JPH0536599Y2 - - Google Patents

Info

Publication number
JPH0536599Y2
JPH0536599Y2 JP19641485U JP19641485U JPH0536599Y2 JP H0536599 Y2 JPH0536599 Y2 JP H0536599Y2 JP 19641485 U JP19641485 U JP 19641485U JP 19641485 U JP19641485 U JP 19641485U JP H0536599 Y2 JPH0536599 Y2 JP H0536599Y2
Authority
JP
Japan
Prior art keywords
lower metal
crankshaft
crank pin
crane
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP19641485U
Other languages
Japanese (ja)
Other versions
JPS62104830U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP19641485U priority Critical patent/JPH0536599Y2/ja
Publication of JPS62104830U publication Critical patent/JPS62104830U/ja
Application granted granted Critical
Publication of JPH0536599Y2 publication Critical patent/JPH0536599Y2/ja
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)

Description

【考案の詳細な説明】 <産業上の利用分野> 本考案は、大型内燃機関のクランク軸のクラン
クピンに連接棒(コネクテイングロツド)の大端
部(上メタル、下メタル)を組み付ける治具装置
に関する。
[Detailed description of the invention] <Field of industrial application> This invention is a method for assembling the large end (upper metal, lower metal) of a connecting rod to the crank pin of the crankshaft of a large internal combustion engine. Regarding equipment.

<従来の技術> 従来、内燃機関とりわけ大型デイーゼル機関の
クランク軸のクランクピンと連接棒の大端部との
組付けは、次のような方法で行なわれている。即
ち、クランク軸のジヤーナル部を支持するため床
面に所定間隔で一列に立設された同一高さの架台
上に、クレーンで吊り下げて運んできた。クラン
ク軸を載置し、この架台にクランプする。次い
で、クランク軸のクランクピン位置下方に床にロ
ーラコンベアをクランク軸に直交するように配置
し、このローラコンベア上の移送台に連接棒大端
部の下メタルをクレーンで吊り下ろして載置し、
この下メタルを移送台と共に手で押して上記クラ
ンクピン直下まで移動させる。続いて、上記クレ
ーンをクランクピン上方に位置させ、このクレー
ンのフツクに掛けられた同一長さの2本のワイヤ
ロープを上記クランクピンをまたがせて床面まで
降ろし、両ワイヤロープの先端を上記下メタルの
両側のボルト穴に夫々上方から貫通させて、これ
ら先端に抜け止め金具を装着した後、上記フツク
を巻き上げて、下メタルを上記クランクピンに下
方から当接させる。この状態で、上記下メタル下
端と床面間にジヤツキを密に挿入してこの下メタ
ルを支える一方、上記抜け止め金具を外して、両
ワイヤロープをボルト穴から抜く。その後、上メ
タルを上記クレーンで吊り上げて移動させて、上
記クランクピンを挟むようにして上方から上記下
メタルに載置し、この下メタルのボルト穴を貫通
して下端から突出する上メタルの植込みボルトに
ナツトを螺着して、上メタルと下メタルを連結し
ている。
<Prior Art> Conventionally, the crank pin of the crankshaft of an internal combustion engine, especially a large diesel engine, and the large end of a connecting rod have been assembled by the following method. That is, in order to support the journal portion of the crankshaft, they were suspended and transported by a crane onto frames of the same height that were erected in a row on the floor at predetermined intervals. Place the crankshaft and clamp it to this frame. Next, a roller conveyor is placed on the floor below the crank pin position of the crankshaft so as to be perpendicular to the crankshaft, and the lower metal of the large end of the connecting rod is lowered and placed on the transfer platform on the roller conveyor using a crane. ,
Push this lower metal together with the transfer table by hand to move it to just below the crank pin. Next, the crane is positioned above the crank pin, and two wire ropes of the same length hung on the hook of the crane are lowered to the floor across the crank pin, and the ends of both wire ropes are lowered. After passing through the bolt holes on both sides of the lower metal from above and attaching retaining metal fittings to their tips, the hook is rolled up to bring the lower metal into contact with the crank pin from below. In this state, a jack is tightly inserted between the lower end of the lower metal and the floor surface to support the lower metal, while the retainer is removed and both wire ropes are pulled out from the bolt holes. Thereafter, the upper metal is lifted and moved by the crane, and placed on the lower metal from above so as to sandwich the crank pin, and is inserted into the stud bolt of the upper metal that passes through the bolt hole of the lower metal and protrudes from the lower end. A nut is screwed on to connect the upper metal and lower metal.

<考案が解決しようとする問題点> ところが、上記従来のロツド大端部の組付け方
法では、クランクピンをまたいで降りる2本の等
長のワイヤロープで下メタルをその両側のボルト
穴を介して吊り上げてクランクピンに当接させる
のに加えて、クランクピン直径に対する両ボルト
穴間距離の余裕が少ないため、下メタル、クラン
クピンおよびクレーンを正確に一鉛直線上に配置
しないと、吊り上げ時にワイヤロープの一方のみ
が引き上げられて下メタルが激しく揺動し、これ
らワイヤロープや下メタルがクランクピンやクラ
ンクジヤーナルに衝突して、これらを傷つけると
いう欠点がある。特にピストン径が400mm程度の
大型デイーゼル機関では、上記下メタルの重量は
80Kgにも達し、このような下メタルの衝突による
クランクピン等の損傷は、デイーゼル機関の重大
な欠陥となるばかりでなく、組付け作業そのもの
を非常に危険なものにする。しかるに、このよう
な欠点を克服する方策は、下メタル、クランクピ
ンおよびクレーンを正確に上記鉛直線上に次々に
配置していくほかなく、そうするには非常な手間
と時間がかかるほか、クランクピンをまたいで両
側に降りるワイヤロープを下メタルの両側のボル
ト穴に抜差し、このワイヤロープ先端に抜け止め
金具を脱着するにも、下メタルを吊るクレーンの
移動等にも手間がかかり、作業能率が低下し、組
付け作業以前の段取りに多大の時間を費やすこと
になる。
<Problems to be solved by the invention> However, in the above conventional method of assembling the big end of the rod, two wire ropes of equal length that straddle the crank pin are used to connect the lower metal through the bolt holes on both sides. In addition, since there is little margin for the distance between both bolt holes relative to the crank pin diameter, if the lower metal, crank pin, and crane are not placed exactly on a vertical line, the wires will come into contact with the crank pin during lifting. There is a drawback that only one of the ropes is pulled up and the lower metal swings violently, causing the wire rope and the lower metal to collide with and damage the crank pin and crank journal. Especially in large diesel engines with a piston diameter of about 400 mm, the weight of the lower metal mentioned above is
Damage to the crank pin, etc. caused by a collision with the lower metal, which can reach up to 80 kg, not only causes a serious defect in the diesel engine, but also makes the assembly process itself extremely dangerous. However, the only way to overcome this drawback is to precisely place the lower metal, crank pin, and crane one after another on the vertical line. Inserting and removing the wire rope that goes down on both sides of the lower metal through the bolt holes on both sides of the lower metal, attaching and removing the stopper to the tip of this wire rope, and moving the crane that hangs the lower metal takes time and reduces work efficiency. This results in a large amount of time being spent on setup before assembly.

そこで、本考案の目的は、簡便な下メタル吊具
を備えて、クランク軸を衝突で傷つけることな
く、安全かつ能率的に、クランク軸のクランクピ
ンに連接棒大端部の下メタルと上メタルを組み付
けることができる治具装置を提供することであ
る。
Therefore, the purpose of this invention is to provide a simple lower metal hanger to safely and efficiently attach the lower metal and upper metal of the large end of the connecting rod to the crank pin of the crankshaft without damaging the crankshaft due to collision. It is an object of the present invention to provide a jig device that can assemble.

<問題点を解決するための手段> 上記目的を達成するため、本考案のロツド大端
部の組付け治具装置は、クランク軸のジヤーナル
部を移動不可に載置してこのクランク軸を水平に
支持する架台と、上辺部と中辺部と下辺部からな
るコ字形状をなし、クレーン用の吊り部を上記上
辺部に有し、上記中辺部に側面を当接させた連接
棒大端部の下メタルのボルト穴に下方から嵌合す
るピンを上記下辺部に有する下メタル吊具と、こ
の下メタル吊具に保持されてクレーンで吊り上げ
られ、上記クランク軸のクランクピンの下方から
当接せしめられた上記下メタル下端に挿入される
ジヤツキとからなることを特徴とする。
<Means for Solving the Problems> In order to achieve the above object, the rod large end assembly jig device of the present invention places the journal part of the crankshaft immovably and horizontally holds the crankshaft. a large connecting rod that has a U-shape consisting of an upper side, a middle side, and a lower side, has a hanging part for the crane on the upper side, and has a side surface in contact with the middle side. A lower metal hoist has a pin on the lower side that fits into the bolt hole of the lower metal at the end from below, and the lower metal hoist is held by the lower metal hoist and lifted by a crane from below the crank pin of the crankshaft. and a jack inserted into the lower end of the lower metal brought into contact.

<作用> まず、クランク軸をクレーンで吊り上げて、ジ
ヤーナル部を架台上に移動不可に載置し、上記ク
ランク軸を水平に支持する。次に、下メタル吊具
の下辺部のピンを連接棒大端部の下メタルのボル
ト穴に下方から嵌合させるとともに、下メタルの
側面を上記下メタル吊具の中辺部に当接させてこ
の下メタルを上記下メタル吊具に保持しつつ、こ
の下メタル吊具の上辺部の吊り部をクレーンで吊
り上げて移動させ、上記下メタルを上記クランク
軸のクランクピンに下方から当接させる。この状
態で上記下メタル下端にジヤツキを挿入してこれ
を支持し、上記クレーンを移動させて上記下メタ
ル吊具を退避させた後、上メタルをクレーンで吊
り上げて移動させて、上記クランクピンを挟んで
上方から上記下メタルに載置して、上記上メタル
と下メタルを連結する。
<Operation> First, the crankshaft is lifted up by a crane, and the journal portion is immovably placed on a pedestal to support the crankshaft horizontally. Next, fit the pin on the lower side of the lower metal hanger into the bolt hole of the lower metal of the large end of the connecting rod from below, and also bring the side surface of the lower metal into contact with the middle side of the lower metal hanger. While holding the lower metal of the lever on the lower metal hanging tool, lift and move the upper part of the lower metal hanging tool with a crane, and bring the lower metal into contact with the crank pin of the crankshaft from below. . In this state, insert a jack into the lower end of the lower metal to support it, move the crane to evacuate the lower metal hoist, and then lift and move the upper metal with the crane to tighten the crank pin. It is sandwiched and placed on the lower metal from above to connect the upper metal and the lower metal.

<実施例> 以下、本考案を図示の実施例により詳細に説明
する。
<Example> Hereinafter, the present invention will be explained in detail with reference to the illustrated example.

第1図は本考案の一実施例を示す側面図であ
り、1,1,1,1は床Fは所定間隔で一列に立
設した同一高さの架台、2はこれらの架台1,
1,…にジヤーナル部2a,2a,…が移動不可
に載置され、水平に支持されるクランク軸、3は
コ字形状をなす下メタル吊具(第2図参照)、4
はこの下メタル吊具3を上辺部11先端のアイボ
ルト17を介してクレーン(図示せず)に吊り下
げるワイヤロープ、5は上記下メタル 吊具3に
保持され、上記クレーンで吊り上げて移動させら
れ、上記クランク軸2のクランクピン2b,2
b,…に下方から当接させられる連接棒大端部の
下メタル、6,6′はこの下メタル下端に挿入さ
れ上記下メタル5を支持するねじ式ジヤツキ、7
は上記クランクピン2bを挟んで上方から上記下
メタル5に載置され互いに連結される連接棒大端
部の上メタルである。
FIG. 1 is a side view showing an embodiment of the present invention, in which 1, 1, 1, 1 stands on the floor F and stands of the same height are erected in a row at predetermined intervals, 2 stands for these stands 1,
1,... on which the journal parts 2a, 2a,... are immovably placed and a horizontally supported crankshaft; 3, a U-shaped lower metal hanger (see Fig. 2); 4;
5 is a wire rope that suspends this lower metal hanging tool 3 from a crane (not shown) via an eye bolt 17 at the tip of the upper side 11; , the crank pins 2b, 2 of the crankshaft 2
The lower metals 6 and 6' of the large ends of the connecting rods that are brought into contact with b, ... from below are threaded jacks 7 that are inserted into the lower ends of the lower metals and support the lower metal 5.
is the upper metal of the large end of the connecting rod which is placed on the lower metal 5 from above with the crank pin 2b in between and connected to each other.

上記架台1は、第2図に示すように、形鋼を台
状に組んでなり、その上面にジヤーナル部2aの
下半に当接する半円筒形の当り板1aを固定する
とともに、上記ジヤーナル部2aをクランプする
図示しないクランプ手段を備えてなる。この架台
1に支持される上記クランク軸2は、6気筒(シ
リンダ径400mm)デイーゼル機関用のもので、6
対のクランクアーム2cは、第2図中( )付数
字でアーム番号を示すようにジヤーナル部2aの
回りに120°のクランク角をなして順に固定され、
この対をなすクランクアーム2c間にクランクピ
ン2bが夫々固定されている。従つて、このクラ
ンクピン2bに下方から当接させられる下メタル
5を支える上記ねじ式ジヤツキ6,6′は、上記
クランクピン2bの中心を通る鉛直線上の床Fに
挿入されとになる。
As shown in FIG. 2, the pedestal 1 is made of shaped steel assembled into a table shape, and has a semi-cylindrical abutment plate 1a fixed to its upper surface that abuts the lower half of the journal part 2a. It is equipped with a clamping means (not shown) for clamping 2a. The crankshaft 2 supported by this frame 1 is for a 6-cylinder (cylinder diameter 400 mm) diesel engine.
The pair of crank arms 2c are fixed in order around the journal part 2a at a crank angle of 120°, as indicated by the arm numbers in parentheses in FIG.
A crank pin 2b is fixed between each pair of crank arms 2c. Therefore, the screw jacks 6, 6' supporting the lower metal 5 which is brought into contact with the crank pin 2b from below are inserted into the floor F on the vertical line passing through the center of the crank pin 2b.

第3図a,bは、コ字形状をなす上記下メタル
吊具3の夫々正面図および側面図を示す。この下
メタル吊具3は、みぞ形鋼を直角に曲げて上辺部
11および中辺部12を形成し、角部に補強材1
4を接合するとともに、中辺部12下端に、上辺
部11側へこの上辺部11と平行に小矩形をなす
下辺部13を固定し、この下辺部13に上方へ向
けてピン15,15を突設する一方、上辺部11
先端にアイボルト17(第2図参照)用のめねじ
16を螺設し、さらに上辺部11内面にナイロン
でなる保護板18を貼着してなる。図中の2点鎖
線で示すように、上記下メタル吊具3のピン1
5,15は下メタル5の片側のボルト穴5a,5
aに下方から嵌合し、下辺部13は上記ボルト穴
5a下端の平坦部5bに当接し、中辺部12内面
は下メタル5の側面5cに当接して、下メタル吊
具3は下メタル5を確実に保持するようになつて
いる。また、下メタル吊具3の各部の寸法および
重量は、下メタル5をこのように保持してアイボ
ルト17およびワイヤロープ4を介して下メタル
吊具3を吊り上げたとき、上記アイボルト17の
回りのモーメントが均合うように、また下メタル
5の上面と上辺部11との間隔がクランクピン2
bの直径より少し広くなるように設計されてい
る。上記ねじ式ジヤツキ6,6′は、クランクピ
ン2bの高さに応じた夫々高いジヤツキと低いジ
ヤツキであり、パイプ本体6a,6′aに先端に
ナツト6b,6′bを螺着したねじ棒6c,6′c
をねじ込み、パイプ本体下端に底板6d,6′d
を接合し、リブ6eで補強した簡単かつ軽量(6
Kg、2Kg)なもので、上記ねじ棒6c,6′cの
ストロークは60mm程度である。
FIGS. 3a and 3b show a front view and a side view, respectively, of the lower metal hanging tool 3 having a U-shape. This lower metal hanging tool 3 is made by bending groove-shaped steel at right angles to form an upper side 11 and a middle side 12, and a reinforcing material 1 at the corner.
At the same time, a small rectangular lower side 13 is fixed to the lower end of the middle side 12 and parallel to the upper side 11, and the pins 15, 15 are attached upward to the lower side 13. On the other hand, the upper side portion 11
A female thread 16 for an eye bolt 17 (see FIG. 2) is screwed at the tip, and a protection plate 18 made of nylon is further adhered to the inner surface of the upper side 11. As shown by the two-dot chain line in the figure, pin 1 of the lower metal hanging tool 3
5 and 15 are bolt holes 5a and 5 on one side of the lower metal 5
a from below, the lower side part 13 contacts the flat part 5b at the lower end of the bolt hole 5a, the inner surface of the middle part 12 contacts the side surface 5c of the lower metal 5, and the lower metal hanger 3 5 is held securely. In addition, the dimensions and weight of each part of the lower metal hoist 3 are as follows: When the lower metal hoist 3 is held in this manner and the lower metal hoist 3 is lifted via the eye bolt 17 and the wire rope 4, the dimensions and weight of the parts around the eye bolt 17 are In order to balance the moments, the distance between the upper surface of the lower metal 5 and the upper side 11 is adjusted so that the crank pin 2
It is designed to be slightly wider than the diameter of b. The screw type jacks 6, 6' have high and low jacks, respectively, depending on the height of the crank pin 2b, and are threaded rods with nuts 6b, 6'b screwed onto the ends of the pipe bodies 6a, 6'a. 6c, 6'c
Screw in the bottom plates 6d and 6'd to the lower end of the pipe body.
simple and lightweight (6
(kg, 2kg), and the stroke of the threaded rods 6c, 6'c is approximately 60mm.

次に、以上の治具装置を用いてクランク軸2に
連接棒の大端部(上メタル7、下メタル5)を組
み付ける方向について、第4図を参照しつつ述べ
る。
Next, the direction of assembling the large ends (upper metal 7, lower metal 5) of the connecting rod to the crankshaft 2 using the above jig device will be described with reference to FIG.

クランク軸2を図示しないクレーンで吊り上げ
て、第1図、第2図に示す如く架台1上に水平に
載置してクランプする、次いで、床Fの一個所に
集めて置いてある下メタル5の1つの片側のボル
ト穴5a,5aに、ワイヤロープ4を介してクレ
ーンから吊り下げられた下メタル吊具3のピン1
5,15を下方から嵌合し、下メタル5の平坦部
5bを下辺部13に、下メタル5の側面5cを中
辺部12内面に夫々当接させて、この下メタル5
を下メタル吊具3に確実に保持する。そして、こ
の下メタル5を上記クレーンで吊り上げて、組み
付けるべきクランク軸2のクランクピン2bの側
方まで縦移動させる(第4図a参照)。続いて、
上記クレーンの操作により、下メタル5をクラン
クピン2bの直下まで横移動させてから上昇さ
せ、クランクピン2bに下方から当接させた状態
で、下メタル5下端にジヤツキ6′を挿入し、ね
じ棒6′cを伸長させて上記下メタル5を確実に
支持せしめる(第4図b参照)。次に、上記クレ
ーンを操作して、下メタル吊具3を、下降させつ
つ下メタル5から外し、次の作業を妨げない位置
まで退避させる。最後に、床Fの一個所に集めて
置かれた上メタル7の1つを、ワイヤロープ4′
およびアイボルト17′を介して別のクレーンで
吊り上げて、上記下メタル5の直上まで移動さ
せ、上記クランクピン2bを挟むようにして上方
から上記下メタル5に載置し、この下メタル5の
両側のボルト穴を貫通して下端から突出する上メ
タルの4本の植込みボルト19にナツト20を螺
着・締結して、上メタル7と下メタル5を連結す
る(第4図c参照)。他のクランクピン2bへの
上メタル7と下メタル5の組み付けも、これと同
様に行なえる。また、前述と逆の手順によれば、
クランク軸2の各クランクピン2bから連接棒大
端部(上メタル7、下メタル5)を取り外すこと
ができる。
The crankshaft 2 is lifted up by a crane (not shown), placed horizontally on the pedestal 1 and clamped as shown in FIGS. The pin 1 of the lower metal hoist 3 suspended from the crane via the wire rope 4 is inserted into the bolt holes 5a, 5a on one side of the
5 and 15 from below, and bring the flat part 5b of the lower metal 5 into contact with the lower side part 13 and the side surface 5c of the lower metal 5 with the inner surface of the middle side part 12, respectively.
is securely held on the lower metal hanging tool 3. Then, the lower metal 5 is lifted up by the crane and moved vertically to the side of the crank pin 2b of the crankshaft 2 to be assembled (see FIG. 4a). continue,
By operating the crane described above, the lower metal 5 is moved laterally to just below the crank pin 2b and then raised. With the lower metal 5 in contact with the crank pin 2b from below, the jack 6' is inserted into the lower end of the lower metal 5, and the screw is screwed. The rod 6'c is extended to securely support the lower metal 5 (see FIG. 4b). Next, the crane is operated to remove the lower metal hanging tool 3 from the lower metal 5 while lowering it, and retreat it to a position where it does not interfere with the next work. Finally, one of the upper metals 7 placed in one place on the floor F is attached to the wire rope 4'.
Then, lift it up with another crane via the eye bolt 17', move it to just above the lower metal 5, place it on the lower metal 5 from above so as to sandwich the crank pin 2b, and bolt the bolts on both sides of the lower metal 5. Nuts 20 are screwed and fastened to the four stud bolts 19 of the upper metal that pass through the holes and protrude from the lower end, thereby connecting the upper metal 7 and the lower metal 5 (see FIG. 4c). The upper metal 7 and lower metal 5 can be assembled to other crank pins 2b in the same manner. Also, according to the reverse procedure as described above,
The connecting rod large end portion (upper metal 7, lower metal 5) can be removed from each crank pin 2b of the crankshaft 2.

上記実施例では、下メタル吊具3が、軽くて強
いみぞ形鋼で形成され、下辺部13を小さくして
2本のピン15,15を設け、下メタル5を保持
した状態で上辺部11の先端をアイボルト17で
吊つたときバランスがとれるような寸法・形状に
設計されているので、取扱いやすいうえ、移動時
にも邪魔になることが少なく、能率良い組付け作
業ができ、下メタル5の保持もより確実になる。
また、ねじ式ジヤツキ6,6′は、軽量で運びや
すく、予めクランクピン2bの高さに応じて作ら
れていて、挿入時のねじ棒6cの調整が僅かです
むので、組付け作業の能率が上がる。
In the above embodiment, the lower metal hanging tool 3 is made of light and strong groove-shaped steel, the lower side part 13 is made small and two pins 15, 15 are provided, and the upper side part 11 holds the lower metal 5. The size and shape are designed to maintain balance when the tip of the lower metal 5 is suspended by the eye bolt 17, so it is easy to handle and does not get in the way when moving, allowing for efficient assembly work. Retention will also become more reliable.
In addition, the screw-type jacks 6 and 6' are lightweight and easy to carry, and are made in advance according to the height of the crank pin 2b, so that only a slight adjustment of the threaded rod 6c is required when inserting them, increasing the efficiency of assembly work. goes up.

<考案の効果> 以上の説明で明らかなように、本考案のロツド
大端部の組付け治具装置は、クランク軸のジヤー
ナル部を移動不可に載置してこのクランク軸を水
平に支持する架台と、上辺部と中辺部と下辺部か
らなるコ字形状をなし、クレーン用の吊り部を上
記上辺部に有し、上記中辺部に側面を当接させた
連接棒大端部の下メタルのボルト穴に下方から嵌
合するピンを上記下辺部に有する下メタル吊具
と、この下メタル吊具に保持されてクレーンで吊
り上げられ、上記クランク軸のクランクピンに下
方から当接せしめられた上記下メタル下端に挿入
されるジヤツキとからなるので、簡便で取扱いや
すい上記下メタル吊具を用いた容易かつ確実な下
メタルの保持と移動によつて、クランク軸を衝突
で傷つけることなく安全かつ能率的にクランク軸
のクランクピンに連接棒大端部の下メタルと上メ
タルを組み付けることができ、大型内燃機関組立
て作業に大きく貢献する。
<Effects of the invention> As is clear from the above explanation, the rod large end assembly jig device of the invention supports the crankshaft horizontally by placing the journal part of the crankshaft immovably. The large end of the connecting rod has a U-shape consisting of a pedestal, an upper side, a middle side, and a lower side, has a hanging part for a crane on the upper side, and has a side surface in contact with the middle side. A lower metal hoist having a pin on the lower side that fits into a bolt hole in the lower metal from below, and a lower metal hoist that is held by the lower metal hoist and lifted up by a crane, and is brought into contact with the crank pin of the crankshaft from below. The lower metal hanger is simple and easy to handle, and the lower metal can be easily and reliably held and moved without damaging the crankshaft due to collision. The lower metal and upper metal of the large end of the connecting rod can be assembled safely and efficiently to the crank pin of the crankshaft, greatly contributing to the assembly work of large internal combustion engines.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の一実施例の側面図、第2図は
第1図の−矢視図、第3図a,bは下メタル
吊具の夫々正面図および側面図、第4図a,b,
cは上記実施例を用いた組付け手順を示す正面図
である。 1……架台、2……クランク軸、2a……ジヤ
ーナル部、2b……クランクピン、3……下メタ
ル吊具、4……ワイヤロープ、5……下メタル、
5a,5a……ボルト穴、5c……側面、6,
6′……ジヤツキ、7……上メタル、11……上
辺部、12……中辺部、13……下辺部、15,
15……ピン、16……めねじ、17……アイボ
ルト、18……保護板、19……植込みボルト、
20……ナツト。
Fig. 1 is a side view of one embodiment of the present invention, Fig. 2 is a view taken from the - arrow in Fig. 1, Figs. 3 a and b are front and side views of the lower metal hanging tool, and Fig. 4 a ,b,
c is a front view showing an assembly procedure using the above embodiment. 1... Frame, 2... Crankshaft, 2a... Journal portion, 2b... Crank pin, 3... Lower metal hanging tool, 4... Wire rope, 5... Lower metal,
5a, 5a... Bolt hole, 5c... Side, 6,
6'...Jacket, 7...Top metal, 11...Top side, 12...Middle side, 13...Bottom side, 15,
15... Pin, 16... Female thread, 17... Eye bolt, 18... Protective plate, 19... Studded bolt,
20...Natsuto.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] クランク軸のジヤーナル部を移動不可に載置し
てこのクランク軸を水平に支持する架台と、上辺
部と中辺部と下辺部からなるコ字形状をなし、ク
レーン用の吊り部を上記上辺部に有し、上記中辺
部に側面を当接させた連接棒大端部の下メタルの
ボルト穴に下方から嵌合するピンを上記下辺部に
有する下メタル吊具と、この下メタル吊具に保持
されてクレーンで吊り上げられ、上記クランク軸
のクランクピンに下方から当接せしめられた上記
下メタル下端に挿入されるジヤツキとからなるこ
とを特徴とするロツド大端部の組付け治具装置。
It has a U-shape consisting of a pedestal on which the journal part of the crankshaft is immovably placed and supports the crankshaft horizontally, an upper part, a middle part, and a lower part, and a suspension part for the crane is attached to the upper part of the frame. a lower metal hanger having a pin on the lower side thereof that fits from below into a bolt hole in the lower metal of the large end of the connecting rod whose side surface is in contact with the middle side; and the lower metal hanger. and a jack inserted into the lower end of the lower metal, which is held by the rod and lifted by a crane and brought into contact with the crank pin of the crankshaft from below. .
JP19641485U 1985-12-19 1985-12-19 Expired - Lifetime JPH0536599Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19641485U JPH0536599Y2 (en) 1985-12-19 1985-12-19

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19641485U JPH0536599Y2 (en) 1985-12-19 1985-12-19

Publications (2)

Publication Number Publication Date
JPS62104830U JPS62104830U (en) 1987-07-04
JPH0536599Y2 true JPH0536599Y2 (en) 1993-09-16

Family

ID=31155213

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19641485U Expired - Lifetime JPH0536599Y2 (en) 1985-12-19 1985-12-19

Country Status (1)

Country Link
JP (1) JPH0536599Y2 (en)

Also Published As

Publication number Publication date
JPS62104830U (en) 1987-07-04

Similar Documents

Publication Publication Date Title
CN109048299B (en) Connecting rod bearing bush mounting tool and method for marine diesel engine
JPH0536599Y2 (en)
CN222294728U (en) Hoop equipment for bent cap tie beam construction
JPH05116881A (en) Plate-shaped suspenders
CN219649002U (en) Automatic welding mechanism for reinforcement cage
CN219029517U (en) Transfer device of high-voltage motor
CN210655818U (en) Special lifting appliance for H-shaped steel
CN112125171A (en) An economizer hoisting device and hoisting method
CN215289688U (en) Bridge detects uses workstation
CN219860130U (en) Pump guard board auxiliary dismounting device
CN222275246U (en) Construction platform for overhauling suspension bridge sling
CN208378199U (en) Steel ingot fixture
CN217102742U (en) A kind of hoisting equipment for flat aluminum alloy
CN220976300U (en) Steel construction installation hangs hoist
CN221370229U (en) Device convenient to hoist and mount girder steel of construction equipment
CN222082232U (en) A simple cylindrical product lifting tool
CN216859605U (en) Tool for mounting heavy bolt vertically above
CN220432265U (en) Fork truck is fork head auxiliary device for transport
CN212924091U (en) Lifting device for mirror surface aluminum plate stainless steel plate
CN210172914U (en) Copper tile welding jig with rotation function
JPH02295614A (en) Bending device for steel plate and working method thereof and production of large-diameter steel pipe body
CN218364060U (en) Tooling for crankshaft machining
CN223792782U (en) Flat ingot lifting device
CN216336174U (en) Lifting appliance for aluminum profile machining
CN224147555U (en) Single lever type hoisting tool