JPH0557576A - Transport device - Google Patents

Transport device

Info

Publication number
JPH0557576A
JPH0557576A JP3213964A JP21396491A JPH0557576A JP H0557576 A JPH0557576 A JP H0557576A JP 3213964 A JP3213964 A JP 3213964A JP 21396491 A JP21396491 A JP 21396491A JP H0557576 A JPH0557576 A JP H0557576A
Authority
JP
Japan
Prior art keywords
station
completion
carrier
work
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3213964A
Other languages
Japanese (ja)
Inventor
Atsushi Shibata
淳 柴田
Kazuji Inoue
和司 井上
Yoshihide Sugihara
良英 杉原
Yoshihisa Kayanaka
良久 茅中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Brother Industries Ltd
Original Assignee
Brother Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brother Industries Ltd filed Critical Brother Industries Ltd
Priority to JP3213964A priority Critical patent/JPH0557576A/en
Publication of JPH0557576A publication Critical patent/JPH0557576A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)
  • Discharge Of Articles From Conveyors (AREA)
  • Control Of Conveyors (AREA)
  • Branching, Merging, And Special Transfer Between Conveyors (AREA)

Abstract

(57)【要約】 【目的】被縫製加工品を保持した搬送体(ハンガー)を
ハンガーコンベアに投入した後に、縫製が終了し、縫製
品が保持された搬送体を完成ステーションに搬送する順
序を、縫製の終了順ではなく、搬送体のラインへの投入
後に任意に設定して製品検査や梱包作業などの都合に合
わすこと。 【構成】搬送体17はコンベア1に投入されてから各作
業ステーションSTbに搬送され、分業生産が行われ
る。最終工程が終了しても搬送体17はコンベア内を循
環移動される。完成順指定モードにすると、循環移動さ
れている搬送体17の一覧表がディスプレイ130に表
示される(S12)。投入単位毎に指定が行われると
(S13)、指定された順序で、完成ステーションST
cに投入単位毎に搬送体17が搬送される(S15)。
(57) [Summary] [Purpose] After the carrier (hanger) holding the products to be sewn is loaded on the hanger conveyor, the sewing is completed, and the order of conveying the carrier holding the sewn products to the completion station is set. , The order should not be set in the end order of sewing, but should be set arbitrarily after the carrier is put on the line to suit the convenience of product inspection and packing work. [Construction] A carrier 17 is introduced into a conveyor 1 and then carried to each work station STb to carry out division of labor production. Even after the final process is completed, the carrier 17 is circulated in the conveyor. When the completion order designation mode is set, a list of the carriers 17 that are cyclically moved is displayed on the display 130 (S12). When the designation is made for each loading unit (S13), the completion station ST is placed in the designated order.
The carrier 17 is carried to the unit c by the unit of insertion (S15).

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、加工布等の物品が保持
された搬送体を、作業を施す作業ステーションに搬送す
る搬送装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a carrying device for carrying a carrier carrying an article such as a work cloth to a work station for carrying out work.

【0002】[0002]

【従来の技術】従来より、縫製工場等において、被縫製
加工品等の仕掛材料を保持した搬送体を、搬送レールに
沿って配置された作業ステーションに、自動的に搬送す
る搬送装置が種々提案されている。
2. Description of the Related Art Conventionally, in a sewing factory or the like, various proposals have been made for a carrier device for automatically carrying a carrier holding work-in-process materials such as sewn products to a work station arranged along a carrier rail. Has been done.

【0003】例えば、本出願人による特願平2−129
691号には、各搬送体の搬送体番号毎に搬送順序を記
憶しておき、各作業ステーション毎に、搬送されてくる
搬送体に付された搬送体番号を読み取り、その搬送体番
号に対応した搬送順序から、その作業ステーションの次
の作業ステーションを、その搬送体番号の搬送体の行き
先として指示し、搬送制御手段により作業を終えた作業
ステーションから次の作業ステーションに、搬送体を搬
送させる搬送装置が提案されている。
For example, Japanese Patent Application No. 2-129 filed by the present applicant
In 691, the transport order is stored for each transport body number of each transport body, and the transport body number attached to the transported transport body is read for each work station and corresponds to the transport body number. The next work station of the work station is instructed as the destination of the carrier of the carrier number from the carried order, and the carrier is carried by the carrying control means from the work station having finished the work to the next work station. A carrier device has been proposed.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記搬
送装置では、各作業ステーションでの作業が終了し、完
成した縫製加工品等の物品を保持した搬送体を完成ステ
ーションに進める順序は作業の終了順であり、検査や梱
包などの都合で、もしくは突発的な事態のためにあるロ
ットの完成品を保持した搬送体を先に完成ステーション
に進めることは不可能であった。
However, in the above-mentioned transfer apparatus, the work at each work station is completed, and the order of advancing the transfer body holding the finished sewn product or the like to the completion station is the end order of the work. Therefore, it is impossible to advance the carrier holding the finished product of a lot to the completion station first due to the circumstances such as inspection and packing, or due to a sudden situation.

【0005】本発明は、上述した課題を解決するために
なされたものであり、製品の検査や梱包作業の都合等に
合わせて、所望の搬送体を完成ステーションに搬送する
ことのできる搬送装置を提供することを目的とする。
The present invention has been made to solve the above-mentioned problems, and provides a transfer device capable of transferring a desired transfer body to a completion station in accordance with the convenience of product inspection and packing work. The purpose is to provide.

【0006】[0006]

【課題を解決するための手段】上記課題を解決するため
に、本発明は図1に例示するように、搬送体を所定の搬
送経路に従って、作業を施す作業ステーションを経由し
て、完成ステーションに搬送し得る搬送機構と、前記搬
送体に付された固有の番号毎に、前記所定の搬送経路を
示すデータを記憶した経路記憶手段と、前記作業ステー
ション毎に設けられ、前記搬送体に付された固有の搬送
体番号を読み取る番号読取手段と、前記番号読取手段に
より読み取られた番号に基づいて、前記搬送機構を制御
して、前記経路記憶手段に記憶された搬送経路データに
従って、作業を終えた作業ステーションから次の作業ス
テーションに前記搬送体を搬送させる搬送制御手段とを
備えた搬送装置において、前記搬送体を前記搬送機構に
投入後に、前記搬送体の完成順を指定するための完成順
指定手段と、前記完成ステーションに搬送可能な搬送体
を、前記完成順指定手段により指定された順序で前記完
成ステーションに移動させるように前記搬送制御手段に
対して指示を出す完成指示手段と、を設けたことを特徴
とする搬送装置を要旨とする。
In order to solve the above-mentioned problems, the present invention, as illustrated in FIG. 1, transfers a carrier according to a predetermined transfer route to a completion station via a work station for performing work. A transport mechanism capable of transporting, a route storage unit storing data indicating the predetermined transport route for each unique number attached to the transport body, and provided for each work station, and attached to the transport body. And a number reading means for reading the unique carrier number, and controlling the carrying mechanism based on the number read by the number reading means to finish the work according to the carrying path data stored in the path storing means. A transport device for transporting the transport body from one work station to the next work station, the transport device after the transport body is loaded into the transport mechanism. Completion order designating means for designating the completion order of the body, and the transport control means for moving the transportable body transportable to the completion station to the completion station in the order designated by the completion order designating means. A gist is a carrying device characterized by being provided with a completion instructing means for issuing an instruction thereto.

【0007】[0007]

【作用】上記構成を有する本発明の搬送装置は、経路記
憶手段が、搬送体に付された固有の番号毎に所定の搬送
経路を示すデータを記憶し、作業ステーション毎に設け
られた番号読取手段が、搬送体に付された固有の搬送体
番号を読み取り、搬送制御手段が、番号読取手段により
読み取られた番号に基づいて、搬送機構を制御して、経
路記憶手段に記憶された搬送経路データに従って、作業
を終えた作業ステーションから次の作業ステーションに
搬送体を搬送させる。
In the transport apparatus of the present invention having the above-mentioned structure, the route storage means stores data indicating a predetermined transport route for each unique number attached to the transport body, and the number reading provided for each work station. The means reads the unique carrier number attached to the carrier, and the carrier control means controls the carrier mechanism based on the number read by the number reading means, and the carrier path stored in the path storage means. According to the data, the carrier is transported from the work station that has finished the work to the next work station.

【0008】そして、搬送体を搬送機構に投入後に、完
成順指定手段により搬送体の完成順を指定すると、完成
指示手段が、完成ステーションに搬送可能な搬送体を、
完成順指定手段により指定された順序で完成ステーショ
ンに移動させるように搬送制御手段に対して指示を出
す。
After the transfer body is loaded into the transfer mechanism, when the completion order of the transfer body is specified by the completion order designating means, the completion instructing means transfers the transfer body to the completion station.
The transfer control means is instructed to move to the completion station in the order specified by the completion order specification means.

【0009】[0009]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。図2は、本発明の一実施例の搬送装置の全体概
略配置図である。図3は、本実施例の搬送装置の振り分
け機構、搬送レール等の配置を説明する配置図である。
図4は、本実施例の搬送装置の拡大部分正面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 2 is an overall schematic layout diagram of a carrying device according to an embodiment of the present invention. FIG. 3 is a layout diagram for explaining the layout of the sorting mechanism, the transport rails, etc. of the transport device of this embodiment.
FIG. 4 is an enlarged partial front view of the carrying device of this embodiment.

【0010】図2に示すように、縫製工場等における縫
製ラインは複数の作業ステーションSTを備える。作業
ステーションSTはその作業の種類から、縫製加工され
る被縫製物を投入する投入ステーションSTaと、各種
の縫製作業を行なう縫製ステーションSTbと、完成品
を搬出する完成ステーションSTcとに区別される。
As shown in FIG. 2, a sewing line in a sewing factory or the like has a plurality of work stations ST. The work station ST is classified into a loading station STa for loading a workpiece to be sewn, a sewing station STb for performing various sewing operations, and a completion station STc for unloading a finished product, depending on the type of work.

【0011】ハンガーコンベア1は、これらの作業ステ
ーションSTを相互に連結して、被縫製物を吊るしたハ
ンガーを作業ステーションから別の作業ステーションに
受け渡すコンベアであって、各作業ステーションSTの
近傍に配置した振り分け機構2と、振り分け機構2間に
設けられた2本1組のブリッジレール3と、各振り分け
機構2から各作業ステーションSTに向かって分岐した
ステーションレール4とを備える。
The hanger conveyor 1 is a conveyor that connects these work stations ST to each other and transfers a hanger for suspending a material to be sewn from the work station to another work station. In the vicinity of each work station ST. The distribution mechanism 2 is arranged, a set of two bridge rails 3 provided between the distribution mechanisms 2, and a station rail 4 branched from each distribution mechanism 2 toward each work station ST.

【0012】ハンガーはブリッジレール3およびステー
ションレール4に沿って、後述の機構により、図2に示
す矢印方向に搬送される。各ステーションレール4の下
流側には、ステーションにおける作業中にハンガーがス
テーションから退場するのを防止するためのステーショ
ン退場ストッパ機構5が設けられる。
The hanger is conveyed along the bridge rail 3 and the station rail 4 in the direction of the arrow shown in FIG. 2 by a mechanism described later. A station exit stopper mechanism 5 is provided downstream of each station rail 4 to prevent the hanger from exiting the station during work at the station.

【0013】各振り分け機構2には、図4に示すよう
に、床面6上に立設される支柱7が設けられている。支
柱7の上端には、図3に示す支軸8が取付台9を介して
立設され、その上端には支持板10が固定されている。
支持板10の上面には、図3に示すように、ステーショ
ンレール4を支持するステーションレール用支枠11
が、その中間部において支持固定されている。また、隣
接する振り分け機構2の支持板10間に跨って、ブリッ
ジレール3を支持する一対の平行なブリッジレール用支
枠12が支持固定されている。一対の平行なブリッジレ
ール3はブリッジレール用支枠12に吊下金具13によ
り吊下支持されている。
As shown in FIG. 4, each distribution mechanism 2 is provided with a column 7 standing on a floor surface 6. A support shaft 8 shown in FIG. 3 is erected on the upper end of the column 7 via a mounting base 9, and a support plate 10 is fixed to the upper end of the support shaft 8.
On the upper surface of the support plate 10, as shown in FIG. 3, a station rail support frame 11 for supporting the station rail 4 is provided.
However, it is supported and fixed in the middle part thereof. A pair of parallel bridge rail support frames 12 that support the bridge rails 3 are fixedly supported across the support plates 10 of the adjacent distribution mechanisms 2. The pair of parallel bridge rails 3 are suspended and supported by a suspension bracket 13 on a bridge rail support frame 12.

【0014】図3に示すように、ブリッジレール3の端
部3a,3bおよびステーションレール4の端部4a,
4bは、振り分け機構2の周囲に同一高さ位置で所定角
度(本実施例では45度)おきに配置されている。一
方、図3、図4に示すように、振り分け機構2の支軸8
には、回転体14が回転可能に支持されている。そし
て、上記端部3a、4a、3b、4bと対向できるよう
に、複数(本実施例では8本)の振り分けアーム15が
所定角度(本実施例では45度)おきに放射状に突出固
定されている。
As shown in FIG. 3, the end portions 3a and 3b of the bridge rail 3 and the end portions 4a and 3b of the station rail 4 are
4b are arranged around the distribution mechanism 2 at the same height and at a predetermined angle (45 degrees in this embodiment). On the other hand, as shown in FIGS. 3 and 4, the support shaft 8 of the distribution mechanism 2
The rotator 14 is rotatably supported by the. Then, a plurality of (eight in this embodiment) sorting arms 15 are radially projected and fixed at predetermined angles (45 degrees in this embodiment) so as to be able to face the end portions 3a, 4a, 3b, 4b. There is.

【0015】また、図4に示すように、支持板10上に
は、正逆回転可能なアーム回転用のサーボモータ16が
装着されている。そして、サーボモータ16を正方向ま
たは逆方向に回転させることにより、回転体14を回動
させ、搬送体17を保持した振り分けアーム15を所定
のブリッジレール3またはステーションレール4と対向
する位置に配置することができるように構成されてい
る。
Further, as shown in FIG. 4, on the support plate 10, a servo motor 16 for rotating the arm, which is rotatable in the forward and reverse directions, is mounted. Then, by rotating the servomotor 16 in the forward or reverse direction, the rotating body 14 is rotated, and the sorting arm 15 holding the carrier 17 is arranged at a position facing the predetermined bridge rail 3 or station rail 4. Is configured to be able to.

【0016】更に、無端状のブリッジレールチェーン1
8が、各吊下金具13に設けられた複数のチェーンガイ
ド19により、前記ブリッジレール3に沿って張設さ
れ、無端状のステーションレールチェーン(図示略)
が、各吊下金具13に設けられた複数のチェーンガイド
(図示略)により、前記ステーションレール4に沿って
張設されている。
Furthermore, the endless bridge rail chain 1
8 is stretched along the bridge rail 3 by a plurality of chain guides 19 provided on each hanging metal fitting 13 to form an endless station rail chain (not shown).
However, it is stretched along the station rail 4 by a plurality of chain guides (not shown) provided in each suspension fitting 13.

【0017】そして、振り分け機構2の支持板10上に
装着されたチェーン駆動用のモータ20が回転される
と、ブリッジレールチェーン18が、ブリッジレール3
に沿って図3に示す反時計方向に周回移動されると共
に、上記モータ20により回転駆動される回転軸21の
回転に伴い、ステーションレールチェーンがステーショ
ンレール4に沿って同方向に周回移動される。
When the chain driving motor 20 mounted on the support plate 10 of the distribution mechanism 2 is rotated, the bridge rail chain 18 is moved to the bridge rail 3
3 is rotated in the counterclockwise direction as shown in FIG. 3, and the station rail chain is rotated in the same direction along the station rail 4 along with the rotation of the rotary shaft 21 which is rotationally driven by the motor 20. ..

【0018】それにより、ブリッジレール3またはステ
ーションレール4上の搬送体17は、係合輪22がブリ
ッジレールチェーン18、またはステーションレールチ
ェーンに係合した状態で、ブリッジレール3またはステ
ーションレール4に沿って図3の矢印方向に搬送移動さ
れる。
As a result, the carrier 17 on the bridge rail 3 or the station rail 4 is guided along the bridge rail 3 or the station rail 4 with the engaging wheels 22 engaged with the bridge rail chain 18 or the station rail chain. And is moved in the direction of the arrow in FIG.

【0019】搬送体17は、図4に示すように、被縫製
加工品等の物品を吊下できるようにハンガー状にされて
いる。そして、搬送体17においては、各レールを転動
するローラが回転可能に支持されると共に、外周に複数
の係合突起を有する一対の係合輪22が、常に摩擦ブレ
ーキが付与された状態で回転可能に支持されており、係
合輪22がブリッジレールチェーン18、またはステー
ションレールチェーンに係合した状態で、ブリッジレー
ル3またはステーションレール4に沿って図3の矢印方
向に搬送移動されるようにされている。
As shown in FIG. 4, the carrier 17 is formed in a hanger shape so that an article such as a product to be sewn can be suspended. In the carrier 17, the rollers rolling on the rails are rotatably supported, and the pair of engaging wheels 22 having a plurality of engaging protrusions on the outer circumference are always provided with a friction brake. It is rotatably supported, and in a state where the engagement wheel 22 is engaged with the bridge rail chain 18 or the station rail chain, it is conveyed and moved along the bridge rail 3 or the station rail 4 in the arrow direction of FIG. Has been

【0020】また、ステーションレール4の下流側の端
部4aには、図2に示すステーション退場ストッパ機構
5が設けられる。ブリッジレール3の下流側の端部3a
にも、同様なストッパ機構23が設けられる。これらの
ストッパ機構5,23には、番号読取装置24と、図示
しないシリンダと、該シリンダにより駆動されるストッ
パとが設けられている。
A station exit stopper mechanism 5 shown in FIG. 2 is provided at the downstream end 4a of the station rail 4. The downstream end 3a of the bridge rail 3
Also, a similar stopper mechanism 23 is provided. The stopper mechanisms 5 and 23 are provided with a number reading device 24, a cylinder (not shown), and a stopper driven by the cylinder.

【0021】そして、搬送体17がブリッジレール3ま
たはステーションレール4に沿って番号読取装置24と
対応する位置に搬送されたとき、ストッパとの当接によ
り搬送体17の移動が一時的に停止されると、係合輪2
2が回転を始め、番号読取装置24により、係合輪22
の側面に付設された図示しない搬送体識別用のコードマ
ーク(搬送体番号)が読み取られるように構成されてい
る。
When the carrier 17 is carried to the position corresponding to the number reading device 24 along the bridge rail 3 or the station rail 4, the movement of the carrier 17 is temporarily stopped by the contact with the stopper. Then, the engagement wheel 2
2 starts rotating, and the number reading device 24 causes the engaging wheel 22 to rotate.
A code mark (conveyor number) for identifying a conveyer (not shown) attached to the side surface of the is read.

【0022】また、投入ステーションSTaには、被縫
製物の投入時にオンされる投入スイッチ25が設けら
れ、縫製ステーションSTbには、そのステーションに
おける作業終了時にオンされる作業終了スイッチ26が
設けられ、完成ステーションSTcには、完成品の処理
終了時にオンされる完成スイッチ27が設けられる。
Further, the loading station STa is provided with a loading switch 25 which is turned on when the material to be sewn is loaded, and the sewing station STb is provided with a work end switch 26 which is turned on when the work at the station is finished, The completion station STc is provided with a completion switch 27 that is turned on when the processing of the finished product is completed.

【0023】次に、本実施例の電気的構成を図5に示す
ブロック図によって説明する。上記各装置は電子制御回
路30によって駆動制御されて搬送体17の搬送を行
う。この電子制御回路30は、論理演算回路の中心とな
るCPU31、ROM32およびRAM33と、外部機
器との入出力を行う入出力回路34等とを、コモンバス
35を介して相互に接続して構成したものである。
Next, the electrical configuration of this embodiment will be described with reference to the block diagram shown in FIG. Each of the above devices is driven and controlled by the electronic control circuit 30 to carry the carrier 17. The electronic control circuit 30 is configured by connecting a CPU 31, a ROM 32, and a RAM 33, which are cores of a logical operation circuit, and an input / output circuit 34, etc., which performs input / output with an external device, to each other via a common bus 35. Is.

【0024】電子制御回路30には、番号読取装置24
や、投入時に操作されて投入信号を発生する投入スイッ
チ25等の各種スイッチ群40からの信号が入力され
る。一方、電子制御回路30からは、これらの信号及び
ROM、RAM内のデータに基づいてサーボモータ16
やチェーン駆動用のモータ20を駆動する駆動信号等が
出力される。
The electronic control circuit 30 includes a number reading device 24.
Alternatively, signals are input from various switch groups 40 such as a closing switch 25 that is operated at the time of closing to generate a closing signal. On the other hand, from the electronic control circuit 30, based on these signals and the data in the ROM and RAM, the servo motor 16
A drive signal or the like for driving the motor 20 for driving the chain and the chain is output.

【0025】また、電子制御回路30は、各振り分け機
構2毎に1台づつ設けられており、この複数の電子制御
回路30がホストコンピュータ100に接続されて、ホ
ストコンピュータ100により、全体の制御がなされる
ようにされている。このホストコンピュータ100に
は、データ入力のためのキーボード110、マウス12
0や、データ出力のためのディスプレイ130、プリン
タ140がそれぞれ接続されている。
Further, one electronic control circuit 30 is provided for each distribution mechanism 2, and the plurality of electronic control circuits 30 are connected to the host computer 100 so that the host computer 100 can control the entire system. It is made to be done. The host computer 100 includes a keyboard 110 and a mouse 12 for data input.
0, a display 130 for outputting data, and a printer 140 are connected to each.

【0026】そして、ホストコンピュータ100のRA
M101内には、図6に示す経路記憶手段としての経路
テーブル、図7に示す投入計画データテーブルがそれぞ
れ記憶されている。まず、図6に示す経路テーブルから
説明する。各作業ステーションSTでは、搬送体17に
種々の作業が施されるが、この経路テーブルには、被縫
製加工品に施される作業工程順序に従って、搬送体17
が搬送される作業ステーションSTの番号が順番に入力
され、搬送経路として記憶されている。
The RA of the host computer 100
In M101, a route table as a route storage unit shown in FIG. 6 and an input plan data table shown in FIG. 7 are stored. First, the route table shown in FIG. 6 will be described. At each work station ST, various operations are performed on the carrier 17, but the carrier 17 is displayed on the route table in accordance with the order of the work processes performed on the workpiece.
The numbers of the work stations ST to which are transported are sequentially input and stored as a transport route.

【0027】そして、被縫製加工品の色やデザインの違
いにより、搬送体17に保持された被縫製加工品の作業
工程が異なるので、搬送経路を区別するために、異なる
経路番号が付され、その各経路番号に対応して作業ステ
ーションSTの番号が書き込まれる。図6では、4種類
の経路番号のものが入力されて記憶された状態を示して
いる。
Since the work process of the sewn product held on the carrier 17 is different due to the difference in color and design of the sewn product, different route numbers are given to distinguish the transport routes. The number of the work station ST is written in correspondence with each path number. FIG. 6 shows a state in which four types of route numbers are input and stored.

【0028】また、図7に示す投入計画データテーブル
には、どんな種類の被縫製加工品をどれだけ投入するか
という投入計画が予め入力され、記憶されている。図7
に示すように、その作業内容が同じである複数の搬送体
17を一まとめにして、それぞれに投入単位番号を付し
てある。
Further, in the throwing plan data table shown in FIG. 7, the throwing plan of what kind and how much of the sewn product to be put in is inputted and stored in advance. Figure 7
As shown in FIG. 5, a plurality of transporters 17 having the same work content are grouped together, and a loading unit number is given to each of them.

【0029】例えば、図7に示す場合では、投入単位番
号「1」〜「4」に対応するものとして、デザインコー
ド「A0101」という所定のデザインで、サイズ
「9」で、カラーコード「50」という色を持つ被縫製
加工品を保持した搬送体17を、それぞれ5本投入する
計画が設定されている。また、投入単位番号「5」およ
び「6」に対応させて、デザインコードは投入単位番号
「1」〜「4」のものと同じであるが、カラーコード
「60」という色の違う被縫製加工品を保持した搬送体
17を、それぞれ5本投入する計画が設定されている。
For example, in the case shown in FIG. 7, as a unit corresponding to the input unit numbers "1" to "4", the predetermined design "A0101", the size "9", and the color code "50" are used. A plan is set in which five conveyors 17 each holding a workpiece to be sewn with the color are loaded. In addition, the design code is the same as that of the input unit numbers "1" to "4" in correspondence with the input unit numbers "5" and "6", but the sewing process is performed with a different color code "60". A plan is set in which five conveyors 17 each holding an item are loaded.

【0030】尚、投入計画データテーブルの完成順の欄
は、搬送体の投入後に設定される。図8〜図9は本実施
例の動作を説明するためのフローチャートであり、図8
は投入から各作業ステーションにおける作業終了までの
処理を示し、図9は完成順の指定および完成ステーショ
ンへの搬送指示の処理を示す。次に、本実施例の動作に
ついて説明する。
The column of the order of completion in the loading plan data table is set after loading the carrier. 8 to 9 are flowcharts for explaining the operation of this embodiment.
Shows the process from the input to the end of the work at each work station, and FIG. 9 shows the process of designating the order of completion and instructing conveyance to the completion station. Next, the operation of this embodiment will be described.

【0031】投入ステーションSTaの投入スイッチ2
5がオペレータによりオンされると、ステップS1にお
いて、被縫製加工品を保持した搬送体17の搬送体番号
を、該ステーションのステーション退場ストッパ機構5
に設けられている番号読取装置24が読み取る。ステッ
プS2では、該ステーションに設けられた電子制御回路
30のCPU31は、読み取った搬送体17の搬送体番
号をRAM33に記憶する。
Input switch 2 of input station STa
5 is turned on by the operator, in step S1, the carrier number of the carrier 17 holding the sewn workpiece is set to the station exit stopper mechanism 5 of the station.
It is read by the number reading device 24 provided in the. In step S2, the CPU 31 of the electronic control circuit 30 provided in the station stores the read carrier number of the carrier 17 in the RAM 33.

【0032】ステップS3では、ストッパ機構5の図示
しないシリンダが作動して、搬送体17の搬送経路への
投入が開始される。ステップS4〜S5では、投入され
た搬送体17は、ブリッジレールチェーン18によって
振り分け機構2に搬送され、予め設定された搬送経路の
作業ステーションSTbに振り分けられる。
In step S3, a cylinder (not shown) of the stopper mechanism 5 is actuated to start loading the carrier 17 into the carrier path. In steps S4 to S5, the introduced transport body 17 is transported to the sorting mechanism 2 by the bridge rail chain 18 and is sorted to the work station STb on the preset transport route.

【0033】搬送先の作業ステーションSTbが隣接し
ていない場合には、目的の作業ステーションSTbに搬
送されるまで、振り分け及び搬送を繰り返す。搬送体1
7が目的の作業ステーションSTbに搬送されると、ス
テップS6に進み、目的の作業ステーションSTbで作
業が開始される。
When the work stations STb of the transfer destinations are not adjacent to each other, the sorting and the transfer are repeated until the work stations STb are transferred to the target work station STb. Carrier 1
When 7 is transported to the target work station STb, the process proceeds to step S6, and the work is started at the target work station STb.

【0034】その作業ステーションSTbにおける作業
が終了すると、オペレータは作業終了スイッチ26をオ
ンする。ステップS7では、作業終了スイッチ26がオ
ンされたか否かを判別し、オンされた場合には、ステッ
プS8に進む。ステップS8において、その作業ステー
ションSTbに設けられた電子制御装置30のCPU3
1は全作業が終了したか否かを判別する。全作業が終了
していなければ、ステップS4に戻り、搬送体17を次
の作業ステーションSTbに搬送する。
When the work at the work station STb is completed, the operator turns on the work end switch 26. In step S7, it is determined whether or not the work end switch 26 is turned on, and if it is turned on, the process proceeds to step S8. In step S8, the CPU 3 of the electronic control unit 30 provided in the work station STb
1 determines whether or not all work has been completed. If all the work is not completed, the process returns to step S4 and the carrier 17 is carried to the next work station STb.

【0035】作業が終了している場合には、ステップS
9に進み、完成ステーションSTcへの搬送指示が出る
まで、搬送体17を搬送経路内に待機させる。これは、
各振り分け機構2により、ブリッジレール3の端部3a
から搬送されてきた搬送体17を、対をなすブリッジレ
ール3の端部3bに搬出させて、搬送体17を振り分け
機構2間を循環させることにより行われる。
If the work is completed, step S
9, the carrier 17 is put on standby in the transport path until a transport instruction to the completion station STc is issued. this is,
The end portion 3a of the bridge rail 3 is divided by each distribution mechanism 2.
The carrier 17 conveyed from the above is carried out to the end portion 3b of the pair of bridge rails 3 and the carrier 17 is circulated between the distribution mechanisms 2.

【0036】完成順の指定、つまり搬送体17の完成ス
テーションSTcへの搬送順序の指定は、下記の手順に
より行われる。ホストコンピュータ100は、周期的に
電子制御回路30と、入出力回路34を介して信号をや
り取りして搬送体17の搬送状態を把握している。オペ
レータは搬送体の投入後に搬送体の完成順の指定を行う
とき、ホストコンピュータ100のキーボード110を
操作して完成順の指定を行なうモードに設定する。完成
順の指定を行なうモードになると、ステップS11にお
いて、ホストコンピュータ100は、搬送経路内で循環
しながら待機している搬送体17があるか否か調べる。
Designation of the order of completion, that is, designation of the order of transport of the transport body 17 to the completion station STc is performed by the following procedure. The host computer 100 periodically exchanges signals with the electronic control circuit 30 via the input / output circuit 34 to grasp the transport state of the transport body 17. When the operator specifies the order of completion of the carrier after loading the carrier, the operator operates the keyboard 110 of the host computer 100 to set the mode in which the order of completion is specified. When the mode for designating the order of completion is entered, the host computer 100 checks in step S11 whether there is a carrier 17 waiting in the carrier path while circulating.

【0037】待機している搬送体17が存在しない場合
には、処理を終了するが、待機している搬送体17が存
在する場合には、ステップS12に進む。ステップS1
2では、ホストコンピュータ100は、ディスプレイ1
30に待機中の搬送体17の一覧表を表示する。
If there is no carrier 17 waiting, the process is ended, but if there is a carrier 17 waiting, the process proceeds to step S12. Step S1
2, the host computer 100 uses the display 1
A list of the waiting carriers 17 is displayed in 30.

【0038】ステップS13において、オペレータは、
ディスプレイ130に表示された待機中の搬送体17の
一覧表を見ながら、各搬送体17の完成順序を指定す
る。この指定は投入単位毎に行われる。指定された完成
順のデータは、図7に示す投入計画データテーブルに記
憶される。
In step S13, the operator
The completion order of the respective carriers 17 is designated while looking at the list of the carriers 17 on standby displayed on the display 130. This designation is made for each input unit. The designated completion order data is stored in the input plan data table shown in FIG. 7.

【0039】ステップS14では、完成順の指定が終了
したか否かを判別し、完成順の指定が終了すると、ステ
ップS15に進む。ステップS15では、ホストコンピ
ュータ100は、電子制御回路30に対して、指定され
た各搬送体を指定された順で、完成ステーションSTc
に向かわせるように搬送指示を出す。
In step S14, it is determined whether or not the designation of the completion order is completed, and when the designation of the completion order is completed, the process proceeds to step S15. In step S15, the host computer 100 instructs the electronic control circuit 30 to transfer the specified carriers to the completion station STc in the specified order.
Send a transportation instruction so that it will be directed to.

【0040】搬送体17は、指定された順番に従って完
成ステーションSTcに移動する。例えば、完成順とし
て、投入単位番号「1」のものが1番目に、投入単位番
号「5」のものが2番目に、投入単位番号「2」のもの
が3番目に、投入単位番号「3」のものが4番目に、投
入単位番号「4」のものが5番目に、投入単位番号
「6」のものが6番目に指定されると、投入番号
「1」,「5」,「2」,「3」,「4」,「6」の順
序で、完成ステーションSTcに搬送される。
The carrier 17 moves to the completion station STc in the designated order. For example, in the order of completion, the one with the input unit number "1" is first, the one with the input unit number "5" is second, the one with the input unit number "2" is third, and the input unit number "3". "4", the input unit number "4" is specified fifth, and the input unit number "6" is specified sixth, the input numbers "1", "5", "2" are specified. , “3”, “4”, and “6” in this order, are conveyed to the completion station STc.

【0041】尚、ステップS4〜S9の処理が搬送制御
手段として働き、ステップS13の処理が完成順指定手
段として働き、ステップS15の処理が、完成指示手段
として働く。以上のように、本実施例によれば、搬送体
を搬送経路に投入後に、完成ステーションに移動する順
を指定できるので、製品の検査や梱包作業の都合に合わ
せた生産を行なうことができる。
The processing of steps S4 to S9 functions as the conveyance control means, the processing of step S13 functions as the completion order designating means, and the processing of step S15 functions as the completion instructing means. As described above, according to the present embodiment, the order in which the carrier is moved to the completion station can be designated after the carrier is put into the carrier path, so that it is possible to perform the production suitable for the inspection of the product and the packing work.

【0042】また、完成順を指定してから各搬送体が完
成ステーションに移動するまでのタイムラグが小さいの
で、突発的な事態が生じて、あるロットの縫製加工品等
の物品を保持した搬送体を先に完成ステーションに移動
させることも容易にできる。本発明は、以上詳述した実
施例に限定されるものではなく、その趣旨を逸脱しない
範囲において種々の変更を加えることができる。例え
ば、本実施例では、完成順を指定された搬送体のみが完
成ステーションに移動するが、完成順を指定された搬送
体が存在しない状態では、作業終了順に搬送体を完成ス
テーションに移動させるように搬送装置を稼動させてお
き、必要なときだけ完成順を指定し、完成順を指定され
た搬送体を指定されなかった搬送体より優先して完成ス
テーションに移動させることもできる。
Further, since the time lag from the designation of the completion order to the movement of each carrier to the completion station is small, a sudden situation occurs, and the carrier holding an article such as a sewn product of a certain lot is held. Can be easily moved to the completion station first. The present invention is not limited to the embodiments described in detail above, and various modifications can be made without departing from the spirit of the invention. For example, in the present embodiment, only the transport bodies whose completion order is designated move to the completion station, but when there is no transport body whose completion order is designated, the transport bodies are moved to the completion station in the order of completion of work. It is also possible to operate the transfer device in advance, specify the completion order only when necessary, and move the transfer bodies with the specified completion order to the completion station with priority over the transfer bodies that have not been specified.

【0043】この場合は、オペレータが、ホストコンピ
ュータを必要なときだけ操作すればよく、省力化が図れ
る。
In this case, the operator may operate the host computer only when necessary, and labor can be saved.

【0044】[0044]

【発明の効果】以上説明したように、本発明によれば、
搬送体を投入した後に、完成順を指定し、縫製加工品等
の物品を保持した搬送体を指定した順で完成ステーショ
ンに移動させることができるので、製品の検査や梱包作
業の都合に合わせた生産を行なうことができ、生産ライ
ン全体での作業効率を向上させることができる。
As described above, according to the present invention,
After the carrier is loaded, you can specify the order of completion and move the carrier that holds items such as sewn products to the completion station in the specified order, so it is convenient for product inspection and packing work. It is possible to perform production and improve work efficiency in the entire production line.

【0045】また、完成順を指定してから各搬送体が完
成ステーションに移動するまでのタイムラグが小さいの
で、突発的な事態が生じて、あるロットの縫製加工品等
の物品を保持した搬送体を先に完成ステーションに移動
させることも容易にできる。
Further, since the time lag between the designation of the order of completion and the movement of each carrier to the completion station is small, a sudden situation occurs, and a carrier that holds an article such as a sewn product of a certain lot is held. Can be easily moved to the completion station first.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の搬送装置の基本的構成を例示するブロ
ック図である。
FIG. 1 is a block diagram illustrating a basic configuration of a carrying device of the present invention.

【図2】本発明の一実施例の搬送装置の全体概略配置図
である。
FIG. 2 is an overall schematic layout diagram of a carrying device according to an embodiment of the present invention.

【図3】本実施例の搬送装置の振り分け機構、搬送レー
ル等の配置を説明する配置図である。
FIG. 3 is a layout diagram illustrating the layout of a distribution mechanism, a transport rail, and the like of the transport device according to the present exemplary embodiment.

【図4】本実施例の搬送装置の拡大部分正面図である。FIG. 4 is an enlarged partial front view of the carrying device according to the present embodiment.

【図5】本実施例の電気的構成を示すブロック図であ
る。
FIG. 5 is a block diagram showing an electrical configuration of this embodiment.

【図6】経路テーブルを示す説明図である。FIG. 6 is an explanatory diagram showing a route table.

【図7】投入計画データテーブルを示す説明図である。FIG. 7 is an explanatory diagram showing an input plan data table.

【図8】本実施例の投入から各作業ステーションにおけ
る作業終了までの処理を示すフローチャートである。
FIG. 8 is a flowchart showing the processing from the input of the present embodiment to the end of work at each work station.

【図9】本実施例の完成順の指定および完成ステーショ
ンへの搬送指示の処理を示すフローチャートである。
FIG. 9 is a flowchart showing processing of designating a completion order and instructing conveyance to a completion station according to the present embodiment.

【符号の説明】[Explanation of symbols]

1…ハンガーコンベア 3…ブリッジレール 4…
ステーションレール 17…搬送体 24…番号読取装置 30…電子制
御回路 31…CPU 100…ホストコンピュータ 101…RAM
1 ... Hanger conveyor 3 ... Bridge rail 4 ...
Station rail 17 ... Carrier 24 ... Number reading device 30 ... Electronic control circuit 31 ... CPU 100 ... Host computer 101 ... RAM

───────────────────────────────────────────────────── フロントページの続き (72)発明者 茅中 良久 愛知県名古屋市瑞穂区苗代町15番1号 ブ ラザー工業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yoshihisa Kanaka 15-1 Naeshiro-cho, Mizuho-ku, Aichi Prefecture Nagoya City Brother Industries, Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 搬送体を所定の搬送経路に従って、作業
を施す作業ステーションを経由して、完成ステーション
に搬送し得る搬送機構と、 前記搬送体に付された固有の番号毎に、前記所定の搬送
経路を示すデータを記憶した経路記憶手段と、 前記作業ステーション毎に設けられ、前記搬送体に付さ
れた固有の搬送体番号を読み取る番号読取手段と、 前記番号読取手段により読み取られた番号に基づいて、
前記搬送機構を制御して、前記経路記憶手段に記憶され
た搬送経路データに従って、作業を終えた作業ステーシ
ョンから次の作業ステーションに前記搬送体を搬送させ
る搬送制御手段とを備えた搬送装置において、 前記搬送体を前記搬送機構に投入後に、前記搬送体の完
成順を指定するための完成順指定手段と、 前記完成ステーションに搬送可能な搬送体を、前記完成
順指定手段により指定された順序で前記完成ステーショ
ンに移動させるように前記搬送制御手段に対して指示を
出す完成指示手段と、 を設けたことを特徴とする搬送装置。
1. A transport mechanism capable of transporting a transport body to a completion station via a work station for performing work along a predetermined transport path, and the predetermined number for each unique number attached to the transport body. A route storage unit that stores data indicating a transport route, a number reading unit that is provided for each of the work stations and that reads a unique carrier number attached to the transport unit, and a number that is read by the number reading unit. On the basis of,
In a transfer device including a transfer control unit that controls the transfer mechanism to transfer the transfer member from the work station that has finished the work to the next work station according to the transfer route data stored in the route storage unit, After the transfer body is loaded into the transfer mechanism, a completion order designating unit for designating a completion order of the transfer body, and a transferable body that can be transported to the completion station in the order specified by the completion order designating means. And a completion instructing unit for instructing the transfer control unit to move to the completion station.
JP3213964A 1991-08-26 1991-08-26 Transport device Pending JPH0557576A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3213964A JPH0557576A (en) 1991-08-26 1991-08-26 Transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3213964A JPH0557576A (en) 1991-08-26 1991-08-26 Transport device

Publications (1)

Publication Number Publication Date
JPH0557576A true JPH0557576A (en) 1993-03-09

Family

ID=16647984

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3213964A Pending JPH0557576A (en) 1991-08-26 1991-08-26 Transport device

Country Status (1)

Country Link
JP (1) JPH0557576A (en)

Similar Documents

Publication Publication Date Title
JPH0725447A (en) Sorting method and device
JPS6283257A (en) Vehicle assembly and transportation equipment
JPH05201547A (en) Carrier
JP3505006B2 (en) External surface working method and apparatus for conveyed articles
JP2988037B2 (en) Transfer device
JPH0569924A (en) Carrier device
WO2023233755A1 (en) Transfer system
JP2000351418A (en) Storage method and storage system of product
JPH0551120A (en) Transport device
JPH0423725A (en) Carrying device
JPH04176528A (en) Production equipment with conveyor equipment
JPH0550366A (en) Conveyor
JPH0557574A (en) Conveyor with pass control function
JPH0569925A (en) Memory access control device in transfer system
JPH0639165A (en) Transport managerial device
JPH068114A (en) Carrier
JP2988036B2 (en) Transfer device with bypass control function
JP2617370B2 (en) Equipment for transporting long objects
JP2775993B2 (en) Transfer device
JP2775994B2 (en) Transfer device
JP2001031219A (en) Tire temporary storage method and temporary storage system
JPH0550367A (en) Conveyor
JP2001293634A (en) Machine tools and manufacturing systems
JP2961813B2 (en) Transport line control device
JP2001071230A (en) Rotary transfer station