JPH0441748B2 - - Google Patents
Info
- Publication number
- JPH0441748B2 JPH0441748B2 JP61197856A JP19785686A JPH0441748B2 JP H0441748 B2 JPH0441748 B2 JP H0441748B2 JP 61197856 A JP61197856 A JP 61197856A JP 19785686 A JP19785686 A JP 19785686A JP H0441748 B2 JPH0441748 B2 JP H0441748B2
- Authority
- JP
- Japan
- Prior art keywords
- bottom plate
- stairs
- formwork
- concrete
- floor height
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Description
【発明の詳細な説明】
[産業上の利用分野]
本発明は、PC板を用いたコンクリート階段の
施工法に関する。[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a method of constructing concrete stairs using PC boards.
[従来の技術]
共同住宅等においては、第5図に示すように、
上階、下階の踊り場1,2間に、全部一体のPC
板で構成した段部3を架け渡すことによりコンク
リート階段を作つていることが多い。これは、共
同住宅等の場合、段高Hが各建物共通であり、
PC板製の段部3の型枠が少なくてするためであ
る。[Prior art] In apartment buildings, etc., as shown in Figure 5,
All PCs are installed between landings 1 and 2 on the upper and lower floors.
Concrete stairs are often constructed by spanning steps 3 made of boards. This means that in the case of apartment buildings, etc., the step height H is common to each building.
This is because the formwork for the stepped portion 3 made of PC board is reduced.
[発明が解決しようとする問題点]
ところが、上記従来の工法では、階高Hが変わ
り段部3の蹴上げBや踏み面Wの寸法が若干変化
する場合、段部3の型枠を変えなくてはならず、
コストがアツプするという問題がある。[Problems to be Solved by the Invention] However, in the above-mentioned conventional construction method, when the floor height H changes and the dimensions of the risers B and treads W of the step 3 change slightly, the formwork of the step 3 does not have to be changed. must not be
There is a problem of rising costs.
すなわち、階高Hの変化に対して型枠で対応す
るためには、目的の階高Hの段部3を形成可能な
寸法に形成した型枠を用意する必要があり製作コ
ストが上昇するほか、隣接する型枠同士の取り合
いに手間がかかつて施工性が低下する。 In other words, in order to respond to changes in the floor height H with a formwork, it is necessary to prepare a formwork with dimensions that allow formation of the stepped portion 3 of the desired floor height H, which increases production costs and increases production costs. , it takes time and effort to connect adjacent formworks, reducing workability.
本発明は、蹴上げや踏み面の寸法変化にも容易
に対応でき、汎用性及び生産性の高いコンクリー
ト階段の施工性を提供することを目的とする。 An object of the present invention is to provide concrete stairs that can easily accommodate changes in the dimensions of risers and treads, and are highly versatile and productive.
[問題点を解決するための手段]
本発明の工法は、上階、下階の踊り場間に底板
型枠を架け渡すとともに、同踊り場間に施工すべ
き階段の勾配に略沿つた形状に形成した階段フレ
ームに所定の間隔毎にブラケツトを固定し、底板
型枠に少なくとも上部を露出させて階段フレーム
を取り付け、この階段フレームに所定の間隔毎に
ブラケツトを固定し、これら各ブラケツトに、蹴
上げとそれに連なる踏み面を有する断面L字状の
PC段板を固定し、その後これらPC段板と前記底
板型枠との間の空間に、現場にてコンクリートを
打設することを特徴としている。この場合、底板
型枠をPC板で作つても勿論よいし、階段フレー
ムの一部をPC板でできた底板型枠に埋設しても
よい。[Means for Solving the Problems] The construction method of the present invention spans the bottom plate formwork between the landings on the upper and lower floors, and forms it into a shape that roughly follows the slope of the stairs to be constructed between the landings. brackets are fixed at predetermined intervals to the stair frame, the stair frame is attached to the bottom plate formwork with at least the upper part exposed, brackets are fixed to the stair frame at predetermined intervals, and risers and risers are attached to each of these brackets. L-shaped cross section with a continuous tread surface
The method is characterized in that the PC tiers are fixed, and then concrete is placed on site in the space between these PC tiers and the bottom plate formwork. In this case, the bottom plate form may of course be made of a PC board, or a part of the stair frame may be embedded in the bottom plate form made of a PC board.
[作用]
組み立てあるいは現場施工の段階で、フレーム
の勾配及びブラケツトの取り付けピツチを変化さ
せると、蹴上げの寸法及び踏み面の寸法が変わ
る。[Function] If the slope of the frame and the mounting pitch of the bracket are changed during assembly or on-site construction, the dimensions of the riser and the dimensions of the tread will change.
フレームは、施工すべき階段の階高の高い位置
において勾配を大きく湾曲させて形成し、階高の
低い位置において勾配を小さく湾曲させて形成す
ることにより階高の変化への対応が簡便で、かつ
ブラケツトの取り付けも容易であるから、階高の
変化に関係なく階段の施工性を確保することが出
来る。 The frame is formed with a large slope curved at the high floor height of the staircase to be constructed, and is formed with a small slope curved at the low floor height, making it easy to respond to changes in floor height. In addition, since the brackets are easy to install, the workability of the stairs can be ensured regardless of changes in floor height.
[実施例]
以下、本発明の一実施例を図面を参照して説明
する。[Example] Hereinafter, an example of the present invention will be described with reference to the drawings.
第1図、第2図は施工途中の状況、第3図、第
4図は出来上がつた階段を示している。 Figures 1 and 2 show the stairs during construction, and Figures 3 and 4 show the completed staircase.
本工法では、まず、符号10で示すPC段板及
び11で示すPC底板を作る。PC段板10は、第
3図に示すように、蹴上げ部10aとそれに連な
る踏み面部10bとを有する断面L字状のもので
ある。 In this construction method, first, a PC step plate indicated by the reference numeral 10 and a PC bottom plate indicated by 11 are made. As shown in FIG. 3, the PC step board 10 has an L-shaped cross section and has a riser portion 10a and a tread portion 10b connected thereto.
このPC段板10は、作ろうとする階段の幅寸
法相当の長さのもので、踏み面部10bは作ろう
とする階段の踏み面寸法Wよりかなり幅狭に、蹴
上げ部10aは作ろうとする階段の蹴上げ寸法B
より若干大きく形成する。蹴上げ部10aの寸法
を大きくするのは、調整代を持たせるためであ
る。また、踏み面部10bから蹴上げ部10aの
上部にかけては滑り止め12を取り付け、蹴上げ
部10aの内面側には、先端を突出させた状態で
ボルト13を埋め込む。 This PC tread 10 has a length corresponding to the width of the staircase to be constructed, the tread portion 10b is considerably narrower than the tread dimension W of the staircase to be constructed, and the riser portion 10a is the width of the staircase to be constructed. Riser dimension B
Form slightly larger. The reason why the dimensions of the riser portion 10a are increased is to provide an adjustment allowance. Further, a non-slip member 12 is attached from the tread portion 10b to the upper part of the riser portion 10a, and a bolt 13 is embedded in the inner surface of the riser portion 10a with its tip protruding.
また、PC底板11は、単なる平板状のもので、
これを製作するときには、コンクリート打設の際
に、長さ方向に沿うチヤンネル材14を2本平行
に間隔をおいて埋め込んでおく。これは、階段フ
レームとなるもので、第4図に示すように半分を
コンクリートの上に出す。チヤンネル材14は、
施工すべき階段の勾配を配慮して、適切な長さに
成形する。 In addition, the PC bottom plate 11 is just a flat plate,
When manufacturing this, two lengthwise channel members 14 are embedded in parallel at intervals during concrete pouring. This will become the stair frame, and half of it will be exposed on the concrete as shown in Figure 4. The channel material 14 is
Shape to an appropriate length, taking into consideration the slope of the stairs to be constructed.
そして、PC底板11を製作したら、チヤンネ
ル材14の表われている方を上にし、チヤンネル
材14に、作ろうとする階段のピツチと同じピツ
チでアングル材(ブラケツト)15を固定する。
この場合、階段の勾配を考慮して、アングル材1
5の向きをそろえる。ついで、各ブラケツト15
に、第1図に示すように、前記PC段板10をボ
ルト13を用いて固定する。これにより現場に搬
入する階段ユニツトUが出来上がる。 After manufacturing the PC bottom plate 11, with the exposed side of the channel material 14 facing upward, angle materials (brackets) 15 are fixed to the channel material 14 at the same pitch as the staircase to be made.
In this case, considering the slope of the stairs, the angle material 1
Align the directions of 5. Next, each bracket 15
Next, as shown in FIG. 1, the PC step board 10 is fixed using bolts 13. As a result, the stair unit U to be delivered to the site is completed.
一方、現場では、上階、下階の踊り場用にPC
板16,17を固定する。そして、出来上がつた
階段ユニツトUを運び込んで、両踊り場PC板1
6,17の間に、第2図に示すように架け渡す。
この状態で作業用の安定通路が出来上がる。そし
て、この通路上を作業者が通行して、後の工程の
作業を進める。 Meanwhile, at the site, PCs are installed for the upper and lower landings.
The plates 16 and 17 are fixed. Then, the completed staircase unit U was brought in, and PC boards 1 for both landings were installed.
6 and 17 as shown in FIG.
In this state, a stable passage for work is created. Then, workers pass along this path to proceed with the work in the subsequent process.
ついで、所定の箇所に配筋を施すとともに、踏
み面等に若干の型枠を配し、その後、第3図に示
すように、踊り場PC板16,17の上面、及び
PC底板11とPC段板10の間にある空間に、コ
ンクリート18を打設して、階段を完成する。な
お、PC段板10は、蹴上げ部10aの下端部の
余剰分が打設コンクリート内に埋設されるように
する。 Next, reinforcement is placed at predetermined locations, and some formwork is placed on the treads, etc., and then, as shown in FIG.
Concrete 18 is placed in the space between the PC bottom plate 11 and the PC step board 10 to complete the stairs. Note that the PC step board 10 is configured such that the surplus portion of the lower end of the riser portion 10a is buried in the poured concrete.
以上のように施工する場合、アングル材15を
固定するピツチとチヤンネル材14(この場合
PC底板11と一体である)を架け渡す勾配を変
えることにより、階高変化に柔軟に対応できる。
すなわち、チヤンネル材14を施工すべき階段の
勾配に略沿つた形状に形成することにより、階高
の変化に対して特別に部材を製作することが不要
で、かつアングル材15の取り付けも通常の方法
により容易に行うことができるから、目的形状に
製作したものを必要とする型枠による調整を比し
て階高の変化への対応が容易でかつ階段の施工性
を確保することが出来、階高の変化のある階段の
施工能率を向上することができる。 When performing construction as described above, the pitch for fixing the angle material 15 and the channel material 14 (in this case
By changing the slope of the bridge (integrated with the PC bottom plate 11), it is possible to flexibly respond to changes in floor height.
In other words, by forming the channel material 14 in a shape that roughly follows the slope of the stairs to be constructed, there is no need to manufacture special members for changes in floor height, and the installation of the angle material 15 can be done in the usual manner. Because it can be easily carried out by this method, it is easier to respond to changes in floor height and ensure the ease of constructing the stairs, compared to adjustment using formwork that requires molding to the desired shape. The construction efficiency of stairs with varying floor heights can be improved.
また、PCで製作する箇所は、段板10と底板
11であるが、これらは階高変化に関係なく一定
の形状に作ることができるから、生産しやすい。 Furthermore, the parts that are manufactured using PC are the step boards 10 and the bottom board 11, which are easy to produce because they can be made into a constant shape regardless of changes in floor height.
また、現場打ちコンクリート18を、踊り場と
段部に同時かつ連続的に打設するので、踊り場と
段部の一体性が確保される。さらに、踊り場に現
場打コンクリートを打設するので、レベルの調整
ができる。以上のような効果が得られる。 Moreover, since the cast-in-place concrete 18 is simultaneously and continuously placed on the landing and the step, the integrity of the landing and the step is ensured. Furthermore, since cast-in-place concrete is placed on the landing, the level can be adjusted. The above effects can be obtained.
なお、上の実施例においては、PC底板11に
一体のフレームであるチヤンネル材14を埋め込
んだ場合を示したが、PC底板11を製作した後
にチヤンネル材14を取り付けてもよい。 In the above embodiment, the channel material 14, which is an integral frame, is embedded in the PC bottom plate 11, but the channel material 14 may be attached after the PC bottom plate 11 is manufactured.
また、上の実施例においては、現場搬入の段階
で、段部を一つのユニツトに完成させているが、
現場でひとつづつ組み立ててもよい。すなわち、
まず、PC底板11を架け渡し、ついでチヤンネ
ル材14を架け渡し、その後アングル材15を所
定ピツチで固定し、PC段板10を固定する。こ
のように手順は自由に変えることができる。 Furthermore, in the above embodiment, the stepped sections are completed into one unit at the stage of delivery to the site.
It can be assembled piece by piece on site. That is,
First, the PC bottom plate 11 is bridged, then the channel material 14 is bridged, and then the angle material 15 is fixed at a predetermined pitch, and the PC step board 10 is fixed. In this way, the procedure can be changed freely.
さらに、上記実施例においては、PC底板11
を用いているが、単なる型枠を用いてもよい。 Furthermore, in the above embodiment, the PC bottom plate 11
is used, but a simple formwork may also be used.
[発明の効果]
本発明においては、組み立てあるいは施工の段
階で、フレームの勾配及びブラケツトの取り付け
ピツチを変化させることにより、容易に蹴上げの
寸法及び踏み面の寸法をかえることができる。し
たがつて、階高変化に柔軟に対応でき、汎用性が
広い。すなわち、フレームを施工すべき階段の勾
配に略沿つた形状に形成することにより、階高の
変化に対して特別に部材を製作することが不要
で、かつブラケツトの取り付けも通常の方法によ
り容易に行うことができるから、略目的の形状に
製作したものを必要とする型枠による調整に比し
て階高の変化への対応が容易でかつ階段の施工性
を確保することが出来、階高の変化のある階段の
施工能率を向上することができる。また、PCで
製作する箇所は、段板と底板であるが、これらは
階高変化に関係なく一定の形状に作ることができ
るから、生産しやすい。[Effects of the Invention] In the present invention, the dimensions of the riser and the dimensions of the tread can be easily changed by changing the slope of the frame and the mounting pitch of the bracket during the assembly or construction stage. Therefore, it can flexibly respond to changes in floor height and has wide versatility. In other words, by forming the frame in a shape that roughly follows the slope of the stairs to be constructed, there is no need to make special members for changes in floor height, and the brackets can be easily installed using normal methods. This makes it easier to adapt to changes in floor height, as well as ensuring the ease of constructing the stairs, compared to adjustment using formwork, which requires molding to approximately the desired shape. It is possible to improve the construction efficiency of stairs where there are changes in the number of stairs. Additionally, the parts that are manufactured using PC are the tiers and bottom plates, which are easy to produce because they can be made into a constant shape regardless of changes in floor height.
第1図〜第4図は本発明の施工法を説明するた
めの図で、第1図、第2図は施工途中の状況を示
す斜視図、第3図は完成した階段の側断面図、第
4図は第3図の−矢視断面図、第5図は従来
の施工法を説明するために示す階段の側断面図で
ある。
10……PC段板、10a……蹴上げ部、10
b……踏み面部、11……PC底板、13……埋
め込みボルト、14……チヤンネル材(階段フレ
ーム)、15……アングル材(ブラケツト)、1
6,17……踊り場用PC板、18……現場打コ
ンクリート。
Figures 1 to 4 are diagrams for explaining the construction method of the present invention, Figures 1 and 2 are perspective views showing the situation during construction, Figure 3 is a side sectional view of the completed staircase, FIG. 4 is a sectional view taken along the - arrow in FIG. 3, and FIG. 5 is a side sectional view of a staircase shown for explaining the conventional construction method. 10... PC step board, 10a... riser part, 10
b...Tread portion, 11...PC bottom plate, 13...Embedded bolt, 14...Channel material (stair frame), 15...Angle material (bracket), 1
6, 17... PC board for landing, 18... Cast concrete on site.
Claims (1)
に際し、同踊り場間に施工すべき階段の勾配に略
沿つた形状に形成した階段フレームに所定の間隔
毎にブラケツトを固定し、底板型枠に少なくとも
上部を露出させて前記階段フレームを取り付け、
前記ブラケツトに蹴上げとそれに連なる踏み面を
有する断面L字状のPC段板を固定し、該PC段板
と前記底板型枠との間の空間に、現場にてコンク
リートを打設することを特徴とするコンクリート
階段の施工法。1 When constructing the bottom plate formwork between the landings on the upper and lower floors, brackets are fixed at predetermined intervals to the stair frame formed in a shape that roughly follows the slope of the stairs to be constructed between the landings, and the bottom plate is attaching the stair frame to the formwork with at least the top exposed;
A PC tier plate having an L-shaped cross section and having a riser and a tread connected thereto is fixed to the bracket, and concrete is poured on site in the space between the PC tier plate and the bottom plate formwork. Construction method for concrete stairs.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61197856A JPS6355252A (en) | 1986-08-23 | 1986-08-23 | Construction method of concrete stairs |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61197856A JPS6355252A (en) | 1986-08-23 | 1986-08-23 | Construction method of concrete stairs |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6355252A JPS6355252A (en) | 1988-03-09 |
| JPH0441748B2 true JPH0441748B2 (en) | 1992-07-09 |
Family
ID=16381471
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP61197856A Granted JPS6355252A (en) | 1986-08-23 | 1986-08-23 | Construction method of concrete stairs |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6355252A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100587216B1 (en) | 2004-02-23 | 2006-06-08 | (주) 하나계전 | Indestructible stair formwork |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS534736A (en) * | 1976-07-02 | 1978-01-17 | Hitachi Ltd | Method of protecting titanium instruments from corrosion |
| JPS5620422A (en) * | 1979-07-27 | 1981-02-26 | Tokyo Shibaura Electric Co | Rice steamer |
| JPS599596B2 (en) * | 1981-07-21 | 1984-03-03 | 関西熱化学株式会社 | Coke oven riser tube carbon adhesion prevention device |
-
1986
- 1986-08-23 JP JP61197856A patent/JPS6355252A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6355252A (en) | 1988-03-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111088877B (en) | A fully prefabricated combined staircase | |
| US3994113A (en) | Stairs and railing system for multi-floored buildings and method of constructing same | |
| JPH08312090A (en) | Construction method and step formwork of concrete stairs leaving the step formwork | |
| CN112302161A (en) | Frame construction prefabricated assembly type concrete house | |
| EP0713942A1 (en) | Temporary stairway with landing and method for arrangement thereof | |
| JPH0441748B2 (en) | ||
| JPH0593448A (en) | Standardized step module | |
| US4050203A (en) | Stairs and railing system for multi-floored buildings and method of constructing same | |
| KR100500306B1 (en) | assembly type steel frame ladder of reinforcement concrete building and construction method thereof | |
| JPS61169563A (en) | Construction of upstairs | |
| KR100676193B1 (en) | Steel stairway structure | |
| JPH0483051A (en) | Construction of reinforced concrete staircase and staircase handrail precast concrete panel and staircase step form using for this | |
| KR200349959Y1 (en) | a stair for sheathing board structure | |
| JP3318694B2 (en) | How to form stairs | |
| CN115749169B (en) | Precast staircase structure and its installation method | |
| JP2586921B2 (en) | Concrete stairs and construction method | |
| KR200395552Y1 (en) | Steel-frame stair structure | |
| JP2002364139A (en) | Steel stair mounting hardware, mounting device and mounting method | |
| JP2004204508A (en) | Construction method of staircase, and form for staircase | |
| CN217299310U (en) | Prefabricated floor and prefabricated floor connected node | |
| KR100550458B1 (en) | Precast Stair Structure in Building Construction and Its Construction Method | |
| JP2757678B2 (en) | Manufacturing method of PC stairs | |
| KR100464594B1 (en) | The method of constructing the prefabricated step on reinforced concrete building | |
| JPH02112551A (en) | How to build a spiral staircase | |
| KR200288515Y1 (en) | assembly type steel frame ladder of reinforcement concrete building |