JPH0596155U - Hydraulic excavator work attachment - Google Patents

Hydraulic excavator work attachment

Info

Publication number
JPH0596155U
JPH0596155U JP4484292U JP4484292U JPH0596155U JP H0596155 U JPH0596155 U JP H0596155U JP 4484292 U JP4484292 U JP 4484292U JP 4484292 U JP4484292 U JP 4484292U JP H0596155 U JPH0596155 U JP H0596155U
Authority
JP
Japan
Prior art keywords
boom
work
pin hole
work attachment
attachment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4484292U
Other languages
Japanese (ja)
Inventor
諭 宮岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP4484292U priority Critical patent/JPH0596155U/en
Publication of JPH0596155U publication Critical patent/JPH0596155U/en
Pending legal-status Critical Current

Links

Landscapes

  • Shovels (AREA)

Abstract

(57)【要約】 [目的] 従来技術の油圧ショベルではブームの全長と
ベンド角度を変えることができないので、作業範囲の大
きな掘削作業を行うときには別個のロングアタッチメン
トを準備しておかなければならなかった。その費用は高
くて不経済であるとともに、大きな保管場所を要するの
で具合が悪かった。本考案は、上記の問題点を解決す
る。 [構成] 本考案の油圧ショベルの作業アタッチメント
では、所要の形状の中継ぎブームをリアブームとフロン
トブームとの間に介設することにより、ブームの長さと
ベンド角度を変えて、種々の作業内容に対応するように
した。あるいはまた、1個の中継ぎブームの基端部側及
び先端部側にそれぞれ複数個のピン穴を開穿し、その複
数個のピン穴のうち所要のピン穴を選択してピン結合す
るようにした。
(57) [Abstract] [Purpose] Since the boom length and bend angle cannot be changed with the conventional hydraulic excavator, a separate long attachment must be prepared when performing excavation work with a large working range. It was The cost is high, it is uneconomical, and it requires a large storage space, which is unsatisfactory. The present invention solves the above problems. [Structure] With the work attachment of the hydraulic excavator of the present invention, by installing the intermediate boom of the required shape between the rear boom and the front boom, the boom length and bend angle can be changed to accommodate various work contents. I decided to do it. Alternatively, a plurality of pin holes may be opened on each of the base end side and the tip end side of one relay boom, and a desired pin hole may be selected from among the plurality of pin holes so as to be pin-coupled. did.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、主としてバックホー油圧ショベルに装着している作業アタッチメン トに関する。 The present invention mainly relates to a work attachment mounted on a backhoe hydraulic excavator.

【0002】[0002]

【従来の技術】[Prior Art]

図5は、通常の一体形のブームをそなえた油圧ショベルの作業範囲を示す図で ある。図において、1は油圧ショベルの下部走行体、2は上部旋回体、3は上部 旋回体2のフロント部に装着した作業アタッチメント、4は作業アタッチメント 3の構成部材である通常の一体形のブーム、5はアーム、6はバケット、H1 は 作業アタッチメント3の最大掘削高さ、F1 は最大前方リーチ,D1 は最大掘削 深さである。図5に示す油圧ショベルでは、上部旋回体2のフロント部に作業ア タッチメント3を装着している。その作業アタッチメント3にはブーム4、アー ム5、バケット6が順次連結され、ブームシリンダ7、アームシリンダ8、バケ ットシリンダ9を伸縮作動させることにより、掘削作業を行うようにしている。 なお図6は、分割形のブームをそなえた油圧ショベルの側面図である。図におい て、図5における油圧ショベルと同一構成要素を使用しているものに対しては同 符号を付す。10は作業アタッチメント、11は分割形のブーム、12はブーム 11のリアブーム,13はフロントブーム、14,15はリアブーム(12)先 端部とフロントブーム(13)基端部をピン結合しているそれぞれ上側ピン,下 側ピンである。図6に示すように、掘削用ブーム製作上の都合によってはブーム を分割形に形成したものがある。 FIG. 5 is a diagram showing a working range of a hydraulic excavator having a normal integral boom. In the figure, 1 is a lower traveling structure of a hydraulic excavator, 2 is an upper revolving structure, 3 is a work attachment mounted on the front part of the upper revolving structure 2, 4 is a normal integrated boom which is a component of the work attachment 3, 5 is an arm, 6 is a bucket, H1 is the maximum excavation height of the work attachment 3, F1 is the maximum forward reach, and D1 is the maximum excavation depth. In the hydraulic excavator shown in FIG. 5, the work attachment 3 is attached to the front part of the upper swing body 2. A boom 4, an arm 5 and a bucket 6 are sequentially connected to the work attachment 3, and a boom cylinder 7, an arm cylinder 8 and a bucket cylinder 9 are extended / contracted to perform excavation work. FIG. 6 is a side view of a hydraulic excavator having a split boom. In the figure, parts that use the same components as the hydraulic excavator in FIG. 5 are given the same symbols. Reference numeral 10 is a work attachment, 11 is a split boom, 12 is a rear boom of the boom 11, 13 is a front boom, and 14 and 15 are pin joints of the rear boom (12) front end portion and the front boom (13) base end portion. The upper pin and the lower pin, respectively. As shown in FIG. 6, there are some booms that are formed in a divided shape depending on the circumstances of manufacturing the boom for excavation.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

従来技術の油圧ショベルでは、ブームの全長と側面視ベンド角度(図5に示す ブーム4のく字形の角度K0 )が変えられない。ところが油圧ショベルの作業内 容によっては、前方距離がF1 より遠くのところ、また高さがH1 より高いとこ ろ、また深さがD1 より深くなるような掘削が要求される。この場合に従来技術 では、作業アタッチメント3をロングアタッチメントに取付け替えしていた。図 7は、ロングアタッチメント16を装着した油圧ショベルの作業範囲を示す図で ある。図において、17は一体形のロングブーム、18はロングアーム、H2 は ロングアタッチメント16の最大掘削高さ(H2 は図5に示すH1 よりかなり大 である)、F2 は最大前方リーチ(F2 は図5に示すF1 よりかなり大である) 、D2 は最大掘削深さ(D2 は図5に示すD1 よりかなり大である)。上記のよ うに、作業範囲の大きな掘削作業を行うときには、別個にロングアタッチメント を準備しておかなければならなかったので、その費用が高くて不経済であるとと もに、大きな保管場所を要するので具合が悪かった。本考案は、上記の問題点を 解決することを目的とする。 In the conventional hydraulic excavator, the full length of the boom and the bend angle in side view (the angle K0 of the V-shaped boom 4 shown in FIG. 5) cannot be changed. However, depending on the work contents of the hydraulic excavator, excavation is required where the forward distance is farther than F1, the height is higher than H1, and the depth is deeper than D1. In this case, in the conventional technique, the work attachment 3 is replaced with the long attachment. FIG. 7 is a diagram showing a working range of the hydraulic excavator equipped with the long attachment 16. In the figure, 17 is an integrated long boom, 18 is a long arm, H2 is the maximum excavation height of the long attachment 16 (H2 is considerably larger than H1 shown in FIG. 5), F2 is the maximum forward reach (F2 is the figure). 5 is considerably larger than F1), D2 is the maximum excavation depth (D2 is considerably larger than D1 shown in FIG. 5). As mentioned above, when performing excavation work with a large working range, it was necessary to separately prepare a long attachment, which is expensive and uneconomical and requires a large storage space. So I was sick. The present invention aims to solve the above problems.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

本考案の作業アタッチメントでは、分割形のブームのリアブームとフロントブ ームとの間に作業内容に対応して中継ぎブームを介設し、ブームの長さと、ブー ムの側面視ベンド角度を調整するようにした。あるいはまた、リアブームとフロ ントブームとの間に取付ける中継ぎブームの基端部の上側ピン穴と下側ピン穴の うちのいずれか一方のピン穴の軸心を中心としかつ両ピン穴間のピッチ寸法を半 径とした円弧上の別のピン穴を開穿し、また上記中継ぎブームの先端部の上側ピ ン穴と下側ピン穴のうちのいずれか一方のピン穴の軸心を中心としかつ両ピン穴 間ピッチを半径とした円弧上に別のピン穴を開穿し、上記ピン穴のうちの所要の ピン穴を選択してピン結合することにより、ブームの側面視ベンド角度を調整す るようにした。 In the work attachment of the present invention, a relay boom is installed between the rear boom and the front boom of the split boom according to the work content, and the boom length and the side view bend angle of the boom are adjusted. I chose Alternatively, the pitch dimension between the center of the pin hole of one of the upper pin hole and the lower pin hole at the base end of the relay boom installed between the rear boom and the front boom and between both pin holes Open another pin hole on the arc with half the diameter, and center the shaft center of either the upper pin hole or the lower pin hole at the tip of the relay boom above and Adjust the boom bend angle in side view by opening another pin hole on an arc with the pitch between both pin holes as the radius, and selecting the required pin hole from the above pin holes and connecting the pins. It was to so.

【0005】[0005]

【実施例】【Example】

以下、本考案の実施例を図面に基づいて詳細に説明する。図1は、本考案請求 項1の第1実施例作業アタッチメント19を装着した油圧ショベルの側面図であ る。図において、従来技術と同一構成要素を使用しているものに対しては同符号 を付す。20は中継ぎブーム、21,22はリアブーム12先端部と中継ぎブー ム20基端部を結合している接続部の上側と下側のそれぞれピン、23,24は 中継ぎブーム20先端部とフロントブーム13基端部を結合している接続部の上 側と下側のそれぞれピンである。またPはピン21ー22、及び23ー24間の ピッチ寸法、l1 はピン21ー23間の距離、l’1 はピン22ー24間の距離 、L1 はブーム全長、K1 はブームのベンド角度である。この図1における作業 アタッチメント19では、略平行四辺形の中継ぎブーム20をリアブーム12と フロントブーム13との間に取付けた。それにより、この作業アタッチメント1 9は、従来技術の作業アタッチメント10(図6に示す)におけるリアブーム1 2を延長した状態となり、特に前方リーチを生かして広範囲の通常の掘削を行う ことができる。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a side view of a hydraulic excavator equipped with a work attachment 19 according to the first embodiment of the present invention. In the figure, the same reference numerals are given to those using the same constituent elements as those in the prior art. Reference numeral 20 is a relay boom, 21 and 22 are pins on the upper side and the lower side of the connecting portion that joins the front end of the rear boom 12 and the base end of the relay boom 20, respectively, and 23 and 24 are the front end of the relay boom 20 and the front boom 13. Pins on the upper side and lower side of the connecting part that joins the base ends. P is the pitch between pins 21-22 and 23-24, l1 is the distance between pins 21-23, l'1 is the distance between pins 22-24, L1 is the full boom length, and K1 is the bend angle of the boom. Is. In the work attachment 19 shown in FIG. 1, a relay boom 20 having a substantially parallelogram shape is attached between the rear boom 12 and the front boom 13. As a result, the work attachment 19 is in a state in which the rear boom 12 of the work attachment 10 of the related art (shown in FIG. 6) is extended, and it is possible to perform a wide range of ordinary excavation particularly by utilizing the front reach.

【0006】 次に図2は、本考案請求項1の第2実施例作業アタッチメント25を装着した 油圧ショベルの側面図である。図において、第1実施例作業アタッチメント19 と同一構成要素を使用しているものに対しては同符号を付す。26は中継ぎブー ムである。なお、l2 はピン21ー23間の距離、l’2 はピン22ー24間の 距離,L2 はブーム全長、K2 はブームのベンド角度である。この図2における 作業アタツチメント25では、略長方形の中継ぎブーム26をリアブーム12と フロントブーム13との間に取付けた。それによりこの作業アタッチメント25 では、リアブーム12先端部の接続部でく字形に曲り、その前部側が長尺となる ので、特に手前に深く掘削することができる。Next, FIG. 2 is a side view of a hydraulic excavator equipped with a work attachment 25 of a second embodiment of the present invention. In the figure, the same components as those of the work attachment 19 of the first embodiment are designated by the same reference numerals. 26 is a relay boom. In addition, l2 is the distance between the pins 21-23, l'2 is the distance between the pins 22-24, L2 is the full boom length, and K2 is the bend angle of the boom. In the work attachment 25 shown in FIG. 2, a substantially rectangular relay boom 26 is attached between the rear boom 12 and the front boom 13. As a result, in this work attachment 25, since the connecting portion at the tip of the rear boom 12 is bent in a V shape and the front side thereof becomes long, it is possible to dig particularly deeply in the front.

【0007】 次に図3は、本考案請求項1の第3実施例作業アタッチメント27を装着した 油圧ショベルの側面図である。図において、第1実施例作業アタッチメント19 と同一構成要素を使用しているものに対しては同符号を付す。28は中継ぎブー ムである。なお、l3 はピン21ー23間の距離,l3 はピン22ー24間の距 離,L3 はブーム全長、K3 はブームのベンド角度である。この図3における作 業アタッチメント27では、中継ぎブームを取付けることによりリアブーム12 とフロントブーム13が略一直線になるように、中継ぎブーム28を長方形の変 形四辺形に、形成した。したがってこの作業アタッチメント27のブームはロン グアームとなり、特に高いところの掘削を行うことができる。Next, FIG. 3 is a side view of a hydraulic excavator equipped with a work attachment 27 according to a third embodiment of the present invention. In the figure, the same components as those of the work attachment 19 of the first embodiment are designated by the same reference numerals. 28 is a relay boom. In addition, l3 is the distance between the pins 21-23, l3 is the distance between the pins 22-24, L3 is the full boom length, and K3 is the bend angle of the boom. In the work attachment 27 shown in FIG. 3, the relay boom 28 is formed in a rectangular modified quadrangle so that the rear boom 12 and the front boom 13 are substantially aligned by attaching the relay boom. Therefore, the boom of the work attachment 27 becomes a long arm, and excavation at a particularly high place can be performed.

【0008】 次に図4は、本考案請求項2の作業アタッチメントに使用する中継ぎブーム2 9の側面図である。図において、30は中継ぎブーム29基端部の上側ピン穴、 31,32はそれぞれ下側ピン穴、33は中継ぎブーム29先端部の上側ピン穴 、34,35はそれぞれ下側ピン穴である。次に、本考案請求項2の作業アタッ チメント(全体側面図としては図示していないが、順次図1,図2,図3を参照 して説明する)の構成を説明する。なお請求項1の作業アタッチメントと同一構 成要素を使用しているものは、同符号で使用する。本考案請求項2の作業アタッ チメントでは、リアブーム12とフロントブーム13との間に取付ける中継ぎブ ーム29基端部の上側ピン穴30のピン穴軸心を中心として半径Pなる円弧上に 複数個の下側ピン穴31,32を開穿し、またその中継ぎブーム29先端部の上 側ピン穴33のピン穴軸心を中心として半径Pなる円弧上に複数個の下側ピン穴 34,35を開穿し、上記ピン穴のうち所要のピン穴を選択してリアブーム12 先端部,フロントブーム13基端部に対しピン結合することにより、ブームの側 面視ベンド角度を調整するようにした。Next, FIG. 4 is a side view of a relay boom 29 used in the work attachment according to claim 2 of the present invention. In the figure, 30 is an upper pin hole at the base end of the intermediate boom 29, 31 and 32 are lower pin holes, 33 is an upper pin hole at the tip of the intermediate boom 29, and 34 and 35 are lower pin holes. Next, the construction of the work attachment according to claim 2 of the present invention (not shown as an overall side view, but will be sequentially described with reference to FIGS. 1, 2 and 3) will be described. The same components as those of the work attachment of claim 1 are used with the same reference numerals. In the work attachment according to claim 2 of the present invention, a plurality of arcs are formed on a circular arc having a radius P about the pin hole axis center of the upper pin hole 30 at the base end portion of the intermediate boom 29 installed between the rear boom 12 and the front boom 13. The lower pin holes 31, 32 are opened, and a plurality of lower pin holes 34, 34 are formed on an arc having a radius P about the pin hole axis of the upper pin hole 33 of the tip end of the intermediate boom 29. By opening a hole 35 and selecting a desired pin hole from the above-mentioned pin holes and connecting it to the distal end portion of the rear boom 12 and the proximal end portion of the front boom 13 by a pin, the bend angle of the boom in side view can be adjusted. did.

【0009】 次に、本考案請求項2の作業アタッチメントの作用について述べる。まず、中 継ぎブーム29を取付ける第1の場合について述べる。中継ぎブーム29基端部 のピン穴30及び31を選択して、リアブーム12先端部にピン21,22にて 枢着する。そして中継ぎブーム29先端部のピン穴33及び34を選択して、フ ロントブーム13後端部にピン23,24にて枢着する。この第1の場合の作業 アタッチメントの形状(ブームのベンド角度,全長を含む)は、図1に示す作業 アタッチメント19と略同じになる。したがってこの第1の場合の取付けを行う ことにより、図1に示す作業アタッチメント19と同様の機能を発揮することが できる。Next, the operation of the work attachment according to claim 2 of the present invention will be described. First, the first case of mounting the relay boom 29 will be described. Select the pin holes 30 and 31 at the base end of the intermediate boom 29, and pivotally attach the pins 21 and 22 to the end of the rear boom 12. Then, pin holes 33 and 34 at the tip of the intermediate boom 29 are selected, and the pins 23 and 24 are pivotally attached to the rear end of the front boom 13. The shape of the work attachment in the first case (including the bend angle and the entire length of the boom) is substantially the same as that of the work attachment 19 shown in FIG. Therefore, by performing the attachment in the first case, the same function as that of the work attachment 19 shown in FIG. 1 can be exhibited.

【0010】 次に、中継ぎブーム29を取付ける第2の場合について述べる。中継ぎブーム 29基端部のピン穴30及び32を選択して、リアブーム12先端部にピン21 ,22にて枢着する。そして中継ぎブーム29先端部のピン穴33及び35を選 択して、フロントブーム後端部にピン23,24にて枢着する。この第2の場合 の作業アタッチメントの形状は、図2に示す作業アタッチメント25と略同じに なる。したがってこの第2の場合の取付けを行うことにより、図2に示す作業ア タッチメント25と同様の機能を発揮することができる。Next, a second case of mounting the relay boom 29 will be described. Select the pin holes 30 and 32 at the base end of the intermediate boom 29, and pivotally attach the pins 21 and 22 to the front end of the rear boom 12. Then, select the pin holes 33 and 35 at the tip of the intermediate boom 29, and pivotally attach the pins 23 and 24 to the rear end of the front boom. The shape of the work attachment in the second case is substantially the same as that of the work attachment 25 shown in FIG. Therefore, by performing the attachment in the second case, it is possible to exhibit the same function as that of the work attachment 25 shown in FIG.

【0011】 次に、中継ぎブーム29を取付ける第3の場合について述べる。中継ぎブーム 29基端部のピン穴30及び31を選択して、リアブーム12先端部にピン21 ,22にて枢着する。しして中継ぎブーム29先端部のピン穴33及び35を選 択して、フロントブーム後端部にピン23,24にて枢着する。この第3の場合 の作業アタッチメントの形状は、図3に示す作業アタッチメント27と略同じに なる。したがってこの第3の場合の取付けを行うことにより、図3に示す作業ア アタッチメント27と同様の機能を発揮することができる。上記のように1個の 中継ぎブーム29に開穿されている複数個のピン穴のうち所要のピン穴を選択し てピン結合することにより、広範囲のしかも種々の作業内容に対応して作業アタ ッチメントの形状及び寸法を調整することができる。Next, a third case of mounting the relay boom 29 will be described. Intermediary boom 29 Select the pin holes 30 and 31 at the base end of the intermediate boom 29 and pivotally attach the pins 21 and 22 to the front end of the rear boom 12. Then, select the pin holes 33 and 35 at the tip of the intermediate boom 29, and pivotally attach the pins 23 and 24 to the rear end of the front boom. The shape of the work attachment in the third case is substantially the same as that of the work attachment 27 shown in FIG. Therefore, by performing the attachment in the third case, it is possible to exhibit the same function as that of the work attachment 27 shown in FIG. As described above, by selecting a desired pin hole from a plurality of pin holes opened in one relay boom 29 and connecting the pins, a work contact corresponding to a wide range and various work contents is performed. The shape and size of the instrument can be adjusted.

【0012】[0012]

【考案の効果】[Effect of the device]

従来技術の油圧ショベルではブームの全長とベンド角度を変えることができな いので、作業範囲の大きな掘削作業を行うときには別個にロングアタッチメント を準備しておかなければならなかった。その費用は高くて不経済であるとともに 、大きな保管場所を要するので具合が悪かった。しかし本考案の作業アタッチメ ントでは、分割形のブームのリアブームとフロントブームとの間に作業内容に対 応して中継ぎブームを介設し、ブームの長さと、ブームの側面視ベンド角度を調 整するようにした。あるいはまた、リアブームとフロントブームとの間に取付け る中継ぎブームの基端部の上側ピン穴と下側ピン穴のうちのいずれか一方のピン 穴の軸心を中心としかつ両ピン穴間のピッチ寸法を半径とした円弧上に別のピン 穴を開穿し、また上記中継ぎブームの先端部の上側ピン穴と下側ピン穴のうちい ずれか一方のピン穴の軸心を中心としかつ両ピン穴間ピッチを半径とした円弧上 に別のピン穴を開穿し、上記ピン穴のうち所要のピン穴を選択してピン結合する ことにより、ブームの側面視ベンド角度を調整するようにした。すなわち本考案 では、所要の形状の中継ぎブームをリアブームとフロントブームとの間に介設す ることにより、ブームの長さとベンド角度を変えて、種々の作業内容に対応する ことができる。あるいはまた、1個の中継ぎブームの基端部側及び先端部側にそ れぞれ複数個のピン穴を開穿し、その複数個のピン穴のうち所要のピン穴を選択 してピン結合することにより、広範囲のしかも種々の作業内容に対応して作業ア タッチメントの形状及び寸法を調整することができる。しかも中継ぎブームの製 作費はロングアタッチメントなどの製作費より非常に安く、保管場所も小さいの で、経済的である。 Since the boom length and bend angle cannot be changed with the conventional hydraulic excavator, a long attachment had to be prepared separately when performing excavation work with a large working range. The cost was high, it was uneconomical, and a large storage space was required, which was unsatisfactory. However, in the work attachment of the present invention, a relay boom is installed between the rear boom and the front boom of the split boom in response to the work content, and the boom length and side bend angle of the boom are adjusted. I decided to do it. Alternatively, the pitch between the upper and lower pin holes of the base end of the relay boom installed between the rear boom and the front boom is centered on the center of the pin hole and the pitch between the two pin holes. Drill another pin hole on a circular arc with the dimension as the radius, and center the shaft center of either the upper pin hole or the lower pin hole at the tip of the relay boom above or both Adjust the boom's side view bend angle by opening another pin hole on an arc with the pitch between the pin holes as the radius, and selecting the desired pin hole from the above pin holes and connecting the pins. did. That is, in the present invention, a relay boom and a front boom are provided between the rear boom and the front boom, so that the boom length and bend angle can be changed to accommodate various work contents. Alternatively, a plurality of pin holes are opened on the base end side and the tip end side of one relay boom, and the desired pin hole is selected from the plurality of pin holes to connect the pins. By doing so, the shape and size of the work attachment can be adjusted in a wide range and corresponding to various work contents. Moreover, the manufacturing cost of the relay boom is much cheaper than the manufacturing cost of long attachments, and the storage space is small, so it is economical.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案請求項1の第1実施例作業アタッチメン
トを装着した油圧ショベルの側面図である。
FIG. 1 is a side view of a hydraulic excavator equipped with a work attachment according to a first embodiment of the present invention.

【図2】本考案請求項1の第2実施例作業アタッチメン
トを装着した油圧ショベルの側面図である。
FIG. 2 is a side view of a hydraulic excavator equipped with a work attachment according to a second embodiment of the present invention.

【図3】本考案請求項1の第3実施例作業アタッチメン
トを装着した油圧ショベルの側面図である。
FIG. 3 is a side view of a hydraulic excavator equipped with a work attachment according to a third embodiment of the present invention.

【図4】本考案請求項2の作業アタッチメントに使用す
る中継ぎブームの側面図である。
FIG. 4 is a side view of a relay boom used in the work attachment according to claim 2 of the present invention.

【図5】従来技術のブームをそなえた油圧ショベルの作
業範囲を示す図である。
FIG. 5 is a diagram showing a working range of a hydraulic excavator having a boom according to the related art.

【図6】従来技術の分割形のブームをそなえた油圧ショ
ベルの側面図である。
FIG. 6 is a side view of a hydraulic excavator having a conventional split boom.

【図7】従来技術のロングアタッチメントを装着した油
圧ショベルの作業範囲を示す図である。
FIG. 7 is a diagram showing a working range of a hydraulic excavator equipped with a conventional long attachment.

【符号の説明】[Explanation of symbols]

2 上部旋回体 3,10,19,25,27 作業アタッチメント 4,11 ブーム 5 アーム 6 バケット 12 リアブーム 13 フロントブーム 20,26,28,29 中継ぎブーム 21,〜,24 ピン 30,〜,35 ピン穴 2 Upper revolving structure 3,10,19,25,27 Work attachment 4,11 Boom 5 Arm 6 Bucket 12 Rear boom 13 Front boom 20, 26, 28, 29 Intermediate boom 21, ~, 24 pin 30, ~, 35 pin hole

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 上部旋回体のフロント部にブーム,アー
ム、作業工具を順次連結して作業アタッチメントを構成
し、しかもブームをピン結合にて前後の分割形に形成し
ている作業アタッチメントであって、ブームのリアブー
ムとフロントブームとの間に作業内容に対応して中継ぎ
ブームを介設し、ブームの長さと、ブームの側面視ベン
ド角度を調整するようにしたことを特徴とする油圧ショ
ベルの作業アタッチメント。
1. A work attachment in which a boom, an arm, and a work tool are sequentially connected to a front portion of an upper swing body to form a work attachment, and the boom is formed into a front and rear divided shape by pin connection. The work of a hydraulic excavator characterized in that a relay boom is installed between the rear boom and the front boom of the boom according to the work content, and the boom length and the side view bend angle of the boom are adjusted. attachment.
【請求項2】 上部旋回体のフロント部にブーム、アー
ム、作業工具を順次連結して作業アタッチメントを構成
し、しかもブームをリアブーム、中継ぎブーム、フロン
トブームの分割形に形成し、それぞれ接続部を上側ピン
及び下側ピンにて結合するようにした作業アタッチメン
トであって、中継ぎブームの基端部の上側ピン穴と下側
ピン穴のうちいずれか一方のピン穴の軸心を中心としか
つ両ピン穴間のピッチ寸法を半径とした円弧上に別のピ
ン穴を開穿し、また上記中継ぎブームの先端部の上側ピ
ン穴と下側ピン穴のうちのいずれか一方のピン穴の軸心
を中心としかつ両ピン穴間ピッチを半径とした円弧上に
別のピン穴を開穿し、上記ピン穴のうち所要のピン穴を
選択してピン結合することにより、ブームの側面視ベン
ド角度を調整するようにしたことを特徴とする油圧ショ
ベルの作業アタッチメント。
2. A work attachment is formed by sequentially connecting a boom, an arm, and a work tool to a front part of an upper swing body, and further, the boom is formed in a divided form of a rear boom, a relay boom, and a front boom, and connecting parts are respectively formed. A work attachment that is connected by an upper pin and a lower pin, with the center of the shaft center of either the upper pin hole or the lower pin hole at the base end of the relay boom and both Open another pin hole on an arc whose radius is the pitch dimension between the pin holes, and set the axial center of either the upper pin hole or the lower pin hole at the tip of the relay boom above. Bend angle of the boom in side view by opening another pin hole on an arc centered at and the radius between both pin holes and selecting the required pin hole from the above pin holes I'll adjust A work attachment for a hydraulic excavator, which is characterized in that
JP4484292U 1992-06-03 1992-06-03 Hydraulic excavator work attachment Pending JPH0596155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4484292U JPH0596155U (en) 1992-06-03 1992-06-03 Hydraulic excavator work attachment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4484292U JPH0596155U (en) 1992-06-03 1992-06-03 Hydraulic excavator work attachment

Publications (1)

Publication Number Publication Date
JPH0596155U true JPH0596155U (en) 1993-12-27

Family

ID=12702732

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4484292U Pending JPH0596155U (en) 1992-06-03 1992-06-03 Hydraulic excavator work attachment

Country Status (1)

Country Link
JP (1) JPH0596155U (en)

Similar Documents

Publication Publication Date Title
US4728251A (en) Complete swivel type backhoe vehicle
JP3282895B2 (en) Hydraulic excavator with arm with built-in breaker
JPH0596155U (en) Hydraulic excavator work attachment
KR19990088296A (en) Arm with simplified attachment removable unit for construction equipment
JPH0324534B2 (en)
JPH0723047U (en) Work attachment adapter
JPH0596153U (en) Construction machine boom structure
JP2719885B2 (en) Bucket swing device
JPS61237722A (en) excavation work vehicle
WO1990003472A1 (en) Slewing and tilting device
JPH08165675A (en) Hydraulic excavator with built-in breaker arm
JPH025441U (en)
JP2529268Y2 (en) Connecting structure of iron fork and arm of earthworking machine
JP2025092771A (en) Excavator
JPH08177075A (en) Hydraulic excavator with built-in breaker arm
JPH0449259Y2 (en)
JP2003034945A (en) Offset boom tape construction machinery
JP2799370B2 (en) Excavator swivel bucket hand
JP3218744U (en) Crusher and work machine
JP3256927B2 (en) Offset boom connecting member
JP2504595Y2 (en) Cylinder cover mounting structure
JP3064964U (en) Construction equipment such as power shovels, tractor shovels, and backhoes
JPH0512362Y2 (en)
JPS5810763Y2 (en) excavation work vehicle
JPS5851252Y2 (en) Hydraulic cylinder mounting device for leveling hydraulic excavators