Prior art keywords
chamber
spool
valve
oil
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1063957A
Other languages
Japanese (ja)
Other versions
JPH0272204A (en
Inventor
Isao Oki
Shozo Shimizu
Mitsuharu Yamashita
Mitsumasa Akashi
Yasusuke Oda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP1063957A priority Critical patent/JPH0272204A/en
Publication of JPH0272204A publication Critical patent/JPH0272204A/en
Publication of JPH0454081B2 publication Critical patent/JPH0454081B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、建設機械などの作業機を駆動する作
業機アクチユエータに圧油を供給するバルブに関
する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a valve that supplies pressure oil to a work machine actuator that drives a work machine such as a construction machine.

例えば、弁本体にスプールを摺動自在に設け、
このスプールをバネ力で油圧ポンプの圧油を作業
機アクチユエータに供給しない中立位置に保持
し、油室に供給されたパイロツト圧油でスプール
を圧油供給位置に摺動させるパイロツト操作形式
バルブが知られている。
For example, a spool is slidably provided on the valve body,
A pilot-operated valve is used that uses a spring force to hold this spool in a neutral position that does not supply pressure oil from the hydraulic pump to the work equipment actuator, and uses pilot pressure oil supplied to the oil chamber to slide the spool to the pressure oil supply position. It is being

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

かかるパイロツト操作形式のバルブであれば、
小型のパイロツトバルブを切換え操作することで
バルブのスプールを摺動できるから操作力を軽減
したり、リモートコントロールで切換操作できる
が、その反面、油室にパイロツト圧油を供給する
ためのパイロツト用油圧ポンプは、その吐出圧油
が油室に供給されるのみで、他に利用できから無
駄である。
If the valve is of such a pilot operated type,
By switching and operating a small pilot valve, the spool of the valve can be slid, reducing operating force, and switching operations can be performed by remote control. However, on the other hand, the pilot hydraulic pressure is required to supply pilot pressure oil to the oil chamber. Pumps are wasteful because their discharge pressure oil is only supplied to the oil chamber and cannot be used for other purposes.

そこで、本発明は前述の課題を解決できるよう
にしたバルブを提供することを目的とする。
Therefore, an object of the present invention is to provide a valve that can solve the above-mentioned problems.

〔課題を解決するための手段及び作用〕[Means and actions for solving the problem]

弁本体98に主圧油供給側の室65とタンク側
の室51と作業機アクチユエータの第1の室35
と作業機アクチユエータ側の2の室50をスプー
ル孔99に開口してそれぞれ形成し、前記弁本体
98のスプール孔99内に各室を連通・遮断する
スプール18を嵌挿し、このスプール18をばね
力によつて各室を遮断する位置に保持し、そのス
プール18を第1の油室41の圧油で主圧油供給
側の室65と作業機アクチユエータ側の第1の室
35を連通しかつ作業機アクチユエータ側の第2
の室50とタンク側の室51を連通する第1の位
置となり、第2の油室47内の圧油で主圧油供給
側の室65と作業機アクチユエータ側の第2の室
50を連通しかつ作業機アクチユエータ側の第1
の室35とタンク側の室51を連通する第2の位
置となるようにし、前記弁本体98にパイロツト
圧供給側の第1の室32とパイロツト圧供給側の
第2の室73を形成し、そのパイロツト圧供給側
の第1の室32を絞り部を介して前記作業機アク
チユエータ側の第1の室35に連通し、この絞り
部を境としてパイロツト圧供給側の第1の室32
寄りを前記第1の油室41に連通し、かつ作業機
アクチユエータ側の第1の室35寄りを前記第2
の油室47に連通し、前記パイロツト圧供給側の
第2の室73を絞り部を介して前記作業機アクチ
ユエータ側の第2の室50に連通し、この絞り部
を境としてパイロツト圧供給側の第2の室73寄
りを前記第2の油室47に連通し、かつ作業機ア
クチユエータ側の第2の室50寄りを前記第1の
油室41に連通したバルブ。
The valve body 98 includes a main pressure oil supply side chamber 65, a tank side chamber 51, and a first chamber 35 of the work machine actuator.
and two chambers 50 on the work machine actuator side are opened in spool holes 99, and a spool 18 for communicating and blocking each chamber is inserted into the spool hole 99 of the valve body 98, and this spool 18 is connected to a spring. The spool 18 is held in a position where each chamber is shut off by force, and the spool 18 is communicated with the chamber 65 on the main pressure oil supply side and the first chamber 35 on the work machine actuator side using the pressure oil in the first oil chamber 41. and the second one on the work equipment actuator side.
The first position communicates the chamber 50 on the tank side with the chamber 51 on the tank side, and the pressure oil in the second oil chamber 47 communicates the chamber 65 on the main pressure oil supply side and the second chamber 50 on the work machine actuator side. And the first one on the work equipment actuator side
A first chamber 32 on the pilot pressure supply side and a second chamber 73 on the pilot pressure supply side are formed in the valve body 98. , the first chamber 32 on the pilot pressure supply side is communicated with the first chamber 35 on the work machine actuator side via a constriction part, and the first chamber 32 on the pilot pressure supply side communicates with the first chamber 35 on the work machine actuator side through the constriction part.
The first chamber 35 on the work machine actuator side communicates with the first oil chamber 41, and the first chamber 35 on the work machine actuator side communicates with the second oil chamber 41.
The second chamber 73 on the pilot pressure supply side is communicated with the second chamber 50 on the work machine actuator side via a constriction part, and the pilot pressure supply side A valve in which a second chamber 73 side of the valve is connected to the second oil chamber 47, and a second chamber 50 side of the working machine actuator side is connected to the first oil chamber 41.

これにより、パイロツト圧供給側の第1又は第
2の室32,73に供給された圧油は絞り部を通
つて作業機アクチユエータ側の第1又は第2の室
35,50に流れ、その絞り部の前後に差圧が生
じ、その差圧がスプール18の第1又は第2の油
室41,47に供給されてスプール18は第1又
は第2の位置となつて主圧油供給側の室65と作
業機アクチユエータ側の第1又は第2の室35,
50が連通し、かつ作業機アクチユエータ側の第
2又は第1の室50,35がタンク側の室51に
連通して主圧油供給側の室65に供給された圧油
とパイロツト圧供給側の第1又は第2の室32,
73に供給された圧油は合流して作業機アクチユ
エータに供給されるスプール18を切換えるパイ
ロツト圧油を作業機アクチユエータに供給して有
効利用できるバルブとなる。
As a result, the pressure oil supplied to the first or second chamber 32, 73 on the pilot pressure supply side flows through the constriction part to the first or second chamber 35, 50 on the work machine actuator side, and the constriction A differential pressure is generated before and after the spool 18, and the differential pressure is supplied to the first or second oil chamber 41, 47 of the spool 18, and the spool 18 is in the first or second position, and the main pressure oil supply side is chamber 65 and the first or second chamber 35 on the work machine actuator side,
50 communicates with each other, and the second or first chamber 50, 35 on the work machine actuator side communicates with the chamber 51 on the tank side, and the pressure oil and pilot pressure supply side are supplied to the main pressure oil supply side chamber 65. the first or second chamber 32,
The pressure oil supplied to the work machine actuator 73 merges to form a valve that can effectively utilize the pilot pressure oil that switches the spool 18 supplied to the work machine actuator by supplying it to the work machine actuator.

また一方のパイロツト圧油供給側の室32又は
73にパイロツト圧油を供給してスプール18を
切換えて一方の作業機アクチユエータ側の室35
又は50から作業機アクチユエータに圧油を供給
している時に作業機アクチユエータが外部負荷に
よつて作動されて他方の作業機アクチユエータ側
の室50又は35への戻り流量が増加した場合に
スプール18の第1・第2の油室41,47の圧
力差を一方のパイロツト圧油供給側の室32又は
73側の絞り部前後の差圧で確保できるからスプ
ール18が振動することがなく、作業機アクチユ
エータのハンチングを防止できる。
In addition, pilot pressure oil is supplied to the chamber 32 or 73 on the pilot pressure oil supply side, and the spool 18 is switched to the chamber 35 on the work machine actuator side.
Or, if the work equipment actuator is actuated by an external load and the return flow rate to the chamber 50 or 35 on the other work equipment actuator side increases while pressure oil is being supplied to the work equipment actuator from the spool 18. Since the pressure difference between the first and second oil chambers 41 and 47 can be ensured by the pressure difference before and after the throttle part on the chamber 32 or 73 side on the pilot pressure oil supply side, the spool 18 does not vibrate and the work machine Actuator hunting can be prevented.

さらに主圧油、パイロツト圧油が発生していな
い時でもパイロツト圧供給側の第2の室73をタ
ンクに連通することで作業機アクチユエータを外
部負荷によつてゆつくりと降下できるし、そのタ
ンクへの連通面積を増大することで絞り部の前後
に差圧を生じさせてスプール18を切換え作業機
アクチユエータを急速に降下できる。
Furthermore, even when main pressure oil and pilot pressure oil are not generated, by communicating the second chamber 73 on the pilot pressure supply side with the tank, the work equipment actuator can be lowered slowly by an external load, and the tank By increasing the communication area to the constriction part, a pressure difference is generated before and after the throttle part, and the spool 18 can be switched and the work machine actuator can be lowered rapidly.

〔実施例〕〔Example〕

以下、本発明を第1図〜第3図を参照して説明
する。
Hereinafter, the present invention will be explained with reference to FIGS. 1 to 3.

第3図中1,2は第1、第2ポンプであり、3
はブレード用の第1コントールバルブ、4はチル
ト用の第2コントロールバルブ、5は第3コント
ロールバルブ、6はアンロードバルブ、17は本
発明に係るバルブであるメインバルブ、55はシ
ヤトル弁である。そして、第1コントロールバル
ブ3とアンロードバルブ6とで圧力補償付比例制
御弁Aを構成している。
In Fig. 3, 1 and 2 are the first and second pumps, and 3
1 is a first control valve for the blade, 4 is a second control valve for tilting, 5 is a third control valve, 6 is an unloading valve, 17 is a main valve which is a valve according to the present invention, and 55 is a shuttle valve. . The first control valve 3 and the unload valve 6 constitute a proportional control valve A with pressure compensation.

前記第3コントロールバルブ5は弁本体91を
備えており、この弁本体91にはスプール孔92
が設けてあり、また弁本体91にはスプール孔9
2に通じる室23,30,75,77,53,2
2,24,28が設けてある。スプール孔92に
はスプール19が嵌挿してあり、スプール19の
端部にはばね座94,95がそれぞれに肩部に接
して設けてあり、両ばね座94,85間にばね9
6が設けてある。前記室22,24は通路97を
介して室28に通じており、通路97にチエツク
弁27が設けてある。
The third control valve 5 includes a valve body 91, and the valve body 91 has a spool hole 92.
is provided in the valve body 91, and a spool hole 9 is provided in the valve body 91.
Room 23, 30, 75, 77, 53, 2 leading to 2
2, 24, and 28 are provided. A spool 19 is fitted into the spool hole 92, and spring seats 94 and 95 are provided at the ends of the spool 19 in contact with their respective shoulders.
6 is provided. The chambers 22, 24 communicate with the chamber 28 via a passage 97, in which the check valve 27 is provided.

そして通路97、チエツク弁27、室77、室
30で作動圧回路部Eを形成し、通路97、室2
3及び通路97、室24、室53でパイロツト圧
回路部Fを形成している。
The passage 97, the check valve 27, the chamber 77, and the chamber 30 form an operating pressure circuit E, and the passage 97 and the chamber 2
3, the passage 97, the chamber 24, and the chamber 53 form a pilot pressure circuit section F.

前記メインバルブ17は弁本体98を備えてお
り、この弁本体98にはスプール孔99,10
0,101が設けてある。
The main valve 17 includes a valve body 98, and the valve body 98 has spool holes 99, 10.
0,101 are provided.

弁本体98にはスプール孔99に通じる室4
9,51が設けてあり、また弁本体98にはスプ
ール孔100に通じる室32,35が設けてあ
り、弁本体98にはスプール孔101に通じる室
50,73が設けてある。
The valve body 98 has a chamber 4 communicating with the spool hole 99.
Further, the valve body 98 is provided with chambers 32, 35 communicating with the spool hole 100, and the valve body 98 is provided with chambers 50, 73 communicating with the spool hole 101.

前記スプール孔99内にはスプール18が嵌挿
してあり、このスプール18は両端部においてば
ね48,48′により付勢されて中立に保持され
ており、スプール孔99の両端部は油室41,4
7になされており、これらで第1バルブ部を形
成している。
A spool 18 is fitted into the spool hole 99, and the spool 18 is held neutrally by springs 48 and 48' at both ends thereof. 4
7, and these form the first valve part.

前記スプール孔100内にはスプール33が嵌
挿してあり、このスプール33はばね38により
中立に保持されている。スプール33にはキリ穴
37,42が形成してあり、これらで第1バルブ
部Gを形成している。
A spool 33 is fitted into the spool hole 100, and is held neutrally by a spring 38. Perforated holes 37 and 42 are formed in the spool 33, and these form a first valve portion G.

前記スプール孔101内にはスプール71が嵌
挿してあり、このスプール71はばね38′によ
り中立に保持されており、またスプール71には
キリ穴79,91が形成してあり、これらで第2
バルブ部Hを形成している。
A spool 71 is inserted into the spool hole 101, and this spool 71 is held neutrally by a spring 38'.The spool 71 is also formed with drilled holes 79 and 91, which allow the second
A valve portion H is formed.

前記弁本体98にはシヤトル弁40,45が設
けてある。
The valve body 98 is provided with shuttle valves 40 and 45.

シヤトル弁40のポート40aは室102に通
路39を介して通じており、シヤトル弁40のポ
ート40bは通路90を介して室80に通じてお
り、またポート40cは通路90′を介して室4
1に通じている。
Port 40a of shuttle valve 40 communicates with chamber 102 via passage 39, port 40b of shuttle valve 40 communicates with chamber 80 via passage 90, and port 40c communicates with chamber 102 via passage 90'.
It leads to 1.

シヤトル弁45のポート45aは通路92を介
して室103に通じており、他のポート45bは
通路44を介して室43に通じており、更に他の
ポート45cは通路46を介して室47に通じて
いる。室65から室49にかけての通路104に
チエツク弁66が設けてある。
Port 45a of shuttle valve 45 communicates with chamber 103 via passage 92, another port 45b communicates with chamber 43 via passage 44, and yet another port 45c communicates with chamber 47 via passage 46. I understand. A check valve 66 is provided in the passage 104 from the chamber 65 to the chamber 49.

前記シヤトル弁55は弁本体7を備えており、
弁本体7にはスプール孔110が設けてあり、ス
プール孔110の端部にはプラグ57が嵌着して
ある。スプール孔110にはスプール12が設け
てあり、また、スプール12の端部にはピストン
56が嵌挿してある。スプール12はばね58に
よりプラグ57側に付勢されている。弁本体7に
はスプール孔12に通じる室9,59,60が設
けてある。
The shuttle valve 55 includes a valve body 7,
A spool hole 110 is provided in the valve body 7, and a plug 57 is fitted into the end of the spool hole 110. A spool 12 is provided in the spool hole 110, and a piston 56 is fitted into the end of the spool 12. The spool 12 is urged toward the plug 57 by a spring 58. The valve body 7 is provided with chambers 9, 59, 60 communicating with the spool hole 12.

第1ポンプ1の吐出側は配管64を介してメイ
ンンバルブ17の室65に接続してあり、また第
1ポンプ1の吐出側は分岐点63を介してアンロ
ードバルブ6のポート6aに接続してある。メイ
ンバルブ17の室51は配管70を介してタンク
111に通じている。メインバルブ17の室3
5,50は配管36,68を介して作業機アクチ
ユエータBであるリツパーシリンダ16に接続し
てある。また、メインバルブ17の室32,73
は配管31,74を介して第3コントロールバル
ブ5の室30,75に接続してある。
The discharge side of the first pump 1 is connected to the chamber 65 of the main valve 17 via a pipe 64, and the discharge side of the first pump 1 is connected to the port 6a of the unload valve 6 via a branch point 63. It has been done. The chamber 51 of the main valve 17 communicates with the tank 111 via a pipe 70. Main valve 17 chamber 3
5 and 50 are connected to the ripper cylinder 16, which is the working machine actuator B, via pipes 36 and 68. In addition, the chambers 32 and 73 of the main valve 17
are connected to the chambers 30, 75 of the third control valve 5 via pipes 31, 74.

第2ポンプ2の吐出側は配管20を介して第3
コントロールバルブ5の通路97に接続してあ
り、この配管20に他の作業機アクチユエータC
であるチルトシリンダ112の第2コントロール
バルブ4が設けてある。第3コントロールバルブ
5の室23は配管21を介してアンロードバルブ
6のポート6bに接続してあり、また前記室23
は配管15を介して第1コントロールバルブ3の
ポート3aに接続してある。
The discharge side of the second pump 2 is connected to the third pump via piping 20.
It is connected to the passage 97 of the control valve 5, and the other work machine actuator C is connected to this piping 20.
A second control valve 4 of the tilt cylinder 112 is provided. The chamber 23 of the third control valve 5 is connected to the port 6b of the unload valve 6 via the pipe 21, and the chamber 23
is connected to port 3a of first control valve 3 via piping 15.

第1コントロールバルブ3は他の作業機アクチ
ユエータDであるブレードシリンダ113を操作
するものである。第3コントロールバルブ5の室
77は配管78を介してタンク111に接続して
ある。
The first control valve 3 operates the blade cylinder 113, which is another working machine actuator D. The chamber 77 of the third control valve 5 is connected to the tank 111 via a pipe 78.

第3コントロールバルブ5の室53はパイロツ
ト管路54を介してシヤトル弁55の室59に接
続してあり、シヤトル弁55の室60はパイロツ
ト管路62を介してアンロードバルブ6のパイロ
ツトポート6dに接続してある。
The chamber 53 of the third control valve 5 is connected to the chamber 59 of the shuttle valve 55 via a pilot line 54, and the chamber 60 of the shuttle valve 55 is connected to the pilot port 6d of the unload valve 6 via a pilot line 62. It is connected to.

このパイロツト管路62に絞り11が設けてあ
る。前記配管15からパイロツト管路115が分
岐していて、このパイロツト管路115はアンロ
ードバルブ6のパイロツトポート6eに接続して
ある。
A throttle 11 is provided in this pilot conduit 62. A pilot line 115 branches off from the pipe 15, and this pilot line 115 is connected to a pilot port 6e of the unload valve 6.

シヤトル弁55の室9はパイロツト管路13を
介してシヤトル弁10に接続してある。
The chamber 9 of the shuttle valve 55 is connected to the shuttle valve 10 via a pilot line 13.

実施例の装置の作動 エンジン回転中において、第1、第2、第3コ
ントロールバルブ3,4,5が第1図の通り中立
状態にあるとき第1ポンプ1の流量は第1コント
ロールバルブ3が閉状態にあるので、アンロード
バルブ6の左端のパイロツト圧が上がり、またア
ンロードバルブ6の右端ののバネ側圧力は絞り1
11、シヤトル弁55のスプール12に切欠かれ
た溝8を通じて室9につながり、パイロツト管路
13を通じてシヤトル弁10から第1コントロー
ルバルブ3よりドレン通路14を通じてタンク1
11と接続されているためアンロードバルブ6は
第2図の状態になつており、第1ポンプ1は低圧
でアンロード状態になつている。一方第2ポンプ
2の吐出側は第2、第3コントロールバルブ4,
5を通じて配管15によつてアンロードバルブ6
に接続されているが、アンロードバルブ6が第2
図のようにポート側に連通ポジシヨンが位置した
状態にあり、第2ポンプ2も低圧でアンロード状
態にある。
Operation of the device of the embodiment When the engine is rotating and the first, second, and third control valves 3, 4, and 5 are in the neutral state as shown in FIG. Since it is in the closed state, the pilot pressure at the left end of the unload valve 6 increases, and the spring side pressure at the right end of the unload valve 6 decreases to the throttle 1.
11, the shuttle valve 55 is connected to the chamber 9 through the groove 8 cut out in the spool 12, and is connected to the tank 1 through the pilot pipe 13 from the shuttle valve 10 through the first control valve 3 through the drain passage 14.
11, the unload valve 6 is in the state shown in FIG. 2, and the first pump 1 is in the unload state at low pressure. On the other hand, the discharge side of the second pump 2 has second and third control valves 4,
5 through pipe 15 through unload valve 6
However, the unload valve 6 is connected to the second
As shown in the figure, the communication position is located on the port side, and the second pump 2 is also in an unloaded state at low pressure.

なお、第1コントロールバルブ3と第3コント
ロールバルブ5の同時操作時、第1コントロール
バルブ3を優先させている。したがつて、シヤト
ル弁55のスプール12はプラグ57に押しつけ
られた状態となり、アンロードバルブ6は第1コ
ントロールバルブ3へ第1、第2ポンプ1,2の
油を供給できる位置をとる。しかし、この場合、
第1コントロールバルブ3とメインバルブ17と
の関係はパラレル回路となるため、負荷の軽い方
へポンプ油は流れる。第1図に示す回路において
は第1、第3コントロールバルブ3,5を同時操
作することは実用上希であり、その場合の流量配
分は特に考慮されていない。
Note that when the first control valve 3 and the third control valve 5 are operated simultaneously, the first control valve 3 is given priority. Therefore, the spool 12 of the shuttle valve 55 is pressed against the plug 57, and the unload valve 6 takes a position where it can supply oil from the first and second pumps 1 and 2 to the first control valve 3. But in this case,
Since the relationship between the first control valve 3 and the main valve 17 is a parallel circuit, the pump oil flows to the side with the lighter load. In the circuit shown in FIG. 1, it is practically rare to operate the first and third control valves 3 and 5 simultaneously, and no particular consideration is given to the flow distribution in that case.

前記シヤトル弁55においては、上記したよう
に第1コントロールバルブ3の回路を優先させる
ため、スプール12とピストン56とに面積差を
つけている。
In the shuttle valve 55, the spool 12 and the piston 56 are provided with a difference in area in order to give priority to the circuit of the first control valve 3 as described above.

第3コントロールバルブ5のスプール19を引
の状態に操作すると配管20から第3コントロー
ルバルブ5の室22,24からスプール19のく
びれ部25,26を通つて流れていた第2ポンプ
2の流れは閉状態になり、それと同時に流れはチ
エツク弁27をおし開き、室28からスプール1
9のくびれ部29のまわりを通つて室30に通じ
る。室30より管路31を通じメインコントロー
ルバルブ17の室32よりスプール33の切欠部
部34を通つて室35に流れ管路36によつてリ
ツパーシリンダ16のボトム側に流れ込むと同時
にスプール33の切欠34を通る前の高圧側の圧
力はスプール33の中にあけたキリ穴37よりス
プール33の室102を通じ通路39、シヤトル
弁40を通じてメインバルブ17のスプール18
の一端の圧力室である室41に導かれる。一方ス
プール33の切欠34を通つた後の低圧側の圧力
はスプール33の中にあけたリ穴42よりスプー
ル33の一端の室43を通じてスプール18の他
端の圧力室である室47に導かれる。この結果ス
プール18は圧力室である室41と47の差圧と
室47内のばね48とバランスするまで移動し、
メインバルブ17の室49と室35との連通を閉
か開の状態にする。またリツパーシリンダ16の
ロツド側と接続されている室50もメインバルブ
17のタンクポートである室51との関係を閉の
状態から開の状態にする。
When the spool 19 of the third control valve 5 is operated to the pulled state, the flow of the second pump 2 that has been flowing from the piping 20 from the chambers 22, 24 of the third control valve 5 through the constrictions 25, 26 of the spool 19 is reduced. At the same time, the flow pushes open the check valve 27 and flows from the chamber 28 to the spool 1.
It passes around the constriction 29 of 9 and communicates with the chamber 30. It flows from the chamber 30 through the conduit 31, from the chamber 32 of the main control valve 17, through the notch part 34 of the spool 33, and into the chamber 35. It flows into the bottom side of the ripper cylinder 16 through the conduit 36, and at the same time flows into the notch of the spool 33. The pressure on the high pressure side before passing through the spool 34 is passed through the through hole 37 made in the spool 33, through the chamber 102 of the spool 33, through the passage 39, and through the shuttle valve 40 to the spool 18 of the main valve 17.
It is led to a chamber 41 which is a pressure chamber at one end of the chamber. On the other hand, the pressure on the low pressure side after passing through the notch 34 of the spool 33 is guided through a chamber 43 at one end of the spool 33 to a chamber 47 which is a pressure chamber at the other end of the spool 18 through a hole 42 made in the spool 33. . As a result, the spool 18 moves until the differential pressure between the pressure chambers 41 and 47 and the spring 48 in the chamber 47 are balanced.
The communication between the chamber 49 of the main valve 17 and the chamber 35 is closed or opened. Further, the relationship between the chamber 50 connected to the rod side of the ripper cylinder 16 and the chamber 51 which is the tank port of the main valve 17 is changed from the closed state to the open state.

また一方第3コントロールバルブ5の引の信号
でスプール19に切欠いた切欠溝52によつて室
24と室53の間を閉から開の状態にし、ポンプ
圧はパイロツト管路54によつてシヤトル弁55
のスプール12の中に設けたピストン56に作用
し、これはプラグ57でおさえられているため、
スプール12はばね58に坑して左方に移動し、
室60と室9を開けていた切欠8は閉となり、室
59と室60がスプール12のくびれ部61を経
て開となり、パイロツト管路62、絞り11を通
じてアンロードバルブ6のばね室側に導かれる。
この結果第2ポンプ2の圧力によつて第2図のア
ンロード状態にあつたアンロードバルブ6は強制
的にオンロード状態第3図のようになり、第1ポ
ンプ1も高圧となり分岐点63より配管64を通
じてメインバルブ17のポンプポートである室6
5からチエツク弁66を押し開け室49、開状態
のスプール18のくびれ部67を通つて室35で
第2ポンプ2の流量と合流し、シリンダボトム側
に流れリツパーシリンダ16を伸ばしシリンダロ
ツド側からの戻り流量は配管68から室50、開
状態にあるスプール18のくびれ部69を通つて
タンクポートである室51から配管70を通つて
タンク111へ戻つている。
On the other hand, in response to a pull signal from the third control valve 5, the gap between the chambers 24 and 53 is changed from the closed state to the open state by the notched groove 52 cut out in the spool 19, and the pump pressure is controlled by the pilot pipe 54 to the shuttle valve. 55
acts on the piston 56 provided in the spool 12, which is held down by a plug 57,
The spool 12 is moved to the left by the spring 58,
The notch 8 that opened the chambers 60 and 9 is closed, and the chambers 59 and 60 are opened through the constriction 61 of the spool 12, leading to the spring chamber side of the unload valve 6 through the pilot pipe 62 and the throttle 11. It will be destroyed.
As a result, the pressure of the second pump 2 forces the unload valve 6, which was in the unload state shown in FIG. 2, into the on-load state shown in FIG. The chamber 6, which is the pump port of the main valve 17, passes through the pipe 64.
5, press the check valve 66 to open the chamber 49, pass through the constriction 67 of the open spool 18, merge with the flow rate of the second pump 2 in the chamber 35, and flow to the cylinder bottom side, extending the ripper cylinder 16 from the cylinder rod side. The return flow rate is returned from the pipe 68 to the chamber 50, through the constriction 69 of the spool 18 in the open state, and from the chamber 51, which is a tank port, to the tank 111 through the pipe 70.

同様に第3コントロールバルブ5のスプール1
9を押位置にした場合ももリツパーシリンダ16
を縮み側に駆動させることができる。
Similarly, spool 1 of third control valve 5
When 9 is in the push position, the ripper cylinder 16
can be driven to the contraction side.

なお、前記メインバルブ17において、前記室
35は、第1ポンプ1の流量が第2ポンプ2の流
量と合流しても前記リツパーシリンダ16が伸び
ている場合、室32に対して下流側になつてい
る。よつて第1ポンプ1の流量が室35で第2ポ
ンプ2の流量に合流して室35の圧が上昇した分
室32の圧を上昇する。このために圧力差は保た
れる。
In addition, in the main valve 17, the chamber 35 is located on the downstream side with respect to the chamber 32 when the ripper cylinder 16 is extended even when the flow rate of the first pump 1 merges with the flow rate of the second pump 2. It's summery. Therefore, the flow rate of the first pump 1 joins the flow rate of the second pump 2 in the chamber 35, and the pressure in the chamber 35 increases the pressure in the divided chamber 32. Because of this, the pressure difference is maintained.

また、油の流れによる差圧を利用しているため
リツパーシリンダ15の負荷圧、負荷の方向に影
響されない。
Furthermore, since the differential pressure caused by the flow of oil is utilized, it is not affected by the load pressure of the ripper cylinder 15 or the direction of the load.

すなわち、第1図でリツパーシリンダ16の伸
び側が自然落下側とすると、前述のように第3コ
ントロールバルブ5のスプール19を引位置とし
てリツパーシリンダ16を伸び側に作動する際
に、リツパーシリンダ16がリツパーの自重によ
つて伸び側に作動してボトム側の容積の増加が供
給流量以上速くなつてボトム側への供給流量が不
足して真空が発生しながらリツパーシリンダ16
が伸び側に作動するので、 リツパーシリンダ16のロツド側から室50へ
の流量>室35からリツパーシリンダ16のボト
ム側への流量 この場合の差圧はスプール71の切欠72前後
の圧力、つまり室50(上流側)と室73(下流
側)の圧で決定され、室50の高圧の油はキリ穴
79、室80、通路90を経由しシヤトル弁40
のポート4cから室41に導びかれ、スプール1
8を第3図において下方向に動かす、したがつ
て、第1ポンプ1の油は室35に流れ、リツパー
シリンダ16のボトム側に入る。
That is, if the extension side of the ripper cylinder 16 is the natural fall side in FIG. The cylinder 16 moves to the extension side due to the weight of the ripper, and the volume on the bottom side increases faster than the supply flow rate, and the supply flow rate to the bottom side becomes insufficient and a vacuum is generated, and the ripper cylinder 16
operates on the extension side, so the flow rate from the rod side of the ripper cylinder 16 to the chamber 50 > the flow rate from the chamber 35 to the bottom side of the ripper cylinder 16. In this case, the differential pressure is the pressure before and after the notch 72 of the spool 71, In other words, the pressure is determined by the pressure in the chamber 50 (upstream side) and the chamber 73 (downstream side), and the high pressure oil in the chamber 50 passes through the through hole 79, the chamber 80, and the passage 90 to the shuttle valve 40.
is led to the chamber 41 from the port 4c of the spool 1.
8 in a downward direction in FIG.

この時、スプール18のストロークによつて決
まる室50から室51への開口面積が大きくなる
とリツパーシリンダ16からの戻り流量の大部分
が室50からスプール18のくびれ部69を通つ
て室51へ流れるため、室50から切欠72を通
つて室73へ流れる流量が減り切欠72前後の差
圧が確保されなくなり、スプール18がスプリン
グ47により押し戻され、スプール18のくびれ
部69のその開口面積が減ることになり、それに
よつて室50から切欠72を通つて室73への流
量が増し切欠72前後の差圧が大きくなつてスプ
ール18が再び押され、この動作がくり返して行
なわれてスプール18が振動し、リツパーシリン
ダ16がハンチングを起すことになる。しかし、
第2ポンプ2からの管路31を通つて室32から
室35への流量で発生する差圧でスプール18の
油室41と油室47の最低の差圧は確保されてい
るため、前述のスプール18の振動もなく、リツ
パーシリンダ16がハンチングすることもない。
At this time, when the opening area from the chamber 50 to the chamber 51 determined by the stroke of the spool 18 increases, most of the return flow from the ripper cylinder 16 passes from the chamber 50 to the chamber 51 through the constriction 69 of the spool 18. As a result, the flow rate from the chamber 50 to the chamber 73 through the notch 72 decreases, making it impossible to ensure a differential pressure across the notch 72, and the spool 18 is pushed back by the spring 47, reducing the opening area of the constricted portion 69 of the spool 18. As a result, the flow rate from the chamber 50 to the chamber 73 through the notch 72 increases, and the differential pressure across the notch 72 increases, pushing the spool 18 again, and this operation is repeated until the spool 18 is pushed. This will cause the ripper cylinder 16 to vibrate and cause hunting. but,
Since the minimum pressure difference between the oil chamber 41 and the oil chamber 47 of the spool 18 is secured by the pressure difference generated by the flow rate from the chamber 32 to the chamber 35 through the pipe line 31 from the second pump 2, the above-mentioned There is no vibration of the spool 18 and no hunting of the ripper cylinder 16.

このように、リツパーシリンダ16に接続した
室35,50に連通する絞りを各々設けられるこ
とにより、スプール18の全ストロークにわたつ
て安定した差圧が得られ、スムーズにリツパーシ
リンダの作動が可能となる。
In this way, by providing the throttles that communicate with the chambers 35 and 50 connected to the ripper cylinder 16, a stable differential pressure can be obtained over the entire stroke of the spool 18, and the ripper cylinder can operate smoothly. It becomes possible.

またエンジンが停止し第1・第2ポンプ1,2
の流量がない時でも作業機を地上まで降す必要が
ある。例えば自重によつてリツパーシリンダ16
が伸ばされる側に作用する場合を考えると、第3
コントロールバルブ5のスプール19を引の位置
におくとリツパーシリンダ16のロツド側の戻り
流量は配管68から室50を通つてスプール71
の切欠72を通つて室73から配管74を通じて
第3コントロールバルブ5の室75に通じ、開状
態にあるスプール19のくびれ部76を通つてタ
ンクポートである室77から配管78を通じタン
ク111へ戻り、その流れによつてスプール71
の切欠72の前後に差圧が生じる。
Also, the engine stopped and the first and second pumps 1 and 2
It is necessary to lower the work equipment to the ground even when there is no flow rate. For example, due to its own weight, the ripper cylinder 16
If we consider the case where the
When the spool 19 of the control valve 5 is placed in the pulled position, the return flow rate on the rod side of the ripper cylinder 16 flows from the pipe 68 through the chamber 50 to the spool 71.
It passes through the notch 72 of the chamber 73, passes through the pipe 74 to the chamber 75 of the third control valve 5, and returns to the tank 111 through the constriction 76 of the spool 19, which is in the open state, from the chamber 77, which is the tank port, through the pipe 78. , due to the flow, the spool 71
A differential pressure is generated before and after the notch 72 of.

前述のスプール19の引の位置への操作ストロ
ークが小さく室75と室77の開口面積が小さい
場合には前述の切欠72の前後の差圧が小さくス
プール18は切換わらないので、リツパーシリン
ダ16のロツド側の流量は前記スプール71の切
欠72のみを通つてタンク111に流れるから、
その流量が少なくリツパーシリンダ16はゆつく
りと降下する。この時リツパーシリンダ16のボ
トム側に真空が発生しながらリツパーシリンダ1
6は降下する。
If the operation stroke of the spool 19 to the pulled position is small and the opening areas of the chambers 75 and 77 are small, the differential pressure across the notch 72 is small and the spool 18 will not switch. Since the flow rate on the rod side flows into the tank 111 only through the notch 72 of the spool 71,
The flow rate is small and the ripper cylinder 16 slowly descends. At this time, while a vacuum is generated on the bottom side of the ripper cylinder 16, the ripper cylinder 1
6 descends.

そして、第3コントロールバルブ5のスプール
19の引の位置への操作ストロークが大きい場合
には前述の流れによつてスプール71の切欠72
の前後に生じる差圧が大きくなつて高圧側のスプ
ール71のキリ穴79を生じ、室80を経て通路
90、シヤトル弁40を通じてスプール18の圧
力室41に導かれ低圧側はスプール71のキリ穴
91から通路92、シヤトル弁45を経てスプー
ル18の圧力室である室47へ導かれている。こ
の結果スプール18は下側に押し下げられ、室5
0と室51の関係は閉から開の状態となりリツパ
ーシリンダ16のヘツド側からの戻り流量はスプ
ール18のくびれ部69を通つてタンク111へ
の配管70を経てタンク111へ多量に戻り、リ
ツパーシリンダ16を急速に降下できる。この時
リツパーシリンダ16のボトム側には真空が発生
する。以上のようにエンジンが停止していても第
3コントロールバルブ5のスプール19を操作す
ることによつてリツパーシリンダ16をゆつくり
降下させたり、メインバルブ17のスプール18
を切換えてリツパーシリンダ16を急速に降下で
き、建設機械に必要とされる作業機の急落下を行
ない作業機の自重で刃先を地面に喰い込ませる
(エンジン停止時の非常ブレーキ)などが可能で
ある。
When the operation stroke of the third control valve 5 to the pulled position of the spool 19 is large, the notch 7 of the spool 71 is
The differential pressure generated before and after becomes large, creating a through hole 79 in the spool 71 on the high pressure side, which is led to the pressure chamber 41 of the spool 18 through a chamber 80, a passage 90, and the shuttle valve 40, and a through hole 79 in the spool 71 on the low pressure side. 91 is led to a chamber 47 which is a pressure chamber of the spool 18 via a passage 92 and a shuttle valve 45. As a result, the spool 18 is pushed down and the chamber 5
0 and the chamber 51 changes from closed to open, and a large amount of the return flow from the head side of the ripper cylinder 16 passes through the constriction 69 of the spool 18, returns to the tank 111 via the piping 70 to the tank 111, and returns to the tank 111 in large quantities. Par cylinder 16 can be lowered rapidly. At this time, a vacuum is generated on the bottom side of the ripper cylinder 16. As described above, even when the engine is stopped, by operating the spool 19 of the third control valve 5, the ripper cylinder 16 can be slowly lowered, and the spool 18 of the main valve 17 can be lowered slowly.
The ripper cylinder 16 can be lowered rapidly by switching to allow the work equipment to fall suddenly, which is required for construction equipment, and the cutting edge can be dug into the ground by the work equipment's own weight (emergency braking when the engine is stopped). It is.

(発明の効果) パイロツト圧供給側の第1又は第2の室32,
73に供給された圧油は絞り部を通つて作業機ア
クチユエータ側の第1又は第2の室35,50に
流れ、その絞り部の前後に差圧が生じ、その差圧
がスプール18の第1又は第2の油室41,47
に供給されてスプール18は第1又は第2の位置
となつて主圧油供給側の室65と作業機アクチユ
エータ側の第1又は第2の室35,50が連通
し、かつ作業機アクチユエータ側の第2又は第1
の室50,35がタンク側の室51に連通して主
圧油供給側の室65に供給された圧油とパイロツ
ト圧供給側の第1又は第2の室32,73に供給
された圧油は合流して作業機アクチユエータに供
給される。
(Effect of the invention) The first or second chamber 32 on the pilot pressure supply side,
The pressure oil supplied to the spool 73 flows through the constriction part to the first or second chamber 35, 50 on the work machine actuator side, and a pressure difference is generated before and after the constriction part. 1 or 2nd oil chamber 41, 47
The spool 18 is in the first or second position, and the chamber 65 on the main pressure oil supply side communicates with the first or second chamber 35, 50 on the work equipment actuator side, and the spool 18 is in the first or second position. second or first
The chambers 50, 35 communicate with the chamber 51 on the tank side, and the pressure oil supplied to the chamber 65 on the main pressure oil supply side and the pressure supplied to the first or second chamber 32, 73 on the pilot pressure supply side. The oil is combined and supplied to the work machine actuator.

したがつて、スプール18の切えるパイロツト
圧油を作業機アクチユエータに供給して有効利用
できるバルブとなる。
Therefore, the valve can supply the pilot pressure oil from the spool 18 to the working machine actuator and utilize it effectively.

また、パイロツト圧油供給側の第1・第2の室
32,73は絞り部を通つて作業機アクチユエー
タ側の第1・第2の室35,50にそれぞれ連通
しているから、一方のパイロツト圧油供給側の室
32又73にパイロツト圧油を供給してスプール
18を切換えて一方の作業機アクチユエータ側の
室35又は50から作業機アクチユエータに圧油
を供給している時に作業機アクチユエータが外部
負荷によつて作動されて他方の作業機アクチユエ
ータ側の室50又は35への戻り流量が増加した
場合にスプール18の第1・第2の油室41,4
7の圧力差を一方のパイロツト圧油供給側の室3
2又は73側の絞り部前後の差圧で確保できるか
らスプール18が振動することがなく、作業機ア
クチユエータのハンチングを防止できる。
Further, since the first and second chambers 32 and 73 on the pilot pressure oil supply side communicate with the first and second chambers 35 and 50 on the work machine actuator side through the throttle part, one pilot When pilot pressure oil is being supplied to the chamber 32 or 73 on the pressure oil supply side and the spool 18 is being switched to supply pressure oil to the work implement actuator from the chamber 35 or 50 on the work implement actuator side, the work implement actuator is When the return flow rate to the chamber 50 or 35 on the other working machine actuator side increases due to actuation by an external load, the first and second oil chambers 41, 4 of the spool 18
7 pressure difference between one pilot pressure oil supply side chamber 3
Since this can be ensured by the differential pressure before and after the throttle part on the 2 or 73 side, the spool 18 does not vibrate, and hunting of the work machine actuator can be prevented.

また、主圧油、パイロツト圧油が発生してない
時でもパイロツト圧供給側の第2の室73をタン
クに連通することで作業機アクチユエータからの
戻り流量が絞り部を通してタンクに流れるから、
作業機アクチユエータを外部負荷によつてゆつく
りと降下できるし、そのタンクへの連通面積を増
大することで絞り部の前後に大きな差圧を生じさ
せてスプール18を切換えることで作業機アクチ
ユエータからの戻り流量がタンク側の室51より
タンクに多量に流れるから、作業機アクチユエー
タを外部負荷によつて急速に降下できる。
Furthermore, even when main pressure oil and pilot pressure oil are not generated, by communicating the second chamber 73 on the pilot pressure supply side with the tank, the return flow rate from the work equipment actuator flows to the tank through the throttle part.
The work equipment actuator can be lowered slowly by an external load, and by increasing the communication area to the tank, a large differential pressure is created before and after the throttle part, and by switching the spool 18, the work equipment actuator can be lowered slowly. Since a large amount of return flow flows into the tank from the tank-side chamber 51, the working machine actuator can be lowered rapidly by an external load.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の実施例を示し、第1図は構成説
明図、第2図、第3図はアンロードバルブの作動
説明図である。 18はスプール、32,73はパイロツト圧供
給側の室、41,47は油室、35,50は作業
機アクチユエータ側の室、65は主圧油供給側の
室。
The drawings show an embodiment of the present invention, with FIG. 1 being an explanatory diagram of the configuration, and FIGS. 2 and 3 being explanatory diagrams of the operation of the unload valve. 18 is a spool, 32 and 73 are chambers on the pilot pressure supply side, 41 and 47 are oil chambers, 35 and 50 are chambers on the work machine actuator side, and 65 is a chamber on the main pressure oil supply side.

Claims (1)

【特許請求の範囲】[Claims] 1 弁本体98に主圧油供給側の室65とタンク
側の室51と作業機アクチユエータ側の第1の室
35と作業機アクチユエータ側の第2の室50を
スプール孔99に開口してそれぞれ形成し、前記
弁本体98のスプール孔99内に各室を連通・遮
断するスプール18を嵌挿し、このスプール18
をばね力によつて各室を遮断する位置に保持し、
そのスプール18を第1の油室41内の圧油で主
圧油供給側の室65と作業機アクチユエータ側の
第1の室35を連通しかつ作業機アクチユエータ
側の第2の室50とタンク側の室51を連通する
第1の位置となり、第2の油室47内の圧油で主
圧油供給側の室65と作業機アクチユエータ側の
第2の室50を連通しかつ作業機アクチユエータ
側の第1の室35とタンク側の室51を連通する
第2の位置となるようにし、前記弁本体98にパ
イロツト圧供給側の第1の室32とパイロツト圧
供給側の第2の室73を形成し、そのパイロツト
圧供給側の第1の室32を絞り部を介して前記作
業機アクチユエータ側の第1の室35に連通し、
この絞り部を境としてパイロツト圧供給側の第1
の室32寄りを前記第1の油室41に連通し、か
つ作業機アクチユエータ側の第1の室35寄りを
前記第2の油室47に連通し、前記パイロツト圧
供給側の第2の室73を絞り部を介して前記作業
機アクチユエータ側の第2の室50に連通し、こ
の絞り部を境としてパイロツト圧供給側の第2の
室73寄りを前記第2の油室47に連通し、かつ
作業機アクチユエータ側の第2の室50寄りを前
記第1の油室41に連通したことを特徴とするバ
ルブ。
1 In the valve body 98, a chamber 65 on the main pressure oil supply side, a chamber 51 on the tank side, a first chamber 35 on the work machine actuator side, and a second chamber 50 on the work machine actuator side are opened in the spool hole 99, respectively. A spool 18 is inserted into the spool hole 99 of the valve body 98 to connect and shut off each chamber.
is held in a position that blocks each chamber by spring force,
The spool 18 is connected to the main pressure oil supply side chamber 65 and the first chamber 35 on the work machine actuator side using the pressure oil in the first oil chamber 41, and connects the second chamber 50 on the work machine actuator side to the tank. This is the first position where the side chamber 51 is communicated with, and the pressure oil in the second oil chamber 47 communicates between the main pressure oil supply side chamber 65 and the second chamber 50 on the work equipment actuator side, and the work equipment actuator. The first chamber 35 on the side and the chamber 51 on the tank side communicate with each other, and the valve body 98 has a first chamber 32 on the pilot pressure supply side and a second chamber 32 on the pilot pressure supply side. 73, and communicates the first chamber 32 on the pilot pressure supply side with the first chamber 35 on the work machine actuator side via a constriction part,
The first valve on the pilot pressure supply side with this constriction as a boundary
The chamber 32 side communicates with the first oil chamber 41, the first chamber 35 side on the work machine actuator side communicates with the second oil chamber 47, and the second chamber on the pilot pressure supply side communicates with the first chamber 41. 73 is communicated with the second chamber 50 on the work machine actuator side through a constriction part, and with this constriction as a boundary, the second chamber 73 on the pilot pressure supply side is communicated with the second oil chamber 47. , and a portion near the second chamber 50 on the work machine actuator side is communicated with the first oil chamber 41.
JP1063957A 1989-03-17 1989-03-17 valve Granted JPH0272204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1063957A JPH0272204A (en) 1989-03-17 1989-03-17 valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1063957A JPH0272204A (en) 1989-03-17 1989-03-17 valve

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP57165072A Division JPS5954802A (en) 1982-09-24 1982-09-24 Work equipment drive circuit device

Publications (2)

Publication Number Publication Date
JPH0272204A JPH0272204A (en) 1990-03-12
JPH0454081B2 true JPH0454081B2 (en) 1992-08-28

Family

ID=13244305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1063957A Granted JPH0272204A (en) 1989-03-17 1989-03-17 valve

Country Status (1)

Country Link
JP (1) JPH0272204A (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3840049A (en) * 1973-08-08 1974-10-08 Caterpillar Tractor Co Compact fluid motor control system with float position
JPS5825161B2 (en) * 1977-12-27 1983-05-26 日立建機株式会社 Merging hydraulic circuit
JPS57165072A (en) * 1981-04-03 1982-10-09 Dainippon Toryo Co Ltd Coating method
JPS5954802A (en) * 1982-09-24 1984-03-29 Komatsu Ltd Work equipment drive circuit device

Also Published As

Publication number Publication date
JPH0272204A (en) 1990-03-12

Similar Documents

Publication Publication Date Title
US2892311A (en) Hydraulic apparatus
JP3802082B2 (en) Rapid drop circuit
US6758128B2 (en) Hydraulic circuit for working machine
US3160076A (en) Fluid system and relief valve assembly therefor
JP2021038792A (en) Control valve device and hydraulic drive system equipped with it
JP3289852B2 (en) Direction control valve for flow rate support
JPH0374608A (en) Flow control circuit
JPH0454081B2 (en)
JP4548959B2 (en) Hydraulic control device
JP3187155B2 (en) Control valve device
JPH0454082B2 (en)
JPH068641B2 (en) Hydraulic circuit
US3776273A (en) Directional control valve
JPH0454083B2 (en)
JPH041202B2 (en)
JPH0371562B2 (en)
JPS612908A (en) Control valve device
JP4565759B2 (en) Hydraulic control device
JPH10310365A (en) Hydraulic control circuit common to crane and hydraulic shovel
JPH0341685B2 (en)
JPH0122961Y2 (en)
JP2889335B2 (en) Hydraulic drive for civil and construction machinery
JP2630775B2 (en) Priority operation control device for high load actuator
JPH02566B2 (en)
JP2020139573A (en) Hydraulic excavator drive system