JPH0571836B2 - - Google Patents
Info
- Publication number
- JPH0571836B2 JPH0571836B2 JP8721389A JP8721389A JPH0571836B2 JP H0571836 B2 JPH0571836 B2 JP H0571836B2 JP 8721389 A JP8721389 A JP 8721389A JP 8721389 A JP8721389 A JP 8721389A JP H0571836 B2 JPH0571836 B2 JP H0571836B2
- Authority
- JP
- Japan
- Prior art keywords
- notch
- lifting pipe
- ring body
- lifting
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 210000000078 claw Anatomy 0.000 description 10
- 230000003028 elevating effect Effects 0.000 description 9
- 238000000034 method Methods 0.000 description 4
- 229920003002 synthetic resin Polymers 0.000 description 4
- 239000000057 synthetic resin Substances 0.000 description 4
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 239000002537 cosmetic Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Description
【発明の詳細な説明】
(イ) 産業上の利用分野
本発明は扇風機、照明装置、ボンネツトドライ
ア、マイクロフオンスタンド等に利用される昇降
装置に関する。DETAILED DESCRIPTION OF THE INVENTION (a) Field of Industrial Application The present invention relates to a lifting device used for electric fans, lighting devices, bonnet dryers, microphone stands, and the like.
従来の技術
本発明に先行する技術として実開昭63−80400
号公報に記載の扇風機の昇降装置がある。昇降装
置は支柱上端に切欠部を形成し、支柱上端に装着
する環体に切欠部に嵌合する取付片を形成し、取
付片に支柱に対し昇降する昇降パイプの係止装置
を形成したものである。 Prior art As a technology prior to the present invention, Utility Model Application No. 63-80400
There is an electric fan lifting device described in the above publication. The lifting device has a notch formed at the top end of the column, a mounting piece that fits into the notch on the ring body attached to the top end of the column, and a locking device for the lifting pipe that moves up and down relative to the column is formed on the mounting piece. It is.
昇降装置は支柱の切欠部に取付片が単に嵌合し
ているのみであり、昇降パイプの昇降、係止装置
による付勢力にて、支柱を押し拡げようとする力
が作用すると、切欠部は上縁が開放していること
で、支柱周方向に拡がる。その結果、環体の取付
片と切欠部との間に隙間ができると共に環体の支
柱への取り付けも安定せず、昇降パイプに対し環
体内縁が押圧される状態も発生する。 The elevating device simply has a mounting piece fitted into a notch in the column, and when a force is applied to push the column apart due to the lifting and lowering of the elevating pipe and the urging force of the locking device, the notch will open. Since the upper edge is open, it expands in the circumferential direction of the column. As a result, a gap is created between the attachment piece of the ring body and the notch, and the attachment of the ring body to the support is not stable, resulting in a situation in which the inner edge of the ring body is pressed against the lifting pipe.
(ハ) 発明が解決しようとする課題
本発明は、支柱と環体との結合が安定化し、係
脱体の取り付けが容易となると共に、昇降パイプ
の安定支持が行なえる昇降装置を提供することを
課題とするものである。(c) Problems to be Solved by the Invention The present invention provides an elevating device in which the connection between the strut and the ring body is stabilized, the attachment and detachment body is easy to attach, and the elevating pipe can be stably supported. The challenge is to
(ニ) 課題を解決するための手段
本発明は、機器主体を端部に支持する昇降パイ
プと、昇降パイプを昇降支持する支柱を突設した
基台と、支柱端部に装着する昇降パイプへの係脱
体とを備え、支柱端部には切欠部を形成し、支柱
端部内面の切欠部両側縁部には突条を形成し、支
柱端部には昇降パイプが挿通する環体を装着し、
環体には、切欠部に嵌合し、係脱体を装着する取
付片を形成し、環体には、切欠部両側部の突条外
側を挾持する突起を形成する手段でもつて課題を
解決するものである。また、本発明は機器主体を
端部に支持する昇降パイプと、昇降パイプを昇降
支持する支柱を突設した基台と、支柱の端部に装
着する環体と、支柱の端部に形成する切欠部に装
着する係脱体とを備え、支柱の切欠部の両側縁部
には突部を形成し、環体には切欠部の突部に係合
する突起を形成する手段でもつて課題を解決する
ものである。(d) Means for Solving the Problems The present invention provides a lifting pipe that supports a main body of equipment at its end, a base having a protruding support for supporting the lifting pipe in elevation, and a lifting pipe that is attached to the end of the support. A notch is formed at the end of the support, protrusions are formed on both sides of the notch on the inner surface of the end of the support, and a ring body through which the lifting pipe is inserted is formed at the end of the support. Put it on,
The problem can be solved by forming a mounting piece on the ring body that fits into the notch and attaching the detachable body, and forming protrusions on the ring body that clamp the outside of the protrusions on both sides of the notch. It is something to do. Further, the present invention provides a lifting pipe that supports the main body of the equipment at the end, a base having a protruding support for supporting the lifting pipe in elevation, a ring body attached to the end of the support, and a ring body formed at the end of the support. The present invention also solves the problem by providing a means for attaching and detaching the body to be attached to the notch, forming protrusions on both side edges of the notch of the column, and forming protrusions on the ring body that engage with the protrusions of the notch. It is something to be solved.
後者の手段では、前者の手段における環体の取
付片を別体として、切欠部に装着した取付片を環
体にて押圧して支持させる構成を技術範囲に含ん
でいる。 The latter means includes within the scope of the technology a configuration in which the attachment piece of the ring body in the former means is separated and the attachment piece attached to the notch is pressed and supported by the ring body.
環体は、支柱端部に被嵌又は嵌入のいずれの構
成であつてもよく、弾性片等による弾性嵌合又は
螺子止めにて固定される。 The ring body may be fitted into or fitted into the end of the support column, and is fixed by elastic fitting with an elastic piece or the like or by screwing.
(ホ) 作用
本発明は、支柱端部に形成する切欠部に、係脱
体を配設し、切欠部の両側部を環体にて係止する
ことで、切欠部の拡がりを阻止している。(E) Function The present invention prevents the notch from expanding by disposing a locking and disengaging body in the notch formed at the end of the column and locking both sides of the notch with ring bodies. There is.
(ヘ) 実施例
第15図に示す扇風機1における基台2に突設
した支柱3と、支柱3に昇降自在に挿入する昇降
パイプ4とに本発明を採用した構造に基づき、本
発明の構成を具体化して説明する。(F) Embodiment The structure of the present invention is based on the structure in which the present invention is adopted for the support 3 protruding from the base 2 of the electric fan 1 shown in FIG. This will be explained in detail.
基台2と支柱3は合成樹脂にて一体に成型し、
支柱3は断面たまご型に形成される。基台2には
制御用スイツチが装着され、底面開口は板金製、
合成樹脂製の裏板にて閉塞される。昇降パイプ4
は合成樹脂にて成型され、支柱3上端開口より挿
入できる外形寸法に形成される。昇降パイプ4は
支柱3との一体感を出すために、断面たまご型に
形成される。昇降パイプ4の支柱3内に挿入され
ることのない上端部には、扇風機主体5を支持す
るための二叉部6を一体に形成している。二叉部
6はネツクピース7を俯仰角度調整自在に挾持枢
支する。二叉部6はネツクピース7を支持するこ
とから、昇降パイプ4の支柱3内に挿入される部
分より外側に突出(膨出)して形成される。ネツ
クピース7は扇風機主体5の一部を構成し、送風
羽根を駆動する電動機部8を首振自在に支持す
る。送風羽根はガード体9にて被われる。 The base 2 and pillar 3 are integrally molded from synthetic resin,
The support column 3 is formed to have an egg-shaped cross section. A control switch is attached to the base 2, and the bottom opening is made of sheet metal.
It is closed with a synthetic resin backing plate. Lifting pipe 4
is molded from synthetic resin and has an external size that allows it to be inserted through the opening at the upper end of the support column 3. The lifting pipe 4 is formed to have an egg-shaped cross section in order to create a sense of unity with the support column 3. A bifurcated portion 6 for supporting the fan main body 5 is integrally formed at the upper end portion of the elevating pipe 4 that is not inserted into the support column 3. The two prongs 6 clamp and pivot the neck piece 7 so that the angle of elevation can be freely adjusted. Since the bifurcated portion 6 supports the neck piece 7, it is formed to protrude (bulge) outward from the portion of the lifting pipe 4 that is inserted into the support column 3. The neck piece 7 constitutes a part of the electric fan main body 5, and swingably supports the electric motor part 8 that drives the blower blades. The blower blade is covered with a guard body 9.
支柱3内面両側には昇降パイプ4の昇降方向に
延設するリブにて、昇降案内部11を形成してい
る。支柱3内上部には、支柱3上部での昇降パイ
プ4の安定支持を行うための支持リブ12を形成
している。支柱3上端部開口には、化粧用環体1
3が嵌入され、支柱3上端部内には、環体13の
載置突部14と、環体13の垂下弾性係止爪片1
5,16と係合する係合部17を形成している。
支柱3上端後部には、切欠部18を形成し、切欠
部18の両側部にはリブ、突条にて突部19を形
成している。 On both sides of the inner surface of the column 3, a lifting guide portion 11 is formed by a rib extending in the lifting direction of the lifting pipe 4. A support rib 12 is formed at the upper part of the inside of the pillar 3 to stably support the lifting pipe 4 at the upper part of the pillar 3. A cosmetic ring 1 is installed in the opening at the upper end of the pillar 3.
3 is inserted into the upper end of the support column 3, and a mounting protrusion 14 of the ring body 13 and a hanging elastic locking claw piece 1 of the ring body 13 are inserted into the upper end of the support column 3.
5 and 16 are formed.
A notch 18 is formed at the rear of the upper end of the column 3, and protrusions 19 are formed on both sides of the notch 18 by ribs and protrusions.
環体13は合成樹脂にて形成し、外形は支柱3
内面に略合致する形状寸法とし、内形は昇降パイ
プ4の外形が略合致する形状寸法に形成される。
環体13の前後両側4ケ所には、支柱3内の係合
部17に係合する垂下弾性係止爪片15,16を
形成している。垂下弾性係止爪片16は、支柱3
の切欠部18の両側突部19を外側から挾持する
突起を兼用している。突部19を突起としての係
止爪片16にて挾持することで、切欠部18の上
縁が開放してたわみ易い構造を補強する。 The ring body 13 is made of synthetic resin and has an external shape similar to that of the support column 3.
The shape and dimensions are made to approximately match the inner surface, and the inner shape is formed to have a shape and dimension that the outer shape of the lifting pipe 4 substantially matches.
At four locations on both the front and rear sides of the ring body 13, there are formed hanging elastic locking claw pieces 15, 16 that engage with the engaging portions 17 in the support column 3. The hanging elastic locking claw piece 16 is attached to the support column 3.
It also serves as a protrusion that clamps the protrusions 19 on both sides of the notch 18 from the outside. By holding the protrusion 19 with the locking claw pieces 16 as protrusions, the upper edge of the notch 18 is opened and the easily flexible structure is reinforced.
なお、突部19を突条とし、係止爪片16とは
別に突起を形成し、突起に縦方向に溝を延設し、
溝に突条挿入するようにして、突部としての突条
を突起の溝に係合させてもよい。 Note that the protrusion 19 is a protrusion, a protrusion is formed separately from the locking claw piece 16, and a groove is provided extending in the longitudinal direction on the protrusion.
The protrusion as a protrusion may be engaged with the groove of the protrusion by inserting the protrusion into the groove.
環体13の切欠部18に対応する部分には、切
欠部18に合致嵌合する取付片20を垂設してい
る。取付片20には、昇降パイプ4に形成した係
止凹部に係脱する係脱体21を装着する。昇降パ
イプ4の係止凹部は、昇降パイプ4が支柱3に対
し、最も下降した時と最も上昇した時に係脱体2
1が係合する位置に形成され、不用意な昇降パイ
プ4の上昇と下降を阻止する。係脱体21は中央
両側に枢軸22を突設し、取付片20の両側内側
に、枢軸22にて枢支する。係脱体21の操作ボ
タン23は取付片20の開口24より突出し、係
脱体21の作用爪体25は、昇降パイプ4に向い
突出する。枢軸22の一方には、係脱体21を係
止方向に付勢するバネ体26を装着している。環
体13に係脱体21を組み込み、環体13を支柱
3に嵌合することで、支柱3と環体13と係脱体
21の組み立てを容易に完了できる。環体13の
内側に昇降パイプ4が挿入されると、係止爪片1
5,16の弾性変型が、昇降パイプ4にて阻止さ
れることで、環体13に、係脱体21の昇降パイ
プ4への係合にて外す方向の力が作用しても環体
13は外れることはない。 At a portion of the ring body 13 that corresponds to the notch 18, a mounting piece 20 that fits into the notch 18 is vertically provided. A locking and disengaging body 21 that locks into and locks into a locking recess formed in the lifting pipe 4 is attached to the mounting piece 20. The locking recess of the lifting pipe 4 is arranged so that the locking recess of the lifting pipe 4 is connected to the locking body 2 when the lifting pipe 4 is lowered to the lowest level and raised to the highest level with respect to the support column 3.
1 is formed at a position where it engages, and prevents the lifting pipe 4 from rising and falling inadvertently. The engaging/disengaging body 21 has pivots 22 protruding from both sides of the center, and is pivotally supported by the pivots 22 inside the mounting piece 20 on both sides. The operating button 23 of the engaging/disengaging body 21 protrudes from the opening 24 of the attachment piece 20, and the working claw body 25 of the engaging/disengaging body 21 projects toward the lifting pipe 4. A spring body 26 is attached to one side of the pivot 22 to bias the locking/disengaging body 21 in the locking direction. By incorporating the detachable body 21 into the ring body 13 and fitting the ring body 13 to the support column 3, the assembly of the support column 3, the ring body 13, and the detachment body 21 can be easily completed. When the lifting pipe 4 is inserted inside the ring body 13, the locking claw piece 1
5 and 16 are prevented from being elastically deformed by the lifting pipe 4, even if a force is applied to the ring body 13 in the direction of disengaging the engaging and disengaging body 21 from engaging with the lifting pipe 4, the ring body 13 will never come off.
なお、本構造は組立能率のより以上の効率を向
上させるために取付片20を環体13に一体形成
したものであるが、取付片20を別部材とし、切
欠部18に取付片20を嵌合して、環体13にて
外れないように押圧する構造であつてもよい。 Note that in this structure, the mounting piece 20 is integrally formed with the ring body 13 in order to improve the efficiency of assembly. In addition, the structure may be such that the ring member 13 presses the ring member 13 so as not to come off.
支柱3の上端前内面には、昇降パイプ4の上昇
方向に付勢するゼンマイ状の定荷重バネ31の一
端を引掛支持する引掛部32を形成している。引
掛部32の上部には環体13が衝合することで、
定荷重バネ31は引掛部32より外れなくなる。 A hook portion 32 is formed on the front inner surface of the upper end of the support column 3 for hooking and supporting one end of a spiral spring-like constant force spring 31 that biases the lifting pipe 4 in the upward direction. By abutting the ring body 13 on the upper part of the hook part 32,
The constant force spring 31 will not come off from the hook portion 32.
昇降パイプ4の下部には定荷重バネ31のコイ
ル部を支持するバネ受け部33を形成し、本構造
では別部材にて形成している。バネ受け部33
は、昇降パイプ4下端部に嵌入されて、爪34が
昇降パイプ4の係合穴35に係合する結合部36
を有する。バネ受け部33の前部には定荷重バネ
31のコイル部に巻き込まれて、制動力をコイル
部との間で発生する制動舌片37を垂設してい
る。制動舌片37は定荷重バネ31と略同一幅に
て形成する。制動舌片37に対するバネ受け部3
3下部内には、コイル部を囲み両側を支持するバ
ネ支持枠38を形成している。バネ受け部33の
両側には、外側に拡がる弾性を有するブレーキ昇
降案内片39を形成している。ブレーキ昇降案内
片39には、支柱3内に形成した昇降案内部11
が挿通するガイド部40を形成している。ブレー
キ昇降案内片39が昇降案内部11に圧接するこ
とで、昇降パイプ4の昇降に制動が加えられ、ガ
イド部40が昇降案内部11に案内されて昇降パ
イプ4が振れなく昇降するものである。バネ受け
部33には、電気コード50の支持部51を形成
し、昇降パイプ4に嵌入することで、電気コード
50は挾持して固定される。 A spring receiving part 33 for supporting the coil part of the constant load spring 31 is formed at the lower part of the lifting pipe 4, and in this structure, it is formed by a separate member. Spring receiving part 33
is a connecting part 36 that is fitted into the lower end of the lifting pipe 4 and the claw 34 engages with the engagement hole 35 of the lifting pipe 4.
has. A braking tongue piece 37 is vertically provided at the front part of the spring receiving part 33 and is wound around the coil part of the constant load spring 31 to generate a braking force between the coil part and the coil part. The braking tongue piece 37 is formed to have substantially the same width as the constant load spring 31. Spring receiving part 3 for brake tongue piece 37
A spring support frame 38 that surrounds the coil portion and supports both sides is formed in the lower portion of the coil portion 3. Brake elevation guide pieces 39 are formed on both sides of the spring receiving portion 33 and have elasticity that spreads outward. The brake elevating guide piece 39 has an elevating guide portion 11 formed inside the column 3.
A guide portion 40 is formed through which the guide portion 40 is inserted. When the brake lifting guide piece 39 comes into pressure contact with the lifting guide part 11, braking is applied to the lifting and lowering of the lifting pipe 4, and the guide part 40 is guided by the lifting guide part 11, so that the lifting pipe 4 moves up and down without swinging. . A support portion 51 for the electric cord 50 is formed in the spring receiving portion 33, and the electric cord 50 is clamped and fixed by being fitted into the lifting pipe 4.
昇降パイプ4の下部両側部には、上縁が係合縁
となる弾性係止部41を形成している。弾性係止
部41は、昇降パイプ4にコ字状の切り込みを形
成して弾性片とし、外面に一対の三角状突条を形
成して係止縁を形成する。三角状突条間にはガイ
ド溝42が形成され、ガイド溝42が支柱3内面
に形成した昇降案内部11に案内される。 Elastic locking portions 41 whose upper edges serve as engagement edges are formed on both sides of the lower portion of the lifting pipe 4. The elastic locking portion 41 is an elastic piece by forming a U-shaped cut in the lifting pipe 4, and a pair of triangular protrusions on the outer surface to form a locking edge. A guide groove 42 is formed between the triangular protrusions, and the guide groove 42 is guided to the elevation guide portion 11 formed on the inner surface of the column 3.
昇降パイプ4の支柱3への装着は、上端二叉部
6が大きいことから、基台2がわより支柱3に挿
入することができず、バネ受け部33がわを支柱
3上端開口より挿入して行う。昇降パイプ4の支
柱3への挿入は、第1図と第2図と第5図と第6
図に示す手順で行ない、第7図と第8図と第9図
と第10図に示す状態となつて完了する。 When attaching the lifting pipe 4 to the column 3, since the upper end bifurcated portion 6 is large, it is not possible to insert the base 2 into the column 3 from the side, and the spring receiver 33 is inserted through the upper end opening of the column 3. and do it. The insertion of the lifting pipe 4 into the column 3 is as shown in Figures 1, 2, 5 and 6.
The procedure shown in the figure is followed, and the process is completed with the state shown in FIGS. 7, 8, 9, and 10.
第1図に示す如く、制動舌片37を定荷重バネ
31に当接させて押し込み、次に第5図に示す如
く、ブレーキ昇降案内片39を内側にたわめて、
環体13に挿入する。この状態で、昇降パイプ4
を支柱3に押し込むと、第6図に示す如く、弾性
係止部41が内側にたわむことで、押し込むこと
ができる。 As shown in FIG. 1, the brake tongue piece 37 is brought into contact with the constant force spring 31 and pushed in. Next, as shown in FIG. 5, the brake lifting guide piece 39 is bent inward.
Insert into ring body 13. In this state, lift pipe 4
When pushed into the support column 3, the elastic locking portion 41 bends inward, as shown in FIG.
昇降パイプ4の支柱3への挿入を終了すると、
弾性係止部41が弾性にて元にもどる。支柱3上
部内には鍔にて係合部43が形成しており、弾性
係止部41が係合部43に係合して昇降パイプ4
は支柱3より抜けなくなる。 After finishing inserting the lifting pipe 4 into the support column 3,
The elastic locking portion 41 returns to its original state with elasticity. An engaging part 43 is formed by a collar in the upper part of the column 3, and the elastic locking part 41 engages with the engaging part 43 to close the lifting pipe 4.
will not come out from pillar 3.
なお、本発明は前述した構造に限定されるもの
ではなく、周知、公知の技術を用いて、形状、材
質、構造を変更して実施できる。 Note that the present invention is not limited to the structure described above, and can be implemented by changing the shape, material, and structure using well-known techniques.
(ト) 発明の効果
本発明は、支柱に切欠部を形成して、昇降パイ
プへの係脱体を取付片にて装着したことで組立性
が向上すると共に、環体の突起にて切欠部両側突
条を挾持したことで、切欠部の拡がりを防止で
き、昇降パイプの昇降にて、支柱上部が拡がり取
付片、環体が外れることがない。(G) Effects of the Invention The present invention improves ease of assembly by forming a notch in the support column and attaching the engaging/disengaging body to the elevating pipe with a mounting piece. By holding the protrusions on both sides, the notch can be prevented from expanding, and the upper part of the column will not expand and the mounting piece and ring body will not come off when the elevating pipe goes up and down.
図は本発明を示し、第1図は要部分解縦断右側
面図、第2図は同正面図、第3図は第1図におけ
る昇降パイプ下部を横断した平面図、第4図は昇
降パイプ下部の分解縦断右側面図、第5図、第6
図、第7図は昇降パイプの支柱への挿入を示す過
程図、第8図は要部縦断正面図、第9図は支柱を
縦断した要部右側面図、第10図は要部縦断右側
面図、第11図は支柱の上部縦断右側面図、第1
2図は同横断平面図、第13図は支柱上部の分解
縦断右側面図、第14図は支柱上部の分解斜視
図、第15図は扇風機の斜視図である。
2…基台、3…支柱、4…昇降パイプ、5…扇
風機主体、11…昇降案内部、13…環体、15
…係止爪片、16…係止爪片(突起)、18…切
欠部、19…突部、20…取付片、21…係脱
体、31…定荷重バネ、32…引掛部、33…バ
ネ受け部、41…弾性係止部、42…ガイド溝、
43…係合部。
The figures show the present invention; FIG. 1 is an exploded vertical right side view of the main part, FIG. 2 is a front view of the same, FIG. 3 is a plan view of the lower part of the lifting pipe in FIG. 1, and FIG. 4 is a cross-sectional view of the lifting pipe. Exploded vertical right side view of the lower part, Figures 5 and 6
Fig. 7 is a process diagram showing the insertion of the lifting pipe into the support column, Fig. 8 is a longitudinal front view of the main part, Fig. 9 is a right side view of the main part taken longitudinally through the support, and Fig. 10 is a right side longitudinal view of the main part. Top view, Figure 11 is the vertical right side view of the upper part of the column, Figure 1
2 is a cross-sectional plan view of the same, FIG. 13 is an exploded longitudinal sectional right side view of the upper part of the support, FIG. 14 is an exploded perspective view of the upper part of the support, and FIG. 15 is a perspective view of the electric fan. 2... Base, 3... Support, 4... Lifting pipe, 5... Fan main body, 11... Lifting guide part, 13... Ring body, 15
...Latching claw piece, 16...Latching claw piece (protrusion), 18...Notch, 19...Protrusion, 20...Mounting piece, 21...Latching/detachment body, 31...Constant load spring, 32...Hook part, 33... Spring receiving part, 41... Elastic locking part, 42... Guide groove,
43...Engagement part.
Claims (1)
降パイプを昇降支持する支柱を突設した基台と、
支柱端部に装着する昇降パイプへの係脱体とを備
え、支柱端部には切欠部を形成し、支柱端部内面
の切欠部両側縁部には突条を形成し、支柱端部に
は昇降パイプが挿通する環体を装着し、環体に
は、切欠部に嵌合し、係脱体を装着する取付片を
形成し、環体には、切欠部両側部の突条外側を挾
持する突起を形成してなる昇降装置。 2 機器主体を端部に支持する昇降パイプと、昇
降パイプを昇降支持する支柱を突設した基台と、
支柱の端部に装着する環体と、支柱の端部に形成
する切欠部に装着する係脱体とを備え、支柱の切
欠部の両側縁部には突部を形成し、環体には切欠
部の突部に係合する突起を形成してなる昇降装
置。[Scope of Claims] 1. A lifting pipe that supports the main body of the device at its end, a base protruding from a support that supports the lifting pipe in lifting and lowering,
A notch is formed at the end of the support, and protrusions are formed on both sides of the notch on the inner surface of the end of the support. The ring body is equipped with a ring body through which the lifting pipe is inserted, and the ring body has a mounting piece that fits into the notch and attaches the locking/detachable body. A lifting device formed with clamping protrusions. 2. A lifting pipe that supports the main body of the equipment at its end, and a base protruding from a support that supports the lifting pipe in lifting and lowering;
It includes a ring body attached to the end of the column and a detachable body attached to a notch formed at the end of the column, protrusions are formed on both side edges of the notch of the column, and a ring body is provided with a ring body attached to the edge of the column. A lifting device formed with a protrusion that engages with a protrusion of a notch.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8721389A JPH02266196A (en) | 1989-04-06 | 1989-04-06 | Lifting gear |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8721389A JPH02266196A (en) | 1989-04-06 | 1989-04-06 | Lifting gear |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02266196A JPH02266196A (en) | 1990-10-30 |
| JPH0571836B2 true JPH0571836B2 (en) | 1993-10-08 |
Family
ID=13908653
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8721389A Granted JPH02266196A (en) | 1989-04-06 | 1989-04-06 | Lifting gear |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH02266196A (en) |
-
1989
- 1989-04-06 JP JP8721389A patent/JPH02266196A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02266196A (en) | 1990-10-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2516213Y2 (en) | Case with detachable clip | |
| JPH02266196A (en) | Lifting gear | |
| JPH02266197A (en) | Lifting gear | |
| JPH032798Y2 (en) | ||
| JPS6322577Y2 (en) | ||
| JP2828940B2 (en) | Fan | |
| JPH0318264Y2 (en) | ||
| JPH0635332Y2 (en) | Dustproof one-touch mounting tilt switch | |
| CN215215853U (en) | Wall lamp | |
| KR200215291Y1 (en) | Illumination light cover attachment structure | |
| JPH0635291Y2 (en) | Recessed luminaire | |
| JPH0647061Y2 (en) | Ceiling field material hanging structure | |
| JP2502618Y2 (en) | Ventilation fan | |
| JP3849243B2 (en) | Pin hook | |
| JPH0411294Y2 (en) | ||
| JP2745120B1 (en) | Gutter support | |
| JPH0612566Y2 (en) | lighting equipment | |
| JPS642950Y2 (en) | ||
| JP3118298U (en) | Door stopper assembly structure | |
| JP3626271B2 (en) | Eaves joint | |
| JPS5928565Y2 (en) | Mounting device for recessed lighting fixtures | |
| JPH0640259Y2 (en) | Hanging structure of eaves gutter | |
| JPS6029128Y2 (en) | Ceiling-mounted fixture for downward lighting | |
| JPS5827445Y2 (en) | chandelier | |
| JPH0745841Y2 (en) | Light case for bicycle lights |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081008 Year of fee payment: 15 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091008 Year of fee payment: 16 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 16 Free format text: PAYMENT UNTIL: 20091008 |