Prior art keywords
formwork
foamed plastic
slab
panels
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6-106197A
Other languages
Japanese (ja)
Other versions
JPH07293003A (en
JP3014918B2 (en
Filing date
Publication date
Application filed filed Critical
Priority to JP6106197A priority Critical patent/JP3014918B2/en
Priority claimed from JP6106197A external-priority patent/JP3014918B2/en
Publication of JPH07293003A publication Critical patent/JPH07293003A/en
Publication of JPH07293003A5 publication Critical patent/JPH07293003A5/ja
Application granted granted Critical
Publication of JP3014918B2 publication Critical patent/JP3014918B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【手続補正書】[Procedural Amendment Document]

【提出日】平成9年10月27日[Date of submission] October 27, 1997

【手続補正2】[Procedural Amendment 2]

【補正対象書類名】明細書[Document to be amended] Statement

【補正対象項目名】0008[Item name to be corrected] 0008

【補正方法】変更[Correction Method] Change

【補正内容】[Correction Details]

【0008】すなわち、前記した課題を解決するための
本発明のスラブ型枠の施工方法は、以下のとおりであ
る。 1. 鉄筋コンクリートスラブを構築するための型枠の
建込みにおいて、複数枚の発泡プラスチック板を作業床
に垂直に立てた状態で支保工とし、その支保工の上に型
枠を設置することを特徴とするスラブ型枠の施工方法。 2. 複数枚の発泡プラスチック板を井桁状に相互連結
して配置し、支保工とする上記1記載のスラブ型枠の施
工方法。 3. 複数枚の発泡プラスチック板の格子状面を面一と
する上記2記載のスラブ型枠の施工方法。 4. 鉄筋コンクリートスラブを構築するための型枠の
建込みにおいて、発泡プラスチック板の複数枚のパネル
(1)を、パネル(1)の幅方向を作業床(4)に垂直
に立てた状態で、間隔をおいて配置するとともに、パネ
ル(1)どうしの間に、発泡プラスチック板のスペーサ
ー(2)を配置し、パネル(1)とスペーサー(2)と
を連結、固定して、型枠(3)を支える支保工とし、そ
の支保工の上に型枠を設置することを特徴とするスラブ
型枠の施工方法。5. 発泡プラスチック板が押し出し発泡ポリスチレン
板である上記1〜4のいずれかに記載のスラブ型枠の施
工方法。 6. 地下階に向かって順次コンクリートスラブを構築
する逆打ち工法に適用される上記1〜5のいずれかに記
載のスラブ型枠の施工方法。
[0008] In other words, the construction method of the slab formwork of the present invention for solving the above-mentioned problems is as follows: 1. In the construction of formwork for constructing a reinforced concrete slab, multiple foamed plastic sheets are used as a work floor.
A method for constructing slab formwork, characterized by using a support structure erected vertically and installing formwork on top of that support structure. 2. Interconnecting multiple foamed plastic sheets in a grid pattern .
The slab formwork described in item 1 above is positioned and used as a support structure.
Construction method. 3. The grid-like surfaces of multiple foamed plastic sheets are made flush.
The method for constructing slab formwork as described in item 2 above. 4. A method for constructing slab formwork for building a reinforced concrete slab, characterized in that, in the construction of formwork for building a reinforced concrete slab, a plurality of foamed plastic panels (1) are placed at intervals with the width direction of the panels (1) perpendicular to the work floor (4), and foamed plastic spacers (2) are placed between the panels (1), and the panels (1) and spacers (2) are connected and fixed to form a support structure for the formwork (3), and the formwork is installed on top of the support structure. 5. The foamed plastic panels are extruded polystyrene foam.
The construction of the slab formwork described in any of the above 1 to 4, which is a plate.
Construction method. 6. Construct concrete slabs sequentially towards the basement level.
The method described in any of the above 1 to 5 applies to the reverse construction method.
Construction method for the slab formwork shown.

Claims (6)

【手続補正書】 【提出日】平成9年10月27日 【手続補正1】 【補正対象書類名】明細書 【補正対象項目名】特許請求の範囲 【補正方法】変更 【補正内容】 【特許請求の範囲】[Procedural Amendment] [Date of Submission] October 27, 1997 [Procedural Amendment 1] [Document to be Amended] Specification [Item to be Amended] Claims [Method of Amendment] Change [Content of Amendment] [Claims] 【請求項1】 鉄筋コンクリートスラブを構築するため
の型枠の建込みにおいて、複数枚の発泡プラスチック板
を作業床に垂直に立てた状態で支保工とし、その支保工
の上に型枠を設置することを特徴とするスラブ型枠の施
工方法。
[Claim 1] A method for constructing slab formwork for building a reinforced concrete slab, characterized in that a plurality of foamed plastic sheets are erected vertically on a work platform to serve as shoring, and the formwork is installed on top of the shoring.
【請求項2】 複数枚の発泡プラスチック板を井桁状に
相互連結して配置し、支保工とする請求項1記載のスラ
ブ型枠の施工方法。
[Claim 2] Multiple foamed plastic sheets arranged in a grid pattern
The sliding supports according to claim 1, which are arranged in interconnected manner to form a support structure.
Construction method for formwork.
【請求項3】 複数枚の発泡プラスチック板の格子状面[Claim 3] A grid-like surface of multiple foamed plastic sheets
を面一とする請求項2記載のスラブ型枠の施工方法。A method for constructing a slab formwork according to claim 2, wherein the formwork is flush with the surface.
【請求項4】 鉄筋コンクリートスラブを構築するため
の型枠の建込みにおいて、発泡プラスチック板の複数枚
のパネル(1)を、パネル(1)の幅方向を作業床
(4)に垂直に立てた状態で、間隔をおいて配置すると
ともに、パネル(1)どうしの間に、発泡プラスチック
板のスペーサー(2)を配置し、パネル(1)とスペー
サー(2)とを連結、固定して、型枠(3)を支える支
保工とし、その支保工の上に型枠を設置することを特徴
とするスラブ型枠の施工方法。
[Claim 4] A method for constructing slab formwork, characterized in that, in the construction of formwork for constructing a reinforced concrete slab, a plurality of foamed plastic panels (1) are arranged at intervals with the width direction of the panels (1) perpendicular to the work floor (4), spacers (2) of foamed plastic are placed between the panels (1), the panels (1) and spacers (2) are connected and fixed to form a support structure for the formwork (3), and the formwork is installed on top of the support structure.
【請求項5】 発泡プラスチック板が押し出し発泡ポリ[Claim 5] Foamed plastic sheet is extruded foamed poly
スチレン板である請求項1乃至4のいずれかに記載のスThe styrene board according to any one of claims 1 to 4
ラブ型枠の施工方法。Construction method for formwork.
【請求項6】 地下階に向かって順次コンクリートスラ[Claim 6] Concrete slabs sequentially towards the basement floor
ブを構築する逆打ち工法に適用される請求項1乃至5のClaims 1 to 5 applicable to the top-down construction method for building a building
いずれかに記載のスラブ型枠の施工方法。The construction method for slab formwork as described in one of the following.
JP6106197A 1994-04-22 1994-04-22 Construction method of slab formwork Expired - Lifetime JP3014918B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6106197A JP3014918B2 (en) 1994-04-22 1994-04-22 Construction method of slab formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6106197A JP3014918B2 (en) 1994-04-22 1994-04-22 Construction method of slab formwork

Publications (3)

Publication Number Publication Date
JPH07293003A JPH07293003A (en) 1995-11-07
JPH07293003A5 true JPH07293003A5 (en) 1999-04-20
JP3014918B2 JP3014918B2 (en) 2000-02-28

Family

ID=14427456

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6106197A Expired - Lifetime JP3014918B2 (en) 1994-04-22 1994-04-22 Construction method of slab formwork

Country Status (1)

Country Link
JP (1) JP3014918B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6204842B2 (en) * 2014-01-23 2017-09-27 鹿島建設株式会社 Reinforcement slab construction method
JP6263393B2 (en) * 2014-01-23 2018-01-17 鹿島建設株式会社 Reinforcement slab construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2769936B2 (en) * 1991-09-20 1998-06-25 株式会社フジタ Construction method of beams and slabs in underground skeleton construction

Similar Documents

Publication Publication Date Title
US5930965A (en) Insulated deck structure
US5758463A (en) Composite modular building panel
CN1109170C (en) Improved formwork for walls of buildings
ES471108A1 (en) Lightweight building module
CN103797197A (en) Building structure with precast monolithic walls and floors
WO2021178213A1 (en) Composite structure including a structural panel and a metal support
DK1214483T3 (en) Hollow core plate to form a floor field in which ducts can be incorporated, and method of forming a floor field using such hollow-core boards
CN1553021A (en) Assembled floor cover
JP2006214212A (en) Floor slab construction method and formwork panel
US4660349A (en) Method of erecting a building using preconstructed modular units
KR200278301Y1 (en) Floor structure of residential building using steel grid
CN105926820B (en) Construction method for precast beam steel support plate resistance mesh combined floor
CN117090350A (en) Integrated construction method of roof insulation and slope finding
JP3813717B2 (en) Precast concrete boards, concrete slabs and structures
JP3060292B2 (en) Cross-beam block and construction method of block building using this cross-beam block
WO2007039887A3 (en) A method of constructing a roof or floor slab
JP3014918B2 (en) Construction method of slab formwork
CN223423610U (en) A kind of external formwork composite board for non-dismantling concrete
CN223907745U (en) A ceiling reinforcement structure
CN223410351U (en) A multi-rib sandwich floor without dismantling formwork
CN219864362U (en) 5G base station base convenient to install
CN216740310U (en) Laminated plate
CN219509383U (en) Autoclaved aerated concrete slat fixing piece and assembled fence based on fixing piece
CN214302542U (en) Wall panel connected with wall
JP3751726B2 (en) Precast concrete boards, concrete slabs and structures