槽下限温度TL、各蓄各種熱槽水温度TST(J)、各
蓄熱槽の槽水量FST (J)および比熱αを下記(1
)弐に代入して、蓄熱槽3でのトータル的な蓄熱量を算
出することができる。
In this figure, if the heat storage tank lower limit temperature TL is determined, the heat storage tank lower limit temperature TL, each type of heat storage type heat tank water temperature TST (J), the tank water amount FST (J) of each heat storage tank, and the specific heat α are calculated as follows (1
)2, the total amount of heat stored in the heat storage tank 3 can be calculated.

Σ(TST (J)  TL)XFST (J)xα丁
二1 ・ ・ ・(11 そして、この算出して得た蓄熱槽3での蓄熱量に基づき
ヒートポンプ1の運転を制御すれば、割引電力料金時間
帯での夜間蓄熱運転や、夜間蓄熱で足りない分を昼間補
う補償蓄熱運転を、効率良く行うことが可能となる。
Σ(TST (J) TL)XFST (J) It becomes possible to efficiently carry out nighttime heat storage operation during the time zone, and compensatory heat storage operation that makes up for the insufficient amount of nighttime heat storage during the day.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかしながら、このような蓄熱量算出方法によると、蓄
熱槽下限温度TLについての明確な規定がなく、支障が
生しない範囲で高めに設定するものとしている。
However, according to such a method of calculating the amount of heat storage, there is no clear regulation regarding the lower limit temperature TL of the heat storage tank, and the lower limit temperature TL of the heat storage tank is set to a high value within a range that does not cause any trouble.

このため、有効蓄熱量が少なく見積もられてしまい、ヒ
ートポンプ1が無駄に運転されてしまうという問題が生
じていた。
For this reason, a problem has arisen in that the effective heat storage amount is underestimated, and the heat pump 1 is operated in vain.

〔課題を解決するための手段〕[Means to solve the problem]

本発明はこのような課題を解決するために提案されたも
ので、現時刻からnステップ先の熱負荷量を予測し、こ
の予測熱負荷量と設計最大熱負荷量との比である熱負荷
率を求め、かつ熱放出器への許容送水温度を定めたうえ
、この許容送水温度の制限域内に蓄熱槽の槽水温度があ
ることを確認して、この槽水温度と熱放出器からの予想
還水温度との差ΔTを熱負荷率に基づき求め、このΔT
と槽水量とに基づき蓄熱槽での蓄熱量を求めるようにし
たものである。
The present invention was proposed to solve such problems, and it predicts the heat load amount n steps ahead from the current time, and calculates the heat load that is the ratio of the predicted heat load amount and the design maximum heat load amount. After determining the allowable water supply temperature to the heat radiator and confirming that the temperature of the water in the heat storage tank is within the limit range of this allowable water supply temperature, The difference ΔT from the expected return water temperature is calculated based on the heat load rate, and this ΔT
The amount of heat stored in the heat storage tank is calculated based on the amount of water in the tank and the amount of water in the tank.

〔作用〕[Effect]

したがってこの発明によれば、ΔT(許容送水温度の制
限域内に位置する槽水温度と許容送水温度の制限域外に
位置し得る予想還水温度との差)と槽水量とに基づき、
蓄熱量が求められる。
Therefore, according to the present invention, based on ΔT (the difference between the tank water temperature located within the limit range of allowable water supply temperature and the expected return water temperature that may be located outside the limit range of allowable water supply temperature) and the tank water amount,
The amount of heat storage is required.

〔実施例〕〔Example〕

以下、本発明に係る蓄熱量算出方法を詳細に説明する。 Hereinafter, the heat storage amount calculation method according to the present invention will be explained in detail.

先ず、本願発明においては、ビルディングにおける時間
負荷(熱負荷)を予測するために、文献:ボソクスアン
ドジェンキンスCBox & Jenkins: Ti
me 5eries Analysis−−forca
sting controlHoIden−dayc1
9”io>〕Lこも記載されているARMA(自己回帰
移動平均)モデルを採用し、このARMAモデルに周期
性・トレンド性をもたせたARIMAモデル式を使用す
る。すなわち、下記式に周期性・トレンド性をもたせた
ARIMAモデル・ ・ ・(2) 但し、A、二自己回帰パラメータ、B8 :移動平均パ
ラメータ、x(t): Iステップ先の予測負荷、x(
t−1):現時刻の実負荷、x(t−z):1ステツプ
前の実負荷、e(t−+):現時刻の実負荷1ステツプ
前に予測された現時刻の負荷。
First, in the present invention, in order to predict the time load (heat load) in a building, the literature: Box & Jenkins CBox & Jenkins: Ti
me 5eries Analysis--forca
sting controlHoIden-dayc1
The ARMA (autoregressive moving average) model described in this article is adopted, and the ARIMA model formula which adds periodicity and trend characteristics to this ARMA model is used. In other words, the following formula has periodicity and trend characteristics. ARIMA model with trend characteristics (2) However, A: two autoregressive parameters, B8: moving average parameter, x(t): predicted load for I step ahead, x(
t-1): Actual load at current time, x(t-z): Actual load one step before, e(t-+): Actual load at current time predicted one step before.

下記(3)式は上記(2)式においてp=25.  q
=25とし、自己回帰パラメータA1および移動平均パ
ラメータB1を、A + =  0.7980.  A
 z 〜A 23−〇、0000.  A、、−−1,
0000,At5=0.7980. Bl=−0,30
90,Bz 〜B2.=O,0OOO,B2.=−0,
6399、B、、=0.1977として定めた場合のA
RTMAモデル式である。
The following equation (3) is the above equation (2) when p=25. q
=25, and the autoregressive parameter A1 and moving average parameter B1 are A + = 0.7980. A
z ~A 23-〇, 0000. A,,--1,
0000, At5=0.7980. Bl=-0,30
90,Bz ~B2. =O, 0OOOO, B2. =-0,
A when set as 6399, B, , = 0.1977
This is an RTMA model formula.

x(t)  0.7980x(t、+)  X(t−Z
4)  0.7980X(t−25)=e(t)  0
.3090e(t−+)  0.6399e(t−za
 )+0.1977e (t−zs )・・・(3)但
し、上記式において、et=Qとし、自己回帰パラメー
タA、および移動平均パラメータB。
x(t) 0.7980x(t,+) X(t-Z
4) 0.7980X(t-25)=e(t) 0
.. 3090e(t-+) 0.6399e(t-za
)+0.1977e (t-zs) (3) However, in the above formula, et=Q, autoregressive parameter A, and moving average parameter B.

は、過去10日間の実負荷データに基づき求めている。is calculated based on actual load data for the past 10 days.

次に、このARIMAモデル式を使用した具体的な時間
負荷予測を説明する。今、第2図において、現時刻が木
曜日の22時であるものとすると、現時刻から24時間
前までの1時間毎の実負荷データが、ARIMAモデル
式(上記(3)式)に代入される。すなわち、現時刻の
実負荷データがX(t−1)トして、23時間前の実負
荷データがx(t24)として、24時間前の実負荷デ
ータがx(t2、)として代入され、1時間先(23時
)の予測負荷x(t)が求まる。次に、23時の予測負
荷x(t)から23時間前までの1時間毎の実負荷デー
タが、同様にしてARIMAモデル式に代入される。す
なわち、23時の予測負荷x(t)がx(t+)として
、22時間前の実負荷データがx (t −z4)とし
て、23時間前の実負荷データがX (t −zs)と
して代入され、2時間先(24時)の予測負荷x(t)
が求まる。以下、この繰り返しにより、金曜日の22時
までの予測負荷が順次に求まり、現時刻における基本パ
ターンが図示−点鎖線で示す如く作成される。この動作
は、現時刻が1時間進む毎に繰り返され、したがって現
時刻が1時間進む毎にその基本パターンが更新されるも
のとなる。
Next, specific time load prediction using this ARIMA model formula will be explained. Now, in Fig. 2, assuming that the current time is 22:00 on Thursday, the hourly actual load data from the current time until 24 hours ago is substituted into the ARIMA model equation (formula (3) above). Ru. That is, the actual load data at the current time is substituted by The predicted load x(t) for one hour ahead (23:00) is determined. Next, hourly actual load data from 23:00 predicted load x(t) until 23 hours ago is substituted into the ARIMA model equation in the same manner. In other words, the predicted load x(t) at 23:00 is substituted as x(t+), the actual load data 22 hours ago is substituted as x(t - z4), and the actual load data 23 hours ago is substituted as X(t - zs). and the predicted load x(t) for 2 hours ahead (24 hours)
is found. Thereafter, by repeating this process, the predicted load up to 22:00 on Friday is sequentially determined, and the basic pattern at the current time is created as shown by the dotted chain line in the figure. This operation is repeated every time the current time advances by one hour, and therefore the basic pattern is updated each time the current time advances by one hour.

現時刻が金曜日の22時になった場合には、それまでの
ARIMAモデル式において、その自己回帰パラメータ
A、および移動平均パラメータB。
If the current time is 22:00 on Friday, the autoregressive parameter A and the moving average parameter B in the ARIMA model equation up to that point.

の新だなる推定が行われる。すなわち、木曜日の22時
から金曜日の22時までの実負荷データを過去10日間
の実負荷データの最終データと置き換えたうえ、この過
去10日間の実負荷データを使用して、自己回帰パラメ
ータA、および移動平均パラメータB1が新たに推定さ
れるものとなる。
A new estimate is made. That is, the actual load data from 22:00 on Thursday to 22:00 on Friday is replaced with the final actual load data for the past 10 days, and using this actual load data for the past 10 days, the autoregressive parameters A, And the moving average parameter B1 is newly estimated.

第1図は第6図に示した空調システムでの制御動作を示
すフローチャートであり、本発明に係る蓄熱量算出方法
の一実施例を適用している。
FIG. 1 is a flowchart showing a control operation in the air conditioning system shown in FIG. 6, to which an embodiment of the heat storage amount calculation method according to the present invention is applied.

今、第2図において、現時刻が木曜日の22時であり、
金曜日の22時までの予測熱負荷が順次に求められ、基
本パターンが作成されているものとする。この場合、先
ずステップ101において、1時間先の予測熱負荷量す
なわち23時における予測熱負荷量Q1を獲得する。そ
して、■が24以下(I≦24)であることを確認して
(ステップ102)、ステップ103へ進む。ここで、
■は、ステップ101にて獲得した予測熱負荷量の予測
時刻に対し、23時を1.24時を2.1時を3という
風に定められる。ステップ103では、予測熱負荷量Q
、を最大熱負荷量Q□、で除することにより、熱負荷率
X1を得る。ここで、最大熱負荷量Q p a a k
は、1時間にヒートポンプ1が発揮し得る熱負荷量の定
格値(設計最大熱負荷量)として定めており、本実施例
においては290Mcal/Hとされている。ステップ
103にて熱負荷率X1を求めた後は、この熱負荷率X
1を使用して、第3図に示す特性テーブルTBIから空
調機2への許容送水温度TCを求める。特性テーブルT
BIにおいて、熱負荷率X8と許容送水温度TCとの関
係は、経験等により予め定められている。また、この特
性テーブルTBIからの許容送水温度TCの導出と同時
に、予測熱負荷量Qの予測時刻を使用して、第3図に示
す記憶テーブルTB2がら空調機2への許容送水温度T
Cを求める。記憶テーブルTB2において、予測時刻と
許容送水温度TCとの関係は、経験等により予め定めら
れている。そして、特性テーブルTBIから導出された
許容送水温度TCと記憶テーブルTB2から導出された
許容送水温度TCとの比較を行い、高い方の許容送水温
度TCを選択して許容送水温度TC(1)としたうえ、
ステップ104へ進む。
Now, in Figure 2, the current time is Thursday at 22:00,
It is assumed that the predicted heat loads until 22:00 on Friday have been sequentially determined and a basic pattern has been created. In this case, first in step 101, the predicted heat load amount for one hour ahead, that is, the predicted heat load amount Q1 at 23:00 is obtained. Then, it is confirmed that ■ is 24 or less (I≦24) (step 102), and the process proceeds to step 103. here,
(2) is determined such that 23:00 is 1.24:00 and 2:10 is 3 for the predicted time of the predicted heat load amount obtained in step 101. In step 103, the predicted heat load amount Q
The heat load factor X1 is obtained by dividing , by the maximum heat load amount Q□. Here, the maximum heat load Q p a k
is determined as the rated value (design maximum heat load) of the amount of heat load that the heat pump 1 can exert in one hour, and is set to 290 Mcal/H in this example. After determining the heat load factor X1 in step 103, this heat load factor
1 to find the allowable water supply temperature TC to the air conditioner 2 from the characteristic table TBI shown in FIG. Characteristic table T
In BI, the relationship between the heat load factor X8 and the allowable water supply temperature TC is determined in advance based on experience or the like. In addition, at the same time as deriving the allowable water supply temperature TC from this characteristic table TBI, the allowable water supply temperature T to the air conditioner 2 is calculated from the memory table TB2 shown in FIG. 3 using the predicted time of the predicted heat load amount Q.
Find C. In the storage table TB2, the relationship between the predicted time and the allowable water supply temperature TC is predetermined based on experience or the like. Then, the allowable water supply temperature TC derived from the characteristic table TBI is compared with the allowable water supply temperature TC derived from the memory table TB2, and the higher allowable water supply temperature TC is selected and set as the allowable water supply temperature TC(1). Moreover,
Proceed to step 104.

ステップ104では、蓄熱槽順位Jを1として、J≧1
00か否かを確認したうえ、ステップ105へ進む。ス
テップ105では、第1順位の蓄熱槽り、について、そ
の槽水温度TST (1)と許容送水温度TC(1)と
を比較する。そして、このステップ105において、槽
水温度TST (1)が許容送水温度TC(1)よりも
高い(T S T(1)≧TC(1))ことを確認した
うえ、すなわち許容送水温度TC(1)の制限域内に槽
水温度TST (1)があることを確認したうえ、ステ
ップ106へ進む。ステップ106では、熱負荷率X+
を使用して、第4図に示す特性テーブルTB3から、槽
水温度TST (1)と空調機2からの予想還水温度T
SR(1)との差ΔT(1)を求める。そして、ステッ
プ107へ進み、ΔT(1)と蓄熱槽3−1での槽水量
FST (1)とを乗算して、蓄熱槽3−1での蓄熱量
QST (1)を算出する。
In step 104, assuming that the heat storage tank rank J is 1, J≧1
After confirming whether the value is 00 or not, the process proceeds to step 105. In step 105, for the first heat storage tank, the tank water temperature TST (1) is compared with the allowable water supply temperature TC (1). Then, in step 105, it is confirmed that the tank water temperature TST(1) is higher than the allowable water supply temperature TC(1) (TST(1)≧TC(1)), that is, the allowable water supply temperature TC( After confirming that the tank water temperature TST (1) is within the limit range of 1), the process proceeds to step 106. In step 106, the heat load factor
Using, from the characteristic table TB3 shown in Fig. 4, the tank water temperature TST (1) and the expected return water temperature T from the air conditioner 2
Find the difference ΔT(1) from SR(1). Then, the process proceeds to step 107, where ΔT(1) is multiplied by the tank water amount FST (1) in the heat storage tank 3-1 to calculate the heat storage amount QST (1) in the heat storage tank 3-1.

ここで、算出された蓄熱量QST (1)について考察
してみるに、許容送水温度TC(1)は、熱負荷率X、
あるいは予測時刻(23時)に基づき、明確に定められ
ている。また、許容送水温度TC(1)の制限域内に位
置する槽水温度TST(1)と許容送水温度TC(1)
の制限域外に位置し得る予想還水温度TSR(1)との
差ΔT(1)が求められ、このΔT(1)と槽水量FS
T(1)とを乗算して蓄熱量(1)が求められている。
Now, considering the calculated heat storage amount QST (1), the allowable water supply temperature TC (1) is the heat load factor X,
Alternatively, it is clearly determined based on the predicted time (23:00). In addition, the tank water temperature TST(1) located within the limit range of the allowable water supply temperature TC(1) and the allowable water supply temperature TC(1)
The difference ΔT(1) between the expected return water temperature TSR(1) which may be located outside the limit area is calculated, and the difference between this ΔT(1) and the tank water volume FS
The heat storage amount (1) is calculated by multiplying by T(1).

このため、許容送水温度TC(1)を従来技術で述べた
蓄熱槽下限温度T、に置き換えて考えても分かるように
、ΔT(1)の内その許容送水温度TC(1)の制限域
外に位置する部分に対応する蓄熱量が有効蓄熱量に加え
られるものとなり、算出される有効蓄熱量の増大に寄与
する。
Therefore, as can be seen by replacing the allowable water supply temperature TC(1) with the heat storage tank lower limit temperature T mentioned in the prior art, it is clear that within ΔT(1), the temperature outside the limit range of the allowable water supply temperature TC(1) is The heat storage amount corresponding to the located portion is added to the effective heat storage amount, contributing to an increase in the calculated effective heat storage amount.

而して、ステップ108へ進み、予測熱負荷量Q、から
蓄熱量QST (1)を差し引いて新たなる予測熱負荷
量Q1とし、蓄熱槽順位Jを1アンプして(ステップ1
09)、予測熱負荷量Q10値をチエツクする(ステッ
プ110)。ここで、予測熱負荷量Q+が≧Oであれば
、ステップ101で獲得した予測熱負荷量Q、を蓄熱槽
3−1での蓄熱量QST (1)のみでは賄えないもの
と判断して、ステップ104へ戻り、ステップ1051
06を経て蓄熱槽3〜2での蓄熱量QST (2)を算
出し、以下同様にして、ステップ110での予測熱負荷
蓋Q1がO以下となるまで、蓄熱槽順位を繰り上げて上
述の動作を繰り返す。
Then, the process proceeds to step 108, where the new predicted heat load amount Q1 is obtained by subtracting the heat storage amount QST (1) from the predicted heat load amount Q, and the heat storage tank rank J is increased by 1 (step 1).
09), the predicted heat load amount Q10 value is checked (step 110). Here, if the predicted heat load amount Q+ is ≧O, it is determined that the predicted heat load amount Q obtained in step 101 cannot be covered only by the heat storage amount QST (1) in the heat storage tank 3-1. , return to step 104, and step 1051
The amount of heat storage QST (2) in the heat storage tanks 3 to 2 is calculated through step 06, and the heat storage tank ranking is moved up in the same manner until the predicted heat load lid Q1 in step 110 becomes O or less, and the above operation is performed. repeat.

ステップ110での予測熱負荷量Q1が0以下となると
、予測時刻を示すIを1アツプして(ステップ111)
 、ステップ101へ戻り、現時刻より2時間先すなわ
ち24時における予測熱負荷量Q2を獲得する。そして
、ステップ102を経たステップ103において、予測
熱負荷量Q2を最大熱負荷量Q p e a kで除す
ることにより、熱負荷率X2を得る。ステップ103に
て熱負荷率×2を求めた後は、この熱負荷率X2を使用
して、特性テーブルTBIから許容送水温度TCを求め
、記憶テーブルTB2から導出される予測時刻での許容
送水温度TCとの比較を行い、低い方の許容送水温度T
Cを選択して許容送水温度TC(2)としたうえ、ステ
ップ104へ進む。ここで、ステップ104での蓄熱槽
順位Jは、予測熱負荷量Q1を賄い得る蓄熱槽順位Nま
で繰り上げられている。したがって、ステップ104を
経たステップ105では、蓄熱槽3−Hについて、その
槽水温度TST (N)と許容送水温度TC(2)とを
比較し、槽水温度TST (N)が許容送水温度TC(
2)よりも高いことを確認したうえ、ステ・7プ106
へ進む。ステップ106では、熱負荷率X2を使用して
、特性テーブルTB3から、槽水温度TST(N)と予
想還水温度TSR(N)との差ΔT (N)を求める。
When the predicted heat load amount Q1 at step 110 becomes 0 or less, I, which indicates the predicted time, is increased by 1 (step 111).
, returns to step 101 and obtains the predicted heat load amount Q2 two hours ahead of the current time, that is, at 24 o'clock. Then, in step 103 after passing through step 102, the predicted heat load amount Q2 is divided by the maximum heat load amount Q p e a k to obtain the heat load factor X2. After determining the heat load factor x 2 in step 103, the allowable water supply temperature TC is determined from the characteristic table TBI using this heat load factor TC and the lower allowable water supply temperature T
After selecting C and setting it as the allowable water supply temperature TC(2), the process proceeds to step 104. Here, the heat storage tank rank J at step 104 has been moved up to a heat storage tank rank N that can cover the predicted heat load amount Q1. Therefore, in step 105 after passing through step 104, the tank water temperature TST (N) and the allowable water supply temperature TC (2) are compared for the heat storage tank 3-H, and the tank water temperature TST (N) is determined to be the allowable water supply temperature TC. (
2) After confirming that it is higher than Step 7, step 106
Proceed to. In step 106, the difference ΔT (N) between the tank water temperature TST (N) and the expected return water temperature TSR (N) is determined from the characteristic table TB3 using the heat load factor X2.

そして、ステップ107へ進み、ΔT (N)と蓄熱槽
3−Nでの槽水量FST(N)とを乗算して、蓄熱槽3
−Nでの蓄熱IQsT (N)を算出する。そして、ス
テップ108へ進み、予測熱負荷量Q2から蓄熱量QS
T (N)を差し引いて新たなる予測熱負荷量Q2とし
、蓄熱槽順位Jを1アンプして(ステップ109)、予
測熱負荷量Q2の値をチエツクする(ステップ110)
。ここで、予測熱負荷量Q、が≧0であれば、ステップ
101で獲得した予測熱負荷tQ2を蓄熱槽3□での蓄
熱量QST (N)のみでは賄えないものと判断して、
ステップ104へ戻り、ステップ105,106を経て
蓄熱槽3.。1での蓄熱量QST (N+1)を算出し
、以下同様にして、ステップ110での予測熱負荷量Q
2がO以下となるまで、蓄熱槽順位を繰り上げて上述の
動作を繰り返す。
Then, the process proceeds to step 107, where ΔT (N) is multiplied by the tank water amount FST (N) in the heat storage tank 3-N, and
Calculate the heat storage IQsT (N) at −N. Then, the process proceeds to step 108, and from the predicted heat load amount Q2, the heat storage amount QS is calculated.
T (N) is subtracted to obtain a new predicted heat load amount Q2, the heat storage tank rank J is increased by 1 (step 109), and the value of the predicted heat load amount Q2 is checked (step 110).
. Here, if the predicted heat load amount Q, is ≧0, it is determined that the predicted heat load tQ2 obtained in step 101 cannot be covered only by the heat storage amount QST (N) in the heat storage tank 3□,
Returning to step 104, the process goes through steps 105 and 106, and the heat storage tank 3. . Calculate the amount of heat storage QST (N+1) at step 110, and calculate the predicted heat load amount QST (N+1) at step 110 in the same manner.
The heat storage tank rank is moved up and the above-mentioned operation is repeated until 2 becomes O or less.

ステップ110での予測熱負荷量Q2が0以下となると
、予測時刻を示すIを1アツプして(ステップ111)
 、ステップ101へ戻り、現時刻より3時間先すなわ
ち1時における予測熱負荷量Q3を獲得し、以下同様に
して、ステップ102での■が24を超えるまで、上述
の動作を繰り返す。
When the predicted heat load amount Q2 at step 110 becomes 0 or less, I, which indicates the predicted time, is increased by 1 (step 111).
, returns to step 101, obtains the predicted heat load amount Q3 for three hours ahead of the current time, that is, 1 o'clock, and repeats the above-mentioned operation in the same manner until ■ exceeds 24 in step 102.

ステップ102においてIが24を超えると、すなわち
1時間先の予測熱負荷量Q、から244時間先予測熱負
荷量Q24までを蓄熱槽3にて賄うことができると判断
すると、ヒートポンプ1が運転中である場合にはその運
転を停止して(ステップ112) 、予測u負riIJ
iQ、 〜Qzaとそht[い得る蓄熱槽順位との関係
を、蓄熱ポテンシャル画面として表示する。第5図は、
現時刻を15時とし、放熱完了時刻を22時としたとき
の、蓄熱ポテンシャル画面の一例である。同図において
、実線は槽水温度TST (J) 、−点鎖線は許容送
水温度TC(i) 、二点鎖線は予想値としての還水温
度TSR(J)を示し、横軸に蓄熱槽順位を示している
。ここに示された蓄熱ポテンシャル画面によれば、その
画面上の分割領域1〜■にて、16時における予測熱負
荷量QI8が蓄熱槽3−、から3−1.までの蓄熱量に
て賄われ、17時における予測熱負荷量QI9が蓄熱槽
3−16から3−3゜までの蓄熱量にて賄われるという
ように、22時までの各時間毎の予測熱負荷量とそれを
賄い得る蓄熱槽順位との関係を視覚的に捉えることがで
きる。
In step 102, when I exceeds 24, that is, when it is determined that the heat storage tank 3 can cover the predicted heat load amount Q for 1 hour ahead to the predicted heat load amount Q24 for 244 hours ahead, the heat pump 1 is in operation. If so, the operation is stopped (step 112) and the predicted
The relationship between iQ, ~Qza and the possible heat storage tank ranks is displayed as a heat storage potential screen. Figure 5 shows
This is an example of a heat storage potential screen when the current time is 15:00 and the heat radiation completion time is 22:00. In the figure, the solid line shows the tank water temperature TST (J), the - dotted line shows the allowable water supply temperature TC (i), the two-dot chain line shows the return water temperature TSR (J) as an expected value, and the horizontal axis shows the heat storage tank rank. It shows. According to the heat storage potential screen shown here, the predicted heat load amount QI8 at 16:00 in divided areas 1 to 3 on the screen is from heat storage tanks 3- to 3-1. The predicted heat load QI9 at 17:00 is covered by the heat storage amount from the heat storage tank 3-16 to 3-3°. It is possible to visually grasp the relationship between the load amount and the ranking of heat storage tanks that can cover it.

なお、第1図に示したステップ105において、槽水温
度TST (J)が許容送水温度TC(i)以下となる
と(TST (J)<TC(i)) 、空調機2への送
水温度と還水温度との温度差を十分に得ることができな
いものと判断し、ヒートポンプ1の運転を許可したうえ
(ステップ114)、すなわちヒートポンプlが運転中
でない場合にはその運転を行うものとしたうえ、槽水温
度TST(J)が許容送水温度TC(i)以下に至るま
での蓄熱ポテンシャル画面を表示する(ステ・ツブ11
3)。また、第1図に示したステップ104において、
蓄熱槽順位Jが100を超えれば(J≧100)、現在
の蓄熱槽3−1〜3−1゜。での蓄熱量では22時まで
の予測熱負荷量を賄うことができないものと判断し、ヒ
ートポンプ1の運転を許可したうえ(ステップ114)
 、賄い得る予測時刻までの蓄熱ポテンシャル画面を表
示する(ステップ113)。
In addition, in step 105 shown in FIG. It is determined that it is not possible to obtain a sufficient temperature difference from the return water temperature, and the operation of heat pump 1 is permitted (step 114). In other words, if heat pump 1 is not in operation, it is assumed to be operated. , displays the heat storage potential screen until the tank water temperature TST (J) reaches the allowable water supply temperature TC (i) or less (Step 11
3). Furthermore, in step 104 shown in FIG.
If the heat storage tank rank J exceeds 100 (J≧100), the current heat storage tank 3-1 to 3-1°. It is determined that the amount of heat stored at 10:00 cannot cover the predicted heat load until 10:00 p.m., and the operation of heat pump 1 is permitted (step 114).
, a heat storage potential screen up to the predicted time that can be met is displayed (step 113).

〔発明の効果〕〔Effect of the invention〕

以上説明したことから明らかなようにこの発明による蓄
熱量算出方法によると、ΔT(許容送水温度の制限域内
に位置する槽水温度と許容送水温度の制限域外に位置し
得る予想還水温度との差ΔT)と槽水量とに基づき蓄熱
量が求められるため、ΔTの内その許容送水温度の制限
域外に位置する部分に対応する蓄熱量が有効蓄熱量に加
えられ、算出される有効蓄熱量の増大に寄与するものと
なり、この算出される正確な有効蓄熱量に基づき、熱源
機器を無駄なく運転することが可能となる。
As is clear from the above explanation, according to the heat storage amount calculation method according to the present invention, ΔT (the difference between the tank water temperature that is within the limit range of allowable water supply temperature and the expected return water temperature that may be located outside the limit range of allowable water supply temperature) Since the heat storage amount is calculated based on the difference ΔT) and the tank water volume, the heat storage amount corresponding to the portion of ΔT that is outside the limit range of the allowable water supply temperature is added to the effective heat storage amount, and the calculated effective heat storage amount is Based on this calculated accurate effective heat storage amount, it becomes possible to operate the heat source equipment without waste.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明に係る蓄熱量算出方法の一実施例を適用
してなる空調システムでの制御動作を示すフローチャー
ト、第2図はARIMAモデル弐を使用した具体的な時
間負荷予測を説明する図、第3図は許容送水温度を求め
るだめの特性テーブルTBIおよび記憶テーブルTB2
を示す図、第4図は槽水温度と予想還水温度との差ΔT
を求めるための特性テーブルTB3を示す図、第5図は
現時刻を15時とし放熱完了時刻を22時としたときの
蓄熱ポテンシャル画面の一例を示す図、第6図は蓄熱槽
まわりの概略的な構成例を示す図、第7図は蓄熱槽順位
を横軸として縦軸にその槽水温度を示した図である。 1・・・ヒートポンプ、2・・・空調機、3゜3−、〜
3−+o。・・・蓄熱槽、TBI、TB3・・・特性テ
ーブル、TB2・・・記憶テーブル。
Fig. 1 is a flowchart showing the control operation in an air conditioning system using an embodiment of the heat storage amount calculation method according to the present invention, and Fig. 2 explains specific hourly load prediction using ARIMA model 2. Figure 3 shows the characteristic table TBI and memory table TB2 for determining the allowable water supply temperature.
Figure 4 shows the difference ΔT between the tank water temperature and the expected return water temperature.
Figure 5 is a diagram showing an example of the heat storage potential screen when the current time is 15:00 and the heat radiation completion time is 22:00. Figure 6 is a schematic diagram of the area around the heat storage tank. FIG. 7 is a diagram showing a typical configuration example, with the horizontal axis representing the heat storage tank rank and the tank water temperature along the vertical axis. 1... Heat pump, 2... Air conditioner, 3゜3-, ~
3-+o. ...heat storage tank, TBI, TB3...characteristic table, TB2...memory table.

Claims (1)

【特許請求の範囲】[Claims] 現時刻からnステップ先の熱負荷量を予測し、この予測
熱負荷量と設計最大熱負荷量との比である熱負荷率を求
め、かつ熱放出器への許容送水温度を定めたうえ、この
許容送水温度の制限域内に蓄熱槽の槽水温度があること
を確認して、この槽水温度と熱放出器からの予想還水温
度との差ΔTを前記熱負荷率に基づき求め、このΔTと
槽水量とに基づき前記蓄熱槽での蓄熱量を求めるように
したことを特徴とする蓄熱量算出方法。
After predicting the amount of heat load n steps ahead from the current time, finding the heat load factor which is the ratio of this predicted amount of heat load to the maximum design heat load, and determining the allowable water supply temperature to the heat radiator, After confirming that the tank water temperature of the heat storage tank is within the limit range of this allowable water supply temperature, the difference ΔT between this tank water temperature and the expected return water temperature from the heat radiator is determined based on the heat load rate. A method for calculating the amount of heat storage, characterized in that the amount of heat stored in the heat storage tank is calculated based on ΔT and the amount of water in the tank.
JP2100252A 1990-04-18 1990-04-18 Heat accumulating amount calculating method Pending JPH043832A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2100252A JPH043832A (en) 1990-04-18 1990-04-18 Heat accumulating amount calculating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2100252A JPH043832A (en) 1990-04-18 1990-04-18 Heat accumulating amount calculating method

Publications (1)

Publication Number Publication Date
JPH043832A true JPH043832A (en) 1992-01-08

Family

ID=14269034

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2100252A Pending JPH043832A (en) 1990-04-18 1990-04-18 Heat accumulating amount calculating method

Country Status (1)

Country Link
JP (1) JPH043832A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7187515B2 (en) 2003-02-05 2007-03-06 Quantum Corporation Method and system for tracking magnetic media with embedded optical servo tracks

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6338855A (en) * 1986-07-30 1988-02-19 Taisei Corp Temperature control method for heat storage tank

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6338855A (en) * 1986-07-30 1988-02-19 Taisei Corp Temperature control method for heat storage tank

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7187515B2 (en) 2003-02-05 2007-03-06 Quantum Corporation Method and system for tracking magnetic media with embedded optical servo tracks

Similar Documents

Publication Publication Date Title
Li et al. Intelligent multi-zone residential HVAC control strategy based on deep reinforcement learning
US10488069B2 (en) Generation of coordinated control commands for groupings of heating/ventilation/cooling thermostats
Nghiem et al. Receding-horizon supervisory control of green buildings
Chen Real-time predictive supervisory operation of building thermal systems with thermal mass
Lee et al. Optimal HVAC control as demand response with on-site energy storage and generation system
CN110874692A (en) Alternating current-direct current hybrid regional power grid spot market clearing calculation optimization method and device
US5778683A (en) Thermal storage system controller and method
US12038189B2 (en) Optimization engine for energy sustainability
CN110581320B (en) A kind of bus power lithium battery thermal insulation maintenance management method and cloud management server
JP2019535230A (en) System and method for randomized packet-based power management of conditional control load and bi-directional distributed energy storage system
Sun et al. A demand limiting strategy for maximizing monthly cost savings of commercial buildings
CN118347072A (en) Self-adaptive refrigeration control method and device based on ice cold accumulation system
JPH043832A (en) Heat accumulating amount calculating method
Pertzborn Using distributed agents to optimize thermal energy storage
CN115009065B (en) Charging processing method, device, electronic device and computer readable storage medium
JP2020201609A5 (en) Water demand forecasting system and its method
CN112602247A (en) A method for controlling energy exchange between energy subsystems under equilibrium conditions; a control center; an energy system; computer program and storage medium
DE102015219199A1 (en) SOC forecast for thermal storage for runtime optimization of heat pumps
CN114187137A (en) Charging pile power capacity distribution method and device, computer equipment and storage medium
US20220198584A1 (en) Computer-Assisted Energy Management Method And Energy Management System
JPH07151369A (en) Heat load prediction device and plant heat load prediction device
EP3850864B1 (en) Method and system for automatically protecting radio network equipment in extreme environmental conditions
JP3351588B2 (en) Operation support equipment for heat production and heat storage facilities
JP2021026299A (en) Demand adjustment device
JPH09264583A (en) Heat storage air conditioning system and method for determining residual storage amount