JPH0444078B2 - - Google Patents
Info
- Publication number
- JPH0444078B2 JPH0444078B2 JP60060813A JP6081385A JPH0444078B2 JP H0444078 B2 JPH0444078 B2 JP H0444078B2 JP 60060813 A JP60060813 A JP 60060813A JP 6081385 A JP6081385 A JP 6081385A JP H0444078 B2 JPH0444078 B2 JP H0444078B2
- Authority
- JP
- Japan
- Prior art keywords
- pedestal
- concrete
- wheels
- mount
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 38
- 238000010276 construction Methods 0.000 claims description 19
- 239000000428 dust Substances 0.000 claims description 15
- 238000005266 casting Methods 0.000 claims 3
- 238000009412 basement excavation Methods 0.000 description 7
- 239000004576 sand Substances 0.000 description 3
- 238000005507 spraying Methods 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003203 everyday effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Road Paving Machines (AREA)
- Lining And Supports For Tunnels (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
【発明の詳細な説明】
<産業上の利用分野>
本発明は、トンネル工事、あるいは屋外の工事
等において、床部分のコンクリートの打設に用い
る桟橋に関するものである。DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a pier used for pouring concrete for a floor portion in tunnel construction, outdoor construction, or the like.
<従来の技術>
たとえばトンネル工事において、特に切羽から
抗口までの通行路が確保されているか否かが、す
べての作業に大きな影響をあたえる。<Prior Art> For example, in tunnel construction, whether or not the passageway from the face to the tunnel entrance is secured has a great influence on all the work.
したがつて、トンネルの床部分(インバート)
のコンクリートを打設する場合には、トンネル内
の交通に与える影響を最少限とすることが重要で
ある。 Therefore, the floor of the tunnel (invert)
When pouring concrete into a tunnel, it is important to minimize the impact on traffic within the tunnel.
そのために従来はインバートの施工を半分に分
けて行い、残りの半分を交通に供用していた。 For this reason, in the past, invert construction was done in half and the remaining half was used for traffic.
<従来の技術の問題点>
上記した従来の施工方法には次のような問題点
が存在している。<Problems with conventional techniques> The conventional construction methods described above have the following problems.
<イ> 最近多く採用されているナトム工法で
は、トンネルの全断面を早急に閉合する必要が
ある。<B> The Natom construction method, which has been widely adopted recently, requires the entire cross section of the tunnel to be closed as soon as possible.
ところが上記したような施工方法では、半分
づつに分けて施工するため早期に閉合すること
ができない。 However, with the above-mentioned construction method, the construction is divided into two halves, which makes it impossible to close them quickly.
<ロ> 半分づつ施工することによつて、トンネ
ルの軸方向に不完全なコンクリートの打ち継ぎ
ができてしまい、大切なインバートの一体化が
出来ない。<B> By constructing the tunnel in half, incomplete concrete pouring is created in the axial direction of the tunnel, making it impossible to integrate the important invert.
<ハ> 片側は車両の通路になるため、施工に際
しては山留めの作業が必要となる。<C> Since one side will be used as a passage for vehicles, it will be necessary to perform mountain retaining work during construction.
<ニ> 湧水のある区間では、コンクリートの打
設作業中に残りの半分の通路が泥寧化してしま
い、車両の通行に支障をきたすばかりでなく、
地盤が緩み構造上問題が多くでる。<D> In the section where there is spring water, the remaining half of the path became muddy during the concrete pouring work, which not only caused a hindrance to vehicle traffic, but also
The ground becomes loose and many structural problems occur.
<ホ> NATMにおける吹付けは多大の粉塵を
発生し、人体に悪影響を与えるだけでなく視界
も悪くなつて作業に支障を来たす。<E> Spraying at NATM generates a large amount of dust, which not only has a negative impact on the human body but also reduces visibility and hinders work.
そのためには集塵機を設置すればよいが、吹
付け作業の場所は毎日前進して行くため集塵機
を固定させておいては意味がない。 For this purpose, a dust collector can be installed, but since the spraying work area moves forward every day, there is no point in keeping the dust collector fixed.
ところが集塵機は大型であるため多くの作業
が重なり合う狭いトンネル現場内では適当な設
置場所がなく、結局十分な機能を発揮させられ
ずにいるのが実情である。 However, since dust collectors are large, there is no suitable place to install them in narrow tunnel sites where many tasks overlap, and the reality is that they are not able to function to their full potential.
<ヘ> 床部分のコンクリートは広い面にひろげ
て打設する必要があるが、従来一般の方法では
長いシユートやコンベアを用いて、未打設部分
の端から徐々に後退しつつコンクリートを打設
して来るものであつた。<F> Concrete for the floor needs to be poured over a wide area, but the conventional method is to use a long chute or conveyor to pour concrete gradually backing up from the edge of the unfilled area. It was something that was coming.
しかし長いコンベア等を用いる方法は打設に
長時間を要し、不経済なものであつた。 However, the method using a long conveyor or the like requires a long time for pouring and is uneconomical.
<本発明の目的>
本発明は上記のような欠点を改善するためにな
されたもので、次のような桟橋を提供することを
目的とする。<Object of the present invention> The present invention was made to improve the above-mentioned drawbacks, and an object of the present invention is to provide a pier as follows.
<イ> トンネル内の通行になんら支障をきたす
ことなく、しかも早急に全断面を閉合すること
のできる、床部分のコンクリート施工用桟橋
<ロ> 充分な集塵機の機能を発揮させることが
できる床部分のコンクリート施工用桟橋
<ハ> 広い面積の床コンクリートであつてもコ
ンベアなどを用いず、至近距離までミキサー車
で運搬してコンクリートを打設できる床部分の
コンクリート施工用桟橋
<問題点を解決するための手段>
次に本発明に係る床部分のコンクリート施工用
桟橋の一実施例について説明する。<B> A pier for concrete construction of the floor section that allows the entire section to be quickly closed without causing any hindrance to traffic inside the tunnel.<B> A floor section that can perform the function of a sufficient dust collector. Pier for concrete construction <C> A pier for concrete construction on the floor where concrete can be poured over a wide area by transporting it to a close distance using a mixer truck without using a conveyor etc. < Solving the problem Means for Concrete Construction> Next, an embodiment of a pier for concrete construction of a floor portion according to the present invention will be described.
<イ> 架台
架台1は床板11と、その両側に立てて設けた
側壁12とによつて構成する。<A> Frame The pedestal 1 is composed of a floor plate 11 and side walls 12 erected on both sides thereof.
床板11および側壁12ともトラス等の強固で
軽量な構造体を使用する。 Both the floor plate 11 and the side walls 12 are made of a strong and lightweight structure such as a truss.
さらに側壁12と直交する位置には切羽側の傾
倒板13と、坑口側の傾倒板14とを、ジヤツキ
やレバーブロツク19、チエンブロツク、ベビー
ウインチその他の力によつて倒したり、ほぼ垂直
に起こしたりすることが可能なように構成する。 Further, at a position orthogonal to the side wall 12, a tilting plate 13 on the face side and a tilting plate 14 on the wellhead side are tilted down or raised almost vertically using a jack, lever block 19, chain block, baby winch, or other force. Configure it so that it can be used.
側壁12の下面の床下には、側壁12と平行に
床下レール15を設ける。 Under the floor on the lower surface of the side wall 12, an underfloor rail 15 is provided parallel to the side wall 12.
この床下レール15は側壁12と平行に二本設
け、各レール15には後述する移動台車4を滑動
自在に取り付ける。 Two underfloor rails 15 are provided parallel to the side walls 12, and a movable cart 4, which will be described later, is slidably attached to each rail 15.
<ロ> 油圧ジヤツキ
油圧ジヤツキ2を、架台1の四隅に垂直にとり
つける。<B> Hydraulic jack Attach the hydraulic jack 2 vertically to the four corners of the pedestal 1.
このジヤツキ2を伸縮することによつて、架台
1を上下動することができる。 By expanding and contracting this jack 2, the pedestal 1 can be moved up and down.
<ハ> 車輪
架台1には二種類の車輪、すなわち固定台車3
と、移動台車4とを設ける。<C> Wheels There are two types of wheels on the pedestal 1, namely a fixed trolley 3.
and a moving trolley 4 are provided.
固定台車3は、架台1の一方(入口側とする)
の端の近くの床下に設けた、通常の車輪である。 The fixed trolley 3 is located on one side of the pedestal 1 (the entrance side)
These are regular wheels installed under the floor near the edge of the building.
一方移動台車4は架台1の他方(出口側)に設
けた前記の床下レール15に、第2図に示すよう
な構造によつてスライド自在に取り付ける。 On the other hand, the movable trolley 4 is slidably attached to the above-mentioned underfloor rail 15 provided on the other side (exit side) of the pedestal 1 by a structure as shown in FIG.
すなわち、台車41の両端に平行に2本のアー
ム42を立ち上がらせ、そのアーム42の上端に
は係合車輪43を回転自在に取り付ける。 That is, two arms 42 are raised parallel to both ends of the truck 41, and engagement wheels 43 are rotatably attached to the upper ends of the arms 42.
さらに台車41には、床下レール15と平行に
回転する床下車輪44を回転自在に4個以上取り
付ける。 Furthermore, four or more underfloor wheels 44 that rotate in parallel with the underfloor rail 15 are rotatably attached to the trolley 41.
そして床下レール15にアーム42上端の係合
車輪43を回転自在に係合する。 Then, the engagement wheel 43 at the upper end of the arm 42 is rotatably engaged with the underfloor rail 15.
<ニ> 方向修正装置
架台1の中央には更に方向修正装置7を設け
る。<d> Direction correction device A direction correction device 7 is further provided at the center of the pedestal 1.
この装置7は架台1中央に垂直に取り付けた修
正用ジヤツキ71と、この修正用ジヤツキ71の
下部に取り付けた車輪72とより構成する。 This device 7 is composed of a correction jack 71 vertically attached to the center of the pedestal 1, and wheels 72 attached to the lower part of the correction jack 71.
ジヤツキ71と車輪72とは垂直ピンで連結す
ることによつて、車輪72の進行方向を自由に変
更し得るよう構成する。 The jack 71 and the wheel 72 are connected by a vertical pin so that the traveling direction of the wheel 72 can be freely changed.
<ホ> 集塵装置
両側の側壁に間をまたぐ状態で門構を設置す
る。<E> Dust collector A gate structure will be installed across the side walls on both sides.
そしてこの門構81の上部に集塵装置8を取り
付け、架台1の中心軸方向に並行方向に集塵して
排塵し得るよう構成する。 A dust collector 8 is attached to the upper part of this gate structure 81, and is configured to collect and discharge dust in a direction parallel to the central axis of the pedestal 1.
門構81の高さは、その下部を工事用の各種車
両が充分に通過できる高さに設定する。 The height of the gate structure 81 is set so that various construction vehicles can sufficiently pass through the lower part thereof.
<ト> 移動シユート
側壁12の下端縁に足場18の一端縁を軸支
し、ジヤツキやレバーブロツク、チエンブロツ
ク、ベビーウインチその他の方法によつて足場1
8を倒したり、ほぼ垂直に起こしたりすることが
可能なように構成する。<G> Moving chute One edge of the scaffold 18 is pivotally supported on the lower edge of the side wall 12, and the scaffold 1 is moved by using jacks, lever blocks, chain blocks, baby winches, or other methods.
8 is configured so that it can be folded down or raised almost vertically.
そして側壁12の高欄に相当する水平桁の外側
には、カーテンレール状にガイドレール16を取
り付ける。 A guide rail 16 in the form of a curtain rail is attached to the outside of the horizontal girder corresponding to the balustrade of the side wall 12.
このガイドレール16には嵌合して滑動するロ
ーラを設け、このローラからシユート17を吊り
上げる。 This guide rail 16 is provided with a roller that fits and slides, and the chute 17 is lifted from this roller.
従つてシユート17は軽く持ち上げて押すだけ
で、架台1の中心軸と並行方向にスムーズにスラ
イドすることになる。 Therefore, by simply lifting and pushing the chute 17, the chute 17 will smoothly slide in a direction parallel to the central axis of the pedestal 1.
<チ> 土砂積込装置
一方の側壁12の外側にはコンベア9を並行に
取り付ける。<H> Earth and sand loading device A conveyor 9 is installed parallel to the outside of one side wall 12.
そして傾倒板13に沿つて、床面近くの低い位
置に設置して、その上端は側壁12の上部を越え
て架台1内に突出させる。 It is installed at a low position near the floor along the tilting plate 13, and its upper end projects beyond the upper part of the side wall 12 into the frame 1.
次に作動方法について説明する。 Next, the operating method will be explained.
<イ> 架台1の設置(第3図)
架台1を、打設の完了したインバートコンクリ
ート5の上に設置する。<A> Installation of the pedestal 1 (Fig. 3) The pedestal 1 is installed on the invert concrete 5 that has been completely poured.
その時、架台1の入口側のジヤツキ2は、イン
バートコンクリート5の上に、出口側のジヤツキ
2は打設完了端の近くの地上(すなわち未打設部
分)に設置する。 At this time, the jacks 2 on the entrance side of the frame 1 are installed on the invert concrete 5, and the jacks 2 on the exit side are installed on the ground near the finished end of pouring (that is, in the unpoured area).
この状態では、架台1の入口側の傾斜板13
は、完了したコンクリート5の上に、出口側の傾
斜板14は未掘削部分の上に掛け渡してある。 In this state, the inclined plate 13 on the entrance side of the pedestal 1
The inclined plate 14 on the exit side is stretched over the completed concrete 5 and the unexcavated portion.
<ロ> 掘削(第4図)
次回のインバートコンクリートを打設するため
には未掘削部分を掘削して路面を下げなければな
らない。<B> Excavation (Figure 4) In order to place the next invert concrete, the unexcavated area must be excavated to lower the road surface.
そこで路盤6の掘削をおこなう。この掘削の間
は交通が不可能になるが、その時間は極めて短時
間であるから、作業のサイクルの調整によつて他
の作業に支障を来さないようにすることが容易で
ある。 Therefore, the roadbed 6 is excavated. Although traffic is not possible during this excavation, the time is so short that it is easy to adjust the work cycle so as not to interfere with other works.
掘削土砂は、架台1外側のコンベア9下部に投
入するだけで、架台1上に乗り上げて来たトラツ
クなどに積み込むことができ、トンネルの外部に
搬出できる。 The excavated earth and sand can be loaded onto a truck or the like that has climbed onto the pedestal 1 by simply throwing it into the lower part of the conveyor 9 outside the pedestal 1, and can be carried out to the outside of the tunnel.
従つて掘削機はトラツクの荷台まで腕を伸ばす
必要がなく作業能率が向上する。 Therefore, the excavator does not have to extend its arm to the truck bed, improving work efficiency.
<ハ> 架台の移動(第5図)
掘削が、架台1の長さの約半分だけ完了したら
架台1を移動する。<C> Moving the pedestal (Figure 5) When the excavation is completed by about half of the length of the pedestal 1, move the pedestal 1.
その移動のためにはまずすべての油圧ジヤツキ
2を短縮する。 To move it, first shorten all the hydraulic jacks 2.
その結果固定台車3の車輪、および移動台車4
の台車41下面がコンクリート上に接地する。 As a result, the wheels of the fixed trolley 3 and the mobile trolley 4
The lower surface of the trolley 41 is grounded on the concrete.
その状態で掘削機などで架台1を引つ張れば、
架台1の全重量は2種類の車輪に支持されること
になるので、容易にトンネルの内部方向に前進す
る。また少なくともこの移動時には、ローラでシ
ユート17や足場18を吊り上げておくほうが、
架台が抵抗なく前進するため望ましい。 If you pull the pedestal 1 with an excavator etc. in this state,
Since the entire weight of the frame 1 is supported by two types of wheels, it can easily move forward toward the inside of the tunnel. Also, at least during this movement, it is better to lift the chute 17 and scaffolding 18 with rollers.
This is desirable because the pedestal moves forward without resistance.
架台1をその長さの半分以上前進させると、移
動台車4よりも前方の重量が重くなつて前方が傾
くことになる。 If the gantry 1 is moved forward by more than half its length, the weight of the front part becomes heavier than the movable cart 4, and the front part will be tilted.
そこで前進を中止して、残りの半分の堀削をお
こなう。 At that point, we stopped the advance and excavated the remaining half of the hole.
<ニ> 移動台車の盛り代え(第6図)
掘削が完了したら、すべてのジヤツキ2をふた
たび伸長して架台1を浮き上がらせる。 その結
果、移動台車4はスライドが自由な状態となるの
で、移動台車4のみを前方に引つ張つて移動す
る。<D> Repositioning the movable cart (Fig. 6) When the excavation is completed, extend all the jacks 2 again and lift the pedestal 1. As a result, the movable trolley 4 is free to slide, so that only the movable trolley 4 is pulled forward and moved.
その状態でふたたびジヤツキ2を短縮して架台
1を前方に引けば、盛り代え前と同様に、架台1
の全重量は台車41上の床下車輪44と固定台車
3の車輪によつて支持されるので、この回で掘削
が完了した範囲だけ架台1を前進させることが出
来る。 In this state, if you shorten the jack 2 again and pull the pedestal 1 forward, the pedestal 1 will be
Since the entire weight of is supported by the underfloor wheels 44 on the truck 41 and the wheels of the fixed truck 3, the gantry 1 can be moved forward by the range that has been excavated in this round.
<ホ> 交通の開放
この状態で出口側の傾斜板14を倒せば、次回
掘削予定の道路盤6と、すでに硬化したコンクリ
ート面上とを架台1が接続することになり、架台
1上を通過して抗口と切羽との間の交通は自由と
なる。<E> Opening for traffic If the slope plate 14 on the exit side is lowered in this state, the pedestal 1 will connect the road slab 6 scheduled for next excavation with the concrete surface that has already hardened, and the vehicle will pass over the pedestal 1. As a result, traffic between the shaft and the face is free.
<ヘ> コンクリートの打設(第7,8図)
架台1の下にコンクリートを打設するには、ま
ず足場18を倒し、次にシユート17をガイドレ
ール16に沿つて所定位置まで移動させる。<F> Placing concrete (FIGS. 7 and 8) To pour concrete under the pedestal 1, first lower the scaffolding 18, and then move the chute 17 along the guide rail 16 to a predetermined position.
次にミキサー車を架台1上に乗り込ませ、直接
シユート17にコンクリートを流し込む。 Next, a mixer truck is mounted on the pedestal 1 and concrete is poured directly into the chute 17.
シユート17は短いからコンクリートの分離も
発生せず短時間で迅速に多量のコンクリートの打
設を行うことができる。 Since the chute 17 is short, concrete separation does not occur and a large amount of concrete can be placed quickly in a short period of time.
架台1下のコンクリートは、まつたく交通の影
響を受けないから丁寧な作業によつて良好なコン
クリートを打設し、十分に養生させることができ
る。 The concrete under the pedestal 1 is unaffected by traffic, so it is possible to pour good quality concrete through careful work and allow it to cure sufficiently.
<ト> 方向修正
架台1の方向を修正したい場合には、修正装置
7の車輪72の回転方向を、架台1と直交する方
向に位置させた後、ジヤツキ71を伸張する。<G> Direction correction When it is desired to correct the direction of the pedestal 1, the direction of rotation of the wheels 72 of the correction device 7 is positioned in a direction perpendicular to the pedestal 1, and then the jack 71 is extended.
そして架台1を支持しているジヤツキ2のいず
れかを短縮させて架台1の重量の半分近くを修正
装置7の車輪72に負担させる。 Then, one of the jacks 2 supporting the pedestal 1 is shortened so that nearly half of the weight of the pedestal 1 is borne by the wheels 72 of the correction device 7.
その状態で架台1を側方から押せば、架台1の
一端は容易に方向を変更する。 If the pedestal 1 is pushed from the side in this state, one end of the pedestal 1 will easily change direction.
<チ> 集塵排気
切羽側ではNATMの吹付け以外にも掘削土砂
の舞い上がりなど多くの塵埃が存在している。<H> Dust collection and exhaust In addition to the NATM spraying, there is a lot of dust on the face side, such as the flying up of excavated soil.
そのため架台一上に搭載した集塵機8を回転し
て切羽近くに貯まりやすい塵埃を集めて坑口側に
排出する。 Therefore, the dust collector 8 mounted on the mount is rotated to collect dust that tends to accumulate near the face and discharge it to the mine entrance side.
<本発明の効果>
本発明は上記したようになるから、次のような
効果を期待することができる。<Effects of the Present Invention> Since the present invention is as described above, the following effects can be expected.
<イ> インバートコンクリートの打設を、交通
路を半分に分割しないで行うことができるの
で、従来の作業のネツクとなつていたコンクリ
ートの打設が他の作業の支障とならずにおこな
うことができる。<B> Since invert concrete can be placed without dividing the traffic route in half, concrete can be placed without interfering with other work, which was the bottleneck of conventional work. can.
<ロ> 交通路の半分だけコンクリートを打設
し、他の半分は掘削したままにしておくこと
は、長時間の間トンネル全断面が閉合しない状
態のままにしておくことになる。<B> Placing concrete on only half of the traffic route and leaving the other half excavated will leave the entire tunnel cross-section unclosed for a long period of time.
本発明の工法では、インバートコンクリート
は分割した状態にはならず、掘削後の早い時期
に全断面の閉合が行われるからきわめて安全で
ある。 In the construction method of the present invention, invert concrete is not divided and the entire cross section is closed at an early stage after excavation, so it is extremely safe.
<ハ> 本発明の桟橋は、車輪によつて軽快かつ
迅速に移動するから、インバートコンクリート
の打設を短時間で完了させることができる。<C> Since the pier of the present invention moves lightly and quickly using wheels, it is possible to complete the placement of invert concrete in a short time.
<ニ> 軽快に移動するシユートを桟橋の外側に
設けたから、ミキサー車によつて至近距離から
短時間にコンクリートの打設ができる。<D> Since a chute that can be moved easily is installed on the outside of the pier, concrete can be poured from close range in a short time using a mixer truck.
従つて他の交通との兼ね合いもあるがポンプ
車によつて圧送する場合とくらべてコンクリー
トの閉塞の危険性もなく、きわめて迅速なコン
クリート打設が可能である。 Therefore, although there are trade-offs with other traffic, there is no risk of concrete clogging compared to when pumping by pump truck, and concrete can be placed extremely quickly.
<ホ> 桟橋の外側にコンベアを設けたので、掘
削機はトラツクの荷台まで腕を伸ばして注意深
く土砂を投入するような慎重な作業が不要であ
る。<E> Since the conveyor is installed outside the pier, the excavator does not have to do the careful work of reaching out to the loading platform of the truck and carefully loading the earth and sand.
従つてきわめて能率的な掘削を行うことがで
きる。 Therefore, extremely efficient excavation can be performed.
<ヘ> 従来は設置する場所がなくて困つていた
集塵機を架台上に搭載することにした。<F> We decided to mount the dust collector on the stand, which was a problem because there was no place to install it in the past.
そのため切羽の移動にともなつて順次前進で
き、しかも車両や他の作業にまつたく支障を与
えず常時、集塵、排出を行うことができる。 Therefore, it is possible to advance sequentially as the face moves, and it is also possible to collect and discharge dust at all times without causing any hindrance to vehicles or other operations.
第1図:本床部分のコンクリート施工用桟橋の
斜視図、第2図:移動台車の説明図、第3図〜第
7図:施工順序の説明図、第8図:コンクリート
打設状態の説明図。
1……架台、2……ジヤツキ、4……移動台
車、15……床下レール、5……コンクリート、
6……路盤。
Figure 1: Perspective view of the concrete construction pier for the main floor, Figure 2: Explanation of the moving trolley, Figures 3 to 7: Explanation of the construction sequence, Figure 8: Explanation of the concrete placement state. figure. 1... Frame, 2... Jacket, 4... Moving trolley, 15... Underfloor rail, 5... Concrete,
6...Roadbed.
Claims (1)
前進させるように構成し、 架台外側には吊り上げ及び吊り下げ可能な跳ね
橋状のコンクリート打設足場を設け、 コンクリート打設足場上にはコンクリート打設
シユートを架台の中心軸と平行方向にスライド可
能に設け、 架台上部には集塵機を搭載し、 架台側面にはコンベアを取り付けた、 床部分のコンクリート施工用桟橋。[Scope of Claims] 1. A mount for vehicle traffic is provided with a jack that moves the mount up and down and wheels that support the mount, and moves forward while alternately moving the mount using the wheels and raising the mount using the jacks. A drawbridge-like concrete casting scaffold that can be lifted and suspended is installed on the outside of the pedestal, and a concrete casting chute is installed on the concrete casting scaffold so that it can slide in a direction parallel to the central axis of the pedestal. , A pier for concrete construction on the floor with a dust collector mounted on the top of the pedestal and a conveyor attached to the side of the pedestal.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60060813A JPS61221498A (en) | 1985-03-27 | 1985-03-27 | Pier for constructing concrete of floor part |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60060813A JPS61221498A (en) | 1985-03-27 | 1985-03-27 | Pier for constructing concrete of floor part |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS61221498A JPS61221498A (en) | 1986-10-01 |
| JPH0444078B2 true JPH0444078B2 (en) | 1992-07-20 |
Family
ID=13153161
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP60060813A Granted JPS61221498A (en) | 1985-03-27 | 1985-03-27 | Pier for constructing concrete of floor part |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS61221498A (en) |
-
1985
- 1985-03-27 JP JP60060813A patent/JPS61221498A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS61221498A (en) | 1986-10-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH08199992A (en) | Reinforcing bar assembly / bar arrangement device | |
| JP2006028881A (en) | Self-propelled PC slab erection machine and PC slab erection method | |
| JP2539150B2 (en) | Bridge erection equipment | |
| JP6262805B2 (en) | Temporary roadway with movable lifting column in tunnel and road construction method using the temporary roadway | |
| JP3356048B2 (en) | Construction method of elevated structure using building girder | |
| JP2539151B2 (en) | Excavation method for bottom floor in tunnel | |
| JPH06185106A (en) | Undercarriage installation trolley and underdrain installation method | |
| JPH0444078B2 (en) | ||
| JP2736761B2 (en) | Pier for construction in tunnel | |
| JPH10196097A (en) | Moving support device and construction method for temporary structure using it | |
| CN108130864B (en) | Integral prefabricated bridge whole span beam transportation and erection equipment | |
| CN211496656U (en) | Purlin hangs equipment | |
| JP3892196B2 (en) | Slope-equipment carrying work device and construction method of this device | |
| JP2000337098A (en) | Structure moving frame and method for moving structure | |
| JP2967508B2 (en) | Scaffolding equipment for wall work | |
| JPH0791814B2 (en) | Arch-type shelter construction equipment | |
| JPH0470480B2 (en) | ||
| JPS61151398A (en) | Pier for constructing concrete of floor part | |
| JP2540000B2 (en) | Reinforcing bar mounting work cart | |
| JPS6315000A (en) | Method of building construction of tunnel lining board and device thereof | |
| JPH0336362B2 (en) | ||
| CN111003643A (en) | Truss hoisting equipment and application thereof | |
| JP2003147705A (en) | Construction method of split bridge body type traffic route | |
| JP2000230204A (en) | Elevated track construction method and equipment | |
| JPS6055165A (en) | Construction apparatus of building peripheral wall surface |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |