JPH07123151A - Line construction data generating system - Google Patents

Line construction data generating system

Info

Publication number
JPH07123151A
JPH07123151A JP29884693A JP29884693A JPH07123151A JP H07123151 A JPH07123151 A JP H07123151A JP 29884693 A JP29884693 A JP 29884693A JP 29884693 A JP29884693 A JP 29884693A JP H07123151 A JPH07123151 A JP H07123151A
Authority
JP
Japan
Prior art keywords
data
storage means
processing
command
fixed asset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP29884693A
Other languages
Japanese (ja)
Inventor
Tadayoshi Sawada
忠義 澤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOKOHAMA UNION KK
Original Assignee
YOKOHAMA UNION KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YOKOHAMA UNION KK filed Critical YOKOHAMA UNION KK
Priority to JP29884693A priority Critical patent/JPH07123151A/en
Publication of JPH07123151A publication Critical patent/JPH07123151A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Telephonic Communication Services (AREA)

Abstract

PURPOSE:To easily and quickly change a large quantity of data by efficiently generating document data, which changes capital asset data, by easy operation. CONSTITUTION:In the case of an automatic processing command for generation of line construction data, the processing where indexes stored in a third storage means 18 are referred to call more necessary capital asset data stored in a first storage means 15 or a second storage means 16 and these data are subjected to sequence operation processing is performed instead of the sequential processing where these data are sequentially called and subjected to operation processing, and the processing result is stored in the second storage means 16 so that it can be called.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、電話設備における線
路工事を行う際に、旧来の固定資産データを新たな固定
資産データとして書き換えるために必要な帳票データの
処理作業を、容易かつ高速に遂行し、コストの低減化を
図るのに好適な線路工事データ作成システムに関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention easily and quickly performs the work of processing the form data necessary for rewriting old fixed asset data as new fixed asset data when conducting line work in telephone equipment. However, the present invention relates to a line construction data creation system suitable for reducing costs.

【0002】[0002]

【従来の技術】電話設備の敷設工事には、新規に電話設
備を敷設するケースと既に敷設されている電話設備を改
変するケースとがあるが、一般的に双方のケースをまと
めて線路工事と称している。
2. Description of the Related Art There are two cases for laying telephone equipment: a case where new telephone equipment is laid and a case where telephone equipment that has already been laid is modified. I am calling it.

【0003】ところで、電話設備に関するデータには、
電柱の材質やその設置位置などのデータ,マンホールの
素材・寸法やその設置位置などのデータ,ケーブル(電
線)の材質やその配線状況などのデータの他にも多種多
様なデータがあり、これらの各電話設備に関するデータ
がそれぞれ各固定資産データとして中央管理装置に入力
されて管理されている。
By the way, the data regarding telephone equipment includes
There is a wide variety of data in addition to data such as the material of the utility pole and its installation position, the data of the material / dimensions of the manhole and its installation position, and the data of the material of the cable (electric wire) and its wiring condition. Data relating to each telephone facility is input and managed as fixed asset data in the central management device.

【0004】従って、各工事請負業者が工事スケジュー
ルに基づいて線路工事を行った場合には、線路工事に係
るエリアの固定資産データが異なってくるため、線路工
事に係るエリア内における工事前の固定資産データを中
央管理装置から呼び出した後、これを工事後の新たな固
定資産データとして書き替えなければならない。
Therefore, when each construction contractor carries out the track construction based on the construction schedule, the fixed asset data in the area relating to the track construction will be different, so that the construction before the construction in the area relating to the track construction will be fixed. After calling the asset data from the central management unit, it must be rewritten as new fixed asset data after construction.

【0005】このような作業は、いわゆる線路工事デー
タ作成業務といわれるもので、各工事請負業者はマイコ
ンなどの端末機を用いてデータの書き替え作業を行うの
であるが、その際には中央管理装置から呼び出された線
路工事に係る固定資産データを、各種別毎の帳票データ
として編集しモニタ画面に逐次表示させる。そして、モ
ニタ画面に表示させた帳票データにおける必要箇所のデ
ータ内容を、オペレータが一つ々々書き替えて新たな固
定資産データを作成する。
Such work is called a so-called line construction data creation work, and each construction contractor rewrites the data using a terminal such as a microcomputer. At that time, central management is performed. Fixed asset data related to track construction called from the device is edited as form data for each type and sequentially displayed on the monitor screen. Then, the operator rewrites the data contents of necessary portions in the form data displayed on the monitor screen one by one to create new fixed asset data.

【0006】このようにして作成された新たな固定資産
データは、中央管理装置に入力管理されている工事前の
固定資産データと置き換えられ、これにより中央管理装
置に入力管理されている膨大な固定資産データは、常に
最新の固定資産データとして管理されることとなる。
尚、中央管理装置との固定資産データの送受信の方式に
ついての説明は省略する。
The new fixed asset data created in this manner is replaced with the fixed asset data before construction which is input and managed by the central management unit, and as a result, a huge amount of fixed assets which are input and managed by the central management unit. The asset data will always be managed as the latest fixed asset data.
The description of the method of transmitting / receiving fixed asset data to / from the central management device is omitted.

【0007】ところで、このような線路工事データの作
成を行う場合には、一定エリア内におけるケーブルの配
線状況を管理する「心線情報データ」に対する処理作業
と、一定エリア内における各種設備の状況を管理する
「設備惰報データ」に対する処理作業とに大別される。
しかして、それぞれの各データに対し、工事前のデータ
内容から工事後のデータ内容に書き替えを行わなければ
ないない。
By the way, in the case of creating such line construction data, processing work for "core wire information data" for managing the cable wiring condition in a certain area and the status of various facilities in the certain area are performed. It is roughly divided into processing work for the "equipment inertia data" to be managed.
Therefore, it is necessary to rewrite the data contents before the construction for the respective data to the data contents after the construction.

【0008】上記した心線情報データには、図13に示
したように、工事に係るエリアを特定する「固定配線区
画データ」,地下配線の状況を示す「地下ケーブルユニ
ットデータ」,地下よりのケーブル引き上げ地点を示す
「き線点データ」,地下と架空との接続(き線点におけ
る接続)の状況を示す「切替接続データ」,配線された
ケーブルの方向を示す「方面別ユニットデータ」などが
ある。
As shown in FIG. 13, the above-mentioned core wire information data includes "fixed wiring section data" for specifying an area related to construction, "underground cable unit data" showing the status of underground wiring, and underground cable data. "Pointer data" indicating the cable pulling point, "Switching connection data" indicating the status of the connection between underground and aerial (connection at the feeder point), "Unit data for each direction" indicating the direction of the wired cable, etc. There is.

【0009】また、設備情報データとしては、上記した
心線情報データにおけるエリア内に包含される各設備、
例えば電柱の設備状況を示す「電柱データ」,マンホー
ル(MH)/ハンドホール(HH)などの設備状況を示
す「マンホールデータ」,地中にケーブルを通すための
設備状況を示す「管路データ」,地上のケーブル設備状
況を示す「架空配線データ」,地下において管路に通さ
れているケーブルの設備状況を示す「地下き配デー
タ」,地下におけるケーブル同士の接続設備の状況を示
す「地下き配下部接続データ」,各集合住宅へ向けての
ケーブル設備の状況を示す「ビル込配線データ」などが
ある(図6(a)(b)参照)。
The facility information data includes each facility included in the area of the above-described core line information data,
For example, "Pole pole data" showing the equipment status of utility poles, "Manhole data" showing the equipment status of manholes (MH) / handholes (HH), etc. "Pipeline data" showing the equipment status for passing cables underground , "Overhead wiring data" that shows the status of cable equipment on the ground, "Underground distribution data" that shows the status of equipment of cables that run through pipelines underground, "Underground wiring" that shows the status of connection equipment between cables underground There are "subordinate connection data" and "building wiring data" showing the status of cable facilities for each housing (see FIGS. 6 (a) and 6 (b)).

【0010】図4に、これらのデータを処理するための
線路工事データ作成システムのブロック図を示す。第1
記憶手段6には、中央管理装置(図示略)より、線路工
事用の電話設備に関する固定資産データが受容される。
FIG. 4 shows a block diagram of a railway construction data preparation system for processing these data. First
The storage unit 6 receives fixed asset data regarding telephone equipment for track construction from a central management unit (not shown).

【0011】次いで、メニュー選択を行ったオペレータ
からの指令に基づいて、外部入力装置9より所定の指令
信号が制御手段1に入力され、この制御手段1の統括・
制御に基づき処理手段3が動作される。
Next, a predetermined command signal is input to the control means 1 from the external input device 9 based on a command from the operator who has selected the menu, and the control means 1 is controlled.
The processing means 3 is operated based on the control.

【0012】この処理手段3は、図5に示すように、少
なくともデータ検索・呼び出しを実行する第1処理部3
1,モニタ画面への表示・編集を実行する第2処理部3
2,演算手段4との送受信を実行する第3処理部33,
演算結果の適性判断を実行する第4処理部34,第2記
憶手段7に対しての出力を実行する第5処理部35など
より構成されており、各処理部31〜35の動作は、制
御手段1から逐次行われる個別の指令に基づいて階層的
に制御手段1と送受信を行いつつ実行される。
As shown in FIG. 5, the processing means 3 includes a first processing section 3 for executing at least data retrieval / calling.
1, a second processing unit 3 for displaying / editing on a monitor screen
2, a third processing unit 33 that performs transmission / reception with the calculation means 4,
It is composed of a fourth processing unit 34 for executing the suitability judgment of the calculation result, a fifth processing unit 35 for executing the output to the second storage unit 7, etc., and the operation of each processing unit 31 to 35 is controlled. It is executed while hierarchically transmitting and receiving to and from the control means 1 on the basis of the individual commands sequentially issued from the means 1.

【0013】従って、第1処理部31の動作によって検
索・呼び出しがなされた固定資産データは、第2処理部
32の動作によりモニタ画面に帳票データとして編集さ
れて表示される。
Therefore, the fixed asset data retrieved and called by the operation of the first processing unit 31 is edited and displayed as form data on the monitor screen by the operation of the second processing unit 32.

【0014】また、モニタ画面の表示を目視しているオ
ペレータは、データ内容の改変を行うための指令を逐次
入力し、これにより第3処理部33は演算手段4との送
受信の動作を開始し、モニタ画面に表示されている帳票
データの必要箇所のデータ内容の改変を演算手段4に実
行させ、第4処理部34の動作によって演算結果の適性
チェックがなされると、モニタ画面には第2処理部32
の動作によりデータ内容の改変がなされた新たな帳票デ
ータが表示される。
The operator who is visually observing the display on the monitor screen sequentially inputs a command for modifying the data content, whereby the third processing unit 33 starts the operation of transmitting / receiving to / from the computing means 4. When the calculation means 4 is caused to modify the data content of the required portion of the form data displayed on the monitor screen and the suitability of the calculation result is checked by the operation of the fourth processing section 34, the second screen is displayed on the monitor screen. Processing unit 32
The new form data whose data content has been modified by the operation of is displayed.

【0015】このような動作を繰り返し行って新たな帳
票データの作成が完成され、その後、オペレータからの
指令があれば第5処理部35の動作により新たな帳票デ
ータは第2記憶手段7に格納される。
The above operation is repeated to complete the creation of new form data, and thereafter, if there is a command from the operator, the new form data is stored in the second storage means 7 by the operation of the fifth processing unit 35. To be done.

【0016】尚、上記した各手段1〜7はそれそれ内部
バス8によって接続されており、2は制御手段1と外部
入力装置9との信号の受け渡しを行うI/O部、5は第
1記憶手段6,第2記憶手段7と制御手段1との信号の
受け渡しを行うI/O部である。
The above-mentioned means 1 to 7 are connected to each other by an internal bus 8. Reference numeral 2 is an I / O unit for transferring signals between the control means 1 and an external input device 9. Reference numeral 5 is a first. It is an I / O unit that exchanges signals between the storage unit 6, the second storage unit 7, and the control unit 1.

【0017】[0017]

【発明が解決しようとする課題】ところで、処理手段3
における各処理部31〜35の動作は、上記したように
制御手段1から逐次行われる個別の指令に基づいて階層
的に制御手段1と送受信を行いつつ動作される。
By the way, the processing means 3
The operation of each of the processing units 31 to 35 is performed while hierarchically transmitting and receiving to and from the control unit 1 based on the individual commands sequentially performed from the control unit 1 as described above.

【0018】従って、各帳票データの改変に際しては、
オペレータはモニタ画面の表示を見ながら逐次必要な指
令の入力を行わなければならず、この業務に従事する熟
練したオペレータであっても、かなり長時間に及ぶ煩雑
な作業を強いられるという問題がある。
Therefore, when modifying each form data,
The operator has to input necessary commands one after another while watching the display on the monitor screen, and even a skilled operator who is engaged in this task is forced to perform a complicated work for a considerably long time. .

【0019】この点を示すために、まず心線情報データ
の場合について概略的に説明する。すなわち、線路工事
の発生に伴って線路工事に係るエリア内のケーブルに関
する配線状況が変更されるため、そのエリア内における
心線情報としての固定資産データの改変処理を行う必要
がある。
In order to show this point, first, the case of the core line information data will be briefly described. That is, since the wiring situation regarding the cables in the area related to the track construction is changed with the occurrence of the track construction, it is necessary to modify the fixed asset data as the core line information in the area.

【0020】例えば、エリア内に配線されている「ケー
ブルユニット名」が、AA01〜AAnnからBB01
〜BBnnへ変更された場合には、その「ケーブルユニ
ット名」の移送処理として、図13で示したそのエリア
内の「地下ケーブルユニットデータ」P1,「き線点デ
ータ」P2,「切替接続データ」P3中の「ケーブルユ
ニット名」をそれぞれ変更する必要がある。
For example, the "cable unit name" wired in the area is from AA01 to AAnn to BB01.
When changed to BBnn, as the transfer processing of the "cable unit name", "underground cable unit data" P1, "feed point data" P2, "switch connection data" in the area shown in FIG. It is necessary to change each "cable unit name" in P3.

【0021】 作動が開始されると、図6に示したよ
うに、設計設備選定メニューA1が表示される。この場
合、各項目が直列的に配置されているので、実際には図
6(a)および図6(b)に示すような2画面として表
示されるため、全項目を確認すには、オペレータは2画
面をスクロールさせながら設計設備選定メニューA1−
1,A1−2を表示する。
When the operation is started, a design equipment selection menu A1 is displayed as shown in FIG. In this case, since the respective items are arranged in series, they are actually displayed as two screens as shown in FIGS. 6 (a) and 6 (b). Is a design equipment selection menu A1-
1, A1-2 are displayed.

【0022】 設計設備選定メニューA1−1中よ
り、「心線」メニューを選択すると、図7に示す心線選
定メニューA2が表示される。尚、心線情報データにお
ける各帳票データは、順列的に呼び出されるように設定
されているが、後述する設備情報データにおける各帳票
データは、個々に呼び出されるように設定されている。
When the "core wire" menu is selected from the design equipment selection menu A1-1, a core wire selection menu A2 shown in FIG. 7 is displayed. It should be noted that each form data in the core line information data is set to be called in order, but each form data in the facility information data described later is set to be called individually.

【0023】 ここで、エリア内に対して新規の「ケ
ーブルユニット名」であるBB01〜BBnnまでを登
録するために、図7に示した心線選定メニューA2中の
「方面別ユニット」P4を選択すると、図8に示すよう
な帳票データX1が表示されるので、この帳票データX
1にBB01〜BBnnのデータを一つ々々入力する。
Here, in order to register new “cable unit names” BB01 to BBnn in the area, the “direction-specific unit” P4 in the core selection menu A2 shown in FIG. 7 is selected. Then, the form data X1 as shown in FIG. 8 is displayed.
The data of BB01 to BBnn are input to 1 one by one.

【0024】すなわち、次の帳票データX1−2にBB
02を入力する場合には、図7からの動作を繰り返して
実行し、以下BBnnまで一つ々々繰り返し実行する。
尚、「ケーブルユニット名」は図8の帳票データX1に
示すように、「方面別ケーブル」と「ユニット番号」が
セットになっている。
That is, BB is added to the next form data X1-2.
In the case of inputting 02, the operation from FIG. 7 is repeatedly executed, and BBnn is repeatedly executed one by one.
The "cable unit name" is a set of "direction-specific cables" and "unit number" as shown in the form data X1 of FIG.

【0025】 この入力後には、モニタ画面の表示は
再度図7の心線選定メニューA2に戻る。従って、今度
は心線選定メニューA2における「ケーブルユニット移
送」を選択すると、図9に示した帳票データX2が表示
されるのでBB01の入力を行う。
After this input, the display on the monitor screen returns to the core selection menu A2 of FIG. 7 again. Therefore, this time, when “Cable unit transfer” in the core selection menu A2 is selected, the form data X2 shown in FIG. 9 is displayed, and BB01 is input.

【0026】 次に、図7の心線選定メニューA2に
戻るので、「方面別ユニット移送」を選択すると図10
に示すような帳票データX3が表示される。従って、こ
の帳票データX3にBB01の入力を行う。
Next, since the process returns to the core selection menu A2 of FIG. 7, if “Transfer unit by direction” is selected, FIG.
The form data X3 as shown in is displayed. Therefore, BB01 is input to this form data X3.

【0027】 以上のような作業を行うことにより、
エリア内の「地下ケーブルユニットデータ」P1,「き
線点データ」P2,「切替接続データ」P3に係る心線
情報データの新旧が改変される。
By performing the above work,
The old and new core wire information data relating to "underground cable unit data" P1, "feed line data" P2, and "switch connection data" P3 in the area are modified.

【0028】また、心線情報データの「ケーブルユニッ
ト名」は、図6に示した設備情報データの「架空配線デ
ータ」,「地下き配データ」,「地下き配下部接続デー
タ」,「ビル込配線データ」などにも記載されている。
The "cable unit name" of the core wire information data is "fictitious wiring data", "underground distribution data", "underground subordinate connection data", "building" of the equipment information data shown in FIG. It is also described in "Built-in wiring data".

【0029】従って、これらの「ケーブルユニット名」
を変更する場合にも、モニタ画面を設計設備選定メニュ
ーA1に戻し、エリア内に敷設されている「架空配線デ
ータ」,「地下き配データ」,「地下き配下部接続デー
タ」,「ビル込配線データ」などについて、個々に呼び
出しを行ってそれらのAA01〜AAnnをBB01〜
BBnnに変換しなければならない。
Therefore, these "cable unit names"
Even when changing, the monitor screen is returned to the design equipment selection menu A1, and the "overhead wiring data", "underground distribution data", "underground subordinate connection data", "building included" are laid in the area. "Wiring data" and the like, and call AA01 to AAnn of them individually from BB01 to
Must be converted to BBnn.

【0030】例えば、図6の設計設備選定メニューA1
において「架空配線データ」のメニューを選択すると、
図11に示すような帳票データY1が表示されるので、
この設備帳票データY1に対して変更処理を行う。
For example, the design equipment selection menu A1 shown in FIG.
When you select the "Overhead wiring data" menu in
Since the form data Y1 as shown in FIG. 11 is displayed,
A change process is performed on this equipment form data Y1.

【0031】次に、設備情報データにおける電柱用の帳
票データに基づいて概略的に説明する。
Next, the outline will be described based on the form data for telephone poles in the equipment information data.

【0032】 作動が開始されると、モニタ画面には
設計設備選定メニューA1が表示され、この設計設備選
定メニューA1中より電柱メニューを選択すれば、図1
2に示すような、電柱用の帳票データY2が表示され
る。
When the operation is started, a design equipment selection menu A1 is displayed on the monitor screen, and if a utility pole menu is selected from the design equipment selection menu A1, the menu shown in FIG.
The form data Y2 for telephone poles as shown in 2 is displayed.

【0033】 この帳票データY2における必要箇所
のデータを書き替えて改変するのであるが、この帳票デ
ータY2は1本の電柱に対するものであるため、例えば
線路工事に係るエリア内に100本の電柱があり、その
100本に対して何らかのデータ書き替えを行う場合に
は、100の帳票データY2−1〜Y2−100を逐次
呼び出しつつデータの書き替え作業を行う。
The data of the necessary place in this form data Y2 is rewritten and modified. Since this form data Y2 is for one electric pole, for example, 100 electric poles are present in the area related to track construction. When performing some data rewriting on the 100 lines, the data rewriting work is performed while sequentially calling the 100 form data Y2-1 to Y2-100.

【0034】 また、線路工事に係るエリア内に10
0本の電柱を新設するような場合には、オペレータは定
型の電柱用帳票データを基に新たな電柱用の帳票データ
を作成しデータの書き込み作業を行う。そして、このよ
うな作業を99回繰り返すこととなる。
In addition, within the area related to track construction, 10
When zero electric poles are newly installed, the operator creates new electric pole form data based on the standard electric pole form data and writes the data. Then, such work is repeated 99 times.

【0035】以上のようにして作成された心線情報デー
タおよび設備情報データにおける新たな帳票データに
は、書き替えの行なわれた一つ々々のデータを含む総て
のデータが、中央管理装置に増減項目として引き継がれ
て入力管理されるよう、特定を施したレーコードヘッダ
を作成して付与する。
In the new form data in the core wire information data and the facility information data created as described above, all the data including the respective rewritten data are all stored in the central management unit. Create and attach a specified racode header so that it can be inherited as input / output items and managed for input.

【0036】その後、それらを送信用ファイルとしてま
とめ、この送信用ファイルに工事竣工年月日,工事名な
どを入力し、中央管理装置への送信用ファイルとしてフ
ロッピーディスクに記憶固定し、一連の作業が終了され
る。
After that, these are put together as a transmission file, the construction completion date, the construction name, etc. are entered in this transmission file, and the data is stored and fixed on a floppy disk as a transmission file to the central management unit, and a series of work is performed. Is ended.

【0037】このように、従来のシステムにおいては、
設計設備選定メニューA1よりそれぞれの帳票データX
1〜Xn,Y1〜Ynを一つ々々検索・呼び出し/書き
替え・格納の順で実行していかなければならず、線路工
事の規模の大小に比例して作成する帳票データX1〜X
n,Y1〜Ynの件数も増加し、単純な作業を長時間に
わたり繰り返し行うことをオペレータは強要される。
As described above, in the conventional system,
Each form data X from the design equipment selection menu A1
1 to Xn and Y1 to Yn must be executed one by one in the order of searching, calling / rewriting, and storing, and the form data X1 to X are created in proportion to the size of the line work.
The number of n, Y1 to Yn also increases, and the operator is forced to repeat simple work for a long time.

【0038】従って、工事請負業者は、実際の線路工事
の遂行の他に、工事によって改変された固定資産データ
を正確に残すため、新たな帳票データ作成の作業にも相
当な手間を必要とし、効率のよい線路工事データ作成シ
ステムの提供が要請されていた。
Therefore, the construction contractor requires a considerable amount of time and labor to create new form data in order to accurately leave the fixed asset data modified by the construction in addition to the actual track construction work. It was requested to provide an efficient track construction data creation system.

【0039】この発明は、上記したような事情に基づい
てなされたものであり、その目的とするところは、固定
資産データの改変を行う帳票データの作成を簡便な操作
で効率よく行い、大量のデータ改変を容易かつ高速に行
うことが可能な線路工事データ作成システムを提供する
ことにある。
The present invention has been made based on the above-mentioned circumstances, and an object thereof is to efficiently create form data for modifying fixed asset data by a simple operation and to generate a large amount of data. It is to provide a railroad construction data creation system capable of easily and rapidly modifying data.

【0040】[0040]

【課題を解決するための手段】この発明は、上記のよう
な目的を達成するために、線路工事用の電話設備に関す
る固定資産データを格納する第1記憶手段より、必要な
固定資産データを呼び出してオペレータからの指令に基
づく演算処理を行い、この演算結果を新たな固定資産デ
ータとして第2記憶手段に格納する線路工事データ作成
システムにおいて、オペレータから逐次処理の指令があ
った場合には、第1記憶手段または第2記憶手段より必
要な固定資産データを呼び出してモニタ画面に表示し、
かつモニタ画面に表示された固定資産データにおける必
要箇所のデータ内容をオペレータの指令に基づいて逐次
演算処理し、これを新たな固定資産データとして第2記
憶手段に呼び出し可能に格納する逐次処理の手段と、オ
ペレータから自動処理の指令があった場合には、上記し
た逐次処理の手段による動作を停止させてシーケンス指
令手段を発動させ、このシーケンス指令手段からの指令
に基づいて第1記憶手段または第2記憶手段に格納され
ている固定資産データ中の指令に関連するデータに、そ
れぞれ固有のインデックスを付けてそれらのインデック
スを第3記憶手段に格納させ、その後に、オペレータか
らの自動処理指令の内容に基づいて第1記憶手段または
第2記憶手段に格納されている固定資産データ中の指令
に関連する必要な固定資産データを、第3記憶手段に格
納されているインデックスを参照しつつ適宜抽出してシ
ーケンス演算処理し、これを新たな固定資産データとし
て呼び出し可能に第2記憶手段に格納する自動処理の手
段と、を備えることを特徴とする。
In order to achieve the above object, the present invention calls necessary fixed asset data from a first storage means for storing fixed asset data relating to telephone equipment for track construction. In the track construction data creation system that performs calculation processing based on a command from the operator and stores the calculation result as new fixed asset data in the second storage means, if there is a command for sequential processing from the operator, Call the required fixed asset data from the first storage means or the second storage means and display it on the monitor screen,
And means for sequentially processing the data contents of the necessary parts in the fixed asset data displayed on the monitor screen based on the operator's instruction, and storing the data as new fixed asset data in the second storage means so as to be callable. When an operator gives an instruction for automatic processing, the operation of the above-mentioned sequential processing means is stopped to activate the sequence instruction means, and the first storage means or the first storage means is operated based on the instruction from the sequence instruction means. (2) Data related to commands in the fixed asset data stored in the storage means are each given a unique index, and those indexes are stored in the third storage means, after which the content of the automatic processing command from the operator Required in relation to the instructions in the fixed asset data stored in the first storage means or the second storage means based on Automatic processing means for extracting fixed asset data appropriately while referring to the index stored in the third storage means, performing sequence operation processing, and storing this in the second storage means so that it can be called as new fixed asset data. And are provided.

【0041】[0041]

【作用】この発明によれば、オペレータから所定の自動
処理指令があった場合には、第1記憶手段に受容されて
いる固定資産データ中より、指令に関連する必要なデー
タを適宜抽出すると共に、オペレータからの自動処理指
令の内容に基づいて各固定資産データをシーケンス演算
処理し、この演算結果を新たな固定資産データとして第
2記憶手段に格納するため、線路工事に伴う帳票データ
の作成に際し、従来のようにオペレータがモニタ画面を
目視しながら逐次指令を行って一つ々々のデータ書き替
えをする必要がなく、大量のデータ改変も容易かつ高速
に行うことができる。
According to the present invention, when a predetermined automatic processing instruction is given by the operator, necessary data relating to the instruction is appropriately extracted from the fixed asset data received in the first storage means. , The fixed asset data is processed in sequence based on the content of the automatic processing command from the operator, and the result of this operation is stored in the second storage means as new fixed asset data. It is not necessary for the operator to rewrite data one by one by sequentially issuing a command while visually observing the monitor screen as in the prior art, and a large amount of data can be easily and rapidly modified.

【0042】[0042]

【実施例】以下、この発明の実施例を図面に基づき詳細
に説明する。図1は、この発明に係るシステム遂行のた
めの一実施例を示すブロック図である。
Embodiments of the present invention will be described in detail below with reference to the drawings. FIG. 1 is a block diagram showing an embodiment for performing the system according to the present invention.

【0043】同図において、制御手段10はオペレータ
の操作するキーボードなどの外部入力装置20からの指
令信号をI/O部11を介して受容すると共に、以下に
説明する全ての各手段を内部バス19を介して統括・制
御する。
In the figure, the control means 10 receives a command signal from an external input device 20 such as a keyboard operated by an operator via the I / O section 11, and controls all means described below in an internal bus. Control and control via 19.

【0044】第1記憶手段15は、図示しないが電話設
備に関する固定資産データが格納されている中央管理装
置より、線路工事を行うのに必要な工事エリア内の電話
設備に関する固定資産データを受容する。尚、第1記憶
手段15と中央管理装置との間における固定資産データ
の送受信は、この発明の要旨と直接関係しないのでその
詳細な説明は省略をする。
Although not shown, the first storage means 15 receives fixed asset data concerning telephone equipment in a construction area necessary for conducting track construction from a central management unit in which fixed asset data concerning telephone equipment is stored. . Note that the transmission and reception of fixed asset data between the first storage means 15 and the central management device are not directly related to the gist of the present invention, so a detailed description thereof will be omitted.

【0045】処理手段12は、制御手段10からの指令
信号に基づいて命令の実行を行う手段であり、具体的に
は図2に示すように、データ検索・呼び出しを実行する
第1処理部121,モニタ画面への表示を実行する第2
処理部122,演算手段13との送受信を実行する第3
処理部123,演算結果の適性判断を実行する第4処理
部124,第2記憶手段16に対しての出力を実行する
第5処理部125などより構成されている。
The processing means 12 is means for executing an instruction on the basis of a command signal from the control means 10. Specifically, as shown in FIG. 2, the first processing section 121 for executing data retrieval / calling. , Second to execute display on monitor screen
Third for executing transmission / reception with the processing unit 122 and the calculation means 13
It comprises a processing unit 123, a fourth processing unit 124 for executing the suitability determination of the calculation result, a fifth processing unit 125 for executing the output to the second storage unit 16, and the like.

【0046】そして、各処理部121〜125は、通常
は制御手段10から逐次行われる個別の指令に基づいて
階層的に制御手段10と送受信を行いつつ実行される。
Each of the processing units 121 to 125 is normally executed while transmitting and receiving hierarchically to and from the control unit 10 based on individual commands sequentially issued from the control unit 10.

【0047】演算手段13は、制御手段10からの指令
を受けて第3処理部123から指令信号が入力される
と、これに基づいて必要な演算処理を行い、その後に演
算手段13におて必要な演算処理が行われたと判断され
た場合には、第5処理部125の動作により、第2記憶
手段16にその演算結果が受容されて格納される。
Upon receiving the command from the control means 10 and receiving the command signal from the third processing section 123, the calculation means 13 performs necessary calculation processing based on this, and then the calculation means 13 receives the command signal. If it is determined that the necessary arithmetic processing has been performed, the operation result of the fifth processing unit 125 causes the second storage unit 16 to receive and store the operation result.

【0048】一方、シーケンス指令手段17は制御手段
10と送受信を行いつつ動作されるのであるが、オペレ
ータから自動処理の指令があった場合に発動され、処理
手段10の各処理部121〜125に対する階層的な動
作のために逐次行われる個別の指令が停止され、各処理
部121〜125を選択的に動作させ、制御手段10と
送受信を行いつつオペレータからの所定の自動処理指令
に基づいてシーケンス的に自動処理を行わしめる。
On the other hand, the sequence command means 17 is operated while transmitting / receiving with the control means 10, and is activated when an automatic processing command is given by the operator, and the sequence command means 17 is applied to the respective processing units 121 to 125 of the processing means 10. Individual commands that are sequentially performed for hierarchical operation are stopped, the processing units 121 to 125 are selectively operated, and a sequence is performed based on a predetermined automatic processing command from the operator while transmitting and receiving with the control unit 10. Automatically perform automatic processing.

【0049】すなわち、このシーケンス指令手段17が
作動開始されると、第1記憶手段15に受容されている
固定資産データ中より、指令に関連する必要なデータに
それぞれ固有のインデックスを付け、そのインデックス
を第3記憶手段18に格納させる。
That is, when the operation of the sequence command means 17 is started, the necessary data related to the command is given a unique index from the fixed asset data received in the first storage means 15, and the index is added. Are stored in the third storage means 18.

【0050】その後に、第3記憶手段18に格納された
各固定資産データのインデックスを参照しつつ適宜必要
なインデックスを抽出すると共に、オペレータからの自
動処理指令の内容に基づいて第1処理部121から第5
処理部125までの各処理部に対して選択的に指令を行
い、演算手段13において各固定資産データをシーケン
ス演算処理させ、この演算結果を新たな固定資産データ
として第2記憶手段18に呼び出し可能に格納する。
After that, the necessary index is extracted while referring to the index of each fixed asset data stored in the third storage means 18, and the first processing unit 121 is executed based on the content of the automatic processing command from the operator. To fifth
It is possible to selectively issue an instruction to each processing unit up to the processing unit 125, to cause the operation unit 13 to perform a sequence operation process on each fixed asset data, and call the operation result to the second storage unit 18 as new fixed asset data. To store.

【0051】また、第2記憶手段18に格納される演算
処理後の新たな固定資産データには、固有のインデック
スと共に、演算処理されたデータ内容を特定することが
可能な改変済のインデックスが付され、この改変済のイ
ンデックスも第3記憶手段18に格納される。
Further, the new fixed asset data after the arithmetic processing stored in the second storage means 18 has a unique index and a modified index capable of specifying the content of the arithmetically processed data. The modified index is also stored in the third storage unit 18.

【0052】従って、この発明に係る線路工事データ作
成システムは、処理手段12の各処理部121〜125
への個別的指令により、オペレータが逐次必要箇所のデ
ータ内容をモニタ画面を目視しながら逐次改変処理する
システムと、オペレータが所定の自動処理指令を発しシ
ーケンス指令手段17を介して処理手段12の各処理部
121〜125への選択的指令により、必要箇所のデー
タ内容を自動的に改変処理するシステムとを具備してい
る。
Therefore, the railway construction data creating system according to the present invention has the processing units 121 to 125 of the processing means 12.
To the processing means 12 through the sequence command means 17 and a system in which the operator sequentially modifies the data contents of the necessary portions while visually observing the monitor screen by an individual command to the operator. It is provided with a system for automatically modifying the data content of a necessary part by a selective command to the processing units 121 to 125.

【0053】これらの動作を、図3に示すフローチャー
トに基づいて説明する。まず、システム遂行がスタート
すると、モニタ画面に初期メニューが表示される(ステ
ップ200)。次いで、システム遂行は自動処理指令か
否かが判断され(ステップ201)、自動処理指令でな
いと判断された場合にはオペレータは初期メニュー中の
逐次改変処理を選択してステップ202へ進み、実行す
るメニューの指令を行う。
These operations will be described with reference to the flowchart shown in FIG. First, when system performance starts, an initial menu is displayed on the monitor screen (step 200). Next, it is judged whether or not the system performance is an automatic processing command (step 201). When it is judged that the system performance is not the automatic processing command, the operator selects the sequential modification process in the initial menu and proceeds to step 202 to execute it. Command the menu.

【0054】その後、オペレータから如何なる入力指令
があったかが判断され(ステップ203)、入力指令が
あった場合にはその入力指令に基づいて逐次演算処理が
行われ(ステップ204)、逐次演算処理の終了か否か
の判断がなされ(ステップ205)、逐次演算処理を終
了する場合にはシステムの遂行は一旦停止されるが、そ
うでない場合はステップ203からの動作が繰り返され
る。
After that, it is judged what kind of input command is received from the operator (step 203), and if there is an input command, the sequential calculation process is performed based on the input command (step 204), and the sequential calculation process ends. Whether or not it is determined (step 205), the execution of the system is temporarily stopped when the sequential calculation processing is ended, but otherwise, the operation from step 203 is repeated.

【0055】一方、ステップ201でシステム遂行は自
動処理指令であると判断された場合には、シーケンス指
令手段17が作動し、第1記憶手段15に受容されてい
る固定資産データ中の指令に関連する必要なデータにそ
れぞれ固有のインデックスを付け、かつこのインデック
スを第3記憶手段18に格納させる(ステップ20
6)。
On the other hand, if it is determined in step 201 that the system performance is an automatic processing command, the sequence command means 17 is activated and is related to the command in the fixed asset data received in the first storage means 15. A unique index is attached to each of the necessary data to be stored, and this index is stored in the third storage means 18 (step 20).
6).

【0056】その後、第1記憶手段15から第3記憶手
段18へのインデックスの格納がなされたかが判断され
(ステップ207)、格納がなされた場合にはシーケン
ス演算処理が行われる(ステップ208)。
After that, it is judged whether or not the index is stored from the first storage means 15 to the third storage means 18 (step 207), and if it is stored, the sequence operation processing is performed (step 208).

【0057】ここでは、第3記憶手段18へ格納された
指令に関連する固有のインデックスを参照しつつ、必要
な各固定資産データを第1記憶手段15から適宜抽出
し、オペレータからの自動処理指令の内容に基づいて処
理手段12の各処理部121〜125に対して選択的に
動作の指示を行い、演算手段13ではシーケンス演算処
理を行う。
Here, each necessary fixed asset data is appropriately extracted from the first storage means 15 while referring to the unique index related to the instruction stored in the third storage means 18, and the automatic processing instruction from the operator is issued. Based on the contents of the above, the operation means is selectively instructed to each of the processing units 121 to 125 of the processing means 12, and the operation means 13 performs the sequence operation processing.

【0058】次に、新たな自動処理指令が入力されたか
否がが判断され、新たな自動処理指令が入力された場合
にはステップ208に戻り新たにシーケンス演算処理が
行われる。また、新たな自動処理指令が入力されない場
合には、シーケンス演算結果は新たな固定資産データと
して第2記憶手段16に呼び出し可能に格納され(ステ
ップ210)、さらに自動処理完了の表示がなされる
(ステップ211)。
Next, it is judged whether or not a new automatic processing command has been input. If a new automatic processing command has been input, the process returns to step 208 and a new sequence operation process is performed. When no new automatic processing command is input, the sequence operation result is stored as new fixed asset data in the second storage means 16 so that it can be called up (step 210), and the completion of automatic processing is displayed (step 210). Step 211).

【0059】その後、再度自動処理を行うか否かが判断
され(ステップ212)、再度自動処理を行う場合には
ステップ200へ戻って一連の動作が繰り返されるが、
再度自動処理を行なわない場合には個別処理を行うか否
かが判断され(ステップ212)、個別処理を行う場合
にはステップ202からの動作へ移行するが、そうでな
い場合にはシステムの遂行は一旦停止される。
Thereafter, it is judged whether or not the automatic processing is to be performed again (step 212). When the automatic processing is to be performed again, the process returns to step 200 and a series of operations are repeated.
If the automatic processing is not performed again, it is determined whether or not the individual processing is performed (step 212). If the individual processing is performed, the operation proceeds from step 202. If not, the system is not executed. It is temporarily stopped.

【0060】このような線路工事データ作成システムに
よれば、次のような各処理を行うことが可能となる。
According to such a line construction data creation system, it is possible to perform the following processes.

【0061】1. 異なる帳票データに対するデータ内
容の一括自動書き替え
1. Batch automatic rewriting of data contents for different form data

【0062】 線路工事に係るエリア内のケーブルに
関する配線状況を管理する心線情報データにおいて、例
えばエリア内に配線されている「ケーブルユニット名」
をAA01からBB01へ変更する場合には、その「ケ
ーブルユニット名」の移送処理として、そのエリア内の
「地下ケーブルユニットデータ」P1,「き線点デー
タ」P2,「切替接続データ」P3中の「ケーブルユニ
ット名」をそれぞれ変更する必要がある(図13参
照)。
In the core wire information data that manages the wiring status of the cables in the area related to the track construction, for example, “cable unit name” wired in the area
When changing from AA01 to BB01, as the transfer processing of the "cable unit name", "underground cable unit data" P1, "feed point data" P2, and "switch connection data" P3 in the area are transferred. It is necessary to change each "cable unit name" (see FIG. 13).

【0063】従来は、まず設計設備選定メニューA1を
呼び出し、この設計設備選定メニューA1−1中より
「心線」メニューを選択して心線選定メニューA2を呼
び出し、この心線選定メニューA2中の「方面別ユニッ
ト」を選択して帳票データX1を呼び出し(図8参
照)、この帳票データX1にBB01を入力する。
Conventionally, first, the design equipment selection menu A1 is called, the "core" menu is selected from the design equipment selection menu A1-1 to call the core selection menu A2, and the core selection menu A2 is selected. Select "Unit for each direction" to call the form data X1 (see FIG. 8), and input BB01 to this form data X1.

【0064】この入力が終了すると、再度心線選定メニ
ューA2に戻るので、この心線選定メニューA2の「ケ
ーブルユニット移送」を選択し、図9に示した帳票デー
タX2を呼び出してBB01の入力を行う。この入力が
終了すると、再度心線選定メニューA2に戻るので、
「方面別ユニット移送」を選択して図10に示した帳票
データX3を呼び出しBB01の入力を行う。
When this input is completed, the screen returns to the core selection menu A2 again, so that "cable unit transfer" in the core selection menu A2 is selected, and the form data X2 shown in FIG. 9 is called to input BB01. To do. When this input is completed, it returns to the core selection menu A2 again.
"Transfer unit by direction" is selected and the form data X3 shown in FIG. 10 is called to input BB01.

【0065】以上のように、従来はオペレータが逐次必
要な帳票データを呼び出すように指令を行い、かつ各個
別にデータの書き替え指令を行い、このような作業を繰
り返し実行し続けなければ、エリア内の「地下ケーブル
ユニットデータ」P1,「き線点データ」P2,「切替
接続データ」P3に係る心線情報データの新旧をAA0
1からBB01へと変更することができない。
As described above, conventionally, the operator issues an instruction to sequentially call the required form data, and also issues an instruction to rewrite the data individually. The old and new core wire information data relating to “underground cable unit data” P1, “feed point data” P2, and “switch connection data” P3 in
You cannot change from 1 to BB01.

【0066】しかしながら、この発明に係るシステムに
よれば、エリアの指定を行うと共に、心線情報データに
おいてその「ケーブルユニット名」をAA01からBB
01へ変更するように自動処理の指令を行うと、シーケ
ンス指令手段17の作動により、第1記憶手段15から
「方面別ユニット」の帳票データX1に対するBB01
の入力が行われる。
However, according to the system of the present invention, the area is designated and the "cable unit name" of the core wire information data is changed from AA01 to BB.
When an automatic processing command is issued so as to change the value to 01, the sequence command means 17 operates to cause BB01 from the first storage means 15 for the form data X1 of the "direction-specific unit".
Is input.

【0067】次いで、「ケーブルユニット移送」の帳票
データX2、「方面別ユニット移送」の帳票データX3
へのBB01の入力が行われ、これに基づいてエリア内
の「地下ケーブルユニットデータ」P1,「き線点デー
タ」P2,「切替接続データ」P3に係る「ケーブルユ
ニット名」がAA01からBB01へとなるように、中
央管理装置に対する登録準備用データとし、第2記憶手
段18に呼び出し可能に新たな心線情報データを格納す
ることができる。
Next, the form data X2 of "cable unit transfer" and the form data X3 of "direction-specific unit transfer"
BB01 is input to, and based on this, the "cable unit name" relating to "underground cable unit data" P1, "feed point data" P2, "switch connection data" P3 in the area is changed from AA01 to BB01. As described above, new core line information data can be stored in the second storage means 18 as registration preparation data for the central management device so as to be callable.

【0068】 心線情報データの「ケーブルユニット
名」は、図6に示した設備情報データの「架空配線デー
タ」,「地下き配データ」,「地下き配下部接続デー
タ」,「ビル込配線データ」などにも記載されている。
The “cable unit name” of the core wire information data is “fictitious wiring data”, “underground distribution data”, “underground distribution lower part connection data”, and “building embedded wiring” of the equipment information data shown in FIG. Data ”and so on.

【0069】従って、これらの「ケーブルユニット名」
を変更する場合にも、従来は設計設備選定メニューA1
に基づき、個々にエリア内の「架空配線データ」,「地
下き配データ」,「地下き配下部接続データ」,「ビル
込配線データ」などの帳票データY1〜Ynを呼び出
し、てそれらのAA01をBB01に変換しなければな
らなかった。
Therefore, these "cable unit names"
Even when changing, the conventional design equipment selection menu A1
Based on the above, the form data Y1 to Yn such as "fictitious wiring data", "underground distribution data", "underground distribution connection data" and "building wiring data" in the area are individually called, and those AA01 Had to be converted to BB01.

【0070】しかしながら、この発明に係るシステムに
よれば、エリアの指定を行うと共に、設備情報データに
おいてその「ケーブルユニット名」をAA01からBB
01へ変更するように自動処理の指令を行うと、シーケ
ンス指令手段17の作動により、第1記憶手段15から
設備情報データ中の必要な帳票データが抽出され、それ
らの「ケーブルユニット名」を一括してAA01からB
B01へと変更し、第2記憶手段18に呼び出し可能に
格納することができる。
However, according to the system of the present invention, the area is designated and the "cable unit name" of the equipment information data is changed from AA01 to BB.
When an automatic processing command is issued so as to change the value to 01, the sequence command means 17 operates to extract necessary form data from the facility information data from the first storage means 15, and to collect those "cable unit names" together. Then AA01 to B
It can be changed to B01 and can be stored in the second storage unit 18 in a callable manner.

【0071】2. 帳票デ−タの自動連続複写2. Automatic continuous copying of form data

【0072】設備情報データにおける電柱の本数は多数
におよため、従来は例えばあるエリア内に100本の電
柱を新設する場合、オペレータは定型の電柱用帳票デー
タを手本にして新設される第1番目の電柱用帳票データ
を作成し、この電柱用帳票データに「電柱番号(n)」
を入力しさらに必要な項目のデータを書き込み、第1番
目の電柱用帳票データの作成を完了する。
Since the number of electric poles in the equipment information data is large, conventionally, for example, when 100 electric poles are newly installed in a certain area, the operator is newly established by using the standard electric pole form data as a model. Create the first utility pole form data, and add "power pole number (n)" to this utility pole form data.
Is input to write data of necessary items, and the creation of the first telephone pole form data is completed.

【0073】そして、これと同様にして「電柱番号(n
+1)」をまた「電柱番号(n+2)」・・・の電柱用
帳票データを順次作成していかなければならない。
Then, in the same manner as this, the "electric pole number (n
+1) ”and the utility pole number (n + 2) ...

【0074】しかしながら、この発明に係るシステムに
よれば、エリアの指定を行うと共に、設備情報データに
おいて「電柱番号(n)」から「電柱番号(n+9
9)」までの電柱用帳票データを複製するように自動処
理の指令を行うと、シーケンス指令手段17の作動によ
り、第1記憶手段15から必要な電柱用帳票データが抽
出され、それを複製すると共に「電柱番号(n)」を書
き込む。
However, according to the system of the present invention, the area is designated, and in the facility information data, "electric pole number (n)" to "electric pole number (n + 9)
9) ”, an automatic processing command is issued to copy the utility pole form data up to 9), and the sequence command means 17 operates to extract the necessary utility pole form data from the first storage means 15 and copy it. At the same time, write the “telephone pole number (n)”.

【0075】このようにして、順次「電柱番号(n+9
9)」を付した100の電柱用帳票データを作成し、第
2記憶手段18に呼び出し可能に格納することができ
る。
In this way, the telephone pole number (n + 9
9) ”is added to create 100 pieces of telephone pole form data, which can be stored in the second storage unit 18 in a callable manner.

【0076】このような異なる帳票データに対するデー
タ内容の一括自動書き替え、および帳票データの自動連
続複写による処理作業歯、線路工事データ作成システム
の約6割前後を占めるため、大幅に作業時間の短縮化を
図ることが可能となる。
Since the data content of such different form data is automatically rewritten collectively and the process data is automatically copied continuously, it occupies about 60% of the work data and the line construction data creation system, which significantly reduces the work time. Can be realized.

【0077】その他、第3記憶手段18に指令に関連す
るデータの固有のインデックスや改変済のインデックス
などを格納するので、シーケンス指令手段の作動時に、
これらのインデックスを指定することにより、あるデー
タ内容を特定し、モニタ画面に表示させてそのデータ内
容のみのチェックを行うことができる。
In addition, since the unique index or the modified index of the data relating to the command is stored in the third storage means 18, when the sequence command means is operated,
By specifying these indexes, it is possible to identify a certain data content, display it on the monitor screen, and check only that data content.

【0078】また、その特定されたデータを必要な帳票
データに適宜書き込みできることせ勿論のこととして、
帳票データ中のそのデータ部分にカーソルをスキップさ
せたり、そのデータ部分だけ発光させたりすることも可
能となる。
Further, it goes without saying that the specified data can be appropriately written in the required form data.
It is also possible to make the cursor skip to that data portion of the form data, or to make only that data portion emit light.

【0079】さらに、帳票データ中の各データ項目を編
集し直して、例えば直列配置から並列配置や空欄データ
部分の行詰など、通常は2画面以上にわたって表示され
る情報を、1画面に圧縮して表示させて画面のスクロー
ルを省き、操作の手間と見易すさの向上などを図ること
も可能となる。
Further, by re-editing each data item in the form data, the information normally displayed on two or more screens such as serial layout to parallel layout or blanking of blank data part is compressed into one screen. It is also possible to reduce the screen scrolling by displaying the above, and to improve the labor and the visibility of the operation.

【0080】[0080]

【発明の効果】以上説明したように、この発明によれ
ば、オペレータから所定の自動処理指令があった場合に
は、第1記憶手段に受容されている固定資産データ中よ
り、指令に関連する必要なデータを適宜抽出すると共
に、オペレータからの自動処理指令の内容に基づいて各
固定資産データをシーケンス演算処理し、この演算結果
を新たな固定資産データとして第2記憶手段に格納する
ため、線路工事に伴う帳票データの作成に際し、従来の
ようにオペレータがモニタ画面を目視しながら逐次指令
を行って一つ々々のデータ書き替えをする必要がなく、
大量のデータ改変も容易かつ高速に行うことができる。
As described above, according to the present invention, when a predetermined automatic processing command is given by the operator, it is related to the command from the fixed asset data received in the first storage means. The necessary data is extracted as appropriate, and each fixed asset data is sequence-processed based on the content of the automatic processing command from the operator, and the calculation result is stored as new fixed asset data in the second storage means. When creating form data associated with construction, it is not necessary for the operator to rewrite data one by one by issuing a command one by one while observing the monitor screen as in the past.
A large amount of data can be easily modified at high speed.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明に係るシステムの概略を示すブロック
図。
FIG. 1 is a block diagram showing an outline of a system according to the present invention.

【図2】図1における自動処理時の処理手段の各部動作
を示す説明図。
FIG. 2 is an explanatory diagram showing the operation of each part of the processing means during automatic processing in FIG.

【図3】この発明に係るシステムの動作の概略を示すフ
ローチャート。
FIG. 3 is a flowchart showing an outline of the operation of the system according to the present invention.

【図4】従来の線路工事データ作成システムの概略を示
すブロック図。
FIG. 4 is a block diagram showing an outline of a conventional line construction data creation system.

【図5】図4における逐次処理時の処理手段の各部動作
を示す説明図。
5 is an explanatory diagram showing the operation of each part of the processing means during sequential processing in FIG. 4. FIG.

【図6】設計設備選定メニューの表示一例を示す図。FIG. 6 is a diagram showing a display example of a design facility selection menu.

【図7】心線選定メニューの表示一例を示す図。FIG. 7 is a diagram showing a display example of a core selection menu.

【図8】心線選定メニューの第1の帳票データ表示例を
示す図。
FIG. 8 is a view showing a first form data display example of a core selection menu.

【図9】心線選定メニューの第2の帳票データ表示例を
示す図。
FIG. 9 is a diagram showing a second form data display example of a core selection menu.

【図10】心線選定メニューの第3の帳票データ表示例
を示す図。
FIG. 10 is a diagram showing a third form data display example of the core selection menu.

【図11】心線選定メニューの第4の帳票データ表示例
を示す図。
FIG. 11 is a view showing a fourth form data display example of a core selection menu.

【図12】設備情報データ中の電柱用帳票データ表示例
を示す図。
FIG. 12 is a view showing a display example of telephone pole form data in facility information data.

【図13】エリア内の心線情報データを示す説明図。FIG. 13 is an explanatory diagram showing core wire information data in an area.

【符号の説明】[Explanation of symbols]

10 制御手段 11,14 I/O 12 処理手段 121 第1処理部 122 第2処理部 123 第3処理部 124 第4処理部 125 第5処理部 13 演算手段 15 第1記憶手段 16 第2記憶手段 17 シーケンス指令手段 18 第3記憶手段 19 内部バス 20 外部入力装置 A1(A1−1,A1−2) 設計設備選定メニュー A2 心線選定メニュー X1,X2,X3 心線情報データ用の帳票データ Y1,Y2 設備情報データ用の帳票データ P 固定配線区画 P1 地下ケーブルユニット P2 き線点 P3 切替接続 P4 方面別ユニット 10 control means 11, 14 I / O 12 processing means 121 first processing section 122 second processing section 123 third processing section 124 fourth processing section 125 fifth processing section 13 computing means 15 first storage means 16 second storage means 17 Sequence Command Means 18 Third Storage Means 19 Internal Bus 20 External Input Device A1 (A1-1, A1-2) Design Equipment Selection Menu A2 Core Selection Menu X1, X2, X3 Form Data Y1 for Core Information Data Y2 Form data for facility information P Fixed wiring section P1 Underground cable unit P2 Line point P3 Switching connection P4 Directional unit

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 線路工事用の電話設備に関する固定資産
データを格納する第1記憶手段より、必要な固定資産デ
ータを呼び出してオペレータからの指令に基づく演算処
理を行い、この演算結果を新たな固定資産データとして
第2記憶手段に格納する線路工事データ作成システムに
おいて、オペレータから逐次処理の指令があった場合に
は、第1記憶手段または第2記憶手段より必要な固定資
産データを呼び出してモニタ画面に表示し、かつモニタ
画面に表示された固定資産データにおける必要箇所のデ
ータ内容をオペレータの指令に基づいて逐次演算処理
し、これを新たな固定資産データとして第2記憶手段に
呼び出し可能に格納する逐次処理の手段と、オペレータ
から自動処理の指令があった場合には、上記した逐次処
理の手段による動作を停止させてシーケンス指令手段を
発動させ、このシーケンス指令手段からの指令に基づい
て第1記憶手段または第2記憶手段に格納されている固
定資産データ中の指令に関連するデータに、それぞれ固
有のインデックスを付けてそれらのインデックスを第3
記憶手段に格納させ、その後に、オペレータからの自動
処理指令の内容に基づいて第1記憶手段または第2記憶
手段に格納されている固定資産データ中の指令に関連す
る必要な固定資産データを、第3記憶手段に格納されて
いるインデックスを参照しつつ適宜抽出してシーケンス
演算処理し、これを新たな固定資産データとして呼び出
し可能に第2記憶手段に格納する自動処理の手段と、を
備えることを特徴とする線路工事データ作成システム。
1. The necessary fixed asset data is called from the first storage means for storing fixed asset data relating to telephone equipment for track construction, arithmetic processing is performed based on a command from an operator, and the arithmetic result is newly fixed. In the railroad construction data creation system for storing the asset data in the second storage means, when an operator issues a sequential processing command, necessary fixed asset data is called from the first storage means or the second storage means and a monitor screen is displayed. Is displayed on the monitor screen, and the data content of the necessary portion of the fixed asset data displayed on the monitor screen is sequentially processed based on the operator's command, and this is stored as new fixed asset data in the second storage means so as to be callable. If there is an instruction for automatic processing from the sequential processing means and the operator, the operation by the above-mentioned sequential processing means is performed. The sequence command means is stopped to activate the sequence command means, and based on the command from the sequence command means, the index unique to the data related to the command in the fixed asset data stored in the first storage means or the second storage means, respectively. And add those indexes to the third
The necessary fixed asset data related to the instruction in the fixed asset data stored in the first storage means or the second storage means based on the content of the automatic processing instruction from the operator An automatic processing means for appropriately extracting and performing sequence operation processing while referring to the index stored in the third storage means, and storing this in the second storage means so as to be callable as new fixed asset data. A railroad construction data creation system featuring.
【請求項2】 第2記憶手段に格納される演算処理後の
新たな固定資産データには、固有のインデックスと共
に、演算処理されたデータ内容を特定することが可能な
改変済のインデックスを付すことを特徴とする請求項1
記載の線路工事データ作成システム。
2. The new fixed asset data after the arithmetic processing stored in the second storage means is provided with a unique index and a modified index capable of specifying the content of the arithmetically processed data. Claim 1 characterized by the above-mentioned.
Line construction data creation system described.
JP29884693A 1993-10-25 1993-10-25 Line construction data generating system Withdrawn JPH07123151A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29884693A JPH07123151A (en) 1993-10-25 1993-10-25 Line construction data generating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29884693A JPH07123151A (en) 1993-10-25 1993-10-25 Line construction data generating system

Publications (1)

Publication Number Publication Date
JPH07123151A true JPH07123151A (en) 1995-05-12

Family

ID=17864970

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29884693A Withdrawn JPH07123151A (en) 1993-10-25 1993-10-25 Line construction data generating system

Country Status (1)

Country Link
JP (1) JPH07123151A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002049731A (en) * 2000-05-26 2002-02-15 Ns Solutions Corp Fixed asset management system
JP2006236162A (en) * 2005-02-28 2006-09-07 Water Technology Institute Ltd Management method for fixed assets
JP2010237943A (en) * 2009-03-31 2010-10-21 Kddi Corp Network equipment construction management system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002049731A (en) * 2000-05-26 2002-02-15 Ns Solutions Corp Fixed asset management system
JP2006236162A (en) * 2005-02-28 2006-09-07 Water Technology Institute Ltd Management method for fixed assets
JP2010237943A (en) * 2009-03-31 2010-10-21 Kddi Corp Network equipment construction management system

Similar Documents

Publication Publication Date Title
US6877154B2 (en) Object-oriented programming apparatus, object-oriented programming supporting apparatus, component builder apparatus, object-oriented program storage medium, program storage medium for use in object-oriented programming, component storage medium, and object-between-network display method
CN114995801B (en) Visual application development method and system based on Internet of things platform
CN115328462B (en) A visual development tool based on Vue.js and its usage.
JPH02232152A (en) Production system simulator forming device
JPH07123151A (en) Line construction data generating system
CN113986445A (en) Intelligent interactive three-dimensional visual drawing system
Overbye et al. A simulation tool for analysis of alternative paradigms for the new electricity business
JP2005078119A (en) Support system and method for software development support, program, and recording medium
JP3736467B2 (en) Cable management system and management method
KR100228547B1 (en) Cable map generating method
JPH0430230A (en) Equipment data base control system for power system
JPH06325113A (en) Equipment control chart creation method
JPH064539A (en) Patrol support system
JP2637277B2 (en) Network display data maintenance device
JPH06295236A (en) Engineering device
JPS63288357A (en) Data editing method
JP2002138667A (en) Equipment construction planning equipment
JP2010182215A (en) Time series map data management system, terminal device, time series map data management method, and time series map data management program
JPH02208693A (en) Multiwindow screen display device
JP3227752B2 (en) Data creation method for distribution system control system
JP3446045B2 (en) Partially revised facility map creation method and partially revised facility map creation method
JP3327017B2 (en) Distribution facility work registration method in distribution system control system
JP2005215065A (en) Learning management system and learning management method
CN121479928A (en) Spacecraft assembly process template generation method and device
JPH10322908A (en) Power system simulator

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20001226