JPH073817A - Joint device between steel pipe pile and footing beam - Google Patents
Joint device between steel pipe pile and footing beamInfo
- Publication number
- JPH073817A JPH073817A JP14326693A JP14326693A JPH073817A JP H073817 A JPH073817 A JP H073817A JP 14326693 A JP14326693 A JP 14326693A JP 14326693 A JP14326693 A JP 14326693A JP H073817 A JPH073817 A JP H073817A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pile
- pipe pile
- bundle
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 51
- 239000010959 steel Substances 0.000 title claims abstract description 51
- 239000011440 grout Substances 0.000 claims abstract description 27
- 239000000463 material Substances 0.000 claims description 32
- 239000002184 metal Substances 0.000 claims description 22
- 239000004570 mortar (masonry) Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は鋼管杭に対して位置決
めした状態で基礎梁を接合する、鋼管杭と基礎梁の接合
装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joining device for a steel pipe pile and a foundation beam, which joins the foundation beam in a state of being positioned with respect to the steel pipe pile.
【0002】[0002]
【従来技術及び発明が解決しようとする課題】独立基礎
を杭に支持させる杭基礎において、設置済みの鋼管杭に
対して基礎梁を接合する場合、従来は図10に示すように
杭頭回りに鉄筋コンクリート造の独立基礎を構築し、そ
の天端に基礎梁を載せ、下端をアンカーボルトに接続す
ることによって鋼管杭に接合している。2. Description of the Related Art In a pile foundation in which an independent foundation is supported by a pile, when a foundation beam is joined to an installed steel pipe pile, conventionally, as shown in FIG. An independent reinforced concrete foundation is constructed, a foundation beam is placed on the top end of the foundation, and the lower end is connected to an anchor bolt to join the steel pipe pile.
【0003】この、基礎梁をコンクリート造の独立基礎
上に載せる方法では杭芯に対して束の位置をずらすこと
により鋼管杭の平面上の施工誤差を吸収することはでき
るが、基礎梁が独立基礎の構築後にその上に載せられる
ため基礎梁のレベルを調整することが難しく、また独立
基礎のコンクリートが硬化するまでは作業を進めること
ができない。In this method of mounting the foundation beam on the concrete independent foundation, it is possible to absorb the construction error on the plane of the steel pipe pile by shifting the position of the bundle with respect to the pile core, but the foundation beam is independent. It is difficult to adjust the level of the foundation beam because it is placed on the foundation after it is built, and the work cannot proceed until the concrete of the independent foundation is hardened.
【0004】この発明は従来の鋼管杭と基礎梁の接合方
法に着目してなされたもので、基礎梁のレベル調整が行
え、作業の中断を要しない接合装置を提案しようとする
ものである。The present invention was made by paying attention to the conventional method for joining a steel pipe pile and a foundation beam, and it is an object of the present invention to propose a joining apparatus capable of adjusting the level of the foundation beam and requiring no interruption of work.
【0005】[0005]
【課題を解決するための手段】本発明では独立基礎を構
成し、下端にベースプレートが一体化した束材に基礎梁
を接続すると同時に、鋼管杭の頭部に杭頭金物を接続
し、杭頭金物にベースプレートを支持するレベル調整ボ
ルトを螺合することにより基礎梁のレベル調整を行い、
また基礎梁の接合が終了するまでの間の基礎梁の荷重を
レベル調整ボルトに負担させることにより作業の中断を
回避する。According to the present invention, an independent foundation is constructed, and a foundation beam is connected to a bundle material in which a base plate is integrated at the lower end thereof, and at the same time, a pile down metal member is connected to the head of a steel pipe pile to form a pile down metal. Adjust the level of the foundation beam by screwing the level adjustment bolt that supports the base plate to the object,
In addition, the load of the foundation beam until the joining of the foundation beams is completed is borne by the level adjustment bolts to avoid interruption of work.
【0006】束材の下端にはベースプレートと共に、こ
れに外接する環状部材が一体化し、束材、すなわち基礎
梁は環状部材内に充填されるグラウト材によって鋼管杭
に接合される。環状部材はレベル調整ボルトを包囲し、
レベル調整ボルトに対して水平面内で位置決めされるこ
とにより鋼管杭に対する束材の平面上の施工誤差を吸収
する。At the lower end of the bundle, an annular member circumscribing the base plate is integrated with the base plate, and the bundle, that is, the foundation beam is joined to the steel pipe pile by the grout material filled in the annular member. The annular member surrounds the level adjustment bolt,
Positioning in the horizontal plane with respect to the level adjustment bolt absorbs the construction error in the plane of the bundle for the steel pipe pile.
【0007】レベル調整ボルトは杭頭金物に軸を鉛直に
向けて螺合し、束材下端のベースプレートを支持するこ
とによりそのレベルを鋼管杭に対して調整し、また基礎
梁を鋼管杭に接合するグラウト材が硬化するまでの基礎
梁の鉛直荷重と水平荷重を負担し、鋼管杭に伝達する。
レベル調整ボルトが施工時の基礎梁と束材の荷重を鋼管
杭に伝達することにより仮支持用の部材を要することな
く、束材と鋼管杭の接合後の、基礎梁とその上載荷重を
鋼管杭に伝達するグラウト材の充填が行え、作業の中断
が回避され、工期の短縮化が図られる。The level adjusting bolt is screwed onto the pile head metal fitting with its axis vertically, and the base plate at the lower end of the bundle is supported to adjust the level of the level adjusting bolt with respect to the steel pipe pile, and the foundation beam is joined to the steel pipe pile. The vertical load and horizontal load of the foundation beam until the grout material is hardened are borne and transmitted to the steel pipe pile.
The level adjustment bolts transfer the load of the foundation beam and the bundle material during construction to the steel pipe pile, so that the foundation beam and the load on the foundation beam after joining the bundle material and the steel pipe pile are The grout material that is transmitted to the pile can be filled, work interruptions can be avoided, and the construction period can be shortened.
【0008】[0008]
【実施例】以下本発明を一実施例を示す図面に基づいて
説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings showing an embodiment.
【0009】この発明の接合装置1は図1に示すように
下端にベースプレート21とこれに外接する環状部材22が
一体化し、基礎梁6が接続する束材2と、鋼管杭7の頭
部に上に載り、これに接続される杭頭金物3と、杭頭金
物3に軸を鉛直に向けて螺合し、束材2のベースプレー
ト21を支持し、束材2のレベルを調整するレベル調整ボ
ルト4と、環状部材22内に充填され、束材2を鋼管杭7
に接合するグラウト材5とから構成され、基礎梁6の水
平面内の位置とレベルを鋼管杭7に対して調整しながら
両者を接合するものである。As shown in FIG. 1, the joining apparatus 1 of the present invention has a base plate 21 and an annular member 22 circumscribing the base plate 21 integrated at the lower end thereof, and a bundle member 2 to which a foundation beam 6 is connected and a head portion of a steel pipe pile 7. Level adjustment for mounting the pile head hardware 3 connected thereto and screwing the pile head hardware 3 with the shaft vertically oriented to support the base plate 21 of the bundle 2 and adjust the level of the bundle 2. The bolt 4 and the annular member 22 are filled with the bundle 2 and the steel pipe pile 7
And the grout material 5 to be joined to the steel pipe pile 7 while adjusting the position and level of the foundation beam 6 in the horizontal plane with respect to the steel pipe pile 7.
【0010】杭頭金物3は鋼管杭7の頭部を適当な高さ
で切断し、杭頭回りの地盤を掘削し、ドライモルタル8
で均した後に設置され、杭頭金物3に螺合したレベル調
整ボルト4を回し、その頭部のレベルを所定の高さに調
整した後に、基礎梁6が接続した束材2がレベル調整さ
れた状態で設置される。束材2のベースプレート21はレ
ベル調整ボルト4上に載置され、環状部材22がレベル調
整ボルト4に外接する範囲内で、束材2のレベル調整ボ
ルト4に対する平面上の位置決めが行われる。As for the pile head metal 3, the head of the steel pipe pile 7 is cut at an appropriate height, the ground around the pile head is excavated, and the dry mortar 8 is used.
After leveling, the level adjustment bolts 4 screwed into the pile head hardware 3 are turned to adjust the level of the head to a predetermined height, and then the level of the bundle 2 to which the foundation beams 6 are connected is adjusted. It is installed in a closed state. The base plate 21 of the bundle 2 is placed on the level adjusting bolt 4, and the bundle 2 is positioned on the plane with respect to the level adjusting bolt 4 within a range where the annular member 22 circumscribes the level adjusting bolt 4.
【0011】レベル調整ボルト4はまた、鋼管杭7に接
続した杭頭金物3に螺合することによりグラウト材5の
充填までの基礎梁6の鉛直荷重を鋼管杭7に伝達し、グ
ラウト材5の硬化後には頭部がグラウト材5中に定着さ
れることにより基礎梁6からの鉛直上向きの力(引き抜
き力)を鋼管杭8に伝達する働きをする。The level adjusting bolt 4 is also screwed onto the pile head metal fitting 3 connected to the steel pipe pile 7 to transmit the vertical load of the foundation beam 6 until the filling of the grout material 5 to the steel pipe pile 7 and to make the grout material 5 After hardening, the head is fixed in the grout material 5 so that the vertically upward force (drawing force) from the foundation beam 6 is transmitted to the steel pipe pile 8.
【0012】レベル調整ボルト4上への束材2の設置と
その位置の調整後、環状部材22の下端と、先行して充填
されたドライモルタル8間の隙間をドライモルタル9で
目止めし、環状部材22内にその一部に明けられた開口か
らコンクリートやモルタル等のグラウト材5を充填し、
その硬化によって基礎梁6と鋼管杭7の接合が完了す
る。After placing the bundle 2 on the level adjusting bolt 4 and adjusting its position, the gap between the lower end of the annular member 22 and the previously filled dry mortar 8 is sealed with the dry mortar 9, The grout material 5 such as concrete or mortar is filled into the annular member 22 through an opening opened in a part thereof,
The hardening completes the joining of the foundation beam 6 and the steel pipe pile 7.
【0013】図1,図2は杭頭金物3に、下端にアンカ
ープレート11が接続したアンカー筋10を接続し、アンカ
ー筋10とアンカープレート11を鋼管杭7の頭部内に充填
されるグラウト材12中に定着させることによって杭頭金
物3を鋼管杭7に接続した場合の実施例を示したもので
ある。FIGS. 1 and 2 show a grout in which an anchor bar 10 having an anchor plate 11 at its lower end is connected to a pile head metal 3, and the anchor bar 10 and the anchor plate 11 are filled in the head of the steel pipe pile 7. It shows an embodiment in which the pile head hardware 3 is connected to the steel pipe pile 7 by being fixed in the material 12.
【0014】この実施例では基礎梁6や束材2が受ける
鉛直荷重はベースプレート21からグラウト材5に伝達さ
れ、グラウト材5の圧縮力によって杭頭金物3に伝達さ
れ、鋼管杭7に伝達される。グラウト材5の強度発現ま
での鉛直荷重は基礎梁6と束材2のみであることから、
上記の通り、レベル調整ボルト4の圧縮力によって鋼管
杭7に伝達される。In this embodiment, the vertical load received by the foundation beam 6 and the bundle member 2 is transmitted from the base plate 21 to the grout member 5, and is transmitted to the pile head metal member 3 by the compressive force of the grout member 5 and is transmitted to the steel pipe pile 7. It Since the vertical load until the strength development of the grout material 5 is only the foundation beam 6 and the bundle material 2,
As described above, it is transmitted to the steel pipe pile 7 by the compressive force of the level adjusting bolt 4.
【0015】基礎梁6や束材2からの引き抜き力は環状
部材22の内周に接合されたシアリブ23からグラウト材5
に伝達され、グラウト材5のせん断力によってレベル調
整ボルト4に伝達され、その引張力によって杭頭金物3
に伝達される。更に杭頭金物3のアンカー筋10とグラウ
ト材12間の付着力によって鋼管杭7へ伝達される。この
実施例では引き抜き力はレベル調整ボルト4の頭部の下
面に作用する支圧力によって引張力に変換されるためレ
ベル調整ボルト4は図3〜図6に示す実施例より大型に
なっている。The pulling-out force from the foundation beam 6 and the bundle 2 is from the shear rib 23 joined to the inner circumference of the annular member 22 to the grout 5
Is transmitted to the level adjusting bolt 4 by the shearing force of the grout material 5, and the tensile force thereof is applied to the pile head hardware 3
Be transmitted to. Further, it is transmitted to the steel pipe pile 7 by the adhesive force between the anchor bar 10 of the pile head metal 3 and the grout material 12. In this embodiment, the pull-out force is converted into a tensile force by the bearing force acting on the lower surface of the head of the level adjusting bolt 4, so that the level adjusting bolt 4 is larger than those in the embodiments shown in FIGS.
【0016】また基礎梁6や束材2からの水平力は環状
部材22からグラウト材5に伝達され、グラウト材5の圧
縮力によってレベル調整ボルト4から杭頭金物3へ、更
にアンカー筋10から鋼管杭7へ伝達される。グラウト材
5が硬化するまではベースプレート21とレベル調整ボル
ト4間の摩擦力によって杭頭金物3へ伝達され、杭頭金
物3からはその下面に突設され、鋼管杭7に内接する突
起31によって鋼管杭7へ伝達される。The horizontal force from the foundation beam 6 and the bundle 2 is transmitted from the annular member 22 to the grout material 5, and the compression force of the grout material 5 causes the level adjusting bolt 4 to the pile head metal 3, and further from the anchor bar 10. It is transmitted to the steel pipe pile 7. Until the grout material 5 is hardened, it is transmitted to the pile head metal member 3 by the frictional force between the base plate 21 and the level adjusting bolt 4, and is protruded from the pile head metal member 3 to the lower surface thereof, and is projected by the projection 31 inscribed in the steel pipe pile 7. It is transmitted to the steel pipe pile 7.
【0017】図3,図4は上記実施例の環状部材22の径
を杭頭金物3を包囲する大きさにし、杭頭金物3をグラ
ウト材5中に埋設して定着させることにより束材2と杭
頭金物3を接合した場合の実施例である。ここでは杭頭
金物3がグラウト材5中に定着されることから、杭頭金
物3の平面積を鋼管杭7の外径より大きくし、外周を鋼
管杭7の外周より突出させることにより図1の実施例に
おけるレベル調整ボルト4に代わり、杭頭金物3自身の
定着強度が期待できるためレベル調整ボルト4は小型化
されている。基礎梁6や束材2からの引き抜き力は杭頭
金物3の、鋼管杭7から外周に張り出した部分の支圧力
によって鋼管杭7に伝達される。3 and 4 show that the annular member 22 of the above embodiment has a diameter so as to surround the pile head metal 3, and the pile head metal 3 is embedded in the grout material 5 and fixed to the bundle material 2. It is an example in the case where and the pile head hardware 3 are joined. Here, since the pile head hardware 3 is fixed in the grout material 5, the plane area of the pile head hardware 3 is made larger than the outer diameter of the steel pipe pile 7, and the outer circumference is made to protrude from the outer circumference of the steel pipe pile 7. In place of the level adjusting bolt 4 in the above embodiment, the fixing strength of the pile head hardware 3 itself can be expected, so that the level adjusting bolt 4 is downsized. The pulling-out force from the foundation beam 6 and the bundle 2 is transmitted to the steel pipe pile 7 by the support pressure of the portion of the pile head metal member 3 that projects from the steel pipe pile 7 to the outer periphery.
【0018】図5は図3の実施例と同様に環状部材22に
よって杭頭金物3を包囲し、杭頭金物3の上方にアンカ
ー筋32を突出させ、アンカー筋32をグラウト材5中に定
着させることにより束材2と杭頭金物3を接合した場合
である。束材2と杭頭金物3間の引き抜き力は杭頭金物
3の上方に突出したアンカー筋32の引張力とその回りの
付着力によって伝達される。In the same manner as in the embodiment of FIG. 3, FIG. 5 surrounds the pile head hardware 3 with an annular member 22, projects an anchor bar 32 above the pile head metal 3, and anchors the anchor bar 32 in the grout material 5. This is a case where the bundle 2 and the pile head hardware 3 are joined by performing the above. The pulling-out force between the bundle 2 and the pile head metal 3 is transmitted by the tensile force of the anchor bar 32 protruding above the pile head metal 3 and the adhesive force around it.
【0019】図6は基礎梁6や束材2からの引き抜き力
を鋼管杭7に伝達する必要がない部位に適用される杭頭
金物3を用いた場合の実施例であり、杭頭金物3にはレ
ベル調整ボルト4のみが付属する。FIG. 6 shows an embodiment in which a pile head metal member 3 applied to a portion where it is not necessary to transmit the pulling force from the foundation beam 6 and the bundle member 2 to the steel pipe pile 7 is used. Comes with level adjustment bolt 4 only.
【0020】図7〜図9は図1に示す実施例と同様に環
状部材22を杭頭金物3の上方に位置させた場合に、杭頭
金物3を、杭頭の内周面との間にクリアランスを持ちな
がら、杭頭上に載る形状に形成し、杭頭の外周を包囲す
るリング33からボルト34を締め付け、鋼管杭7の頭部を
かしめ、杭頭金物3に密着させることにより杭頭金物3
を鋼管杭7に接続した場合の実施例である。この実施例
では鋼管杭7の頭部がかしめられて杭頭金物3に一体化
することによりグラウト材5からの鉛直荷重や、レベル
調整ボルト4からの引き抜き力及び水平力は杭頭金物3
から直接鋼管杭7に伝達される。FIGS. 7 to 9 show that when the annular member 22 is positioned above the pile head hardware 3 as in the embodiment shown in FIG. 1, the pile head hardware 3 is placed between the inner peripheral surface of the pile head. With a clearance to form on the pile head, tighten the bolt 34 from the ring 33 that surrounds the outer periphery of the pile head, crimp the head of the steel pipe pile 7, and bring it into close contact with the pile top metal fitting 3. Thing 3
It is an example in the case where is connected to the steel pipe pile 7. In this embodiment, the head of the steel pipe pile 7 is caulked and integrated with the pile head metal 3, so that the vertical load from the grout material 5 and the pulling force and horizontal force from the level adjusting bolt 4 are
Is directly transmitted to the steel pipe pile 7.
【0021】[0021]
【発明の効果】この発明は以上の通りであり、独立基礎
を構成し、下端にベースプレートが一体化した束材に基
礎梁を接続すると同時に、鋼管杭の頭部に杭頭金物を接
続し、杭頭金物にベースプレートを支持するレベル調整
ボルトを螺合したものであるため、基礎梁のレベル調整
を行うことができ、また基礎梁の接合が終了するまでの
間の基礎梁の荷重はレベル調整ボルトが負担するため仮
支持用の部材を要することなく、束材と鋼管杭の接合後
の、基礎梁とその上載荷重を鋼管杭に伝達するグラウト
材の充填が行え、作業の中断が回避され、工期の短縮化
を図ることができる。The present invention is as described above, and at the same time as connecting the foundation beam to the bundle material in which the base plate is integrated to the lower end, the pile beam is connected to the head of the steel pipe pile, Since the level adjustment bolts that support the base plate are screwed into the pile head hardware, the level of the foundation beam can be adjusted, and the load of the foundation beam until the connection of the foundation beam is completed is level adjusted. Since the bolts do not require temporary support members, the foundation beam and the grout material that transfers the load on it to the steel pipe pile can be filled after joining the bundle material and the steel pipe pile, and work interruption can be avoided. The work period can be shortened.
【図1】環状部材を杭頭金物上に配置した場合の実施例
を示した縦断面図である。FIG. 1 is a vertical cross-sectional view showing an embodiment in which an annular member is arranged on a pile head hardware.
【図2】図1の平面図である。FIG. 2 is a plan view of FIG.
【図3】環状部材を杭頭金物を包囲して配置した場合の
実施例を示した縦断面図である。FIG. 3 is a vertical cross-sectional view showing an embodiment in which an annular member is arranged so as to surround a pile head hardware.
【図4】図3の平面図である。FIG. 4 is a plan view of FIG.
【図5】環状部材を杭頭金物を包囲して配置した場合の
他の実施例を示した縦断面図である。FIG. 5 is a vertical cross-sectional view showing another embodiment in which the annular member is arranged so as to surround the pile head hardware.
【図6】図3に示す実施例において引き抜き力を伝達さ
せない場合の実施例を示した縦断面図である。FIG. 6 is a vertical cross-sectional view showing an embodiment in which the pulling force is not transmitted in the embodiment shown in FIG.
【図7】環状部材を杭頭金物上に配置した場合の他の実
施例を示した縦断面図である。FIG. 7 is a vertical cross-sectional view showing another embodiment in which the annular member is arranged on the pile head hardware.
【図8】図7の一部拡大図である。FIG. 8 is a partially enlarged view of FIG.
【図9】図8の杭頭金物部分の平面図である。9 is a plan view of the pile head hardware portion of FIG. 8. FIG.
【図10】従来構造を示した縦断面図である。FIG. 10 is a vertical cross-sectional view showing a conventional structure.
1……接合装置、2……束材、21……ベースプレート、
22……環状部材、23……シアリブ、3……杭頭金物、31
……突起、32……アンカー筋、33……リング、34……ボ
ルト、4……レベル調整ボルト、5……グラウト材、6
……基礎梁、7……鋼管杭、8,9……ドライモルタ
ル、10……アンカー筋、11……アンカープレート、12…
…グラウト材。1 ... Joining device, 2 ... Bundle, 21 ... Base plate,
22 …… Annular member, 23 …… Shear rib, 3 …… Pile head hardware, 31
...... Protrusion, 32 ...... Anchor streak, 33 ...... Ring, 34 ...... Bolt, 4 …… Level adjustment bolt, 5 …… Grout material, 6
…… Foundation beams, 7 …… Steel pipe piles, 8,9 …… Dry mortar, 10 …… Anchor bars, 11 …… Anchor plates, 12…
… Grout material.
Claims (1)
環状部材が一体化し、基礎梁が接続する束材と、鋼管杭
の頭部上に載り、これに接続される杭頭金物と、杭頭金
物に軸を鉛直に向けて螺合し、束材のベースプレートを
支持し、束材のレベルを調整するレベル調整ボルトと、
環状部材内に充填され、束材の脚部を鋼管杭に対して接
合するグラウト材とから構成される鋼管杭と独立基礎の
接合装置。1. A base plate and an annular member circumscribing the base plate are integrated at a lower end thereof, and a bundle material to which a foundation beam is connected, a pile head metal member mounted on the head of a steel pipe pile and connected thereto, and a pile head metal member. A level adjustment bolt that screws the shaft vertically to support the base plate of the bundle and adjusts the level of the bundle,
A joining device for a steel pipe pile and an independent foundation, which is filled in an annular member and is composed of a grout material that joins leg portions of a bundle material to the steel pipe pile.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05143266A JP3142685B2 (en) | 1993-06-15 | 1993-06-15 | Equipment for joining steel pipe piles and foundation beams |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05143266A JP3142685B2 (en) | 1993-06-15 | 1993-06-15 | Equipment for joining steel pipe piles and foundation beams |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH073817A true JPH073817A (en) | 1995-01-06 |
| JP3142685B2 JP3142685B2 (en) | 2001-03-07 |
Family
ID=15334753
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP05143266A Expired - Fee Related JP3142685B2 (en) | 1993-06-15 | 1993-06-15 | Equipment for joining steel pipe piles and foundation beams |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3142685B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006265999A (en) * | 2005-03-25 | 2006-10-05 | Koyama Kosakusho:Kk | Basic structure of independent pile without basic beam |
| CN106703033A (en) * | 2015-11-13 | 2017-05-24 | 五冶集团上海有限公司 | Adjustable support of PHC tube pile cutting machine |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6275601B1 (en) | 1997-03-05 | 2001-08-14 | Fujitsu Denso Ltd. | Fingerprinting judging method |
-
1993
- 1993-06-15 JP JP05143266A patent/JP3142685B2/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006265999A (en) * | 2005-03-25 | 2006-10-05 | Koyama Kosakusho:Kk | Basic structure of independent pile without basic beam |
| CN106703033A (en) * | 2015-11-13 | 2017-05-24 | 五冶集团上海有限公司 | Adjustable support of PHC tube pile cutting machine |
| CN106703033B (en) * | 2015-11-13 | 2019-06-14 | 五冶集团上海有限公司 | A kind of support with adjustable of PHC pipe pile cutter |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3142685B2 (en) | 2001-03-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4693299B2 (en) | Column base connection structure | |
| JPH08170340A (en) | Pedestal structure and method of pedestal construction | |
| JP4657028B2 (en) | Joining structure and joining method of pile and superstructure | |
| JP3142685B2 (en) | Equipment for joining steel pipe piles and foundation beams | |
| JPH10121576A (en) | Fixing structure of pedestal | |
| JPS639622Y2 (en) | ||
| JP3278823B2 (en) | Column base fixing device and column base fixing method | |
| JP7770649B2 (en) | Joint structure between steel pipe pile and building, and joint method between steel pipe pile and building | |
| JP3336367B2 (en) | Steel column base structure and construction method of steel column base | |
| JP3236950B2 (en) | Embedded column base and method of construction | |
| JP2980886B1 (en) | How to install column bases | |
| JP2000319989A (en) | Mounting structure and construction method of exposed column base | |
| JPS6033159Y2 (en) | Ready-made concrete pile | |
| JP7857836B2 (en) | Seismic isolation structure and method for fixing seismic isolation devices | |
| JPH0734531A (en) | How to fix the bottom of the column | |
| JPH1025759A (en) | Adjustable column base | |
| JPH09264030A (en) | Method of construction of fixing pedestal of exposed type and members and washers for level adjustment used therefor | |
| JP2001279829A (en) | Connection method and member | |
| JPS5925969Y2 (en) | basic hardware | |
| JPS6141789Y2 (en) | ||
| JP2003027499A (en) | Structure of pile head joint | |
| JPH04327608A (en) | Connection method between foundation and superstructure materials in buildings | |
| JPH037762B2 (en) | ||
| JPH0118215B2 (en) | ||
| JPH033016B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20001212 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081222 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081222 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091222 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101222 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101222 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111222 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111222 Year of fee payment: 11 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111222 Year of fee payment: 11 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| LAPS | Cancellation because of no payment of annual fees |