JPH0716629A - Bridle roll controller for rolling mill - Google Patents
Bridle roll controller for rolling millInfo
- Publication number
- JPH0716629A JPH0716629A JP5149525A JP14952593A JPH0716629A JP H0716629 A JPH0716629 A JP H0716629A JP 5149525 A JP5149525 A JP 5149525A JP 14952593 A JP14952593 A JP 14952593A JP H0716629 A JPH0716629 A JP H0716629A
- Authority
- JP
- Japan
- Prior art keywords
- bridle
- roll
- bridle roll
- rolling mill
- rolls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000005096 rolling process Methods 0.000 title claims description 23
- 238000009826 distribution Methods 0.000 claims abstract description 11
- 230000009467 reduction Effects 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 abstract description 13
- 238000005097 cold rolling Methods 0.000 abstract description 5
- 230000007547 defect Effects 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 41
- 239000010959 steel Substances 0.000 description 41
- 238000010586 diagram Methods 0.000 description 6
- 230000002093 peripheral effect Effects 0.000 description 6
- 238000003466 welding Methods 0.000 description 6
- 238000004804 winding Methods 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000011144 upstream manufacturing Methods 0.000 description 3
- 239000010960 cold rolled steel Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000005554 pickling Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000007751 thermal spraying Methods 0.000 description 1
Landscapes
- Control Of Metal Rolling (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、冷延鋼帯などストリ
ップの圧延機の出側に設置するブライドルロール装置の
制御装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a control device for a bridle roll device installed on the exit side of a rolling mill for strip such as cold rolled steel strip.
【0002】[0002]
【従来の技術】冷間圧延機の出側では、鋼帯に高い張力
をかけることで形状や圧延性を安定化するため、巻取り
リール以外にブライドルロールを設置する先行技術があ
る。たとえば、図6に示すように圧延機本体2とカロー
ゼルリール6の間にブライドルロール装置3を設置して
いる。2. Description of the Related Art On the delivery side of a cold rolling mill, there is a prior art in which a bridle roll is installed in addition to a take-up reel in order to stabilize the shape and rollability by applying a high tension to a steel strip. For example, as shown in FIG. 6, a bridle roll device 3 is installed between the rolling mill body 2 and the carousel reel 6.
【0003】また、最近では圧延機の通板、尻抜き作業
を行わずにすむように圧延機入側に溶接機1を設けた
り、酸洗ライン等と接続して連続的に圧延する技術が発
達してきた。この場合、圧延機出側に走間シャー5とカ
ローゼルリール6を設けて連続的に鋼帯を切断・巻取り
を行っている。Further, recently, a technique has been developed in which a welding machine 1 is provided on the inlet side of the rolling mill so as to avoid passing through the rolling mill and punching work, or by connecting to a pickling line or the like and continuously rolling. I've been In this case, a running shear 5 and a carousel reel 6 are provided on the delivery side of the rolling mill to continuously cut and wind the steel strip.
【0004】このブライドルロール装置3の各ロール
は、高い張力を得るために、および寿命を長くするため
に、通常、ショア硬度Hs80以上の硬度を有し、ダル
ショット加工を行い、さらにCrメッキを行うもの、も
しくは、セラミック・サーメット等の溶射加工を行いか
つ、ダルショット加工を行っているものが多い。Each of the rolls of the bridle roll device 3 usually has a hardness of Shore hardness Hs80 or more in order to obtain a high tension and to prolong the life of the bridle roll device. In many cases, this is done, or thermal spraying of ceramics, cermets, etc. is performed and dull shot processing is also performed.
【0005】前記の連続圧延機で、この出側ブライドル
ロール装置3を使用している場合、走間シャー5で鋼帯
を切断する際、次に示すような問題が発生する。図6を
参照して説明すると、走間シャー5で鋼帯7を切断する
と、巻取りリール6aとブライドルロール装置3の間の
張力が無くなり、後続材の鋼帯が待機リール6bに巻付
くまで、この状態が続く。この張力が無い状態では、後
続材の鋼帯の先端部が待機リール6bまで通板し難いの
で、ブライドルロール装置3と、走間シャー5の間にピ
ンチロール4を別途設け、多少の張力を維持している。When the exit side bridle roll device 3 is used in the above continuous rolling mill, the following problems occur when the steel strip is cut by the running shear 5. Explaining with reference to FIG. 6, when the steel strip 7 is cut by the running shear 5, the tension between the take-up reel 6a and the bridle roll device 3 disappears, and the steel strip of the succeeding material is wound around the standby reel 6b. , This state continues. In the absence of this tension, it is difficult for the leading end of the steel strip of the succeeding material to pass through to the standby reel 6b. Therefore, a pinch roll 4 is separately provided between the bridle roll device 3 and the running shear 5, and some tension is applied. I am maintaining.
【0006】しかしながら、その張力はピンチロール4
を常時使用しない以上、設計上最小限の張力にするのが
通例であり、したがって巻取りリール6aでかかる張力
より大幅に低い。このため、走間切断した瞬間にブライ
ドルロール装置3の下流側(すなわちリール6側)の張
力が急変するのは避けられない。この張力の急変によっ
て、ブライドルロール3a〜3dと鋼帯7がスリップを
起こし、鋼帯に疵を発生させ、製品の品質に重大な影響
を及ぼす場合がある。However, the tension of the pinch roll 4
Since it is not always used, the tension is usually designed to be the minimum tension, and therefore, the tension is significantly lower than the tension applied to the take-up reel 6a. For this reason, it is inevitable that the tension on the downstream side of the bridle roll device 3 (that is, the reel 6 side) suddenly changes at the moment when the running is cut. Due to this sudden change in tension, the bridle rolls 3a to 3d and the steel strip 7 may slip, causing flaws in the steel strip, which may seriously affect the quality of the product.
【0007】この問題を解決するための先行技術では、
一番下流のブライドルロール3dに接触するようにさら
に別のスナバロール8を設け、走行切断前後の一定期間
接触圧下し、小型ピンチロール4よりも高い張力を出そ
うという構成がとられている。この場合、スナバロール
8は、圧延作業をするわけではなく線接触しかしていな
いので、このスナバロール8より、ミル本体2に近い側
のブライドルロール3a〜3cではシャー走行切断した
瞬間の張力の急変は避けられない。このときスナバロー
ル8に付設されていない他のブライドルロール3a〜3
cは、この張力の急変によってロール3a〜3cと鋼帯
がスリップを起こし、鋼帯に疵を発生させることがあ
る。In the prior art for solving this problem,
Another snubber roll 8 is provided so as to come into contact with the most downstream bridle roll 3d, and the contact pressure is reduced for a certain period before and after traveling cutting, so that a tension higher than that of the small pinch roll 4 is produced. In this case, since the snubber roll 8 does not perform rolling work and only makes line contact, the bridle rolls 3a to 3c closer to the mill main body 2 than the snubber roll 8 avoid a sudden change in tension at the moment of shear running. I can't. At this time, the other bridle rolls 3 a to 3 not attached to the snubber roll 8
In c, the rolls 3a to 3c and the steel strip may slip due to this sudden change in tension, which may cause flaws in the steel strip.
【0008】この疵の発生原因は、種々調査した結果、
ブライドルロール3a〜3cのダル加工時の粗さ凸部の
高い所が走行切断時の張力急変時に鋼帯7とスリップす
ることによって疵を付けていることが判明した。As a result of various investigations, the cause of this flaw is
It was found that the high places of the roughness convex portions of the bridle rolls 3a to 3c at the time of the dull processing slipped with the steel strip 7 at the time of a sudden change in the tension at the time of traveling cutting, thereby causing a flaw.
【0009】一方、ブライドルロール3a〜3d自体
は、使用期間が長くなると、表面のダル目が摩耗して平
滑になってくるため、通常運転中でも鋼帯7とブライド
ルロール3a〜3dがスリップし易く、ミル本体2の出
側で所要の張力が保てなくなってくる。このため、ブラ
イドルロール3a〜3d自体は、ダル目が跡に残らない
限りできるだけ粗さの大きいブライドルロールを使用し
たい。こうすることで、ブライドルロール3a〜3dの
交換周期を延長することができるわけである。つまり、
走間切断時の急激な張力の変動による鋼帯の疵付きに対
しては、粗さの低いブライドルロールが必要であるが、
ロール自身の寿命という点では、粗さの高いロールが必
要であるという相反する事態が発生しているわけであ
る。On the other hand, when the bridle rolls 3a to 3d themselves are used for a long period of time, the dulls on the surface become worn and become smooth, so that the steel strip 7 and the bridle rolls 3a to 3d easily slip during normal operation. The required tension cannot be maintained on the outlet side of the mill body 2. Therefore, as the bridle rolls 3a to 3d themselves, it is desired to use bridle rolls having as large a roughness as possible, as long as no dull marks are left on the marks. By doing so, the replacement cycle of the bridle rolls 3a to 3d can be extended. That is,
Bridle rolls with low roughness are required to prevent flaws in steel strips due to rapid changes in tension during cutting during running.
In terms of the life of the roll itself, there is a contradictory situation that a roll with high roughness is required.
【0010】[0010]
【発明が解決しようとする課題】この発明は、前記課題
を解決するためになされたものであり、走間切断を行っ
たときに、ブライドルロールをスリップさせないで、ブ
ライドルロール自身の寿命は長くできる装置を供するこ
とを目的としている。SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and the bridle roll itself can have a long life without slipping when the running cut is performed. The purpose is to provide the device.
【0011】[0011]
【課題を解決するための手段】本発明は、圧延機出側に
ブライドルロールおよび走間シャーを有するブライドル
ロール装置において、通常運転中は、圧延機出側の張力
一定制御ないし電流一定制御を行い、ストリップの走間
切断前後の一定期間のみ速度一定制御で運転することを
特徴とした圧延機のブライドルロール制御装置である。SUMMARY OF THE INVENTION The present invention is a bridle roll device having a bridle roll and a running shear on the rolling mill outlet side, and during normal operation, constant tension control or constant current control on the rolling mill outlet side is performed. The bridle roll control device for a rolling mill is characterized in that the strip is operated under constant speed control only for a certain period before and after the strip running.
【0012】また本発明は、圧延機出側に複数個のブラ
イドルロールを有し、そのいずれかのロールに接触する
スナバロールを有し、さらに走間シャーを有するブライ
ドルロール装置において、通常の各ブライドルロールの
負荷配分に対し、ストリップの走間切断前後のスナバロ
ール圧下中の一定期間のみ各ブライドルロール負荷配分
を変更することを特徴とした圧延機のブライドルロール
制御装置である。Further, the present invention has a plurality of bridle rolls on the delivery side of the rolling mill, has a snubber roll which comes into contact with any one of the rolls, and further has a bridle roll device having a running shear, in which each ordinary bridle roll is provided. A bridle roll control device for a rolling mill, characterized in that the load distribution of each bridle roll is changed only for a certain period during the reduction of the snubber roll before and after the strip is cut while the strip is running.
【0013】また本発明は、通板方向の最も下流側のブ
ライドルロールの負荷を、残余のブライドルロールより
も大きく設定することを特徴とする。Further, the present invention is characterized in that the load of the bridle roll on the most downstream side in the sheet passing direction is set to be larger than that of the remaining bridle rolls.
【0014】[0014]
【作用】本発明に従えば、通常運転中、すなわちストリ
ップの走間切断を行わない期間では、圧延機出側の張力
が一定になるように制御し、あるいはまたブライドルロ
ール装置における各ブライドルロールを駆動するモータ
の負荷電流が一定になるように制御し、走間切断前後の
一定期間では、速度が一定になるように制御し、これに
よってブライドルロールの周速とストリップの通板速度
とは同一値に保たれ、したがってブライドルロールの表
面とストリップとの滑りがなく、したがってストリップ
の表面に疵が付くことが防がれる。前記一定期間が経過
した後には、ストリップの張力が一定となるように、ま
たはブライドルロールを駆動するモータの負荷電流が一
定となるように制御態様を戻す。According to the present invention, during normal operation, that is, during the period during which strip running is not cut, the tension on the delivery side of the rolling mill is controlled to be constant, or each bridle roll in the bridle roll device is controlled. The load current of the motor to be driven is controlled to be constant, and the speed is controlled to be constant during a certain period before and after the disconnection between running runs, so that the peripheral speed of the bridle roll and the strip passing speed are the same. It is kept at a value and therefore there is no slippage between the surface of the bridle roll and the strip, thus preventing the surface of the strip from being scratched. After the lapse of the certain period, the control mode is returned so that the tension of the strip becomes constant or the load current of the motor that drives the bridle roll becomes constant.
【0015】また本発明に従えば、複数個のブライドル
ロールのいずれか少なくとも1つのロールに、ストリッ
プの走間切断前後の一定期間だけ、スナバロールを接触
させ、このスナバロールとブライドルロールとの間でス
トリップを挟圧している前記一定期間だけ、ブライドル
ロール負荷配分を、それ以外の通常の負荷配分とは変更
し、これによってスナバロールが圧接するブライドルロ
ールよりも通板方向の上流側のブライドルロールにおい
てストリップとの滑りが発生することを防ぎ、これによ
ってストリップに疵が付くことを防ぐことができる。Further, according to the present invention, at least one roll of the plurality of bridle rolls is contacted with the snubber roll for a certain period of time before and after the strip is cut while the strip is stripped between the snubber roll and the bridle roll. The bridle roll load distribution is changed from the normal load distribution other than that for a certain period of time during which the snare roll is clamped, whereby a strip is formed in the bridle roll on the upstream side in the threading direction of the bridle roll in which the snubber roll is in pressure contact. Slippage can be prevented, which can prevent the strip from being scratched.
【0016】また本発明に従えば、スナバロールが圧接
されるブライドルロールは、通板方向の最も下流側に配
置されたブライドルロールであり、その最も下流側のブ
ライドルロールの負荷を、残余のブライドルロールより
も大きく設定し、こうして上流側のブライドルロールと
ストリップとの間で滑りを生じないようにする。According to the present invention, the bridle roll against which the snubber roll is pressed is the bridle roll arranged on the most downstream side in the sheet passing direction, and the load on the most downstream bridle roll is the remaining bridle roll. Larger than this so that no slippage occurs between the upstream bridle roll and the strip.
【0017】[0017]
【実施例】図1に示す冷間圧延設備において、溶接機か
ら圧延機ミル本体2を出た冷延鋼帯7は、ブライドルロ
ール装置3を介してカローゼルリール6の巻取りリール
6aに連続的に巻取られている。巻取りリール6aで巻
付けている張力よりも高い張力をミル本体2の出側で付
与するためにブライドルロール装置3は、モータ11a
〜11dで力をかけている。ブライドルロール装置3
は、4つのブライドルロール3a〜3dを有し、各ブラ
イドルロール3a〜3dは、各モータ11a〜11dに
よって回転駆動される。通板方向の最も下流側のブライ
ドルロール3dよりもさらに下流側には、ピンチロール
4が設けられ、鋼帯7を挟圧する。さらにその下流側に
は走間シャー5が設けられる。ミル本体2とブライドル
ロール3aとの間には、鋼帯7の張力を検出する張力計
9が設けられる。この実施例は、前述の図6に関連して
述べた先行技術の対応する部分に同一の参照符を付して
ある。EXAMPLE In the cold rolling equipment shown in FIG. 1, a cold rolled steel strip 7 exiting from a rolling mill mill main body 2 from a welding machine is continuously connected to a take-up reel 6a of a carousel reel 6 via a bridle roll device 3. Has been rolled up. The bridle roll device 3 is provided with a motor 11a in order to apply a tension higher than the tension wound by the take-up reel 6a on the exit side of the mill body 2.
I'm working hard at ~ 11d. Bridle roll device 3
Has four bridle rolls 3a to 3d, and each bridle roll 3a to 3d is rotationally driven by each motor 11a to 11d. A pinch roll 4 is provided further downstream than the most downstream bridle roll 3d in the sheet passing direction, and clamps the steel strip 7. Further, a running shear 5 is provided on the downstream side. A tensiometer 9 for detecting the tension of the steel strip 7 is provided between the mill body 2 and the bridle roll 3a. This embodiment bears the same reference numbers on corresponding parts of the prior art described in connection with FIG. 6 above.
【0018】この図1において、巻取りリール6aで所
要の直径まで鋼帯を巻取った後、走間シャー5で鋼帯を
切断した瞬間を考えると、ピンチロール4である程度張
力を確保しているものの、切断した瞬間、ブライドルロ
ール3の出側張力が急に低下する。このとき、通常ブラ
イドルロール3a〜3dのモータ電流一定制御や、ミル
本体2の出側に設置された張力計9による張力一定制御
をブライドルロール3a〜3dのモータ11a〜11d
に対して行っている場合、ブライドルロール3a〜3d
の周速度が急変することは避けられない。このブライド
ルロール3a〜3dの周速度と鋼帯の速度のアンマッチ
が発生したとき、ブライドルロール3a〜3dのダル目
の極端な凸部が鋼帯7に疵を付けてしまうことがある。In FIG. 1, considering the moment when the steel strip is wound up to the required diameter by the take-up reel 6a and then cut by the running shear 5, the pinch roll 4 secures some tension. However, at the moment of cutting, the tension on the exit side of the bridle roll 3 suddenly drops. At this time, the motor current constant control of the normal bridle rolls 3a to 3d and the constant tension control of the tension meter 9 installed on the exit side of the mill main body 2 are performed for the motors 11a to 11d of the bridle rolls 3a to 3d.
Bridle rolls 3a-3d
It is unavoidable that the peripheral speed changes rapidly. When the peripheral speeds of the bridle rolls 3a to 3d and the speed of the steel strip are unmatched, the extreme convex portions of the dulls of the bridle rolls 3a to 3d may scratch the steel strip 7.
【0019】この状況をさらに説明する。図1の張力一
定制御を行う場合において、各ブライドルロール3a〜
3dは、各モータ11a〜11dによって回転されてお
り、張力計9による信号のフィードバック制御を制御装
置10によって行っている。制御方法としては、通常の
P・I(比例・積分)制御等を使用する。すなわち張力
計9の出力に応答し、その張力が目標とする値になるよ
うに、各モータ11a〜11dの電流を制御する。This situation will be further described. When the constant tension control of FIG. 1 is performed, each bridle roll 3a-
3d is rotated by each of the motors 11a to 11d, and the controller 10 performs feedback control of the signal by the tensiometer 9. As a control method, ordinary P · I (proportional / integral) control or the like is used. That is, in response to the output of the tensiometer 9, the currents of the motors 11a to 11d are controlled so that the tension becomes a target value.
【0020】この張力一定制御を行っているとき、走間
シャー5で鋼帯を切断したときの状況を示したのが、図
2である。走間切断を行う直前まではミル出側張力が一
定にコントロールされ、ブライドルロール周速もブライ
ドルロール電流も比較的安定している。図2(1)はミ
ル本体2の出側の鋼帯7の張力を示す図であり、図2
(2)はブライドルロール3dの周速を示す図であり、
図2(3)はブライドルロール3dを駆動するモータ1
1dの負荷電流を示す図であり、図2(4)は鋼帯7の
ミル本体2からの供給速度を示す。時刻t1以前では、
通常の圧延作業が行われており、走間シャー5での切断
すべき時刻が近付いたとき、張力が低下され、時刻t2
以降では、その張力が一定に保たれる。FIG. 2 shows a situation in which the steel strip is cut by the running shear 5 while the constant tension control is being performed. The tension at the exit side of the mill is controlled to be constant until just before the cutting during running, and the peripheral speed of the bridle roll and the bridle roll current are relatively stable. FIG. 2 (1) is a diagram showing the tension of the steel strip 7 on the delivery side of the mill main body 2.
(2) is a diagram showing the peripheral speed of the bridle roll 3d,
FIG. 2C shows a motor 1 for driving the bridle roll 3d.
It is a figure which shows the load current of 1d, and FIG. 2 (4) shows the supply speed from the mill main body 2 of the steel strip 7. Before time t1,
Normal rolling work is being performed, and when the time to cut at the running shear 5 approaches, the tension is reduced and time t2 is reached.
After that, the tension is kept constant.
【0021】従来では、時刻t4において走間切断を行
った後、ミル出側張力は、瞬間的に低下し、前記のピン
チロール4で付与する張力のみになる。このときブライ
ドルロール3a〜3dには張力が低下したことにより、
電流を上げる指令が出ている。一方、ロール周速は、モ
ータ11a〜11d自身リール張力によって鋼帯を介し
て回転トルクを助けられていたのが、走間切断によって
無くなる。このため、速度は多少ドロップし、この後、
張力制御によるフィードバックにより速度は上昇する。
この間、ミル出側の鋼帯の速度は不変であってもこのよ
うなことが起こる。すなわち、ブライドルロール3a〜
3dの速度変化で、鋼帯の速度と同調しないため、鋼帯
とブライドルロール間のスリップが発生する。このよう
な先行技術における動作は、図2において実線で示され
ているとおりである。Conventionally, after the running cut is performed at the time t4, the tension on the delivery side of the mill is instantaneously reduced to only the tension applied by the pinch roll 4. At this time, since the bridle rolls 3a to 3d have reduced tension,
There is a command to increase the current. On the other hand, the roll peripheral speed is lost by the running cut, while the rotational torque was assisted through the steel strip by the reel tension of the motors 11a to 11d themselves. Therefore, the speed drops a little, and after this,
The speed is increased by the feedback of the tension control.
During this time, this occurs even if the speed of the steel strip on the mill exit side is unchanged. That is, the bridle roll 3a-
Since the speed change of 3d is not synchronized with the speed of the steel strip, a slip between the steel strip and the bridle roll occurs. The operation in such a prior art is as shown by the solid line in FIG.
【0022】この問題への対策として、本発明に従え
ば、図2の破線で示されるように動作が行われ、このよ
うな動作を行うために、図3で示すフローチャートに示
すような制御回路10を追加する。ステップn1では、
時刻t3〜t6であるシャーカット前後一定期間W1か
どうかの判断を行う。この期間W1とは、走間切断を行
う一定時間前あるいは、鋼帯のカットポイントがシャー
5に到達する一定長さから、リール巻付け完了の一定時
間後あるいは、鋼帯のカットポイントがリールに到達し
て一定長さ巻取り後までの間とする。鋼帯のコイルの溶
接機による溶接位置がその鋼帯7の走行に伴い、走行距
離を検出することによって、走間切断を行う時刻を演算
して求めることができ、これによって前述の期間W1
が、演算して求めることが可能である。さらに、この期
間W1であるという判断がYESの場合、ステップn2
へ、NOの場合、ステップn3へ進む。ステップn3で
は、全てのブライドルロール3a〜3dによって、鋼帯
7の張力が各目標値に一定になるように設定されて負帰
還制御される。ステップn2では、全ブライドルロール
3a〜3dを速度一定制御にコントロールする。As a measure against this problem, according to the present invention, the operation is performed as shown by the broken line in FIG. 2, and in order to perform such operation, the control circuit as shown in the flow chart of FIG. Add 10. In step n1,
It is determined whether or not it is a predetermined period W1 before and after the shear cut that is from time t3 to t6. This period W1 means a certain time before the cutting during running, or a certain length after the cut point of the steel strip reaches the shear 5, a certain time after the reel winding is completed, or the cut point of the steel strip reaches the reel. It is between the arrival and the winding of a certain length. The welding position of the coil of the steel strip by the welding machine along with the traveling of the steel strip 7 can be calculated and obtained by detecting the traveling distance, whereby the time W1 can be obtained.
Can be calculated and obtained. Further, if the determination that the period is W1 is YES, step n2
If NO, go to step n3. In step n3, the tension of the steel strip 7 is set to be constant at each target value and negative feedback control is performed by all the bridle rolls 3a to 3d. In step n2, all bridle rolls 3a to 3d are controlled to a constant speed control.
【0023】こうすることで従来、走間切断後から巻付
け完了までの間発生していたブライドルロール3a〜3
dと鋼帯7の速度同調しないことによるスリップは解消
する。速度一定制御の具体的内容としては、速度一定制
御開始時の各ブライドルロール速度を目標値としてその
まま保持する。すなわち各ブライドルロール3a〜3d
の速度を検出する速度検出器を個別的に設け、時刻t3
〜t6の期間W1では、時刻t3において検出された各
ブライドルロール3a〜3dの速度を目標値としてスト
アし、その目標値が保たれるように、各モータ11a〜
11dを負帰還制御する。By doing so, the bridle rolls 3a to 3 which have conventionally been generated from after the cutting of the running to the completion of the winding.
The slip caused by not synchronizing the speeds of d and the steel strip 7 is eliminated. As a specific content of the constant speed control, each bridle roll speed at the start of the constant speed control is held as a target value as it is. That is, each bridle roll 3a-3d
A speed detector for detecting the speed of
During a period W1 of t6 to t6, the speeds of the bridle rolls 3a to 3d detected at time t3 are stored as target values, and the motors 11a to 11d are stored so that the target values are maintained.
11d is controlled by negative feedback.
【0024】他の実施例として、ミル出側鋼帯速度を別
の手段で検知して、それと同じ値になるようにする。す
なわちミル本体2の出側で鋼帯7の速度を検出する速度
検出器を設け、時刻t3において検出された速度を目標
値とし、その目標値となるように、モータ11a〜11
dの速度を負帰還制御する。As another embodiment, the mill outlet steel strip speed is detected by another means so as to have the same value. That is, a speed detector for detecting the speed of the steel strip 7 is provided on the outlet side of the mill body 2, and the speed detected at time t3 is set as a target value.
The speed of d is negatively feedback controlled.
【0025】この走間切断期間W1が過ぎたら、時刻t
6以降で元の張力フィードバックコントロールに戻し、
時刻t8以降、元々のブライドルロール3a〜3dの機
能であるミル出側張力上昇に供する。After the running-off period W1 has passed, time t
Return to the original tension feedback control after 6
After the time t8, the original bridle rolls 3a to 3d are provided with the mill exit side tension increase, which is the function of the original bridle rolls 3a to 3d.
【0026】本発明の他の実施例では、図1のスナバロ
ール8がさらに設けられる。このロール8は、走間切断
前後の一定期間接触圧下し、ブライドルロール3a〜3
dとともに、走行切断から巻付け完了までの張力をでき
るだけ保持して、所要のミル本体2の出側張力を確保す
る。このような構成のブライドルロール装置3の場合で
も、スナバロール8のあるブライドルロール3dより上
流のブライドルロール3a〜3cでは、従来では、図2
の実線に示すような状況が発生し、スリップを起こすこ
とがある。In another embodiment of the present invention, the snubber roll 8 of FIG. 1 is further provided. This roll 8 is subjected to contact pressure reduction for a certain period before and after cutting during running, and the bridle rolls 3a to 3
Along with d, the tension from the traveling cutting to the completion of winding is maintained as much as possible to secure the required outlet tension of the mill main body 2. Even in the case of the bridle roll device 3 having such a configuration, the bridle rolls 3a to 3c upstream of the bridle roll 3d having the snubber roll 8 have been conventionally configured as shown in FIG.
The situation shown by the solid line in Fig. 2 may occur, causing slippage.
【0027】スナバロール8を使用する走間切断時の対
策として、スナバロール8の圧下で鋼帯7とのスリップ
が起きないブライドルロール3dを回転するモータ11
dに重点的にモータパワーを配分する。このとき、スナ
バロール8の無い他のロール3a,3b,3cは、スリ
ップを起こさない程度に負荷配分を与える。こうするこ
とでシャーカット直前から、巻取りリール巻付け完了ま
での期間W1も、各ブライドルロール3a〜3dを最大
限利用し、元々のブライドルロール機能であるミル出側
の張力アップが行える。As a countermeasure at the time of running cut using the snubber roll 8, a motor 11 for rotating the bridle roll 3d which does not slip with the steel strip 7 under the pressure of the snubber roll 8 is produced.
Motor power is distributed with emphasis on d. At this time, the other rolls 3a, 3b, 3c without the snubber roll 8 give load distribution to the extent that slipping does not occur. By doing so, the bridle rolls 3a to 3d can be used to the maximum during the period W1 from immediately before shear cut to the completion of winding of the take-up reel, and the original bridle roll function, that is, the tension on the delivery side of the mill can be increased.
【0028】このため、図4に示すような動作を制御回
路10によって行う。ステップm1では、シャーカット
前後一定期間W1かどうかの判断を行う。この期間と
は、図3のn1と同じであってさらに、「スナバロール
8の圧下中である」という条件を判断する。さらに、こ
のステップm1の判断がYESの場合、ステップm2
へ、NOの場合ステップm3へ進む。ステップm2で
は、走間切断後のブライドルロール3a〜3dの出側張
力の無い状態を想定し、モータ11dに重点的に負荷配
分し、残りのロール3a〜3cにはスリップを起こさな
い程度に負荷配分を与える。この期間W1が過ぎたら、
元のフィードバックコントロールに戻す。すなわちスナ
バロール8を走間切断の前後に使用する場合、前記と同
様のタイミングで、各ブライドルロール3a〜3dの負
荷を変更し、制御したところ、従来発生していたブライ
ドルロール3a〜3dのスリップによる疵は無くなっ
た。Therefore, the operation as shown in FIG. 4 is performed by the control circuit 10. At step m1, it is judged whether or not it is W1 for a certain period before and after the shear cut. This period is the same as n1 in FIG. 3, and the condition that “the snubber roll 8 is under pressure” is determined. Furthermore, if the determination in step m1 is YES, step m2
If NO, the process proceeds to step m3. In step m2, assuming that the bridle rolls 3a to 3d after running cut have no tension on the exit side, the load is concentrated on the motor 11d, and the remaining rolls 3a to 3c are loaded to such an extent that no slip occurs. Give allocation. After this period W1,
Return to original feedback control. That is, when the snubber roll 8 is used before and after the running cut, the load of each bridle roll 3a to 3d is changed and controlled at the same timing as described above. The flaw is gone.
【0029】負荷配分は、以下のようにミル出側張力一
定制御を行う。モータ11a〜11dの負荷、すなわち
負荷電流を、参照符a,b,c,dでそれぞれ示す。通
常運転中、すなわち走間切断を行わない図2における時
刻t1以前、時刻t2〜t3の期間、時刻t6〜t7の
期間および時刻t8以降では、図5の実線で示されるよ
うに定められる。For load distribution, constant tension on the outlet side of the mill is controlled as follows. The loads of the motors 11a to 11d, that is, the load currents are indicated by reference signs a, b, c, and d, respectively. During normal operation, that is, before the time t1 in FIG. 2 in which the inter-running disconnection is not performed, the period from the time t2 to t3, the period from the time t6 to t7, and the time t8 or later, it is determined as shown by the solid line in FIG.
【0030】 a<b<c<d …(1) これらの負荷a〜dは、ほぼ近似した値である。A <b <c <d (1) These loads a to d are approximately approximate values.
【0031】期間W1では、負荷a〜dは、図5の実線
で示されるように設定され、すなわち d>>a>b>c …(2) 数2において、モータ11a〜11cの負荷a,b,c
はほぼ近似した値であり、通板方向の最も下流側のブラ
イドルロール3dを駆動するモータ11dの負荷dをそ
れらに比べて充分に大きな値に選ぶ。これによってブラ
イドルロール3a〜3dによる鋼帯7の疵を防ぐことが
できる。In the period W1, the loads a to d are set as shown by the solid lines in FIG. 5, that is, d >>a>b> c (2) In the equation 2, the loads a, 11a to 11c of the motors 11a to 11c. b, c
Is an approximate value, and the load d of the motor 11d that drives the bridle roll 3d on the most downstream side in the sheet passing direction is selected to be a sufficiently large value as compared with them. This can prevent the steel strip 7 from being damaged by the bridle rolls 3a to 3d.
【0032】本件発明者の実験において、ミル本体2の
入側に溶接機、出側にブライドルロール3a〜3d、続
いてカローゼルリール6を配した連続式冷間圧延機にお
いて、ブライドルロール3は、800mmφを4本セッ
トで使用している。この設備で、鋼帯のシャーカット位
置が、ミル本体に到達した所で、上述のように速度一定
制御に切替え、リール巻付け後リール3回転後に戻す制
御を行ったところ、従来から発生していた、ブライドル
ロール3のスリップによる疵は無くなった。In an experiment conducted by the present inventor, in a continuous cold rolling mill having a welding machine on the inlet side of the mill body 2, bridle rolls 3a to 3d on the outlet side, and subsequently a carousel reel 6, the bridle roll 3 was , 800mmφ is used in a set of 4. With this equipment, when the shear cut position of the steel strip reached the mill main body, switching to constant speed control as described above, and performing control to return after reeling 3 reels after reel winding, it has occurred conventionally. In addition, the defect due to the slip of the bridle roll 3 disappeared.
【0033】[0033]
【発明の効果】以上のように、ブライドルロール装置を
持つ連続式冷間圧延機に本発明を実施することによっ
て、走間切断時にブライドルロールと鋼帯の間のスリッ
プおよびそれによるストリップの疵が発生しなくなる。As described above, by carrying out the present invention in a continuous cold rolling mill having a bridle roll device, slip between the bridle roll and the steel strip and the resulting flaw in the strip during cutting during running can be prevented. It will not occur.
【0034】また本発明によれば、ブライドルロール表
面粗さも比較的粗いものが採用でき、ブライドルロール
の交換や加工費用も低減できる。Further, according to the present invention, it is possible to employ a bridle roll having a relatively rough surface, and it is possible to reduce the cost of exchanging the bridle roll and processing.
【0035】さらに本発明によれば、スナバロールを、
複数のブライドルロールのうちの少なくとも1つに圧接
した状態で、ストリップの走間切断前後の期間に、それ
以外の期間におけるブライドルロールの負荷配分とは異
なるように変更することによって、さらに各ブライドル
ロールを最大限活用し、鋼帯の品質向上に寄与できる。Further in accordance with the present invention, snavalol is
By changing the load distribution of the bridle rolls during the period before and after the strip is cut so as to be different from the load distribution of the bridle rolls in the other period while being pressed against at least one of the plurality of bridle rolls. Can be utilized to the maximum and contribute to the quality improvement of steel strip.
【0036】スナバロール8は、たとえば複動油圧シリ
ンダ12によって駆動される。このスナバロール8は、
それ以外のブライドルロール3a〜3cに関連して設け
られていてもよい。The snubber roll 8 is driven by, for example, a double-acting hydraulic cylinder 12. This snubber roll 8
It may be provided in association with the other bridle rolls 3a to 3c.
【図1】本発明の一実施例の全体の構成を示すブロック
図である。FIG. 1 is a block diagram showing the overall configuration of an embodiment of the present invention.
【図2】図1に示される実施例の動作を説明するととも
に、先行技術の動作を説明するための図である。FIG. 2 is a diagram for explaining the operation of the embodiment shown in FIG. 1 and for explaining the operation of the prior art.
【図3】本発明の一実施における鋼帯7の走間切断前後
の一定期間W1において速度一定制御で運転を行うとき
の動作を説明するためのフローチャートである。FIG. 3 is a flow chart for explaining an operation when the operation is performed with a constant speed control in a constant period W1 before and after the running cut of the steel strip 7 in one embodiment of the present invention.
【図4】本発明の他の実施例において、鋼帯7の走間切
断前後の一定期間W1においてスナバロール8を駆動
し、しかも残余の期間とは異なるブライドルロールの負
荷配分とするときの動作を説明するためのフローチャー
トである。FIG. 4 shows the operation of driving the snubber rolls 8 during a certain period W1 before and after the running of the steel strip 7 in another embodiment of the present invention, and setting the load distribution of the bridle rolls different from the remaining period. It is a flow chart for explaining.
【図5】図4に示される実施例におけるブライドルロー
ル3a〜3dを駆動するモータ11a〜11dの負荷配
分を示す図である。5 is a diagram showing load distribution of motors 11a to 11d driving bridle rolls 3a to 3d in the embodiment shown in FIG.
【図6】先行技術の全体の構成を示すブロック図であ
る。FIG. 6 is a block diagram showing an overall configuration of a prior art.
1 溶接機 2 ミル本体 3 ブライドルロール装置 3a〜3d ブライドルロール 4 ピンチロール 5 走間シャー 6 リール 7 鋼帯 8 スナバロール 9 張力計 10 制御装置 11a〜11d モータ 1 Welding machine 2 Mill body 3 Bridle roll device 3a-3d Bridle roll 4 Pinch roll 5 Running shear 6 Reel 7 Steel strip 8 Snubber roll 9 Tensiometer 10 Controller 11a-11d Motor
Claims (3)
間シャーを有するブライドルロール装置において、 通常運転中は、圧延機出側の張力一定制御ないし電流一
定制御を行い、ストリップの走間切断前後の一定期間の
み速度一定制御で運転することを特徴とした圧延機のブ
ライドルロール制御装置。1. A bridle roll device having a bridle roll and a running shear on the delivery side of the rolling mill, during normal operation, constant tension control or constant current control on the delivery side of the rolling mill is performed to control the strip before and after strip running. A bridle roll controller for a rolling mill, which is operated by constant speed control only for a certain period.
を有し、そのいずれかのロールに接触するスナバロール
を有し、さらに走間シャーを有するブライドルロール装
置において、 通常の各ブライドルロールの負荷配分に対し、ストリッ
プの走間切断前後のスナバロール圧下中の一定期間のみ
各ブライドルロール負荷配分を変更することを特徴とし
た圧延機のブライドルロール制御装置。2. In a bridle roll device having a plurality of bridle rolls on the delivery side of the rolling mill, a snubber roll in contact with any one of the rolls, and a running shear, a load of each ordinary bridle roll is provided. A bridle roll control device for a rolling mill, characterized in that the load distribution of each bridle roll is changed only for a certain period of time during the reduction of the snubber roll before and after the strip is cut while running.
ルの負荷を、残余のブライドルロールよりも大きく設定
することを特徴とする請求項2に記載の圧延機のブライ
ドルロール制御装置。3. The bridle roll control device for a rolling mill according to claim 2, wherein the load of the most downstream bridle roll in the sheet passing direction is set to be larger than that of the remaining bridle rolls.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5149525A JPH0716629A (en) | 1993-06-21 | 1993-06-21 | Bridle roll controller for rolling mill |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5149525A JPH0716629A (en) | 1993-06-21 | 1993-06-21 | Bridle roll controller for rolling mill |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0716629A true JPH0716629A (en) | 1995-01-20 |
Family
ID=15477046
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5149525A Withdrawn JPH0716629A (en) | 1993-06-21 | 1993-06-21 | Bridle roll controller for rolling mill |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0716629A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000190013A (en) * | 1998-12-24 | 2000-07-11 | Nippon Steel Corp | Tension bridle device |
-
1993
- 1993-06-21 JP JP5149525A patent/JPH0716629A/en not_active Withdrawn
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000190013A (en) * | 1998-12-24 | 2000-07-11 | Nippon Steel Corp | Tension bridle device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3311666B2 (en) | Winding method of metal band | |
| JPH0532372A (en) | Protective film laminator device with tension control mechanism | |
| JP3624619B2 (en) | Rolling method and rolling control device for reversible cold rolling mill | |
| JPH0671320A (en) | Rolling method for strip | |
| JP2003136108A (en) | Hot rolling system, run-out table threading method, and method of manufacturing rolled sheet | |
| JPH0379087B2 (en) | ||
| JP3426452B2 (en) | Tension control method for stopping and restarting operation of cold tandem rolling mill | |
| KR100354209B1 (en) | How to Change the Set Point in Open Continuous Rolling _ | |
| JP3624620B2 (en) | 2-stand cold mill rolling method and rolling control device | |
| JP2005193256A (en) | Steel strip manufacturing method | |
| JPS61249624A (en) | Tension controlling method for payoff reel | |
| JPS60206505A (en) | Continuous cold rolling method | |
| JP3073633B2 (en) | Automatic thickness control method for rolling mill | |
| JPH0775824A (en) | Winding tension controller | |
| JPH02151306A (en) | Method and apparatus for rolling stainless cold rolled steel sheet | |
| CN116618450A (en) | Tension control method, device, electronic equipment and medium of a recoiling unit | |
| JPS63177904A (en) | Continuous hot finish rolling equipment | |
| JP2763490B2 (en) | Method of controlling tension between stands of rolling mill | |
| JP3633544B2 (en) | Rolling method in tandem rolling mill | |
| JP2006224119A (en) | Rolling method with cold tandem rolling mill | |
| JPH05237529A (en) | Control method of finishing mill of hot strip mill | |
| JPH1094827A (en) | Hot rolling winding control method | |
| JPS6188903A (en) | Continuous hot rolling method for steel slabs | |
| JP2000144263A (en) | Method and apparatus for controlling helper roll speed in continuous annealing line | |
| JPH09150201A (en) | Continuous sheet processing facility |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A300 | Withdrawal of application because of no request for examination |