JPH0594447A - Production process scheduling table preparing device - Google Patents
Production process scheduling table preparing deviceInfo
- Publication number
- JPH0594447A JPH0594447A JP3253799A JP25379991A JPH0594447A JP H0594447 A JPH0594447 A JP H0594447A JP 3253799 A JP3253799 A JP 3253799A JP 25379991 A JP25379991 A JP 25379991A JP H0594447 A JPH0594447 A JP H0594447A
- Authority
- JP
- Japan
- Prior art keywords
- molds
- mold
- product
- unit
- molding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Moulds For Moulding Plastics Or The Like (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
Abstract
(57)【要約】
【目的】 複数台の成形機を有する成形ラインにおい
て、各作業時間帯の金型毎の使用可能個数を考慮した生
産工程計画表作成装置を提供する。
【構成】 金型の種類及びその種類毎の個数を同時使用
が可能な個数として格納する第2の格納部14と、生産
要求の優先順位に従って各製品を複数台の成形機の一つ
に割り付けて行く工程割付処理部22と、ある一定期間
の間に各成形機に割り付けられた製品を成形する金型を
その種類毎に分類するとともに、その分類された金型の
使用個数をその一定期間における金型の種類毎の実使用
個数として求める実使用個数算出部23と、この求めら
れた金型の種類毎の実使用個数と第2の格納部14に格
納された金型の種類毎の使用可能個数との比較を行い、
任意の金型の実使用個数が使用可能個数を越えていると
きには、製品の割り付け位置を変更する割付変更処理部
25とを備えた構成とする。
(57) [Summary] [Purpose] To provide a production process plan table preparation device in a molding line having a plurality of molding machines in consideration of the usable number of each mold in each working time zone. [Configuration] A second storage unit 14 that stores the types of molds and the number of each type as a number that can be used simultaneously, and each product is assigned to one of a plurality of molding machines according to the priority order of the production request. The process allocation processing unit 22 and the molds for molding the products allocated to each molding machine during a certain period of time are classified according to their types, and the number of the classified molds used is determined for a certain period of time. Of the actually used number for each type of die in the above-mentioned step, and the actually used number for each type of die thus obtained and for each type of die stored in the second storage section 14. Compare with the available number,
When the actually used number of arbitrary molds exceeds the usable number, the allocation change processing unit 25 for changing the allocation position of the product is provided.
Description
【0001】本発明は、それぞれ種類の異なる複数個の
製品が、それらの製品に対応する複数台の金型をそれぞ
れ装着した複数台の成形機によって同時平行的に生産さ
れる成形ラインに適用されるもので、より詳細には、あ
る作業時間帯における任意の金型の実使用個数が使用可
能個数を越えた場合には、その金型の実使用個数が使用
可能個数を越えないように制約回避を行うようにした生
産工程計画表作成装置に関する。The present invention is applied to a molding line in which a plurality of products of different kinds are simultaneously produced in parallel by a plurality of molding machines equipped with a plurality of molds corresponding to those products. More specifically, when the actual number of molds used in a given working time exceeds the usable number, the actual number of molds used must not exceed the usable number. The present invention relates to a production process plan table preparation device for avoidance.
【0002】[0002]
【従来の技術】近時、半導体技術の進歩によるコンピュ
ータ等の発達により、従来は人間の経験則に頼っていた
プラスチック成形プラントにおける成形工程の計画を、
コンピュータによって行うことができるようになってき
ている。2. Description of the Related Art Recently, due to the development of computers and the like due to the progress of semiconductor technology, the planning of the molding process in a plastic molding plant, which has conventionally relied on human experience,
It can be done by computer.
【0003】このような工程計画装置の一例として、例
えば特開昭56−162713号公報の対話型日程計画
装置がある。As an example of such a process planning device, there is, for example, an interactive schedule planning device disclosed in Japanese Patent Laid-Open No. 56-162713.
【0004】この対話型日程計画装置は、与えられた各
仕事の条件(作業量、着手可能日、納期日等)を入力
し、その条件下で作業量が平滑化するように個々の仕事
の日程を作成し、さらに操作者(オペレータ)の指示に
より該日程の修正を行って最終的な日程表を作成し、こ
の日程表を出力するようになっている。This interactive schedule planning device inputs the conditions of each given work (work amount, workable date, delivery date, etc.), and the work amount of each work is smoothed under the conditions. The schedule is created, and the schedule is corrected according to the instruction of the operator (operator) to create a final schedule, and the schedule is output.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、上記し
た従来の装置では、制約条件として納期のみが設定され
ており、製造過程において発生する制約条件(例えば、
各作業時間帯毎の原料供給装置の供給能力等)は全く考
慮されておらず、きめ細かな日程表を作成することがで
きないといった問題があった。However, in the above-mentioned conventional apparatus, only the delivery date is set as the constraint condition, and the constraint condition generated in the manufacturing process (for example,
There is a problem in that it is not possible to create a detailed itinerary, since the supply capacity of the raw material supply device for each work time period, etc. is not considered at all.
【0006】また、上記した従来の装置では、単一の成
形ラインでの日程を作成するものであり、複数の成形ラ
インにおいてそれぞれ種類の異なる複数個の製品が同時
平行的に生産される生産システムには適用できないとい
った問題もあった。Further, in the above-mentioned conventional apparatus, a schedule is created in a single molding line, and a production system in which a plurality of different kinds of products are simultaneously produced in parallel in a plurality of molding lines. There was also a problem that it could not be applied to.
【0007】本発明はかかる実情に鑑みてなされたもの
で、その目的は、マンマシンインターフェイスの向上と
ともに、納期といった販売サイドの制約条件だけでな
く、製造過程において発生する制約条件、特に各作業時
間帯毎の同一金型の使用可能個数を考慮した生産工程計
画表作成装置を提供することにある。The present invention has been made in view of the above circumstances, and its object is to improve not only the man-machine interface but also the constraints on the sales side such as the delivery date, as well as the constraints that occur in the manufacturing process, especially each work time. An object of the present invention is to provide a production process plan table preparation device in consideration of the usable number of the same molds for each band.
【0008】[0008]
【課題を解決するための手段】上記課題を解決するた
め、本発明の生産工程計画表作成装置は、それぞれ種類
の異なる複数個の製品が、それらの製品に対応する複数
台の金型をそれぞれ装着した複数台の成形機によって同
時平行的に生産される成形ラインにおいて、単位期間の
生産工程計画表の作成時、前記成形ラインに設置された
複数台の成形機のそれぞれに装着される金型の種類及び
その種類毎の個数を同時使用可能な個数として記憶する
記憶部と、予め決定された生産要求の優先順位に従って
各製品を前記複数台の成形機の一つに割り付けて行く工
程割付処理部と、ある一定期間の間に各成形機に割り付
けられた製品を成形する金型をその種類毎に分類すると
ともに、その分類された金型の使用個数をその一定期間
における金型の種類毎の実使用個数として求める実使用
個数算出部と、この実使用個数算出部によって求められ
た金型の種類毎の実使用個数と前記記憶部に記憶された
金型の種類毎の使用可能個数との比較を行い、任意の金
型の実使用個数が使用可能個数を越えているときには、
生産要求の優先順位に従って、その越えている金型によ
って生産される製品の割り付け位置を変更することによ
り、任意の金型の実使用個数が使用可能個数を越えない
ように制約回避を行う割付変更処理部とを備えた構成と
する。In order to solve the above-mentioned problems, the production process plan table creating apparatus of the present invention has a plurality of products of different types and a plurality of molds corresponding to the products. In a molding line that is simultaneously produced in parallel by a plurality of mounted molding machines, a mold to be mounted on each of the plurality of molding machines installed on the molding line when creating a production process plan table for a unit period. Type and the number of each type as a number that can be used at the same time, and a process allocation process of allocating each product to one of the plurality of molding machines in accordance with a predetermined priority of the production request Parts and the molds that mold the products assigned to each molding machine within a certain period of time are classified according to their types, and the number of the classified molds used is the type of mold during that certain period of time. The actual used quantity calculation unit for obtaining the actual used quantity of the mold, the actual used quantity for each mold type obtained by the actual used quantity calculation unit, and the usable number for each mold type stored in the storage unit. When the actual number of used molds exceeds the usable number,
By changing the allocation position of the products produced by the dies that exceed it according to the priority of the production request, the allocation change that avoids the constraint so that the actual number of dies used does not exceed the usable number. And a processing unit.
【0009】[0009]
【作用】1週間又は1か月等の単位期間の生産工程計画
表の作成時において、記憶部には、成形ラインに設置さ
れた複数台の成形機のそれぞれに装着される金型の種類
及びその種類毎の個数が同時使用可能個数として予め記
憶されている。When the production process schedule table for a unit period such as one week or one month is created, the storage unit stores the types of molds installed in each of the plurality of molding machines installed in the molding line and The number of each type is stored in advance as the number that can be used simultaneously.
【0010】工程割付処理部では、予め決定された生産
要求の優先順位に従って各製品を複数台の成形機の一つ
に順次割り付けて行く。In the process allocation processing section, each product is sequentially allocated to one of a plurality of molding machines in accordance with a predetermined priority order of production requirements.
【0011】ここで、生産要求の優先順位を決定する一
例として、例えば季節による販売動向の類似性に従って
分類した基準データに基づいて生産要求のあった各種製
品を分類するとともに、その分類した製品群の割り付け
順序(1,2,3・・・)を決定することによって行
う。割り付け順序(1,2,3・・・)とは、生産要求
の高い順番のことであって、順序(以下、優先度と言
う。)1が付された製品群はすぐに必要とする製品群、
優先度2が付された製品群は優先度1の製品群の製造後
すぐに必要とする製品群を示している。また、優先度n
が付された製品群は優先度n−1の製品群の製造後すぐ
に必要とする製品群を示している。Here, as an example of determining the priority order of the production demands, various products having production demands are categorized based on the reference data categorized according to the similarity of the sales trend depending on the season, and the categorized product group This is done by determining the allocation order (1, 2, 3 ...). The allocation order (1, 2, 3 ...) is the order in which the production demand is high, and the product group to which the order (hereinafter referred to as priority) 1 is added is a product that is immediately required. group,
The product groups to which the priority level 2 is attached indicate the product groups that are required immediately after the production of the priority level 1 product group. Also, the priority n
The product group to which is attached indicates the product group that is required immediately after the production of the product group of priority n-1.
【0012】実使用個数算出部では、工程割付処理部に
より上記のようにしてある一定期間(例えば、始業時の
午前9:00から終業時の午後5:00までの8時間)
の間に各成形機に割り付けられた製品を成形する金型を
その種類毎に分類するとともに、その分類された金型の
使用個数をその一定期間における金型の種類毎の実使用
個数として求める。In the actually used quantity calculation unit, the process allocation processing unit performs a certain period as described above (for example, 8 hours from 9:00 am at the start of work to 5:00 pm at the end of work).
Molds for molding the products allocated to each molding machine during are classified by type, and the number of classified molds used is determined as the actual number of molds used for each type within a certain period. ..
【0013】例えば、始業時から終業時までの間に製品
Aから製品Dまでが割り付けられており、製品Aは金型
1によって成形機1と成形機3で、製品Bは金型2によ
って成形機2で、製品Cは金型3によって成形機3で、
製品Dは金型1によって成形機1と成形機2でそれぞれ
成形される場合、この期間中に製品A及び製品Dを成形
する金型1の実使用個数は2個、製品Bを成形する金型
2の実使用個数は1個、製品Cを成形する金型3の実使
用個数は1個となる。For example, products A to D are allocated from the beginning of work to the end of work. The product A is molded by the mold 1 by the molding machine 1 and the molding machine 3, and the product B is molded by the mold 2. In the machine 2, the product C is formed by the mold 3 in the molding machine 3,
When the product D is molded by the molding machine 1 and the molding machine 2 respectively by the mold 1, the actual number of molds 1 used to mold the products A and D is 2 during this period, and the mold used to mold the product B. The actually used number of the mold 2 is one, and the actually used number of the mold 3 for molding the product C is one.
【0014】割付変更処理部では、この実使用個数算出
部によって求められた金型の種類毎の実使用個数と記憶
部に記憶された金型の種類毎の使用可能個数との比較を
行う。そして、その比較結果に基づき、例えば金型4の
実使用個数(例えば、2個)が使用可能個数(例えば、
1個)を越えているときには、生産要求の優先順位に従
って、その越えている金型4によって生産される製品E
の割り付け位置を変更することにより、金型4の実使用
個数が使用可能個数を越えないように制約回避を行う。The allocation change processing unit compares the actual use number for each mold type obtained by the actual use number calculating unit with the usable number for each mold type stored in the storage unit. Then, based on the comparison result, for example, the actual number of used molds 4 (for example, two) is usable (for example, two).
1), the product E produced by the surpassing mold 4 in accordance with the priority of the production request.
By changing the allocation position of, the constraint is avoided so that the actual number of molds 4 used does not exceed the usable number.
【0015】例えば、始業時から終業時までの一定期間
から、終業時である午後5:00から翌日の午前1:0
0までの次の一定期間に割り付け位置を変更する。これ
により、始業時から終業時までの一定期間における金型
4の実使用個数は1個となり、使用可能個数である1個
の範囲内となる。For example, from a fixed period from the start of work to the end of work, from 5:00 p.m. at the end of work to 1: 0 am the next day.
The allocation position is changed in the next fixed period until 0. As a result, the actual number of molds 4 used during the fixed period from the start of work to the end of work becomes one, which is within the range of one, which is the usable number.
【0016】[0016]
【実施例】以下、本発明の一実施例を図面を参照して説
明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.
【0017】図1は、本発明に係わる生産工程計画表作
成装置の電気的構成を示すブロック図である。FIG. 1 is a block diagram showing an electrical configuration of a production process plan table preparation apparatus according to the present invention.
【0018】同図において、本発明の生産工程計画表作
成装置は、大別すると画面操作用のパーソナルコンピュ
ータ10と、生産工程を自動立案するワークステーショ
ン20とで構成され、これらパーソナルコンピュータ1
0とワークステーション20とが、図示しない中継器を
介してLAN(LOCAL Area Network)で結ばれた構成と
なっている。In FIG. 1, the production process plan table preparation apparatus of the present invention is roughly divided into a personal computer 10 for screen operation and a workstation 20 for automatically planning a production process.
0 and the workstation 20 are connected by a LAN (LOCAL Area Network) via a repeater (not shown).
【0019】すなわち、単位期間(例えば、1週間等)
当たりの生産計画データを入力する生産計画データ入力
部(以下、単に入力部と言う。)11の出力は、パーソ
ナルコンピュータ10の各部の動作制御を行う主制御部
12に導かれており、主制御部12と外部データベース
である第1の格納部13及び第2の格納部14とは、そ
れぞれが双方向性の接続となっている。That is, a unit period (for example, one week)
The output of a production plan data input unit (hereinafter, simply referred to as an input unit) 11 for inputting the production plan data for each hit is led to a main control unit 12 that controls the operation of each unit of the personal computer 10, and the main control is performed. The unit 12 and the first storage unit 13 and the second storage unit 14, which are external databases, are bidirectionally connected.
【0020】第1の格納部13には、単位期間毎に日付
と曜日と作業時間帯と各成形ラインに設置された成形機
の番号との各項目が割り振りされたカレンダーデータが
格納されている。The first storage unit 13 stores calendar data in which items such as a date, a day of the week, a working time zone, and a number of a molding machine installed on each molding line are allocated for each unit period. ..
【0021】図2は、第1の格納部13に格納された単
位期間当たりのカレンダデータの一例を示している。同
図において、1直とは本実施例の場合午前9:00から
午後5:00までの作業時間帯のことであり、2直とは
午後5:00から翌日の午前1:00までの作業時間帯
のことであり、3直とは午前1:00からその日の午前
9:00までの作業時間帯のことである。また、本実施
例では3台の成形機1〜3が稼働している場合を示して
いる。FIG. 2 shows an example of calendar data per unit period stored in the first storage unit 13. In the figure, in the case of the present embodiment, 1 shift refers to a work time zone from 9:00 am to 5:00 pm, and 2 shifts refers to work from 5:00 pm to 1:00 am the next day. It refers to the time zone, and the third shift is the working time zone from 1:00 am to 9:00 am on that day. In addition, this embodiment shows a case where three molding machines 1 to 3 are in operation.
【0022】また、第2の格納部14には、図示しない
各金型の同時使用可能な個数を示すデータが格納されて
いる。The second storage unit 14 also stores data indicating the number of molds (not shown) that can be used simultaneously.
【0023】図3は、第2の格納部14に格納された各
金型の同時使用可能な個数データの一例を示している。
本実施例では、5種類の金型を製品に応じて使い分ける
ものとし、その使用可能個数を金型1は2個、金型2は
1個、金型3は2個、金型4は1個、金型5は1個とし
ている。FIG. 3 shows an example of simultaneously usable number data of the respective molds stored in the second storage section 14.
In the present embodiment, five types of dies are used according to the product, and the usable number of dies is two for die 1, one for die 2, two for die 3, and one for die 4. The number of dies and the number of dies 5 are one.
【0024】また、本装置によって作成された生産工程
計画表の修正を行う工程修正部15の出力は、主制御部
12に導かれており、作成した生産工程計画表を表示す
るCRT等を備えた表示部16と主制御部12とは双方
向性の接続となっている。Further, the output of the process correction section 15 for correcting the production process plan table created by this apparatus is led to the main control section 12 and provided with a CRT or the like for displaying the created production process plan table. The display unit 16 and the main control unit 12 are bidirectionally connected.
【0025】主制御部12は、工程修正部15からの修
正指示に基づき、表示部16に表示された生産工程計画
表の必要箇所の修正を行うようになっている。また、表
示部16に表示された生産工程計画表を示すデータの送
出を行う主制御部12の出力は、プリンタ17に導かれ
ており、該プリンタ17によって生産工程計画表がプリ
ントアウトされるようになっている。The main control unit 12 is adapted to modify the necessary parts of the production process plan table displayed on the display unit 16 based on the modification instruction from the process modification unit 15. Further, the output of the main control unit 12 which sends out the data showing the production process plan table displayed on the display unit 16 is led to the printer 17, so that the printer 17 prints out the production process plan table. It has become.
【0026】また、主制御部12とワークステーション
20の構成要素である制御部21とは、通信線31によ
って双方向性に接続されている。The main control unit 12 and the control unit 21 which is a constituent element of the workstation 20 are bidirectionally connected by a communication line 31.
【0027】制御部21は、ワークステーション20の
各部の動作制御を行うものであって、この制御部21と
工程割付処理部22、実使用個数算出部23及び割付変
更処理部25とはそれぞれが双方向性の接続となってい
る。また、制御部21は、外部データベースである第3
の格納部26及び第4の格納部27とそれぞれ双方向性
の接続となっている。The control unit 21 controls the operation of each unit of the workstation 20, and the control unit 21, the process allocation processing unit 22, the actual usage number calculation unit 23, and the allocation change processing unit 25 are respectively provided. It is a bidirectional connection. Further, the control unit 21 is a third database that is an external database.
The storage unit 26 and the fourth storage unit 27 are each bidirectionally connected.
【0028】第3の格納部26には、単位期間毎に日付
と曜日と作業時間帯との各項目が割り振りされるととも
に、各作業時間帯の領域には、その縦軸に各金型の種類
を示す項目が割り振られ、その横軸に各成形機での金型
の使用の有無を示す使用フラグと各金型の使用中個数と
の項目が割り振られたカレンダデータが格納されてい
る。In the third storage unit 26, the items of date, day of the week, and work time zone are allocated for each unit period, and the vertical axis of each work time zone region indicates the mold of each mold. Items indicating types are allocated, and the horizontal axis stores calendar data in which items such as a usage flag indicating whether or not a mold is used in each molding machine and the number of molds in use in each mold are allocated.
【0029】図4は、第3の格納部26に格納された単
位期間当たりのカレンダデータの一例を示している。本
実施例では、各作業時間帯の領域に、5種類の金型1〜
5と3種類の成形機1〜3とが割り振りされている。FIG. 4 shows an example of calendar data per unit period stored in the third storage section 26. In this embodiment, five types of molds 1 to 1 are provided in each work time zone area.
5 and 3 types of molding machines 1 to 3 are allocated.
【0030】工程割付処理部22は、入力部11から入
力された単位期間当たりの生産計画データを、第1の格
納部13から読み出した単位期間当たりのカレンダデー
タに割り付ける。The process allocation processing unit 22 allocates the production plan data per unit period input from the input unit 11 to the calendar data per unit period read from the first storage unit 13.
【0031】実使用個数算出部23は、工程割付処理部
22において割り付けたある作業時間帯(例えば2月1
日の1直)の間に各成形機1〜3に割り付けられた製品
A〜Eを成形する各金型1〜5をその種類毎に分類する
とともに、その分類された金型1〜5の使用個数をその
一定期間における金型1〜5の種類毎の実使用個数とし
て求め、これを第3の格納部26から読み出したカレン
ダデータの対応する箇所に記入する。The actually used quantity calculation unit 23 uses a certain work time zone (for example, February 1) assigned by the process assignment processing unit 22.
The molds 1 to 5 for molding the products A to E allocated to the molding machines 1 to 3 during the first shift of the day are classified according to their types, and the classified molds 1 to 5 are classified. The used number is obtained as the actual used number for each type of molds 1 to 5 in the fixed period, and this is entered in the corresponding portion of the calendar data read from the third storage unit 26.
【0032】割付変更処理部25は、実使用個数算出部
23によって求めた金型1〜5毎の実使用個数と第2の
格納部14に格納された金型1〜5毎の使用可能個数と
の比較を行う。そして、その比較結果に基づき、任意の
金型の実使用個数が使用可能個数を越えているときに
は、生産要求の優先順位に従って任意の製品の割り付け
位置を変更することにより、任意の金型の実使用個数が
使用可能個数を越えないように制約回避処理を行うよう
になっている。The allocation change processing unit 25 uses the actual use number for each mold 1 to 5 obtained by the actual use number calculating unit 23 and the usable number for each mold 1 to 5 stored in the second storage unit 14. Compare with. Then, based on the comparison result, when the actual number of molds used exceeds the number that can be used, the allocation position of any product is changed according to the priority order of the production request, so that the actual molds of any mold are changed. Constraint avoidance processing is performed so that the number of used pieces does not exceed the usable number.
【0033】このようにして回避処理が行われた生産工
程計画表を示すカレンダデータ(すなわち、工程割付処
理部22において割り付け処理が行われた図2に示すカ
レンダデータ及び実使用個数が記入された図4に示すカ
レンダデータ。)は、対応付けられて第4の格納部27
に格納されるようになっている。Calendar data showing the production process plan table thus avoided (in other words, the calendar data shown in FIG. 2 to which the allocation process is performed in the process allocation processing unit 22 and the actual number of pieces used are entered. The calendar data shown in FIG. 4 is associated with the fourth storage unit 27.
It is supposed to be stored in.
【0034】また、この生産工程計画表を示すカレンダ
データは、制御部21を介して表示部28に表示される
とともに、通信線31、主制御部12を介して表示部1
6の画面上に表示されるようになっている。The calendar data indicating the production process schedule is displayed on the display unit 28 via the control unit 21 and the display unit 1 via the communication line 31 and the main control unit 12.
6 is displayed on the screen.
【0035】なお、上記した入力部11や工程修正部1
5は、テンキー等を備えたキーボードやマウスによって
構成されている。The input unit 11 and the process correction unit 1 described above are used.
Reference numeral 5 is composed of a keyboard and a mouse provided with a numeric keypad and the like.
【0036】次に、上記構成の生産工程計画表作成装置
の動作を説明する。Next, the operation of the production process plan table preparation device having the above configuration will be described.
【0037】生産工程計画表を作成するに当たり、操作
者(オペレータ)は、まず入力部11を操作して、単位
期間(例えば、1週間)の生産計画データを入力する。In creating the production process plan table, the operator (operator) first operates the input unit 11 to input the production plan data for a unit period (for example, one week).
【0038】この生産計画データは、どの製品を、何
個、何時頃までに製造するかといった生産要求データ
と、各製品の1個当たりの製造時間や各成形ラインにお
ける各形成機1〜3の金型の段取り替え時間等の基礎デ
ータとに基づいて作成される。また、生産要求データ
は、一定の基準で分類されるとともに、各分類の生産割
り付け順序が決定されている。The production plan data includes production request data such as which product, how many, and by what time, the manufacturing time for each product, and the forming machines 1 to 3 of each molding line. It is created based on basic data such as die setup change time. Further, the production requirement data is classified according to a certain standard, and the production allocation order of each classification is determined.
【0039】ここで、一定の基準で分類するとは、例え
ば製品の使用目的の類似性を基準とした分類(例えば、
台所で使用する製品群、スポーツに使用する製品群
等。)季節による販売動向の類似性を基準とした分類
(例えば、春先によく売れる製品群、夏先によく売れる
製品群等。)等である。また、生産割り付け順序1,
2,3・・・とは、生産要求の高い順番のことであり、 順序1:すぐに欲しい。Here, to classify by a certain standard means, for example, classification based on the similarity of intended use of products (for example,
Products used in the kitchen, products used for sports, etc. ) Classification based on the similarity of sales trends according to seasons (for example, a product group that sells well in early spring, a product group that sells well in summer, etc.). Also, the production allocation order 1,
2, 3, ... means the order in which the production requirements are high, and order 1: I want it immediately.
【0040】順序2:順序1の後すぐに欲しい。Sequence 2: Want immediately after sequence 1.
【0041】順序3:順序2の後すぐに欲しい。Sequence 3: Want immediately after sequence 2.
【0042】 といった意味合いのことである。[0042] It means that.
【0043】このような基準で分類され、作成された生
産計画データは、主制御部12、通信線31及び制御部
21を介して工程割付処理部22に入力される。ここ
で、作成された生産計画データの生産順位を製品A、製
品B、製品C、製品D、製品E・・・とする。ここで、
製品A及び製品Dは金型1によって成形され、製品Bは
金型2によって成形され、製品Cは金型3によって成形
され、製品Eは金型4によって成形されるものとする。The production planning data that is classified and created according to such criteria is input to the process allocation processing unit 22 via the main control unit 12, the communication line 31, and the control unit 21. Here, the production order of the produced production plan data is assumed to be product A, product B, product C, product D, product E, .... here,
The products A and D are molded by the mold 1, the product B is molded by the mold 2, the product C is molded by the mold 3, and the product E is molded by the mold 4.
【0044】工程割付処理部22では、導かれた単位期
間当たりの生産計画データを、外部データベースである
第1の格納部13から読み出した単位期間当たりのカレ
ンダデータに割り付ける。カレンダデータへの割り付け
は、各作業時間帯毎(すなわち、各直毎)に行われる。The process allocation processing unit 22 allocates the derived production plan data per unit period to the calendar data per unit period read from the first storage unit 13 which is an external database. Allocation to calendar data is performed for each work time zone (that is, for each shift).
【0045】また、実使用個数算出部23では、工程割
付処理部22において一つの工程(製品)を割り付ける
たびに、各成形機1〜3に割り付けられた製品の金型毎
の使用個数を求めるとともに、この求めた金型毎の使用
個数をその作業時間帯における金型毎の実使用個数とし
て求め、これを第3の格納部26から読み出したカレン
ダデータの対応する箇所に記入するといった処理を行っ
ている。Further, in the actually used quantity calculating unit 23, every time one process (product) is allocated in the process allocation processing unit 22, the used quantity of the products allocated to the respective molding machines 1 to 3 is obtained for each mold. At the same time, the obtained number of dies used for each die is obtained as the actual number of dies used for each die during the working time period, and this is entered in the corresponding portion of the calendar data read from the third storage unit 26. Is going.
【0046】また、割付変更処理部25では、工程割付
処理部22において一つの工程(製品)を割り付けるた
びに、カレンダデータの使用中個数に記入された実使用
個数と第2の格納部14に格納された金型毎の使用可能
個数との比較を行い、必要があるときには制約回避処理
を行なうようになっている。Further, in the allocation change processing unit 25, every time one process (product) is allocated in the process allocation processing unit 22, the actual used number entered in the in-use number of the calendar data and the second storage unit 14 are stored. The number of molds stored is compared with the usable number, and the constraint avoidance process is performed when necessary.
【0047】以下、工程割付処理部22の動作、実使用
個数算出部23の動作及び割付変更処理部25の動作
を、図5乃至図10に示すある日のカレンダデータへの
割り付け状態を順次参照して説明する。ただし、図5乃
至図10に示すカレンダデータは2月1日の1直を示し
ている。Hereinafter, the operation of the process allocation processing unit 22, the operation of the actually used number calculation unit 23, and the operation of the allocation change processing unit 25 will be sequentially referred to the allocation state to the calendar data on a certain day shown in FIGS. 5 to 10. And explain. However, the calendar data shown in FIGS. 5 to 10 shows one shift on February 1.
【0048】すなわち、工程割付処理部22は、生産計
画データの最初の製品Aを成形機1に割り付ける。That is, the process allocation processing unit 22 allocates the first product A in the production plan data to the molding machine 1.
【0049】このとき、実使用個数算出部23では、製
品Aの金型が金型1であることから、成形機1の金型1
の使用フラグを調べることによってすでに金型1が成形
機1で使用中かどうかを調べる。この場合には使用中で
はないので、成形機1での金型1の使用フラグを「使用
中」にし、金型1の使用中個数を1増やす。この場合に
は使用中個数1となる。At this time, in the actually used quantity calculating unit 23, since the mold of the product A is the mold 1, the mold 1 of the molding machine 1 is
Whether the mold 1 is already in use by the molding machine 1 is checked by checking the use flag of. In this case, since it is not in use, the use flag of the mold 1 in the molding machine 1 is set to "in use", and the number of molds 1 in use is increased by 1. In this case, the number in use is 1.
【0050】割付変更処理部25では、図4に示すカレ
ンダデータの使用中個数欄に記入された使用中個数(こ
の場合には、図表中上から1、0、0、0、0となる)
と、第2の格納部14に格納された金型毎の使用可能個
数との比較を行う。この場合、第2の格納部14に格納
された金型毎の使用可能個数は、金型1が2個、金型2
が1個、金型3が2個、金型4が1個、金型5が1個と
なっており、符号44に示す使用中個数欄に記入された
金型毎の実使用個数は、対応する金型の使用可能個数を
いずれも下回っていることから、この場合には、制約回
避処理は行わない。In the allocation change processing unit 25, the number in use entered in the in-use number column of the calendar data shown in FIG. 4 (in this case, 1, 0, 0, 0, 0 from the top of the chart)
And the usable number of each mold stored in the second storage unit 14 are compared. In this case, the usable number of each mold stored in the second storage unit 14 is two molds 1 and two molds 2.
1 mold, 2 molds 3, 2 molds 4, 1 mold 5, and the actual number of molds used for each mold entered in the number-in-use column indicated by reference numeral 44 is In this case, the constraint avoidance process is not performed because the number of usable molds is lower than that of the corresponding molds.
【0051】次に、工程割付処理部22は、生産計画デ
ータの次の製品Bを成形機2に割り付ける。Next, the process allocation processing unit 22 allocates the product B next to the production plan data to the molding machine 2.
【0052】このとき、実使用個数算出部23では、製
品Bの金型が金型2であることから、成形機2の金型2
の使用フラグを調べることによってすでに金型2が成形
機2で使用中かどうかを調べる。この場合には使用中で
はないので、成形機2での金型2の使用フラグを「使用
中」にし、金型2の使用中個数を1増やす。この場合に
は使用中個数1となる。At this time, in the actually used quantity calculating unit 23, since the mold of the product B is the mold 2, the mold 2 of the molding machine 2 is
It is checked whether the mold 2 is already being used by the molding machine 2 by checking the usage flag of. In this case, since it is not in use, the use flag of the mold 2 in the molding machine 2 is set to "in use", and the number of molds 2 in use is increased by 1. In this case, the number in use is 1.
【0053】割付変更処理部25では、図4に示すカレ
ンダデータの使用中個数欄に記入された使用中個数(こ
の場合には、図表中上から1、1、0、0、0となる)
と、第2の格納部14に格納された金型毎の使用可能個
数との比較を行う。この場合、符号44に示す使用中個
数欄に記入された金型毎の実使用個数は、対応する金型
の使用可能個数をいずれも下回っていることから、この
場合には、制約回避処理は行わない。In the allocation change processing section 25, the number in use entered in the number in use column of the calendar data shown in FIG. 4 (in this case, 1, 1, 0, 0, 0 from the top of the chart)
And the usable number of each mold stored in the second storage unit 14 are compared. In this case, since the actual number of pieces used for each die entered in the in-use number column indicated by reference numeral 44 is less than the usable number of corresponding die, in this case, the constraint avoidance process is not performed. Not performed.
【0054】次に、工程割付処理部22は、生産計画デ
ータの次の製品Cを成形機3に割り付ける。Next, the process allocation processing unit 22 allocates the product C next to the production plan data to the molding machine 3.
【0055】このとき、実使用個数算出部23では、製
品Cの金型が金型3であることから、成形機3の金型3
の使用フラグを調べることによってすでに金型3が成形
機3で使用中かどうかを調べる。この場合には使用中で
はないので、成形機3での金型3の使用フラグを「使用
中」にし、金型3の使用中個数を1増やす。この場合に
は使用中個数1となる。また、上記した製品Aから製品
Cまでを割り付けたときのカレンダデータを図5に示
す。At this time, in the actually used quantity calculating unit 23, since the mold of the product C is the mold 3, the mold 3 of the molding machine 3 is used.
Whether the mold 3 is already in use by the molding machine 3 is checked by checking the use flag of. In this case, since it is not in use, the use flag of the mold 3 in the molding machine 3 is set to "in use", and the number of molds 3 in use is increased by 1. In this case, the number in use is 1. Further, FIG. 5 shows the calendar data when the products A to C are allocated.
【0056】割付変更処理部25では、符号44で示す
使用中個数欄に記入された使用中個数と、第2の格納部
14に格納された金型毎の使用可能個数との比較を行
う。この場合、符号44に示す使用中個数欄に記入され
た金型毎の実使用個数は、対応する金型の使用可能個数
をいずれも下回っていることから、この場合には、制約
回避処理は行わない。The allocation change processing unit 25 compares the in-use number entered in the in-use number column indicated by reference numeral 44 with the usable number for each die stored in the second storage unit 14. In this case, since the actual number of molds used for each mold entered in the in-use number column indicated by reference numeral 44 is lower than the usable number of corresponding molds, in this case, the constraint avoidance process is not performed. Not performed.
【0057】次に、工程割付処理部22は、生産計画デ
ータの製品Aを今度は成形機3に割り付ける。Next, the process allocation processing unit 22 allocates the product A of the production plan data to the molding machine 3 this time.
【0058】このとき、実使用個数算出部23では、製
品Aの金型が金型1であることから、成形機3の金型1
の使用フラグを調べることによってすでに金型1が成形
機3で使用中かどうかを調べる。この場合には使用中で
はないので、成形機3での金型1の使用フラグを「使用
中」にし、金型1の使用中個数を1増やす。この場合、
金型1の使用中個数は2となる。このときのカレンダデ
ータを図6に示す。At this time, in the actually used quantity calculating unit 23, since the mold of the product A is the mold 1, the mold 1 of the molding machine 3 is
Whether the mold 1 is already in use by the molding machine 3 is checked by checking the usage flag of. In this case, since it is not in use, the use flag of the mold 1 in the molding machine 3 is set to "in use", and the number of molds 1 in use is increased by 1. in this case,
The number of molds 1 in use is 2. The calendar data at this time is shown in FIG.
【0059】割付変更処理部25では、符号44に示す
使用中個数欄に記入された使用中個数(この場合には、
図表中上から2、1、1、0、0となる)と、第2の格
納部14に格納された金型毎の使用可能個数との比較を
行う。この場合、符号44に示す使用中個数欄に記入さ
れた金型毎の実使用個数は、対応する金型の使用可能個
数をいずれも下回っていることから、この場合には、制
約回避処理は行わない。In the allocation change processing section 25, the number of in-use items entered in the in-use number column indicated by reference numeral 44 (in this case,
(2, 1, 1, 0, 0 from the top in the figure) is compared with the usable number of each mold stored in the second storage section 14. In this case, since the actual number of molds used for each mold entered in the in-use number column indicated by reference numeral 44 is lower than the usable number of corresponding molds, in this case, the constraint avoidance process is not performed. Not performed.
【0060】次に、工程割付処理部22は、生産計画デ
ータの次の製品Dを成形機1に割り付ける。Next, the process allocation processing section 22 allocates the product D next to the production plan data to the molding machine 1.
【0061】このとき、実使用個数算出部23では、製
品Dの金型が金型1であることから、成形機1の金型1
の使用フラグを調べることによってすでに金型1が成形
機1で使用中かどうかを調べる。この場合には使用中で
あり、製品Dは金型1の使用可能個数を満足しているこ
とがわかる。従って、この場合には製品回避処理は行わ
れず、製品Dは成形機1に割り付けられる。このときの
カレンダデータを図7に示す。At this time, in the actually used quantity calculating unit 23, since the mold of the product D is the mold 1, the mold 1 of the molding machine 1 is
Whether the mold 1 is already in use by the molding machine 1 is checked by checking the use flag of. In this case, it can be seen that the product D is in use and the product D satisfies the usable number of molds 1. Therefore, in this case, the product avoidance process is not performed, and the product D is assigned to the molding machine 1. The calendar data at this time is shown in FIG.
【0062】以上までは、製品回避処理が不要な場合、
すなわち金型個数制約を満足する場合の製品の割り付け
処理である。Up to the above, if product avoidance processing is unnecessary,
In other words, this is a product allocation process when the number of molds constraint is satisfied.
【0063】次に、金型個数制約を満足せず、製品回避
処理が必要な場合の例を説明する。Next, an example of the case where the product avoidance process is necessary because the constraint on the number of molds is not satisfied will be described.
【0064】すなわち、工程割付処理部22は、図7に
示すように製品Dまでを割り付けた後、再び製品Dを成
形機2に割り付ける。That is, the process allocation processing section 22 allocates the products D up to the product D as shown in FIG. 7, and then allocates the products D to the molding machine 2 again.
【0065】このとき、実使用個数算出部23では、製
品Dの金型が金型1であることから、成形機2の金型1
の使用フラグを調べることによってすでに金型1が成形
機2で使用中かどうかを調べる。この場合には使用中で
はないので、成形機2での金型1の使用フラグを「使用
中」にし、金型1の使用中個数を1増やす。この場合、
金型1の使用中個数は3となる。このときのカレンダデ
ータを図8に示す。At this time, in the actually used quantity calculating unit 23, since the mold of the product D is the mold 1, the mold 1 of the molding machine 2 is
It is checked whether the mold 1 is already being used by the molding machine 2 by checking the usage flag of. In this case, since it is not in use, the use flag of the mold 1 in the molding machine 2 is set to "in use", and the number of molds 1 in use is increased by 1. in this case,
The number of molds 1 in use becomes three. The calendar data at this time is shown in FIG.
【0066】割付変更処理部25では、符号44に示す
使用中個数欄に記入された使用中個数(この場合には、
図表中上から3、1、1、0、0となる)と、第2の格
納部14に格納された金型毎の使用可能個数との比較を
行う。この場合、符号44に示す使用中個数欄に記入さ
れた金型毎の実使用個数のうち、金型1の実使用個数3
が使用可能個数2を越えていることから、この場合に
は、以下に示す3つのパターンの制約回避処理のうちい
ずれか1つを選択して行う。In the allocation change processing unit 25, the number in use (filled in this case) entered in the in-use number column indicated by reference numeral 44 (in this case,
(3, 1, 1, 0, 0 from the top in the figure) and the usable number of each mold stored in the second storage unit 14 are compared. In this case, among the actually used number of each die entered in the in-use number column indicated by reference numeral 44, the actually used number of the die 1 is 3
In this case, any one of the following three patterns of constraint avoidance processing is selected and performed.
【0067】すなわち、制約回避処理の1つ目のパター
ン1は、図9に示すように、成形機2に割り付けられた
製品Bの生産量を破線から実線まで増加する。その結
果、製品Dは、成形機2の2直の最初に割り付けられ、
1直における金型1の実使用個数は2となって、使用可
能個数と同じになる。この場合、同品種の製品Bで未割
り付けのものから増加分を差し引いておけば、製品B全
体としての生産増加にはつながらない。That is, in the first pattern 1 of the constraint avoidance processing, as shown in FIG. 9, the production amount of the product B allocated to the molding machine 2 is increased from the broken line to the solid line. As a result, the product D is assigned to the first of the two shifts of the molding machine 2,
The actual number of molds 1 that can be directly used is 2, which is the same as the number that can be used. In this case, if the increase is subtracted from the unallocated products B of the same type, the production of the entire product B will not increase.
【0068】また、制約回避処理の2つ目のパターン2
は図10に示すように、成形機2への製品Dの割り付け
を中止し、次の製品Eを形成機2に割り付ける。The second pattern 2 of the constraint avoidance process
As shown in FIG. 10, the allocation of the product D to the molding machine 2 is stopped and the next product E is allocated to the molding machine 2.
【0069】このとき、実使用個数算出部23では、製
品Eの金型が金型4であることから、成形機3の金型4
の使用フラグを調べることによってすでに金型4が成形
機2で使用中かどうかを調べる。この場合には使用中で
はないので、成形機2での金型4の使用フラグを「使用
中」にし、金型4の使用中個数を1増やす。この場合、
金型4の使用中個数は1となる。At this time, in the actually used quantity calculating unit 23, since the mold of the product E is the mold 4, the mold 4 of the molding machine 3 is
Whether the mold 4 is already being used by the molding machine 2 is checked by checking the use flag of. In this case, since it is not in use, the use flag of the mold 4 in the molding machine 2 is set to "in use", and the number of molds 4 in use is increased by 1. in this case,
The number of molds 4 in use becomes 1.
【0070】割付変更処理部25では、符号44に示す
使用中個数欄に記入された使用中個数(この場合には、
図表中上から2、1、1、1、0となる)と、第2の格
納部14に格納された金型毎の使用可能個数との比較を
行う。この場合、符号44に示す使用中個数欄に記入さ
れた金型毎の実使用個数は、対応する金型の使用可能個
数をいずれも下回っていることから、この場合には、制
約回避処理は行わないことになる。In the allocation change processing section 25, the number in use (filled in this case) entered in the in-use number column indicated by reference numeral 44 (in this case,
(2, 1, 1, 1, 0 from the top in the figure) is compared with the usable number of each mold stored in the second storage unit 14. In this case, since the actual number of molds used for each mold entered in the in-use number column indicated by reference numeral 44 is lower than the usable number of corresponding molds, in this case, the constraint avoidance process is not performed. I will not do it.
【0071】また、制約回避処理の3つ目のパターン3
は、上記したパターン1とパターン2とに予め優先順位
を付けておき、制約回避が必要となったときには、その
優先順位に従って制約回避処理を行うものである。The third pattern 3 of the constraint avoidance process
In the above, pattern 1 and pattern 2 are given priorities in advance, and when constraint avoidance is required, constraint avoidance processing is performed in accordance with the priority.
【0072】例えば、パターン2、パターン1の優先順
位である場合、上記したパターン2に従って成形機2で
成形する製品を、製品Dから製品Eに変更したにも係わ
らず、任意の金型の実使用個数が使用可能個数を越えた
場合には、その時点でパターン1の動作を解除して元の
状態に戻し、この後パターン1の動作に移行するように
すればよい。For example, in the case of the priorities of pattern 2 and pattern 1, even if the product to be molded by the molding machine 2 according to the pattern 2 is changed from the product D to the product E, the actual product of an arbitrary mold is obtained. If the number used exceeds the usable number, the operation of pattern 1 may be canceled at that point to return to the original state, and thereafter the operation of pattern 1 may be performed.
【0073】このような制約回避処理を必要に応じて行
いながら、単位期間当たりの生産計画データをカレンダ
データに順次割り付けて行くことによって、全成形ライ
ンの生産工程計画表を作成する。そして、全工程の割り
付けが終了した生産工程計画表は、第4の格納部27に
格納されるとともに、制御部21及び制御部12を介し
て表示部16に表示される。The production process plan table for all molding lines is created by sequentially allocating the production plan data per unit period to the calendar data while performing such constraint avoidance processing as necessary. Then, the production process plan table for which allocation of all processes has been completed is stored in the fourth storage unit 27 and displayed on the display unit 16 via the control unit 21 and the control unit 12.
【0074】この後、表示部16に表示された生産工程
計画表を見ながら、オペレータが必要であると判断した
ときには、工程修正部15の操作によって挿入、削除、
移動等の修正を行う。After that, when the operator judges that it is necessary while looking at the production process plan table displayed on the display unit 16, the process correction unit 15 is operated to insert, delete,
Make corrections such as movement.
【0075】このようにして修正された最終的な生産工
程計画表は、プリンタ17によってプリントアウトさ
れ、製造作業指示書として各製造作業者に渡されること
になる。The final production process plan table corrected in this way is printed out by the printer 17 and given to each manufacturing worker as a manufacturing work instruction.
【0076】なお、上記実施例では、一定期間を直単位
として説明しているが、これを短く(例えば、4時間単
位、2時間単位等。)することにより、例えば割り付け
可能であるのに割り付けないように回避処理をしてしま
うといった不具合が解消され、よりきめの細かい効率的
な生産工程計画表の作成が可能となる。In the above embodiment, the fixed period is explained as a direct unit, but by making it short (for example, every 4 hours, every 2 hours, etc.), for example, allocation is possible, but allocation is possible. The problem that the avoidance process is performed so as not to exist is solved, and it becomes possible to create a more detailed and efficient production process plan table.
【0077】[0077]
【発明の効果】本発明の生産工程計画表作成装置は、単
位期間当たりの工程計画表の作成時において、任意の金
型の実使用個数が使用可能個数を越えた場合には、生産
要求の優先順位に従って任意の製品の割り付け位置を変
更することにより、任意の金型の実使用個数が使用可能
個数を越えないように制約回避を行う構成としたので、
複数台の成形機を同時に使用する成形ラインの生産シス
テムに対してほとんど全ての場合に適用可能な生産工程
計画表作成装置を実現することができる。また、本生産
工程計画表作成装置により単位期間当たりの工程立案に
要する時間を大幅に短縮することができるとともに、生
産効率の良いきめの細かな工程計画データの作成が可能
となるといった効果を奏する。The production process plan table preparation apparatus of the present invention, when preparing the process plan table per unit period, if the actual number of used molds exceeds the usable number, the production request By changing the allocation position of any product according to the priority order, it is configured to avoid restrictions so that the actual number of molds used does not exceed the usable number.
It is possible to realize a production process plan table preparation apparatus applicable to almost all cases for a production system of a molding line that uses a plurality of molding machines at the same time. In addition, this production process plan table preparation device can significantly reduce the time required for process planning per unit period, and can produce fine process plan data with good production efficiency. ..
【図1】本発明の生産工程計画表作成装置の電気的構成
を示すブロック図である。FIG. 1 is a block diagram showing an electrical configuration of a production process plan table preparation device of the present invention.
【図2】第1の格納部に格納されたカレンダデータの一
例を示す図である。FIG. 2 is a diagram showing an example of calendar data stored in a first storage unit.
【図3】第2の格納部に格納されたに使用可能個数デー
タの一例を示す図である。FIG. 3 is a diagram showing an example of usable usable number data stored in a second storage unit.
【図4】第3の格納部26に格納された単位期間当たり
のカレンダデータの一例を示す図である。FIG. 4 is a diagram showing an example of calendar data per unit period stored in a third storage section 26.
【図5】ある日のカレンダデータへの割り付け状態の一
例を示す図である。FIG. 5 is a diagram showing an example of a state of allocation to calendar data on a certain day.
【図6】ある日のカレンダデータへの割り付け状態の一
例を示す図である。FIG. 6 is a diagram showing an example of a state of allocation to calendar data on a certain day.
【図7】ある日のカレンダデータへの割り付け状態の一
例を示す図である。FIG. 7 is a diagram showing an example of a state of allocation to calendar data on a certain day.
【図8】ある日のカレンダデータへの割り付け状態の一
例を示す図である。FIG. 8 is a diagram showing an example of a state of allocation to calendar data on a certain day.
【図9】ある日のカレンダデータへの割り付け状態の一
例を示す図である。FIG. 9 is a diagram showing an example of a state of allocation to calendar data on a certain day.
【図10】ある日のカレンダデータへの割り付け状態の
一例を示す図である。FIG. 10 is a diagram showing an example of a state of allocation to calendar data on a certain day.
10 パーソナルコンピュータ 11 入力部 12 主制御部 13 第1の格納部 15 工程修正部 14 第2の格納部 16 表示部 17 プリンタ 20 ワークステーション 21 制御部 22 工程割付処理部 23 実使用個数算出部 25 割付変更処理部(比較部を含む。) 26 第3の格納部 27 第4の格納部 28 表示部 10 personal computer 11 input unit 12 main control unit 13 first storage unit 15 process correction unit 14 second storage unit 16 display unit 17 printer 20 workstation 21 control unit 22 process allocation processing unit 23 actual usage number calculation unit 25 allocation Change processing unit (including comparison unit) 26 Third storage unit 27 Fourth storage unit 28 Display unit
Claims (1)
それらの製品に対応する複数台の金型をそれぞれ装着し
た複数台の成形機によって同時平行的に生産される成形
ラインにおいて、 単位期間の生産工程計画表の作成時、 前記成形ラインに設置された複数台の成形機のそれぞれ
に装着される金型の種類及びその種類毎の個数を同時使
用が可能な個数として記憶する記憶部と、 予め決定された生産要求の優先順位に従って各製品を前
記複数台の成形機の一つに割り付けて行く工程割付処理
部と、 ある一定期間の間に各成形機に割り付けられた製品を成
形する金型をその種類毎に分類するとともに、その分類
された金型の使用個数をその一定期間における金型の種
類毎の実使用個数として求める実使用個数算出部と、 この実使用個数算出部によって求められた金型の種類毎
の実使用個数と前記記憶部に記憶された金型の種類毎の
使用可能個数との比較を行い、任意の金型の実使用個数
が使用可能個数を越えているときには、生産要求の優先
順位に従って、その越えている金型によって生産される
製品の割り付け位置を変更することにより、任意の金型
の実使用個数が使用可能個数を越えないように制約回避
を行う割付変更処理部とを備えたことを特徴とする生産
工程計画表作成装置。1. A plurality of products of different types,
In a molding line that is simultaneously produced in parallel by a plurality of molding machines equipped with a plurality of molds corresponding to those products, it was installed on the molding line when the production process plan table for a unit period was created. A storage unit that stores the types of molds mounted on each of a plurality of molding machines and the number of each type as a number that can be used at the same time, and a plurality of each product according to the priority order of a predetermined production request. The process allocation unit that allocates to one of the molding machines on the stand and the molds that mold the products allocated to each molding machine within a certain period of time are classified according to their types, and the classified metal The actual used quantity calculation unit that obtains the number of used molds as the actual used quantity for each type of mold in the fixed period, and the actual used quantity for each mold type obtained by this actual used quantity calculation unit Compared with the usable number of each type of mold stored in the section, if the actual number of usable molds exceeds the usable number, according to the priority of the production request, the exceeded number of molds Production characterized by having an allocation change processing unit that avoids restrictions by changing the allocation position of the product produced by the mold so that the actual number of molds used does not exceed the usable number Process schedule table creation device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3253799A JPH0594447A (en) | 1991-10-01 | 1991-10-01 | Production process scheduling table preparing device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3253799A JPH0594447A (en) | 1991-10-01 | 1991-10-01 | Production process scheduling table preparing device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0594447A true JPH0594447A (en) | 1993-04-16 |
Family
ID=17256317
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3253799A Pending JPH0594447A (en) | 1991-10-01 | 1991-10-01 | Production process scheduling table preparing device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0594447A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6863768B2 (en) | 1999-11-08 | 2005-03-08 | Premark Rwp Holdings Inc. | Water resistant edge of laminate flooring |
| US20240190057A1 (en) * | 2022-12-12 | 2024-06-13 | Seiko Epson Corporation | Molding Management Device, Production Plan Generation Device, And Molding Machine Control Device |
-
1991
- 1991-10-01 JP JP3253799A patent/JPH0594447A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6863768B2 (en) | 1999-11-08 | 2005-03-08 | Premark Rwp Holdings Inc. | Water resistant edge of laminate flooring |
| US20240190057A1 (en) * | 2022-12-12 | 2024-06-13 | Seiko Epson Corporation | Molding Management Device, Production Plan Generation Device, And Molding Machine Control Device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2000028457A1 (en) | System and method for designing a mixed-model manufacturing process | |
| JPH0425350A (en) | Preparation device for schedule of production process | |
| JPH0594447A (en) | Production process scheduling table preparing device | |
| JP3391261B2 (en) | Production planning method and device | |
| JP2796409B2 (en) | Schedule management method and device | |
| JP2973691B2 (en) | NC turret punch press | |
| JP3106027B2 (en) | Production plan creation method | |
| JP2000079542A (en) | Production plan forming system | |
| JPH09260231A (en) | Production control system and its equipment | |
| JP2004046308A (en) | Process load control device and method, and program | |
| JP4648013B2 (en) | Production scheduling system | |
| JPH1097657A (en) | Work plan creation method and work plan creation device for distribution center | |
| JPH04346162A (en) | Production plan table generating device | |
| JP4232386B2 (en) | Production plan creation system and production plan creation method | |
| Drexl et al. | Assembly management in machine tool manufacturing and the PRISMA-Leitstand | |
| JP3003869B2 (en) | Electronic package manufacturing equipment | |
| JP2832318B2 (en) | Electronic package manufacturing equipment | |
| JP3853649B2 (en) | Production management support system, method, apparatus, and program | |
| JPH10244442A (en) | Large-scale production planning method | |
| JP4631500B2 (en) | In-process pattern creation method and apparatus | |
| JPH04171166A (en) | Preparation device for production process planning table | |
| JPH10335896A (en) | Electronic component mounting equipment | |
| JP4308554B2 (en) | PRODUCTION MANAGEMENT SUPPORT DEVICE, PRODUCTION MANAGEMENT SUPPORT COMPUTER PROGRAM, AND RECORDING MEDIUM CONTAINING THE COMPUTER PROGRAM | |
| JPH0721278A (en) | Production planning support device | |
| JPH11320343A (en) | Production planning method and device |