JPH0576654U - Tundish equipment for continuous casting - Google Patents

Tundish equipment for continuous casting

Info

Publication number
JPH0576654U
JPH0576654U JP2548892U JP2548892U JPH0576654U JP H0576654 U JPH0576654 U JP H0576654U JP 2548892 U JP2548892 U JP 2548892U JP 2548892 U JP2548892 U JP 2548892U JP H0576654 U JPH0576654 U JP H0576654U
Authority
JP
Japan
Prior art keywords
molten steel
tundish
receiving side
steel receiving
space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2548892U
Other languages
Japanese (ja)
Inventor
裕貴 三木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP2548892U priority Critical patent/JPH0576654U/en
Publication of JPH0576654U publication Critical patent/JPH0576654U/en
Pending legal-status Critical Current

Links

Landscapes

  • Continuous Casting (AREA)

Abstract

(57)【要約】 【目的】 鋳込みを続けたまま成分の異なる溶鋼を鋳造
する。成分混合部を少なくする。溶鋼ヘッドを一定に保
つ。 【構成】 タンディッシュ10内を仕切壁20により浸
漬ノズル側と溶鋼受入側とに仕切る。仕切壁20の下方
に隙間21を設ける。隙間21を除いて溶鋼受入側の空
間を気密に封止する、蓋体30をタンディッシュ10に
設ける。成分の異なる溶鋼を鋳造するときは、溶鋼受入
側の空間を気密に封止して、その空間内へ不活性ガスを
圧入することにより、溶鋼受入側の溶鋼を浸漬ノズル側
へ移動させる。溶鋼受入側の溶鋼を充分に減らしてか
ら、成分の異なる溶鋼を溶鋼受入側へ供給する。
(57) [Summary] [Purpose] Molten steels with different compositions are cast while continuing casting. Reduce the component mixing section. Keep the molten steel head constant. [Structure] The inside of the tundish 10 is partitioned by a partition wall 20 into a dipping nozzle side and a molten steel receiving side. A gap 21 is provided below the partition wall 20. The tundish 10 is provided with a lid 30 that hermetically seals the space on the molten steel receiving side except the gap 21. When casting molten steel having different components, the space on the molten steel receiving side is hermetically sealed, and an inert gas is pressed into the space to move the molten steel on the molten steel receiving side to the dipping nozzle side. After sufficiently reducing the molten steel on the molten steel receiving side, the molten steel having different components is supplied to the molten steel receiving side.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、鋳込み停止することなく成分の異なる溶鋼を連続的に鋳造できる連 続鋳造用タンディッシュ装置に関する。 The present invention relates to a continuous casting tundish device capable of continuously casting molten steel having different components without stopping casting.

【0002】[0002]

【従来の技術】[Prior Art]

連続鋳造は、周知のとおり、成分が同じ溶鋼であれば、その溶鋼をタンディッ シュ内へ供給し続けることにより、エンドレスに鋳造を続けることができる。し かし、最近はニーズが多様化し、同じ溶鋼を長時間に鋳造し続けることはむしろ 少なく、成分の異なる溶鋼を少量ずつ次々と切り替えて鋳造する機会が増加して きた。その場合の溶鋼の切り替えは、これまで次のような方法で行われてきた。 As is well known, continuous casting allows endless continuous casting by continuously supplying the molten steel into the tundish if the molten steel has the same composition. However, recently, the needs have diversified, and it is rather rare to continuously cast the same molten steel for a long time, and the chances of casting molten steel with different compositions little by little one after another have increased. In that case, the switching of molten steel has been performed by the following methods.

【0003】 鋳造を終了し、改めて鋳造を始める。 鋳造途中にタンディッシュを空にして鋳込みを一時中断する。この間に鋳片 を接続する治具と溶鋼が混合するの防ぐ分離板とを鋳型内にセットし、鋳込みを 再開する。 異なる成分の溶鋼を続けて鋳込む。Casting is completed and casting is started again. The tundish is emptied during casting and the casting is suspended. During this time, a jig for connecting the cast pieces and a separation plate for preventing molten steel from mixing are set in the mold, and the casting is restarted. Continuously cast molten steel with different components.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

の方法では、連続鋳造の特質が滅殺され、大きな時間ロスを生じる。の方 法では、連続鋳造の特質が一応維持されるが、若干の時間ロスは避け得ない。ま た、タンディッシュを空にする際に、タンディッシュ内の溶鋼ヘッドが低下する 従ってスライディングゲートを全開にする必要がある。スライディングゲートの 極端な動作は、振動による付着介在物の巻き込みなどを招き、鋳片の品質低下を 生じる。の方法では、連続鋳造の特質が完全に残される。しかし、成分混合部 が広範囲に生じ、この部分を後でスクラップ化することにより、大きな歩留り低 下が生じる。 In this method, the characteristics of continuous casting are destroyed, resulting in a large loss of time. With this method, the quality of continuous casting is maintained for the time being, but some time loss is unavoidable. Moreover, when the tundish is emptied, the molten steel head in the tundish lowers, so it is necessary to fully open the sliding gate. Extreme movement of the sliding gate causes the inclusion of adhering inclusions due to vibration, which causes deterioration of the quality of the slab. This method completely preserves the characteristics of continuous casting. However, a large proportion of the component mixing part occurs, and by scrapping this part later, a large yield loss occurs.

【0005】 本考案の目的は、鋳込みを続けたまま溶鋼の切り替えができて、なおかつ、成 分混合部を従来よりも格段に小さくでき、しかもスライディングゲートの極端な 動作による品質低下のおそれがない連続鋳造用タンディッシュ装置を提供するこ とにある。The object of the present invention is to enable the switching of molten steel while continuing casting, to make the component mixing section much smaller than before, and without the risk of quality deterioration due to extreme movement of the sliding gate. An object is to provide a tundish device for continuous casting.

【0006】[0006]

【課題を解決するための手段】[Means for Solving the Problems]

本考案の連続鋳造用タンディッシュ装置は、一端部の上方から溶鋼を供給され 、他端部の下方へ浸漬ノズルを突出させたタンディッシュと、該メンディッシュ 内を下端部を残して浸漬ノズル側と溶鋼受入側とに仕切る仕切壁と、該仕切壁の 下方を残してタンディッシュ内の溶鋼受入側の空間を気密に封止し、溶鋼受入部 を開閉可能とした蓋体と、前記溶鋼受入側の空間に接続された不活性ガス圧入手 段とを具備することを特徴とする。 The tundish device for continuous casting according to the present invention comprises a tundish in which molten steel is supplied from above one end and a submerged nozzle is projected below the other end, and the submerged nozzle side is left inside the mendish leaving a lower end. And a molten steel receiving side, and a lid body that hermetically seals the space on the molten steel receiving side in the tundish leaving the lower part of the partition wall openable and capable of opening and closing the molten steel receiving part, and the molten steel receiving side. And an inert gas pressure acquisition stage connected to the side space.

【0007】[0007]

【作用】[Action]

溶鋼を切り替える際には、まず、タンディッシュ内の溶鋼注入側への注湯を停 止し、蓋体の溶鋼受入部を閉じる。そして、タンディッシュ内の溶鋼が鋳型へ排 出されるつれて溶鋼受入側へ不活性ガスを圧入する。これにより、溶鋼受入側の 溶鋼が仕切壁の下方を通って浸漬ノズル側へ移動する。このようにして浸漬ノズ ル側の溶鋼ヘッドを一定に保ち、溶鋼受入側の溶鋼ヘッドのみを低下させる。溶 鋼受入側の溶鋼ヘッドが充分に低下すると、不活性ガスの圧入を停止し、蓋体の 溶鋼受入部を開いてここから成分の異なる溶鋼を溶鋼受入側に注入する。以上に より、鋳込みを継続しつつ成分混合部を可及的に小さくして溶鋼の切り替えを行 うことができる。また、切り替え操作中も、浸漬ノズル側の溶鋼ヘッドは一定に 保つことができる。 When switching the molten steel, first stop the pouring of the molten steel into the molten steel injection side in the tundish, and close the molten steel receiving portion of the lid. Then, as the molten steel in the tundish is discharged to the mold, the inert gas is injected into the molten steel receiving side. As a result, the molten steel on the molten steel receiving side moves under the partition wall and moves to the immersion nozzle side. In this way, the molten steel head on the immersion nozzle side is kept constant, and only the molten steel head on the molten steel receiving side is lowered. When the molten steel head on the molten steel receiving side is sufficiently lowered, the pressurization of the inert gas is stopped, the molten steel receiving portion of the lid is opened, and molten steel having different components is injected from there to the molten steel receiving side. From the above, it is possible to switch the molten steel while continuing the casting while making the component mixing section as small as possible. Further, the molten steel head on the immersion nozzle side can be kept constant during the switching operation.

【0008】[0008]

【実施例】【Example】

以下に本考案の実施例を図面に基づいて説明する。 An embodiment of the present invention will be described below with reference to the drawings.

【0009】 図1は本考案を実施した連続鋳造用タンディッシュ装置の一例を示す縦断側面 図、図2は溶鋼の切り替え操作を段階的に示す模式図である。FIG. 1 is a vertical sectional side view showing an example of a tundish device for continuous casting according to the present invention, and FIG. 2 is a schematic view showing a molten steel switching operation stepwise.

【0010】 タンディッシュ10は、一端部上方から取鍋50内の溶鋼Aを供給され、その 溶鋼Aを、他端部底面から下方へ突出した浸漬ノズル11により鋳型60内へ注 入する。浸漬ノズル11は、鋳型60内の溶鋼Aに挿入され、鋳型20への注湯 速度をスライディングゲート12により調節する。The tundish 10 is supplied with the molten steel A in the ladle 50 from above one end, and the molten steel A is poured into the mold 60 by the immersion nozzle 11 protruding downward from the bottom surface of the other end. The immersion nozzle 11 is inserted into the molten steel A inside the mold 60, and the pouring speed of the molten metal into the mold 20 is adjusted by the sliding gate 12.

【0011】 タンディッシュ10内には、垂直な仕切壁20が設けられている。仕切壁20 は、タンディッシュ10内を浸漬ノズル側と溶鋼受入側とに仕切り、タンディッ シュ内底面との間には、溶鋼Aの流通を阻害しない程度の微少な隙間21を形成 している。タンディッシュ10内の浸漬ノズル側の空間は、タンディッシュ10 の直上空間を含む必要があるが、溶鋼切り替えに伴う成分混合部を小さくするた めに、出来るだけ狭くするのが望ましい。A vertical partition wall 20 is provided in the tundish 10. The partition wall 20 partitions the inside of the tundish 10 into a dipping nozzle side and a molten steel receiving side, and a minute gap 21 is formed between the tundish 10 and the bottom surface of the tundish so as not to hinder the flow of the molten steel A. The space in the tundish 10 on the side of the immersion nozzle needs to include the space directly above the tundish 10, but it is desirable to make it as narrow as possible in order to make the component mixing part accompanying the switching of molten steel small.

【0012】 タンディッシュ10内の溶鋼受入側の空間は、仕切壁20の下方の隙間21を 除いて、蓋体30により気密に封止されるようになっている。蓋体30には、取 鍋50内の溶鋼Aを受け入れるために溶鋼受入部31が開口されている。溶鋼受 入部31は、可倒式の気密蓋32により開閉される。そして、この蓋体30には 、溶鋼受入側の空間にAr等の不活性ガスを圧入するために、そのガス源が配管 40により加圧ポンプ41を介して接続されている。A space on the molten steel receiving side in the tundish 10 is hermetically sealed by a lid 30 except for a gap 21 below the partition wall 20. A molten steel receiving portion 31 is opened in the lid body 30 to receive the molten steel A in the ladle 50. The molten steel receiving portion 31 is opened and closed by a retractable airtight lid 32. The lid 30 is connected to a gas source thereof via a pressurizing pump 41 by a pipe 40 in order to pressurize an inert gas such as Ar into the space on the molten steel receiving side.

【0013】 溶鋼の切り替えを行う際には、まず、図2(A)に示すように、先の溶鋼Aの タンディッシュ10への注入を停止し、気密蓋32を閉じる。このままでは、タ ンディッシュ10内の浸漬ノズル側の空間に残っている溶鋼Aが鋳型60へ注入 され、そのヘッドが低下する。そこで、気密蓋32を閉じると同時に、ガス管4 0を通じてAr等の不活性ガスを溶鋼受入側の空間内へ圧入して、溶鋼受入側の 溶鋼Aを仕切壁20の下方の隙間21から浸漬ノズル側へ移動させる。When switching the molten steel, first, as shown in FIG. 2A, the injection of the molten steel A into the tundish 10 is stopped and the airtight lid 32 is closed. In this state, the molten steel A remaining in the space on the immersion nozzle side in the tundish 10 is injected into the mold 60, and the head of the mold 60 is lowered. Therefore, at the same time as closing the airtight lid 32, an inert gas such as Ar is press-fitted into the space on the molten steel receiving side through the gas pipe 40 to immerse the molten steel A on the molten steel receiving side from the gap 21 below the partition wall 20. Move to the nozzle side.

【0014】 この操作により、図2(B)に示すように、浸漬ノズル側の溶鋼ヘッドを一定 に保ち、溶鋼受入側の溶鋼ヘッドのみを低下させる。この間も、鋳型60への溶 鋼Aの注入は続けられている。そして、図2(C)(D)に示すように、溶鋼受 入側の溶鋼ヘッドが隙間21のレベルの近くまで低下すると、不活性ガスの圧入 を停止し、気密蓋32を開いて、成分が異なる次の溶鋼Bを溶鋼受入側へ注入し 始める。By this operation, as shown in FIG. 2B, the molten steel head on the immersion nozzle side is kept constant and only the molten steel head on the molten steel receiving side is lowered. During this time, the injection of the molten steel A into the mold 60 is continued. Then, as shown in FIGS. 2C and 2D, when the molten steel head on the molten steel receiving side falls close to the level of the gap 21, the pressurization of the inert gas is stopped, the airtight lid 32 is opened, and the components are closed. Start to inject the next molten steel B with a different temperature into the molten steel receiving side.

【0015】 かくして、鋳型60への鋳込みを停止することなく溶鋼の切り替えを行うこと ができる。溶鋼Bの供給を開始した時点でタンディッシュ10内に残っていた溶 鋼Aがタンディッシュ10から排出される間、成分の混合を生じるか、その溶鋼 量は僅かであるので、鋳片の成分混合部を小さく抑えることができる。また、溶 鋼の切り替えの全期間を通じて、浸漬ノズル側の溶鋼ヘッドを一定に保つので、 スライディングゲート12の極端な動作がなくなり、これによる品質上の効果も 大きい。Thus, the molten steel can be switched without stopping the casting into the mold 60. While the molten steel A remaining in the tundish 10 at the time of starting the supply of the molten steel B is discharged from the tundish 10, the components are mixed or the amount of the molten steel is small, so that the composition of the slab is small. The mixing section can be kept small. Further, since the molten steel head on the immersion nozzle side is kept constant throughout the entire period of switching the molten steel, the sliding gate 12 is prevented from extreme movement, which has a great effect on quality.

【0016】 また、仕切壁20を昇降させたり、隙間21に昇降式の開閉壁を設けるなどし て、隙間21を閉じることができるようにすれば、介在物等を多量に含む残鋼お よびスラグの混入や、鋳込み再開時の成分の異なる溶鋼の混入が一層確実に防止 できる。Further, if the partition wall 20 is moved up and down or the clearance 21 is provided with an up-and-down type opening / closing wall so as to be able to close the clearance 21, the residual steel and a large amount of inclusions and the like It is possible to more reliably prevent the mixing of slag and the mixing of molten steel having different components when the casting is restarted.

【0017】[0017]

【考案の効果】[Effect of the device]

以上の説明から明らかなように、本考案の連続鋳造用タンディッシュ装置は、 鋳込みを停止することなく溶鋼の切り替えを実行できるので、切り替えに伴う時 間のロスをなくし、鋳造能率を高める。しかも、溶鋼切り替え時の溶鋼混合を抑 えて成分混合部を少なくするので、成分混合部の切捨てによる歩留り低下を抑え る。更に、溶鋼ヘッドの低下に伴うスライディングゲートの急激な動作をなくし 、鋳片の品質も高める。 As is clear from the above description, the continuous casting tundish device of the present invention can perform switching of molten steel without stopping casting, thereby eliminating time loss associated with switching and improving casting efficiency. In addition, since the molten steel mixing at the time of switching the molten steel is suppressed and the component mixing portion is reduced, the yield reduction due to the discarding of the component mixing portion is suppressed. In addition, the sudden movement of the sliding gate due to the deterioration of the molten steel head is eliminated, and the quality of the slab is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案を実施した連続鋳造用タンディッシュ装
置の一例を示す縦断側面図である。
FIG. 1 is a vertical cross-sectional side view showing an example of a tundish device for continuous casting according to the present invention.

【図2】溶鋼の切り替え操作を段階的に示す模式図であ
る。
FIG. 2 is a schematic diagram showing a molten steel switching operation step by step.

【符号の説明】[Explanation of symbols]

10 タンディッシュ 11 浸漬ノズル 20 仕切壁 21 隙間 30 蓋体 31 溶鋼受入部 32 気密蓋 40 ガス管 50 取鍋 60 鋳型 A,B 溶鋼 10 Tundish 11 Immersion Nozzle 20 Partition Wall 21 Gap 30 Lid 31 Molten Steel Receiving Section 32 Airtight Lid 40 Gas Pipe 50 Ladle 60 Mold A, B Molten Steel

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 一端部の上方から溶鋼を供給され、他端
部の下方へ浸漬ノズルを突出させたタンディッシュと、
該タンディッシュ内を下端部を残して浸漬ノズル側と溶
鋼受入側とに仕切る仕切壁と、該仕切壁の下方を残して
タンディッシュ内の溶鋼受入側の空間を気密に封止し、
溶鋼受入部を開閉可能とした蓋体と、前記溶鋼受入側の
空間に接続された不活性ガス圧入手段とを具備すること
を特徴とする連続鋳造用タンディッシュ装置。
1. A tundish in which molten steel is supplied from above one end and a dipping nozzle is projected below the other end,
A partition wall for partitioning the inside of the tundish into the immersion nozzle side and the molten steel receiving side while leaving the lower end portion, and a space below the partition wall for sealing the molten steel receiving side in the tundish in an airtight manner,
A tundish apparatus for continuous casting, comprising: a lid body capable of opening and closing a molten steel receiving portion; and an inert gas press-fitting means connected to the space on the molten steel receiving side.
JP2548892U 1992-03-25 1992-03-25 Tundish equipment for continuous casting Pending JPH0576654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2548892U JPH0576654U (en) 1992-03-25 1992-03-25 Tundish equipment for continuous casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2548892U JPH0576654U (en) 1992-03-25 1992-03-25 Tundish equipment for continuous casting

Publications (1)

Publication Number Publication Date
JPH0576654U true JPH0576654U (en) 1993-10-19

Family

ID=12167446

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2548892U Pending JPH0576654U (en) 1992-03-25 1992-03-25 Tundish equipment for continuous casting

Country Status (1)

Country Link
JP (1) JPH0576654U (en)

Similar Documents

Publication Publication Date Title
KR970005371B1 (en) Vacuum casting
KR970003120B1 (en) Vacuum casting equipment
JPH0119995B2 (en)
JPH09155535A (en) Method and apparatus for forced opening of molten metal outflow hole
CZ24695A3 (en) Process and apparatus for casting parts
JPH08187558A (en) Method and apparatus for pouring molten metal into continuous casting mold
JPH01249252A (en) Two-divided tundish in different kinds of materials by continuous casting method
JPS5884661A (en) Method and device for pressure casting
JPH05293589A (en) Casting method for metallic mold
JPH07290225A (en) Reduced pressure casting method and device thereof
JPH08117977A (en) Method for plugging bottom pouring ladle
JP2000102858A (en) How to open the tundish nozzle
JP2024089066A (en) Molten metal supply device
JPH02133159A (en) Molten metal pouring device for die cast molding
JPS62134149A (en) Continuous casting method for different kinds of steel
JP2000005864A (en) Method and apparatus for inoculating molten metal
RU2048247C1 (en) Method and apparatus for in-line evacuation of metal in the process of continuous casting
ATE229858T1 (en) PROCESS FOR CONTINUOUS STEEL CASTING FOR PRODUCING HIGH QUALITY BARs OR BLOCKS
JPH0332452A (en) Method for continuously casting different steel kinds
JPH06126384A (en) Casting method
JPH032369Y2 (en)
JP2572041Y2 (en) Pressure casting equipment
JPH09108824A (en) Method for reopening a sliding gate for molten metal
JPH07266023A (en) Reduced pressure casting method and reduced pressure casting apparatus
JPH04258351A (en) Continuous casting method for different kinds of steel