JPH0452247Y2 - - Google Patents

Info

Publication number
JPH0452247Y2
JPH0452247Y2 JP11093887U JP11093887U JPH0452247Y2 JP H0452247 Y2 JPH0452247 Y2 JP H0452247Y2 JP 11093887 U JP11093887 U JP 11093887U JP 11093887 U JP11093887 U JP 11093887U JP H0452247 Y2 JPH0452247 Y2 JP H0452247Y2
Authority
JP
Japan
Prior art keywords
aggregate
dust
bin
screen
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11093887U
Other languages
Japanese (ja)
Other versions
JPS6419608U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP11093887U priority Critical patent/JPH0452247Y2/ja
Publication of JPS6419608U publication Critical patent/JPS6419608U/ja
Application granted granted Critical
Publication of JPH0452247Y2 publication Critical patent/JPH0452247Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Road Paving Machines (AREA)

Description

【考案の詳細な説明】 「産業上の利用分野」 本考案は、ホツトエレベータからスクリーンを
介してホツトビン内に骨材を貯蔵する際に、発生
するダストをホツトビン内から効率良く除去する
ことのできるアスフアルトプラントに関するもの
である。
[Detailed description of the invention] "Industrial application field" The present invention is capable of efficiently removing dust generated from the inside of the hot bin when aggregate is stored in the hot bin from the hot elevator through the screen. It concerns an asphalt plant.

「従来の技術」 従来、このアスフアルトプラントとしては、第
2図に示すようなものが知られている。
"Prior Art" Conventionally, as this asphalt plant, the one shown in FIG. 2 is known.

図中、符号1は骨材(砕石や砂)2を収納した
骨材ホツパであり、この骨材ホツパ1から取り出
された骨材2はベルトコンベヤによつてドライヤ
3に搬送され、このドライヤ3によつて乾燥、加
熱された後、ホツトエレベータ4によつて上方に
搬送され、ついでに振動するスクリーン5上に投
下されて所定の粒度毎に分別されんはがら、各粒
度毎に内部が区画されたホツトビン6内へ貯蔵さ
れる。そして、ホツトビン6内に貯蔵された骨材
は骨材計量槽7によつて計量された後ミキサ8内
に投下され、ここでアスフアルトや、フイラ、ダ
スト等と混合されてアスフアルト合材が製造され
る。
In the figure, reference numeral 1 is an aggregate hopper that stores aggregate (crushed stone or sand) 2, and the aggregate 2 taken out from this aggregate hopper 1 is conveyed to a dryer 3 by a belt conveyor. After being dried and heated by a hot elevator 4, the particles are transported upward by a hot elevator 4, and are then dropped onto a vibrating screen 5 to be separated into predetermined particle sizes. It is stored in the hot bin 6. The aggregate stored in the hot bin 6 is weighed by an aggregate measuring tank 7 and then dumped into a mixer 8, where it is mixed with asphalt, filler, dust, etc. to produce an asphalt mixture. Ru.

なお、前記アスフアルトはアスフアルトタンク
9から計量器10に送られて計量された後、ミキ
サ8へ散布され、前記フイラはフイラタンク11
からフイラエレベータ12によつてフイラビン1
3へ貯蔵され、ついで、ダストビン14に貯蔵さ
れたダストとともに、計量器15によつて計量さ
れた後、ミキサ8内へ投下されるようになつてい
る。
The asphalt is sent from the asphalt tank 9 to a measuring device 10 and measured, and then sprayed to the mixer 8, and the filler is sent to the filler tank 11.
From the filler bin 1 by the filler elevator 12
3, and then, together with the dust stored in the dust bin 14, is weighed by a measuring device 15 and then dumped into the mixer 8.

そして、前記ドライヤ3内で骨材2を加熱する
際に発生する煤煙は、ダクトを介して排風機16
によつて吸収されて煙突17から排気されるが、
その間に集塵機によつて煤煙中のダストが除去さ
れる。まず、煤塵中の粗粒ダストは前記ドライヤ
3との間に設けられたダクト18aを介して一次
集塵機のサイクロン集塵機19によつて回収さ
れ、前記骨材2とともにホツトエレベータ4に搬
送される。また、前記サイクロン集塵機19には
ダクト18bを介して骨材計量槽7内のダストが
回収されるとともに、ホツトエレベータ4からス
クリーン5を介してホツトビン6内に骨材を貯蔵
する際に発生するダストが、ホツトビン6の天井
部分からサイクロン集塵機19の入口付近に連通
されたスカベンジングダクト20によつて回収さ
れるようになつている。さらに、サイクロン集塵
機19によつて回収されない微粒ダストは、サイ
クロン集塵機19を通過してダスト21を介して
二次集塵機であるバツグフイルタ22で回収され
た後、フイラエレベータ12によつて前記ダスト
ビン14内へ貯蔵されるようになつている。
The soot and smoke generated when the aggregate 2 is heated in the dryer 3 is sent to the exhaust fan 16 through the duct.
is absorbed by the gas and exhausted from the chimney 17,
During this time, the dust in the soot is removed by a dust collector. First, the coarse dust in the soot and dust is collected by a cyclone dust collector 19, which is a primary dust collector, through a duct 18a provided between the dryer 3 and the dryer 3, and is conveyed to the hot elevator 4 together with the aggregate 2. The cyclone dust collector 19 also collects dust in the aggregate measuring tank 7 via a duct 18b, and collects dust generated when aggregates are stored in the hot bin 6 from the hot elevator 4 via the screen 5. is collected by a scavenging duct 20 connected from the ceiling of the hot bin 6 to the vicinity of the entrance of the cyclone dust collector 19. Further, the fine dust that is not collected by the cyclone dust collector 19 passes through the cyclone dust collector 19 and is collected by a bag filter 22 which is a secondary dust collector via the dust 21, and is then moved into the dust bin 14 by the filler elevator 12. It is now being stored in

「考案が解決しようとする問題点」 ところが、前記アスフアルトプラントにおいて
は、ホツトビンの上方にあるスクリーンの天井付
近にのみスカベンジングダクトを設けたものであ
るので、天井付近を浮遊するダストは除去するこ
とができるが、ホツトビン内を浮遊しながら降下
するダストまで十分に回収することができず、ホ
ツトビン内に前記ダストが落下して堆積すること
になり、スクリーンで分別された骨材の粒度と異
なる微細な粒度のダストがホツトビン内に貯蔵さ
れることとなり、その結果、骨材の配合比率に誤
差が生じることとなり、最適なアスフアルト合材
を製造することが困難になるという問題点があつ
た。
``Problem that the invention aims to solve'' However, in the above-mentioned asphalt plant, the scavenging duct is installed only near the ceiling of the screen above the hot bin, so the dust floating near the ceiling must be removed. However, it is not possible to sufficiently collect the dust that floats and descends inside the hot bin, and the dust falls and accumulates inside the hot bin. The problem was that dust of a certain particle size was stored in the hot bin, and as a result, an error occurred in the blending ratio of the aggregate, making it difficult to produce an optimal asphalt mixture.

本考案は前記問題点に鑑みてなされたものであ
り、ホツトビン内で浮遊するダストを確実に除去
してホツトビン内にダストが堆積するのを防止
し、所望の粒度の骨材のみが貯蔵されるようにし
て、最適なアスフアルト合材を製造することので
きるアスフアルトプラントを提供することを目的
としている。
The present invention has been developed in view of the above-mentioned problems, and it reliably removes the dust floating in the hot bin, prevents the dust from accumulating in the hot bin, and stores only aggregate of the desired particle size. The purpose of this invention is to provide an asphalt plant that can produce an optimal asphalt mixture.

「問題点を解決するための手段」 本考案は、骨材をスクリーンによつて粒度毎に
分別しながらホツトビンへ貯蔵する際に発生する
ダストを回収するためのダストを、骨材乾燥用ド
ライヤで生じる煤煙中のダストを回収する集塵機
とスクリーンの上部との間に設けるとともに、前
記集塵機と内部が骨材の粒度毎に区画されたホツ
トビンの側部との間にもダクトを設けることよ
り、前記問題点を解決したものである。
``Means for Solving the Problems'' This invention uses an aggregate dryer to collect dust generated when aggregate is separated by particle size using a screen and stored in hot bins. By providing a duct between the dust collector that collects the dust in the generated soot and the upper part of the screen, and also providing a duct between the dust collector and the side of the hot bin whose interior is divided according to the grain size of the aggregate, the above-mentioned This solves the problem.

「作用」 本考案では、骨材がスクリーンに投下され、さ
らに振動するスクリーンの内部を通過する際にダ
ストが発生し、これがホツトビン内を浮遊する
が、スクリーンの上方に舞い上がつたダストは上
部のダクトから吸引するとともに、ホツトビンの
内部を浮遊しながら降下するダストは側部材のダ
クトから吸引して集塵機で回収することにより、
ホツトビンの内部にダストが堆積するのを防止す
る。
"Operation" In this invention, the aggregate is dropped onto the screen, and when it passes through the vibrating screen, dust is generated, which floats in the hot bin, but the dust that flies up above the screen is At the same time, the dust floating inside the hot bin is sucked through the duct of the side member and collected by the dust collector.
Prevent dust from accumulating inside the hot bin.

「実施例」 以下、本考案を第1図、第2図を参照しながら
説明する。第1図は本考案の一実施例の要部を示
し、第2図のホツトビン付近を拡大し、これに本
考案の構成要素を付加して示したものであり、そ
の他の構成は第2図と全く同様である。前記第2
図の従来の技術に示した構成要素と同一の要素に
ついては、同一符号を付してその説明を省略す
る。
``Example'' The present invention will be described below with reference to FIGS. 1 and 2. FIG. 1 shows the main part of an embodiment of the present invention, and the vicinity of the hot bin in FIG. 2 is enlarged, and the constituent elements of the present invention are added to this. The other configuration is shown in FIG. 2. It is exactly the same. Said second
Elements that are the same as those shown in the prior art in the figures are given the same reference numerals and their explanations will be omitted.

第1図中符号6は骨材を貯蔵するためのホツト
ビンであり、骨材を粒度毎に分別して貯蔵するた
めに内部が複数に区画されている。本実施例にお
いては、4つの貯蔵室に区画されており、図中左
側から、貯蔵される骨材の粒度が大きな順に1ビ
ン6a、2ビン6b、3ビン6c、4ビン6dと
なつている。そして、ホツトビン6の上部にはホ
ツトエレベータ4によつて搬送され、シユート4
aから投入された骨材を分別するためのスクリー
ン5が配設されている。スクリーン5は4段に積
層されたスクリーン本体5a,5a,5a,5a
が1ビン6a側に向つて下方に緩やかに傾斜して
いるとともに、スクリーン全体は所定の周期で振
動するように構成されており、これによつてスク
リーン5内に投入された骨材の内、粒度の小さい
骨材から順次降下して4ビン6d側から貯蔵さ
れ、粒度の大きな骨材ほど最後までスクリーン上
を移動して、その先端部から1ビン6aへ落下す
るようになつている。
Reference numeral 6 in FIG. 1 is a hot bin for storing aggregates, and the interior thereof is divided into a plurality of sections for storing aggregates separated by particle size. In this embodiment, the storage rooms are divided into four storage rooms, and from the left side of the figure, the aggregate particle size to be stored is arranged in descending order of size: 1 bottle 6a, 2 bottle 6b, 3 bottle 6c, and 4 bottle 6d. . The hot bin 6 is then transported to the upper part of the hot bin 6 by the hot elevator 4, and is placed in the chute 4.
A screen 5 is provided to separate the aggregates introduced from a. The screen 5 has screen bodies 5a, 5a, 5a, 5a stacked in four stages.
is gently inclined downward toward the 1-bin 6a side, and the entire screen is configured to vibrate at a predetermined period, so that among the aggregates put into the screen 5, Aggregates with smaller particle sizes descend in order and are stored from the 4th bin 6d side, and larger aggregates move on the screen to the end and fall from the tip to the 1st bin 6a.

そして、スクリーン5はホツトビンカバー30
によつて覆われており、ホツトビンカバー30の
天井部分にはスカベンジングダクト20の一端部
が接続されている。スカベンジングダクト20の
他端部は一次集塵機であるサイクロン集塵機19
の入口付近に連通されているとともに、スカベン
ジングダクト20の一端部側にはホツトビン6の
各貯留室3ビン6c〜4ビン6dの側部に取り付
けられた分岐ダクト30c,30dに連通するダ
クト31が接続された構成となつており、その他
の構成については、前記従来の技術に示し通りで
ある。
And the screen 5 is a hot bin cover 30
One end of the scavenging duct 20 is connected to the ceiling portion of the hot bin cover 30. The other end of the scavenging duct 20 is a cyclone dust collector 19 which is a primary dust collector.
At one end of the scavenging duct 20, there is a duct 31 that communicates with branch ducts 30c and 30d attached to the sides of each storage chamber 3 6c to 4 6d of the hot bin 6. The other configurations are as shown in the prior art described above.

つぎに、前記構成の本実施例に係る、アスフア
ルトプラントの作用について説明する。
Next, the operation of the asphalt plant according to this embodiment having the above configuration will be explained.

まず、骨材ホツパ1から取り出された骨材2は
ベルトコンベヤによつてドライヤ3に搬送され、
このドライヤ3によつて乾燥、加熱された後、ホ
ツトエレベータ4によつて上方に搬送される。そ
して、ホツトエレベータ4の上部からシユート4
aを通つて振動しているスクリーン5の上端部に
投下される。スクリーン5に投下された骨材2
は、スクリーンの振動に伴して、粒度の小さなも
のから順次スクリーン本体5a内を落下して、ホ
ツトビン6の4ビン6d側から貯蔵される一方、
粒度大きな骨材2はスクリーン本体5aの先端か
ら1ビン6a側へ貯蔵されることになる。
First, the aggregate 2 taken out from the aggregate hopper 1 is conveyed to the dryer 3 by a belt conveyor.
After being dried and heated by this dryer 3, it is transported upward by a hot elevator 4. Then, from the top of the hot elevator 4,
It is dropped onto the upper end of the vibrating screen 5 through a. Aggregate 2 dropped onto screen 5
As the screen vibrates, the particles fall through the screen body 5a in descending order of particle size and are stored from the 4th bin 6d side of the hot bin 6.
The aggregate 2 having a large particle size is stored from the tip of the screen main body 5a toward the 1-bin 6a side.

そして、骨材2がホツトエレベータ4からスクリ
ーン5へ投下されたり、振動するスクリーン5内
を落下したりする際に、骨材2のダストが発生し
てホツトビン内を浮遊するが、スクリーン5の上
方に舞い上がつた軽いダストは、スカベンジング
ダクト20へ吸引されるとともに、ホツトビン6
内を浮遊しながら降下するダストは、各ビン6c
〜6dの側部に取り付けられた分岐ダクト30c
〜30dからダクト31を介してスカベンジング
ダクト20内へ吸引される。
Then, when the aggregate 2 is dropped from the hot elevator 4 onto the screen 5 or falls through the vibrating screen 5, dust of the aggregate 2 is generated and floats in the hot bin, but the dust does not rise above the screen 5. The light dust that flies up is sucked into the scavenging duct 20 and the hot bin 6.
The dust that descends while floating inside each bin 6c
Branch duct 30c attached to the side of ~6d
~30d is sucked into the scavenging duct 20 via the duct 31.

そして、スカベンジングダクト20に吸引され
たダストの内、粒度の大きなダストは、ドライヤ
3で発生する煤煙中に含まれる粗粒ダストととも
に、サイクロン集塵機19によつて回収されて、
再びホツトエレベータ4でホツトビン6内へ搬送
される一方、微粒ダストはサイクロン集塵機19
を通過してダクト21からバツグフイルタ22に
搬送されてここで回収され、フイラエレベータ1
2によつてダストビン14へ貯蔵された後、ミキ
サ8内へ投下されてアスフアルト合材の原料とな
る。
Among the dust sucked into the scavenging duct 20, large-grained dust is collected by the cyclone dust collector 19 together with coarse-grained dust contained in the soot generated by the dryer 3.
The fine dust is transported again into the hot bin 6 by the hot elevator 4, while the fine dust is transferred to the cyclone dust collector 19.
is conveyed from the duct 21 to the bag filter 22, where it is collected and sent to the filler elevator 1.
After being stored in the dust bin 14 by the asphalt mixer 2, it is dropped into the mixer 8 and becomes a raw material for asphalt mixture.

また、ホツトビン6内を浮遊するダストは確実
に回収されるため、各ビン6c,6dにはダスト
が堆積することなく、所望の粒度の骨材のみが貯
蔵されることになる。そして、ホツトビン6に貯
蔵された骨材は各粒度毎に骨材計量槽7によつて
計量された後、ミキサ8に投下されてアスフアル
ト合材の原料となる。
Moreover, since the dust floating in the hot bin 6 is reliably collected, only aggregate of a desired particle size is stored in each of the bins 6c and 6d without the accumulation of dust. The aggregate stored in the hot bin 6 is weighed for each particle size in an aggregate measuring tank 7, and then is dumped into a mixer 8 to become a raw material for asphalt mixture.

したがつて、前記実施例のアスフアルトプラン
トにおいては、スクリーン5の上部に接続された
スカベンジングダクト20の一端部側と、ホツト
ビン6の側部との間をダクト31で連通させ、こ
れによつてホツトビン6の3ビン6c〜4ビン6
dの内部を浮遊しながら降下するダストを側部の
分岐ダクト30c〜30dから確実に吸引して集
塵機で回収することができるため、ホツトビン6
の内部にダストが堆積するのを防止することがで
き、所望ぼ粒度の骨材のみが貯蔵される。その結
果、骨材の配合比率に誤差が生じることがなく、
最適〜アスフアルト合材を製造することができ
る。
Therefore, in the asphalt plant of the above embodiment, the one end side of the scavenging duct 20 connected to the upper part of the screen 5 and the side of the hot bin 6 are communicated with each other by the duct 31. Hot Bin 6, 3 Bin 6c - 4 Bin 6
The dust floating inside the hot bin 6 can be reliably sucked through the side branch ducts 30c to 30d and collected by the dust collector.
It is possible to prevent dust from accumulating inside the container, and only aggregate of the desired grain size is stored. As a result, there are no errors in the mix ratio of aggregates,
It is possible to produce optimal ~ asphalt composite material.

なお、前記実施例においては、ホツトビン6の
側部材とスカベンジングダクト20の一端部側と
をダクト31で連通させるようにしたが、これに
限られることなく、サイクロン集塵機19の上流
側に連通させるようにすればよく、例えば、一端
部をホツトビン6の側部に接続したダクト31の
他端部を、骨材計量槽7とサイクロン集塵機19
との間を接続するダクト18dに連通させるよう
にしてもよい。
In the above embodiment, the side member of the hot bin 6 and one end side of the scavenging duct 20 are communicated with each other through the duct 31, but the present invention is not limited thereto. For example, one end of the duct 31 is connected to the side of the hot bin 6, and the other end of the duct 31 is connected to the aggregate measuring tank 7 and the cyclone dust collector 19.
You may make it communicate with the duct 18d which connects between.

「考案の効果」 以上詳細に説明したように、本考案のアスフア
ルトプラントにおいては、集塵機とスクリーンの
上方との間にダクト設けるとともに、前記集塵機
とホツトビンの側部との間にもダクトを設けるよ
うにしたものであるので、スクリーンの天井付近
を浮遊するダストを除去することができるととも
に、ホツトビン内を浮遊しながら降下するダスト
まで確実に回収することができることになり、ホ
ツトビン内に前記ダストが落下して堆積すること
がなく、所望の粒度の骨材がホツトビン内に貯蔵
されることになり、その結果、骨材の配合比率に
誤差が生じることがなく、最適なアスフアルト合
材を製造することができるという優れた効果を有
する。
"Effect of the invention" As explained in detail above, in the asphalt plant of the invention, a duct is provided between the dust collector and the upper part of the screen, and a duct is also provided between the dust collector and the side of the hot bin. This makes it possible to remove dust floating near the ceiling of the screen, and also to reliably collect dust that floats and descends inside the hot bin, preventing the dust from falling into the hot bin. As a result, the aggregate of the desired particle size is stored in the hot bin without being deposited, and as a result, there is no error in the mixing ratio of the aggregate, and an optimal asphalt mixture can be produced. It has the excellent effect of being able to

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の一実施例の要部を示し、ホツ
トビンの付近を拡大した断面図、第2図は従来の
技術を説明するためのアスフアルトプラントの全
体を示す説明図である。 1……骨材ホツパ、3……ドライヤ、5……ス
クリーン、6……ホツトビン、6a……1ビン、
6b……2ビン、6c……3ビン、6d……4ビ
ン、16……排風機、18a,21……ダクト、
19……集塵機(サイクロン集塵機)、20……
スカベンジングダクト、22……集塵機(バツグ
フイルタ)、30a,30b,30c,30d…
…分岐ダクト、31……ダクト。
FIG. 1 shows a main part of an embodiment of the present invention, and is an enlarged sectional view of the vicinity of a hot bin, and FIG. 2 is an explanatory diagram showing the entire asphalt plant to explain the conventional technology. 1... Aggregate hopper, 3... Dryer, 5... Screen, 6... Hot bin, 6a... 1 bin,
6b...2 bins, 6c...3 bins, 6d...4 bins, 16...exhaust fan, 18a, 21...ducts,
19... Dust collector (cyclone dust collector), 20...
Scavenging duct, 22... Dust collector (bag filter), 30a, 30b, 30c, 30d...
...Branch duct, 31...Duct.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 骨材ホツパから搬送される骨材を乾燥、加熱さ
せるためのドライヤと、このドライヤで乾燥、加
熱させた骨材をスクリーンによつて粒度毎に分別
するとともに、この粒度毎の骨材を貯蔵するため
に内部が区画されたホツトビンと、前記ドライヤ
内で骨材を乾燥、加熱させる際に生じる煤煙をダ
クトを介して排気する排風機と、前記煤煙中に含
まれるダストを回収するための集塵機とを備えた
アスフアルトプラントにおいて、前記骨材をスク
リーンによつて粒度毎に分別しながらホツトビン
へ貯蔵する際に発生するダストを回収するための
ダクトを、前記集塵機とスクリーンの上方との間
に設けるとともに、前記集塵機とホツトビンの側
部との間に設けたことを特徴とするアスフアルト
プラント。
A dryer is used to dry and heat the aggregate transported from the aggregate hopper, and the aggregate dried and heated by this dryer is separated by particle size using a screen, and the aggregate of each particle size is stored. a hot bin whose interior is partitioned for the purpose of drying and heating the aggregate; an exhaust fan that exhausts soot and smoke generated when the aggregate is dried and heated in the dryer through a duct; and a dust collector that collects dust contained in the soot and smoke. In the asphalt plant, a duct is provided between the dust collector and above the screen to collect dust generated when the aggregate is separated by particle size by a screen and stored in a hot bin. An asphalt plant, characterized in that the dust collector is provided between the dust collector and the side of the hot bin.
JP11093887U 1987-07-20 1987-07-20 Expired JPH0452247Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11093887U JPH0452247Y2 (en) 1987-07-20 1987-07-20

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11093887U JPH0452247Y2 (en) 1987-07-20 1987-07-20

Publications (2)

Publication Number Publication Date
JPS6419608U JPS6419608U (en) 1989-01-31
JPH0452247Y2 true JPH0452247Y2 (en) 1992-12-09

Family

ID=31348549

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11093887U Expired JPH0452247Y2 (en) 1987-07-20 1987-07-20

Country Status (1)

Country Link
JP (1) JPH0452247Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6274841B2 (en) * 2013-12-09 2018-02-07 日工株式会社 Dust exhaust system for asphalt plant

Also Published As

Publication number Publication date
JPS6419608U (en) 1989-01-31

Similar Documents

Publication Publication Date Title
US4431405A (en) Gas pollution control apparatus and method and wood drying system employing same
US4600379A (en) Drum heating and mixing apparatus and method
CN105705897B (en) A method and system for producing light-weight ceramic aggregates, especially using fly ash to produce light-weight ceramic aggregates
US9863101B2 (en) Highly portable asphalt plant
AU692014B2 (en) Method for separating gaseous pollutants from hot process gases
CN110042729A (en) Pitch mixes and stirs system and Asphalt smoke purification method
CN114522973A (en) Be used for heavy metal contaminated soil cement kiln to deal with system in coordination
CN100487196C (en) Asphalt concrete aggregate storage and classification mechanism and method thereof
JP2000186307A (en) Asphalt material manufacturing equipment using recycled aggregate
JPS6145210Y2 (en)
CA1161396A (en) Two stage air-entrained particle separator with re-entrainment of secondary particles
JPH0118649Y2 (en)
JPS6215282Y2 (en)
JPH0452246Y2 (en)
JPS6133044Y2 (en)
JPH0330410Y2 (en)
JPS6129765Y2 (en)
JPS6346490Y2 (en)
JPH033792Y2 (en)
JPH0827718A (en) Asphalt plant
JP2546738B2 (en) Asphalt mixture manufacturing method and manufacturing apparatus
JPH06299510A (en) Asphalt plant dust collector
JPH0218090Y2 (en)
JPH1026334A (en) Method and apparatus for treating limestone in response to circulating fluidized bed combustion requirements
CA1170590A (en) Two-stage air-entrained particle separator with re- entrainment of secondary particles