JPH07137635A - Railroad crossing control device - Google Patents
Railroad crossing control deviceInfo
- Publication number
- JPH07137635A JPH07137635A JP31125493A JP31125493A JPH07137635A JP H07137635 A JPH07137635 A JP H07137635A JP 31125493 A JP31125493 A JP 31125493A JP 31125493 A JP31125493 A JP 31125493A JP H07137635 A JPH07137635 A JP H07137635A
- Authority
- JP
- Japan
- Prior art keywords
- train
- railroad crossing
- train detection
- detection signal
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000001514 detection method Methods 0.000 claims abstract description 103
- 239000000725 suspension Substances 0.000 claims description 3
- 101000606504 Drosophila melanogaster Tyrosine-protein kinase-like otk Proteins 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 6
- 230000001934 delay Effects 0.000 description 2
- 101000847024 Homo sapiens Tetratricopeptide repeat protein 1 Proteins 0.000 description 1
- 102100032841 Tetratricopeptide repeat protein 1 Human genes 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004870 electrical engineering Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、踏切制御装置に関し、
更に詳しくは、踏切道から見て軌道の進路後方に備えら
れた踏切警報区間に場外停車区間を設け、列車が場外停
車区間内に停車しているときには、踏切制御信号の出力
を一時停止し、踏切開放時間を長くする技術に係る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a railroad crossing control device,
More specifically, the outside stop section is provided in the level crossing warning section provided behind the track of the track as viewed from the level crossing, and when the train is stopped within the outside stop section, the output of the level crossing control signal is temporarily stopped, This is related to the technology to extend the crossing open time.
【0002】[0002]
【従来の技術】従来の踏切制御装置は、踏切道の手前に
警報開始点、踏切道の先方に警報終了点を設け、列車が
警報開始点に進入してから警報終了点を進出するまで警
報等の踏切制御信号を出力する。かかる踏切制御装置
は、「信号」(吉村 寛、吉越三郎共著、交友社発行)
及び軌道技術者のための電気概論・信号シリーズNo.
6「踏切保安装置」(日本軌道電気技術協会発行)に詳
述されている。また、踏切制御時間を最適にする踏切定
時間制御装置が特開平3ー57769号公報等に開示さ
れている。2. Description of the Related Art A conventional railroad crossing control device provides an alarm start point in front of a railroad crossing and an alarm end point ahead of the railroad crossing so that a warning is issued from when the train enters the alarm start point until it reaches the alarm end point. It outputs a level crossing control signal. Such a crossing control device is "Signal" (written by Hiroshi Yoshimura and Saburo Yoshikoshi, published by Koyusha)
And electrical series and signal series No. for orbit engineers
6 "Level crossing security device" (published by the Japan Orbital Electrical Engineering Association). Further, Japanese Patent Application Laid-Open No. 3-57769 discloses a level crossing time control device that optimizes the level crossing control time.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、従来の
踏切制御装置は、以下のような問題点を有している。 (A)列車が警報開始点に進入してから警報終了点を進
出するまで踏切制御信号を出力するから、踏切警報区間
内で列車が停車したときには踏切制御時間が長くなって
しまう。特に、駅の近傍にある踏切では、先行列車との
関係で後続列車が踏切の手前で停車させられることが頻
発し、開かずの踏切となって交通渋滞を招来している。 (B)列車が警報開始点に進入したときの走行速度から
列車の踏切道への到達時間を予測し、踏切制御信号の出
力を遅延させる踏切定時間制御では、踏切を高速度で通
過する場合には踏切制御時間が短縮されて効果的であ
る。しかし、駅近傍の踏切制御装置は、先行列車が駅に
停車していると、後続列車が踏切の手前で停車させられ
るため、遅延時間だけでは後続列車の位置を割りだすこ
とができず、遅延時間だけ踏切制御時間が短くなるだけ
で、依然として踏切制御時間は長いままである。However, the conventional level crossing control device has the following problems. (A) Since the railroad crossing control signal is output from when the train enters the alarm start point to when it reaches the alarm end point, the railroad crossing control time becomes long when the train stops within the railroad crossing warning section. In particular, at railroad crossings near stations, trailing trains often stop before the railroad crossing due to the relationship with the preceding train, which results in traffic congestion as the railroad crossing does not open. (B) When a train crosses a railroad crossing at high speed in the fixed-time railroad crossing control that delays the output of the railroad crossing control signal by predicting the arrival time of the train to the railroad crossing from the traveling speed when the train enters the alarm start point This is effective because the crossing control time is shortened. However, when the preceding train is stopped at the station, the railroad crossing control device near the station will stop the succeeding train before the railroad crossing, so it will not be possible to determine the position of the following train by the delay time alone. The level crossing control time is shortened by the time, and the level crossing control time is still long.
【0004】そこで、本発明の課題は、先行列車との関
係において後続列車が停車させられたときに踏切制御時
間を適切に制御し得る踏切制御装置を提供することであ
る。Therefore, an object of the present invention is to provide a railroad crossing control device capable of appropriately controlling the railroad crossing control time when the succeeding train is stopped in relation to the preceding train.
【0005】[0005]
【課題を解決するための手段】上述した課題解決のた
め、本発明に係る踏切制御装置は、踏切警報区間と、列
車検知回路と、制御回路とを含んでおり、前記踏切警報
区間は、踏切道を含んで前記踏切道から見て軌道の進路
後方に設けられ、途中に場外停車区間を含んでおり、前
記列車検知回路は、少なくとも2つ備えられ、第1の列
車検知回路が前記踏切警報区間内の列車の有無を検出し
て第1の列車検知信号を出力し、第2の列車検知回路が
前記場外停車区間に列車が停車していることを検出して
第2の列車検知信号を出力するものであり、前記制御回
路は、前記第1の列車検知信号と、前記第2の列車検知
信号とが入力され、前記第1の列車検知信号が列車有で
あるときに踏切制御信号を出力し、前記第1の列車検知
信号が列車有であり、かつ、前記第2の列車検知信号が
列車停車であるときに前記踏切制御信号の出力を一時停
止するものである。In order to solve the above-mentioned problems, a railroad crossing control device according to the present invention includes a railroad crossing warning section, a train detection circuit, and a control circuit. It is provided at the rear of the track of the track including the road, and includes an outside stop section in the middle of the track, at least two train detection circuits are provided, and the first train detection circuit is the crossing warning. The first train detection signal is output by detecting the presence / absence of a train in the section, and the second train detection circuit detects that the train is stopped in the outside stop section and outputs the second train detection signal. The control circuit outputs a crossing control signal when the first train detection signal and the second train detection signal are input and the first train detection signal indicates that there is a train. Output, and the first train detection signal indicates that there is a train And said second train detection signal is to pause the output of the crossing control signal when a train stop.
【0006】[0006]
【作用】踏切警報区間は踏切道を含んで踏切道から見て
軌道の進路後方に設けられ、第1の列車検知回路は踏切
警報区間内の列車の有無を検出して第1の列車検知信号
を出力し、制御回路は第1の列車検知信号が列車有であ
るときに踏切制御信号を出力するから、列車が踏切警報
区間に進入すると、踏切警報器を鳴動させ、踏切遮断機
を降下させる。[Function] The railroad crossing warning section is provided behind the track of the railroad crossing including the railroad crossing, and the first train detection circuit detects the presence or absence of a train in the railroad crossing warning section to detect the first train detection signal. And the control circuit outputs a railroad crossing control signal when the first train detection signal indicates that the train exists, so when the train enters the railroad crossing warning section, the railroad crossing alarm is sounded and the railroad crossing barrier is lowered. .
【0007】踏切警報区間は途中に場外停車区間を含ん
でおり、第2の列車検知回路は場外停車区間に列車が停
車していることを検出して第2の列車検知信号を出力す
るから、先行列車が踏切警報区間に隣接した進路前方の
区間に在線しているときに、後続列車の停車位置を明確
にすることができる。また、先行列車が進路前方の区間
を進出して後続列車が再出発するときに、踏切道と場外
停車区間との距離に応じた踏切制御時間を確保できる。
このため、踏切制御信号の出力を一時停止させることが
できる。The railroad crossing warning section includes an outside stop section on the way, and the second train detection circuit outputs a second train detection signal by detecting that the train is stopped in the outside stop section. When the preceding train is in the section ahead of the route adjacent to the level crossing warning section, the stop position of the following train can be clarified. Further, when the preceding train advances in the section ahead of the route and the succeeding train re-starts, it is possible to secure a level crossing control time corresponding to the distance between the level crossing and the outside stop section.
Therefore, the output of the level crossing control signal can be temporarily stopped.
【0008】第2の列車検知回路は場外停車区間に列車
が停車していることを検出して第2の列車検知信号を出
力し、制御回路は第1の列車検知信号が列車有であり、
かつ、第2の列車検知信号が列車停車であるときに踏切
制御信号の出力を一時停止するから、列車の停車及び停
車位置を確認した上で踏切制御信号の出力を停止する。
このため、踏切の安全性を確保した上で踏切を開放し、
後続列車が再出発する場合にも踏切制御時間を確保で
き、先行列車との関係において後続列車が停車させられ
た場合に踏切制御時間を適切に制御し得る踏切制御装置
が得られる。The second train detection circuit detects that the train is stopped in the outside stop section and outputs a second train detection signal, and the control circuit detects that the first train detection signal is present.
Moreover, since the output of the level crossing control signal is temporarily stopped when the second train detection signal is the train stop, the output of the level crossing control signal is stopped after confirming the stop and stop position of the train.
Therefore, after ensuring the safety of the railroad crossing, open the railroad crossing,
It is possible to obtain a level crossing control time that can secure a level crossing control time even when the following train restarts, and can appropriately control the level crossing control time when the following train is stopped in relation to the preceding train.
【0009】駅区間は、踏切警報区間に隣接した進路前
方に備えられ、第3の列車検知回路は、駅区間に備えら
れ、駅区間に停車した列車(先行列車)の出発を検出し
て第3の列車検知信号を出力し、制御回路は、第3の列
車検知信号が列車出発であるときに踏切制御信号の出力
の一時停止を解除するものであるから、場外停車区間が
踏切近くに設けられた場合でも適切な踏切制御時間を確
保できる。従って、場外停車区間を踏切近傍に設け、運
行間隔を詰めて運行した場合でも、適切な踏切制御時間
を確保できる。The station section is provided in front of the route adjacent to the railroad crossing warning section, and the third train detection circuit is provided in the station section and detects the departure of the train (preceding train) stopped in the station section and The control circuit outputs the train detection signal of No. 3, and the control circuit releases the temporary stop of the output of the railroad crossing control signal when the third train detection signal is the train departure. Therefore, the outside stop section is provided near the railroad crossing. Even if the vehicle is hit, an appropriate level crossing control time can be secured. Therefore, even when the off-site stop section is provided near the railroad crossing and the trains are operated at close intervals, the appropriate railroad crossing control time can be secured.
【0010】表示器は、踏切道に備えられ、表示信号に
基づき列車が場外停車区間に停車中であることを表示
し、制御回路は、踏切制御信号の出力を一時停止してい
るときに表示器に表示信号を出力するから、一度踏切警
報器を鳴動させた後、列車が踏切道の近傍の場外停車区
間に停車しているにもかかわらず踏切を開放したとき
に、踏切通行者に安心感を与えることができる。The display device is provided on the level crossing, and indicates based on the display signal that the train is stopped in the outside stop section, and the control circuit displays when the output of the level control signal is temporarily stopped. Since the display signal is output to the railroad crossing, once the railroad crossing alarm is sounded, when the train crosses open outside the off-street section near the railroad crossing, the crossing is safe for passersby. It can give a feeling.
【0011】[0011]
【実施例】図1は本発明に係る踏切制御装置の構成を示
すブロック図である。踏切制御装置は、踏切警報区間L
と、列車検知回路1と、制御回路2とを含み、踏切警報
器3または踏切遮断機4に踏切制御信号S21を出力す
る。参照符号参照符号5は踏切道、6は軌道、7は列
車、8は駅のホームである。71は先行列車、72は後
続列車である。1 is a block diagram showing the configuration of a railroad crossing control device according to the present invention. The railroad crossing control device uses the railroad crossing warning section L
And a train detection circuit 1 and a control circuit 2, and outputs a railroad crossing control signal S21 to the railroad crossing alarm device 3 or the railroad crossing breaker 4. Reference numeral 5 is a railroad crossing, 6 is a track, 7 is a train, and 8 is a platform of a station. Reference numeral 71 is a preceding train, and 72 is a following train.
【0012】踏切警報区間Lは、踏切道5を含んで踏切
道5から見て軌道6の進路後方に設けられ、途中に場外
停車区間L1を含んでいる。実施例の踏切警報区間L
は、閉塞区間(1T、2T、下り1T)により構成され
ている。The crossing warning section L is provided behind the track of the track 6 including the crossing road 5, and includes an outside stop section L1 on the way. Level crossing warning section L in the embodiment
Is composed of closed sections (1T, 2T, downlink 1T).
【0013】列車検知回路1は、少なくとも2つ備えら
れている。第1の列車検知回路11は、踏切警報区間L
内の列車7の有無を検出して第1の列車検知信号S11
を出力する。第1の列車検知回路11は、踏切警報区間
Lに列車7が進入したこと、及び踏切警報区間Lから列
車7が進出したことを検知できればよく、点検知型、連
続検知型の何れのタイプでもよい。実施例は連続検知型
となっている。At least two train detection circuits 1 are provided. The first train detection circuit 11 has a railroad crossing warning section L.
The presence or absence of the train 7 in the train is detected to detect the first train detection signal S11.
Is output. The first train detection circuit 11 only needs to be able to detect that the train 7 has entered the railroad crossing warning section L and that the train 7 has advanced from the railroad crossing warning section L, and may be either a point detection type or a continuous detection type. Good. The embodiment is a continuous detection type.
【0014】閉塞区間(1T、2T、下り1T)のそれ
ぞれは、軌道回路(1T、2T、下り1T)を構成し、
それぞれの閉塞区間の列車7の有無を検出している。Each of the closed sections (1T, 2T, downlink 1T) constitutes a track circuit (1T, 2T, downlink 1T),
The presence or absence of the train 7 in each closed section is detected.
【0015】軌道回路(1T、2T、下り1T)のそれ
ぞれは、図示しない軌道リレー(1TR、2TR、下り
1TR)を有し、列車7の在線する軌道回路の軌道リレ
ーが落下(無励磁状態になると接点が開放される)する
ように構成されている。例えば、列車7が軌道回路1T
に在線したときは、軌道リレー1TRが落下し、接点1
TR1が開放される。従って、接点(1TR1、2TR
1、下り1TR1)を直列接続し、アンド接続回路を構
成すると、列車7が何れかの軌道回路に在線したときに
アンド接続回路が不導通となり、列車有の第1の列車検
知信号S11が得られる。軌道回路及び軌道リレーの構
成は当業者に周知である。Each of the track circuits (1T, 2T, down 1T) has a track relay (1TR, 2TR, down 1TR) (not shown), and the track relay of the track circuit where the train 7 is present drops (in a non-excitation state). Then the contacts are opened). For example, train 7 is a track circuit 1T
Track relay 1TR drops and contacts 1
TR1 is opened. Therefore, the contact (1TR1, 2TR
1 and down 1TR1) are connected in series to form an AND connection circuit, the AND connection circuit becomes non-conductive when the train 7 is on any track circuit, and the first train detection signal S11 with a train is obtained. To be Track circuit and track relay configurations are well known to those skilled in the art.
【0016】また、図示はしないが、踏切警報区間Lの
全域に亙ってループコイルをはり、列車7から送信され
る送信信号の有無で列車検知を行なうように構成しても
よい。点検知型の第1の列車検知回路11は、踏切警報
区間Lの始点P1及び終点P2に踏切制御子または車軸
検知子を設け、列車7が始点P1に進入した時に列車有
を検出し終点P2を進出した時に列車無を検出する。踏
切制御子は前述の「信号」に、車軸検知子は特開平3ー
57769号公報に詳述されている。第2の列車検知回
路12は、場外停車区間L1に列車7が停車しているこ
とを検出して第2の列車検知信号S12を出力する。例
えば、車軸検知子を間隔をおいて設け、一連の車軸の到
来数及び到来時間から列車7の速度を求め、列車7の停
車を検知する。Although not shown, a loop coil may be spread over the entire railroad crossing warning section L so that train detection is performed based on the presence or absence of a transmission signal transmitted from the train 7. The first point detection type train detection circuit 11 is provided with railroad crossing controllers or axle detectors at the start point P1 and the end point P2 of the railroad crossing warning section L, detects the presence of the train when the train 7 enters the start point P1, and finishes the end point P2. Detects the absence of a train when you advance to. The level crossing controller is described in the above-mentioned "Signal" and the axle detector is described in detail in Japanese Patent Laid-Open No. 3-57769. The second train detection circuit 12 detects that the train 7 is stopped in the outside stop section L1 and outputs a second train detection signal S12. For example, the axle detectors are provided at intervals, the speed of the train 7 is calculated from the number and arrival time of a series of axles, and the stop of the train 7 is detected.
【0017】制御回路2は、第1の列車検知信号S11
と、第2の列車検知信号S12とが入力される。第1の
列車検知信号S11が列車有であるときに踏切制御信号
S21を出力する。第1の列車検知信号S11が列車有
であり、かつ、第2の列車検知信号S12が列車停車で
あるときに踏切制御信号S21の出力を一時停止する。The control circuit 2 uses the first train detection signal S11.
And the second train detection signal S12 are input. The crossing control signal S21 is output when the first train detection signal S11 indicates the presence of a train. When the first train detection signal S11 indicates that a train exists and the second train detection signal S12 indicates that the train is stopped, the output of the level crossing control signal S21 is temporarily stopped.
【0018】上述したように、踏切警報区間Lは踏切道
5を含んで踏切道5から見て軌道6の進路後方に設けら
れ、第1の列車検知回路11は踏切警報区間L内の列車
7の有無を検出して第1の列車検知信号S11を出力
し、制御回路2は第1の列車検知信号S11が列車有で
あるときに踏切制御信号S21を出力するから、列車7
が踏切警報区間Lに進入すると、踏切警報器3を鳴動さ
せ、踏切遮断機4を降下させる。As described above, the railroad crossing warning section L is provided behind the track of the track 6 including the railroad crossing 5, and the first train detection circuit 11 allows the train 7 in the railroad crossing warning section L to be provided. The presence or absence of the train is detected and the first train detection signal S11 is output, and the control circuit 2 outputs the railroad crossing control signal S21 when the first train detection signal S11 is present.
When enters the railroad crossing warning section L, the railroad crossing alarm device 3 is activated and the railroad crossing breaker 4 is lowered.
【0019】踏切警報区間Lは途中に場外停車区間L1
を含んでいるから、先行列車71が踏切警報区間Lに隣
接した進路前方の区間(下り2T)に在線しているとき
に、後続列車72の停車位置を明確にすることができ
る。また、先行列車71が踏切警報区間Lに隣接した進
路前方の区間(下り2T)を進出して後続列車72が再
出発するときに、踏切道5と場外停車区間L1との距離
L2に応じた踏切制御時間を確保できる。このため、踏
切制御信号S21の出力を一時停止させることができ
る。The railroad crossing warning section L is an outside stop section L1 on the way.
Therefore, the stop position of the succeeding train 72 can be clarified when the preceding train 71 is in a section (downhill 2T) in front of the route adjacent to the level crossing warning section L. Further, when the preceding train 71 advances in the section (downhill 2T) in front of the track adjacent to the level crossing warning section L and the subsequent train 72 restarts, the distance L2 between the level crossing 5 and the off-site stop section L1 is determined. The level control time can be secured. Therefore, the output of the level crossing control signal S21 can be temporarily stopped.
【0020】第2の列車検知回路12は場外停車区間L
1に列車7が停車していることを検出して第2の列車検
知信号S12を出力し、制御回路2は第1の列車検知信
号S11が列車有であり、かつ、第2の列車検知信号S
12が列車停車であるときに踏切制御信号S21の出力
を一時停止するから、列車7の停車及び停車位置を確認
した上で踏切制御信号S21の出力を停止する。このた
め、踏切の安全性を確保した上で踏切を開放し、後続列
車72が再出発する場合にも踏切制御時間を確保でき、
先行列車71との関係において後続列車72が停車させ
られた場合に踏切制御時間を適切に制御し得る踏切制御
装置が得られる。The second train detection circuit 12 is an outside stop section L
1 detects that the train 7 is stopped and outputs the second train detection signal S12, and the control circuit 2 has the first train detection signal S11 and the second train detection signal. S
Since the output of the railroad crossing control signal S21 is temporarily stopped when 12 is a train stop, the output of the railroad crossing control signal S21 is stopped after confirming the stop and the stop position of the train 7. Therefore, the level crossing control time can be secured even when the level crossing is opened after ensuring the safety of the level crossing and the succeeding train 72 restarts.
A railroad crossing control device that can appropriately control the railroad crossing control time when the succeeding train 72 is stopped in relation to the preceding train 71 is obtained.
【0021】図2は本発明に係る踏切制御装置の動作を
示すタイムチャート、図3は列車との関連で踏切制御装
置の動作を示す概念図である。上述の作用を参照しなが
ら、図2及び図3を簡単に説明する。図において、図1
と同一参照符号は同一性ある構成部分を示している。状
態(a)は、先行列車71が区間(下り2T)に在線し
ているときに、後続列車72が踏切警報区間Lに進入す
る直前を示している。信号機81は「赤」現示となって
いる。FIG. 2 is a time chart showing the operation of the railroad crossing control device according to the present invention, and FIG. 3 is a conceptual diagram showing the operation of the railroad crossing control device in relation to the train. 2 and 3 will be briefly described with reference to the above operation. In the figure,
The same reference numerals as in FIG. State (a) shows the state immediately before the succeeding train 72 enters the railroad crossing warning section L when the preceding train 71 is in the section (downhill 2T). The traffic signal 81 is "red".
【0022】状態(b)は、時刻t1において、後続列
車72が区間1Tに進入した場合を示している。この
時、第1の列車検知信号S11が列車「有」となるか
ら、制御回路2は踏切制御信号S21を出力し、踏切警
報器3が鳴動する。The state (b) shows the case where the succeeding train 72 enters the section 1T at the time t1. At this time, since the first train detection signal S11 is "present" for the train, the control circuit 2 outputs the level crossing control signal S21 and the level crossing alarm device 3 sounds.
【0023】状態(c)は、時刻t2において、後続列
車72が場外停車区間L1に停車した場合を示してい
る。この時、第1の列車検知信号S11が列車「有」、
第2の列車検知信号S12が列車「停車」となるから、
制御回路2は踏切制御信号S21の出力を一時停止し、
踏切警報器3の鳴動が停止する。The state (c) shows the case where the succeeding train 72 stops in the outside stop section L1 at the time t2. At this time, the first train detection signal S11 is "Yes" for the train,
Since the second train detection signal S12 is a train "stop",
The control circuit 2 suspends the output of the level crossing control signal S21,
Ringing alarm 3 stops ringing.
【0024】状態(d)は、時刻t3において、先行列
車71が出発し、区間(下り2T)を進出した場合を示
している。この時、信号機81が「黄」現示となり、後
続列車72が再出発する。後続列車72の走行速度が所
定の速度を超えると、第2の列車検知信号S12が列車
「再出発」となる。制御回路2は踏切制御信号S21の
一時停止を解除し、踏切警報器3は鳴動する。The state (d) shows the case where the preceding train 71 departs at the time t3 and advances into the section (downhill 2T). At this time, the traffic signal 81 becomes “yellow” and the succeeding train 72 restarts. When the traveling speed of the succeeding train 72 exceeds a predetermined speed, the second train detection signal S12 becomes a train "restart". The control circuit 2 releases the suspension of the level crossing control signal S21, and the level crossing alarm device 3 sounds.
【0025】状態(e)は、踏切道5を通過する直前を
示している。状態(f)は、時刻t4において、後続列
車72が区間(下り1T)を進出し区間(下り2T)に
進入した場合を示している。第1の列車検知信号S11
は列車「無」となるから、制御回路2は踏切制御信号S
21を停止する。信号機81は「赤」現示となる。The state (e) shows the state just before passing through the railroad crossing 5. The state (f) shows a case where the succeeding train 72 has advanced the section (downhill 1T) and entered the section (downhill 2T) at time t4. First train detection signal S11
Is no train, the control circuit 2 controls the level crossing control signal S
Stop 21. The traffic light 81 becomes "red".
【0026】図1に示す実施例の踏切制御装置は、駅区
間(下り2T)及び第3の列車検知回路13を含んでい
る。駅区間(下り2T)は、踏切警報区間Lに隣接した
進路前方に備えられている。第3の列車検知回路13
は、駅区間(下り2T)に備えられ、駅区間(下り2
T)に停車した列車7の出発を検出して第3の列車検知
信号S13を出力する。例えば、車軸検知子を間隔をお
いて設け、一連の車軸の到来数及び到来時間から列車7
の速度を求め、列車7の出発を検知する。また、先行列
車71が出発するときは信号機82が「青」現示になる
ので、信号機82の「青」現示への変化を第3の列車検
知信号S13とすることもできる。制御回路2は、第3
の列車検知信号S13が入力され、第3の列車検知信号
S13が列車「出発」であるときに踏切制御信号S21
の出力の一時停止を解除する。The railroad crossing control apparatus of the embodiment shown in FIG. 1 includes a station section (downhill 2T) and a third train detection circuit 13. The station section (downhill 2T) is provided in front of the route adjacent to the railroad crossing warning section L. Third train detection circuit 13
Is prepared for the station section (downhill 2T), and the station section (downhill 2T
The departure of the train 7 stopped at T) is detected and a third train detection signal S13 is output. For example, by providing axle detectors at intervals, the train 7 can be determined from the number and arrival time of a series of axles.
, The departure of the train 7 is detected. Further, when the preceding train 71 departs, the traffic light 82 becomes a "blue" indication, so that the change of the traffic light 82 to a "blue" indication can be used as the third train detection signal S13. The control circuit 2 is the third
Railroad crossing control signal S21 when the third train detection signal S13 is a train "departure".
Cancels the output pausing.
【0027】上述の構成では、駅区間(下り2T)は、
踏切警報区間Lに隣接した進路前方に備えられ、第3の
列車検知回路13は、駅区間(下り2T)に備えられ、
駅区間(下り2T)に停車した列車7(先行列車71)
の出発を検出して第3の列車検知信号S13を出力し、
制御回路2は、第3の列車検知信号S13が列車出発で
あるときに踏切制御信号S21の出力の一時停止を解除
するものであるから、先行列車71が出発して区間(下
り2T)を進出するまでの時間を踏切制御時間として利
用できるので、場外停車区間L1が踏切道5の近くに設
けられた場合でも適切な踏切制御時間を確保できる。従
って、場外停車区間L1を踏切道3の近傍に設け、運行
間隔を詰めて運行した場合でも、適切な踏切制御時間を
確保できる。In the above configuration, the station section (downhill 2T) is
It is provided in front of the route adjacent to the railroad crossing warning section L, and the third train detection circuit 13 is provided in the station section (downhill 2T),
Train 7 (preceding train 71) stopped in the station section (downhill 2T)
Detects the departure of the train and outputs the third train detection signal S13,
Since the control circuit 2 cancels the temporary stop of the output of the level crossing control signal S21 when the third train detection signal S13 is the train departure, the preceding train 71 departs and advances the section (downhill 2T). Since the time until the start of the crossing can be used as the crossing control time, an appropriate crossing control time can be secured even when the off-site stop section L1 is provided near the crossing 5. Therefore, even when the off-site stop section L1 is provided in the vicinity of the level crossing 3 and the operating intervals are shortened, an appropriate leveling control time can be secured.
【0028】図4は第3の列車検知信号を用いた踏切制
御装置の動作を示すタイムチャートである。図におい
て、図1及び図2と同一参照符号は同一性ある構成部分
を示している。時刻t2までの動作は図2に示すタイム
チャートと同じである。時刻t21において、先行列車
71が出発する。この時に、第3の列車検知信号S13
が列車「出発」となるので、制御回路2は踏切制御信号
S21の一時停止を解除し、踏切警報器3は鳴動する。
このため、先行列車71が出発してから区間(下り2
T)を進出するまでの時間、即ち、時刻t21から時刻
t3までの時間が踏切制御時間として使用できる。時刻
t3から時刻t4までの動作も図2に示すタイムチャー
トと同じである。従って、場外停車区間L1を踏切道3
の近傍に設け、運行間隔を詰めて運行した場合でも、適
切な踏切制御時間を確保できる。FIG. 4 is a time chart showing the operation of the railroad crossing control device using the third train detection signal. In the figure, the same reference numerals as those in FIGS. 1 and 2 denote the same components. The operation up to time t2 is the same as the time chart shown in FIG. At time t21, the preceding train 71 departs. At this time, the third train detection signal S13
Is a train "departure", the control circuit 2 releases the suspension of the level crossing control signal S21, and the level crossing alarm device 3 sounds.
Therefore, after the preceding train 71 departs, the section
The time until advancing T), that is, the time from time t21 to time t3 can be used as the level crossing control time. The operation from time t3 to time t4 is also the same as the time chart shown in FIG. Therefore, take the crossing 3
It is possible to secure an appropriate railroad crossing control time even if the vehicle is installed near the vehicle and the operation interval is shortened.
【0029】後続列車72は、信号機81の「赤」現示
が解除されてから再出発する。信号機81の「赤」現示
の解除は、先行列車71が区間(下り2T)を進出した
ときに行なわれる。従って、区間(下り2T)が狭く、
しかも場外停車区間L1が踏切道3の直前に設けられて
いて法定最小踏切警報時間を確保できない場合は、制御
回路2が第3の列車検知信号S13の列車「出発」に応
答して信号機81の「赤」現示の解除を遅延させる遅延
信号を出力するように構成することにより、法定最小踏
切警報時間を確保した踏切制御ができる。The succeeding train 72 restarts after the "red" indication of the traffic signal 81 is released. The cancellation of the “red” indication of the traffic signal 81 is performed when the preceding train 71 has advanced the section (downhill 2T). Therefore, the section (downstream 2T) is narrow,
Moreover, when the outside stop section L1 is provided immediately before the railroad crossing 3 and the legal minimum railroad crossing warning time cannot be secured, the control circuit 2 responds to the train "departure" of the third train detection signal S13 and outputs the signal 81. By configuring so as to output a delay signal that delays the release of the "red" indication, the level crossing control can be performed while ensuring the legal minimum level crossing warning time.
【0030】更に図1に示す実施例の踏切制御装置は、
表示器9を含んでいる。表示器9は、踏切道5に備えら
れ、表示信号S22に基づき列車7が場外停車区間L1
に停車中であることを表示する。制御回路2は、踏切制
御信号S21の出力を一時停止しているとき、即ち、時
刻t2から時刻t21まで表示器9に表示信号S22を
出力する。Furthermore, the crossing control device of the embodiment shown in FIG.
It includes a display 9. The display 9 is provided on the railroad crossing 5 so that the train 7 stops outside the section L1 based on the display signal S22.
Display that the car is stopped. The control circuit 2 outputs the display signal S22 to the display 9 when the output of the level crossing control signal S21 is temporarily stopped, that is, from time t2 to time t21.
【0031】上述の構成では、表示器9は、踏切道5に
備えられ、表示信号S22に基づき列車7が場外停車区
間L1に停車中であることを表示し、制御回路2は、踏
切制御信号S21の出力を一時停止しているときに表示
器9に表示信号S22を出力するから、一度踏切警報器
3を鳴動させた後、列車7が踏切道5の近傍の場外停車
区間L1に停車しているにもかかわらず踏切を開放した
ときに、踏切通行者に安心感を与えることができる。In the above-mentioned structure, the display 9 is provided on the railroad crossing 5 to display that the train 7 is stopped in the off-site stop section L1 based on the display signal S22, and the control circuit 2 causes the railroad crossing control signal. Since the display signal S22 is output to the display 9 while the output of S21 is temporarily stopped, the train 7 stops at the outside stop section L1 near the railroad crossing 5 after the railroad crossing alarm 3 is activated once. Even when the railroad crossing is open, it can give a feeling of security to passers-by.
【0032】図5は制御回路の具体的な回路図である。
図において、参照符号XRは出力リレー、STPRは制
御リレーである。軌道リレーの接点(1TR1、2TR
1、下り1TR1)は、出力リレーXRに直列接続され
ている。出力リレーXRは、無励磁になると落下し、接
点XR1が不導通となり、踏切警報器3を鳴動させ踏切
遮断機4を降下させる踏切制御信号S21を出力する。
制御リレーSTPRは、第2の列車検知信号S12と、
第3の列車検知信号S13が入力され、接点STPR1
が接点2TR1に並列に接続されている。第2の列車検
知信号S12が列車「停止」であるときに、接点STP
R1が導通し、第3の列車検知信号S13が列車「出
発」であるときに接点STPR1が不導通となる。FIG. 5 is a specific circuit diagram of the control circuit.
In the figure, reference numeral XR is an output relay and STPR is a control relay. Orbital relay contacts (1TR1, 2TR
1, down 1TR1) are connected in series to the output relay XR. When the output relay XR is de-energized, the output relay XR drops, the contact XR1 becomes non-conductive, and the crossing control device S21 outputs the crossing control signal S21 that causes the crossing alarm device 3 to sound and the crossing breaker 4 to descend.
The control relay STPR has a second train detection signal S12,
Third train detection signal S13 is input and contact point STPR1
Are connected in parallel to the contact 2TR1. Contact point STP when the second train detection signal S12 is "stop"
The contact STPR1 becomes non-conductive when R1 is conductive and the third train detection signal S13 is "departure" for the train.
【0033】図1を参照しながら、回路の動作を説明す
る。後続列車72が軌道回路1Tに進入すると接点1T
R1が不導通となり、出力リレーXRが落下し、踏切制
御信号S21を出力する。後続列車72が軌道回路1T
を進出し軌道回路2Tに進入すると、接点1TR1が導
通し接点2TR1が不導通となり、踏切制御信号S21
が維持される。The operation of the circuit will be described with reference to FIG. When the succeeding train 72 enters the track circuit 1T, the contact point 1T
R1 becomes non-conductive, the output relay XR falls, and the level crossing control signal S21 is output. Subsequent train 72 is track circuit 1T
And the track circuit 2T, the contact 1TR1 becomes conductive and the contact 2TR1 becomes non-conductive, and the level crossing control signal S21
Is maintained.
【0034】後続列車72が場外停車区間に停車する
と、制御リレーSTPRが動作し、接点STPR1が導
通する。このため、出力リレーXRは、接点1TR1、
接点STPR1、接点(下り1TR1)を介して励磁さ
れ、踏切制御信号S21の出力を一時停止する。先行列
車71が区間(下り2T)を出発し、第3の列車検知信
号S13が列車「出発」になると、制御リレーの接点S
TPR1が不導通となり、出力リレーXRが落下し、踏
切制御信号S21の出力の一時停止を解除する。後続列
車72が軌道回路2TRを進出し軌道回路(下り1T)
に進入すると、接点2TR1が導通し接点(下り1TR
1)が不導通となり、踏切制御信号S21が維持され
る。When the succeeding train 72 stops in the outside stop section, the control relay STPR operates and the contact point STPR1 becomes conductive. Therefore, the output relay XR has the contact 1TR1,
It is excited via the contact point STPR1 and the contact point (downward 1TR1), and the output of the level crossing control signal S21 is temporarily stopped. When the preceding train 71 departs the section (downhill 2T) and the third train detection signal S13 becomes the train "departure", the contact S of the control relay S
TPR1 becomes non-conductive, the output relay XR falls, and the temporary stop of the output of the level crossing control signal S21 is released. Subsequent train 72 enters track circuit 2TR and track circuit (down 1T)
Contact point 2TR1 becomes conductive and contacts (downlink 1TR
1) becomes non-conductive, and the level crossing control signal S21 is maintained.
【0035】後続列車72が軌道回路(下り1T)を進
出すると、接点(下り1TR1)が導通し、出力リレー
XRが励磁され、踏切制御信号S21が停止する。これ
により、図4に示すタイムチャートが得られる。表示信
号S22は、接点STPR1と連動した図示しない接点
STPR2により与えられる。When the succeeding train 72 advances in the track circuit (down 1T), the contact (down 1TR1) becomes conductive, the output relay XR is excited, and the railroad crossing control signal S21 stops. As a result, the time chart shown in FIG. 4 is obtained. The display signal S22 is given by a contact STPR2 (not shown) which is interlocked with the contact STPR1.
【0036】[0036]
【発明の効果】以上述べたように、本発明によれば、先
行列車との関係において後続列車が停車させられた場合
に踏切制御時間を適切に制御し得る踏切制御装置を提供
できる。As described above, according to the present invention, it is possible to provide a railroad crossing control device capable of appropriately controlling the railroad crossing control time when the succeeding train is stopped in relation to the preceding train.
【図1】本発明に係る踏切制御装置の構成を示すブロッ
ク図である。FIG. 1 is a block diagram showing a configuration of a railroad crossing control device according to the present invention.
【図2】本発明に係る踏切制御装置の動作を示すタイム
チャートである。FIG. 2 is a time chart showing the operation of the railroad crossing control device according to the present invention.
【図3】列車との関連で踏切制御装置の動作を示す概念
図である。FIG. 3 is a conceptual diagram showing an operation of a railroad crossing control device in relation to a train.
【図4】第3の列車検知信号を用いた踏切制御装置の動
作を示すタイムチャートである。FIG. 4 is a time chart showing the operation of the railroad crossing control device using a third train detection signal.
【図5】踏切制御装置を構成する制御回路の具体的な回
路図である。FIG. 5 is a specific circuit diagram of a control circuit that constitutes the level crossing control device.
L 踏切警報区間 1 列車検知回路 11 第1の列車検知回路 12 第2の列車検知回路 13 第3の列車検知回路 2 制御回路 3 踏切警報器 4 踏切遮断機 5 踏切道 6 軌道 7 列車 71 先行列車 72 後続列車 8 駅 81、82 信号機 9 表示器 S11 第1の列車検知信号 S12 第2の列車検知信号 S13 第3の列車検知信号 S21 踏切制御信号 S22 表示信号 L Level crossing alarm section 1 Train detection circuit 11 First train detection circuit 12 Second train detection circuit 13 Third train detection circuit 2 Control circuit 3 Level crossing alarm 4 Level crossing gate 5 Level crossing 6 Track 7 Train 71 Preceding train 72 Subsequent trains 8 stations 81, 82 Traffic light 9 Display device S11 First train detection signal S12 Second train detection signal S13 Third train detection signal S21 Railroad crossing control signal S22 Display signal
Claims (3)
回路とを含み、踏切警報器または遮断機に踏切制御信号
を出力する踏切制御装置であって、 前記踏切警報区間は、踏切道を含んで前記踏切道から見
て軌道の進路後方に設けられ、途中に場外停車区間を含
んでおり、 前記列車検知回路は、少なくとも2つ備えられ、第1の
列車検知回路が前記踏切警報区間内の列車の有無を検出
して第1の列車検知信号を出力し、第2の列車検知回路
が前記場外停車区間に列車が停車していることを検出し
て第2の列車検知信号を出力するものであり、 前記制御回路は、前記第1の列車検知信号と、前記第2
の列車検知信号とが入力され、前記第1の列車検知信号
が列車有であるときに前記踏切制御信号を出力し、前記
第1の列車検知信号が列車有であり、かつ、前記第2の
列車検知信号が列車停車であるときに前記踏切制御信号
の出力を一時停止するものである踏切制御装置。1. A railroad crossing control device that includes a railroad crossing warning section, a train detection circuit, and a control circuit, and outputs a railroad crossing control signal to a railroad crossing alarm device or a circuit breaker, wherein the railroad crossing warning section includes a railroad crossing. It is provided at the rear of the track of the track when viewed from the railroad crossing, and includes an off-site stop section on the way, at least two train detection circuits are provided, and the first train detection circuit is in the railroad crossing warning section. Detecting the presence or absence of a train and outputting a first train detection signal, and a second train detection circuit detecting that the train is stopped in the outside stop section and outputting a second train detection signal. The control circuit may include the first train detection signal and the second train detection signal.
And the first train detection signal is input, the railroad crossing control signal is output when the first train detection signal is a train present, and the first train detection signal is a train present, and the second train detection signal is output. A railroad crossing control device for temporarily stopping the output of the railroad crossing control signal when the train detection signal indicates that the train is stopped.
おり、 前記駅区間は、前記踏切警報区間に隣接した進路前方に
備えられており、 前記第3の列車検知回路は、前記駅区間に備えられ、前
記駅区間に停車した列車の出発を検出して第3の列車検
知信号を出力するものであり、 前記制御回路は、前記第3の列車検知信号が入力され、
前記第3の列車検知信号が列車出発であるときに前記踏
切制御信号の出力の一時停止を解除するものである請求
項1に記載の踏切制御装置。2. A station section and a third train detection circuit are included, the station section is provided in front of a route adjacent to the railroad crossing warning section, and the third train detection circuit is the station. It is provided in a section, detects departure of a train stopped in the station section, and outputs a third train detection signal, wherein the control circuit receives the third train detection signal,
The railroad crossing control device according to claim 1, wherein the suspension of the output of the railroad crossing control signal is released when the third train detection signal is a train departure.
き前記列車が前記場外停車区間に停車中であることを表
示するものであり、 前記制御回路は、前記踏切制御信号の出力を一時停止し
ているときに前記表示器に前記表示信号を出力するもの
である請求項1または2に記載の踏切制御装置。3. A display device is provided, wherein the display device is provided at the railroad crossing, and displays that the train is stopped in the outside stop section based on a display signal. The level crossing control device according to claim 1 or 2, wherein the circuit outputs the display signal to the display while the output of the level crossing control signal is temporarily stopped.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31125493A JPH07137635A (en) | 1993-11-17 | 1993-11-17 | Railroad crossing control device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31125493A JPH07137635A (en) | 1993-11-17 | 1993-11-17 | Railroad crossing control device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH07137635A true JPH07137635A (en) | 1995-05-30 |
Family
ID=18014942
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP31125493A Pending JPH07137635A (en) | 1993-11-17 | 1993-11-17 | Railroad crossing control device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07137635A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021079859A (en) * | 2019-11-20 | 2021-05-27 | 東日本旅客鉄道株式会社 | Remote open-type crossing control device |
-
1993
- 1993-11-17 JP JP31125493A patent/JPH07137635A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021079859A (en) * | 2019-11-20 | 2021-05-27 | 東日本旅客鉄道株式会社 | Remote open-type crossing control device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US2554056A (en) | Multiple frequency intermittent inductive cab signal and automatic train control system | |
| JP4721508B2 (en) | Single wire automatic closure system | |
| JPH07137635A (en) | Railroad crossing control device | |
| JP3346499B2 (en) | Railroad crossing control device | |
| JP6431103B2 (en) | Level crossing control device and level crossing control method | |
| JP3992783B2 (en) | Railroad crossing control device | |
| JP2001236594A (en) | Wireless traffic control system | |
| JP3441942B2 (en) | Train detection method, train operation system and train detection device using the same | |
| JPH11192950A (en) | Railroad crossing control device | |
| JP3312668B2 (en) | Railroad crossing control device | |
| JP2613328B2 (en) | Railroad crossing control device | |
| JPH11278276A (en) | Crossing controller | |
| JP2868250B2 (en) | Level crossing alarm control device | |
| JP2006168382A (en) | Railroad crossing security device | |
| JP2619568B2 (en) | Railroad crossing control device | |
| JP6032800B2 (en) | Railroad crossing safety device and railroad crossing control switching device | |
| JP3278033B2 (en) | Railroad crossing control device | |
| KR20190110200A (en) | Appartus and method for controlling traffic signal | |
| JP3704924B2 (en) | Departure guidance device | |
| JP2862573B2 (en) | Railroad crossing control device | |
| JP2000211514A (en) | Train stop detecting device | |
| JPH0714100Y2 (en) | Railroad crossing control device | |
| JPH11321651A (en) | Vehicle detector device | |
| US2098719A (en) | Railway signaling system and apparatus | |
| US1861488A (en) | Railway traffic controlling apparatus |