JPH0579181A - Lightweight cellular concrete panel with building frame attachment device and manufacturing method thereof - Google Patents
Lightweight cellular concrete panel with building frame attachment device and manufacturing method thereofInfo
- Publication number
- JPH0579181A JPH0579181A JP26699791A JP26699791A JPH0579181A JP H0579181 A JPH0579181 A JP H0579181A JP 26699791 A JP26699791 A JP 26699791A JP 26699791 A JP26699791 A JP 26699791A JP H0579181 A JPH0579181 A JP H0579181A
- Authority
- JP
- Japan
- Prior art keywords
- bolt
- mounting
- top surface
- reinforcing bar
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Panels For Use In Building Construction (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
(57)【要約】
【目的】 大型のパネルでも建築躯体への取り付けを可
能にすると共に、その取り付けのために、パネル内に埋
設したボルトの雌ネジ孔を探す必要ない建築躯体取付け
装置付軽量気泡コンクリートパネルを容易に提供できる
ようにする。
【構成】 頂面に雌ネジ孔2bを穿設したボルト2のネ
ジ部2cを取付け金具1に螺合し、このボルト2の頂面
が鉄筋マット3よりも外側に突出するようにして、複数
の取付け金具1を鉄筋マット3に溶接し、ボルト2と取
付け金具1の螺合の調節で、ボルト2の頂面を型枠4の
底面4aに接触状態にして、鉄筋マット3を型枠内に水
平にセットし、型枠4内に軽量気泡コンクリートスラリ
ーを注入して成型した。
(57) [Summary] [Purpose] A lightweight structure with a building structure mounting device that allows mounting on a building frame even with a large panel and does not require searching for female screw holes of bolts embedded in the panel for mounting. Make it easy to provide aerated concrete panels. [Structure] A screw portion 2c of a bolt 2 having a female screw hole 2b formed on the top surface is screwed into a mounting member 1 so that the top surface of the bolt 2 protrudes outward from a reinforcing rod mat 3 to form a plurality of members. Welding the mounting metal fitting 1 to the reinforcing bar mat 3 and adjusting the screwing of the bolt 2 and the mounting metal fitting 1 to bring the top surface of the bolt 2 into contact with the bottom surface 4a of the mold 4 so that the reinforcing bar mat 3 is inside the mold. Then, the lightweight aerated concrete slurry was poured into the mold 4 for molding.
Description
【0001】[0001]
【産業上の利用分野】本発明は、建築物の外壁面を形成
する軽量気泡コンクリートパネルを、建築物の躯体に取
り付けるための取付け装置を内蔵した建築躯体取付け装
置付軽量気泡コンクリートパネル、及びこの建築躯体取
付け装置付軽量気泡コンクリートパネルを製造するため
の製造方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a lightweight cellular concrete panel with a building frame mounting device, which includes a mounting device for mounting a lightweight cellular concrete panel forming an outer wall surface of a building to a building frame of a building, and The present invention relates to a manufacturing method for manufacturing a lightweight cellular concrete panel with a building frame attaching device.
【0002】[0002]
【従来の技術】従来、水蒸気で養生する軽量気泡コンク
リート(以下、単にALCと言う)パネルを建築物の外
壁として使用する場合には、建築現場でALCパネルの
厚さ方向に貫通する孔を穿設し、取付け治具を介して建
築躯体等の建築部材にボルトで固定していた。2. Description of the Related Art Conventionally, when a lightweight cellular concrete (hereinafter simply referred to as ALC) panel cured by steam is used as an outer wall of a building, a hole penetrating in the thickness direction of the ALC panel is bored at a construction site. It was installed and bolted to building members such as a building frame through a mounting jig.
【0003】この方法は、建築現場での手数がかかり、
工期が長引くと共に、人手を要し、更に前記の貫通孔の
補修部から浸水し易く、建築部材に錆を生じ、或いは腐
食が発生する等の問題点があった。This method is troublesome at a construction site,
There is a problem that the construction period is prolonged, manpower is required, and water is easily infiltrated from the repaired portion of the through hole, and rust or corrosion occurs in the building member.
【0004】このような問題点を解決するために、AL
Cパネルを製造する段階で、予め取付け用治具を埋設し
たALCパネルが使用されるようになってきた。In order to solve such a problem, the AL
At the stage of manufacturing a C panel, an ALC panel in which a mounting jig is embedded in advance has been used.
【0005】このALCパネルに取付け用治具を埋設す
る方法としては、製品とすべく成型されたALCパネル
の小口面と裏面の所定位置に、その成型完了後穿孔し
て、取付け治具であるナットを、これに螺合するボルト
孔が埋没されないようにして、埋設する方法がある。As a method of embedding a mounting jig in the ALC panel, a mounting jig is formed by punching holes at predetermined positions on the front and back surfaces of the ALC panel molded to be a product after the molding is completed. There is a method of embedding a nut so that a bolt hole screwed into the nut is not embedded.
【0006】また、取付け用治具であるナットの基部を
係止した鉄筋マットを、前記ナットの雌ネジ孔内にAL
Cが浸入しないようにして、型枠内にセットし、次いで
前記型枠内に、ALCの材料である原料スラリーを注入
し、半硬化状態となった時に、所定寸法に成型加工し
て、オートクレーブに入れ、高温高圧蒸気で養生する方
法もある。Further, a reinforcing bar mat having a base of a nut, which is a mounting jig, locked therein is provided in the female screw hole of the nut.
It is set in a mold so that C does not enter, then a raw material slurry that is a material of ALC is injected into the mold, and when it is in a semi-cured state, it is molded into a predetermined size and then autoclaved. There is also a method of putting it in a pot and curing it with high temperature and high pressure steam.
【0007】[0007]
【発明が解決しようとする課題】前者の方法は、取付け
治具であるナットの位置精度も良く、表面に傷痕が残ら
ない等の利点があるため、汎用性がある。しかし、手数
がかかったり、取付け治具であるナットを鉄筋マットに
固定できない等の欠点があり、取り付け強度も弱いた
め、強い取り付け強度を要求される大型のALCパネル
には、適用することができなかった。The former method has versatility because it has the advantages of good positional accuracy of the nut, which is a mounting jig, and no scratches left on the surface. However, it has drawbacks such as troublesome work and the nut as a mounting jig cannot be fixed to the reinforcing bar mat, and the mounting strength is weak, so it can be applied to a large ALC panel that requires strong mounting strength. There wasn't.
【0008】後者の方法は、治具であるナットの雌ネジ
に、原料スラリーが侵入するのを防止するための方法と
して、ナットの雌ネジ孔の開口部にテープを貼ったり、
雌ネジ孔に発泡スチロールの栓を挿着したりしていた。The latter method is a method for preventing the raw material slurry from entering the female screw of the nut, which is a jig, by attaching a tape to the opening of the female screw hole of the nut,
For example, a Styrofoam plug was inserted into the female screw hole.
【0009】前記のように、テープを貼った場合には、
パネル中のナットの位置の判別が困難であるために、パ
ネルを取り付ける際に、ナットの位置の見当をつけて、
大きな孔を穿設し、ボルト止めしなくてはならないの
で、穿設した孔の修復等の現場での面倒な作業を必要と
する欠点があった。As mentioned above, when the tape is attached,
Since it is difficult to determine the position of the nuts in the panel, when installing the panel, make a reference of the nut positions,
Since a large hole must be bored and bolted, there is a drawback that it requires troublesome work on site such as repairing the bored hole.
【0010】また、発泡スチロールの栓を用いた場合に
は、オートクレーブでの水蒸気養生の際に、発泡スチロ
ールが溶融してしまい、ボルト用の孔が形成されはする
が、発泡スチロールの溶融残渣が雌ネジ孔内に付着し、
その除去作業に手数がかかる欠点があった。In the case of using a Styrofoam plug, the Styrofoam is melted during steam curing in an autoclave and holes for bolts are formed. Stuck inside,
There is a drawback that the removal work is troublesome.
【0011】本発明は、従来のALCパネルにおける前
述の課題を解決し、大型のALCパネルでも支持できる
強度を有し、建築部材である建築躯体に取り付けるボル
ト頂面の雌ネジ孔が露出していて、ナットの位置を探す
ために、穿孔する必要がなく、且つナットの雌ネジ孔の
栓の溶融残渣の除去の必要ないALCパネル、及びこの
ALCパネルを製造する方法を提供することを目的とす
る。The present invention solves the above-mentioned problems in the conventional ALC panel, has a strength capable of supporting even a large ALC panel, and the female screw hole on the top surface of the bolt to be attached to the building frame which is a building member is exposed. Therefore, it is an object of the present invention to provide an ALC panel which does not need to be drilled in order to find the position of a nut and does not need to remove the molten residue of the plug of the female screw hole of the nut, and a method for manufacturing this ALC panel To do.
【0012】[0012]
【課題を解決するための手段】本発明は、前述の目的を
達成するための建築躯体取付け装置付軽量気泡コンクリ
ートパネルの手段に関し、頂面にネジ孔を穿設したボル
トのネジ部を螺合した取付け金具を、前記ボルトの頂面
が鉄筋マットよりも外側に突出するようにして、鉄筋マ
ットに固定し、前記ボルトの頂面を外面に露出させて鉄
筋マット、取付け金具を軽量気泡コンクリートパネル内
に埋設したことを特徴とする。SUMMARY OF THE INVENTION The present invention relates to a means for a lightweight cellular concrete panel with a building frame attachment device for achieving the above-mentioned object, wherein a screw portion of a bolt having a screw hole on the top surface is screwed. The above-mentioned mounting bracket is fixed to the reinforcing bar mat so that the top surface of the bolt protrudes outward from the reinforcing bar mat, and the top surface of the bolt is exposed to the outer surface to attach the reinforcing bar mat and the mounting bracket to the lightweight cellular concrete panel. It is characterized by being buried inside.
【0013】また、本発明は、この建築躯体取付け装置
付軽量気泡コンクリートパネルを製造するための方法に
関し、頂面にネジ孔が穿設されているボルトのネジ部を
取付け金具に螺合し、この取付け金具を複数、鉄筋マッ
トに固定して、この鉄筋マットを前記ボルトの頂面が下
面となるように、且つこの複数の取付け金具のボルトの
頂面を鉄筋マットから突出させて型枠内にセットし、こ
の突出させたボルトの頂面と型枠の底面とが接触するよ
うに、ボルトと取付け金具の螺合を調節した後、パネル
枠内に軽量気泡コンクリートの材料を流し込んで、軽量
気泡コンクリートに形成することを特徴とする。Further, the present invention relates to a method for manufacturing the lightweight cellular concrete panel with the building frame mounting device, wherein a screw portion of a bolt having a screw hole on the top surface is screwed into a mounting metal fitting, A plurality of these mounting brackets are fixed to the reinforcing bar mat, the reinforcing bar mat is placed in the form with the top surfaces of the bolts facing down, and the top surfaces of the bolts of the plurality of mounting brackets are projected from the reinforcing bar mat. After adjusting the screwing of the bolt and the mounting bracket so that the top surface of the protruding bolt and the bottom surface of the form contact each other, pour the lightweight cellular concrete material into the panel frame to reduce the weight. It is characterized by being formed into aerated concrete.
【0014】[0014]
【作用】本発明の建築躯体取付け装置付軽量気泡コンク
リートパネルでは、ALCパネルに内蔵されている鉄筋
マットに取付け金具が固定され、鉄筋マットと取付け金
具は一体化されているので、取付け金具に螺合している
ボルトでALCパネルが建築躯体に取り付けられた際、
取付け金具による鉄筋マットの支持強度が増大し、大型
のALCパネルの建築躯体への取り付けが可能となる。In the lightweight cellular concrete panel with a building frame mounting device of the present invention, the mounting bracket is fixed to the reinforcing bar mat built into the ALC panel, and the reinforcing bar mat and the mounting bracket are integrated, so that the mounting bracket is screwed. When the ALC panel is attached to the building frame with the matching bolts,
The support strength of the reinforcing bar mat by the mounting bracket is increased, and it becomes possible to mount a large ALC panel to the building frame.
【0015】また、前記のボルトは、型枠内にALC材
料を流し込む際に、その頂面は型枠の底面に接触してい
るので、パネルを型枠から取り外した際に、ALCパネ
ルのボルトの頂面は露出した状態となり、その位置を探
す必要がなくなり、ボルトの頂面のネジ孔をテープで塞
いでおいても、そのテープの剥離も容易に行われるもの
である。Further, since the top surface of the bolt contacts the bottom surface of the mold when pouring the ALC material into the mold, the bolt of the ALC panel is removed when the panel is removed from the mold. Since the top surface of the bolt is exposed, it is not necessary to search its position, and even if the screw hole on the top surface of the bolt is closed with tape, the tape can be easily peeled off.
【0016】さらに、鉄筋マットに対しボルトの頂面が
調整自在であるので、ボルトの頂面を常に型枠の底面に
接触させることができる。Further, since the top surface of the bolt is adjustable with respect to the reinforcing bar mat, the top surface of the bolt can always contact the bottom surface of the form.
【0017】[0017]
【実施例】次に、本発明の製造方法を、図1、図2につ
いて、以下に説明する。EXAMPLES Next, the manufacturing method of the present invention will be described below with reference to FIGS.
【0018】図1に示すように、厚さ3〜10mmのコ
字形鋼を切断して形成したコ字形の取付け金具1の中央
の水平な面に、ネジ孔1aが穿設されている。As shown in FIG. 1, a screw hole 1a is formed in a central horizontal surface of a U-shaped fitting 1 formed by cutting a U-shaped steel having a thickness of 3 to 10 mm.
【0019】このネジ孔1aには、6角形の頭部2aの
頂面に、雌ネジ孔2bを螺設したボルト2の雄ネジ部2
cが螺合しており、頭部2aを廻すことで、取付け金具
1に対する頂面の位置を上下に調節できるようになって
いる。In this screw hole 1a, a male screw portion 2 of a bolt 2 in which a female screw hole 2b is screwed on the top surface of a hexagonal head portion 2a.
c is screwed together, and the position of the top surface with respect to the fitting 1 can be adjusted up and down by turning the head 2a.
【0020】このような構成により、取付け金具1がボ
ルト2を螺合により支持することになる。ボルト2を支
持する強度を確保するには、取付け金具1の板厚が3m
m以上必要で、板厚内にねじ山が2つ以上あるのが望ま
しい。尚、板厚が10mmを超えると重量が増えるだけ
で支持強度が不必要に大きくなってしまう。With such a structure, the mounting member 1 supports the bolt 2 by screwing. To secure the strength to support the bolt 2, the plate thickness of the mounting bracket 1 is 3 m.
m or more is required, and it is desirable that there are two or more threads in the plate thickness. If the plate thickness exceeds 10 mm, the supporting strength is unnecessarily increased only by increasing the weight.
【0021】鉄筋により主筋3a、補筋3b、スペーサ
3cからなる籠状に組み立てた鉄筋マット3の一面に向
けて、前後左右の対称位置等の4か所以上の所定の位置
に、前記取付け金具1の左右両側の脚部1bが溶接等の
手段で固定される。The mounting metal fittings are provided at four or more predetermined positions, such as symmetrical positions in the front, rear, left and right, toward one surface of a basket-shaped rebar mat 3 composed of main bars 3a, supplementary bars 3b and spacers 3c. The left and right leg portions 1b of 1 are fixed by means such as welding.
【0022】前記ボルト2の長さは、取付け金具1から
ALCパネルの建築物取付け面までの高さに応じて決め
られる。また、鉄筋マット3への取付け位置は、ALC
パネルの建築物躯体への取り付け仕様によって、決定さ
れる。The length of the bolt 2 is determined according to the height from the fitting 1 to the building mounting surface of the ALC panel. In addition, the mounting position on the rebar mat 3 is ALC.
It is determined by the installation specifications of the panel to the building frame.
【0023】このように組み立てられた鉄筋マット3
は、ボルト2の頂面を下向きとして、図2に示すように
長方形の型枠4内にセットされ、型枠4内にALCの材
料であるスラリーが流し込まれる。Reinforcing bar mat 3 assembled in this way
Is set in a rectangular mold 4 as shown in FIG. 2 with the top surface of the bolt 2 facing downward, and a slurry which is a material of ALC is poured into the mold 4.
【0024】前記のように、スラリーが流し込まれる前
に、型枠4内にセットされた鉄筋マット3に対して、各
ボルト2の頂面が型枠4の底面4aに接触するよう、取
付け金具1に対するボルト2の回転で調節される。この
後、スポット溶接でネジの回転を固定する。As described above, before the slurry is poured, the metal fittings 3 set in the mold 4 are attached so that the top surface of each bolt 2 contacts the bottom surface 4a of the mold 4. Adjusted by rotation of bolt 2 relative to 1. After that, the rotation of the screw is fixed by spot welding.
【0025】ボルト2を鉄筋マット3に対して調節する
ことにより、総てのボルト2の頂面を、型枠4の底面4
aに接触させ、雌ネジ孔2bにスラリーが浸入するのを
防止すると共に、鉄筋マット3を水平に支持することが
できる。By adjusting the bolts 2 with respect to the rebar mat 3, the top surfaces of all the bolts 2 are changed to the bottom surface 4 of the formwork 4.
The slurry can be prevented from invading the female screw hole 2b by contacting with a and the reinforcing bar mat 3 can be supported horizontally.
【0026】しかし、スラリーを流し込む際に、ALC
材料であるスラリーの発泡で、型枠4の底面4aからボ
ルト2の頂面が浮き上がり、型枠4の底面4aとの間に
隙間を生じて、この隙間から雌ネジ孔2bにスラリーが
浸入したり、ボルト2の頂面にALCの膜を形成し、ボ
ルト2の頂面がALCパネル内に埋没する恐れがある。
従って、ボルト2の雌ネジ孔2bの開口からALC材料
が流れ込まないよう、予めテープ等で蓋することが望ま
しい。また、多少の浮き上がりに対しては、その隙間を
自動的に閉鎖させるため、この雌ネジ孔2bを蓋するテ
ープとしては、弾力性のあるものが望ましい。However, when pouring the slurry, the ALC
By the foaming of the slurry which is the material, the top surface of the bolt 2 is lifted from the bottom surface 4a of the mold 4 and a gap is created between the bottom surface 4a of the mold 4 and the slurry enters the female screw hole 2b through this gap. Alternatively, an ALC film may be formed on the top surface of the bolt 2 and the top surface of the bolt 2 may be buried in the ALC panel.
Therefore, it is desirable to previously cover with a tape or the like so that the ALC material does not flow from the opening of the female screw hole 2b of the bolt 2. Further, since the gap is automatically closed when the tape slightly floats, it is desirable that the tape that covers the female screw hole 2b be elastic.
【0027】更により多くの浮き上がりが予想される場
合には、ボルト2の頂面のテープと型枠4の底面4aと
の間に、ゴム等の弾性体を挟んでおいて、前記の浮き上
がりが生じても、型枠上面との間に生ずる隙間を弾性体
が吸収して、これを閉鎖するようにする。If more lift is expected, an elastic body such as rubber is sandwiched between the tape on the top surface of the bolt 2 and the bottom surface 4a of the form 4, and the above lift occurs. Even if it occurs, the elastic body absorbs the gap formed between the elastic body and the upper surface of the mold to close it.
【0028】前記型枠に流し込まれるスラリーとして
は、通常の方法で珪酸質原料と石灰質原料を混合したス
ラリーに、アルミニュウーム粉末等の添加物を混合した
物が用いられ、これを前記の型枠内で発泡させる。As the slurry poured into the mold, a slurry obtained by mixing a siliceous raw material and a calcareous raw material by an ordinary method and mixed with an additive such as aluminum powder is used. Let it foam in the frame.
【0029】そして、適当な時間が経過して、半硬化状
態となった時に、型枠4から取り出し、上面を水平に切
除したり、側面を垂直に切断する等の加工をして、所定
の寸法に仕上げる。When a semi-cured state is reached after a suitable time, the mold 4 is taken out, and the upper surface is cut off horizontally, the side surfaces are cut off vertically, and the like. Finish to dimensions.
【0030】その後、オートクレーブに挿入して高温、
高圧で水蒸気養生して完成するものであるが、ボルト2
の頂面に貼りつけたテープは、出荷前、または現場で取
り外せばよい。After that, it was inserted into an autoclave and heated at high temperature.
It is completed by steam curing at high pressure, but bolt 2
The tape attached to the top surface of the can be removed before shipping or at the site.
【0031】このようにして製造された建築躯体取付け
装置付軽量気泡コンクリートパネルは、その取付け金具
1が鉄筋マット3に一体化されているので、建築躯体に
取り付けた際の鉄筋マット3の取付け強度が大になり、
大型のALCパネルでも、強固に取り付けられるもので
ある。In the lightweight cellular concrete panel with a building frame mounting device manufactured in this manner, since the mounting bracket 1 is integrated with the reinforcing bar mat 3, the mounting strength of the reinforcing bar mat 3 when mounted on the building frame is Becomes large,
Even a large ALC panel can be firmly attached.
【0032】また、この取り付けに使用されるボルト2
の頂面の雌ネジ孔2bは、ALCパネルの完成後でも、
パネルの裏面に露出しているので、これを探したり、雌
ネジ内の溶融残渣を取り出す必要がない。Also, the bolt 2 used for this attachment
The female screw hole 2b on the top surface of the
Since it is exposed on the back surface of the panel, there is no need to search for it or take out the molten residue in the female screw.
【0033】[0033]
【発明の効果】本発明の建築躯体取付け装置付軽量気泡
コンクリートパネルは上記のように、鉄筋マットと取付
け金具が一体化されていて、且つ取付け金具には、建築
躯体に取り付けられるネジ孔が穿設されているボルトが
螺合しているため、ALCパネルの取り付け強度が大き
くなり、大型のALCパネルでも、その取り付け強度に
不足を生じることなく取り付けられる。As described above, the lightweight cellular concrete panel with a building frame mounting device of the present invention has the reinforcing bar mat and the mounting bracket integrated with each other, and the mounting bracket has a screw hole for mounting on the building frame. Since the installed bolts are screwed together, the mounting strength of the ALC panel is increased, and even a large-sized ALC panel can be mounted without insufficient mounting strength.
【0034】そして、その取り付けに使用される前記の
ボルト頂面のネジ孔も、ALCパネル面に露出している
ので、その位置を簡単に知ることができ、その位置を現
場で探す面倒な作業を必要としない。Since the screw hole on the top surface of the bolt used for mounting is also exposed on the ALC panel surface, its position can be easily known, and the troublesome work of searching for the position on site. Don't need
【0035】更に、本発明の製造方法は、このような利
点を有する建築躯体取付け装置付軽量気泡コンクリート
パネルを容易に製造できる特徴も有する。Further, the manufacturing method of the present invention has a feature that a lightweight cellular concrete panel with a building frame attaching device having such advantages can be easily manufactured.
【図1】取付け金具とボルトの螺合状態の斜視図であ
る。FIG. 1 is a perspective view showing a state in which a fitting and a bolt are screwed together.
【図2】本発明の製造工程を示す断面図である。FIG. 2 is a cross-sectional view showing the manufacturing process of the present invention.
1 取付け金具 2 ボルト 2b 雌ネジ孔 3 鉄筋マット 4 型枠 1 Mounting bracket 2 Bolt 2b Female screw hole 3 Reinforcing bar mat 4 Formwork
Claims (2)
を螺合した取付け金具を、前記ボルトの頂面が鉄筋マッ
トよりも外側に突出するようにして、鉄筋マットに固定
し、前記ボルトの頂面を外面に露出させて鉄筋マット、
取付け金具を軽量気泡コンクリートパネル内に埋設した
ことを特徴とする建築躯体取付け装置付軽量気泡コンク
リートパネル。1. A mounting metal fitting, into which a threaded portion of a bolt having a screw hole formed in the top surface is screwed, is fixed to the rebar mat so that the top surface of the bolt projects outward from the rebar mat. Exposing the top surface of the bolt to the outer surface, a reinforcing bar mat,
A lightweight cellular concrete panel with a building frame mounting device, characterized in that the mounting hardware is embedded in the lightweight cellular concrete panel.
ネジ部を取付け金具に螺合し、この取付け金具を複数、
鉄筋マットに固定して、この鉄筋マットを前記ボルトの
頂面が下面となるように、且つこの複数の取付け金具の
ボルトの頂面を鉄筋マットから突出させて型枠内にセッ
トし、この突出させたボルトの頂面と型枠の底面とが接
触するように、ボルトと取付け金具の螺合を調節した
後、パネル枠内に軽量気泡コンクリートの材料を流し込
んで、軽量気泡コンクリートに形成することを特徴とす
る建築躯体取付け装置付軽量気泡コンクリートパネルの
製造方法。2. A plurality of mounting brackets are formed by screwing a threaded portion of a bolt having a screw hole on the top surface into the mounting bracket.
Fix it to the reinforcing bar mat, set the reinforcing bar mat so that the top surface of the bolt is the bottom surface, and project the top surfaces of the bolts of the plurality of mounting brackets from the reinforcing bar mat in the formwork. Form the lightweight cellular concrete by pouring the material of the lightweight cellular concrete into the panel frame after adjusting the screwing of the bolt and the fitting so that the top surface of the bolt and the bottom surface of the mold contact each other. And a method for manufacturing a lightweight cellular concrete panel with a building frame attaching device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26699791A JPH0579181A (en) | 1991-09-19 | 1991-09-19 | Lightweight cellular concrete panel with building frame attachment device and manufacturing method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26699791A JPH0579181A (en) | 1991-09-19 | 1991-09-19 | Lightweight cellular concrete panel with building frame attachment device and manufacturing method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0579181A true JPH0579181A (en) | 1993-03-30 |
Family
ID=17438631
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP26699791A Pending JPH0579181A (en) | 1991-09-19 | 1991-09-19 | Lightweight cellular concrete panel with building frame attachment device and manufacturing method thereof |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0579181A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013036371A (en) * | 2011-08-05 | 2013-02-21 | Toyota Motor Corp | Direct injection internal combustion engine |
-
1991
- 1991-09-19 JP JP26699791A patent/JPH0579181A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013036371A (en) * | 2011-08-05 | 2013-02-21 | Toyota Motor Corp | Direct injection internal combustion engine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0579181A (en) | Lightweight cellular concrete panel with building frame attachment device and manufacturing method thereof | |
| JPS6315415B2 (en) | ||
| JPH07173843A (en) | Foundation coupling metal fittings and foundation construction method | |
| JP4225861B2 (en) | Rising block construction method and rising block structure | |
| JPH0586671A (en) | Lightweight cellular concrete panel | |
| KR100450113B1 (en) | Structure for molding a stairs of building | |
| CN220857553U (en) | Secondary structure terminal box installation auxiliary device | |
| JPH0613319Y2 (en) | Floor border mounting structure in large unit room | |
| JP3194788B2 (en) | Sheath tube fixing jig | |
| JPH0711657A (en) | Manufacturing method of concrete foundation | |
| JP2586823Y2 (en) | Top setting jig for concrete casting | |
| JP2821447B2 (en) | Concrete foundation | |
| JPH0544218A (en) | Jig for fixing anchor bolt | |
| JPS5929076Y2 (en) | Parapet inner formwork support device | |
| JPH0641989A (en) | Installation method of foundation metal fitting | |
| JPH039985Y2 (en) | ||
| JP4085195B2 (en) | Installation method of firewood, grease trap, etc. and equipment and formwork used in the method | |
| JP2600007Y2 (en) | Top setting jig for concrete casting | |
| JPH0546572Y2 (en) | ||
| JPS6133089Y2 (en) | ||
| KR200378220Y1 (en) | Apparatus for fixing hydrant box | |
| JP2519317B2 (en) | Pump foundation bolt setting method | |
| JP3013816U (en) | Waterproof pan mounting device | |
| JPS61235105A (en) | Manufacture of flat striking type light aerated concrete block | |
| JP3184946B2 (en) | Refurbishment method of existing pool |