JPH06101271A - Method of joint construction of steel frame girder and joint structure - Google Patents

Method of joint construction of steel frame girder and joint structure

Info

Publication number
JPH06101271A
JPH06101271A JP27338592A JP27338592A JPH06101271A JP H06101271 A JPH06101271 A JP H06101271A JP 27338592 A JP27338592 A JP 27338592A JP 27338592 A JP27338592 A JP 27338592A JP H06101271 A JPH06101271 A JP H06101271A
Authority
JP
Japan
Prior art keywords
girder
dovetail
connecting arm
steel
web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP27338592A
Other languages
Japanese (ja)
Other versions
JP3099017B2 (en
Inventor
Katsuto Masuda
勝人 増田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP04273385A priority Critical patent/JP3099017B2/en
Publication of JPH06101271A publication Critical patent/JPH06101271A/en
Application granted granted Critical
Publication of JP3099017B2 publication Critical patent/JP3099017B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To simplify joining operation by forming a stepped section to the web of the joint of a girder consisting of H-steel and a dovetail tenon to a flange while sliding in a splice plate with a dovetail groove from the lateral direction and clamping the stationary plate of the stepped section by a bolt. CONSTITUTION:A stationary plate 11 with a bolthole is installed to a stepped section formed to the web 5 of the connecting section of an H-shaped steel coupling arm 1 mounted to a post 2 while dovetail tenons 4 are set up in the cross direction of flanges 3. The stationary plate 11 and the dovetail tenons 4 are also installed to a girder 8 in response to the coupling arm 1. The girder 8 is connected to the coupling arm 1, splice plates 13 having dovetail grooves 12 are slid in from the lateral direction, and the coupling arm 1 and the girder 8 are combined while the stationary plate 11 is clamped by a bolt 9. Accordingly, the joining operation of the girder 8 can be simplified.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、鉄骨構造または鉄筋
鉄骨構造等の建築物に使用される鉄骨梁を鉄骨柱に取付
ける場合の継手工法および継手構造に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint construction method and a joint structure for attaching a steel beam used in a building such as a steel frame structure or a reinforced steel frame structure to a steel frame column.

【0002】[0002]

【従来の技術】従来、鉄骨梁と鉄骨柱を連結するには、
図3に示すように鉄骨柱21の連結腕22の端部とこれ
に取付ける梁23のフランジ24およびウエブ25に多
数のボルト孔26をあけて置き、鉄骨建方時に接合部分
のフランジ24の上下面およびウエブ25の両側面に添
板27を当てて多数の高力ボルト28で締付けを行って
いた。
2. Description of the Related Art Conventionally, to connect a steel beam and a steel column,
As shown in FIG. 3, a large number of bolt holes 26 are bored in the ends of the connecting arms 22 of the steel frame columns 21 and the flanges 24 and webs 25 of the beams 23 attached to the connecting arms 22, and the bolts 26 are placed on the flanges 24 of the joints when constructing the steel frame. An attachment plate 27 was applied to the lower surface and both side surfaces of the web 25 and tightened with a large number of high-strength bolts 28.

【0003】[0003]

【発明が解決しようとする課題】前記従来の鉄骨梁の端
部にはボルト用の多数の孔を予めあけて置くので、その
ための加工を必要とし手間がかかり、建方時に行う高力
ホルト締めは1次、2次の2段階の締付けを行う必要が
あり高力ボルトの数が多いのでその作業に長時間を費や
し、雨天の時は高力ボルトの締付け作業が行えない等、
工期の短縮上好ましくない欠点があった。
Since a large number of holes for bolts are preliminarily placed at the end of the conventional steel frame beam, it is necessary to perform processing for that purpose, which is troublesome, and the high-strength holt tightening performed at the time of erection is required. Needs to perform two-stage tightening of the primary and secondary, and the number of high-strength bolts is large, so it takes a long time for the work, and in the case of rain, it is not possible to tighten the high-strength bolts.
There was an unfavorable drawback in shortening the construction period.

【0004】この発明はこれらの欠点を解消し、鉄骨梁
の接合作業をきわめて簡単な操作で短時間に行うことが
できる継手工法および継手構造を得ることを課題とする
ものである。
An object of the present invention is to solve these drawbacks and to obtain a joint construction method and a joint structure capable of performing a joining work of a steel frame beam by an extremely simple operation in a short time.

【0005】[0005]

【課題を解決するための手段】前記の課題を解決するた
めにこの発明は、H形鋼からなる連結腕と、これに連結
するH形鋼からなる大梁の各上下のフランジに突設した
蟻ほぞに、それぞれ蟻溝を有する添板を横方向から滑入
させた後、ウエブに固着した固定板をボルト締めするよ
うにした鉄骨梁の継手工法、およびH形鋼からなる連結
腕とH形鋼からなる大梁の各上下のフランジに突設した
蟻ほぞに、蟻溝を設けた添板を滑入させ、連結腕と大梁
の各ウエブに固着された固定板をボルト締めした鉄骨梁
の継手構造からなる手段を講じるものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention has a connecting arm made of H-shaped steel and a dovetail projecting from the upper and lower flanges of a girder made of H-shaped steel connected to the connecting arm. Steel bar beam joint construction method in which the fixing plate fixed to the web is bolted after sliding the side plates with dovetail grooves on the tenon from the lateral direction, and the connecting arm and H-shaped H-shaped steel. Steel beam girder joints made by sliding dowel plates with dovetail grooves into dovetails protruding from the upper and lower flanges of steel girders, and bolting fixing plates fixed to the connecting arm and girder webs. It is a measure that consists of a structure.

【0006】[0006]

【実施例】この発明の実施例について図面を参照して説
明する。図1において、1は柱2に取付けられた梁連結
用のH形鋼からなる連結腕であり、連結腕1の右端部は
そのやや内側の上下のフランジ3、3にフランジ3の幅
一杯に幅方向の上下の蟻ほぞ4、4が設けられ、上下の
フランジ3、3でその取付位置を異ならせてある。連結
腕1のウエブ5の右端はウエブ5の高さの1/2の位置
から垂直の切込み6が設けられ、その前方の下半部は突
出部7となっている。
Embodiments of the present invention will be described with reference to the drawings. In FIG. 1, reference numeral 1 is a connecting arm made of H-shaped steel for connecting beams which is attached to a pillar 2, and the right end portion of the connecting arm 1 is slightly inside the upper and lower flanges 3 and 3 to fill the width of the flange 3. Upper and lower dovetails 4 and 4 are provided in the width direction, and the mounting positions of the upper and lower flanges 3 and 3 are different. The right end of the web 5 of the connecting arm 1 is provided with a vertical cut 6 from a position half the height of the web 5, and a lower half portion in front thereof is a protrusion 7.

【0007】これに連結されるH形鋼からなる大梁8の
左端部は連結腕1と対称形をなしている。すなわち、上
下のフランジ3、3には左端部のやや内側に上下の位置
を異ならせて連結腕1と同様に蟻ほぞ4、4が設けられ
連結腕1の切込み6に対応してウエブ5に垂直な切込み
6が設けられ、左方の上半部は突出部7となっている。
連結腕1と大梁8のウエブ5における各切込み6、6の
前方の突出部7、7にはウエブ5、5の両側に取付け用
のボルト9のボルト孔10があけられた固定板11が固
着されている。また、これらとは別に連結腕1と大梁8
の端部を接合した時の蟻ほぞ4、4の位置に、両側の蟻
ほぞ4、4に嵌合する蟻溝12、12を設けた上下の添
板13、13が用意される。
The left end of the girder 8 made of H-shaped steel connected to this is symmetrical with the connecting arm 1. That is, the upper and lower flanges 3 and 3 are provided with dovetails 4 and 4 in the same way as the connecting arm 1 with the upper and lower positions slightly different from each other on the inner side of the left end, and the web 5 corresponds to the notch 6 of the connecting arm 1. A vertical notch 6 is provided, and the upper left half is a protrusion 7.
A fixing plate 11 having bolt holes 10 for mounting bolts 9 on both sides of the webs 5 and 5 is fixed to the projections 7 and 7 in front of the cuts 6 and 6 in the web 5 of the connecting arm 1 and the girder 8. Has been done. Separately from these, the connecting arm 1 and the girder 8
Upper and lower attachment plates 13 and 13 provided with dovetail grooves 12 and 12 that fit into the dovetails 4 and 4 on both sides at the positions of the dovetails 4 and 4 when the ends of the are joined.

【0008】柱2の連結腕1と大梁8とを連結するに
は、連結腕1のフランジ3と大梁8のフランジ3とが水
平方向に、ウエブ5、5が垂直方向に一致するように大
梁8をクレーン等によって近接させた後、上下のフラン
ジ3、3の蟻ほぞ4、4に上下の添板13、13の蟻溝
12、12を横方向から水平に滑り込ませ、上下の固定
板11、11のボルト孔10にボルト9をねじ込んで連
結腕1と大梁8のウエブ5、5が一直線状を保つことに
より添板13の蟻溝12がフランジ3の蟻ほぞ4から外
れることがないように固定するものである。
To connect the connecting arm 1 of the pillar 2 and the girder 8 to each other, the flange 3 of the connecting arm 1 and the flange 3 of the girder 8 are aligned horizontally and the webs 5 and 5 are aligned vertically. After bringing 8 closer by a crane or the like, the dovetail grooves 12 of the upper and lower attachment plates 13 and 13 are slid horizontally from the lateral direction into the dovetails 4 and 4 of the upper and lower flanges 3 and 3 to fix the upper and lower fixing plates 11. The bolts 9 are screwed into the bolt holes 10 of the connector 11 to keep the webs 5 and 5 of the connecting arm 1 and the girder 8 in a straight line so that the dovetail groove 12 of the attachment plate 13 does not come off from the dovetail 4 of the flange 3. It is fixed to.

【0009】[0009]

【発明の効果】請求項1の発明は、鉄骨建方時に鉄骨の
フランジに設けた蟻ほぞに添板を滑入させるという、き
わめて短時間の作業で鉄骨梁の接合作業の大部分を終わ
らせることができ、後は数本のボルトで固定板を固定す
るだけであるので、接合作業の操作がきわめて簡単であ
り、したがって雨天時でも作業が可能で、かつ作業を短
時間に行うことができ工期の短縮に頗る有効である。請
求項2の発明は、鉄骨のフランジに蟻ほぞを設け、これ
に蟻溝を有する添板を滑入させるという簡単な構造によ
って連結腕と大梁の強固な結合が得られ、固定板でウエ
ブを固定することによって添板が移動することのない確
実な継手構造が得られる。
According to the invention of claim 1, most of the joining work of the steel beam is completed in a very short time, that is, the attachment plate is slid into the dovetail provided on the flange of the steel frame when constructing the steel frame. Since the fixing plate can be fixed with only a few bolts after that, the operation of joining work is extremely easy and therefore work can be performed even in the rain, and the work can be done in a short time. It is very effective in shortening the construction period. According to the invention of claim 2, the dovetail tenon is provided on the flange of the steel frame, and the attachment arm having the dovetail groove is slid into the dowel to provide a strong connection between the connecting arm and the girder, and the fixing plate holds the web. By fixing, a reliable joint structure can be obtained in which the attachment plate does not move.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の1実施例を示すもので、図2(A)
のI−I線における1部を切断した正面図である。
FIG. 1 shows an embodiment of the present invention and is shown in FIG.
It is a front view which cut | disconnected one part in the II line of FIG.

【図2】(A)は平面図、(B)は図1のII−II線
における切断平面図である。
2A is a plan view, and FIG. 2B is a sectional plan view taken along line II-II in FIG.

【図3】従来例を示す正面図である。FIG. 3 is a front view showing a conventional example.

【符号の説明】[Explanation of symbols]

1 連結腕 3 フランジ 4 蟻ほぞ 5 ウエブ 8 大梁 9 ボルト 11 固定板 12 蟻溝 13 添板 1 connecting arm 3 flange 4 dovetail 5 web 8 girder 9 bolt 11 fixing plate 12 dovetail groove 13 attachment plate

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 H形鋼からなる連結腕(1)と、これに
連結するH形鋼からなる大梁(8)の各上下のフランジ
(3)に突設した蟻ほぞ(4)に、それぞれ蟻溝(1
2)を有する添板(13)を横方向から滑入させた後、
ウエブ(5)に固着した固定板(11)をボルト(9)
締めするようにした鉄骨梁の継手工法。
A connecting arm (1) made of H-shaped steel, and dovetails (4) projecting from the upper and lower flanges (3) of a girder (8) made of H-shaped steel connected to the connecting arm (1), respectively. Dovetail (1
After sliding the attachment plate (13) having 2) from the lateral direction,
Attach the fixing plate (11) fixed to the web (5) to the bolt (9).
Steel beam joint construction method so that it can be tightened.
【請求項2】 H形鋼からなる連結腕(1)とH形鋼か
らなる大梁(8)の各上下のフランジ(3)に突設した
蟻ほぞ(4)に、蟻溝(12)を設けた添板(13)を
滑入させ、連結腕(1)と大梁(8)の各ウエブ(5)
に固着された固定板(11)をボルト(9)締めした鉄
骨梁の継手構造。
2. A dovetail groove (12) is formed in a dovetail (4) projecting from upper and lower flanges (3) of a connecting arm (1) made of H-section steel and a girder (8) made of H-section steel. Sliding the attached plate (13) provided, each web (5) of the connecting arm (1) and girder (8).
A steel frame joint structure in which a fixing plate (11) fixed to a bolt is tightened with bolts (9).
JP04273385A 1992-09-18 1992-09-18 Joint method and joint structure of steel beam Expired - Fee Related JP3099017B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04273385A JP3099017B2 (en) 1992-09-18 1992-09-18 Joint method and joint structure of steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04273385A JP3099017B2 (en) 1992-09-18 1992-09-18 Joint method and joint structure of steel beam

Publications (2)

Publication Number Publication Date
JPH06101271A true JPH06101271A (en) 1994-04-12
JP3099017B2 JP3099017B2 (en) 2000-10-16

Family

ID=17527163

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04273385A Expired - Fee Related JP3099017B2 (en) 1992-09-18 1992-09-18 Joint method and joint structure of steel beam

Country Status (1)

Country Link
JP (1) JP3099017B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012127089A (en) * 2010-12-14 2012-07-05 Kurosawa Construction Co Ltd Composite structural beam using outer cable system tension steel material together
JP2017186794A (en) * 2016-04-06 2017-10-12 新日鐵住金株式会社 Cascade construction method and restraint member
WO2018030361A1 (en) * 2016-08-08 2018-02-15 新日鐵住金株式会社 Vertical joint structure of steel member
CN111945908A (en) * 2020-07-31 2020-11-17 徐州工业职业技术学院 High-heat-insulation heat-preservation plate and preparation method thereof
CN118305522A (en) * 2024-06-07 2024-07-09 湖南华韧钢结构工程有限公司 Integrated steel structure correcting and welding device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012127089A (en) * 2010-12-14 2012-07-05 Kurosawa Construction Co Ltd Composite structural beam using outer cable system tension steel material together
JP2017186794A (en) * 2016-04-06 2017-10-12 新日鐵住金株式会社 Cascade construction method and restraint member
WO2018030361A1 (en) * 2016-08-08 2018-02-15 新日鐵住金株式会社 Vertical joint structure of steel member
CN109477321A (en) * 2016-08-08 2019-03-15 新日铁住金株式会社 Longitudinal connection structure of steel components
JPWO2018030361A1 (en) * 2016-08-08 2019-03-28 新日鐵住金株式会社 Longitudinal structure of steel members
AU2017308325B2 (en) * 2016-08-08 2019-09-12 Nippon Steel Corporation Steel member vertical joint structure
CN111945908A (en) * 2020-07-31 2020-11-17 徐州工业职业技术学院 High-heat-insulation heat-preservation plate and preparation method thereof
CN118305522A (en) * 2024-06-07 2024-07-09 湖南华韧钢结构工程有限公司 Integrated steel structure correcting and welding device

Also Published As

Publication number Publication date
JP3099017B2 (en) 2000-10-16

Similar Documents

Publication Publication Date Title
JPH06101271A (en) Method of joint construction of steel frame girder and joint structure
JP2883262B2 (en) Jig for adjusting joints of steel columns
JPH03221636A (en) Beam connecting structure
JPH0444545A (en) Joint of column and beam and reinforcing metal
JPH10147980A (en) Beam joint structure
JPH09125515A (en) Column / beam joint structure
JP2000054487A (en) Joining method of steel beam
JPH09291593A (en) Column-beam joint hardware and column-beam joint structure using the same
JP2626854B2 (en) Column-column joint structure
JP3134125B2 (en) Column / beam joining equipment
JP2000027295A (en) How to join columns and beams in steel structures
JP3220663B2 (en) Framed equipment for wooden buildings
JPH03290565A (en) Beam construction method
JPH086881Y2 (en) Joiner for large and small beams
JPH04120801U (en) Connection structure between H-shaped column and H-shaped beam
JPH05339991A (en) Structure of beam connection
JP2537320Y2 (en) Connection structure of beam end to column
JP3134124B2 (en) Column / beam joining equipment
JPH0470449A (en) Mounting structure for angle rafter beam top part
JPH0849297A (en) Joint structure of columns and beams
JPH06248699A (en) Built-in method of structure in wooden building
JPH05331910A (en) How to join steel beams
JPS6286241A (en) Connection of pillar and beam
JPH0220324Y2 (en)
JPH04330130A (en) Column/beam joining device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees