JPH0594331U - Steel sheet pile with sand removal claw - Google Patents
Steel sheet pile with sand removal clawInfo
- Publication number
- JPH0594331U JPH0594331U JP4089192U JP4089192U JPH0594331U JP H0594331 U JPH0594331 U JP H0594331U JP 4089192 U JP4089192 U JP 4089192U JP 4089192 U JP4089192 U JP 4089192U JP H0594331 U JPH0594331 U JP H0594331U
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- sheet pile
- grip
- sand
- claw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
(57)【要約】
【目的】 U形鋼矢板、H形鋼矢板等のグリップの先端
部に土砂排除爪及び切欠部を設けることにより、既設鋼
矢板のグリップに詰った土砂を排除しながら鋼矢板を迅
速に打設する。
【構成】 鋼矢板の両側縁に形成されたグリップ16の
先端部に土砂排除爪18及び切欠部15を設ける。
(57) [Summary] [Purpose] A steel excavation claw and a notch are provided at the tip of the grip of U-shaped steel sheet pile, H-shaped steel sheet pile, etc. Quickly place sheet piles. [Structure] A sand removing claw 18 and a notch 15 are provided at the tip of a grip 16 formed on both side edges of a steel sheet pile.
Description
【0001】[0001]
本考案は土木工事等に使用される土留め用の鋼矢板に関し、連続して打設する 際に起りがちなグリップの土砂詰まりを防止する土砂排除爪を備えた鋼矢板に関 する。 The present invention relates to a steel sheet pile for retaining soil used in civil engineering work, etc., and relates to a steel sheet pile having a sand removing claw for preventing clogging of grip which tends to occur during continuous driving.
【0002】[0002]
土木工事に使用される鋼矢板は連続的に順次並列的に土中に打設されるが、こ の場合、隣接鋼矢板同士がその側縁部において互いに離間しないように連結して 立設される。このため、既設鋼矢板の両側縁部のグリップのうち空いているグリ ップの上端に、次位の鋼矢板の一方のグリップの下端を合わせて嵌合させながら 打設している。この場合、既設鋼矢板の空いているグリップには、打設時に土砂 が詰っているため、打設鋼矢板のグリップの下端は、既設鋼矢板のグリップ内に 詰まっている土砂を押し込みあるいは周辺に押し分けながら嵌入されていく。 Steel sheet piles used in civil engineering work are continuously and sequentially placed in parallel in the soil.In this case, adjacent steel sheet piles are erected in such a manner that their side edges are not separated from each other. It For this reason, one of the grips of the next-order steel sheet pile is fitted to the upper end of the empty grip of the grips on both side edges of the existing steel sheet pile, and the other steel sheet pile is driven. In this case, the empty grip of the existing steel sheet pile is clogged with earth and sand at the time of driving.Therefore, the bottom end of the grip of the driven steel sheet pile pushes the earth and sand clogged in the grip of the existing steel sheet pile or pushes it around. It is inserted while pushing it away.
【0003】[0003]
上記の如く既設鋼矢板のグリップ内の土砂を押し込み、一部を押し分けながら 鋼矢板を打設していくと、土砂はグリップ内で逃げ場を失いグリップとグリップ の内壁との間に挾みつけられ固結し、それが抵抗となって打設が容易に行えず、 あるいはグリップの膨大破損などの問題が生じた。この現象は、特に砂が多い土 壌の場合に著しかった。 As described above, when pushing the sand and sand in the grip of the existing steel sheet pile and pushing the steel sheet pile while pushing a part of it, the sand and sand loses their escape area in the grip and is caught between the grip and the inner wall of the grip. It was tied up, and it became a resistance and could not be easily placed, or problems such as huge damage to the grip occurred. This phenomenon was particularly prominent in soil with a lot of sand.
【0004】[0004]
上記の問題を解決するための本考案の鋼矢板は、両側縁にグリップを有する鋼 矢板の一方のグリップの下端をその先端から上方に向かって斜めに切欠いて土砂 排除爪を形成し、かつ前記土砂排除爪の側方の鋼矢板の先端に切欠部を形成した ことを特徴とする。 A steel sheet pile according to the present invention for solving the above-mentioned problems is a steel sheet pile having grips on both side edges. It is characterized in that a notch is formed at the tip of the steel sheet pile on the side of the sediment removing claw.
【0005】[0005]
上記のように構成した鋼矢板の土砂排除爪は、既設鋼矢板のグリップに嵌合す る際に、その先端から上方に向かってグリップの外側方向に傾斜した面で、グリ ップ内に詰まっている土砂をグリップの開口方向へ押し出すので、土砂詰まりに よる問題が解決される。 The debris removal claw of the steel sheet pile configured as described above, when fitted into the grip of the existing steel sheet pile, is jammed in the grip with the surface inclined upward from the tip of the grip toward the outside of the grip. The existing sediment is pushed out toward the grip opening, solving the problem of clogging with sediment.
【0006】[0006]
図1は本考案の第1実施例の使用状態を示す説明図である。本実施例はU形鋼 矢板の例であり、互いに連結して地中に打設された鋼矢板2と、この既設鋼矢板 2に連結して新たに打設すべき鋼矢板5が示されている。各鋼矢板2、5の両側 縁には横断面がU字状のグリップ6、7、16、17が両側縁に対称に設けられ ている。 鋼矢板5のグリップ16の下端構造は図2に示すように、グリップ16の先端 を鋼矢板5の外側に向かって斜めに切欠いて形成した傾斜面14からなる土砂排 除爪18として加工されている。そしては鋼矢板5のグリップ16側に切欠部1 5を設けている。 FIG. 1 is an explanatory view showing a usage state of the first embodiment of the present invention. This embodiment is an example of a U-shaped steel sheet pile, and shows steel sheet piles 2 which are connected to each other and placed in the ground, and steel sheet piles 5 which are to be newly placed in connection with the existing steel sheet piles 2. ing. On each side edge of each steel sheet pile 2, 5, grips 6, 7, 16, 17 having a U-shaped cross section are provided symmetrically on each side edge. As shown in FIG. 2, the lower end structure of the grip 16 of the steel sheet pile 5 is processed as a sediment removing claw 18 composed of an inclined surface 14 formed by obliquely notching the tip of the grip 16 toward the outside of the steel sheet pile 5. There is. And the notch 15 is provided on the grip 16 side of the steel sheet pile 5.
【0007】 上記の実施例の作用を説明する。まず、土砂排除爪18が図1のグリップ7内 のA方向に嵌入されていく。これに伴い、土砂排除爪18の傾斜面14がグリッ プ7内の土砂をB方向に押し出しつつ、滞ることなく嵌入されていく。この場合 傾斜面14はグリップ16の外側、つまり既設鋼矢板2のグリップ7の開口側に 向いているため、グリップ7内の土砂は傾斜面14および切欠部15の働きによ りグリップ7の開口方向(B方向)に押し出されるのである。The operation of the above embodiment will be described. First, the earth and sand removing claw 18 is fitted in the grip 7 in FIG. 1 in the direction A. Along with this, the inclined surface 14 of the earth and sand removing claw 18 pushes the earth and sand in the grip 7 in the B direction, and the earth and sand is gradually inserted therein. In this case, since the inclined surface 14 faces the outside of the grip 16, that is, the opening side of the grip 7 of the existing steel sheet pile 2, the soil in the grip 7 is opened by the operation of the inclined surface 14 and the cutout portion 15. It is extruded in the direction (B direction).
【0008】 図4、図5は本考案の第2実施例を示し、直線形鋼矢板の平面図である。この 鋼矢板22のグリップ構造は、側縁が二俣に分かれていて、中央に開口部21を 形成している。嵌合時には、一方の鋼矢板22の開口部21に他方の鋼矢板23 のグリップ26の端縁26aを嵌入するのである。 この実施例においては、グリップ26の端縁26aの先端を切欠いて傾斜面2 4を形成すると共に、一方の端縁26bの下端部に切欠部25を形成している。 傾斜面24は、打設方向Aに対し土砂をB方向に排除する。 図6は図4の直線鋼矢板22、23をH形鋼矢板28に適用した例を示し、グ リップは、いずれも図4に示す構造からなる。符号29はボックスである。4 and 5 show a second embodiment of the present invention and are plan views of a straight steel sheet pile. In the grip structure of the steel sheet pile 22, the side edge is divided into two parts and the opening 21 is formed in the center. At the time of fitting, the end edge 26a of the grip 26 of the other steel sheet pile 23 is fitted into the opening 21 of the one steel sheet pile 22. In this embodiment, the tip end of the edge 26a of the grip 26 is cut out to form the inclined surface 24, and the notch 25 is formed at the lower end of the one edge 26b. The inclined surface 24 removes earth and sand in the B direction with respect to the placing direction A. FIG. 6 shows an example in which the straight steel sheet piles 22 and 23 of FIG. 4 are applied to an H-shaped steel sheet pile 28, and each grip has the structure shown in FIG. Reference numeral 29 is a box.
【0009】 図7および図8は、Z形鋼矢板32、33に直線形式のグリップ37、36を 適用した例を示す。符号35は傾斜面である。これらの例は上記直線形鋼矢板と 同様に加工して製造できる。 図9および図10は、H形鋼矢板42、43に直線形式のグリップ47、46 を適用した例を示す。符号45は傾斜面である。これらの例は上記直線形鋼矢板 と同様に加工して製造できる。FIGS. 7 and 8 show an example in which linear grips 37 and 36 are applied to the Z-shaped steel sheet piles 32 and 33. Reference numeral 35 is an inclined surface. These examples can be manufactured by processing in the same manner as the straight steel sheet pile. 9 and 10 show an example in which linear grips 47, 46 are applied to the H-shaped steel sheet piles 42, 43. Reference numeral 45 is an inclined surface. These examples can be manufactured by processing in the same manner as the straight steel sheet pile.
【0010】 なお、同一の土砂排除機能を発揮する構造として、既存の鋼矢板の下端部に加 工を施して土砂排除爪を形成するもの以外に、グリップ端縁の下端部にグリップ の開口側に傾斜を有する土砂排除爪片をとりつける構造も考えられる。As a structure for exhibiting the same sediment removal function, in addition to the one in which the bottom edge of the existing steel sheet pile is processed to form the soil removal claw, the grip opening side is provided at the bottom edge of the grip edge. It is also possible to attach a sludge removal claw piece with a slope to the bottom.
打設鋼矢板のグリップの先端に土砂排除爪を構成したため、既設鋼矢板のグリ ップに詰った土砂を排除しながら鋼矢板を迅速に打設することができる。 Since the earth and sand removing claw is configured at the tip of the grip of the cast steel sheet pile, the steel sheet pile can be quickly driven while removing the sand and sand clogging the grip of the existing steel sheet pile.
【図1】第1実施例の使用状態を示す説明図FIG. 1 is an explanatory diagram showing a usage state of a first embodiment.
【図2】第1実施例の土砂排除爪の拡大側面図FIG. 2 is an enlarged side view of the sediment removing claw of the first embodiment.
【図3】第1実施例のグリップの嵌合状態を示す拡大正
面図。FIG. 3 is an enlarged front view showing a fitted state of the grip of the first embodiment.
【図4】第2実施例のグリップの嵌合状態を示す拡大平
面図。FIG. 4 is an enlarged plan view showing a fitted state of the grip of the second embodiment.
【図5】第2実施例の土砂排除爪の拡大側面図。FIG. 5 is an enlarged side view of the sediment removing claw of the second embodiment.
【図6】H形鋼矢板に第2実施例の土砂排除爪を適用し
た場合の平面図。FIG. 6 is a plan view of the H-shaped steel sheet pile to which the earth and sand removing claw of the second embodiment is applied.
【図7】他例のグリップの嵌合状態を示す拡大正面図。FIG. 7 is an enlarged front view showing a grip fitted state of another example.
【図8】Z形鋼矢板に図7に示すグリップを適用した場
合の平面図。FIG. 8 is a plan view when the grip shown in FIG. 7 is applied to a Z-shaped steel sheet pile.
【図9】他例のグリップの嵌合状態を示す拡大正面図。FIG. 9 is an enlarged front view showing a fitted state of a grip of another example.
【図10】H形鋼矢板に図9に示すグリップを適用した
場合の平面図。FIG. 10 is a plan view when the grip shown in FIG. 9 is applied to an H-shaped steel sheet pile.
2 鋼矢板 5 鋼矢板 6 グリップ 7 グリップ 14 傾斜面 15 切欠部 16 グリップ 17 グリップ 18 土砂排除爪 2 Steel sheet pile 5 Steel sheet pile 6 Grip 7 Grip 14 Inclined surface 15 Notch 16 Grip 17 Grip 18 Sediment removal claw
Claims (1)
のグリップの下端をその先端から上方に向かって斜めに
切欠いて土砂排除爪を形成し、かつ前記土砂排除爪の側
方の鋼矢板の先端に切欠部を形成した土砂排除爪を備え
た鋼矢板。1. A steel sheet pile having grips on both side edges is notched obliquely upward from the tip of one grip of the steel sheet pile to form an earth and sand removing claw, and a steel sheet pile on the side of the earth and sand removing claw is formed. A steel sheet pile with a sand removal claw with a notch at the tip.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4089192U JPH0594331U (en) | 1992-04-30 | 1992-04-30 | Steel sheet pile with sand removal claw |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4089192U JPH0594331U (en) | 1992-04-30 | 1992-04-30 | Steel sheet pile with sand removal claw |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0594331U true JPH0594331U (en) | 1993-12-24 |
Family
ID=12593140
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4089192U Pending JPH0594331U (en) | 1992-04-30 | 1992-04-30 | Steel sheet pile with sand removal claw |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0594331U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100975824B1 (en) * | 2008-05-16 | 2010-08-13 | 김영수 | Earthen board member |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4429465Y1 (en) * | 1965-05-15 | 1969-12-05 |
-
1992
- 1992-04-30 JP JP4089192U patent/JPH0594331U/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4429465Y1 (en) * | 1965-05-15 | 1969-12-05 |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100975824B1 (en) * | 2008-05-16 | 2010-08-13 | 김영수 | Earthen board member |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7555870B1 (en) | Stake impact and removal system | |
| US4773195A (en) | Method and apparatus for forming a sluiceway adjacent a wall and cement floor | |
| KR101863526B1 (en) | Drawing apparatus for H beam | |
| JP6997512B2 (en) | Dredging intake structure | |
| US10287747B1 (en) | Trench scoop bucket | |
| AU2019280036A1 (en) | Narrow Trencher Bucket | |
| JP2003064671A (en) | Steel pipe pile with tip blade | |
| JPH0745646Y2 (en) | Excavator bucket | |
| JPH0738295U (en) | Blade for construction of underground structures | |
| JPS597408Y2 (en) | Drilling plate for digging bucket | |
| JPH0226977Y2 (en) | ||
| JP3422974B2 (en) | Earth retaining plate | |
| JPS5835349Y2 (en) | Steel sheet pile removal metal fittings | |
| JPH02266025A (en) | Slope tapping method of embankment and soil receiving bucket for use of the method | |
| JPH0330438Y2 (en) | ||
| JP2575809Y2 (en) | Steel pipe sheet pile in the middle digging method | |
| US4156950A (en) | Culvert cleanout device | |
| JPH07510Y2 (en) | Plate removal equipment for civil engineering | |
| JPH06193066A (en) | Discharged earth removal method and device therefor in driving row of steel tube piles or the like for earth retaining wall | |
| JP3009414U (en) | Non-collapse steel sheet pile | |
| JP3021866U (en) | Gutter scoop | |
| JP4206962B2 (en) | Pipeliner lining plate | |
| JP3004749U (en) | Sheet pile | |
| JPH0516280Y2 (en) | ||
| JPH0458526B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 19950808 |