JPH0648048Y2 - Stone scaffolding tether for building - Google Patents
Stone scaffolding tether for buildingInfo
- Publication number
- JPH0648048Y2 JPH0648048Y2 JP1988088827U JP8882788U JPH0648048Y2 JP H0648048 Y2 JPH0648048 Y2 JP H0648048Y2 JP 1988088827 U JP1988088827 U JP 1988088827U JP 8882788 U JP8882788 U JP 8882788U JP H0648048 Y2 JPH0648048 Y2 JP H0648048Y2
- Authority
- JP
- Japan
- Prior art keywords
- connecting plate
- stone
- scaffolding
- skeleton
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004575 stone Substances 0.000 title claims description 38
- 239000002184 metal Substances 0.000 claims description 20
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
- Ladders (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Description
【考案の詳細な説明】 (産業上の利用分野) この考案は、コンクリート建築物の躯体と適当間隔を設
け石貼りして石貼り建築物を構築する場合に、その石貼
りの目地内を通して足場を躯体に堅固に支持する石貼り
建築物用足場つなぎ具に係るものである。[Detailed Description of the Invention] (Industrial Application Field) This invention is a scaffold through a joint of stones when a stone-pasted building is constructed by placing stones with a proper distance from the frame of a concrete building. The present invention relates to a scaffolding tie for a stone-covered building, which firmly supports the structure on a skeleton.
(従来の技術) 従来のこの種のコンクリート建築物の躯体に足場を連結
して設ける場合は、実公昭39−18140号公報に記載され
ているように、コンクリートの躯体内に埋設したセパレ
ーター軸の先端に螺着した連結金具に足場繋留杆の一端
部を引掛け、その足場繋留杆に足場の布地管を直交クラ
ンプにより固定して足場を設けている。(Prior Art) When a scaffold is connected to the body of a conventional concrete building of this type, as described in Japanese Utility Model Publication No. Sho 39-18140, a separator shaft embedded in a concrete body is used. A scaffold is provided by hooking one end of a scaffolding rod to a connecting metal fitting screwed to the tip, and fixing a fabric pipe of the scaffolding to the scaffolding rod by an orthogonal clamp.
(考案が解決しようとする問題点) コンクリート建築物の躯体と適当間隔を設け石貼りして
石貼り建築物を構築する場合、特に乾式方法において
は、石貼りの目地間隔が狭い。(Problems to be solved by the invention) When a stone-pasted building is constructed by placing stones at a proper distance from the skeleton of a concrete building, the joint spacing between stones is narrow, especially in the dry method.
そのため、上記従来の足場繋留杆による足場連結装置に
おいては、 (1)足場繋留杆を石貼りの目地内に通すにはその足場
繋留杆が相当細くなるから、足場を躯体に堅固に支持す
ることができない。Therefore, in the above-mentioned conventional scaffold connecting device using the scaffolding mooring rod, (1) the scaffolding mooring rod becomes considerably thin in order to pass the scaffolding mooring rod into the joints of the stones. I can't.
(2)作業の終了後、足場を解体するとき、足場繋留杆
を石貼りの外側で操作して除去することができなくて取
扱い難い。(2) When the scaffold is disassembled after the work is completed, the scaffolding rod cannot be manipulated and removed on the outside of the stone sticking, which is difficult to handle.
等の点に問題がある。There is a problem in such points.
(問題点を解決するための手段) この考案は、上記の問題点を解決するために、コンクリ
ート建築物の躯体(A)と適当間隔を設けて上下に並置
する貼り石(B),(C)間の目地(1)に嵌通する連
結板(2)の躯体(A)側の端部には、躯体(A)内の
アンカー(12)に縦片をボルト(13)によつて固定する
形取付金(3)の横片をその連結板(2)および横片
の通孔(15),(17)に挿着するボルト・ナツト(6)
により連結し、連結板(2)の外側の端部には、つなぎ
パイプ(4)の基端の連結金(5)をその連結板(2)
および連結金(5)の通孔(16),(20)に挿着するボ
ルト・ナツト(7)によつて連結し、つなぎパイプ
(4)の先端ねじ孔(8)には、先端部に足場(D)の
パイプ(14)を着脱可能に挟持するクランプ(9)およ
び操作部(10)を設けた調整ボルト(11)を螺通して石
貼り建築物用足場つなぎ具(a)を構成する。(Means for Solving Problems) In order to solve the above-mentioned problems, the present invention provides a stepping stone (B), (C) that is juxtaposed vertically with a skeleton (A) of a concrete building with an appropriate interval. ) A vertical piece is fixed to the anchor (12) in the skeleton (A) by bolts (13) at the end on the skeleton (A) side of the connecting plate (2) that fits into the joint (1) between Bolts and nuts (6) for inserting the horizontal piece of the mounting metal (3) into the connecting plate (2) and the through holes (15) and (17) of the horizontal piece.
The connecting plate (2) is connected with the connecting plate (2) at the outer end of the connecting plate (2) by a connecting metal (5) at the base end of the connecting pipe (4).
And the bolts and nuts (7) that are inserted into the through holes (16) and (20) of the connecting metal (5) to connect the ends of the connecting pipe (4) to the screw holes (8). A clamp (9) that removably clamps a pipe (14) of a scaffold (D) and an adjusting bolt (11) provided with an operating portion (10) are screwed into a scaffolding connector (a) for a stone-bonded building. To do.
(作用) 足場(D)を設けるときは、躯体(A)内のアンカー
(12)に取付金(3)の縦片をボルト(13)により固定
し、クランプ(9)により足場(D)のパイプ(14)を
挟持して足場(D)を躯体(A)に堅固に支持する。(Operation) When the scaffold (D) is provided, the vertical piece of the mounting metal (3) is fixed to the anchor (12) in the skeleton (A) by the bolt (13), and the scaffold (D) is fixed by the clamp (9). The pipe (14) is sandwiched to firmly support the scaffold (D) on the skeleton (A).
足場(D)を解体するときは、貼り石(B),(C)の
外側で操作し、つなぎパイプ(4)の取付け用ボルト・
ナツト(7)を取外して調整ボルト(11)付きつなぎパ
イプ(4)を連結板(2)から取除く。When dismantling the scaffold (D), operate it on the outside of the stones (B) and (C) to attach the connecting pipe (4) to the bolt.
Remove nut (7) and remove connecting pipe (4) with adjusting bolt (11) from connecting plate (2).
その後、連結板(2)の突出部を側方へ押圧すると、そ
の連結板(2)がボルト・ナツト(6)を支点として側
方へ回動し目地(1)内に没入して収納される。After that, when the protruding portion of the connecting plate (2) is pushed laterally, the connecting plate (2) pivots laterally around the bolt nut (6) as a fulcrum and is retracted and stored in the joint (1). It
(実施例) 図面に示すこの考案の一実施例についてその構造を説明
すれば、(A)はコンクリート建築物の躯体、(B),
(C)は躯体(A)の外側に適当間隔を設けて上下に並
置する貼り石、(D)は貼り石(B),(C)の外側に
設ける足場を示し、(1)は貼り石(B),(C)間の
横目地、(14)は足場(D)の建地パイプである。(Example) Explaining the structure of an example of the present invention shown in the drawings, (A) is a frame of a concrete building, (B),
(C) shows stones placed side by side at the upper and lower sides of the body (A) with appropriate intervals, (D) shows scaffolds provided outside the stones (B) and (C), and (1) shows stones The horizontal joint between (B) and (C), and (14) is the building pipe of the scaffold (D).
(a)は石貼り建築物用足場つなぎ具を示し、(2)は
そのリンク状連結板で、両端部に通孔(15),(16)を
穿設する。(3)は形の取付金で、その横片に通孔
(17)を、縦片に縦長孔(18)をそれぞれ穿設する。
(4)はつなぎパイプで、その基端に座板(19)付き
形連結金(5)を固定して該形連結金(5)の中間片
に通孔(20)を穿設し、つなぎパイプ(4)の先端部は
小径にしぼつてその内方をねじ孔(8)に形成する。
(6),(7)は連結板(2)の取付金(3)、および
つなぎパイプ(4)の連結金(5)への取付け用ボルト
・ナツト、(11)はつなぎパイプ(4)のねじ孔(8)
に螺通する調整ボルトで、その先端部にはクランプ
(9)および操作ハンドル(10)を嵌着する。(A) shows a stone scaffolding scaffolding joint for a building, and (2) is its link-like connecting plate having through holes (15), (16) at both ends. Reference numeral (3) is an attachment metal having a shape in which a through hole (17) is formed in the horizontal piece and a vertically elongated hole (18) is formed in the vertical piece.
(4) is a connecting pipe, and a base plate with a seat plate (19) is fixed to the connecting pipe (5), and a through hole (20) is bored in an intermediate piece of the connecting pipe (5) to form a connecting pipe. The tip of the pipe (4) is reduced in diameter to form a screw hole (8) inside.
(6) and (7) are the mounting plate (2) mounting metal (3) and the connecting pipe (4) for connecting bolts and nuts to the connecting metal (5), and (11) is the connecting pipe (4). Screw hole (8)
The clamp (9) and the operating handle (10) are fitted to the tip of the adjusting bolt which is screwed into the.
(12)は躯体(A)への後付けアンカー、(13)はその
アンカー(12)に螺合するボルトである。(12) is a post-installed anchor to the skeleton (A), and (13) is a bolt screwed to the anchor (12).
(21)は躯体(A)への後付けアンカー、(22)はその
アンカー(21)に螺合するボルト、(23)はL形金物
で、その横片上に取付板(24)の基部をボルト・ナツト
(25)により固定する。(26)は貼り石(B),(C)
を連結して取付けるダボである。(21) is a post-installed anchor to the skeleton (A), (22) is a bolt screwed to the anchor (21), (23) is an L-shaped metal object, and the base of the mounting plate (24) is bolted on the horizontal piece.・ Fix with nut (25). (26) is stone (B), (C)
It is a dowel that connects and installs.
次にその足場つなぎ具の使用法を説明する。躯体(A)
の側面の適当箇所にアンカー孔を穿設して第2図および
第3図に示すようにそのアンカー孔内にアンカー(2
1),(12)をそれぞれ挿着する。Next, how to use the scaffolding tie will be described. Body (A)
Anchor holes are drilled at appropriate points on the side surface of the anchor, and as shown in FIGS. 2 and 3, anchors (2
Insert 1) and (12) respectively.
次いで、取付板(24)付きL形金物(23)を、そのL形
金物(23)の縦片の通孔に挿通してアンカー(21)のね
じ孔に螺合するボルト(22)によつて躯体(A)に締付
け固定する。Then, the L-shaped metal fitting (23) with the mounting plate (24) is inserted into the through hole of the vertical piece of the L-shaped metal fitting (23) and screwed into the screw hole of the anchor (21) by a bolt (22). Tighten and fix it to the body (A).
一方、形取付金(3)を、その縦片の長孔(18)に挿
通してアンカー(12)のねじ孔に螺合するボルト(13)
によつて躯体(A)に締付け固定した後、該形取付金
(3)の横片上に連結板(2)の一端部をそれらの通孔
(17),(15)に挿着するボルト・ナツト(6)によつ
て取付ける。On the other hand, a bolt (13) for inserting the shape mounting metal (3) into the elongated hole (18) of the vertical piece and screwing it into the screw hole of the anchor (12).
Bolts for fixing one end of the connecting plate (2) to the through holes (17), (15) on the horizontal piece of the shape mounting metal (3) after tightening and fixing to the skeleton (A). Install with nut (6).
そこで、躯体(A)の外側に適当間隔を設けた所定位置
に下方貼り石(C)を立設し、取付板(24)の先端部の
通孔と下方貼り石(C)の上面のダボ孔にダボ(26)の
下半部を挿着して下方貼り石(C)を支保する。一方、
連結板(2)は下方貼り石(C)と直交状態になしてそ
の外側の端部を下方貼り石(C)より外側、すなわち躯
体(A)と反対側へ突出させる。Therefore, a lower sticking stone (C) is erected at a predetermined position on the outside of the skeleton (A) with a proper interval, and a through hole at the tip of the mounting plate (24) and a dowel on the upper surface of the lower sticking stone (C). The lower half of the dowel (26) is inserted into the hole to support the lower stuck stone (C). on the other hand,
The connecting plate (2) is in a state of being orthogonal to the lower stone (C) so that the outer end of the connecting plate (2) projects outside the lower stone (C), that is, on the opposite side of the skeleton (A).
次に、調整ボルト(11)付きつなぎパイプ(4)の連結
金(5)を連結板(2)の外側の端部に嵌合してそれら
の通孔(20),(16)に挿着するボルト・ナツト(7)
により連結する。Next, the connecting metal (5) of the connecting pipe (4) with the adjusting bolt (11) is fitted to the outer end of the connecting plate (2) and inserted into their through holes (20), (16). Bolt Nut (7)
Connect by.
次いで、上方貼り石(B)の下面のダボ孔をダボ(26)
の上半部に嵌合して上方貼り石(B)を取付板(24)上
に載置すれば、足場つなぎ具(a)の連結板(2)が目
地(1)に嵌合して上方貼り石(B)は取付板(24)上
に載るから、その後、上方貼り石(B)の上端において
上記の下方貼り石(C)の上端の取付けと同様に操作
し、上方貼り石(B)の上端をアンカー(21),ボルト
(22),L形金物(23),取付板(24),ボルト・ナツト
(25)およびダボ(26)により躯体(A)に連結して上
方貼り石(B)を取付ける。Next, insert the dowel hole (26) in the lower surface of the upper stone (B).
If the upper bonded stone (B) is placed on the attachment plate (24) by fitting in the upper half of the above, the connecting plate (2) of the scaffolding joint (a) fits in the joint (1). Since the upper stone (B) is placed on the mounting plate (24), the upper stone (B) is then operated at the upper end of the upper stone (B) in the same manner as the upper edge of the lower stone (C). The upper end of B) is connected to the skeleton (A) by the anchor (21), bolt (22), L-shaped hardware (23), mounting plate (24), bolt / nut (25) and dowel (26), and is attached on top. Install the stone (B).
以下順次上記操作を繰返し、躯体(A)の外側に適当間
隔を設けて石貼りすると共に、その貼り石(B),
(C)間の目地(1)内に挿通して躯体(A)に連結し
た足場つなぎ具(a)を設ける。The above operation is sequentially repeated, and stones are stuck on the outside of the skeleton (A) at appropriate intervals, and the stones (B),
A scaffolding joint (a) is provided which is inserted into the joint (1) between (C) and connected to the skeleton (A).
次に、各足場つなぎ具(a)において、ハンドル(10)
により調整ボルト(11)を回転して躯体(A)からクラ
ンプ(9)までの距離を所定に調節した後、クランプ
(9)により足場(D)の建地パイプ(14)を挟持して
所要位置に足場(D)を設ける。Next, in each scaffolding joint (a), the handle (10)
After adjusting the distance from the frame (A) to the clamp (9) by rotating the adjustment bolt (11) with the clamp, the clamp (9) clamps the building pipe (14) of the scaffold (D). Provide a scaffold (D) in position.
一方、作業の終了後、足場(D)を解体するときは、ク
ランプ(9)を開いて足場(D)を取除いた後、ボルト
・ナツト(7)を取外でば足場つなぎ具(a)の調整ボ
ルト(11)付きつなぎパイプ(4)が連結板(2)より
取除かれるから、足場(D)を解体することができる。On the other hand, when dismantling the scaffold (D) after the completion of the work, the clamp (9) is opened to remove the scaffold (D), and then the bolt and nut (7) is removed to remove the scaffold joint (a). Since the connecting pipe (4) with the adjusting bolt (11) of (1) is removed from the connecting plate (2), the scaffold (D) can be disassembled.
更に、その後、連結板(2)の突出部を側方へ押圧する
と、その連結板(2)がボルト・ナツト(6)を支点と
して側方へ回動し目地(1)内に没入して収納される。Further, thereafter, when the protruding portion of the connecting plate (2) is pressed laterally, the connecting plate (2) pivots laterally around the bolt nut (6) as a fulcrum and sinks into the joint (1). It is stored.
(考案の効果) この考案の石貼り建築物用足場つなぎ具は、下記のよう
な顕著な効果を有する。(Effect of the Invention) The scaffolding connecting tool for stone-attached buildings of the present invention has the following remarkable effects.
(1)連結板のコンクリート躯体側端部には該躯体内の
アンカーに縦片を取付ける形取付金の横片を、外側の
端部には調整ボルト付きつなぎパイプの基端の連結金を
それぞれボルト・ナツトにより連結し、その調整ボルト
の先端のクランプにより足場のパイプを挟持する。従つ
て、 (イ)連結板が薄くて石貼りの目地内に挿通し形取付
金を介して躯体内のアンカーに連結し、足場つなぎ具が
堅牢で、足場を躯体に堅固に連結して設けることができ
る。(1) At the end of the concrete plate side of the connecting plate, there is a horizontal piece of mounting metal that attaches a vertical piece to the anchor in the body, and at the outer end is the connecting piece of the base end of the connecting pipe with adjusting bolts. Connect with bolts and nuts, and clamp the scaffold pipe with the clamp at the tip of the adjusting bolt. Therefore, (a) The connecting plate is thin and is inserted into the joint of stones and is connected to the anchor inside the body through the mounting metal, and the scaffold tie is robust, and the scaffold is firmly connected to the body. be able to.
(ロ)足場つなぎ具の取付け操作が容易である。(B) It is easy to attach the scaffold tie.
(ハ)足場は足場つなぎ具を介して躯体と一体的に支持
され、倒れるおそれがなくて安全上有益である。(C) The scaffold is supported integrally with the body through the scaffolding joint, and there is no risk of falling, which is beneficial for safety.
(2)石貼りの目地内を通る足場つなぎ具の部材が連結
板の板体であるから、石貼りの目地間隔が狭くても、そ
の足場つなぎ具の連結作用は確実堅固である。(2) Since the member of the scaffolding joint that passes through the joint of the stone is the plate of the connecting plate, the connecting action of the scaffolding joint is sure and firm even if the joint space of the stone is narrow.
(3)足場つなぎ具を取除くときは、そのつなぎパイプ
の連結板への取付けボルト・ナツトを取外すことによつ
て調整ボルト付きつなぎパイプが取除かれ、足場つなぎ
具を石貼りの外側で操作して取除くことができる。(3) When removing the scaffolding joints, the joint pipes with adjusting bolts are removed by removing the bolts / nuts for attaching the jointing pipes to the connecting plate, and the scaffolding joints are operated outside the stones. Can be removed.
従つて、躯体と石貼りとの間の狭い間隔のところに手を
入れることなく、石貼りの外側で簡易迅速に取除き操作
し得られ、特に、石貼りの目地間隔が狭い建築物にも十
分対応でき、取扱い易くて作業能率を向上する。Therefore, it is possible to remove the stones easily and quickly on the outside of the stone without putting a hand in the narrow space between the body and the stone. It can handle well, is easy to handle, and improves work efficiency.
(4)調整ボルト付きつなぎパイプの取除き後、連結板
の外側突出部を側方へ押圧することにより、該連結板が
形取付金への取付けボルト・ナツトを支点として側方
へ回動し目地内に没入して収納され、その操作が簡易で
作業上有益である。(4) After removing the connecting pipe with the adjusting bolt, by pressing the outer protruding part of the connecting plate to the side, the connecting plate is rotated to the side with the mounting bolt / nut on the shape mounting metal as a fulcrum. It is stored by being immersed in the joint, and its operation is simple and useful for work.
(5)構造が極めて簡単で、容易安価に製作できる。(5) The structure is extremely simple and easy and inexpensive to manufacture.
第1図はこの考案の一実施例に係る足場つなぎ具を使用
して石貼りしたコンクリート建築物の正面図、第2図は
第1図のI−I線断面図、第3図は同上足場つなぎ具に
よつて足場をコンクリート建築物の躯体に連結した状態
の拡大側断面図、第4図は平面図、第5図はその足場つ
なぎ具の分解斜面図である。 (A)…コンクリート建築物の躯体、(B),(C)…
貼り石、(D)…足場、(1)…目地、(2)…連結
板、(3)…形取付金、(4)…つなぎパイプ、
(5)…連結金、(6)…ボルト・ナツト、(7)…ボ
ルト・ナツト、(8)…先端ねじ孔、(9)…クラン
プ、(10)…操作部、(11)…調整ボルト、(12)…ア
ンカー、(13)…ボルト、(14)…パイプ、(15)…通
孔、(16)…通孔、(17)…通孔、(20)…通孔、FIG. 1 is a front view of a concrete building on which stones are attached using a scaffolding jointing tool according to an embodiment of the present invention, FIG. 2 is a sectional view taken along the line I--I of FIG. 1, and FIG. FIG. 4 is an enlarged side sectional view of the scaffold connected to the skeleton of the concrete building by a tether, FIG. 4 is a plan view, and FIG. 5 is an exploded perspective view of the scaffold tether. (A) ... The frame of the concrete building, (B), (C) ...
Paving stone, (D) ... Scaffold, (1) ... Joint, (2) ... Connecting plate, (3) ... Shape mounting metal, (4) ... Connecting pipe,
(5) ... Connecting metal, (6) ... Bolt / nut, (7) ... Bolt / nut, (8) ... Tip hole, (9) ... Clamp, (10) ... Operating part, (11) ... Adjusting bolt , (12) ... anchor, (13) ... bolt, (14) ... pipe, (15) ... through hole, (16) ... through hole, (17) ... through hole, (20) ... through hole,
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 実願 昭61−132120号(実開 昭63− 40435号)の願書に添付した明細書及び図 面の内容を撮影したマイクロフィルム(J P,U) 実願 昭58−175326号(実開 昭60− 82047号)の願書に添付した明細書及び図 面の内容を撮影したマイクロフィルム(J P,U) ─────────────────────────────────────────────────── ─── Continuation of front page (56) References Microfilm (JP, U ) A microfilm (JP, U) obtained by photographing the contents and drawings attached to the application of Japanese Utility Model Application No. 58-175326 (Japanese Utility Model Application No. 60-82047).
Claims (1)
けて上下に並置する貼り石間の目地に嵌通する連結板の
上記躯体側の端部には、上記躯体内のアンカーに縦片を
ボルトによつて固定する形取付金の横片をその連結板
および横片の通孔に挿着するボルト・ナツトにより連結
し、上記連結板の外側の端部には、つなぎパイプの基端
の連結金をその連結板および連結金の通孔に挿着するボ
ルト・ナツトによつて連結し、上記つなぎパイプの先端
ねじ孔には、先端部に足場のパイプを着脱可能に挟持す
るクランプおよび操作部を設けた調整ボルトを螺通して
なる石貼り建築物用足場つなぎ具。1. A vertical piece is attached to an anchor in the skeleton at the skeleton-side end of a connecting plate that fits into joints between the stones that are vertically juxtaposed with the skeleton of a concrete building at a proper distance. The horizontal pieces of the mounting metal fixed by bolts are connected by bolts and nuts that are inserted into the through holes of the connecting plate and the horizontal pieces, and the outer end of the connecting plate is connected to the base end of the connecting pipe. The connecting plate is connected by bolts and nuts that are inserted into the connecting plate and through holes of the connecting plate, and the tip screw hole of the connecting pipe is a clamp and operation that detachably clamps the scaffolding pipe at the tip. A scaffolding joint for stone-bonded buildings, which is made by screwing adjustment bolts with parts.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1988088827U JPH0648048Y2 (en) | 1988-07-04 | 1988-07-04 | Stone scaffolding tether for building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1988088827U JPH0648048Y2 (en) | 1988-07-04 | 1988-07-04 | Stone scaffolding tether for building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0211946U JPH0211946U (en) | 1990-01-25 |
| JPH0648048Y2 true JPH0648048Y2 (en) | 1994-12-07 |
Family
ID=31313384
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1988088827U Expired - Lifetime JPH0648048Y2 (en) | 1988-07-04 | 1988-07-04 | Stone scaffolding tether for building |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0648048Y2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6082047U (en) * | 1983-11-11 | 1985-06-06 | 株式会社 国元商会 | wall joining tools |
| JPS6340435U (en) * | 1986-08-29 | 1988-03-16 |
-
1988
- 1988-07-04 JP JP1988088827U patent/JPH0648048Y2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0211946U (en) | 1990-01-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5830378A (en) | Concrete slab foundation forming devices | |
| JPH05280202A (en) | Anchor frame locating tool | |
| JPH0648048Y2 (en) | Stone scaffolding tether for building | |
| JPH0751835B2 (en) | Connecting device for structures such as stone materials | |
| JP3740232B2 (en) | Anchor bolt mounting bracket | |
| JPH019886Y2 (en) | ||
| JP2971061B1 (en) | Anchor bolt holding device for foundation when placing concrete | |
| JPS639732Y2 (en) | ||
| JP3004186U (en) | Hanging metal fittings for space truss | |
| JPH0315712Y2 (en) | ||
| JP2603722Y2 (en) | Scaffolding wall fittings | |
| JP2579387Y2 (en) | Storage fixed structure | |
| JPH0340982Y2 (en) | ||
| JP2552733Y2 (en) | Veranda form support device | |
| JPH07119157A (en) | Installation structure of anchor bolt | |
| JPH10204892A (en) | Anchor bolt support device of foundation concrete | |
| JPS627806Y2 (en) | ||
| JPH0645554Y2 (en) | Jigs for pipe piping in concrete structures | |
| JPS5916440Y2 (en) | Misalignment prevention clamp for concrete formwork | |
| JPS6220596Y2 (en) | ||
| JPS5910269Y2 (en) | Handrail support for scaffolding frame | |
| JP2548953Y2 (en) | Connection holding bracket | |
| JP3032444U (en) | Rotational fall prevention support | |
| JP2804925B2 (en) | Lower end support device of inclined support for concrete construction | |
| JPH0355710Y2 (en) |