JPH0446528A - Automatic load selecting breaker - Google Patents

Automatic load selecting breaker

Info

Publication number
JPH0446528A
JPH0446528A JP2152327A JP15232790A JPH0446528A JP H0446528 A JPH0446528 A JP H0446528A JP 2152327 A JP2152327 A JP 2152327A JP 15232790 A JP15232790 A JP 15232790A JP H0446528 A JPH0446528 A JP H0446528A
Authority
JP
Japan
Prior art keywords
power
load
received
cutoff
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2152327A
Other languages
Japanese (ja)
Inventor
Noriyuki Hayashi
則行 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2152327A priority Critical patent/JPH0446528A/en
Publication of JPH0446528A publication Critical patent/JPH0446528A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は電力会社と自家用発電設備とが並列運転中に
発電機しゃ断器がトリップした時、自動的に選択しゃ断
する負荷の量を最小となるように制御する自動負荷選択
しゃ断装置に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] This invention minimizes the amount of load that is automatically selected and cut off when a generator breaker trips during parallel operation between an electric power company and a private power generation facility. This invention relates to an automatic load selection cutoff device that controls the load so that

〔従来の技術〕[Conventional technology]

従来のこの種の装置として第2図に示すものがあった。 A conventional device of this type is shown in FIG.

図において、1は電力会社の買電を受電する受電しゃ断
器、2は受電変圧器、3は受電変圧器202次側に設け
た受電2次しゃ断器、4は自家用発電設備の発電機しゃ
断器、5はその発電機、6は後述する負荷を開閉する所
内負荷しゃ断器、7は発電機5の出力電流を計測する計
器用変流器、8は各所内負荷電流を計測する計器用変流
器、9は母線電圧を計測する計器用変圧器、10は所内
負荷しゃ断器6をしゃ断する負荷しゃ断信号、11は所
定の演算を実行して負荷しゃ断信号10を出力する自動
負荷選択しゃ断制御部である。
In the figure, 1 is a power receiving breaker that receives power purchased by the electric power company, 2 is a power receiving transformer, 3 is a power receiving secondary breaker installed on the secondary side of the power receiving transformer 20, and 4 is a generator breaker for private power generation equipment. , 5 is the generator, 6 is an in-station load breaker that opens and closes the load, which will be described later, 7 is an instrument current transformer that measures the output current of the generator 5, and 8 is an instrument current transformer that measures each in-station load current. 9 is an instrument transformer for measuring the bus voltage; 10 is a load cutoff signal that cuts off the in-station load breaker 6; 11 is an automatic load selection cutoff control unit that executes a predetermined calculation and outputs the load cutoff signal 10; It is.

次に動作について説明する。まず、所内負荷(L)は電
力会社からの買電と、自家用発電設備による発電機5と
より電力が供給されているものとする。
Next, the operation will be explained. First, it is assumed that the in-house load (L) is supplied with power by purchasing power from an electric power company and by a generator 5 using private power generation equipment.

ここで、発電機5に故障が発生したとすると、直ちに発
電機しゃ断器4がトリップする。この時、自動負荷選択
しゃ断制御部11は受電2次しや断器3が過負荷でトリ
ップすることのないように瞬時に計器用変流器7と母線
の計器用変圧器9とから発電機5の解列時の発電機出力
を検出する。そして自動負荷選択しゃ断制御部11は負
荷フィーダの計器用変流器8と該計器用変圧器9とから
解列時の発電機出力に相当する所内負荷(L)を選択し
、負荷しゃ断信号10を出力して該当する所内負荷しゃ
断器6をトリップさせるように制御する。この場合、し
ゃ断される負荷しゃ断電力(AP)は自家用発電設備の
出力(cp)と同容量が解列対象となっていた。なお、
上記従来の自動負荷選択しゃ断装置に類似するものとし
て実公昭63−30196号公報がある。
Here, if a failure occurs in the generator 5, the generator breaker 4 will immediately trip. At this time, the automatic load selection/cutoff control unit 11 instantly connects the instrument current transformer 7 and the bus instrument transformer 9 to the generator so that the power receiving secondary shield switch 3 does not trip due to overload. The generator output at the time of disconnection of 5 is detected. Then, the automatic load selection/cutoff control unit 11 selects the station load (L) corresponding to the generator output at the time of disconnection from the instrument current transformer 8 and the instrument transformer 9 of the load feeder, and outputs the load cutoff signal 10. is output to trip the corresponding local load breaker 6. In this case, the load cutoff power (AP) to be cut off had the same capacity as the output (cp) of the private power generation equipment and was subject to parallel disconnection. In addition,
Japanese Utility Model Publication No. 63-30196 is similar to the above-mentioned conventional automatic load selection cutoff device.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

従来の自動負荷選択しゃ断装置は以上のように構成され
ているので、契約電力と受電電力との間に相当の差があ
り、受電容量に余裕があっても、無条件に自家用発電設
備出力(GP)と同容量の負荷しゃ断電力(AP)をし
ゃ断している。従って本来は、発電機解列時の余裕分に
ついては負荷をしゃ断する必要はなく、工場操業度を上
げるために、発電機解列時の負荷しゃ断は最小にしたい
などの課題があった。
Conventional automatic load selection cutoff devices are configured as described above, so even if there is a considerable difference between the contracted power and the received power, and there is a surplus in the received power capacity, the private power generation equipment output ( It cuts off load cutting power (AP) of the same capacity as GP). Therefore, originally, there was no need to cut off the load for the margin when the generator was disconnected, and there was a problem such as wanting to minimize the amount of load shedding when the generator was disconnected in order to increase the factory operating rate.

この発明は、上記のような課題を解消するためになされ
たもので、発電機が解列した時にしや断する対象負荷を
最小にして高効率操業を行うことができる自動負荷選択
しや断装置を得ることを目的とする。
This invention was made in order to solve the above-mentioned problems, and it is an automatic load selection and disconnection system that enables high-efficiency operation by minimizing the load to be disconnected when a generator is disconnected. The purpose is to obtain equipment.

〔課題を解決するための手段〕[Means to solve the problem]

この発明に係る自動負荷選択しゃ断装置は、電力会社の
買電と自家用発電設備の出力とを並列運転するとき、七
〇買電の受電電力を計測する受電電力計測手段と、その
受電電力計測手段に接続され、受電電力と契約電力とよ
り受電余裕分を演算し、前記発電機しゃ断器がトリップ
するとそのトリップ直前の自家用発電設備の出力から前
記受電余裕分を減算して負荷しゃ断電力を求め、負荷し
や断信号を発生する自動負荷選択しや断制御部とを備え
て構成したものである。
The automatic load selection cutoff device according to the present invention includes a received power measuring means for measuring the received power of 70 purchased power when the power purchased by the electric power company and the output of the private power generation equipment are operated in parallel, and the received power measuring means is connected to, calculates the power receiving margin from the received power and the contract power, and when the generator breaker trips, subtracts the power receiving margin from the output of the private power generation equipment immediately before the trip to obtain the load cutoff power, The present invention includes an automatic load selection and disconnection control section that generates a load disconnection signal.

〔作 用〕[For production]

この発明における自動負荷しゃ断制御部は、自家用発電
設備出力から契約電力と受電電力との差分、すなわち、
受電余裕分を減算した電力に見合う所内負荷をしゃ断す
るように負荷しゃ断信号を出力する。この動作によりし
ゃ断する工場負荷は最小となり、工場操業度を上げるこ
とができる。
The automatic load cutoff control unit in this invention calculates the difference between the contracted power and the received power from the private power generation equipment output, that is,
A load cutoff signal is output so as to cut off the station load corresponding to the power obtained by subtracting the received power margin. This operation minimizes the factory load that is cut off and increases the factory operating efficiency.

〔発明の実施例〕[Embodiments of the invention]

以下この発明の一実施例を図について説明する。 An embodiment of the present invention will be described below with reference to the drawings.

図中、第2図の同一の部分は同一の符号をもって図示し
た第1図において、12は受電電流を計測する受電計器
用変流器、13は受電電圧を計測する受電計器用変圧器
である。ここで、前記受電計器用変流器12及び受電計
器用変圧器13を総称して受電電力計測手段と呼ぶ。
In FIG. 1, the same parts as in FIG. 2 are designated by the same reference numerals. In FIG. . Here, the power receiving meter current transformer 12 and the power receiving meter transformer 13 are collectively referred to as received power measuring means.

次に動作について説明する。まず、所内負荷(L)は従
来例と同様に受電と発電機5とより電力が供給されてい
るものとする。ここで、発電機5が何らかの理由で故障
し、発電機しゃ断器4がトリップしたとすると、自動負
荷選択しや断制御部11は瞬時に計器用変流器7と母線
計器用変圧器9とから解列時の自家用発電設備出力(c
p)を検出して取込む。そして同時に受電計器用変流器
12と受電計器用変圧器13とから次の演算を実行する
Next, the operation will be explained. First, it is assumed that power is supplied to the station load (L) by the power receiving unit and the generator 5 as in the conventional example. Here, if the generator 5 fails for some reason and the generator breaker 4 trips, the automatic load selection and disconnection control section 11 instantly switches the instrument current transformer 7 and the bus instrument transformer 9. Private power generation equipment output (c
p) is detected and taken in. At the same time, the following calculation is executed from the power receiving meter current transformer 12 and the power receiving meter transformer 13.

負荷しゃ断電力(AP)−自家用発電設備出力(GP)
−APここで、△P=CP−DP △P;受電余裕電力 CP:契約電力 DP;受電電力 すなわち、受電電力(DP)を検出して取込み、契約電
力(cp)との差(AP)を前記自家用発電設備出力(
GP)より減算し、それに見合うだけの所内負荷(L)
を選択し負荷しゃ断信号10にて所内負荷しゃ断器6を
トリップするように制御する。
Load cutting power (AP) - Private power generation equipment output (GP)
-AP where, △P = CP - DP △P; Received surplus power CP: Contract power DP; Received power, that is, the received power (DP) is detected and taken in, and the difference (AP) from the contract power (cp) is calculated. The private power generation equipment output (
GP) and the corresponding internal load (L)
is selected and the load breaker 6 is controlled to trip using the load breaker signal 10.

尚、上記実施例では、自家用発電設備解列時の所内負荷
しゃ断器の動作について説明したが、受電側解列時でも
自家用発電機設備出力の余裕分を減算した所内負荷しゃ
断する制御であってもよく、上記実施例と同様の効果を
奏する。
In the above embodiment, the operation of the on-site load breaker when the private power generation equipment is disconnected is explained, but even when the power receiving side is disconnected, the control is such that the on-site load is cut off by subtracting the margin of the output of the private generator equipment. The same effect as in the above embodiment can be obtained.

〔発明の効果〕〔Effect of the invention〕

以上のようにこの発明によれば自動負荷選択しや断制御
部は発電機が解列した時に自家用発電設備出力から契約
電力と受電電力との差を減算した電力に見合う所内負荷
を解列するようにしたので、効率の良い負荷しゃ断が実
施でき、工場操業度が向上する効果がある。
As described above, according to the present invention, when the generator is disconnected, the automatic load selection and disconnection control unit disconnects the in-house load corresponding to the electric power obtained by subtracting the difference between the contracted power and the received power from the private power generation equipment output. As a result, efficient load shedding can be carried out, which has the effect of improving factory operating efficiency.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の一実施例による自動負荷選択しや断
装置を示す構成図、第2図は従来の自動負荷選択しゃ断
装置を示す構成図である。 図において、10は負荷しゃ断信号、11は自動負荷選
択しゃ断制御部、12は受電計器用変流器、13は受電
計器用変圧器である。 なお、図中、同一符号は同一 又は相当部分を示す。 特許出願人  三菱電機株式会社 10:’!<’aLwHイ請 12゛+電計器用度:九器 13、受電計器用麦圧器
FIG. 1 is a block diagram showing an automatic load selection and cutoff device according to an embodiment of the present invention, and FIG. 2 is a block diagram showing a conventional automatic load selection and cutoff device. In the figure, 10 is a load cutoff signal, 11 is an automatic load selection cutoff control section, 12 is a current transformer for a power receiving meter, and 13 is a transformer for a power receiving meter. In addition, the same symbols in the figures indicate the same or equivalent parts. Patent applicant Mitsubishi Electric Corporation 10:'! <'aLwH Ike 12゛+Electrical meter grade: 9th grade 13, Barley pressure gauge for power receiving meter

Claims (1)

【特許請求の範囲】[Claims] 電力会社の買電と自家用発電設備の出力とを並列運転中
に発電機しゃ断器がトリップすると負荷を選択しゃ断す
る自動負荷選択しゃ断装置において、前記買電の受電電
力を計測する受電電力計測手段と、前記受電電力計測手
段に接続され、前記受電電力と契約電力とより受電余裕
分を演算し、前記発電機しゃ断器がトリップするとその
トリップ直前の自家用発電設備の出力から前記受電余裕
電力を減算して負荷しゃ断電力を求め、負荷しゃ断信号
を発生する自動負荷選択しや断制御部とを備えたことを
特徴とする自動負荷選択しゃ断装置。
In an automatic load selection breaker that selectively cuts off a load when a generator breaker trips during parallel operation of power purchased by a power company and the output of a private power generation facility, a received power measuring means for measuring the received power of the purchased power; , connected to the received power measuring means, calculates the received surplus power from the received power and contract power, and when the generator breaker trips, subtracts the received surplus power from the output of the private power generating equipment immediately before the trip. 1. An automatic load selection and cutoff device comprising: an automatic load selection and cutoff control unit that determines load cutoff power and generates a load cutoff signal.
JP2152327A 1990-06-11 1990-06-11 Automatic load selecting breaker Pending JPH0446528A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2152327A JPH0446528A (en) 1990-06-11 1990-06-11 Automatic load selecting breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2152327A JPH0446528A (en) 1990-06-11 1990-06-11 Automatic load selecting breaker

Publications (1)

Publication Number Publication Date
JPH0446528A true JPH0446528A (en) 1992-02-17

Family

ID=15538108

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2152327A Pending JPH0446528A (en) 1990-06-11 1990-06-11 Automatic load selecting breaker

Country Status (1)

Country Link
JP (1) JPH0446528A (en)

Similar Documents

Publication Publication Date Title
JP3319264B2 (en) Solar power system
JPH0446528A (en) Automatic load selecting breaker
JP2721285B2 (en) Control device of AC / DC converter
JPH11289670A (en) Bipolar DC transmission system
JP7618474B2 (en) Three-phase power conversion system for electric railways
JP3729616B2 (en) Active filter operation / control method
JP2751009B2 (en) Grid connection protection device
JPH1118278A (en) Bipolar DC transmission system
SU1056341A1 (en) Device for monitoring conditions of de-energized power line with shunting reactors during cycle of single-phase automatic phase reclosing
JPS6118631Y2 (en)
JPS6223222Y2 (en)
JP2007060797A (en) Generator protective relay device
JPH0332289B2 (en)
JPH1084635A (en) Grid connection protection device
JPH0468874B2 (en)
US1529769A (en) Relay system
JPH0898411A (en) Grid interconnection protection device
JPS60148345A (en) Generating plant
JPS5818866B2 (en) Denryokukeito no Jikohakiyuuboshisouchi
JPH03178600A (en) No-load detector for generator
JPH0522868A (en) Turbine generator islanding detection device
JPS61116935A (en) Reverse power protective device
JPH07131931A (en) Grid interconnection protection device
JPH06343230A (en) System-interconnection protecting apparatus
JP2002051452A (en) Distance relay device