JPH0634775U - Lining device - Google Patents

Lining device

Info

Publication number
JPH0634775U
JPH0634775U JP7725292U JP7725292U JPH0634775U JP H0634775 U JPH0634775 U JP H0634775U JP 7725292 U JP7725292 U JP 7725292U JP 7725292 U JP7725292 U JP 7725292U JP H0634775 U JPH0634775 U JP H0634775U
Authority
JP
Japan
Prior art keywords
resin
lining
air
leveling
side device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7725292U
Other languages
Japanese (ja)
Other versions
JP2557432Y2 (en
Inventor
高則 伊藤
雅樹 名取
正明 板垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP7725292U priority Critical patent/JP2557432Y2/en
Publication of JPH0634775U publication Critical patent/JPH0634775U/en
Application granted granted Critical
Publication of JP2557432Y2 publication Critical patent/JP2557432Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)
  • Coating Apparatus (AREA)

Abstract

(57)【要約】 【目的】 補修管の均しライニング作業に適正な治具を
使用して、自動的に樹脂の進行を停止すると共に管内空
気圧を抜いて、常に適確に均しライニング作業する。 【構成】 補修管1の一方の開口端1aに樹脂を空気圧
により注入して押し進める発進側装置10を連結し、他
方の開口端1bに空気の吹き抜けを可能にすると共に、
余剰樹脂を捕集する到達側装置20を連結する。そして
ライニング作業後の均しライニング作業では、到達側装
置20の管路中に、補修管1の口径に応じた孔径の空気
逃し孔32を有する筒体31、樹脂受け33、雄金具3
4、雌金具35で構成される均しライニング治具30を
設け、樹脂が到達側に到達すると、自動的に樹脂の進行
を停止し、且つ筒内空気圧を抜いて空気の吹き抜けを防
止する。
(57) [Summary] [Purpose] Using a proper jig for leveling lining of repair pipes, automatically stop the progress of the resin and release the air pressure inside the pipes to always perform an appropriate leveling lining work. To do. [Structure] A starting-side device 10 is connected to one opening end 1a of a repair pipe 1 by air pressure to push the resin and pushes the resin, and air is blown through to the other opening end 1b.
The arrival side device 20 for collecting the excess resin is connected. Then, in the leveling lining work after the lining work, the tubular body 31, the resin receiver 33, and the male metal fitting 3 having the air escape hole 32 having the hole diameter corresponding to the bore diameter of the repair pipe 1 in the conduit of the arrival side device 20.
4. The leveling lining jig 30 including the female metal fittings 35 is provided, and when the resin reaches the arrival side, the progress of the resin is automatically stopped, and the air pressure in the cylinder is released to prevent the air from passing through.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、地下に埋設されるガス配管、水道配管等の補修管に、管の一端から 注入した高粘度の樹脂プラグを空気圧により一定速度で搬送し、管内面に厚くて 均一なライニング膜を形成するライニング工法を施行するライニング装置に関し 、詳しくは、均しライニング作業での空気の吹き抜けを自動的に防止する均しラ イニング治具に関する。 The present invention conveys a high-viscosity resin plug injected from one end of a pipe to a repair pipe such as a gas pipe or a water pipe buried underground at a constant speed by air pressure to form a thick and uniform lining film on the inner surface of the pipe. More specifically, the present invention relates to a leveling lining jig for automatically preventing blow-through of air during leveling lining work.

【0002】[0002]

【従来の技術】[Prior art]

上記のライニング工法では、補修管の両端部を路面掘削して露出させ、その一 方の開口端に発進側装置が連結され、他方の開口端には到達側装置が連結される 。また補修管の途中に供給管が分岐して取出されている場合は、この取出し部か ら圧縮空気が排出してライニング不能になることを防止するため、取出し部に耐 圧ストッパを取付けて一時的に塞ぐ。そして発進側装置で圧縮空気の空気圧によ りエポキシ樹脂を補修管に注入し、且つその樹脂を管内壁に付着しながら押し進 めることにより、補修管の全長にわたり一律に樹脂膜を形成する。また到達側装 置は、余剰樹脂の到達状態からライニング作業の経過を確認し、且つ余剰樹脂を 回収するように施行される。 In the above lining method, both ends of the repair pipe are excavated to expose the road surface, and the starting side device is connected to one of the open ends and the arrival side device is connected to the other open end. If the supply pipe branches and is taken out in the middle of the repair pipe, a pressure resistant stopper is attached to the take-out part to prevent compressed air from being discharged from the take-out part and making the lining impossible. Block it. Then, by injecting the epoxy resin into the repair pipe by the air pressure of compressed air in the starting side device and pushing the resin while adhering to the inner wall of the pipe, a uniform resin film is formed over the entire length of the repair pipe. . In addition, the arrival side equipment is implemented so as to confirm the progress of the lining work from the arrival state of the excess resin and to collect the excess resin.

【0003】 またこのライニング工法では、樹脂が樹脂同士は付着せず異質の管内壁にのみ 付着する性質を有することから、所定量の樹脂を複数回に分けて注入し、補修管 の樹脂膜の長さを順次伸ばすように施行される。このためこのライニングでは常 に空気の吹き抜けを伴って、膜面が適宜乱れた状態になる。そこでこの膜面の乱 れを整えるため、補修管の全長にライニングした後に、更に空気の吹き抜けを生 じないように均しライニングが数回行われている。この均しライニングでは、余 剰樹脂が到達側に達した際に樹脂プラグの状態で進行を止め、迅速に管内空気圧 を抜くことが必要になる。Further, in this lining method, since the resins have a property of not adhering to each other and adhering only to the inner wall of a heterogeneous pipe, a predetermined amount of the resin is injected in a plurality of times, and the resin film of the repair pipe is It is enforced to gradually increase the length. For this reason, in this lining, the film surface is appropriately disordered, with air always blown through. Therefore, in order to correct this disturbance on the film surface, after lining the entire length of the repair pipe, smoothing lining is performed several times to prevent further air blow-through. In this leveling lining, when the excess resin reaches the arrival side, it is necessary to stop the progress in the state of the resin plug and quickly release the air pressure in the pipe.

【0004】 従来、上記均しライニングを行う場合の手段として、特別な治具が使用されて いない。そこで作業者が到達側で余剰樹脂の到達を目視で確認すると、バルブを 閉止して樹脂の進行を停止する。そして直ちに発進側の作業者に無線機等により 知らせ、発進側で管内空気圧を抜くように作業している。Conventionally, no special jig has been used as a means for performing the leveling lining. Therefore, when the operator visually confirms the arrival of the excess resin on the arrival side, the valve is closed and the progress of the resin is stopped. Immediately, a worker on the starting side is informed by a wireless device, etc., and work is performed to release the air pressure inside the pipe on the starting side.

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところで上記従来技術のものにあっては、作業者により到達側でバルブを閉止 し、発進側で空気抜き作業するものであるから、熟練した作業者が必要になる。 特に、均しライニングでは樹脂が比較的速い速度で到達して樹脂排出ホース内部 を通過するので、バルブを閉止するタイミングが難しい。また到達側の樹脂排出 ホースは、バルブ閉止のタイミングのずれに対する空気抜けを防止するために充 分長く用意する必要があって、無駄が多い等の不具合がある。 By the way, in the above-mentioned prior art, since the operator closes the valve on the arrival side and bleeds air on the starting side, a skilled worker is required. Particularly, in the leveling lining, the resin arrives at a relatively high speed and passes through the inside of the resin discharge hose, so it is difficult to close the valve. Further, the resin discharge hose on the arrival side needs to be prepared for a long time in order to prevent air escape due to the deviation of the valve closing timing, which causes a problem such as a lot of waste.

【0006】 本考案は、この点に鑑みてなされたもので、補修管の均しライニング作業に適 正な治具を使用し、自動的に樹脂の進行を停止すると共に管内空気圧を抜いて、 常に適確に均しライニング作業することを目的とする。The present invention has been made in view of this point, and uses a jig suitable for leveling and lining repair pipes to automatically stop the progress of the resin and release the air pressure in the pipes. The aim is to always perform proper leveling and lining work.

【0007】[0007]

【課題を解決するための手段】[Means for Solving the Problems]

上記目的を達成するため、本考案は、補修管の一方の開口端に樹脂を空気圧に より注入して押し進める発進側装置が連結され、他方の開口端に空気の吹き抜け を可能にすると共に余剰樹脂を捕集する到達側装置が連結されるライニング装置 において、到達側装置の管路中に均しライニング治具を設け、この均しライニン グ治具は所定の孔径の空気逃し孔を有する筒体と、筒体の空気逃し孔の側に取付 けられる樹脂受けと、筒体の両端に取付けられる接続金具とを、着脱可能に構成 するものである。 In order to achieve the above-mentioned object, the present invention has a starting side device connected to one opening end of a repair pipe for injecting resin by air pressure and pushing the resin, and enables blow-out of air to the other opening end and to prevent excess resin. In the lining device to which the arrival side device that collects the arrival side device is connected, a leveling lining jig is provided in the pipe line of the arrival side device, and the leveling lining jig is a cylindrical body having an air escape hole of a predetermined hole diameter. The resin receiver that is attached to the air vent hole side of the tubular body and the connection fittings that are attached to both ends of the tubular body are detachable.

【0008】[0008]

【作用】[Action]

上記構成に基づき、ライニング作業終了後の均しライニング作業では、到達側 装置の管路中に均しライニング治具が装着される。このため発進側装置により再 び樹脂を補修管に注入して押し進めると、樹脂が既に形成されている樹脂膜の乱 れを直すように付着しながら通過し、到達側装置に到達して均しライニング治具 に流入する。そして樹脂が筒体の空気逃し孔の箇所を通過すると、その時点で管 内空気圧がその空気逃し孔から直ちに抜けるようになり、これにより樹脂の進行 が自動的に停止し、且つ筒内空気圧も徐々に降下することになり、こうして空気 の吹き抜けが防止されて、補修管の樹脂膜は均しライニングにより均一に整えた 状態に保持されるようになる。 Based on the above configuration, in the leveling lining work after the end of the lining work, the leveling lining jig is mounted in the pipeline of the arrival side device. For this reason, when the starting side device again injects the resin into the repair pipe and pushes it forward, the resin passes while adhering so as to correct the disturbance of the already formed resin film, and reaches the reaching side device to level it. Flow into the lining jig. Then, when the resin passes through the air escape hole of the cylinder, the air pressure inside the pipe immediately comes out of the air escape hole at that time, which automatically stops the progress of the resin and also the air pressure inside the cylinder. It will gradually descend, thus preventing blow-through of air, and the resin film of the repair pipe will be maintained in a uniform state by the leveling lining.

【0009】[0009]

【実施例】【Example】

以下、本考案の実施例を図面に基づいて説明する。図1において、管の一端か ら注入した高粘度の樹脂プラグを空気圧により一定速度で搬送し、管内面に厚く て均一なライニング膜を形成するライニング工法の施行に使用される全体の装置 の概略について説明すると、符号1は土aの中の所定の深度に埋設されるガス配 管、水道配管等の補修管である。この補修管1は両端の箇所の土aを掘削して掘 削穴bを形成することで、両端部が開口して露出される。また補修管1の途中に 供給管4の取出し部としてサービスチー2がある場合は、そのサービスチー2に 耐圧ストッパ3が開口部を一時的に塞ぐように取付けられる。そして補修管1の 一方の開口端1aに発進側装置10が、他方の開口端1bに到達側装置20が連 結して設けられる。 Embodiments of the present invention will be described below with reference to the drawings. In Fig. 1, a schematic diagram of the entire equipment used to carry out the lining method in which a highly viscous resin plug injected from one end of the pipe is conveyed at a constant speed by air pressure to form a thick and uniform lining film on the inner surface of the pipe The reference numeral 1 is a repair pipe such as a gas pipe or a water pipe buried in the soil a at a predetermined depth. The repair pipe 1 is formed by excavating the soil a at both ends to form excavation holes b, so that both ends are opened and exposed. When there is a service che 2 as a take-out portion of the supply pipe 4 in the middle of the repair pipe 1, a pressure resistant stopper 3 is attached to the service che 2 so as to temporarily close the opening. The start side device 10 is connected to one opening end 1a of the repair pipe 1, and the arrival side device 20 is connected to the other opening end 1b.

【0010】 発進側装置10は、圧縮空気を蓄えた空気ボンベ11、空気圧を減圧するレギ ュレータ12、圧送速度制御装置13及び空気圧ノズル14が耐圧ホース15に より順次連結される。そして、ライニング工法の施行前の作動確認作業の場合に は、空気圧ノズル14の先端に作動確認治具18が取付けられる。また正常な作 動が確認されてライニング工法を施行する場合には、補修管1の開口端1aのL 字形のランチャー16と空気圧ノズル14との間に樹脂注入管17を連結して構 成される。In the start-side device 10, an air cylinder 11 that stores compressed air, a regulator 12 that reduces the air pressure, a pressure-feed speed control device 13, and an air pressure nozzle 14 are sequentially connected to a pressure hose 15. Then, in the case of the operation confirmation work before the execution of the lining construction method, the operation confirmation jig 18 is attached to the tip of the pneumatic nozzle 14. When the normal operation is confirmed and the lining method is applied, a resin injection pipe 17 is connected between the L-shaped launcher 16 at the opening end 1a of the repair pipe 1 and the pneumatic nozzle 14. It

【0011】 到達側装置20は、補修管1の開口端1bのL字形のレシーバ21に対して、 均しライニング作業の場合には均しライニング治具30が連結される。そしてレ シーバ21または均しライニング治具30に、短い樹脂排出ホース22を介し樹 脂受脱臭器23を連結して構成される。In the arrival side device 20, a leveling lining jig 30 is connected to an L-shaped receiver 21 at the opening end 1b of the repair pipe 1 in the case of leveling lining work. The receiver 21 or the leveling lining jig 30 is connected to a resin deodorizer 23 via a short resin discharge hose 22.

【0012】 図2(a)の斜視図、(b)の断面図において、均しライニング治具30につ いて詳細に説明すると、アクリル樹脂の透明な筒体31を有し、この筒体31の 中間に空気逃し孔32が設けられる。筒体31の外側の径方向には2つの取付け 部31aが突設して、空気逃し孔32の側に透明な半円筒形の樹脂受け33が取 付け部31aに取付けて装着され、筒体31の両端に雄金具34と、止め金具3 5aを有する雌金具35を取付けて構成される。そしてレシーバ21の雌金具2 1aに均しライニング治具30の雄金具34を挿入して止め金具21bにより結 合し、雌金具35に樹脂排出ホース22を挿入して同様に止め金具35aにより 結合して連結される。In the perspective view of FIG. 2A and the sectional view of FIG. 2B, the leveling lining jig 30 will be described in detail. The leveling lining jig 30 includes a transparent acrylic resin tubular body 31. An air escape hole 32 is provided in the middle. Two mounting portions 31a are provided on the outside of the cylindrical body 31 in a radial direction, and a transparent semi-cylindrical resin receiver 33 is mounted and mounted on the mounting portion 31a on the air escape hole 32 side. A male metal fitting 34 and a female metal fitting 35 having a stopper metal fitting 35 a are attached to both ends of 31. Then, the male metal fitting 34 of the lining jig 30 is inserted into the female metal fitting 21a of the receiver 21 and connected by the stopper metal fitting 21b, and the resin discharge hose 22 is inserted in the female metal fitting 35 and similarly connected by the stopper metal fitting 35a. And then connected.

【0013】 図3において、均しライニング治具30の各部の構成について説明する。筒体 31は、両端にねじ部31bを有して雄金具34と雌金具35がそれぞれ螺着さ れる。また半円筒形の樹脂受け33は、その弾性により変形することが可能であ り、両端の鍔部33aの溝33bを取付け部31aに掛けることにより着脱可能 に取付けられ、これにより筒体31、雄金具34、雌金具35、樹脂受け33が 容易に分解、組付け可能になっている。The configuration of each part of the leveling lining jig 30 will be described with reference to FIG. The cylindrical body 31 has threaded portions 31b at both ends, and a male fitting 34 and a female fitting 35 are respectively screwed thereto. Further, the semi-cylindrical resin receiver 33 can be deformed by its elasticity, and is detachably attached by hooking the grooves 33b of the flange portions 33a at both ends to the attachment portion 31a, whereby the tubular body 31, The male fitting 34, the female fitting 35, and the resin receiver 33 can be easily disassembled and assembled.

【0014】 ここで補修管1の口径が例えば40mm、50mmの比較的細い場合には、ラ イニング速度が大きくて樹脂膜を薄く形成し、80mm、100mmの太い場合 には、ライニング速度が遅くて樹脂膜を厚く形成するように制御される。そこで このような樹脂膜の厚さの変化に対して適正に空気圧を抜くため、細い口径に対 応した例えば3mmの孔径の空気逃し孔32を有する筒体31と、太い口径に対 応した例えば5mmの孔径の空気逃し孔32’を有する筒体31’を有する。そ して補修管1の口径に応じて、筒体31,31’のいずれか一方を選択して使用 するようになっている。Here, when the diameter of the repair pipe 1 is relatively thin, for example, 40 mm and 50 mm, the lining speed is high and the resin film is thin, and when it is 80 mm and 100 mm, the lining speed is slow. It is controlled to form a thick resin film. Therefore, in order to properly release the air pressure in response to such a change in the thickness of the resin film, a cylinder body 31 having an air escape hole 32 having a hole diameter of, for example, 3 mm corresponding to a small diameter, and a cylinder body having a large diameter, for example, 3 It has a cylindrical body 31 ′ having an air escape hole 32 ′ having a hole diameter of 5 mm. Then, depending on the diameter of the repair pipe 1, either one of the cylindrical bodies 31 and 31 'is selected and used.

【0015】 次に、この実施例のライニング工法を施行する場合の作業について説明する。 先ず、施行する前の事前準備として、発進側装置10において空気圧ノズル14 の先端に作動確認治具18を取付け、この状態で発進側装置10を実際に作動す る。このとき圧送速度制御装置13でのライニング速度が設定値と一致するか否 かをチェックして作動状態を確認する。そして発進側装置10の正常な作動が確 認されると、実際にライニング工法が施行されるのであり、この場合の作業につ いて説明する。Next, the work for carrying out the lining method of this embodiment will be described. First, as a preliminary preparation before execution, the operation confirmation jig 18 is attached to the tip of the pneumatic nozzle 14 in the starting side device 10, and the starting side device 10 is actually operated in this state. At this time, it is checked whether the lining speed in the pressure feeding speed control device 13 matches the set value to confirm the operating state. Then, when the normal operation of the starting side device 10 is confirmed, the lining method is actually carried out, and the work in this case will be described.

【0016】 先ず、空気圧ノズル14から作動確認治具30を外し、図1のように空気圧ノ ズル14とランチャー16の間に樹脂を充填した樹脂注入器17を取付ける。ま た到達側装置20においては、補修管1の開口端1bのレシーバ21に樹脂排出 ホース22を介して樹脂受脱臭器23を連結するのであり、こうして発進側装置 10が補修管1を介し到達側装置20に連通してライニング作業することが可能 になる。First, the operation confirmation jig 30 is removed from the pneumatic nozzle 14, and the resin injector 17 filled with the resin is mounted between the pneumatic nozzle 14 and the launcher 16 as shown in FIG. Further, in the arrival side device 20, the resin deodorizer 23 is connected to the receiver 21 at the opening end 1b of the repair pipe 1 via the resin discharge hose 22, and thus the starting side device 10 arrives via the repair pipe 1. The lining work can be performed by communicating with the side device 20.

【0017】 そこで空気ボンベ11を開いて圧縮空気cを供給すると、その圧縮空気cが空 気圧ノズル14により樹脂注入器17の樹脂に高圧で作用し、これにより樹脂が 補修管1に注入される。そしてこの樹脂の塊の樹脂プラグdが管内を押し進むこ とにより、樹脂を管内壁に付着しながら移動して樹脂膜eが形成される。Then, when the air cylinder 11 is opened to supply the compressed air c, the compressed air c acts on the resin of the resin injector 17 at a high pressure by the pneumatic nozzle 14, whereby the resin is injected into the repair pipe 1. . Then, the resin plug d of the resin mass pushes inside the pipe, and the resin moves while adhering to the inner wall of the pipe to form the resin film e.

【0018】 この場合に制御装置13により、樹脂プラグdが多くて抵抗の大きい場合は空 気圧が高く、樹脂プラグdの量が減少すると空気圧が減圧して一定のライニング 速度に制御され、これにより樹脂膜eが均一に形成される。また途中で樹脂が無 くなって空気の吹き抜けを生じると、圧送速度制御装置13が自動停止する。そ こで樹脂注入器17を新しいものに交換して再開すると、樹脂はその性質により 補修管1の内部のライニング済みの区間は素通りし、未だ処理されない箇所から 付着し始めて樹脂膜eが順次延長して形成されるようになる。In this case, the controller 13 controls the air pressure to be high when the resin plug d is large and the resistance is high, and the air pressure is reduced to a constant lining speed when the amount of the resin plug d is decreased. The resin film e is uniformly formed. Further, when the resin runs out on the way and air blows through, the pressure-feeding speed control device 13 automatically stops. Then, when the resin injector 17 is replaced with a new one and restarted, the resin will pass through the lined section inside the repair pipe 1 due to its nature, and the resin film e will gradually extend from the point where it is not yet processed and will adhere. Will be formed.

【0019】 そこでこのような作業を数回繰返すことにより、補修管1の管内壁の全長にわ たり樹脂膜eを形成してライニングされる。そして補修管1の終端をライニング し終わると、余剰樹脂が到達側装置のレシーバ21から樹脂排出ホース22を通 過して樹脂受脱臭器23に入り、空気の吹き抜けを生じる。このため圧送速度制 御装置13が自動停止して、ライニング作業を終了する。Therefore, by repeating such work several times, the resin film e is formed and lined over the entire length of the inner wall of the repair pipe 1. When the end of the repair pipe 1 is completely lined, excess resin passes through the resin discharge hose 22 from the receiver 21 of the arrival side device and enters the resin deodorizer 23, causing blowout of air. Therefore, the pressure feeding speed control device 13 automatically stops and the lining work is completed.

【0020】 上記ライニング作業では常に空気の吹き抜けを伴って膜面が乱れているため、 この後更に均しライニング作業が行われる。そこで先ず、補修管1が例えば細い 場合には、均しライニング治具30において一方の筒体31が選択され、この筒 体31に雄金具34、雌金具35及び樹脂受け33を装着して一体的に組付けら れる。そして図1のように補修管1のレシーバ21と樹脂排出ホース22との間 に、この均しライニング治具30が連結される。In the above-mentioned lining work, the film surface is always disturbed due to the blow-through of air, so that after this, a further leveling lining work is performed. Therefore, first, when the repair pipe 1 is, for example, thin, one tube body 31 is selected in the leveling lining jig 30, and a male metal piece 34, a female metal piece 35, and a resin receiver 33 are attached to the tube body 31 to be integrated. Be assembled in a proper manner. Then, as shown in FIG. 1, the leveling lining jig 30 is connected between the receiver 21 of the repair pipe 1 and the resin discharge hose 22.

【0021】 こうして準備の整った後に、上述のライニング作業の場合と同様に樹脂注入器 17を装着し、発進側装置10を作動して、再び圧縮空気の空気圧により樹脂プ ラグdを補修管1に押し進める。すると樹脂プラグdが既に形成されている樹脂 膜eの乱れを直すように僅かずつ付着しながら,速い速度で補修管1を通過して 到達側装置20に到達する。ところでこの場合には、レシーバ21に均しライニ ング治具30が連結されることで、樹脂プラグdがその均しライニング治具30 の樹脂製の筒体31に流入し、且つ殆ど樹脂の付着の無い状態で通過するように なる。After the preparation is completed in this way, the resin injector 17 is mounted as in the case of the lining work described above, the starting side device 10 is operated, and the resin plug d is repaired by the pneumatic pressure of the compressed air again. Push forward. Then, the resin plug d passes through the repair pipe 1 and reaches the arrival side device 20 at a high speed while adhering little by little so as to correct the disorder of the already formed resin film e. By the way, in this case, by connecting the leveling lining jig 30 to the receiver 21, the resin plug d flows into the resin cylindrical body 31 of the leveling lining jig 30, and almost no resin adheres. There will be no passing.

【0022】 このため図4のように、多量の樹脂プラグが筒体31の空気逃し孔32の箇所 を通過した時点で、管内の圧縮空気cがその空気逃し孔32から直ちに抜け、こ れにより樹脂プラグdはこの状態を保って進行が自動的に停止する。また空気逃 し孔32により筒内空気圧も徐々に降下することになり、こうして空気の吹き抜 けが防止されて、補修管1の樹脂膜eは均しライニングにより均一に整えた状態 に保持される。一方、この空気抜けの際には樹脂の一部が孔32から外部に噴出 するが、この樹脂は樹脂受け33により捕集されて飛散防止される。Therefore, as shown in FIG. 4, when a large amount of resin plugs pass through the air escape holes 32 of the cylindrical body 31, the compressed air c in the pipe immediately escapes from the air escape holes 32, which causes The resin plug d maintains this state and the progress automatically stops. Further, the air pressure inside the cylinder is gradually decreased by the air escape hole 32, and thus the blowout of air is prevented, and the resin film e of the repair pipe 1 is held in a uniform state by the leveling lining. . On the other hand, when the air is released, a part of the resin is ejected from the hole 32 to the outside, but the resin is collected by the resin receiver 33 and is prevented from scattering.

【0023】 尚、上述の均しライニング作業において、補修管1の口径が大きい場合には、 筒内空気圧が低くてライニング速度が遅く制御されるため、これに対応して均し ライニング治具30では、孔径の大きい空気逃し孔32’を有する筒体31’が 使用される。そこでこの場合にも、樹脂プラグdが空気逃し孔32を通過した時 点で、低い筒内空気圧が孔径の大きい孔32’により迅速に抜けて、同様に作用 する。In the above-mentioned leveling lining work, when the diameter of the repair pipe 1 is large, the in-cylinder air pressure is low and the lining speed is controlled to be slow. In, a cylindrical body 31 ′ having an air escape hole 32 ′ having a large hole diameter is used. Therefore, also in this case, when the resin plug d passes through the air escape hole 32, the low in-cylinder air pressure quickly escapes through the hole 32 'having a large hole diameter, and the same operation is performed.

【0024】 以上、本考案の実施例について説明したが、均しライニング治具の構成はこれ のみに限定されない。Although the embodiment of the present invention has been described above, the structure of the leveling lining jig is not limited to this.

【0025】[0025]

【考案の効果】[Effect of device]

以上説明したように、本考案によれば、管の一端から注入した高粘度の樹脂プ ラグを空気圧により一定速度で搬送し、管内面に厚くて均一なライニング膜を形 成するライニング工法を施行するライニング装置において、均しライニング作業 では均しライニング治具を使用し、樹脂が到達側に到達した時点で管内空気圧を 抜くように構成されているので、自動的に樹脂進行が停止すると共に管内空気圧 が降下して空気の吹き抜けが防止され、均しライニング作業を確実に行うことが できる。また均しライニング治具によるこのような機能により、到達側の作業者 によるバルブ閉止、発進側の作業者による空気抜きの作業が不要になって作業が 簡素化し、樹脂排出ホースも短くて済む。 As explained above, according to the present invention, the high-viscosity resin plug injected from one end of the pipe is conveyed at a constant speed by air pressure, and the lining method is applied to form a thick and uniform lining film on the inner surface of the pipe. In the lining device, the leveling jig is used in the leveling lining work, and the air pressure inside the pipe is released when the resin reaches the arrival side. The air pressure drops and blow-through of air is prevented, so the leveling lining work can be performed reliably. In addition, this function of the leveling lining jig simplifies the work by eliminating the valve closing work by the worker on the arrival side and the air discharge work by the worker on the start side, and shortens the resin discharge hose.

【0026】 均しライニング治具は、所定の孔径の空気逃し孔を備えた筒体を有し、この筒 体に樹脂受けと接続金具を取付けた構成であるから、構造が簡単で、清掃も容易 である。筒体の空気逃し孔は、補修管の口径に応じて選択使用されるので、補修 管の太さの変化に対して常に確実に均しライニング作業することができる。The leveling lining jig has a cylindrical body provided with an air escape hole having a predetermined hole diameter, and has a structure in which a resin receiver and a connection fitting are attached to the cylindrical body, so that the structure is simple and cleaning is easy. It's easy. The air vent hole of the cylinder is selected and used according to the diameter of the repair pipe, so that even if the thickness of the repair pipe changes, the leveling lining can always be performed reliably.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に係るライニング装置の実施例を示す全
体の側面図である。
FIG. 1 is an overall side view showing an embodiment of a lining device according to the present invention.

【図2】均しライニング治具の構成を示す斜視図と断面
図である。
FIG. 2 is a perspective view and a cross-sectional view showing the structure of a leveling lining jig.

【図3】同均しライニング治具の分解斜視図である。FIG. 3 is an exploded perspective view of the equalizing lining jig.

【図4】均しライニング治具による樹脂進行停止と管内
空気圧降下の状態を示す断面図である。
FIG. 4 is a cross-sectional view showing a state where the progress of the resin is stopped and the air pressure in the pipe is lowered by the leveling lining jig.

【符号の説明】[Explanation of symbols]

1 補修管 1a,1b 開口端 10 発進側装置 20 到達側装置 30 均しライニング治具 31 筒体 32 空気逃し孔 33 樹脂受け 34 雄金具 35 雌金具 1 Repair Pipe 1a, 1b Opening End 10 Starting Side Device 20 Reaching Side Device 30 Leveling Lining Jig 31 Cylindrical Body 32 Air Release Hole 33 Resin Receptor 34 Male Metal Fitting 35 Female Metal Fitting

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 補修管の一方の開口端に樹脂を空気圧に
より注入して押し進める発進側装置が連結され、他方の
開口端に空気の吹き抜けを可能にすると共に余剰樹脂を
捕集する到達側装置が連結されるライニング装置におい
て、到達側装置の管路中に均しライニング治具を設け、
この均しライニング治具は所定の孔径の空気逃し孔を有
する筒体と、筒体の空気逃し孔の側に取付けられる樹脂
受けと、筒体の両端に取付けられる接続金具とを、着脱
可能に構成することを特徴とするライニング装置。
1. A starting-side device for injecting and pushing resin by air pressure is connected to one opening end of the repair pipe, and an arrival-side device for allowing excess air to be blown and collecting excess resin at the other opening end. In the lining device that is connected to, a leveling lining jig is provided in the pipeline of the arrival side device,
This leveling lining jig has a tubular body having an air vent hole of a predetermined bore diameter, a resin receiver attached to the air vent hole side of the tubular body, and connection fittings attached to both ends of the tubular body, which are detachable. A lining device characterized by being configured.
【請求項2】 均しライニング治具は、補修管の口径の
変化に対応して、異なる孔径を有する複数本の筒体を有
することを特徴とする請求項1記載のライニング装置。
2. The lining device according to claim 1, wherein the leveling lining jig has a plurality of cylindrical bodies having different hole diameters corresponding to changes in the diameter of the repair pipe.
JP7725292U 1992-10-12 1992-10-12 Lining equipment Expired - Fee Related JP2557432Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7725292U JP2557432Y2 (en) 1992-10-12 1992-10-12 Lining equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7725292U JP2557432Y2 (en) 1992-10-12 1992-10-12 Lining equipment

Publications (2)

Publication Number Publication Date
JPH0634775U true JPH0634775U (en) 1994-05-10
JP2557432Y2 JP2557432Y2 (en) 1997-12-10

Family

ID=13628670

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7725292U Expired - Fee Related JP2557432Y2 (en) 1992-10-12 1992-10-12 Lining equipment

Country Status (1)

Country Link
JP (1) JP2557432Y2 (en)

Also Published As

Publication number Publication date
JP2557432Y2 (en) 1997-12-10

Similar Documents

Publication Publication Date Title
US5983948A (en) Method of repairing an existing pipeline including a main pipe and a branch pipe
JPS6149071A (en) Adhesive injection apparatus and method for injecting adhesive in cracks of concrete structure
JP2557432Y2 (en) Lining equipment
JP2562372Y2 (en) Operation check jig for lining work
JP3160354B2 (en) Pipe line repair method by suction lining
JP3161620B2 (en) Pipe line repair method by suction lining
JP2562373Y2 (en) Excess resin removal equipment for lining work
JPS6227861B2 (en)
JP2945105B2 (en) How to line the inside of a pipe
JPS5850779B2 (en) Pipe inner lining method
JP2683050B2 (en) Inner lining method for city gas conduits and jigs used therefor
JPH06126230A (en) Existing pipe lining equipment
JPH0418966A (en) Method for repairing inside surface of supply pipe
EP2322836A1 (en) Method to carry out a branching point of a pipe line under repair
JP3510753B2 (en) Partial rehabilitation repair jig and rehabilitation repair method
JPH07241524A (en) Pipe lining method
JPH0260395B2 (en)
JP3608718B2 (en) Method and apparatus for refurbishing inner wall surface of branch pipe
JPH05228437A (en) Pipe line repair method using suction lining
JPH04371271A (en) Method for repairing lining of existing supply inner pipe
JPH09141152A (en) Pipe-inside coating apparatus
JPS61103568A (en) Repair apparatus of pipe inside surface of established pipeline
JPH04293577A (en) Non-excavation lining repairing construction method of existing piping
JPH05228440A (en) Pipe line repair method using suction lining
JPH0783379A (en) How to block the supply pipe

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees