JPH06101280A - Erection method - Google Patents

Erection method

Info

Publication number
JPH06101280A
JPH06101280A JP25160692A JP25160692A JPH06101280A JP H06101280 A JPH06101280 A JP H06101280A JP 25160692 A JP25160692 A JP 25160692A JP 25160692 A JP25160692 A JP 25160692A JP H06101280 A JPH06101280 A JP H06101280A
Authority
JP
Japan
Prior art keywords
unloading device
building
concrete foundation
roof portion
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP25160692A
Other languages
Japanese (ja)
Inventor
Hiroyuki Araki
弘之 荒木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP25160692A priority Critical patent/JPH06101280A/en
Publication of JPH06101280A publication Critical patent/JPH06101280A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

(57)【要約】 【目的】コンクリート基礎上で屋根部を組み上げ、この
部分を揚荷装置で押し上げた後、その空間に壁軸組や外
壁材などを組み付ける建方工法に関する。 【構成】コンクリート基礎1上に載置した小屋梁2の上
で屋根部A1を組み上げた後、この屋根部A1を揚荷装
置100を用いて所定の位置まで持ち上げ、この屋根部
A1と床梁3あるいはコンクリート基礎1との間に壁軸
組、外壁材、外装材などを組み付ける建方工法である。
(57) [Abstract] [Purpose] A erection method in which a roof part is assembled on a concrete foundation, this part is pushed up by a unloading device, and then a wall frame or outer wall material is assembled in the space. [Structure] After the roof portion A1 is assembled on the hut beam 2 placed on the concrete foundation 1, the roof portion A1 is lifted to a predetermined position by using the unloading device 100, and the roof portion A1 and the floor beam are 3 or a concrete foundation 1 is a erection method in which a wall frame, outer wall material, exterior material, etc. are assembled.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、コンクリート基礎上で
屋根部を組み上げ、この部分を揚荷装置で押し上げた
後、その空間に壁軸組や外壁材などを組み付ける建方工
法である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is a erection method in which a roof portion is assembled on a concrete foundation, this portion is pushed up by a unloading device, and then a wall shaft assembly, an outer wall material and the like are assembled in the space.

【0002】[0002]

【従来の技術】プレハブ住宅などの施工方法として、例
えばトラッククレーンで建築資材を吊り上げながら建屋
を組み立てる工法が知られている。
2. Description of the Related Art As a construction method of a prefabricated house, for example, a construction method is known in which a building is assembled while hoisting building materials with a truck crane.

【0003】[0003]

【発明が解決しようとする課題】ところが、住宅密集地
や進入道路が狭い場所で工事を行う場合、トラッククレ
ーンが使えないことがあった。
However, when construction is carried out in a residential dense area or in a place where the approach road is narrow, there are cases where the truck crane cannot be used.

【0004】[0004]

【課題を解決するための手段】本発明建方工法は、コン
クリート基礎上に載置した小屋梁の上で屋根部を仕上
げ、この仕上げた屋根部を外周基礎内に配した揚荷装置
を用いて所定の位置に持ち上げ、屋根部とコンクリート
基礎との間に壁軸組や外壁材などを組み付けるものであ
る。
The erection method of the present invention uses a unloading device in which a roof part is finished on a shed beam placed on a concrete foundation and the finished roof part is arranged in an outer peripheral foundation. Are lifted to a predetermined position, and a wall shaft assembly, an outer wall material, and the like are assembled between the roof portion and the concrete foundation.

【0005】また、コンクリート基礎上に床梁と小屋梁
を下から順に載置しておき、このようにコンクリート基
礎上に載置した小屋梁の上で屋根部を仕上げ、この仕上
げた屋根部を外周基礎内に配した揚荷装置を用いて所定
の位置に持ち上げ、屋根部と床梁との間に壁軸組、外壁
材、外装材などを組み付けて建屋上部を形成し、この建
屋上部を再び外周基礎内に配した揚荷装置を用いて所定
の位置に持ち上げ、床梁とコンクリート基礎との間に壁
軸組や外壁材などを組み付けるものである。
Further, a floor beam and a shed beam are placed in order from the bottom on a concrete foundation, and the roof portion is finished on the shed beam placed on the concrete foundation in this way, and the finished roof portion is Lift to a predetermined position using the unloading device arranged in the outer peripheral foundation, form a building upper part by assembling a wall shaft assembly, outer wall material, exterior material, etc. between the roof part and floor beam, and form this building upper part. The hoisting device is again placed in the outer peripheral foundation to lift it to a predetermined position, and the wall shaft assembly and the outer wall material are assembled between the floor beam and the concrete foundation.

【0006】[0006]

【作用】コンクリート基礎上で屋根部を組み上げた後、
この屋根部を外周基礎内に配した揚荷装置で所定の位置
まで持ち上げ、この屋根部と床梁あるいはコンクリート
基礎との間に壁軸組、外壁材、外装材を組み付ける建方
工法である。
[Operation] After assembling the roof on the concrete foundation,
This is a erection method in which the roof is lifted to a predetermined position by an unloading device arranged in the outer peripheral foundation, and a wall shaft assembly, an outer wall material and an exterior material are assembled between the roof portion and the floor beam or the concrete foundation.

【0007】この建方工法によると、高所作業を全く必
要としないので安全に建屋の構築ができる。
According to this erection method, it is possible to construct a building safely because it does not require work at high places.

【0008】足場設備などを必要としないので、建築費
を削減できる。
Since no scaffolding equipment is required, the construction cost can be reduced.

【0009】また、揚荷装置を外周基礎内に配している
から、周りが囲まれた狭小地での建築が容易に可能とな
るとともに、建築中であっても建屋周囲の例えば配管工
事などを並行しておこなうことができる。
Further, since the unloading device is arranged in the outer peripheral foundation, it is possible to easily construct a building in a narrow space surrounded by the unloading device, and even during construction, for example, piping work around the building. Can be performed in parallel.

【0010】[0010]

【実施例】図面は本発明に係る建方工法の一実施例を示
すものである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The drawings show an embodiment of the construction method according to the present invention.

【0011】コンクリート基礎1の上にスペーサである
仮設材4を介して2階の床梁3を載置し、この床梁3の
上にさらにスペーサである仮設材4を介して小屋梁2を
載置している(図2参照)。
A floor beam 3 on the second floor is placed on a concrete foundation 1 through a temporary material 4 which is a spacer, and a shed beam 2 is further mounted on the floor beam 3 through a temporary material 4 which is a spacer. It is placed (see Fig. 2).

【0012】屋根部A1を組み立てるとき、あるいは仕
上げた屋根部A1を上昇させるとき、小屋梁2だけでは
強度に問題があれば補強梁を用いる。小屋梁2に代えて
仮設の補強張を用いることもある。この場合、補強梁は
仕上げた屋根部A1を所定の高さに持ち上げ、屋根部A
1と床梁3との間に壁軸組を組み付けた後、この補強梁
を取り外す。
When the roof portion A1 is assembled or the finished roof portion A1 is raised, if there is a problem with the strength of the shed beam 2 alone, a reinforcing beam is used. Temporary reinforcement tension may be used instead of the shed beam 2. In this case, the reinforcing beam lifts the finished roof part A1 to a predetermined height,
After assembling the wall framing between 1 and the floor beam 3, this reinforcing beam is removed.

【0013】仮設材4、床梁3、補強梁もしくは小屋梁
2はH形鋼で形成したもので、1個の高さが約200mm
である。21は梁つなぎである。
The temporary member 4, the floor beam 3, the reinforcing beam or the hut beam 2 are made of H-shaped steel, and each one has a height of about 200 mm.
Is. 21 is a beam connection.

【0014】なお、コンクリート基礎1と床梁3との
間、あるいは床梁3と補強梁もしくは小屋梁2との間に
用いた仮設材4は必須の構成部材ではない。
The temporary member 4 used between the concrete foundation 1 and the floor beam 3 or between the floor beam 3 and the reinforcing beam or the shed beam 2 is not an essential component.

【0015】補強梁もしくは小屋梁2は、地上約100
0mm〜1500mmくらいの所に載置している。この状態
で、補強梁もしくは小屋梁2の少なくとも4ケ所を外周
基礎11内に配した揚荷装置100で支持している(図
1および図2参照)。
Reinforcing beams or hut beams 2 are about 100 above the ground.
It is placed in the place of 0mm-1500mm. In this state, at least four places of the reinforcing beam or the hut beam 2 are supported by the unloading device 100 arranged in the outer peripheral foundation 11 (see FIGS. 1 and 2).

【0016】本発明に係る建方工法は、上物である屋根
部A1から順にコンクリート基礎1の上で組み立て、仕
上げたものを順次外周基礎11内に配した揚荷装置10
0を用いて上昇させて建屋を築くことに特徴がある。
According to the erection method of the present invention, the unloading device 10 is constructed by sequentially assembling the finished roof part A1 on the concrete foundation 1 and finishing it, and arranging the finished products in the outer peripheral foundation 11.
It is characterized by using 0 to raise it to build a building.

【0017】揚荷装置100は、多段伸縮式がよく油圧
力と機械力のいずれを用いるものであってもよい。10
1は揚荷装置100のベースである。
The unloading device 100 is preferably a multi-stage telescopic type and may use either hydraulic pressure or mechanical force. 10
Reference numeral 1 is a base of the unloading device 100.

【0018】このように揚荷装置100で支持した補強
梁もしくは小屋梁2の上に屋根部A1を組み立てる。揚
荷装置100で補強梁もしくは小屋梁2を支持している
ことにより、屋根部A1を組み付けるとき補強梁もしく
は小屋梁2のたわみが防止される。
The roof portion A1 is assembled on the reinforcing beam or the shed beam 2 thus supported by the unloading device 100. By supporting the reinforcing beam or the hut beam 2 with the unloading device 100, the bending of the reinforcing beam or the hut beam 2 when the roof portion A1 is assembled is prevented.

【0019】屋根部A1の構成は、例えば補強梁もしく
は小屋梁2の上にトラス23を立て、トラス23の上に
配設した登り梁24の上に野地板や屋根材25を葺いて
いる。
As for the structure of the roof portion A1, for example, a truss 23 is erected on the reinforcing beam or the hut beam 2, and a climbing beam 24 arranged on the truss 23 is covered with a field plate and a roofing material 25.

【0020】図1および図2に示す実施例では補強梁を
用いている。この補強梁は、仕上げた屋根部A1を所定
の高さに持ち上げ、屋根部A1と床梁3との間に壁軸組
などを組み付けた後、取り外すのである。しかし、この
ような取り外し作業をなくすため、強度の高い小屋梁2
を用い、はめ殺しにしてもよい。
In the embodiment shown in FIGS. 1 and 2, a reinforcing beam is used. The reinforcing beam is obtained by lifting the finished roof part A1 to a predetermined height, and assembling a wall shaft assembly or the like between the roof part A1 and the floor beam 3 and then removing it. However, in order to eliminate this kind of removal work, the shed beam 2 with high strength
May be used to kill.

【0021】屋根部A1をコンクリート基礎1の上で組
み立てた後、揚荷装置100を用いてこの仕上げた屋根
部A1を所定の高さに上昇させる(図3参照)。
After assembling the roof part A1 on the concrete foundation 1, the finished roof part A1 is raised to a predetermined height by using the unloading device 100 (see FIG. 3).

【0022】この状態で小屋梁2と床梁3との間に建屋
上部A2(2階部分)の壁軸組や外壁材50、バルコニ
ー51、窓枠サッシ52などの外装材の組み付けを行
う。
In this state, a wall shaft assembly of the building upper part A2 (second floor portion) and exterior materials such as the outer wall material 50, the balcony 51, and the window frame sash 52 are assembled between the shed beam 2 and the floor beam 3.

【0023】建屋上部A2の組み付け施工が終了する
と、支持していた揚荷装置100を一旦取り外す。補強
梁も取り外す。
When the assembling work of the building upper part A2 is completed, the unloading device 100 which has been supported is once removed. Also remove the reinforcement beams.

【0024】次に、揚荷装置100が床梁3を下方から
支持するようにセットする。このとき、建屋上部A2を
上昇させる強度に床梁3だけでは問題があれば、再び補
強梁を床梁3の下に配すればよい。そして、この補強梁
を介して揚荷装置100をセットし、建屋上部A2を持
ち上げる。
Next, the unloading device 100 is set so as to support the floor beam 3 from below. At this time, if there is a problem with the strength of raising the building upper part A2 only with the floor beam 3, the reinforcing beam may be arranged below the floor beam 3 again. Then, the unloading device 100 is set via this reinforcing beam, and the building upper part A2 is lifted.

【0025】揚荷装置100を用いて建屋上部A2を所
定の高さまで持ち上げた後、床梁3とコンクリート基礎
1との間に建屋下部A3(1階部分)の壁軸組や外壁材
60、窓枠サッシ61などを組み付け施工して建屋A4
を完成させる。
After the building upper part A2 is lifted up to a predetermined height by using the unloading device 100, the wall framing of the building lower part A3 (first floor portion) and the outer wall material 60 are provided between the floor beam 3 and the concrete foundation 1. Building A4 by installing window frame sash 61 etc.
To complete.

【0026】ここに示した実施例は2階のある建屋A4
の建方工法であるが、2階以上の建屋の建方にもこの工
法が適用できること言うまでもない。
The embodiment shown here is a building A2 with a second floor.
However, it goes without saying that this construction method can be applied to the construction of a building with two or more floors.

【0027】また、平屋の建築にも本発明の建方工法が
適用できる。この建方は図3と図4に示す工法のみでよ
い。
Further, the erection method of the present invention can be applied to a one-story building. This erection only requires the construction method shown in FIGS. 3 and 4.

【0028】[0028]

【発明の効果】この建方工法によると、高所作業を全く
必要としないので、安全に建屋の構築ができる。
EFFECTS OF THE INVENTION According to this erection method, it is possible to construct a building safely because it does not require work at height.

【0029】揚荷装置は外周基礎内に配置させているか
ら、建屋を構築しているときでも同時に建屋外周の配管
工事などを行うことができるし、狭小地においても、建
屋を構築することができる。
Since the unloading device is arranged in the outer peripheral foundation, it is possible to simultaneously perform the plumbing work around the outside of the building even when the building is being constructed, and the building can be constructed even in a narrow land. it can.

【0030】トラッククレーンを使用しないため、住宅
密集地や進入道路が狭い場所での施工に適する。
Since a truck crane is not used, it is suitable for construction in a dense residential area or a place with a narrow approach road.

【0031】建屋の組み立て作業を全てコンクリート基
礎の上で行うことができるため安全ネットや足場などの
仮設設備が不要で、生産性よく、建築費用を削減するこ
とができる。
Since the building can be assembled entirely on the concrete foundation, temporary equipment such as safety nets and scaffolds are not required, and productivity can be improved and construction cost can be reduced.

【0032】コンクリート基礎上での組み立てであるた
め、細かな部分の工事を精度よく行うことができるか
ら、施工品質の向上をはかることができる。
Since the work is assembled on the concrete foundation, it is possible to carry out the work on the fine parts with high accuracy, and hence the work quality can be improved.

【0033】屋根部が先に仕上がっているので、雨天で
も部材を濡らさないで工事ができる。
Since the roof portion is finished first, it is possible to carry out construction without getting the members wet even in the rain.

【0034】計画生産ができるし、工期は一般の建方工
法より約10〜20%短縮できる。
Planned production is possible, and the construction period can be shortened by about 10 to 20% compared with the general construction method.

【0035】揚荷装置はシンプルな多段伸縮式でよいた
め、設備費用は少なくてよい。
Since the unloading device may be a simple multi-stage telescopic type, the equipment cost may be low.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明建方工法に用いる揚荷装置の配置を示す
ため、屋根部を透視した平面図である。
FIG. 1 is a plan view in which a roof portion is seen through in order to show an arrangement of an unloading device used in the erection method of the present invention.

【図2】本発明建方工法において、屋根部を仕上げた一
部拡大断面図である。
FIG. 2 is a partially enlarged cross-sectional view of the roof portion finished in the erection method of the present invention.

【図3】仕上げた屋根部を揚荷装置を用いて所定の高さ
まで持ち上げた正面図である。
FIG. 3 is a front view of the finished roof portion lifted up to a predetermined height by using an unloading device.

【図4】所定の高さに持ち上げた屋根部と床梁との間に
外壁軸組や外壁材などを組み付けた正面図である。
FIG. 4 is a front view in which an outer wall shaft assembly, an outer wall member, and the like are assembled between the roof portion lifted to a predetermined height and the floor beam.

【図5】仕上げた建屋上部を揚荷装置を用いて所定の高
さまで持ち上げた正面図である。
FIG. 5 is a front view of the finished building upper part lifted to a predetermined height by using an unloading device.

【図6】所定の高さに持ち上げた建屋上部とコンクリー
ト基礎との間に外壁軸組や外壁材を組み付けて完成した
建屋の正面図である。
FIG. 6 is a front view of a building completed by assembling an outer wall framework and an outer wall material between an upper part of the building lifted to a predetermined height and a concrete foundation.

【符号の説明】[Explanation of symbols]

1 コンクリート基礎 11 外周基礎 2 小屋梁 3 床梁 4 仮設材 100 揚荷装置 A1 屋根部 A2 建屋上部 A3 建屋下部 A4 建屋 1 Concrete foundation 11 Perimeter foundation 2 Shed beam 3 Floor beam 4 Temporary material 100 Unloading device A1 Roof part A2 Building upper part A3 Building lower part A4 building

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート基礎上に載置した小屋梁の
上で屋根部を仕上げ、この仕上げた屋根部を外周基礎内
に配した揚荷装置を用いて所定の位置に持ち上げ、屋根
部とコンクリート基礎との間に壁軸組や外壁材などを組
み付けることを特徴とする建方工法。
1. A roof portion is finished on a shed beam placed on a concrete foundation, and the finished roof portion is lifted to a predetermined position by using an unloading device arranged in an outer peripheral foundation. The erection method, which is characterized by assembling the wall frame and outer wall material with the foundation.
【請求項2】 コンクリート基礎上に床梁と小屋梁を下
から順に載置しておき、このようにコンクリート基礎上
に載置した小屋梁の上で屋根部を仕上げ、この仕上げた
屋根部を外周基礎内に配した揚荷装置を用いて所定の位
置に持ち上げ、屋根部と床梁との間に壁軸組、外壁材、
外装材などを組み付けて建屋上部を形成し、この建屋上
部を再び外周基礎内に配した揚荷装置を用いて所定の位
置に持ち上げ、床梁とコンクリート基礎との間に壁軸組
や外壁材などを組み付けることを特徴とする建方工法。
2. A floor beam and a shed beam are placed in order from the bottom on a concrete foundation, and the roof portion is finished on the shed beam placed on the concrete foundation in this way, and the finished roof portion is Lifted to a predetermined position using the unloading device arranged in the outer peripheral foundation, between the roof part and the floor beam, the wall frame, the outer wall material,
An exterior material is assembled to form the upper part of the building, and the upper part of the building is again lifted to a predetermined position using the unloading device placed inside the outer peripheral foundation, and the wall frame and outer wall material are placed between the floor beam and the concrete foundation. The erection method is characterized by assembling etc.
JP25160692A 1992-09-21 1992-09-21 Erection method Pending JPH06101280A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25160692A JPH06101280A (en) 1992-09-21 1992-09-21 Erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25160692A JPH06101280A (en) 1992-09-21 1992-09-21 Erection method

Publications (1)

Publication Number Publication Date
JPH06101280A true JPH06101280A (en) 1994-04-12

Family

ID=17225322

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25160692A Pending JPH06101280A (en) 1992-09-21 1992-09-21 Erection method

Country Status (1)

Country Link
JP (1) JPH06101280A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101137603B1 (en) * 2009-07-28 2012-04-19 김경훈 A prefabricated house construction method and the construction device
JP2016513763A (en) * 2013-03-08 2016-05-16 アップ・ファースト・コンストラクション・システムズ・プロプライアタリ・リミテッド Building system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0339538A (en) * 1989-07-05 1991-02-20 Sumitomo Ringyo Kk Construction work of wooden building
JPH04128472A (en) * 1990-09-18 1992-04-28 Nippon Koki Kk Jack for construction work

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0339538A (en) * 1989-07-05 1991-02-20 Sumitomo Ringyo Kk Construction work of wooden building
JPH04128472A (en) * 1990-09-18 1992-04-28 Nippon Koki Kk Jack for construction work

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101137603B1 (en) * 2009-07-28 2012-04-19 김경훈 A prefabricated house construction method and the construction device
JP2016513763A (en) * 2013-03-08 2016-05-16 アップ・ファースト・コンストラクション・システムズ・プロプライアタリ・リミテッド Building system
US10214927B2 (en) 2013-03-08 2019-02-26 Up First Construction Systems Pty Ltd. Building system

Similar Documents

Publication Publication Date Title
WO2020185587A1 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
JP3218519B2 (en) Building demolition method
JP2018096163A (en) Method of constructing building
JP2979039B2 (en) Large space building construction equipment
US3435583A (en) Method of forming buildings
JPH08239906A (en) Building construction method
JP3241896B2 (en) Steel frame stair hang down method
JP3345395B2 (en) Elevator tower construction method
JP2696486B2 (en) Building construction method
JP2723620B2 (en) Wooden construction method
JPH04161565A (en) Construction of large space building
JPH08105229A (en) How to build a building
JP3139854B2 (en) Collapse prevention frame
JP3124152B2 (en) Collapse prevention frame
JP3115942B2 (en) Building construction method
JPH03235838A (en) Lift up method of construction using temporary pillar
JP3060333B2 (en) Construction method of building frame
JP3018947B2 (en) Construction method of reinforced concrete building with balcony
JPH03197734A (en) Lift up method by replacement of scaffold body
JPH0518132A (en) Tower type construction method for construction of steel structures such as parking lots
JPH11131811A (en) Building method
JPH05171810A (en) Erecting method of structure body of building
JPH0781323B2 (en) Building construction method
JP2761528B2 (en) How to build structures
JPH1181679A (en) How to build a building