- Publication number
- JPH069249Y2 JPH069249Y2 JP1987089493U JP8949387U JPH069249Y2 JP H069249 Y2 JPH069249 Y2 JP H069249Y2 JP 1987089493 U JP1987089493 U JP 1987089493U JP 8949387 U JP8949387 U JP 8949387U JP H069249 Y2 JPH069249 Y2 JP H069249Y2
- Authority
- JP
- Japan
- Prior art keywords
- anchor bolt
- mold material
- outer peripheral
- base body
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【考案の詳細な説明】 〈産業上の利用分野〉 本考案はアンカーボルトを基礎に植設する為に設けるア
ンカーボルト孔の形成用型材に関する。DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to a material for forming an anchor bolt hole provided for implanting an anchor bolt on a foundation.
〈従来の技術〉 従来第3図の側断面図で示す様に、建物,機械等を据付
けるに際し、基礎1に予めアンカーボルト孔2を設け
る。該アンカーボルト孔2にアンカーボルト3を挿入す
るとともに後詰モルタル4を充填してアンカーボルト3
を基礎1に固定している。前記アンカーボルト3の先端
にはフックHが設けられ、後詰モルタル4との固着を強
固なものとしている。<Prior Art> Conventionally, as shown in the side sectional view of FIG. 3, anchor bolt holes 2 are provided in the foundation 1 in advance when installing a building, a machine or the like. The anchor bolt 3 is inserted into the anchor bolt hole 2 and the back-filled mortar 4 is filled, and the anchor bolt 3 is inserted.
Is fixed to the foundation 1. A hook H is provided at the tip of the anchor bolt 3 so that the anchor bolt 3 is firmly fixed to the backfilled mortar 4.
アンカーボルト孔2を形成する通常の手段としては、例
えばその1つとして予め円柱状の型材や管材を配設し、
基礎コンクリートを打設した後にこれを取り外して孔を
形成したり、さらには別の手段として上記型材の外周面
に突起や蝶子を形成して引抜きに対する抵抗力を大きく
したりしていた。As a usual means for forming the anchor bolt hole 2, for example, a cylindrical mold material or pipe material is previously arranged as one of the means.
After pouring the basic concrete, it was removed to form a hole, and as another means, a protrusion or a butterfly was formed on the outer peripheral surface of the above-mentioned mold material to increase the resistance against pulling out.
〈考案が解決しようとする問題点〉 しかしながら上記第1の手段によって形成されたアンカ
ーボルト孔2では、基礎コンクリートと後詰モルタル4
の付着力だけでアンカーボルト3を固定するものであ
り、引抜力Fに対する耐力が十分とはいえない。すなわ
ち、後詰モルタル4は硬化後に収縮するので一般に付着
力は計算値より下回る。従って計算値内の引抜力Fであ
っても後詰モルタル4とともにアンカーボルト3が基礎
1から脱抜する問題があった。<Problems to be Solved by the Invention> However, in the anchor bolt hole 2 formed by the first means, the basic concrete and the post-filling mortar 4 are used.
Since the anchor bolts 3 are fixed only by the adhesive force of, the proof strength against the pulling force F cannot be said to be sufficient. That is, since the post-filling mortar 4 shrinks after curing, the adhesive force is generally lower than the calculated value. Therefore, even if the pulling force F is within the calculated value, there is a problem that the anchor bolt 3 is pulled out from the foundation 1 together with the back-filled mortar 4.
一方外周面に突起や蝶子を形成した型材を用いた第2の
手段によって形成されたアンカーボルト孔2は、引抜力
には抵抗できるものの単なる突起や蝶子形状なので後詰
モルタル4と基礎コンクリートとの間に生じる「ガタ」
を防ぐことができない。その為基礎コンクリートにおけ
るアンカーボルトの安定した固定状態を長期間に亘って
得ることが出来なかった。On the other hand, the anchor bolt hole 2 formed by the second means using the mold material having the protrusions and the butterfly formed on the outer peripheral surface can resist the pulling force, but since it is a simple protrusion or butterfly shape, it is between the backfilled mortar 4 and the basic concrete. "Backlash" that occurs in
Cannot be prevented. Therefore, it was not possible to obtain a stable fixed state of the anchor bolt in the basic concrete for a long period of time.
〈問題点を解決するための手段〉 そこで本考案は、円柱状を成す基体の外周面に突条を螺
旋状でかつ一体的に設けたものであって、この突条は、
基体の外周面と略直交する状態に略同じ長さ丈突出した
上向き面と下向き面が所定間隔で平行に形成されかつ該
両面の外周縁部間には、前記基体の外周面と略平行状態
に外側面が形成された型材を提供するものである。<Means for Solving the Problems> Therefore, the present invention is one in which a ridge is spirally and integrally provided on the outer peripheral surface of a cylindrical base body.
An upward surface and a downward surface protruding substantially the same length in a state substantially orthogonal to the outer peripheral surface of the base body are formed in parallel at a predetermined interval, and between the outer peripheral edge portions of the both surfaces, the outer peripheral surface of the base body is in a substantially parallel state. There is provided a mold material having an outer surface formed on.
〈作用〉 上記型材を基礎型枠内の所定箇所に配置し、基礎コンク
リートを打設すれば、アンカーボルト孔の周壁には上向
き面に対応した下面壁が形成される。同様に下向き面と
外側面に夫々対応した上面壁と側面壁が形成され、これ
ら各面壁が構成する空間、所謂充填室に後詰モルタル充
填されれば、この後詰モルタルは基礎とはガタのない状
態に固定される。しかも突条は平行な上向き面と下向き
面、さらにこれら面と直交した外側面にて形成されてい
るので、型材を取り外す際は回転が円滑となり容易にコ
ンクリート基礎内に孔を形成できることになる。<Operation> When the above-mentioned mold material is arranged at a predetermined position in the basic formwork and the basic concrete is placed, a lower surface wall corresponding to the upward surface is formed on the peripheral wall of the anchor bolt hole. Similarly, if the upper surface wall and the side surface wall are formed corresponding to the downward surface and the outer surface, respectively, and if the space formed by each of these surface walls, the so-called filling chamber, is filled with the backfilled mortar, the backfilled mortar is in a state free from backlash. Fixed to. Moreover, since the ridges are formed by the parallel upward and downward surfaces and the outer surface orthogonal to these surfaces, the rotation is smooth when the mold material is removed, and the holes can be easily formed in the concrete foundation.
〈実施例〉 以下本考案を図面に基づいて説明する。<Examples> The present invention will be described below with reference to the drawings.
第1図は本考案による型材の斜視図、第2図は同型材を
用いて形成したアンカーボルト孔の側断面図である。FIG. 1 is a perspective view of a mold material according to the present invention, and FIG. 2 is a side sectional view of an anchor bolt hole formed using the mold material.
先ず型材の構成を説明する。型材Aは鋼材やセラミック
等からなる円柱状の基体5である。そして基体5の外周
面5aには突条6が螺旋状でかつ一体的に設けられてい
る。前記突条6は所謂角ネジ状に設けられ、基体5の外
周面5aと略直交する上向き面W1と所定間隔でかつ平行
に下向き面W2が形成され、しかもこれら面W1,W2
は略同じ長さ丈突出している。さらに両面W1,W2の
外周線部Wa,Wb間には、基体5の外周面5aと略平行
状態に外側面W3が形成されている。First, the structure of the mold material will be described. The mold material A is a columnar base 5 made of steel, ceramics or the like. The ridge 6 is spirally and integrally provided on the outer peripheral surface 5a of the base 5. The protrusion 6 is provided in a so-called square screw shape, and a downward surface W 2 is formed at a predetermined interval and in parallel with the upward surface W 1 that is substantially orthogonal to the outer peripheral surface 5 a of the base body 5. Moreover, these surfaces W 1 , W 2
Have almost the same length and length. Further, an outer surface W 3 is formed between the outer peripheral line portions W a and W b of the both surfaces W 1 and W 2 in a state substantially parallel to the outer peripheral surface 5 a of the base body 5.
次に上記型材Aを用いて基礎にアンカーボルト孔を形成
する手順を説明する。例えば引抜力Fに対抗するにはア
ンカーボルト3を型材Aの3段分埋込む必要がある場合
において、先ず型材Aの外表面に剥離剤を塗布してお
く。そして必要な段数3段分が基礎1の天端より下方と
なる様に基礎1の型枠(図示せず)内に型枠Aを配設す
る。同時に型材Aの軸心をアンカーボルト3の配設位置
に合わせる。斯かる状態において前記型枠内に基礎コン
クリートを打設して基礎1を形成する。該基礎1が硬化
した後に前記型材Aを基礎1から取り外す。この際に基
礎1の天端より突き出た基体5を円周方向に回転する
と、下向き面W1と上向き面W2は同じ長さ丈突出して
いる為、さらに外側面W3が基体5を中心に平行に回動
するため初期の回し力が十分であればそのままスムース
に回転する。しかも剥離剤を介在させれば型材Aと基礎
コンクリートとの付着がより容易に切り離されて、全体
としてナットからネジが螺退する如く基礎1から型材A
は取り外される。又上記初期の回転力に耐え得る素材で
型材Aを形成しておけば型材A自体が壊れることはな
く、転用も容易となる。型材Aを取り外した基礎1内に
は、型材Aの基体5と突条6とに夫々対応する雌ネジ状
のアンカーボルト孔7が形成される。Next, the procedure for forming the anchor bolt holes in the foundation by using the mold material A will be described. For example, when it is necessary to embed the anchor bolt 3 in three steps of the mold material A in order to counter the pulling force F, first, a release agent is applied to the outer surface of the mold material A. Then, the form A is arranged in the form (not shown) of the base 1 so that the required number of stages is 3 below the top end of the base 1. At the same time, the axis of the mold material A is aligned with the arrangement position of the anchor bolt 3. In such a state, foundation concrete is poured into the formwork to form the foundation 1. After the base 1 is cured, the mold material A is removed from the base 1. At this time, when the base body 5 protruding from the top end of the foundation 1 is rotated in the circumferential direction, since the downward surface W 1 and the upward surface W 2 protrude by the same length, the outer side surface W 3 is further centered on the base body 5. Since it rotates in parallel with, if the initial turning force is sufficient, it will rotate smoothly as it is. Moreover, by interposing a release agent, the adhesion between the mold material A and the basic concrete can be more easily separated, and the screw can be screwed back from the nut as a whole.
Is removed. Further, if the mold material A is formed of a material capable of withstanding the initial rotational force, the mold material A itself will not be broken, and diversion will be easy. Inside the base 1 from which the mold material A has been removed, female screw-shaped anchor bolt holes 7 corresponding to the base body 5 and the ridges 6 of the mold material A are formed.
上記の如く形成されたアンカーボルト孔7の周壁には、
型材Aの上向き面W1に対応した下面壁Wxと下向き面
W2に対応した上面壁Wyと外側面Wcに対応した側面
壁Wzで縦断面略矩形状の充填室Woが形成される。こ
のアンカーボルト孔7にアンカーボルト3を挿入して位
置を設定し、その後に後詰モルタル材を充填すると後詰
モルタル材は上記充填室Woに廻り込む。上述の如く充
填室Woは縦断面矩形状を成す為、後詰モルタルが十分
充填されると基礎1と下面壁Wx,上面壁Wy,側面壁
Wzとの間に隙間を生じない。On the peripheral wall of the anchor bolt hole 7 formed as described above,
A bottom wall W x corresponding to the upward surface W 1 of the mold material A, an upper surface wall W y corresponding to the downward surface W 2 and a side wall W z corresponding to the outer surface W c form a filling chamber W o having a substantially rectangular cross section. It is formed. When the anchor bolt 3 is inserted into the anchor bolt hole 7 to set the position and then the back-filled mortar material is filled, the back-filled mortar material flows into the filling chamber W o . As described above, since the filling chamber W o has a rectangular cross section, when the back-filled mortar is sufficiently filled, there is no gap between the foundation 1 and the lower surface wall W x , the upper surface wall W y , and the side surface wall W z .
換言すれば基礎1に対し、硬化した後詰モルタル4は上
下,左右にガタつくことはない。従って硬化後の後詰モ
ルタル4は基礎1に対して堅固に固定される。In other words, with respect to the base 1, the cured post-filling mortar 4 does not rattle up and down, left and right. Therefore, the post-filling mortar 4 after hardening is firmly fixed to the base 1.
この結果フックHを設けたアンカーボルト3自体はガタ
や緩みのない状態で基礎1に対し固定されることにな
る。As a result, the anchor bolt 3 itself provided with the hook H is fixed to the foundation 1 without looseness or looseness.
尚型材Aの回転及び持ち運び用に基体5の頂部にハンド
ル8を設けておくと良い。It should be noted that a handle 8 may be provided on the top of the base 5 for rotating and carrying the mold material A.
〈考案の効果〉 上記の様に本考案による型材を用いると、アンカーボル
ト孔にはその孔の軸心と略直交する上下面壁と略平行な
側面壁とにより充填室が形成されるので、この充填室に
後詰モルタルが充填されると基礎に対して硬化した後詰
モルタルのガタはなく、従って後詰モルタルと一体とな
ったアンカーボルトと基礎との固定にガタや緩みはなく
脱抜等の事故も生じない。<Effect of the Invention> When the mold material according to the present invention is used as described above, the filling chamber is formed in the anchor bolt hole by the upper and lower surface walls that are substantially orthogonal to the axis of the hole and the side walls that are substantially parallel to each other. When the filling chamber is filled with post-filling mortar, there is no backlash of the post-filling mortar that hardens to the foundation.Therefore, there is no looseness or looseness in fixing the anchor bolts integrated with the post-filling mortar and the foundation, and there is no accident such as removal. Does not happen.
しかも基体自体が円柱状でありかつ突条を構成する上下
の面が夫々基体の外周面と略直交で、その外側面も平行
なので型材の回転(抜き取り)が極めて容易となる。Moreover, since the base body itself has a cylindrical shape, and the upper and lower surfaces constituting the ridge are substantially orthogonal to the outer peripheral surface of the base body, and the outer side surfaces thereof are also parallel, rotation (extraction) of the mold material is extremely easy.
その結果型材は解体することもなく転用が可能となるな
ど経済的にも有利である。As a result, the die material can be diverted without being disassembled, which is economically advantageous.
第1図は、本考案による型材の斜視図、 第2図は、同型材を用いて形成したアンカーボルト孔の
側断面図、 第3図は、従来のアンカーボルト固定状態を示す側断面
図である。 1…基礎,3…アンカーボルト, 5…基体,6…突条, 7…アンカーボルト孔,A…型材, W1…上向き面,W2…下向き面, W3…外側面,Wo…充填室。FIG. 1 is a perspective view of a mold member according to the present invention, FIG. 2 is a side sectional view of an anchor bolt hole formed using the mold member, and FIG. 3 is a side sectional view showing a conventional anchor bolt fixing state. is there. 1 ... Basic, 3 ... anchor bolt, 5 ... substrate, 6 ... ridges, 7 ... anchor bolt holes, A ... mold material, W 1 ... upward surface, W 2 ... lower surface, W 3 ... outer surface, W o ... filling Room.
Claims (1)
為の型材において、 円柱状を成す基体の外周面には突条が螺旋状でかつ一体
的に設けられたものであって、 前記突条は、基体の外周面と略直交する状態に略同じ長
さ丈突出した上向き面と下向き面が所定間隔で平行に形
成されかつ該両面の外周縁部間には、前記基体の外周面
と略平行状態に外側面が形成されてなることを特徴とす
るアンカーボルト孔用の型材。1. A mold material for forming a hole for an anchor bolt in a foundation, wherein a ridge is spirally and integrally provided on an outer peripheral surface of a cylindrical base body, The ridge is formed such that an upward surface and a downward surface protruding substantially the same length in a state substantially orthogonal to the outer peripheral surface of the base body are formed in parallel at a predetermined interval, and the outer peripheral surface of the base body is provided between the outer peripheral edge portions of the both surfaces. A mold material for an anchor bolt hole, which has an outer surface formed in a state substantially parallel to.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1987089493U JPH069249Y2 (en) | 1987-06-10 | 1987-06-10 | Mold material for anchor bolt holes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1987089493U JPH069249Y2 (en) | 1987-06-10 | 1987-06-10 | Mold material for anchor bolt holes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63200047U JPS63200047U (en) | 1988-12-22 |
| JPH069249Y2 true JPH069249Y2 (en) | 1994-03-09 |
Family
ID=30948526
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1987089493U Expired - Lifetime JPH069249Y2 (en) | 1987-06-10 | 1987-06-10 | Mold material for anchor bolt holes |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH069249Y2 (en) |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5142856A (en) * | 1974-10-09 | 1976-04-12 | Shigetomo Matsui | TAIOKUREHAKAISEIKOCHORYOKUBORUTO OYOBISONO SEIZOHOHO |
| JPS5926149U (en) * | 1982-08-02 | 1984-02-18 | フクビ化学工業株式会社 | Bolt hole forming tool for anchor bolt embedding |
| JPS60175664A (en) * | 1984-02-21 | 1985-09-09 | 日本鋼管株式会社 | Frame for construction anchor bolt |
-
1987
- 1987-06-10 JP JP1987089493U patent/JPH069249Y2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63200047U (en) | 1988-12-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH069249Y2 (en) | Mold material for anchor bolt holes | |
| JP3029343U (en) | Form tool for mortar material injection in exposed elastic fixed column base method | |
| JP2778272B2 (en) | Wall formwork, manufacturing method of wall formwork, and wall construction method using wall formwork | |
| JPH0752886Y2 (en) | Embedded anchor fittings | |
| JPH069248Y2 (en) | Mold material for anchor bolt holes | |
| JPH0734109Y2 (en) | Reinforcing joint sleeve fixing jig | |
| JPH0711207Y2 (en) | Embedded anchor | |
| JPH0444729Y2 (en) | ||
| JPH0712421Y2 (en) | Pile head metal fittings | |
| JPS6319423Y2 (en) | ||
| JPH0539153Y2 (en) | ||
| JPH0239772Y2 (en) | ||
| JPH0531159Y2 (en) | ||
| JPH0728186Y2 (en) | Anchor bolt construction metal fittings | |
| JPH0722437Y2 (en) | Makeup mold assembly fittings | |
| JPH0740327A (en) | Manufacturing method of precast concrete hollow member and hollow member manufactured by the manufacturing method | |
| JPH0444728Y2 (en) | ||
| JPH024963Y2 (en) | ||
| JP3080519U (en) | Fasteners for concrete formwork | |
| JPH0648052Y2 (en) | Scaffolding insert | |
| JPH0346107Y2 (en) | ||
| JP3015499U (en) | Concrete pole and connecting structure of concrete pole and steel pipe | |
| JP3025142B2 (en) | Method of manufacturing PC board by overstrike | |
| JPH0240684Y2 (en) | ||
| JPS6233778Y2 (en) |