JPH0455522A - Foundation construction method for temporary column - Google Patents
Foundation construction method for temporary columnInfo
- Publication number
- JPH0455522A JPH0455522A JP16279190A JP16279190A JPH0455522A JP H0455522 A JPH0455522 A JP H0455522A JP 16279190 A JP16279190 A JP 16279190A JP 16279190 A JP16279190 A JP 16279190A JP H0455522 A JPH0455522 A JP H0455522A
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- temporary
- construction method
- column
- pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
【発明の詳細な説明】 〈産業上の利用分野〉 本発明は、仮設柱の基礎工法に係るものである。[Detailed description of the invention] <Industrial application field> The present invention relates to a foundation construction method for temporary columns.
〈従来の技術〉
従来からの仮設柱用の基礎工事として、例えば仮設柱の
基礎部分に根抛材を取付けて立設する工法があるが、該
根機材は仮設柱の引抜き抵抗力を増す目的をもってなさ
れる単なる補強手段に終わっている。また、実効を朋す
るためには該仮設柱の根太り深さを増し、地中における
基礎体の重量と横幅を増大することが大きな抵抗モーメ
ントを確保する上で最も有効であるところ、上記根太り
深さは2m(地上高さ15mの仮設柱の場合)を越える
と特殊な掘削機械を用いない限り基礎工事に充分な施工
が望めぬため、多くの場合、仮設柱の基礎部分に配筋し
てコンクリートを基礎穴深く打設して基礎体を構成する
工法が採用されてるゆ然しなから、上記コンクリートを
打設する工法においても配筋やコンクリートの養生に相
当期間を要し、場合によっては重機類の搬入を伴い工数
がかかる上、人家や施設が密集した狭隘地や山間部での
施工は難儀があり、また当該仮設柱の撤去時における埋
戻しに際して、基礎体としたコンクリートを破砕して搬
出せねばならない等の問題点が多く残っている。<Conventional technology> As a conventional foundation construction method for temporary columns, there is a construction method in which, for example, a rooting material is attached to the base of the temporary column and erected, but the purpose of the rooting material is to increase the pull-out resistance of the temporary column. It ends up being a mere means of reinforcement. In addition, in order to ensure the effectiveness, increasing the depth of the roots of the temporary pillars and increasing the weight and width of the foundation underground is the most effective way to ensure a large resistance moment. If the thickness exceeds 2m (for a temporary pillar with a height of 15m above the ground), sufficient foundation work cannot be expected unless a special excavation machine is used, so in many cases reinforcement is placed at the base of the temporary pillar. Because the method used is to construct the foundation by pouring concrete deep into the foundation hole, even with the method of pouring concrete, a considerable period of time is required for reinforcing and curing of the concrete, and in some cases Not only does it require the transportation of heavy machinery, it takes a lot of man-hours, and it is difficult to construct it in narrow areas or mountainous areas where there are a lot of people's houses and facilities.Also, when the temporary pillars are removed, the concrete used as the foundation must be crushed when backfilling. Many problems remain, such as the need to transport the materials.
〈発明が解決しようとする課題〉
本発明は上記従来の問題点を可及的に解消するためにな
されたもので、迅速で能率的な施工を可能ならしめ、人
家や施設が密集した狭隘地でも施工可能であり、しかも
仮設柱を基礎体に挿通後、充分な引抜抵抗力が得られる
新規な仮設柱の基礎工法を提案することを課題とする。<Problems to be Solved by the Invention> The present invention has been made in order to solve the above-mentioned conventional problems as much as possible. The purpose of the present invention is to propose a new foundation construction method for temporary columns that can be constructed even in the case of temporary columns and that can provide sufficient pull-out resistance after inserting the temporary columns into the foundation.
く課題を解決するための手段〉
上記課題を達成するために、本発明においては、埋設す
べき基礎体の嵩に対応した竪孔を掘削し、これに該基礎
体を構成すべく、適宜厚を有する円盤状のコンクリート
成形体であって、上面中央部を膨出させて台地状の凸部
を形成し、その底面側中央部には上記凸部の形状に対応
する同形の凹部を形成せしめると共に、仮設柱の立設用
透孔を上記凸部の中央に穿設した単体を上記竪孔に順次
必要個数を重合させて円柱状の基礎体を構成し、のち仮
設柱は該基礎体の最上面における固定手段により固定さ
れ、かつ該基礎体と共に埋設して設置されるべき仮設柱
の基礎工法をもって、その解決するための手段とするも
のである。Means for Solving the Problems> In order to achieve the above problems, in the present invention, a pit corresponding to the volume of the foundation to be buried is excavated, and a hole with an appropriate thickness is drilled in order to construct the foundation. A disc-shaped concrete molded body having a central part of the upper surface bulged to form a plateau-like convex part, and a concave part of the same shape corresponding to the shape of the convex part formed in the central part of the bottom side. At the same time, a through hole for erecting a temporary pillar is drilled in the center of the convex part, and the required number of single pieces are stacked in the vertical hole in order to form a cylindrical base. A means for solving this problem is a foundation construction method for temporary columns that are fixed by fixing means on the top surface and buried together with the foundation.
〈実施例〉
1は適宜厚を有する円盤状のコンクリート成形体であり
、上面中央部を膨出させて台地状の凸部1aを形成し、
その底面側中央部には該台地状の凸部1aに対応する同
形の凹部1bを形成すると共に、仮設柱3の立設用透孔
1cを上記凸部1aの中央に穿設している。<Example> 1 is a disc-shaped concrete molded body having an appropriate thickness, and the central part of the upper surface is bulged to form a plateau-like convex part 1a,
A concave portion 1b having the same shape as the plateau-like convex portion 1a is formed at the center of the bottom surface thereof, and a through hole 1c for erecting the temporary pillar 3 is bored in the center of the convex portion 1a.
上記成形体1を必要個数用意して竪孔2の底部より順次
重合して円柱状の仮設柱30基礎体4を得る工法が本発
明の要旨となすもので、その工法の工程を第3図にした
がって説明する。The gist of the present invention is a method of preparing a required number of molded bodies 1 and polymerizing them sequentially from the bottom of the pit 2 to obtain a cylindrical temporary column 30 and a base body 4. The process of this method is shown in Fig. 3. Explain according to the following.
(イ)の工程:埋設すべき基礎体4の嵩に対応した竪孔
2を掘削する。該竪孔2の基底
部2aは基礎体4の安定を図るために
床付けを行なう(第3図・イ参照)。Step (a): A pit hole 2 corresponding to the volume of the foundation body 4 to be buried is excavated. The base 2a of the shaft 2 is floored to stabilize the base body 4 (see FIG. 3A).
(ロ)の工程;基礎体4を構成すべく円盤状のコンクリ
ート成形体1を必要個数用意し、該円盤状コンクリート
成形体1′の台
形状の凸#1aを上方にして吊り下げ、竪孔2の基底部
2&に据え付ける(第
3図・口参照)。Step (b): Prepare the required number of disc-shaped concrete molded bodies 1 to constitute the base body 4, suspend the disc-shaped concrete molded bodies 1' with the trapezoidal convex #1a upward, and Install it on the base 2 & of 2 (see Figure 3, opening).
(ハ)の工程;該円盤状コンクリート成形体1′の上に
同形状の成形体1#を順次吊り
下げて重合し、円柱状の基礎体4を構
成する。Step (c): Molded bodies 1# of the same shape are successively suspended on the disk-shaped concrete formed body 1' and polymerized to form a cylindrical base body 4.
このようにして得られた基礎体4は仮 設柱3を立設すべく仮設柱立設用の透 孔1cが第3図・への如く深さ方向に 連続して形成される。The base body 4 obtained in this way is tentatively In order to erect installation pillar 3, a transparent hole for erecting a temporary pillar is installed. The hole 1c is in the depth direction as shown in Figure 3. Formed continuously.
(ニ)の工程;上記仮設柱3の立設用の透孔1cに、仮
設柱3を挿通して立設した後、
前記台地状の凸部1a最上面における
固定手段により仮設柱3を固定する。Step (d): After inserting the temporary pillar 3 into the through hole 1c for erection of the temporary pillar 3 and erecting it, fix the temporary pillar 3 by the fixing means on the top surface of the plateau-like convex part 1a. do.
その後、上記基礎体と共に埋設して仮 設は設置される(第3図・二参照)。After that, it will be buried together with the above foundation and temporarily The equipment will be installed (see Figure 3, 2).
以上のようにして、本発明の工法による仮設柱30基礎
は完成する。In the manner described above, the foundation for the temporary pillars 30 is completed using the construction method of the present invention.
なを、前記固定手段として実施例では第1図に示す如く
、円弧状に複数箇所穿孔を施した半割り輪状の固定部材
5で仮設柱の外周を囲んだのち、上記固定部材5の穿孔
に対応する位置に設けられたネジ孔を利用してボルト6
により緊締して固定したが、この固定手段は上記に限定
されることなく、仮設柱3と基礎体4が一体化されるべ
く固定される手段であればいずれを採用してもよい。In this embodiment, as the fixing means, as shown in FIG. Insert bolt 6 using the screw hole provided in the corresponding position.
Although the fixing means is not limited to the above, any means may be used as long as the temporary pillar 3 and the base body 4 are fixed so as to be integrated with each other.
〈発明の効果〉
本発明に係る仮設柱の基礎工法によれば、円盤状のコン
クリート成形体の上面中央部を膨出させて台地状の凸部
を形成し、その底面側中央部には該凸部の形状に対応す
る同形の凹部を形成したから、該円盤状のコンクリート
成形体を順次隙間なく正確に重合でき、ざらに立設用透
孔に仮設柱を挿通することにより速やかに基礎体を構築
され、また組立解体が容易であるので人家および施設が
密集した狭隘地、或いは工事現場や催事場における仮設
柱の基礎工法として好個である。<Effects of the Invention> According to the foundation construction method for temporary pillars according to the present invention, the central part of the upper surface of the disc-shaped concrete molded body is bulged to form a plateau-like convex part, and the central part of the bottom side of the convex part is bulged. Since the concave part of the same shape corresponding to the shape of the convex part is formed, the disc-shaped concrete molded bodies can be stacked one after another accurately without any gaps, and the foundation can be quickly assembled by inserting the temporary pillars into the through holes for erection. Since it is easy to assemble and dismantle, it is suitable as a foundation construction method for temporary pillars in narrow areas where houses and facilities are crowded, or at construction sites and event halls.
また、前記台地状の凸部の最上面における固定手゛段に
より仮設柱は固定されるので、該仮設柱に作用する転倒
力に抗して充分な引抜き抵抗力を有して高い支持力が得
られる。In addition, since the temporary pillar is fixed by the fixing means on the top surface of the terrace-like convex part, it has sufficient pull-out resistance against the overturning force acting on the temporary pillar, and has a high supporting force. can get.
さらに、簡単な構造であって実施し易く、量産にも適し
た円盤状の成形体より成るから各種柱体の立設にも転用
可能であり、また反復して使用できるなど多々効果を有
する工法である。Furthermore, it has a simple structure, is easy to implement, and is suitable for mass production because it consists of a disc-shaped molded body, so it can be used to erect various types of columns, and it can be used repeatedly. It is.
第1図は基礎工法の一実施態様を示す要部分解斜視図、
第2図は本発明の一実施例において採用する円盤状のコ
ンクリート成形体の一例を示す断面図、js3図は基礎
工法の施工例を示す説明図である。
1.1’ 1”−−−一成形体
la−−6部
lb−−H部
lc−一透 孔
2−−一−−−竪 孔
3−−−−−一仮設柱
4−−−−−一基礎体
5−−−−−一同定部材
6−−−−−−ボルトFigure 1 is an exploded perspective view of essential parts showing one embodiment of the foundation construction method;
FIG. 2 is a sectional view showing an example of a disc-shaped concrete molded body employed in an embodiment of the present invention, and FIG. 3 is an explanatory view showing an example of construction using the foundation construction method. 1.1'1''----1 molded body la--6 part lb--H part lc--1 hole 2--1 vertical hole 3-----1 temporary pillar 4---- -One base body 5---One identification member 6---Bolt
Claims (1)
設する為の竪孔を掘削して該竪孔に設けられる仮設柱用
の基礎工法であって、 イ、埋設すべき基礎体の嵩に対応した竪孔を掘削し、床
付けを行う。 ロ、基礎体を構成すべく円盤状のコンクリート成形体を
用意する。適宜厚を有する該コンクリート成形体は、上
面中央部を膨出させて台地状の凸部を形成し、その底面
側中央部には上記凸部の形状に対応する同形の凹部を形
成せしめると共に、仮設柱の立設用透孔を上記凸部の中
央に穿設してなる。 ハ、上記、円盤状のコンクリート成形体の必要個数を前
記竪孔底部より順次重合して基礎体を構成する。 ニ、前記台地状の凸部の最上面における固定手段により
仮設柱は固定され、かつ上記基礎体と共に埋設して仮設
柱は設置される。 上記イ〜ニの各工程を経て得られる仮設柱の基礎工法。(1) A foundation construction method for temporary columns in which, when installing temporary columns, a pit is dug in order to bury the foundation in a predetermined position and the foundation is installed in the pit. A pit corresponding to the area will be excavated and the floor will be laid. B. Prepare a disc-shaped concrete molding to form the foundation. The concrete molded body having an appropriate thickness has a central portion of the upper surface bulged to form a plateau-like convex portion, and a concave portion of the same shape corresponding to the shape of the convex portion is formed at the central portion of the bottom side. A through hole for erecting a temporary pillar is bored in the center of the convex portion. C. As described above, the required number of disc-shaped concrete molded bodies are sequentially polymerized from the bottom of the pit to form a base body. D. The temporary pillar is fixed by the fixing means on the uppermost surface of the terrace-like convex portion, and is installed by being buried together with the foundation. A foundation construction method for temporary columns obtained through each of the steps A to D above.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16279190A JPH0455522A (en) | 1990-06-22 | 1990-06-22 | Foundation construction method for temporary column |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16279190A JPH0455522A (en) | 1990-06-22 | 1990-06-22 | Foundation construction method for temporary column |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0455522A true JPH0455522A (en) | 1992-02-24 |
Family
ID=15761277
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16279190A Pending JPH0455522A (en) | 1990-06-22 | 1990-06-22 | Foundation construction method for temporary column |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0455522A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7993079B2 (en) * | 2004-08-12 | 2011-08-09 | Societe Centrale D'etudes Et De Realisations Routieres Scetauroute | Device and method for a tower reinforcing foundation |
| ES2579994A1 (en) * | 2015-02-17 | 2016-08-18 | Iconkrete 2012, S.L. | Foundation element of prefabricated concrete for the execution of solar thermal or photovoltaic plants and procedure for its execution (Machine-translation by Google Translate, not legally binding) |
| JP2017137620A (en) * | 2016-02-01 | 2017-08-10 | 東日本旅客鉄道株式会社 | Precast concrete split foundation |
| JP2019214875A (en) * | 2018-06-13 | 2019-12-19 | 山湛産業開発株式会社 | Prefabricated foundation block |
| JP2021507148A (en) * | 2017-12-16 | 2021-02-22 | エヌエックスティ アイピー プロプライエタリー リミテッドNxt Ip Pty Ltd | Building system |
-
1990
- 1990-06-22 JP JP16279190A patent/JPH0455522A/en active Pending
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7993079B2 (en) * | 2004-08-12 | 2011-08-09 | Societe Centrale D'etudes Et De Realisations Routieres Scetauroute | Device and method for a tower reinforcing foundation |
| ES2579994A1 (en) * | 2015-02-17 | 2016-08-18 | Iconkrete 2012, S.L. | Foundation element of prefabricated concrete for the execution of solar thermal or photovoltaic plants and procedure for its execution (Machine-translation by Google Translate, not legally binding) |
| JP2017137620A (en) * | 2016-02-01 | 2017-08-10 | 東日本旅客鉄道株式会社 | Precast concrete split foundation |
| JP2021507148A (en) * | 2017-12-16 | 2021-02-22 | エヌエックスティ アイピー プロプライエタリー リミテッドNxt Ip Pty Ltd | Building system |
| JP2019214875A (en) * | 2018-06-13 | 2019-12-19 | 山湛産業開発株式会社 | Prefabricated foundation block |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4335958B2 (en) | Simple foundation | |
| US5039256A (en) | Pinned foundation system | |
| CA2060459C (en) | Post anchoring device | |
| US20030021636A1 (en) | Foundation for a tower and a method for its deployment on site | |
| US5890333A (en) | Concrete form | |
| US20020166302A1 (en) | Footing for sound-barrier walls | |
| JPH0455522A (en) | Foundation construction method for temporary column | |
| JP2017505393A (en) | Prop support device | |
| JP5635048B2 (en) | Basics for installing solar panels | |
| JP2596798B2 (en) | Existing building seismic isolation method | |
| JP3129676B2 (en) | Piling columns in building structures using piles as pillars | |
| JPH11217838A (en) | Execution method of columnar structure and foundation of columnar structure | |
| JPH08189041A (en) | Unit anchor and shape-steel footing beam | |
| KR100650976B1 (en) | Foundation pile installation structure | |
| JP2002047662A (en) | Portable columnar foundation body and its installation method | |
| JP2011012433A (en) | Manhole lift preventing structure | |
| JPS6242989Y2 (en) | ||
| KR100679296B1 (en) | Rebar cap assembly of high strength concrete pile | |
| KR200314876Y1 (en) | Retaining Wall using Permanent Anchor and Pre-Cast Concrete Panel | |
| JP3025214B2 (en) | Concrete fence | |
| AU2005100373A4 (en) | Foundation base plate | |
| JP3085926B2 (en) | Connection pole | |
| JPH077386Y2 (en) | Foundation structure for building columns | |
| JPH01278641A (en) | Vibration isolation foundation structure of building | |
| JPH0673923A (en) | Concrete fence and construction method thereof |