JPH072430A - Doffing system of hand spun silk yarn winder - Google Patents
Doffing system of hand spun silk yarn winderInfo
- Publication number
- JPH072430A JPH072430A JP16971093A JP16971093A JPH072430A JP H072430 A JPH072430 A JP H072430A JP 16971093 A JP16971093 A JP 16971093A JP 16971093 A JP16971093 A JP 16971093A JP H072430 A JPH072430 A JP H072430A
- Authority
- JP
- Japan
- Prior art keywords
- doffing
- winder
- full pipe
- full
- take
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000003028 elevating effect Effects 0.000 abstract description 6
- 230000032258 transport Effects 0.000 description 10
- 238000009987 spinning Methods 0.000 description 9
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
Landscapes
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、多数列設された紡糸巻
取機のボビンホルダから満管を受け取り、空紙管を挿入
するための紡糸巻取機の玉揚システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a doffing system of a take-up winder for receiving a full pipe from a bobbin holder of a plurality of take-up winders and inserting an empty paper tube.
【0002】[0002]
【従来の技術】近年、多数列設された紡糸巻取機のボビ
ンホルダに対する満管の受け取りや紙管の挿入は、満管
受取手段や紙管挿入手段を備えた玉揚装置を用いること
によって自動化されつつある。このような玉揚装置によ
る従来の自動化例を図4及び図5により説明する。2. Description of the Related Art In recent years, the receiving of a full tube and the insertion of a paper tube into a bobbin holder of a plurality of spinning winders are automated by using a doffing device equipped with a full tube receiving means and a paper tube inserting means. Is being done. A conventional automation example using such a doffing device will be described with reference to FIGS.
【0003】図4において、1は紡糸巻取機、2は玉揚
装置、3はペグスタンド、4は紙管供給装置、5は自走
搬送車である。玉揚装置2が玉揚を要する特定の紡糸巻
取機1の前で停止し、満管(実)を受け取ると同時に、
紙管供給装置4から受け取った紙管(空)を紡糸巻取機
1に挿入する。そして、玉揚装置2はペグスタンド4の
前まで走行し、満管(実)をペグスタンド4のペグ軸に
移載する。そして満管が移載されたペグスタンド4は横
滑りして、自走搬送車5の上に移動し、自動倉庫等に運
ばれる。In FIG. 4, 1 is a take-up winder, 2 is a doffing device, 3 is a peg stand, 4 is a paper tube feeding device, and 5 is a self-propelled carrier. At the same time when the doffing device 2 stops in front of the specific take-up winder 1 that requires doffing and receives a full pipe (fruit),
The paper tube (empty) received from the paper tube supply device 4 is inserted into the take-up winder 1. Then, the doffing device 2 travels to the front of the peg stand 4 and transfers the full pipe (actual) to the peg shaft of the peg stand 4. Then, the peg stand 4 on which the full pipe is transferred slides sideways, moves onto the self-propelled carrier 5, and is transported to an automatic warehouse or the like.
【0004】つぎに、このような玉揚装置2の従来の構
造と作動を図5により説明する。紡糸巻取機1の列に沿
い、操作通路を隔てて、玉揚装置2が走行自在に配置さ
れ、紡糸巻取機1の列の右端にペグスタンド3が配置さ
れている。さらに、玉揚装置2の走行路の真上にプラッ
トフォーム6が架設され、このプラットフォーム6の各
紡糸巻取機1に対応する位置に紙管供給装置4が立設さ
れている。玉揚装置2は、紡糸巻取機1の列と平行に設
置されたレール12上を走行する台車13と、この台車
13上を紡糸巻取機1のボビンホルダBHに向かってス
ライド可能なスライド台15と、このスライド台15上
の支柱16と、この支柱16に昇降自在又は固定的に設
けられた紙管支持軸11及び満管支持軸14からなる。Next, the conventional structure and operation of such a doffing device 2 will be described with reference to FIG. A doffing device 2 is movably arranged along the row of the take-up winders 1 with an operation passage therebetween, and a peg stand 3 is arranged at the right end of the row of the take-up winders 1. Further, a platform 6 is installed right above the traveling path of the doffing device 2, and a paper tube feeding device 4 is installed upright on the platform 6 at a position corresponding to each spinning winder 1. The doffing device 2 includes a carriage 13 that travels on a rail 12 installed in parallel with a row of the take-up winders 1, and a slide stand that can slide on the carriage 13 toward a bobbin holder BH of the take-up winder 1. 15, a column 16 on the slide base 15, and a paper tube support shaft 11 and a full tube support shaft 14 that are vertically movable or fixedly provided on the column 16.
【0005】上述した玉揚装置2の作動を以下に説明す
る。まず、満管となった紡糸巻取機1の前まで玉揚装置
2が走行して停止する。そして、満管支持軸14で満管
Pを受け取るために、スライド台15を方向に前進さ
せ、ボビンホルダBH先端と満管支持軸14先端を当接
嵌合させ、紡糸巻取機1側のプッシャで満管Pを満管支
持軸14に受け取る。その間、紙管支持軸11は水平位
置から垂直位置まで旋回すると共に上昇し(動作)、
紙管供給装置4から紙管Bが紙管支持軸11へと挿入さ
れる。そして、紙管支持軸11は水平位置に旋回すると
共に満管支持軸14と同じ高さまで下降し(動作)、
満管支持軸14と平行な位置となる。次に、ボビンホル
ダBH先端と満管支持軸14先端の当接嵌合を解いた
後、台車13は方向に距離Lだけ走行する。この距離
Lは満管支持軸14と紙管支持軸11間の距離Lに相当
する。そして、ボビンホルダBH先端と紙管支持軸11
先端を当接嵌合させ、紙管支持軸11側の図示されない
プッシャによって紙管Bを押し出し挿入する。そして、
スライド台15が方向に後退する。つぎに、玉揚装置
2が紡糸巻取機1の右端にあるペグスタンド3の前まで
走行し、満管支持軸14の満管Pをペグスタンド3のペ
グ軸3aに差し込む。そして満管となった他の紡糸巻取
機1に向かって玉揚装置2が再び走行する。The operation of the doffing device 2 described above will be described below. First, the doffing device 2 travels and stops up to the front of the fully-wound spinning winder 1. Then, in order to receive the full pipe P by the full pipe support shaft 14, the slide base 15 is moved forward in the direction, the tip of the bobbin holder BH and the front end of the full pipe support shaft 14 are abutted and fitted, and the pusher on the side of the take-up winder 1 is pushed. Then, the full pipe P is received by the full pipe support shaft 14. In the meantime, the paper tube support shaft 11 pivots from the horizontal position to the vertical position and rises (moves),
The paper tube B is inserted into the paper tube support shaft 11 from the paper tube supply device 4. Then, the paper tube support shaft 11 pivots to a horizontal position and descends to the same height as the full tube support shaft 14 (operation),
The position is parallel to the full pipe support shaft 14. Next, after releasing the contact fitting between the tip of the bobbin holder BH and the tip of the full pipe support shaft 14, the carriage 13 travels the distance L in the direction. This distance L corresponds to the distance L between the full tube support shaft 14 and the paper tube support shaft 11. Then, the tip of the bobbin holder BH and the paper tube support shaft 11
The tips are brought into contact with each other, and the paper tube B is pushed out and inserted by a pusher (not shown) on the paper tube support shaft 11 side. And
The slide base 15 retracts in the direction. Next, the doffing device 2 travels to the front of the peg stand 3 at the right end of the take-up winder 1, and the full pipe P of the full pipe support shaft 14 is inserted into the peg shaft 3 a of the peg stand 3. Then, the doffing device 2 runs again toward the other full-scale take-up winder 1.
【0006】[0006]
【発明が解決しようとする課題】ところで、上述した玉
揚システムにおいては、特定の紡糸巻取機1から満管P
を受け取ると、紡糸巻取機列の端に設けられたペグスタ
ンド3まで走行して、満管3を移載しないと、次の紡糸
巻取機1の玉揚に移れない。ランダムドッフィングの場
合、次の紡糸巻取機の玉揚まで時間があるのが普通であ
り、図5の如き玉揚システムでも支障がない。しかし順
次ドッフィングの場合は、連続して玉揚が行われるた
め、玉揚装置2が玉揚のたびに紡糸巻取機列の端まで走
行すると、玉揚に間に合わなくなる場合があるという問
題点を有していた。そこで、紡糸巻取機列の反対側で玉
揚装置2の走行経路に沿って、ペグスタンドを走行自在
に配置し、玉揚装置2が玉揚をするたびにペグスタンド
に満管を移載し、玉揚サイクルを短くするシスシムが考
えられる。しかし、紡糸巻取機列に沿って玉揚装置2に
加えてペグスタンドも走行自在に配置すると、紡糸巻取
機列に沿って設けられる走行スペースが広くなりすぎる
という問題点を有することになる。By the way, in the above-mentioned doffing system, the full pipe P from the specific spinning winder 1
When it receives, the travel to the peg stand 3 provided at the end of the take-up winder train is performed and the full pipe 3 is not transferred, until the next take-up of the take-up winder 1 can be performed. In the case of random doffing, it usually takes time to doff the next spinning winder, and the doffing system as shown in FIG. 5 does not cause any problems. However, in the case of sequential doffing, doffing is continuously performed. Therefore, if the doffing device 2 travels to the end of the take-up winder row at each doffing, the doffing may not be in time. Had. Therefore, a peg stand is movably arranged along the traveling path of the doffing device 2 on the opposite side of the take-up winder row, and a full pipe is transferred to the peg stand each time the doffing device 2 doffs. However, it is possible to use systim that shortens the doffing cycle. However, if the peg stand is arranged to run freely in addition to the doffing device 2 along the take-up winder train, the traveling space provided along the take-up winder train becomes too wide. .
【0007】本発明は、従来の技術の有するこのような
問題点に鑑みてなされたものであり、その目的とすると
ころは、順次ドッフィングの場合のように連続した玉揚
に対応して玉揚サイクルを短くでき、紡糸巻取機に沿っ
て玉揚のために設けられるスペースを広げないようにす
ることができる紡糸巻取機の玉揚システムを提供するこ
とにある。The present invention has been made in view of the above problems of the prior art, and an object of the present invention is to perform doffing corresponding to continuous doffing as in the case of sequential doffing. It is an object of the present invention to provide a doffing system for a take-up winder, which can shorten the cycle and does not expand the space provided for the doffing along the take-up winder.
【0008】[0008]
【課題を解決するための手段】上記課題を解決するため
に、本発明における紡糸巻取機の玉揚システムは、満管
を受け取る玉揚装置を紡糸巻取機列に沿って走行自在に
配設すると共に、該玉揚装置から満管の移載を受けるク
リール搬送車を玉揚装置の走行経路に沿った天井側に走
行自在に配設し、該クリール搬送車への満管の移載手段
を前記玉揚装置に設けたものである。In order to solve the above problems, in a doffing system of a take-up winder according to the present invention, a doffing device that receives a full pipe is arranged so that it can travel along a row of the take-up winders. A creel carrier that receives the transfer of the full pipe from the doffing device is movably arranged on the ceiling side along the travel route of the doffing device, and the transfer of the full pipe to the creel carrier is performed. Means are provided in the doffing device.
【0009】[0009]
【作用】玉揚装置が満管を受け取ると、玉揚装置の満管
移載手段により満管を天井側のクリール搬送車に移載
し、クリール搬送車が紡糸巻取機列の端まで満管を搬送
する。そしてクリール搬送車が満管を搬送している間
に、玉揚装置は次の紡糸巻取機に対して玉揚を行う。ク
リール搬送車と玉揚装置の走行スペースは上下に分かれ
ており、紡糸巻取機に沿った玉揚のための地上側スペー
スは変わらない。[Operation] When the doffing device receives a full pipe, the full pipe transfer means of the doffing device transfers the full pipe to the creel conveyor vehicle on the ceiling side, and the creel conveyor vehicle reaches the end of the take-up winder train. Transport the tube. Then, the doffing device performs doffing for the next spinning winder while the creel transporting vehicle transports a full pipe. The running space of the creel carrier and the doffing device is divided into upper and lower parts, and the ground side space for doffing along the take-up winder does not change.
【0010】[0010]
【実施例】以下、本発明の実施例について図面を参照し
つつ説明する。図1は本発明の紡糸巻取機の玉揚システ
ムの機器配置図である。Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a device layout view of a doffing system for a take-up winder according to the present invention.
【0011】図1において、21は紡糸巻取機、22は
玉揚装置、23はクリール搬送車、24は移載装置、2
5はコンベアである。玉揚装置22は紡糸巻取機列に沿
って設けられた地上のレール26上を走行自在に配設さ
れている。クリール搬送車は紡糸巻取機列に沿って設け
られた天井のレール27に走行自在に配設さている。玉
揚装置22はボビンホルダBHから満管Pを受け取り空
紙管Bを挿入するという基本的機能の他に、受け取った
満管Pをクリール搬送車23に移載する機能と、空紙管
Bを貯溜し供給する機能を有している。In FIG. 1, 21 is a take-up winder, 22 is a doffing device, 23 is a creel carrier, 24 is a transfer device, and 2 is a transfer device.
5 is a conveyor. The doffing device 22 is arranged so that it can travel freely on a rail 26 on the ground provided along the line of the take-up winder. The creel carrier is movably arranged on a rail 27 on the ceiling provided along the line of the take-up winder. The doffing device 22 has the basic function of receiving the full pipe P from the bobbin holder BH and inserting the empty paper pipe B, the function of transferring the received full pipe P to the creel carrier 23, and the empty paper pipe B. It has the function of storing and supplying.
【0012】玉揚装置22のこれらの機能を図2及び図
3により説明する。まず満管受取手段と満管移載手段と
を説明する。図3において、満管支持軸31が突設され
た第1スライド体32が第2スライド体33に対して紙
面厚み方向にスライド自在に設けられている。第2スラ
イド体33は旋回台34に対して紙面厚み方向にスライ
ド自在であり、ラックとピニオンの組合せによる倍速駆
動装置35で満管支持軸31は2倍ストロークでスライ
ドできる。なお第2スライド体33等は旋回台34の左
右に2組設けられており、紡糸巻取機の満管Pを2分割
して受け取れるようになっている。These functions of the doffing device 22 will be described with reference to FIGS. First, the full pipe receiving means and the full pipe transfer means will be described. In FIG. 3, a first slide body 32 on which a full pipe support shaft 31 is provided is provided slidably with respect to the second slide body 33 in the thickness direction of the paper surface. The second slide body 33 is slidable in the thickness direction of the drawing with respect to the swivel base 34, and the full pipe support shaft 31 can be slid with a double stroke by the double speed drive device 35 that is a combination of a rack and a pinion. Two sets of the second slide bodies 33 and the like are provided on the right and left sides of the swivel base 34 so that the full pipe P of the take-up winder can be divided into two and received.
【0013】旋回台34は垂直軸36で昇降枠37に回
転自在に支持されている。この昇降枠37はサイドフレ
ーム38に沿って昇降自在である。図1のように満管支
持軸31がボビンホルダBHに対向する下方位置で正面
向きであるときには、紡糸巻取機1から押し出される満
管Pを受け取る。図2のように満管支持軸31がクリー
ル搬送車23のペグ軸23aと対向する上方位置で背面
向きである時には、満管Pをクリール搬送車23に移載
する。なお、39は満管Pを移載するためのプッシャで
ある。The swivel base 34 is rotatably supported by an elevating frame 37 by a vertical shaft 36. The elevating frame 37 can move up and down along the side frame 38. When the full pipe support shaft 31 faces the bobbin holder BH and faces forward as shown in FIG. 1, the full pipe P pushed out from the spin winder 1 is received. As shown in FIG. 2, when the full pipe support shaft 31 faces rearward at an upper position facing the peg shaft 23 a of the creel transport vehicle 23, the full pipe P is transferred to the creel transport vehicle 23. In addition, 39 is a pusher for transferring the full pipe P.
【0014】つぎに、空紙管Bを貯溜し供給し挿入する
機能を図3により説明する。サイドフレーム38の横に
は空紙管Bを2列で上下に積み上げる紙管ボックス41
が設けられている。この紙管ボックス41の各列には切
り出し装置42が設けられており、P1,P2,P5,
P6ポジションのいずれかで紙管を順番に投下できるよ
うになっている。またP1〜P6ポジションの下側にス
ライドレール43が渡されており、第1スライド台44
が所望のP1〜P6ポジションに位置できるようにスラ
イド自在に乗っている。Next, the function of storing, supplying and inserting the empty paper tube B will be described with reference to FIG. A paper tube box 41 for stacking empty paper tubes B vertically in two rows beside the side frame 38.
Is provided. A cutting device 42 is provided in each row of the paper tube box 41, and P1, P2, P5, and
The paper tubes can be sequentially dropped at any of the P6 positions. A slide rail 43 is provided below the P1 to P6 positions, and a first slide base 44 is provided.
Is slidably mounted so that it can be positioned at the desired P1 to P6 positions.
【0015】この第1スライド台44には紙面厚み方向
にスライド自在な第2スライド体45が乗り、第2スラ
イド体45には紙面厚み方向にスライド自在な第3スラ
イド体46が乗っている。この第3スライド体46には
プッシャ48が内設された空紙管支持枠47が取り付け
られている。そしてラックとピニオンの組合せによる倍
速駆動装置49により、空紙管支持枠47は紙面厚み方
向に2倍ストロークでスライドできる。図2に示される
ように、紙管支持枠47がボビンホルダBHと対向する
位置までスライドすると、プッシャ48で空紙管をボビ
ンホルダBHに挿入できる。A second slide body 45 slidable in the thickness direction of the paper is mounted on the first slide base 44, and a third slide body 46 slidable in the thickness direction of the paper is mounted on the second slide body 45. An empty paper tube support frame 47 having a pusher 48 therein is attached to the third slide body 46. Then, the empty paper tube support frame 47 can be slid in the thickness direction of the paper with a double stroke by the double speed drive device 49 by the combination of the rack and the pinion. As shown in FIG. 2, when the paper tube support frame 47 slides to a position facing the bobbin holder BH, the pusher 48 can insert an empty paper tube into the bobbin holder BH.
【0016】さらに、図1によりクリール搬送車23を
説明する。クリール搬送車23はボビンホルダBH一本
分の満管に相当する4本のペグ軸23aが横向きに突設
されたものであり、停止した玉揚装置22の所定の満管
支持軸31に所定のペグ軸23aを対向させるように走
行自在である。そして図2のように、背面向きとなった
満管支持軸31から満管Pを一個ずつペグ軸23aに移
載される。Further, the creel carrier 23 will be described with reference to FIG. The creel carrier 23 has four peg shafts 23a, which correspond to a full tube for one bobbin holder BH, projecting laterally, and a predetermined full tube support shaft 31 of the stopped doffing device 22 has a predetermined full tube support shaft 31. It is free to travel so that the peg shafts 23a face each other. Then, as shown in FIG. 2, the full pipes P are transferred one by one from the full pipe support shaft 31 facing the rear surface to the peg shaft 23a.
【0017】満管Pを満載したクリール搬送車23は移
載装置24に対面するホームポジションに走行する。移
載装置24はチャック51を横向き又は下向きに揺動自
在に支持する横枠52をクリール搬送車23に対向する
前進位置又はコンベア25のトレイ27の真上となる後
退位置との間でスライド自在に昇降枠53に支持したも
のである。横向きのチャック51は一斉に4個のクリー
ル搬送車23から満管Pを受け取り、次に4個の満管P
を同時にトレイ27に移載することができる。そしてト
レイ27はコンベア25によって図外のストッカーに搬
送される。The creel carrier 23, which is fully loaded with the full pipe P, travels to the home position facing the transfer device 24. The transfer device 24 is slidable between a horizontal frame 52, which supports the chuck 51 so as to swing sideways or downward, between an advancing position facing the creel transport vehicle 23 or a retracted position directly above the tray 27 of the conveyor 25. It is supported by the elevating frame 53. The sideways chucks 51 receive the full pipes P from the four creel transport vehicles 23 all at once, and then the four full pipes P.
Can be transferred to the tray 27 at the same time. Then, the tray 27 is conveyed to the stocker (not shown) by the conveyor 25.
【0018】上述した玉揚システムによる玉揚動作を図
1及び図2により説明する。図1において、紡糸巻取機
1は左から右へと順次ドッフィングされている。玉揚装
置22は先ず右側の満管支持軸31をボビンホルダBH
に対向させ、2個の満管Pを受け取る。そして玉揚装置
22は左側の満管支持軸31がボビンホルダBHに対向
するように、距離Lだけ走行し、更に2個の満管Pを受
け取る。そして昇降枠37が上昇しながら、旋回台33
が180度旋回して図2の状態となる。そして満管Pの
一個をクリール搬送車23のペグ軸23aに移載する。
クリール搬送車23は紙面厚み方向に走行して次のペグ
軸23aを満管支持軸31に対向させ、順次満管Pの移
載を受ける。このようにしてクリール搬送車23は4個
の満管Pの移載を受けた後、図1の移載装置24に対面
する位置まで走行し、移載装置24が満管Pをトレイ2
7まで移載する。The doffing operation by the above-mentioned doffing system will be described with reference to FIGS. In FIG. 1, the spin winder 1 is sequentially doffed from left to right. First, the doffing device 22 sets the full pipe support shaft 31 on the right side to the bobbin holder BH.
And receive two full pipes P. The doffing device 22 travels a distance L so that the left full pipe support shaft 31 faces the bobbin holder BH, and further receives two full pipes P. Then, as the elevating frame 37 rises, the swivel base 33
Turns 180 degrees and becomes the state of FIG. Then, one full pipe P is transferred onto the peg shaft 23 a of the creel carrier vehicle 23.
The creel transporting vehicle 23 travels in the thickness direction of the paper, the next peg shaft 23a faces the full pipe support shaft 31, and sequentially receives the full pipe P. In this way, the creel transport vehicle 23, after receiving the transfer of the four full pipes P, travels to a position facing the transfer device 24 of FIG.
Reprint up to 7.
【0019】図2のように満管支持軸31が上昇すると
同時に、2個の空紙管Bを支持する空紙管支持枠47が
ボビンホルダBHに対向する位置までスライド移動し、
プッシャ48で空紙管Bの2個を挿入する。そして空紙
管支持枠47は紙管ボックス41から更に2個の紙管B
の供給を受け、再びボビンホルダBHに対向する位置ま
でスライド移動する。この紙管挿入動作は満管Pをクリ
ール搬送車23に移載する間に行われる。したがって、
玉揚装置22のサイクルタイムは満管Pを受け取ってク
リール搬送車23に移載するまでの時間で決まり、満管
Pの搬送を行っていた場合に比較すると相当短縮するこ
とができる。また玉揚装置22自体が空紙管Bを貯溜
し、供給及び挿入まで一連の動作で行うため、紙管供給
装置を別途紡糸巻取機1に沿って設ける必要もなくな
り、空紙管挿入のサイクルタイムも短縮可能である。At the same time as the full tube support shaft 31 moves up as shown in FIG. 2, the empty paper tube support frame 47 supporting the two empty paper tubes B slides to a position facing the bobbin holder BH,
The pusher 48 inserts two empty paper tubes B. Further, the empty paper tube support frame 47 is provided with two paper tubes B from the paper tube box 41.
Is supplied to the bobbin holder BH, and again slides. This paper tube inserting operation is performed while the full tube P is transferred onto the creel transport vehicle 23. Therefore,
The cycle time of the doffing device 22 is determined by the time until the full pipe P is received and transferred to the creel transport vehicle 23, and can be considerably shortened as compared with the case where the full pipe P is transported. Further, since the doffing device 22 itself stores the empty paper tube B and performs the supply and the insertion in a series of operations, it is not necessary to separately provide the paper tube feeding device along the take-up winder 1, and the empty paper tube insertion The cycle time can also be shortened.
【0020】なお、ボビンホルダBHの4個の満管又は
空紙管を2個ずつ2回に分けて受け取り又は挿入するの
は、玉揚装置22の機械幅を狭くするためである。玉揚
装置22の機械幅を広くするだけのスペース的余裕があ
れば、4個の満管又は空紙管を一度に受け取り又は挿入
できる玉揚装置とすることができる。この場合でも、4
個に対応した機械幅を有する玉揚装置が走行するスペー
スを紡糸巻取機列に沿って設けるだけでよく、玉揚装置
の走行の為に設けられ地上側スペースとは別の天井側に
クリール搬送車を設けるので、紡糸巻取機に沿った玉揚
のための地上側スペースはクリール搬送車によって広げ
る必要がない。Incidentally, the reason why the four full tubes or empty paper tubes of the bobbin holder BH are received or inserted in two portions in two steps is to narrow the machine width of the doffing device 22. If the doffing device 22 has enough space to widen the machine width, a doffing device that can receive or insert four full pipes or empty paper pipes at one time can be used. Even in this case, 4
It is only necessary to provide a space in which the doffing device having a machine width corresponding to each piece runs along the line of the take-up winder, and a creel is provided for the running of the doffing device on the ceiling side different from the space on the ground side. Since the carrier vehicle is provided, the space on the ground side for doffing along the take-up winder does not need to be expanded by the creel carrier vehicle.
【0021】[0021]
【発明の効果】本発明の紡糸巻取機の玉揚システムは上
述のように、満管を搬送するクリール搬送車を玉揚装置
と分けて天井側に沿って走行自在に配設しているので、
従来のように満管搬送を玉揚装置が行っていた場合と比
べると、満管搬送のために次の玉揚を待つ必要がなくな
り、サイクルタイムが短縮され、紡糸巻取機の順次ドッ
フィングのように短い時間で順番に玉揚する場合に対応
できる。また、天井側にクリール搬送車が走行自在に設
けられているので、紡糸巻取機に沿って設けられる玉揚
スペースは玉揚装置で決まり、地上側のスペースを広げ
る必要がない。As described above, in the doffing system for the take-up winder of the present invention, the creel carrier for transporting the full pipe is separately arranged from the doffing device so as to be movable along the ceiling side. So
Compared to the conventional case where a doffing device carries out full pipe feeding, it is not necessary to wait for the next doffing for full pipe feeding, the cycle time is shortened, and the sequential doffing of the spinning winder is reduced. It is possible to deal with doffing in a short time. Further, since the creel carrier is movably provided on the ceiling side, the doffing device provided along the spinning winder is determined by the doffing device, and it is not necessary to expand the space on the ground side.
【図1】本発明の紡糸巻取機の玉揚システムの機器配置
図である。FIG. 1 is a device layout view of a doffing system for a take-up winder according to the present invention.
【図2】玉揚装置及びクリール搬送車の側面図である。FIG. 2 is a side view of a doffing device and a creel carrier.
【図3】玉揚装置要部の背面図である。FIG. 3 is a rear view of the main part of the doffing device.
【図4】従来の紡糸巻取機の玉揚システムを現す機器配
置図である。FIG. 4 is an equipment layout diagram showing a doffing system of a conventional take-up winder.
【図5】従来の玉揚装置を示す斜視図である。FIG. 5 is a perspective view showing a conventional doffing device.
BH ボビンホルダ B 紙管 P 満管 21 紡糸巻取機 22 玉揚装置 23 クリール搬送車 27 天井のレール 34 旋回台(満管移載手段) 37 昇降枠(満管移載手段) BH Bobbin holder B Paper tube P Full tube 21 Spinning winder 22 Doffing device 23 Creel transport vehicle 27 Ceiling rail 34 Swiveling base (full pipe transfer means) 37 Elevating frame (full pipe transfer means)
Claims (1)
に沿って走行自在に配設すると共に、該玉揚装置から満
管の移載を受けるクリール搬送車を玉揚装置の走行経路
に沿った天井側に走行自在に配設し、該クリール搬送車
への満管の移載手段を前記玉揚装置に設けた紡糸巻取機
の玉揚システム。1. A doffing device for receiving a full pipe is arranged movably along a line of a take-up winder, and a creel carrier for receiving a full pipe from the doffing device is run by the doffing device. A doffing system for a take-up winder, which is movably arranged on a ceiling side along a route and in which the doffing device is provided with means for transferring a full pipe to the creel carrier.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16971093A JPH072430A (en) | 1993-06-15 | 1993-06-15 | Doffing system of hand spun silk yarn winder |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16971093A JPH072430A (en) | 1993-06-15 | 1993-06-15 | Doffing system of hand spun silk yarn winder |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH072430A true JPH072430A (en) | 1995-01-06 |
Family
ID=15891437
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16971093A Pending JPH072430A (en) | 1993-06-15 | 1993-06-15 | Doffing system of hand spun silk yarn winder |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH072430A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6685999B2 (en) | 1998-12-28 | 2004-02-03 | Canon Kabushiki Kaisha | Recording medium and method of manufacturing the same |
-
1993
- 1993-06-15 JP JP16971093A patent/JPH072430A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6685999B2 (en) | 1998-12-28 | 2004-02-03 | Canon Kabushiki Kaisha | Recording medium and method of manufacturing the same |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2503348B2 (en) | Spinning device | |
| US5350128A (en) | Apparatus for loading winding tubes | |
| JPS59143874A (en) | Bobbin transporter | |
| JP2002332104A (en) | Device for supplying packaging material to packaging machine | |
| CN104039673A (en) | Filament installation | |
| US5316126A (en) | System for conveying packages | |
| JPH05195348A (en) | Can transferring car with can exchange device | |
| JPS6117743B2 (en) | ||
| JPH06305640A (en) | Device to take out figure wound bobbin from machine to manufacture figure wound bobbin and to supply freshly bobbin to the machine | |
| JPH05201534A (en) | Conveying device | |
| JP3094353B2 (en) | Doffing device for spinning winder | |
| JPS6262933A (en) | Roving transportation system | |
| US4561243A (en) | Spinning or twisting machine having devices for the simultaneous automatic removal of all cops | |
| JPH04121365A (en) | Doffing system in spinning rewinder | |
| JPH0543137A (en) | Paper pipe supply device | |
| JPS60119233A (en) | Doffing apparatus of spinning frame | |
| JPH06255887A (en) | Doffing system for spinning winder | |
| JPH04214428A (en) | Device for supplying and discharging bobbin | |
| JPS6342926A (en) | Apparatus for carrying full of empty bobbin | |
| JP2894295B2 (en) | Package transfer device | |
| JPS6119176Y2 (en) | ||
| JPH06108350A (en) | System for feeding yarn to creel | |
| JPH0713330B2 (en) | Bobbin supply and discharge device for spinning machine | |
| JPH05246623A (en) | Overhead carrying vehicle | |
| JPS586667B2 (en) | Bobbin transport method and device |