JPH061765Y2 - Post-tension type pressure bearing plate mounting device in formwork for prestressed concrete member manufacturing - Google Patents

Post-tension type pressure bearing plate mounting device in formwork for prestressed concrete member manufacturing

Info

Publication number
JPH061765Y2
JPH061765Y2 JP11951689U JP11951689U JPH061765Y2 JP H061765 Y2 JPH061765 Y2 JP H061765Y2 JP 11951689 U JP11951689 U JP 11951689U JP 11951689 U JP11951689 U JP 11951689U JP H061765 Y2 JPH061765 Y2 JP H061765Y2
Authority
JP
Japan
Prior art keywords
bearing plate
steel material
pressure bearing
dowel
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP11951689U
Other languages
Japanese (ja)
Other versions
JPH0357011U (en
Inventor
勝 上田
寛美 井上
良則 工藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Toda Kogyo Corp
Original Assignee
Railway Technical Research Institute
Toda Kogyo Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute, Toda Kogyo Corp filed Critical Railway Technical Research Institute
Priority to JP11951689U priority Critical patent/JPH061765Y2/en
Publication of JPH0357011U publication Critical patent/JPH0357011U/ja
Application granted granted Critical
Publication of JPH061765Y2 publication Critical patent/JPH061765Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、ポストテンション方式のプレストレストコン
クリート部材、例えば、ポストテンション方式によるプ
レストレストコンクリート枕木やプレストレストコンク
リート軌道スラブ、角落しPC版、プレストレストコン
クリート建築部材および一般橋梁のスラブ等の製造用型
枠における支圧板取付け装置に関するものである。
[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a post-tensioning prestressed concrete member, for example, a post-tensioning prestressed concrete sleeper, a prestressed concrete track slab, a decimated PC plate, a prestressed concrete building member. Also, the present invention relates to a bearing plate attachment device for a manufacturing frame such as a slab of a general bridge.

〔従来の技術〕[Conventional technology]

本考案者らは、第10図に示すように、コンクリート枕
木製造用型枠における長手方向一端の妻板7から、中心
部にボルト挿入用孔10が形成され、外周面に抜き勾配が
付けられダボ9を突設し、2個のPC鋼材挿入孔13a,
13bと、2個のPC鋼材挿入孔13a,13b間に位置する
ねじ孔14とが形成された支圧板3の前記PC鋼材挿入孔
13a,13bに夫々PC鋼材2…の固定端側を挿入し、前
記ねじ孔14に、前記妻板7の外側から前記ダボ9のボル
ト挿入孔10に挿入したボルト16の先端部を螺着するよう
にした支圧板取付け装置を開発しており、該装置は既に
実願昭63-19251号として出願されている。図中の17…
は、PC鋼材2…の緊張端側の支圧板4を妻板8に取り
付けるための装置である。
As shown in FIG. 10, the inventors of the present invention formed a dowel plate 7 at one end in the longitudinal direction of a formwork for manufacturing concrete sleepers, formed a bolt insertion hole 10 at the center thereof, and provided a draft on the outer peripheral surface thereof. 9 is projected, and two PC steel material insertion holes 13a,
The PC steel material insertion hole of the pressure bearing plate 3 in which 13b and the screw hole 14 located between the two PC steel material insertion holes 13a and 13b are formed.
Insert the fixed end sides of the PC steel materials 2 into 13a and 13b, respectively, and screw the tip ends of the bolts 16 inserted into the bolt insertion holes 10 of the dowel 9 into the screw holes 14 from the outside. Has been developed, and the device has already been filed as Japanese Patent Application No. 63-19251. 17 in the figure ...
Is a device for attaching the bearing plate 4 on the tensioned end side of the PC steel materials 2 to the end plate 8.

上記の支圧板取付け装置は、支圧板3を螺着するボルト
16の周囲にダボ9を套嵌しているので、従来から公知の
装置、つまり、支圧板を、その中央部に螺合するボルト
を介して妻板に支持させ、妻板から突設した複数のダボ
を、支圧板の両端側のPC鋼材挿入孔に挿入されたPC
鋼材の固定端(大径頭部又はPC鋼材の端部に螺合する
ナット)に外嵌して、支圧板の位置決め(PC鋼材の位
置決め)を行う形式の装置に比して、脱型後、コンクリ
ート枕木の端面に生じるダボ穴の数が少なくなり、ダボ
穴への填充作業が簡易化され、しかもダボ穴がPC鋼材
間に、つまり、PC鋼材から離れた位置に形成されるか
ら、填充部分の亀裂や填充部分と最初のコンクリート部
分との付着不良等によるPC鋼材への悪影響を防止でき
る等々の非常に優れた長所を有している。
The pressure plate attaching device is a bolt for screwing the pressure plate 3.
Since the dowel 9 is fitted around the periphery of the dowel 16, a conventionally known device, that is, a bearing plate is supported on the end plate through a bolt screwed to the center thereof, and a plurality of dowels projecting from the end plate. PC inserted into the PC steel material insertion holes on both ends of the bearing plate
After demolding, compared to a device of the type that externally fits to the fixed end of steel material (large diameter head or nut screwed to the end of PC steel material) and positions the pressure plate (positioning of PC steel material) The number of dowel holes formed on the end surface of the concrete sleeper is reduced, and the work of filling the dowel holes is simplified, and the dowel holes are formed between the PC steel materials, that is, at a position away from the PC steel material. It has excellent advantages such as prevention of adverse effects on PC steel materials due to cracks in the parts and poor adhesion between the filled part and the first concrete part.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

しかしながら、実願昭63-19251号として提案した上記の
支圧板取付け装置においては、次の点に改良の余地があ
った。
However, the above-mentioned pressure bearing plate mounting device proposed as Japanese Patent Application No. 63-19251 has room for improvement in the following points.

即ち、各支圧板3の中央部をボルト16に螺着しているだ
けであると、型枠内へのコンクリート打設時、バイブレ
ータでコンクリートに付与される振動によって、支圧板
3がボルト16を中心にして回転する可能性がある。ま
た、1本のコンクリート枕木には、通常、上記の支圧板
3を2枚併設し、各支圧板3に2本ずつ、合計4本のP
C鋼材2…が埋設されるのであるが、これらの支圧板3
がボルト16まわりに回転すると、PC鋼材2…の位置関
係に狂いが生じ、PC鋼材2…の他端側を引っ張ってコ
ンクリート枕木にプレストレスを導入しても、設計通り
のプレストレスの分布状態が得られない可能性がある。
That is, if the central portion of each pressure support plate 3 is simply screwed to the bolt 16, the pressure support plate 3 fixes the bolt 16 to the bolt 16 by the vibration applied to the concrete by the vibrator when the concrete is placed in the formwork. It may rotate around the center. In addition, one concrete sleeper is usually provided with two of the pressure bearing plates 3 described above, and two pressure bearing plates 3 are provided in total, for a total of four Ps.
C steel material 2 ... Is buried, but these bearing plates 3
When is rotated around the bolt 16, the positional relationship between the PC steel materials 2 ... Distorts, and even if the other end side of the PC steel materials 2 ... is pulled to introduce prestress to the concrete sleepers, the prestress distribution state as designed May not be obtained.

このため、第11図、第12図に示すように、溝状を成
す型枠本体6の上部に、支圧板3,3の外形に対応した
凹入部18a,18bを有する回転防止具18を架設し、該回
転防止具18の凹入部18a,18bを支圧板3,3に嵌合さ
せて支圧板3,3の回り止めを行っていたのであるが、
これによる場合は、コンクリートの打設後、回転防止具
18を抜いた跡にできる縦穴を再振動によりコンクリート
で埋めることが必要である。
Therefore, as shown in FIGS. 11 and 12, a rotation preventing tool 18 having recessed portions 18a and 18b corresponding to the outer shapes of the pressure bearing plates 3 and 3 is provided on the upper portion of the groove-shaped mold body 6. Then, the concave portions 18a and 18b of the rotation preventing tool 18 are fitted to the pressure support plates 3 and 3 to prevent the pressure support plates 3 and 3 from rotating.
In this case, after placing the concrete, the rotation prevention tool
It is necessary to re-vibrate and fill the vertical hole formed by removing 18 with concrete.

本考案は、上記の点で改良された支圧板取付け装置を提
供することを目的としている。
An object of the present invention is to provide a bearing plate mounting device improved in the above points.

〔課題を解決するための手段〕[Means for Solving the Problems]

上記の目的を達成するために、本考案が講じた技術的手
段は、次の通りである。即ち、本考案は、ポストテンシ
ョン方式プレストレストコンクリート部材製造用型枠に
おけるPC鋼材の固定端側の妻板から、中心部にボルト
挿入用孔が形成され、外周面に抜き勾配が付けられ、先
端面には凸部又は凹部が設けられたダボを突設し、複数
のPC鋼材挿入孔と、これらのPC鋼材挿入孔間に位置
するねじ孔と、前記凸部又は凹部に対応する凹部又は凸
部とが形成された支圧板の前記PC鋼材挿入孔に夫々P
C鋼材の固定端側を挿入し、前記ねじ孔には前記妻板の
外側から前記ダボのボルト挿入孔に挿入したボルトの先
端部を螺着し、ダボ先端面の凸部又は凹部を、支圧板の
凹部又は凸部に嵌合したことを特徴としている。
The technical means taken by the present invention to achieve the above object are as follows. That is, according to the present invention, a bolt insertion hole is formed in the center of the end plate of the PC steel material in the post-tensioning prestressed concrete member manufacturing form, and the outer peripheral surface is drafted, and the tip surface is Is a plurality of PC steel material insertion holes, screw holes located between these PC steel material insertion holes, and recesses or projections corresponding to the projections or recesses. P in the PC steel material insertion holes of the bearing plate on which
The fixed end side of the C steel material is inserted, and the tip end of the bolt inserted into the bolt insertion hole of the dowel from the outside of the end plate is screwed into the screw hole, and the convex portion or the concave portion of the dowel tip surface is attached to the pressure plate. It is characterized in that it is fitted in the concave portion or the convex portion.

〔作用〕[Action]

上記の構成によれば、ダボ先端面の凸部又は凹部が支圧
板の凹部又は凸部に嵌合しているため、支圧板が1本の
ボルトを介して妻板に取り付けられているにもかかわら
ず、支圧板のボルトまわりでの回転が阻止されることに
なる。
According to the above configuration, since the convex portion or the concave portion of the dowel tip surface is fitted in the concave portion or the convex portion of the pressure bearing plate, the pressure bearing plate may be attached to the end plate through one bolt. Therefore, the rotation of the pressure bearing plate around the bolt is prevented.

〔実施例〕〔Example〕

以下、本考案の実施例を図面に基づいて説明する。 Embodiments of the present invention will be described below with reference to the drawings.

第1図(イ),(ロ)は、ポストテンション方式プレス
トレストコンクリート部材の一例を示す。図において、
1はコンクリート枕木、1′はコンクリート軌道スラブ
である。2…はコンクリート枕木1やコンクリート軌道
スラブ1′に埋設されたアンボンドPC鋼材、3…はP
C鋼材2…の固定端側の支圧板、4…はPC鋼棒2…の
緊張端側の支圧板である。コンクリート枕木1における
支圧板3…,4…やコンクリート軌道スラブ1′の長手
方向両端部に位置する支圧板3…,4…には、夫々、前
記PC鋼材2…が2本ずつ挿通されている。
1 (a) and 1 (b) show an example of a post-tensioning prestressed concrete member. In the figure,
Reference numeral 1 is a concrete sleeper and 1'is a concrete track slab. 2 ... is an unbonded PC steel material embedded in a concrete sleeper 1 or a concrete track slab 1 ', 3 ... is a P
Pressure-bearing plates on the fixed end side of the C steel material 2 ... are pressure-bearing plates on the tensioned end side of the PC steel rods 2. Two pieces of the PC steel material 2 are inserted into the pressure bearing plates 3 ... 4 in the concrete sleeper 1 and the pressure bearing plates 3 ... 4 located at both longitudinal ends of the concrete track slab 1 '. .

本考案は、上記のような複数本のPC鋼材2…が挿通さ
れた固定端側の支圧板3を、コンクリート枕木1やコン
クリート軌道スラブ1′あるいはその他のプレストレス
トコンクリート部材を製造するための型枠に対して、次
のような装置によって取り付けるようにしたものであ
る。
The present invention is a formwork for manufacturing a concrete sleeper 1, a concrete track slab 1 ', or other prestressed concrete members, by using a bearing plate 3 on the fixed end side in which a plurality of PC steel materials 2 ... On the other hand, it is attached by the following device.

即ち、第2図〜第5図に示すようなコンクリート枕木製
造用型枠5(コンクリート枕木1の側面及び上面を成形
する溝状の型枠本体6と、端面を成形するための妻板
7,8とを備え、該妻板7,8は型枠本体6の長手方向
両端に着脱自在に連結されている。)を例にとって本考
案に係る支圧板取付け装置Aの構成を説明すると、次の
通りである。
That is, as shown in FIGS. 2 to 5, a concrete sleeper manufacturing mold 5 (a groove-shaped mold body 6 for molding the side surface and the upper surface of the concrete sleeper 1 and the end plates 7 and 8 for molding the end faces). And the end plates 7 and 8 are detachably connected to both ends of the form body 6 in the longitudinal direction.) The structure of the pressure bearing plate mounting device A according to the present invention will be described as follows. is there.

第3図、第4図に示すように、妻板7から、2個のダボ
9…が突設され、溶接により一体化されている。各ダボ
9の構成は、第5図、第6図に示す通りであり、中心部
にボルト挿入用孔10が形成され、外周面Sに抜き勾配
が付けられ、先端面Sには直径方向の対称位置に2個
の凸部11…が設けられている。12はダボ9の外端に形成
したフランジ部であり、妻板7の孔縁部に当接し、ダボ
9の型枠内方への突出量を規定している。前記支圧板7
には、2個のPC鋼材挿入孔13a,13bと、これらのP
C鋼材挿入孔13a,13b間の中央位置に位置するねじ孔
14と、前記凸部11…に対応する、つまり、前記ねじ孔14
を中心として上下対称位置に位置する2個の凹部15…と
が形成されている。
As shown in FIGS. 3 and 4, two dowels 9 ... Are projected from the end plate 7 and integrated by welding. The structure of each dowel 9 is as shown in FIGS. 5 and 6, in which a bolt insertion hole 10 is formed in the central portion, the outer peripheral surface S 1 is drafted, and the tip surface S 2 has a diameter. Two convex portions 11 ... Are provided at symmetrical positions in the direction. Reference numeral 12 denotes a flange portion formed on the outer end of the dowel 9, which abuts the hole edge portion of the end plate 7 and defines the amount of protrusion of the dowel 9 inward of the mold. The bearing plate 7
Has two PC steel material insertion holes 13a and 13b, and these P
C Screw hole located at the center position between the steel material insertion holes 13a and 13b
14 and the convex portions 11 ..., that is, the screw holes 14
Two concave portions 15 ... Which are vertically symmetrical with respect to the center are formed.

そして、支圧板7の前記PC鋼材挿入孔13a,13bに夫
々PC鋼材2…の固定端側を挿入し、この状態で、前記
妻板7の外側からボルト16を前記ダボ9のボルト挿入孔
10に挿入して、該ボルト16の先端部を前記ねじ孔14に螺
着すると共に、ダボ先端面Sの凸部11…を、支圧板7
の凹部15…に嵌合してある。この場合、前記凸部11…、
凹部15…を上下対称的に設けてあるので、支圧板7を、
上下逆にして型枠内に配置した場合でも、凸部11…と凹
部15…とが嵌合することになる。
Then, the fixed end sides of the PC steel materials 2 are inserted into the PC steel material insertion holes 13a and 13b of the pressure support plate 7, respectively, and in this state, the bolt 16 is inserted from the outside of the end plate 7 into the bolt insertion hole of the dowel 9.
Insert 10, the screwing tip of the bolt 16 into the screw hole 14, the convex portion 11 of the dowel tip surface S 2 ... a, Bearing plate 7
It is fitted in the concave portion 15 of. In this case, the convex portions 11 ...
Since the concave portions 15 are provided symmetrically in the vertical direction, the pressure bearing plate 7 is
Even when they are placed upside down in the mold, the convex portions 11 ... And the concave portions 15 ... Fit.

上記の構成によれば、コンクリート打設時の振動に起因
する支圧板7のボルト16まわりでの回転は凸部11…と凹
部15…との嵌合により阻止されることになる。
According to the above configuration, the rotation of the pressure bearing plate 7 around the bolt 16 due to the vibration at the time of placing concrete is prevented by the fitting of the convex portions 11 ... And the concave portions 15.

脱型後は、PC鋼材2……の緊張作業を行い、しかる
後、枕木端面に生じるダボ穴にモルタルやコンクリート
等の填充を行うことにより、第1図(イ)で示したコン
クリート枕木1が得られるのである。
After demolding, the tension work of the PC steel material 2 ... is performed, and then the dowel holes formed in the end face of the sleeper are filled with mortar, concrete, etc., so that the concrete sleeper 1 shown in FIG. You can get it.

尚、PC鋼材2…の緊張端側の妻板8に対する支圧板4
…の取付け装置の構成は従来通りであるため説明を省
く。凸部11…としては、例えば、ダボ9の先端面S
ピンやねじ軸を、一部が突出した状態に埋め込んで形成
したものであってもよいが、この実施例では、鋼球を埋
め込み、カシメ工程を経た後、高周波焼き入れを行っ
て、当該鋼球の突出部分により、前記凸部11…を構成し
てある。支圧板3側の凹部15…は支圧板3を貫通する孔
によって形成したものであってもよいが、この実施例で
は、凹部15…を前記鋼球の突出部分に対応する球面状の
凹入に形成してある。また、この実施例では、前記凸部
11…、凹部15…の夫々を上下対称的に設けたが、凹部15
…を2個対称的に設けておけば、凸部11を1個だけしか
設けなくても、支圧板3の上下に関係なく、凸部11と凹
部15が嵌合することになる。前記凸部11…および凹部15
…は横方向に配設してもよい。この場合、第7図に示す
ように、凹部15…を溝状に形成してもよい。また1枚の
支圧板3に形成するPC鋼材挿入孔13a,13bの数は、
複数であれば足り、第8図、第9図に示すように4個あ
るいはそれ以上のPC鋼材挿入孔13a…,13b…を形成
して実施することも可能である。第9図中の2aはPC鋼
材2の端部に螺着したナットである。
In addition, the pressure support plate 4 for the end plate 8 of the PC steel material 2 ...
The structure of the mounting device of ... Is the same as the conventional one, and therefore the description thereof is omitted. The protrusions 11 may be formed by embedding a pin or a screw shaft in the distal end surface S 2 of the dowel 9 in a partially protruding state, but in this embodiment, a steel ball is used. After the embedding and caulking steps, induction hardening is performed to form the protrusions 11 ... With the protruding portions of the steel balls. The recesses 15 on the pressure bearing plate 3 side may be formed by holes penetrating the pressure bearing plate 3, but in this embodiment, the recesses 15 are formed into spherical recesses corresponding to the protruding portions of the steel balls. It is formed on. Further, in this embodiment, the convex portion
11 ... and the recess 15 ... are provided symmetrically in the vertical direction, the recess 15
If two ... Are provided symmetrically, even if only one convex portion 11 is provided, the convex portion 11 and the concave portion 15 are fitted to each other regardless of the upper and lower sides of the pressure bearing plate 3. The convex portion 11 ... and the concave portion 15
... may be arranged in the lateral direction. In this case, as shown in FIG. 7, the recesses 15 may be formed in a groove shape. Further, the number of PC steel material insertion holes 13a and 13b formed in one bearing plate 3 is
It suffices if the number is plural, and it is also possible to form four or more PC steel material insertion holes 13a ..., 13b ... As shown in FIGS. Reference numeral 2a in FIG. 9 denotes a nut screwed to the end of the PC steel material 2.

以上の各実施例では、いずれも、ダボ9側に凸部11を設
け、支圧板3側に凹部15を設けたが、これとは逆に、ダ
ボ9側に凹部15を設け、支圧板3側に凸部11を設けても
よいことは勿論である。但し、凹部15に比して凸部11の
方が加工費が高く付くのが普通であるから、図示の実施
例のように、プレストレストコンクリート部材に埋設さ
れてしまう支圧板3側に凹部15を形成し、型枠側の構成
部材であって何回も転用されるダボ9に凸部11を設ける
方が経済的である。
In each of the above embodiments, the convex portion 11 is provided on the dowel 9 side and the concave portion 15 is provided on the pressure bearing plate 3 side. On the contrary, the concave portion 15 is provided on the dowel 9 side and the pressure bearing plate 3 is provided. Of course, the convex portion 11 may be provided on the side. However, since it is usual that the convex portion 11 has a higher processing cost than the concave portion 15, the concave portion 15 is provided on the side of the bearing plate 3 that is embedded in the prestressed concrete member as in the illustrated embodiment. It is more economical to provide the convex portion 11 on the dowel 9 which is a constituent member on the mold side and which is diverted many times.

〔考案の効果〕[Effect of device]

本考案は、上述した構成より成り、脱型後、コンクリー
ト部材の端面に生じるダボ穴の数が少なくなり、ダボ穴
への填充作業が簡易化され、しかもダボ穴がPC鋼材か
ら離れた位置に形成されるから、填充部分の亀裂や填充
部分と最初のコンクリート部分との付着不良等によるP
C鋼材への悪影響を防止できる等々の利点に加えて次の
効果を奏し得るのである。
The present invention, which has the above-described structure, reduces the number of dowel holes formed on the end surface of the concrete member after demolding, simplifies the work of filling the dowel holes, and places the dowel holes at a position away from the PC steel material. Since it is formed, P due to cracks in the filling part and poor adhesion between the filling part and the first concrete part, etc.
In addition to the advantages of preventing adverse effects on the C steel material, the following effects can be achieved.

即ち、ダボ先端面の凸部又は凹部が支圧板の凹部又は凸
部に嵌合しているため、支圧板が1本のボルトを介して
妻板に取り付けられているにもかかわず、支圧板のボル
トまわりでの回転が阻止され、コンクリート打設時の振
動によって支圧板が不測に回転することがなく、PC鋼
材を所定位置に正確に埋設することができる。
That is, since the convex portion or the concave portion of the dowel tip surface is fitted into the concave portion or the convex portion of the pressure bearing plate, the pressure bearing plate is attached to the end plate regardless of whether the pressure bearing plate is attached to the end plate through one bolt. Rotation around the bolt is prevented, and the pressure bearing plate does not unexpectedly rotate due to vibration during concrete pouring, and the PC steel material can be accurately embedded in a predetermined position.

また、支圧板をダボ先端面の凸部又は凹部と支圧板の凹
部又は凸部との嵌合により回り止めするので、冒頭で述
べた従来例のように、コンクリート面に回転防止具の穴
ができず、回転防止具に起因する穴埋めする作業が不要
である。
Further, since the pressure bearing plate is prevented from rotating by fitting the convex portion or the concave portion of the dowel tip surface and the concave portion or the convex portion of the pressure bearing plate, as in the conventional example described at the beginning, the hole of the rotation preventing tool is provided on the concrete surface. This is not possible, and the work of filling holes due to the rotation prevention tool is unnecessary.

【図面の簡単な説明】[Brief description of drawings]

第1図乃至第6図は本考案の一実施例を示し、第1図
(イ),(ロ)はポストテンション方式プレストレスト
コンクリート部材の一例であるコンクリート枕木とコン
クリート軌道スラブの概略斜視図、第2図はコンクリー
ト枕木製造用型枠の概略縦断側面図、第3図はコンクリ
ート枕木製造用型枠の概略平面図、第4図は支圧板取付
け装置の斜視図、第5図は支圧板取付け装置の縦断側面
図、第6図は支圧板取付け装置の分解斜視図である。 第7図は本考案の別実施例を示す支圧板取付け装置の分
解斜視図である。 第8図は本考案の別実施例を示す支圧板の正面図、第9
図は該支圧板を取り付けた状態における要部の縦断側面
図である。 第10図〜第12図は従来例を示し、第10図は縦断側
面図、第11図は縦断正面図、第12図は縦断側面図で
ある。 A…支圧板取付け装置、2…PC鋼材、3…支圧板、5
…型枠、7…妻板、9…ダボ、11…凸部、15…凹部、16
…ボルト。
1 to 6 show an embodiment of the present invention, and FIGS. 1 (a) and (b) are schematic perspective views of concrete sleepers and concrete track slabs, which are examples of post-tensioning prestressed concrete members. 2 is a schematic vertical side view of a concrete sleeper manufacturing formwork, FIG. 3 is a schematic plan view of a concrete sleeper manufacturing formwork, FIG. 4 is a perspective view of a bearing plate mounting device, and FIG. 5 is a bearing plate mounting device. FIG. 6 is a vertical cross-sectional side view, and FIG. 6 is an exploded perspective view of the pressure bearing plate mounting device. FIG. 7 is an exploded perspective view of a pressure bearing plate mounting device showing another embodiment of the present invention. FIG. 8 is a front view of a bearing plate showing another embodiment of the present invention, and FIG.
The figure is a vertical cross-sectional side view of a main part in a state where the pressure bearing plate is attached. 10 to 12 show a conventional example, FIG. 10 is a vertical sectional side view, FIG. 11 is a vertical sectional front view, and FIG. 12 is a vertical sectional side view. A ... Pressure plate mounting device, 2 ... PC steel material, 3 ... Pressure plate, 5
… Formwork, 7… Cable plate, 9… Dowel, 11… Convex part, 15… Concave part, 16
…bolt.

───────────────────────────────────────────────────── フロントページの続き (72)考案者 井上 寛美 東京都国分寺市光町2丁目8番地38 財団 法人鉄道総合技術研究所内 (72)考案者 工藤 良則 神奈川県横浜市南区六ツ川2―25―4 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Hiromi Inoue, 2-8, Hikarimachi, Kokubunji, Tokyo 38, Incorporated Railway Technical Research Institute (72) Yoshinori Kudo 2-25, Mutsukawa, Minami-ku, Yokohama-shi, Kanagawa Four

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】ポストテンション方式プレストレストコン
クリート部材製造用型枠におけるPC鋼材の固定端側の
妻板から、中心部にボルト挿入用孔が形成され、外周面
に抜き勾配が付けられ、先端面には凸部又は凹部が設け
られたダボを突設し、複数のPC鋼材挿入孔と、これら
のPC鋼材挿入孔間に位置するねじ孔と、前記凸部又は
凹部に対応する凹部又は凸部とが形成された支圧板の前
記PC鋼材挿入孔に夫々PC鋼材の固定端側を挿入し、
前記ねじ孔には前記妻板の外側から前記ダボのボルト挿
入孔に挿入したボルトの先端部を螺着し、ダボ先端面の
凸部又は凹部を、支圧板の凹部又は凸部に嵌合してある
ことを特徴とするポストテンション方式プレストレスト
コンクリート部材製造用型枠における支圧板取付け装
置。
1. A post-tension type prestressed concrete member manufacturing form has a bolt plate on the fixed end side of a PC steel material, a hole for bolt insertion is formed in the center, a draft is formed on the outer peripheral surface, and a tip end surface is formed. A dowel provided with a convex portion or a concave portion is projectingly provided, and a plurality of PC steel material insertion holes, screw holes located between these PC steel material insertion holes, and a concave portion or a convex portion corresponding to the convex portion or the concave portion are provided. The fixed end sides of the PC steel materials are inserted into the PC steel material insertion holes of the formed pressure bearing plate,
The tip of the bolt inserted into the bolt insertion hole of the dowel is screwed into the screw hole from the outside of the end plate, and the convex portion or concave portion of the dowel tip surface is fitted into the concave portion or convex portion of the pressure bearing plate. A support device for mounting a pressure plate in a mold for manufacturing a pretensioned prestressed concrete member, which is characterized in that
JP11951689U 1989-10-11 1989-10-11 Post-tension type pressure bearing plate mounting device in formwork for prestressed concrete member manufacturing Expired - Lifetime JPH061765Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11951689U JPH061765Y2 (en) 1989-10-11 1989-10-11 Post-tension type pressure bearing plate mounting device in formwork for prestressed concrete member manufacturing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11951689U JPH061765Y2 (en) 1989-10-11 1989-10-11 Post-tension type pressure bearing plate mounting device in formwork for prestressed concrete member manufacturing

Publications (2)

Publication Number Publication Date
JPH0357011U JPH0357011U (en) 1991-05-31
JPH061765Y2 true JPH061765Y2 (en) 1994-01-19

Family

ID=31667636

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11951689U Expired - Lifetime JPH061765Y2 (en) 1989-10-11 1989-10-11 Post-tension type pressure bearing plate mounting device in formwork for prestressed concrete member manufacturing

Country Status (1)

Country Link
JP (1) JPH061765Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006255904A (en) * 2005-03-15 2006-09-28 Toda Kogyo Kk Form made of steel for concrete crosstie and its manufacturing method

Also Published As

Publication number Publication date
JPH0357011U (en) 1991-05-31

Similar Documents

Publication Publication Date Title
US3678815A (en) Concrete structural member
JPH061765Y2 (en) Post-tension type pressure bearing plate mounting device in formwork for prestressed concrete member manufacturing
JPH08105115A (en) Connection method of column and beam
JP2544782B2 (en) Concrete formwork for construction of mass concrete structures
JP3029343U (en) Form tool for mortar material injection in exposed elastic fixed column base method
JPH072828Y2 (en) Hollow concrete slab mounting structure
JPH0355610Y2 (en)
JP2971038B2 (en) Climbing wall and climbing wall hold mounting cup
JP2618839B2 (en) Manufacturing method of precast slab
JPH024963Y2 (en)
JP3159996B2 (en) Precast beam fixing structure
JPH0711207Y2 (en) Embedded anchor
JP2517735Y2 (en) Precast concrete foundation
JPH0750489Y2 (en) Concrete connection equipment
JP2529881Y2 (en) Housing unit positioning structure
JPS62185703U (en)
JPS6035639Y2 (en) Hardware for installing foundations of tower-like structures
JP2507676Y2 (en) Concrete cloth foundation assembly member positioning jig
JP3891495B2 (en) Joint mechanism for bridge deck slab and its dam plate
JPH0332582Y2 (en)
JPS62114983U (en)
JPH01138943U (en)
JPH0810106Y2 (en) Mounting hardware and precast concrete board equipped with the mounting hardware
JPH0712433Y2 (en) Anchor bolt
JPH02106008U (en)

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term