JPH07158018A - Mounting position matching method supported by rubber - Google Patents
Mounting position matching method supported by rubberInfo
- Publication number
- JPH07158018A JPH07158018A JP31040693A JP31040693A JPH07158018A JP H07158018 A JPH07158018 A JP H07158018A JP 31040693 A JP31040693 A JP 31040693A JP 31040693 A JP31040693 A JP 31040693A JP H07158018 A JPH07158018 A JP H07158018A
- Authority
- JP
- Japan
- Prior art keywords
- metal plate
- rubber bearing
- lower metal
- base plate
- rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 7
- 239000002184 metal Substances 0.000 claims abstract description 39
- 230000005540 biological transmission Effects 0.000 claims abstract description 11
- 230000008602 contraction Effects 0.000 claims abstract description 3
- 239000000463 material Substances 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000010008 shearing Methods 0.000 abstract 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、橋脚等の下部構造と橋
桁等の上部構造物との間に介装されるゴム支承に関し、
より詳しくはゴム支承に掛かったせん断変形歪を修正す
るためのゴム支承の取り付け位置合わせ方法に関するも
のである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rubber bearing interposed between a lower structure such as a bridge pier and an upper structure such as a bridge girder,
More specifically, the present invention relates to a rubber bearing mounting position adjusting method for correcting a shear deformation strain applied to a rubber bearing.
【0002】[0002]
【従来の技術】一般的に、橋梁の作り方は先ず橋脚を作
り、橋脚の上面部にゴム支承を据えつけた後、ゴム支承
の上面部に橋桁を作るといった順で行われる。ところ
が、橋桁は外気温によって伸縮を起こすため、橋脚と橋
桁との位置関係が当初に設定した位置にもかかわらず、
橋桁が完成した時にはずれてゴム支承にせん断変形歪が
掛かることがある。そのため、このせん断変形歪を解消
するために、ゴム支承をずらして所定の位置に修正する
工程が必要となる場合がある。2. Description of the Related Art Generally, a bridge is first constructed by first forming a bridge pier, installing a rubber bearing on the upper surface of the bridge pier, and then forming a bridge girder on the upper surface of the rubber bearing. However, since the bridge girder expands and contracts depending on the outside temperature, despite the position that the positional relationship between the pier and the bridge girder was originally set,
When the bridge girder is completed, the rubber bearing may shift and shear deformation strain may be applied. Therefore, in order to eliminate this shear deformation strain, a step of shifting the rubber bearing to correct it in a predetermined position may be required.
【0003】従来は、このゴム支承に掛かったせん断変
形歪を修正する方法としては、図3に示す如く、ベ−ス
プレ−トの上表面を滑り面としたベ−スプレ−トを橋脚
の上面に固定して、上部金属板および下部金属板を備え
たゴム支承の下部金属板の下面と下沓の上面とを固定し
たゴム支承をベ−スプレ−トの上面と下沓の下面とが接
触するように載置し、下沓の側面には移動用のネジ穴タ
ップを備えて、この移動用のネジ穴タップを介して反力
伝達棒を伸ばし、橋脚の端部に取り付けた反力支持部の
固定部を介して伸縮装置を取りつけて、反力伝達棒と伸
縮装置とを連結し、伸縮装置を伸縮させることにより下
沓がベ−スプレ−ト上を滑ることによりゴム支承の位置
を調整して、調整が終了してから下沓とベ−スプレ−ト
とをボルトまたは溶接等で固定していた。Conventionally, as a method of correcting the shear deformation strain applied to the rubber bearing, as shown in FIG. 3, a base plate having an upper surface of the base plate as a sliding surface is used as an upper surface of the pier. The lower surface of the lower metal plate and the upper surface of the lower shoe of the rubber bearing having the upper metal plate and the lower metal plate are fixed to each other, and the upper surface of the base plate and the lower surface of the lower shoe contact each other. It has a screw hole tap for movement on the side surface of the lower shoe, and the reaction force transmission rod is extended through this screw hole tap for movement to support the reaction force attached to the end of the pier. Attach the expansion device via the fixed part of the section, connect the reaction force transmission rod and the expansion device, and expand and contract the expansion device so that the lower shoe slides on the base plate so that the position of the rubber bearing is fixed. Adjust and after the adjustment is completed, bolt the bottom shoe and the base plate or It was fixed by contact or the like.
【0004】ここで、下沓の側面には移動用のネジ穴タ
ップ(図示せず)を備えているが、そのネジ穴タップの
径の大きさに比例して下沓の厚さ決まる場合があり、下
沓の厚さによっては必要以上に支承全体の高さが高くな
る場合もあった。また、ゴム支承本体とベ−スプレ−ト
との間に下沓を介在させる必要があっためその分コスト
も高くなっていた。Here, the side surface of the lower shoe is provided with a screw hole tap (not shown) for movement, but the thickness of the lower shoe may be determined in proportion to the diameter of the screw hole tap. In some cases, depending on the thickness of the lower shoe, the height of the entire bearing may become unnecessarily high. Further, since it is necessary to interpose a lower shoe between the rubber bearing main body and the base plate, the cost is increased accordingly.
【0005】[0005]
【発明が解決しようとする課題】本発明にあっては、特
にベ−スプレ−トとゴム支承の下部金属板との間に下沓
を介在させず、ベ−スプレ−トの上面とゴム支承の下部
金属板の下面とを直接に接触させて、ゴム支承の下部金
属板を専用の移動用治具を用いて移動させることによっ
てゴム支承に掛かったせん断変形歪を取り除くものであ
る。また、本発明は下沓を用いないため、下沓に起因す
る諸問題、例えば、支承全体の高さが高くなることを防
止できると共に、支承全体をコンパクトにでき、かつ、
支承全体の重量も軽減でき、しかも下沓の部品を使わな
いことによるコストダウンにもなるのである。According to the present invention, a lower shoe is not particularly interposed between the base plate and the lower metal plate of the rubber support, and the upper surface of the base plate and the rubber support are not provided. By directly contacting the lower surface of the lower metal plate with the lower metal plate of the rubber bearing and moving the lower metal plate of the rubber bearing using a dedicated moving jig, the shear deformation strain applied to the rubber bearing is removed. Further, since the present invention does not use the lower shoe, various problems caused by the lower shoe can be prevented, for example, the height of the entire bearing can be prevented from increasing, and the entire bearing can be made compact, and
The weight of the entire bearing can be reduced, and the cost can be reduced by not using the lower gear parts.
【0006】[0006]
【課題を解決するための手段】本発明は上記のような目
的を達成するため、次のような構成を採用したものであ
る。すなわち、ベ−スプレ−トの上表面を滑り面とした
ベ−スプレ−トを橋脚の上面に固定し、下部金属板を備
えたゴム支承の下面をベ−スプレ−トの滑り面上に載置
し、このゴム支承の上部金属板の上面を橋桁の下面に固
定した橋梁において、ゴム支承の下部金属板に移動用治
具を装着し、移動用治具の長さ方向の側面に設けたネジ
穴タップ等を介して反力伝達棒を伸ばし、橋脚の端部お
よび橋脚面に取り付けた反力支持部の固定部を介して伸
縮装置を取り付けて、反力伝達棒と伸縮装置とを連結
し、伸縮装置を伸縮させることにより、ゴム支承の下部
金属板を滑らせて、ゴム支承に掛かったせん断変形歪を
修正することを特徴とするゴム支承の取り付け位置合わ
せ方法である。In order to achieve the above object, the present invention adopts the following constitution. That is, a base plate having the upper surface of the base plate as the sliding surface is fixed to the upper surface of the pier, and the lower surface of the rubber bearing provided with the lower metal plate is placed on the sliding surface of the base plate. In the bridge where the upper surface of the upper metal plate of the rubber bearing is fixed to the lower surface of the bridge girder, the moving jig is attached to the lower metal plate of the rubber bearing, and it is provided on the side surface in the length direction of the moving jig. Extend the reaction force transmission rod through a screw hole tap, etc., and attach the expansion device via the fixed part of the reaction force support part attached to the end of the pier and the bridge pier surface, and connect the reaction force transmission rod and the expansion device. Then, by expanding and contracting the expansion / contraction device, the lower metal plate of the rubber bearing is slid to correct the shear deformation strain applied to the rubber bearing.
【0007】[0007]
【作用】本発明は以上のような構成を有するため、本発
明にあっては、特に、ベ−スプレ−トの上面とゴム支承
の下部金属板の下面との間に介在する下沓を装備せず、
ベ−スプレ−トの上面とゴム支承材の下部金属板との下
面とが直接接触しており、ゴム支承に掛かったせん断変
形歪を取り除く方法としては、専用の移動用治具を用い
て移動させるものである。したがって、本発明では下沓
を用いないため、下沓に起因する諸問題、例えば、支承
全体の高さが高くなることを防止できると共に、支承全
体をコンパクトにでき、かつ支承全体の重量も軽減で
き、更に下沓の部品を使わないことによるコストダウン
にもなるのである。Since the present invention has the above-mentioned structure, in the present invention, in particular, a lower shoe is provided which is interposed between the upper surface of the base plate and the lower surface of the lower metal plate of the rubber bearing. Without
The upper surface of the base plate and the lower surface of the lower metal plate of the rubber support material are in direct contact with each other.As a method of removing the shear deformation strain applied to the rubber support, use a special moving jig. It is what makes me. Therefore, since the lower shoe is not used in the present invention, various problems caused by the lower shoe can be prevented, for example, the height of the entire bearing can be prevented from increasing, and the entire bearing can be made compact and the weight of the entire bearing can be reduced. This can be done, and the cost can be reduced by not using the lower parts.
【0008】[0008]
【実施例】図1は、本発明に係る実施例の断面図であ
る。ベ−スプレ−ト5は上表面を滑り面6としており、
このベ−スプレ−ト5を橋脚8の上面に固定し、上部金
属板1および下部金属板2を備えたゴム支承3の下部金
属板2の下面をベ−スプレ−ト5の滑り面6上に載置し
て、このゴム支承3の上部金属板1の上面を橋桁7の下
面に固定した橋梁である。ゴム支承3の下部金属板2に
は杆体21の両端部に前部係合突起22と後部係合突起
23とを有する移動用治具20をゴム支承3の下部金属
板2に杆体21、前部係合突起22および後部係合突起
23とで嵌合するように装着できる寸法を有している。
移動用治具20の側面にはネジ穴タップ25を有してお
り、固定ネジ穴24、24を用いてゴム支承3の下部金
属板2に杆体21をネジ等で固定(図示せず)し、移動
用治具20の長さ方向の側面にあるネジ穴タップ25に
反力伝達棒12をネジで接続して伸ばし、橋脚8の端部
に取り付けた反力支持部の固定部13に取り付けてある
ジャッキ10に接続してあり、ジャッキ10を伸縮させ
ることによって、ゴム支承3の下部金属板2をずらし
て、ゴム支承3に掛かったせん断変形力を無くすように
修正することでゴム支承の取り付け位置合わせを行うの
である。1 is a sectional view of an embodiment according to the present invention. The base plate 5 has a sliding surface 6 on the upper surface,
The base plate 5 is fixed to the upper surface of the pier 8, and the lower surface of the lower metal plate 2 of the rubber bearing 3 having the upper metal plate 1 and the lower metal plate 2 is placed on the sliding surface 6 of the base plate 5. Is a bridge in which the upper surface of the upper metal plate 1 of the rubber bearing 3 is fixed to the lower surface of the bridge girder 7. The lower metal plate 2 of the rubber bearing 3 is provided with a moving jig 20 having front and rear engaging projections 22 and 23 on both ends of the rod 21. It has a size such that it can be mounted so as to fit with the partial engagement projection 22 and the rear engagement projection 23.
A screw hole tap 25 is provided on the side surface of the moving jig 20, and the rod 21 is fixed to the lower metal plate 2 of the rubber bearing 3 with screws or the like (not shown) using the fixing screw holes 24, 24. , The reaction force transmission rod 12 is connected with a screw to the screw hole tap 25 on the side surface in the length direction of the moving jig 20 and extended, and attached to the fixed portion 13 of the reaction force support portion attached to the end of the pier 8. It is connected to the jack 10 and is expanded and contracted so that the lower metal plate 2 of the rubber bearing 3 is displaced to correct the shear deformation force applied to the rubber bearing 3 so that the rubber bearing 3 The mounting position is adjusted.
【0009】ゴム支承3の下部金属板2をずらすことに
よってゴム支承3に掛かったせん断変形歪を修正した後
は、下部金属板2とベ−スプレ−ト5とをボルトまたは
溶接等で固定(図示せず)すると共に、ゴム支承3の下
部金属板2をずらすために用いた移動用治具20、反力
伝達棒12、反力支持部の固定部13およびジャッキ1
0は取り外してゴム支承の取り付け位置合わせ作業は完
了する。ここで用いられるゴム支承3は、一般的にはゴ
ムと金属板とを交互に配置して一体化した積層ゴムが用
いられる。After the shear deformation strain applied to the rubber support 3 is corrected by shifting the lower metal plate 2 of the rubber support 3, the lower metal plate 2 and the base plate 5 are fixed with bolts or welding ( (Not shown) and used to displace the lower metal plate 2 of the rubber bearing 3, the reaction jig 20, the reaction force transmission rod 12, the reaction force support fixing portion 13, and the jack 1.
0 is removed to complete the rubber bearing mounting position alignment work. The rubber bearing 3 used here is generally a laminated rubber in which rubber and metal plates are alternately arranged and integrated.
【0010】図2は、図1に用いた移動用治具20の斜
視図である。移動用治具20には杆体21の両端部に前
部係合突起22と後部係合突起23とを有し、杆体21
には固定ネジ穴24、24を有し、移動用治具20の長
さ方向側面にはネジ穴タップ25を有しており、ゴム支
承3の下部金属板2に杆体21、前部係合突起22およ
び後部係合突起23とで嵌合する寸法を有している。固
定ネジ穴24、24はゴム支承3の下部金属板2に杆体
21を固定する時に用いるボルトの取り付け穴である。
また、ネジ穴タップ25は反力伝達棒12を取り付ける
ためのものである。FIG. 2 is a perspective view of the moving jig 20 used in FIG. The moving jig 20 has a front engaging protrusion 22 and a rear engaging protrusion 23 at both ends of a rod 21,
Has fixing screw holes 24, 24, and has a screw hole tap 25 on the side surface in the length direction of the moving jig 20. The lower metal plate 2 of the rubber bearing 3 has a rod 21, a front engaging portion. The protrusion 22 and the rear engagement protrusion 23 are dimensioned to fit together. The fixing screw holes 24, 24 are mounting holes for bolts used when fixing the rod 21 to the lower metal plate 2 of the rubber bearing 3.
The screw hole tap 25 is for mounting the reaction force transmission rod 12.
【0011】[0011]
【発明の効果】以上のような構成を有することにより、
本発明にあっては、特にベ−スプレ−トとゴム支承の下
部金属板との間に下沓を介在させず、ベ−スプレ−トの
上面とゴム支承の下部金属板の下面とを直接に接触させ
て、ゴム支承の下部金属板を専用の移動用治具を用いて
移動させることによってゴム支承に掛かったせん断変形
歪を取り除くものである。したがって、本発明では下沓
を用いないため、下沓に起因する諸問題、例えば、支承
全体の高さが高くなることを防止できると共に、支承全
体をコンパクトにでき、かつ、支承全体の重量も軽減で
き、しかも下沓の部品を使わないことによるコストダウ
ンにもなるのである。By having the above-mentioned structure,
According to the present invention, the upper surface of the base plate and the lower surface of the lower metal plate of the rubber bearing are directly connected to each other without interposing a lower shoe between the base plate and the lower metal plate of the rubber bearing. The lower metal plate of the rubber bearing is moved by using a dedicated moving jig to remove the shear deformation strain applied to the rubber bearing. Therefore, in the present invention, since the lower shoe is not used, it is possible to prevent various problems caused by the lower shoe, for example, to prevent the height of the entire bearing from becoming high, and to make the entire bearing compact and to reduce the weight of the entire bearing. The cost can be reduced and the cost can be reduced by not using the lower parts.
【0012】[0012]
【図1】図1は、本発明のゴム支承の取り付け位置合わ
せ方法の断面図である。FIG. 1 is a cross-sectional view of a rubber bearing mounting position alignment method of the present invention.
【図2】図2は、図1に用いた移動用治具の斜視図であ
る。FIG. 2 is a perspective view of the moving jig used in FIG.
【図3】図3は、従来のゴム支承の取り付け位置合わせ
方法の断面図である。FIG. 3 is a cross-sectional view of a conventional rubber bearing mounting position alignment method.
1・・・・上部金属板 2・・・・下部金属板 3・・・・ゴム支承 5・・・・ベ−スプレ−ト 6・・・・滑り面 7・・・・橋桁 8・・・・橋脚 10・・・伸縮装置またはジャッキ 12・・・反力伝達棒 13・・・反力支持部の固定部 20・・・移動用治具 21・・・杆体 22・・・前部係合突起 23・・・後部係合突起 24・・・固定ネジ穴 25・・・ネジ穴タップ 30・・・下沓 31・・・下沓のネジ穴タップ 1 ... ・ Upper metal plate 2 ・ ・ ・ ・ ・ ・ Lower metal plate 3 ・ ・ ・ ・ Rubber bearing 5 ・ ・ ・ ・ Base plate 6 ・ ・ ・ ・ ・ ・ Sliding surface 7 ・ ・ ・ ・ ・ ・ Bridge girder 8 ・ ・ ・・ Bridge pier 10 ... Expansion device or jack 12 ... Reaction force transmission rod 13 ... Fixed portion of reaction force support portion 20 ... Migration jig 21 ... Rod body 22 ... Front engagement Protrusion 23 ... Rear engaging protrusion 24 ... Fixing screw hole 25 ... Screw hole tap 30 ... Lower shoe 31 ... Lower shoe screw hole tap
Claims (1)
ベ−スプレ−トを橋脚の上面に固定し、下部金属板を備
えたゴム支承の下面をベ−スプレ−トの滑り面上に載置
し、このゴム支承の上部金属板の上面を橋桁の下面に固
定した橋梁において、ゴム支承の下部金属板に移動用治
具を装着し、移動用治具の長さ方向の側面に設けたネジ
穴タップ等を介して反力伝達棒を伸ばし、橋脚の端部お
よび橋脚面に取り付けた反力支持部の固定部を介して伸
縮装置を取り付けて、反力伝達棒と伸縮装置とを連結
し、伸縮装置を伸縮させることにより、ゴム支承の下部
金属板を滑らせて、ゴム支承に掛かったせん断変形歪を
修正することを特徴とするゴム支承の取り付け位置合わ
せ方法。1. A base plate having an upper surface of the base plate as a sliding surface is fixed to an upper surface of a pier, and a lower surface of a rubber bearing having a lower metal plate is attached to a sliding surface of the base plate. On a bridge with the upper surface of the upper metal plate of the rubber bearing fixed to the lower surface of the bridge girder, mount the moving jig on the lower metal plate of the rubber bearing, and set the side surface in the length direction of the moving jig. Extend the reaction force transmission rod through the taps on the screw holes, etc., and attach the expansion / contraction device via the fixed part of the reaction force support part attached to the end of the pier and the bridge pier surface. A method for aligning the mounting position of a rubber bearing, characterized in that the lower metal plate of the rubber bearing is slid to correct the shear deformation strain applied to the rubber bearing by connecting and to expand and contract the expansion device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31040693A JPH07158018A (en) | 1993-12-10 | 1993-12-10 | Mounting position matching method supported by rubber |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31040693A JPH07158018A (en) | 1993-12-10 | 1993-12-10 | Mounting position matching method supported by rubber |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH07158018A true JPH07158018A (en) | 1995-06-20 |
Family
ID=18004878
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP31040693A Pending JPH07158018A (en) | 1993-12-10 | 1993-12-10 | Mounting position matching method supported by rubber |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07158018A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111118971A (en) * | 2020-01-17 | 2020-05-08 | 中铁二院工程集团有限责任公司 | End socket expansion device of roadbed pile plate structure and construction method |
-
1993
- 1993-12-10 JP JP31040693A patent/JPH07158018A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111118971A (en) * | 2020-01-17 | 2020-05-08 | 中铁二院工程集团有限责任公司 | End socket expansion device of roadbed pile plate structure and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH07158018A (en) | Mounting position matching method supported by rubber | |
| JP3375885B2 (en) | Method of fixing steel column to correct posture and fixing jig | |
| CN115582794B (en) | Assembly and profiling tooling for satellite lens barrel blade ribs and assembly method | |
| JP4052649B2 (en) | Orbital connection structure | |
| CN114016388A (en) | Suspension bridge cable saddle | |
| RU2254208C2 (en) | Clamp of gate valve for refractory plate | |
| US7013698B2 (en) | Bending press with a substantially undeformable toolholder beam | |
| JPH0890379A (en) | Feed screw mechanism | |
| KR960031302A (en) | Reciprocating slat conveyor and its mounting method | |
| JPH07127018A (en) | Rubber bearing material aligning method | |
| JP4527990B2 (en) | Slide plate mounting structure for telescopic boom | |
| JP7410744B2 (en) | Position adjustment device and position adjustment method | |
| CN210263907U (en) | Aluminum alloy bench die | |
| JP2007112413A (en) | Assembly structure at the front of the body | |
| JP3175806B2 (en) | Installation structure and installation method of mold clamping device | |
| JP3639465B2 (en) | Jig mounting structure | |
| JP4222845B2 (en) | Holding structure for adjusting strain of rubber-like elastic bearing body and strain adjusting method using the same | |
| CN111451661A (en) | Plate welding deformation control device and welding equipment | |
| KR200232860Y1 (en) | Side support equipment for the preflex beam manufacturing process | |
| JP2001027282A (en) | Method and apparatus for adjusting position of seismic isolation member | |
| CN114083012B (en) | A clamping device | |
| CN214558428U (en) | A sheet metal welding rack device | |
| JP2965435B2 (en) | Joint structure of strut in lifting equipment | |
| JPH11141746A (en) | Pipe support device | |
| JP2590947B2 (en) | Piezoelectric element displacement converter |