JPH06975B2 - Construction method of steel plate cell breakwater - Google Patents

Construction method of steel plate cell breakwater

Info

Publication number
JPH06975B2
JPH06975B2 JP63062836A JP6283688A JPH06975B2 JP H06975 B2 JPH06975 B2 JP H06975B2 JP 63062836 A JP63062836 A JP 63062836A JP 6283688 A JP6283688 A JP 6283688A JP H06975 B2 JPH06975 B2 JP H06975B2
Authority
JP
Japan
Prior art keywords
steel plate
cell
concrete
water
breakwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63062836A
Other languages
Japanese (ja)
Other versions
JPH01235707A (en
Inventor
高明 宇多
禎美 村井
泰伴 柳本
修 飯村
秀雄 荻野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Toa Corp
Original Assignee
Sumitomo Metal Industries Ltd
Toa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd, Toa Corp filed Critical Sumitomo Metal Industries Ltd
Priority to JP63062836A priority Critical patent/JPH06975B2/en
Publication of JPH01235707A publication Critical patent/JPH01235707A/en
Publication of JPH06975B2 publication Critical patent/JPH06975B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、鋼板セル消波堤の施工法、特にそれを構成す
る各円柱状鋼板セル構造物の施工法に関する。
Description: TECHNICAL FIELD The present invention relates to a method of constructing a steel plate cell breakwater, and in particular to a method of constructing each cylindrical steel plate cell structure constituting it.

(従来の技術) 我が国では、従来より、内湾に面した沿岸域の開発利用
が進められているが、近年、海象条件の厳しい外洋に面
した沿岸域の開発が推進されつつある。特に、海外漁業
資源の涸渇による国内漁業資源の確保、そして余裕ある
生活の延長としての海洋レジャー適正海域の確保が求め
られるようになった。
(Prior Art) In Japan, the development and utilization of the coastal area facing the inner bay has been conventionally promoted, but in recent years, the development of the coastal area facing the open ocean where the sea condition is severe has been promoted. In particular, it has become necessary to secure domestic fishery resources due to the depletion of overseas fishery resources, and to secure appropriate marine leisure areas as an extension of living.

しかし、四周を海に囲まれている我が国においてもすで
に開発容易な海域は少なくなり、従来考えらなかったよ
うな海域の開発が求められている。
However, even in Japan, which is surrounded by the sea on all four laps, there are few sea areas that are already easy to develop, and there is a demand for the development of sea areas that have never been considered.

(発明が解決しようとする課題) これらの外洋沿岸域開発には、海岸保全を図りながら、
魚業資源造成あるいは海洋性レクレーション海域創造の
ため新しいタイプの消波構造物が要求される。すなわ
ち、かかる目的達成のためには、次のような条件が同時
に満足されなければならない。
(Problems to be solved by the invention) In developing these open ocean coastal areas, while conserving the coast,
A new type of wave-dissipating structure is required to create fisheries resources or create oceanic recreation areas. That is, the following conditions must be satisfied at the same time in order to achieve such an objective.

水質の維持、海岸保全のため透過式であること、 大水深(10〜30m)に設置可能なこと、 大きな波(波高5〜15m)に耐え得ること、 施工が簡単であること、 経済的であること。To maintain water quality, be transparent for coastal conservation, be installed in deep water (10 to 30 m), be able to withstand large waves (wave height 5 to 15 m), be easy to construct, economical To be.

このような条件を満たす消波堤として本件出願人のひと
りは、先に特願昭61−209136号(特開昭63−63807号公
報)によって、鋼製セル構造物を一列もしくは複数列並
べるとともに、堤外側上部にスリット部およびその背後
に遊水室を設けて波のエネルギー損失を促進する透過式
消波堤を提案している。このようなスリット部を有する
遊水室の消波機構は、水粒子がスリット部を通過する際
のエネルギー損失と反射波の位相差による消波を利用す
るものである。かかる消波機構とすでに実用化されてい
る根入れを有する鋼板セル等の鋼製セル構造物とを組み
合せることにより、上記条件を満たしかつ消波効果の高
い消波堤を実現するものである。
One of the applicants of the present invention as a breakwater satisfying such a condition is to arrange one or more rows of steel cell structures in accordance with Japanese Patent Application No. 61-209136 (Japanese Patent Laid-Open No. 63-63807). We proposed a transmission type breakwater that promotes energy loss of waves by providing a slit part on the upper part of the outside of the dam and a water retaining chamber behind it. The wave canceling mechanism of the water retaining chamber having such a slit portion utilizes the wave loss due to the energy loss when the water particles pass through the slit portion and the phase difference between the reflected waves. By combining such a wave-breaking mechanism and a steel cell structure such as a steel plate cell having a rooting that has already been put into practical use, a breakwater that satisfies the above conditions and has a high wave-breaking effect is realized. .

しかるに特願昭61−209136号(特開昭63−63807号公
報)では、スリット部および遊水室外周壁の構成を現場
打鉄筋コンクリートとするか、あるいはスリット部につ
いてはセル鋼板を切断することにより形成するとしてい
る。このうち、セル鋼板をスリット状に切断することだ
けでスリット部を構成したのでは、スリット部の剛性が
明らかに不足し、作用波力に対して耐え得る構造とはな
り得ないと考えられ、現場打コンクリートによる補強が
必然的に必要となってくる。従って具体的な施工手順は
下記のようになると考えられる。
However, in Japanese Patent Application No. 61-209136 (Japanese Patent Laid-Open No. 63-63807), the structure of the slit portion and the outer wall of the water retaining chamber is made of cast-in-place reinforced concrete, or the slit portion is formed by cutting the cell steel plate. I am trying. Of these, if the slit portion is configured only by cutting the cell steel plate into a slit shape, the rigidity of the slit portion is obviously insufficient, and it is considered that the structure cannot withstand the acting wave force. Reinforcement with cast-in-place concrete is inevitable. Therefore, it is considered that the concrete construction procedure is as follows.

鋼板セルの打設もしくは設置 遊水室底版下面レベルまでの中詰材の投入 スリット部および遊水室外周壁鉄筋コンクリート打設 遊水室背後の中詰材投入 スリット部セル鋼板切断 蓋コンクリート、防食コンクリート、上部コンクリー
ト施工 しかしながら、この場合、次のような問題点がみられ
る。
Placing or installing steel plate cells Filling the filling material to the lower level of the bottom plate of the water chamber Inserting the slit and the outer wall of the water chamber Reinforced concrete Placing the filling material behind the water chamber Cutting the slit steel plate of the cell lid Concrete, anti-corrosion concrete, top concrete construction However, in this case, the following problems are observed.

スリット部および遊水室外周壁の現場施工は、鉄筋・
型枠の組立、コンクリートの打設・養生、型枠のとりは
ずしと、長期間を要し、この間遊水室背後の中詰めが末
施工であるためセル上部の剛性が不足し、波浪等の外力
により、施工中にセル鋼板が変形し易い。
On-site construction of the slit part and the outer wall of the water retention chamber is
It takes a long time to assemble the formwork, place and cure concrete, and remove the formwork.Because of this, the inner part of the back of the water retention chamber is the last work, so the rigidity of the upper part of the cell is insufficient, and due to external forces such as waves. , The cell steel plate is easily deformed during construction.

本件出願人の実施した実験によれば、遊水室の深さは
水付加の1/2〜1/4程度が適当であることが明らかになっ
ているが、この方法で遊水室の深さを水面以下とするに
は、水中での鉄筋・型枠組立が必要となり施工困難であ
る。
According to the experiment conducted by the applicant, it is clear that the depth of the water retaining chamber is suitable to be 1/2 to 1/4 of the addition of water. To make it below the water level, it is difficult to construct it because it is necessary to assemble the rebar and formwork underwater.

海上作業となるためコンクリートの信頼性に欠ける。The reliability of concrete is lacking because it requires offshore work.

そこで、本発明者らはかかる欠点に鑑み、スリット付プ
レキャストコンクリート函体を、下部まで中詰した鋼板
セル内に設置し、コンクリートなどの間詰材により鋼板
セルと一体化させる構造を発明し、別途特許出願した。
その後、検討を続けたところ、上述のプレキャストコン
クリート函体を用いる方法によれば、 プレキャストコンクリート函体設置直ちに遊水室背後
の中詰めが可能となり、中詰め完了までのセル鋼板が変
形し易い期間を大幅に短縮できる。
Therefore, in view of such drawbacks, the present inventors installed a slit precast concrete box in a steel plate cell filled up to the lower part, and invented a structure in which it is integrated with a steel plate cell by a filling material such as concrete, I applied for a separate patent.
After that, when we continued to study, according to the method using the above-mentioned precast concrete box, it was possible to fill the inside of the water tank immediately after the precast concrete box was installed, and the period during which the cell steel plate was easily deformed until the filling was completed. It can be greatly shortened.

水中での鉄筋・型枠組立がなくなり、遊水室の水深を
深くできる 等の効果が期待できるが、 プレキャストコンクリート函体設置前に、中詰表面を
均らす必要があるが、これは潜水夫による手作業で行わ
なければならないため1〜2日間程度の期間を要し、こ
の間セル鋼板上部が変形しやすい。
The effect of deepening the water depth of the water retention chamber can be expected by eliminating the rebar / formwork assembly in the water, but it is necessary to even out the filling surface before installing the precast concrete box. Since it has to be done manually, it takes about 1 to 2 days, during which the upper part of the cell steel plate is easily deformed.

中詰材の沈下がおこるとプレキャストコンクリート函
体の重量が鋼板セルに直接加わることになりセル鋼板が
局部的に座屈する可能性がある。
When the filling material sinks, the weight of the precast concrete box is directly added to the steel plate cell, and the cell steel plate may buckle locally.

等の問題点があることが判明した。It turned out that there are problems such as.

かくして、本発明の目的は、上記の問題点を解決すべ
く、スリット部および遊水室を有し消波性の優れた鋼板
セル消波堤の実用的な施工法を提供することである。
Therefore, an object of the present invention is to provide a practical construction method of a steel plate cell breakwater having a slit portion and a water storage chamber and having excellent wave-dissipating properties, in order to solve the above problems.

(課題を解決するための手段) ここに、本発明の要旨とするところは、円柱状鋼板セル
構造物を所要の間隔をもって一列もしくは複数列に配列
して成る透過式の鋼板セル消波堤の施工法において、予
め外側上部の少なくとも一部にスリット部を設けるとと
もにその背後に消波堤延長方向に鋼製の隔壁部を設け、
該スリット部に連結した遊水室を設けてなる円筒状鋼板
セルを前記スリット部を沖合側に面して海底面に打設も
しくは設置し、遊水室の底版下面レベルまで中詰材の投
入後、前記遊水室の背後の部分に中詰材の投入を続ける
とともに水中にて該遊水室の底版コンクリートを施工す
ることによって前記円柱状鋼板セル構造物をそれぞれ建
造することを特徴とする鋼板セル消波堤の施工法であ
る。
(Means for Solving the Problems) Here, the gist of the present invention is to provide a transmission type steel plate cell breakwater in which columnar steel plate cell structures are arranged in a single row or a plurality of rows at a required interval. In the construction method, a slit portion is provided in advance on at least a part of the outer upper side, and a steel partition wall portion is provided behind it in the breakwater extension direction,
Cylindrical steel plate cell provided with a water retarding chamber connected to the slit portion is placed or installed on the sea bottom facing the slit portion to the offshore side, and after filling the filling material to the bottom plate bottom level of the water retaining chamber, Steel plate cell wave-dissipating feature characterized in that each of the columnar steel plate cell structures is constructed by continuing to put a filling material in the portion behind the water storage chamber and constructing a bottom slab concrete for the water storage chamber in water. It is the construction method of the bank.

本発明にあっても、中詰材の投入が完了してからは、従
来例と同様に鋼板セル頂部の蓋コンクリートの施工、上
部コンクリートの施工、そして防食コンクリートの施工
をそれぞれ行って円柱状鋼板セル構造物の建造を完了す
るのである。
Even in the present invention, after the filling of the filling material is completed, as in the conventional example, the construction of the lid concrete at the top of the steel plate cell, the construction of the upper concrete, and the construction of the anticorrosion concrete are performed to form a cylindrical steel sheet. The construction of the cell structure is completed.

(作用) このように、本発明によれば、予め鋼製のスリット部お
よび遊水室間隔を有する円筒状の鋼板セルを製作し、海
底面に打設もしくは設置した後、中詰、遊水室底版コン
クリート、蓋・上部・防食コンクリートの施工をそれぞ
れ行うのであり、以下、添付図面を参照しながら、順次
その施工法につき説明する。
(Operation) As described above, according to the present invention, a cylindrical steel plate cell having a slit portion made of steel and an interval of the water chamber is manufactured in advance, and after being placed or installed on the sea bottom, the inner filling and the bottom plate of the water chamber are formed. Since concrete, lid / top and anticorrosive concrete are respectively constructed, the construction method will be sequentially described below with reference to the accompanying drawings.

第1図は、本発明方法によって施工される鋼板セル消波
堤の鳥瞰図である。図示例では円柱状鋼板セル構造物
(単に「鋼板セル」ともいう)10が一定間隔で一列に配
列されている。各鋼板セル10には外洋に面した側の上部
にスリット部12が設けられ、そ背後には遊水室14が形成
されている。波の方向に面したこのスリット部12に波が
当たると一部は反射波となり戻っていくが、残りはスリ
ット部12を通り抜け、波のエネルギーを失いながら遊水
失14入った後、隔壁部16で反射波となり、スリット部12
で生じた反射波との位相差により消波される。
FIG. 1 is a bird's-eye view of a steel plate cell breakwater constructed by the method of the present invention. In the illustrated example, cylindrical steel plate cell structures (also simply referred to as “steel plate cells”) 10 are arranged in a row at regular intervals. Each steel plate cell 10 is provided with a slit portion 12 on the upper side facing the open sea, and a water retaining chamber 14 is formed behind it. When a wave hits this slit portion 12 facing the direction of the wave, part of it returns as a reflected wave, but the rest passes through the slit portion 12 and loses the energy of the wave and enters the loss of water 14, then the partition wall portion 16 It becomes a reflected wave at the slit part 12
It is canceled by the phase difference with the reflected wave generated in.

なお、各鋼板セルの大きさ、配置は建造海域の状況に応
じ適宜設定すればよい。
The size and arrangement of each steel plate cell may be appropriately set according to the situation of the construction sea area.

第2図(イ)および(ロ)は、施工完了した鋼板セル10
の略式縦断面図および平面図である。第2図(ロ)のB
−Bの断面図である第2図(イ)からも分かるように、
鋼板セル10の前半分は遊水室14によって占められてお
り、前面には鋼製の箱形断面を有するスリット部材17と
縦スリット13とから成るスリット部12が設けられてい
る。スリット部材17には局部的な変形を防止するため、
好ましくはコンクリートが充填されている。遊水室14の
底面には底版コンクリート15が設けられている。一方、
遊水室の背面側は隔壁部16で隔てられており、その背後
には中詰材が充填され、該中詰材上部には栗石19および
蓋コンクリート20が施工されている。この蓋コンクリー
ト20の上には、上部コンクリート21が打設され、天端面
18を構成する。スリット部12および隔壁部16の頂部には
補強のため鉄筋コンクリート梁22が設けられていてもよ
い。
Figures 2 (a) and (b) show the steel plate cells 10 that have been completed.
FIG. 3 is a schematic vertical sectional view and a plan view of FIG. B in Figure 2 (b)
As can be seen from FIG. 2A which is a cross-sectional view of -B,
The front half of the steel plate cell 10 is occupied by a water retaining chamber 14, and a slit portion 12 composed of a slit member 17 having a steel box-shaped cross section and a vertical slit 13 is provided on the front surface. To prevent local deformation of the slit member 17,
It is preferably filled with concrete. A bottom slab concrete 15 is provided on the bottom surface of the water retaining chamber 14. on the other hand,
The back surface side of the water retaining chamber is separated by a partition wall portion 16, the back side of which is filled with a filling material, and the upper part of the filling material is covered with stones 19 and a cover concrete 20. The upper concrete 21 is placed on the lid concrete 20, and the top surface is
Make up eighteen. Reinforced concrete beams 22 may be provided on the tops of the slit portion 12 and the partition wall portion 16 for reinforcement.

なお、防食コンクリート23は必要により設ければよい。The anticorrosion concrete 23 may be provided if necessary.

第3図(イ)(ロ)には、予め工場等で製作される本発
明における鋼板セル11の例を示す。堤外側に面して配置
される側の上部には縦スリット13を有しており、この縦
スリット13とともにスリット部12を構成するスリット部
材17は、作用する波力に耐え得るように鋼板製箱形断面
をしている。またスリット部12の背後のセル径中心付近
には消波堤延長方向に鋼製の隔壁30から成る16を有して
いる。隔壁部16の位置は作用波に条件により決定され
る。
FIGS. 3A and 3B show an example of the steel plate cell 11 according to the present invention which is manufactured in advance in a factory or the like. A vertical slit 13 is provided on the upper part of the side facing the outside of the bank, and the slit member 17 that constitutes the slit portion 12 together with the vertical slit 13 is made of a steel plate so as to withstand the acting wave force. It has a box-shaped cross section. Further, in the vicinity of the center of the cell diameter behind the slit portion 12, there is provided a steel partition wall 16 in the extending direction of the breakwater. The position of the partition wall portion 16 is determined depending on the condition of the working wave.

なお、第3図に示すでは隔壁部16を構成する鋼製隔壁30
を、縦・横方向補剛材32を溶接した鋼板と上・下部横桁
41による構造としているが、第4図に示すように鋼矢板
43と横桁41から成る隔壁34を用いてもよい。第4図にお
けるA−A面およびB−B面は第3図(イ)のそれであ
る。
In FIG. 3, the steel partition wall 30 forming the partition wall portion 16 is shown.
Is a steel plate welded with vertical and horizontal stiffeners 32 and upper and lower transverse girders.
Although the structure is based on 41, as shown in Fig. 4, steel sheet pile
You may use the partition 34 which consists of 43 and the cross beam 41. The planes AA and BB in FIG. 4 are those in FIG. 3A.

これらの図示構造例では隔壁下部の横桁中央部につなぎ
梁36を設けているが、作用外力に応じ隔壁上部横桁にも
つなぎ梁38を設けるか、あるいは上部、下部共つなぎ梁
を省略してよい。スリット部材17の上・下端は円周方向
の補強桁40に固定されている。遊水室側面には捨型枠用
鋼製パネル42が取り付けられている。遊水室底部は吹き
抜けとなっており、定版は現場打コンクリートによる。
図には省略しているが、セル鋼板内側には必要に応じ
縦、横補剛材を溶接しておいてもよい。
In these illustrated structural examples, the connecting beam 36 is provided in the central portion of the transverse girder below the partition wall, but a connecting beam 38 is provided to the transverse girder upper transverse girder depending on the external force applied, or the upper and lower joint beams are omitted. You may The upper and lower ends of the slit member 17 are fixed to the reinforcing girder 40 in the circumferential direction. A steel panel 42 for a scrap frame is attached to the side surface of the water retaining chamber. The bottom of the water retaining chamber is a through-hole, and the fixed plate is cast concrete in-situ.
Although not shown in the figure, vertical and horizontal stiffening materials may be welded to the inside of the cell steel plate, if necessary.

本発明における具体的施工手順は下記の通りである。The concrete construction procedure in the present invention is as follows.

鋼製スリット、隔壁付鋼板セル製作 鋼板セルの打設もしくは装置 中詰材の投入 遊水室底版コンクリート・スリット中詰コンクリート
・遊水室側壁コンクリート打設 蓋コンクリート、上部コンクリート打設、防食コンク
リート 鋼製スリット、隔壁付鋼板セル製作: 本発明において使用する鋼板セルの本体は予め陸上のヤ
ードあるいは工場等で例えば溶接組立法によって製作す
る。必要により、梁、桁等の補強材を設け、建造予定海
域の状況に耐え得る構造とする。鋼板セルの製作それ自
体については、すでにこれまでの説明から当業者には明
らかであると思われるので、これ以上の言及は省略す
る。
Steel slits, production of steel plate cells with bulkheads Steel plate cell placement or equipment Filling of filling material Filling chamber bottom concrete / slit Filling concrete / filling chamber side wall concrete lid concrete, top concrete casting, anticorrosion concrete Steel slits Manufacture of steel plate cell with partition wall: The body of the steel plate cell used in the present invention is manufactured in advance in a yard or factory on land by, for example, a welding assembly method. Reinforcement materials such as beams and girders will be provided as necessary so that the structure will withstand the conditions of the planned sea area. Since the production of the steel plate cell itself is already apparent to those skilled in the art from the above description, further description will be omitted.

鋼板セルの打設もしくは装置: 陸上のヤード等の製作されたスリット・隔壁付鋼板セル
11は、建造海域に適宜運搬され海底面に打設もしくは設
置される。打設方法としては数台の大型バイブロハンマ
ーを連動させる方法がすでに実用化されている。海底地
盤条件が適当な場合には海底面上に設置する、いわゆる
置きセル構造でもよい。
Placing or equipment of steel plate cells: Steel plate cells with slits and bulkheads manufactured for land yards, etc.
No. 11 is properly transported to the construction area and placed or installed on the sea floor. As a driving method, a method of interlocking several large vibro hammers has already been put into practical use. It may be a so-called stationary cell structure, which is installed on the sea floor when the seabed ground conditions are appropriate.

中詰材の投入: 打設の後、鋼板セル11内には中詰材が速やかに投入され
る。中詰材は隔壁下端レベル、つまり遊水室底版下面レ
ベルより深いレベルでは鋼板セル全断面に、それより浅
いレベルでは隔壁背面側にのみ投入される。中詰材とし
ては礫、砂あるいは土石等適宜のものが利用される。
Filling the filling material: After the casting, the filling material is promptly put in the steel plate cell 11. The filling material is poured into the entire section of the steel plate cell at the partition bottom end level, that is, at a level deeper than the bottom surface of the water retention chamber bottom plate, and at the shallower level, only at the partition wall rear surface side. As the filling material, suitable materials such as gravel, sand, and debris are used.

すなわち、本発明において鋼板セル打設後中詰材を一気
に天端付近の所要レベルまで投入することができ、これ
によりセル鋼板が変形し易い中詰未施工期間を、数時間
程度とすることができる。
That is, in the present invention, after filling the steel plate cells, the filling material can be charged all at once to a required level near the top end, whereby the filling non-construction period in which the cell steel sheet is easily deformed can be about several hours. it can.

遊水室底板コンクリート・スリット中詰コンクリート・
遊水室側壁コンクリート打設: 中詰材の投入の後、遊水室底版コンクリート15を水中に
て施工する。この底版コンクリート15は無筋コンクリー
トでよく、また例えば、高い粘性を有し材料分離の少な
い特殊コンクリートを用いることにより、水中であって
も信頼性の高いコンクリートの施工が可能である。
Retaining chamber bottom plate concrete, slit filling concrete,
Placement of concrete in the side wall of the water retaining chamber: After the filling material is added, the bottom slab concrete 15 for the water retaining chamber is constructed in water. The bottom slab concrete 15 may be unreinforced concrete, and for example, by using special concrete having high viscosity and little material separation, highly reliable concrete construction is possible even in water.

遊水室側法の空隙部44にはコンクリートを充填する。こ
のための型枠は、鋼製の捨型枠42としてセル製作時にと
りつけられている。
Concrete is filled in the voids 44 of the water retaining chamber side method. A mold for this purpose is attached as a scrap frame 42 made of steel at the time of manufacturing the cell.

また、スリット部材17の内部には波力による鋼板の局部
変形を防ぐため必要に応じてコンクリートを充填する。
Further, the inside of the slit member 17 is filled with concrete as necessary in order to prevent local deformation of the steel sheet due to wave force.

蓋コンクリート、防食コンクリート、上部コンクリート
打設: 上述のようにして、スリット部12および遊水室14が構成
されてから、あるいは蓋遊水室14の背後の鋼板セル内部
に中詰材を天端付近まで投入してから、鋼板セル上部に
は、蓋コンクリート20、上部コンクリート21および必要
により外周部に防食コンクリート23を施工して仕上げと
する。この際、遊泳室上部梁部の強度が鋼製の補強桁、
梁、38、40、41のみでは不足する場合には鉄筋コンクリ
ート梁22を打設することにより補強することができる。
Cover concrete, anti-corrosion concrete, top concrete pouring: After the slit 12 and the water storage chamber 14 are configured as described above, or inside the steel plate cell behind the lid water storage chamber 14, the filling material up to near the top end. After charging, a lid concrete 20, an upper concrete 21 and, if necessary, an anticorrosion concrete 23 are applied to the upper portion of the steel plate cell for finishing. At this time, the strength of the upper beam of the swimming room is a steel reinforcement girder,
If the beams, 38, 40 and 41 alone are insufficient, they can be reinforced by placing reinforced concrete beams 22.

なお、鋼板セルの剛性確保については、必要に応じ適宜
手段でもって補強を行うことで容易に対処できるであっ
て、それらについては以上の説明からも当業者には明ら
かであろう。
It should be noted that securing the rigidity of the steel plate cell can be easily dealt with by appropriately reinforcing the steel plate cell, as will be apparent to those skilled in the art from the above description.

(発明の効果) 以上詳述してきたが、本発明により次の効果が期待でき
る。
(Effects of the Invention) As described above in detail, the following effects can be expected by the present invention.

鋼板セル打設後、直ちにセル天端付近まで中詰材を投
入することができ、鋼板セル打設から中詰完了までのセ
ル殻の変形しやすい期間は数時間程度と非常に短くなり
安定した施工が可能である。
Immediately after placing the steel plate cells, the filling material can be added to the vicinity of the cell top, and the period during which the cell shell is easily deformed from the placing of the steel plate cells to the completion of filling is very short, about a few hours, and stable. It can be installed.

スリット部材および遊水室隔壁は陸上ヤードにて製作
した鋼製構造であり、また底版コンクリートは特殊コン
クリートを用いることにより水中でも確実な施工が可能
であることから、遊水室の底面レベルが水面下となって
も信頼性の高い施工が可能となり、遊水室水深を深くす
ることができる。
The slit member and the water retaining chamber partition are steel structures made in the land yard, and the bottom slab concrete can be constructed reliably even in water by using special concrete.Therefore, the bottom level of the water retaining chamber is below the water level. Even so, highly reliable construction becomes possible and the water depth of the water in the basin can be deepened.

スリット部材は鋼板セル製作時にすでに形成されてお
り、セル打設後におけるセル鋼板の水中切断作業が不要
となり、工期の短縮および工事の安全性向上が可能とな
る。
Since the slit member is already formed at the time of manufacturing the steel plate cell, it is not necessary to cut the cell steel plate underwater after the cell is placed, which makes it possible to shorten the construction period and improve the work safety.

スリット材および遊水室隔壁は鋼製であり重量が小さ
いため中詰材が沈下してもセル鋼板に大きな力が加わら
ない。
Since the slit material and the partition wall of the water retaining chamber are made of steel and have a small weight, even if the filling material sinks, a large force is not applied to the cell steel plate.

【図面の簡単な説明】[Brief description of drawings]

第1図は、本発明により施工される鋼板セル消波堤の島
瞰図; 第2図(イ)および同(ロ)は、施工完了した鋼板セル
のそれぞれ略式縦断面図および一部切断して示す平面
図; 第3図(イ)および同(ロ)は、施工前の鋼板セルのそ
れぞれ縦断面図および横断面図;および 第4図は、鋼矢板隔壁を使った鋼板セルの横断面図であ
る。 10:鋼板セル 12:スリット部 14:遊水室 16:隔壁部 18:天端面
FIG. 1 is an island view of a steel plate cell breakwater constructed according to the present invention; FIGS. 2 (a) and 2 (b) are schematic longitudinal sectional views and partially cut views of the completed steel plate cell, respectively. Fig. 3 (a) and Fig. 3 (b) are longitudinal sectional views and transverse sectional views, respectively, of the steel sheet cell before construction; and Fig. 4 is a transverse sectional view of the steel sheet cell using a steel sheet pile partition wall. It is a figure. 10: Steel plate cell 12: Slit part 14: Water retaining chamber 16: Partition part 18: Top end surface

フロントページの続き (72)発明者 村井 禎美 茨城県つくば市大字旭1番地 建設省土木 研究所内 (72)発明者 柳本 泰伴 東京都千代田区大手町1丁目1番3号 住 友金属工業株式会社内 (72)発明者 飯村 修 東京都千代田区大手町1丁目1番3号 住 友金属工業株式会社内 (72)発明者 荻野 秀雄 東京都千代田区四番町5 東亜建設工業株 式会社内 (56)参考文献 特開 昭59−165710(JP,A)Front page continued (72) Inventor Sadami Murai, Asahi 1 Tsukuba, Ibaraki Prefectural Civil Engineering Research Institute, Ministry of Construction (72) Inventor Tae Yanagimoto 1-3-3 Otemachi, Chiyoda-ku, Tokyo Sumitomo Metal Industries Co., Ltd. Company (72) Inventor Osamu Iimura 1-3-3 Otemachi, Chiyoda-ku, Tokyo Sumitomo Metal Industries, Ltd. (72) Inventor Hideo Ogino 5 Yonban-cho, Chiyoda-ku, Tokyo Toa Construction Industry Co., Ltd. (56) References JP-A-59-165710 (JP, A)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】円柱状鋼板セル構造物を所要の間隔をもっ
て一列もしくは複数列に配列して成る透過式の鋼板セル
消波堤の施工法において、予め外側上部の少なくとも一
部にスリット部を設けるとともにその背後に消波堤延長
方向に鋼製の隔壁部を設け、該スリット部に連絡した遊
水室を設けてなる円筒状鋼板セルを前記スリット部を沖
合側に面して海底面に打設もしくは設置し、遊水室の底
版下面レベルまで中詰材の投入後、前記遊水室の背後の
部分に中詰材の投入を続けるとともに水中にて該遊水室
の底版コンクリートを施工することによって前記円柱状
鋼板セル構造物をそれぞれ建造することを特徴とする鋼
板セル消波堤の施工法。
1. A construction method of a transmission type steel plate cell breakwater in which cylindrical steel plate cell structures are arranged in a single row or a plurality of rows at a required interval, and a slit portion is previously provided in at least a part of an outer upper portion. A cylindrical steel plate cell, which is provided with a partition wall made of steel in the direction of extension of the breakwater and a water-retaining chamber connected to the slit part, is cast on the sea bottom with the slit part facing the offshore side. Or, by installing the filling material up to the bottom surface level of the bottom plate of the water retaining chamber, and continuing the introduction of the filling material in the area behind the water retaining chamber and by constructing the bottom slab concrete of the water retaining chamber in water. A method of constructing a steel plate cell breakwater, characterized by constructing columnar steel cell structures.
JP63062836A 1988-03-16 1988-03-16 Construction method of steel plate cell breakwater Expired - Lifetime JPH06975B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63062836A JPH06975B2 (en) 1988-03-16 1988-03-16 Construction method of steel plate cell breakwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63062836A JPH06975B2 (en) 1988-03-16 1988-03-16 Construction method of steel plate cell breakwater

Publications (2)

Publication Number Publication Date
JPH01235707A JPH01235707A (en) 1989-09-20
JPH06975B2 true JPH06975B2 (en) 1994-01-05

Family

ID=13211798

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63062836A Expired - Lifetime JPH06975B2 (en) 1988-03-16 1988-03-16 Construction method of steel plate cell breakwater

Country Status (1)

Country Link
JP (1) JPH06975B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59165710A (en) * 1983-03-09 1984-09-19 Sumitomo Metal Ind Ltd Wave-breaking shell revetment

Also Published As

Publication number Publication date
JPH01235707A (en) 1989-09-20

Similar Documents

Publication Publication Date Title
CN103321241B (en) Deep water open type combination foundation harbour and construction method thereof
JP2011231519A (en) Reinforcement beams of underwater structures and reinforcement method
KR101053139B1 (en) Anti-collision structure of offshore bridge and its construction method
JP2000290936A (en) Construction method of pier footing and caisson for pier footing construction
JPH06975B2 (en) Construction method of steel plate cell breakwater
JP2010180684A (en) Pier of three-dimensional rigid frame structure and construction method
KR102557753B1 (en) U-shaped caisson and its buoyancy launch method
JPS6310243B2 (en)
JPS59150810A (en) Coastal structure with caisson and its construction
JPH06976B2 (en) Construction method of steel plate cell breakwater
JP2676779B2 (en) Cylindrical caisson
JP3808552B2 (en) Form for constructing underwater caisson, underwater caisson and construction method thereof
RU53312U1 (en) BRIDGE OF BRIDGE SUPPORT
JP2655322B2 (en) Construction method of revetment structure
JP2000212969A (en) Caisson footing of honeycomb structure
JP2519299B2 (en) Underwater civil engineering structure and its construction method
JPH06257163A (en) Drought barge for shallow water foundation work
JPH0649824A (en) Breakwater
JP2556380B2 (en) Construction method of revetment structure
JPH01169397A (en) Building foundation structure of nuclear power generation plant
JP2745097B2 (en) Construction method of low temperature liquefied gas underground tank
JPH076175B2 (en) Breakwater structure
SU785413A1 (en) Quay
JPH0762626A (en) Construction method of breakwater by cylindrical caisson group
JPH02252807A (en) Execution process of transmission type breakwater for deep depth

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080105

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090105

Year of fee payment: 15

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090105

Year of fee payment: 15