JPH0743361Y2 - Units and panels with slings - Google Patents
Units and panels with slingsInfo
- Publication number
- JPH0743361Y2 JPH0743361Y2 JP12817490U JP12817490U JPH0743361Y2 JP H0743361 Y2 JPH0743361 Y2 JP H0743361Y2 JP 12817490 U JP12817490 U JP 12817490U JP 12817490 U JP12817490 U JP 12817490U JP H0743361 Y2 JPH0743361 Y2 JP H0743361Y2
- Authority
- JP
- Japan
- Prior art keywords
- panel
- unit
- hanging
- side core
- core material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011162 core material Substances 0.000 description 48
- 238000010276 construction Methods 0.000 description 10
- 239000002184 metal Substances 0.000 description 8
- 238000000034 method Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 239000000725 suspension Substances 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000003287 bathing Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【考案の詳細な説明】 [産業上の利用分野] 本考案は、吊り上げるのに便利な吊り具付きユニットお
よびパネルに関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a unit and a panel with a hanger that are convenient for hoisting.
[従来の技術] 所定の規格に基づいて予め工場で製作されたパネルを用
いて構築されるプレハブ住宅にあっては、従来より一般
に、現場で各パネルを組み立てる方法、あるいは各パネ
ルを工場で予め箱型に組み立ててなるユニットを形成し
ておき、これを現場に運んで所定位置に設置するという
ユニット工法が採用されている。特に、後者の方法、す
なわちユニットを現場で設置するユニット工法によれ
ば、現場施工が簡略化され工期の短縮化が図れることか
ら、近年多く採用されるようになってきている。[Prior Art] In a prefabricated house constructed using panels manufactured in advance in accordance with a predetermined standard in a factory, generally, a method of assembling each panel in the field or a method of assembling each panel in a factory in advance has been generally used. A unit construction method is employed in which a unit assembled in a box shape is formed, and the unit is transported to the site and installed at a predetermined position. In particular, the latter method, that is, the unit construction method in which the unit is installed on the site, has been widely adopted in recent years because the site construction can be simplified and the construction period can be shortened.
ところで、前記のようなユニット工法を採用する場合、
従来一般には、ユニットを構成している壁パネルの上芯
材に吊り金物を取り付け、この吊り金物を用いてユニッ
ト全体を吊り上げて、設置するようにしている。具体的
には例えば、先端に吊りフックを備えたボルト状の吊り
金物を用い、この吊り金物を、前記吊りフックを上方に
突出した状態で上芯材にねじ込んで取り付けるようにし
ている。By the way, when adopting the unit construction method as described above,
Generally, a hanging metal object is attached to an upper core material of a wall panel which constitutes a unit, and the entire unit is hoisted and installed using the hanging metal object. Specifically, for example, a bolt-shaped metal hanging object having a hanging hook at the tip is used, and the hanging metal object is screwed and attached to the upper core material with the hanging hook protruding upward.
また、パネルを直接現場へ運んで組み立てる方法を採用
する場合には、同様に、パネルの上芯材に吊り金物を取
り付け、この吊り金物を用いてパネルを吊り上げるよう
にしている。Further, when adopting a method of directly transporting the panel to the site and assembling it, similarly, a hanging metal object is attached to the upper core material of the panel, and the panel is hoisted using the hanging metal object.
[考案が解決しようとする課題] しかしながら、このように上芯材に吊り金物を取り付け
る方法では、次のような欠点があった。[Problems to be Solved by the Invention] However, the method of attaching the hanging metal object to the upper core material in this manner has the following drawbacks.
すなわち、第1には、ユニットあるいはパネルを吊り上
げた際の荷重が、すべてこの上芯材に加わってしまうた
めに、上芯材がこの重量に耐えきれずに変形してしまう
という点である。特に、大形のユニットのように大重量
のものを吊り上げる際には、この現象は顕著である。こ
のため、前記吊り金物を取り付ける際には、予め上芯材
を補強するための補強プレートを組み込んでおくなどの
対策が必要となる。That is, firstly, the load when the unit or the panel is lifted is all applied to the upper core material, so that the upper core material cannot withstand this weight and is deformed. This phenomenon is particularly noticeable when lifting a heavy object such as a large unit. Therefore, when attaching the hanging hardware, it is necessary to take measures such as previously incorporating a reinforcing plate for reinforcing the upper core material.
第2には、ユニットあるいはパネルを現場に運んで所定
位置に設置した後には、ユニットあるいはパネルに取り
付けられた吊り金物を取り外さなくてはならないという
点である。このために、現場施工の工程数が増え、作業
が煩雑化するという問題がある。Secondly, after the unit or panel has been transported to the site and installed at a predetermined position, the hanging hardware attached to the unit or panel must be removed. For this reason, there is a problem that the number of on-site construction steps increases and the work becomes complicated.
また第3には、パネル、特に枠組だけで構成されたスケ
ルトンパネルを吊り上げる場合の問題点であって、面材
が設けられていないために、吊り上げ途中に吊り金物が
外れてしまい易いという点である。Thirdly, there is a problem when hoisting a panel, especially a skeleton panel composed only of a frame, and since the face material is not provided, the hanging metal object is likely to come off during hoisting. is there.
本考案は、このような事情に鑑みてなされたものであっ
て、吊り上げ時の荷重に十分に耐えてユニットあるいは
パネルの変形を防ぐとともに、吊り上げて所定位置に設
置した後にも取り外す必要のない吊り具を用いた吊り具
付きユニットおよびパネルを提供することを目的として
いる。The present invention has been made in view of the above circumstances, and it is possible to sufficiently withstand the load at the time of hoisting and prevent the unit or panel from being deformed. An object of the present invention is to provide a unit and a panel with a hanger using a tool.
[課題を解決するための手段] 本考案は、パネルあるいはユニットを形成する壁パネル
の側端部に表出する側部芯材の上端部には、上端面に開
口しかつ上下方向に延びる矩形状の座掘溝を設け、該座
掘溝内には、上端部に吊り上げ用の掛止孔を備えた矩形
板状の吊り具を嵌め入れて、その上端部を側部芯材の表
面より離れる方向に反らせた状態で、下端部を座掘溝内
に固定してなることを解決手段とした。[Means for Solving the Problem] The present invention provides a rectangular core that is open at the upper end surface and extends in the vertical direction at the upper end portion of a side core member that is exposed at the side end portion of a wall panel that forms a panel or unit. A slotted groove having a shape is provided, and a rectangular plate-shaped suspending tool having a hooking hole for lifting at the upper end is fitted in the slotted groove, and the upper end of the hanging tool is located above the surface of the side core member. The solution means is that the lower end is fixed in the slot groove in a state of being bent in the direction of separating.
[作用] 本考案の吊り具付きユニットおよびパネルによれば、そ
の側端部に表出する側部芯材の上端部に前記構成の吊り
具が取り付けられているので、吊り上げ時の荷重は、こ
の吊り具を介して、該側部芯材の長手方向、すなわち上
下方向に加えられる。よって、吊り上げ時の荷重に十分
耐えて、ユニットあるいはパネルの変形が防止される。
また、このユニットあるいはパネルを吊り上げて現場の
所定位置に設置した後には、吊り具の上端部を側部芯材
の座掘溝内に沿わせてスクリュー釘打ちすれば、側部芯
材の表面より出っ張ることなく該側部芯材に埋設できる
ので、その取り外しの作業を省略することができる。[Operation] According to the unit with a hanging tool and the panel of the present invention, since the hanging tool having the above-mentioned configuration is attached to the upper end portion of the side core member exposed at the side end portion, the load at the time of lifting is Through this suspender, it is applied in the longitudinal direction of the side core material, that is, in the vertical direction. Therefore, the load at the time of lifting is sufficiently endured, and the deformation of the unit or panel is prevented.
Also, after this unit or panel has been lifted and installed at a predetermined position on the site, the upper end of the lifting tool can be screwed along the inside of the cut groove of the side core material to the surface of the side core material. Since it can be embedded in the side core without protruding further, the work of removing the core can be omitted.
[実施例] 以下、実施例を示し、図面を参照して、本考案の吊り具
付きユニットおよびパネルについて説明する。[Embodiment] Hereinafter, an embodiment will be described and with reference to the drawings, a unit with a hanger and a panel of the present invention will be described.
第1図ないし第3図は、本考案の一実施例を示すもの
で、吊り具付きユニットの一例を示している。1 to 3 show an embodiment of the present invention and show an example of a unit with a hanging tool.
図中符号1は、バスユニット(ユニット)である。この
バスユニット1は、略箱型に形成されたボックス部2
と、該ボックス部2の内部に納められたバスセット7と
を主体として構成されたものである。ボックス部2は、
概略、床パネル3と、該床パネル3の対向する2辺部
(短辺部)にそれぞれ立設された側部壁パネル4,4と、
床パネル3の1長辺部に立設された背部壁パネル5と、
該背部壁パネル5の上に前記床パネル3と平行になるよ
うにして配設された天井パネル6とによって、1面が開
口した略箱型に形成されている。このボックス部2の床
パネル3、側部壁パネル4,4、背部壁パネル5および天
井パネル6は、それぞれ上芯材、下芯材および側部芯材
によって矩形輪郭に組まれた枠体の表面に面材が貼設さ
れた構成を有している。また、前記バスセット7は、入
浴スペースに設置された浴槽8と、入浴スペースの側部
に設けられた脱衣スペースの出入口に開閉自在に取り付
けられたドア9と、壁パネルの裏面に貼設された断熱材
10などを組み合わせて形成されたものである。Reference numeral 1 in the figure is a bus unit. The bus unit 1 includes a box portion 2 formed in a substantially box shape.
And a bus set 7 housed inside the box portion 2 as a main component. Box part 2
In general, the floor panel 3 and the side wall panels 4 and 4 which are erected on the two opposite sides (short sides) of the floor panel 3, respectively.
A back wall panel 5 erected on one long side of the floor panel 3,
On the back wall panel 5, a ceiling panel 6 arranged in parallel with the floor panel 3 is formed into a substantially box shape with one surface open. The floor panel 3, the side wall panels 4, 4, the back wall panel 5 and the ceiling panel 6 of the box portion 2 are of a frame body assembled in a rectangular contour by an upper core material, a lower core material and a side core material, respectively. It has a structure in which a face material is attached to the surface. The bath set 7 is attached to the bathtub 8 installed in the bathing space, the door 9 openably and closably attached to the entrance and exit of the undressing space provided on the side of the bathing space, and the back surface of the wall panel. Heat insulation
It is formed by combining 10 etc.
このバスユニット1のボックス部2の側面部を形成する
2つの側部壁パネル4,4は、天井パネル6の上面より上
方に突出して設けられており、該側部壁パネル4,4の両
側端部に表出する側部芯材4a,4a,4a,4aの上端部には、
該側部芯材4a,4a,4a,4aの長手方向、すなわち上下方向
に延びる座掘溝11,11,11,11が、該側部芯材4a,4a,4a,4a
の上端面に開口して設けられている。The two side wall panels 4, 4 forming the side surface of the box portion 2 of the bus unit 1 are provided so as to project upward from the upper surface of the ceiling panel 6, and both side walls of the side wall panels 4, 4 are provided. At the upper end of the side core material 4a, 4a, 4a, 4a exposed at the end,
Longitudinal direction of the side core material 4a, 4a, 4a, 4a, that is, the recessed groove 11, 11, 11, 11 extending in the vertical direction, the side core material 4a, 4a, 4a, 4a
Is opened at the upper end surface of the.
そして、これらの座掘溝11内には、それぞれこのバスユ
ニット1を吊り上げるための吊り具12が取り付けられて
いる。Then, inside these dug-down grooves 11, there are attached suspenders 12 for suspending the bus unit 1, respectively.
吊り具12は、第2図および第3図に示すように、前記座
掘溝11とほぼ同一長さに形成された細長い矩形板状の鋼
板であり、その一端部付近には、該吊り具12の厚み方向
に貫通する円形の掛止孔13が設けられている。掛止孔13
は、この吊り具12を吊り上げる際にクレーン18の吊りフ
ック17などを掛け止めるためのものである。さらにま
た、この吊り具12には、該吊り具12の厚み方向に貫通す
る透孔14,14…が、複数個、全体にほぼ均等に分散した
状態に設けられている。これらの透孔14,14…は、この
吊り具12を前記側部芯材4aにスクリュー釘打ちするため
に用いられるもので、その形状は、スクリュー釘15の頭
部を埋め込むことができるように、吊り具12の表面から
裏面に向けて漸次縮径する切頭円錘形部分14aを有して
いる。あるいは、前記スクリュー釘15の代わりに、螺子
が用いられてもよい。As shown in FIGS. 2 and 3, the suspending tool 12 is an elongated rectangular plate-shaped steel plate formed to have substantially the same length as the slot groove 11, and the suspending tool is provided near one end thereof. A circular hooking hole 13 penetrating in the thickness direction of 12 is provided. Hook hole 13
Is for hanging a hanging hook 17 of a crane 18 when the hanging device 12 is hoisted. Further, the suspending tool 12 is provided with a plurality of through holes 14, 14 ... Penetrating in the thickness direction of the suspending tool 12 in a state in which they are substantially evenly dispersed throughout. These through holes 14, 14 ... Are used for screwing the suspension 12 to the side core 4a, and its shape is such that the head of the screw nail 15 can be embedded. The hanging tool 12 has a truncated conical portion 14a whose diameter gradually decreases from the front surface to the back surface. Alternatively, a screw may be used instead of the screw nail 15.
このような吊り具12は、その掛止孔13を有する一端部を
上方に向けて、前記側部芯材4aに設けられた座掘溝11内
に嵌め入れられている。そして、この吊り具12は、掛止
孔13を含む上端部を該側部芯材4aの表面より離れる方向
に反らせた状態で、その下端部が座掘溝11内に密着接合
され、前記透孔14,14…よりスクリュー釘15,15…が打ち
付けられたことによって固定されている。Such a hanger 12 is fitted into the countersunk groove 11 provided in the side core member 4a with one end portion having the hook hole 13 facing upward. Further, the suspending tool 12 is such that the upper end portion including the hooking hole 13 is warped in a direction away from the surface of the side core material 4a, and the lower end portion thereof is closely joined in the countersunk groove 11 to form the transparent member. It is fixed by screwing nails 15, 15 ... from the holes 14, 14.
次に、本実施例の吊り具付きユニットの吊り上げ方法に
ついて、第4図を参照して説明する。Next, a method of hoisting the unit with hoisting tool of the present embodiment will be described with reference to FIG.
工場で前記構成の吊り具付きユニットを製作した後、そ
の上端部の4箇所に取り付けられた吊り具12,12,12,12
の掛止孔13,13,13,13に、それぞれ吊りワイヤー16の先
端に設けられた吊りフック17,17,17,17を掛け止めす
る。After manufacturing the unit with the hanging device having the above-mentioned structure in the factory, the hanging device 12,12,12,12 attached to the four places at the upper end of the unit.
The hanging hooks 17, 17, 17, 17 provided at the tips of the hanging wires 16 are hooked in the hook holes 13, 13, 13, 13, respectively.
その後、吊りワイヤー16をクレーン18で吊り上げて、こ
の吊り具付きユニットを所定位置に設置する。After that, the hanging wire 16 is lifted by the crane 18 to install the unit with the hanging tool at a predetermined position.
現場の所定位置にこのユニット1を設置した後、吊りワ
イヤー16を吊り具12,12,12,12より外す。After the unit 1 is installed at a predetermined position on the site, the suspension wire 16 is removed from the suspensions 12, 12, 12, 12.
その後、吊り具12,12,12,12の上端部の反り返り部分
を、側部芯材4a,4a,4a,4aの座掘溝11,11,11,11内に密着
状態に沿わせ、透孔14,14…よりスクリュー釘15,15…を
打ち付けて、吊り具12,12,12,12全体をそれぞれ座掘溝1
1,11,11,11内に埋設する。After that, the warped portion of the upper end of the hanger 12, 12, 12, 12 is placed along the close contact state in the scoring groove 11, 11, 11, 11 of the side core material 4a, 4a, 4a, 4a, and Screw nails 15,15 ... from the holes 14,14 ...
It is buried in 1,11,11,11.
このように、本実施例の吊り具付きユニットによれば、
ユニット1を構成する側部壁パネル4の側端部に表出す
る側部芯材4aの上端部に前記構成の吊り具12が取り付け
られているので、吊り上げ時の荷重は、この吊り具12を
介して、該側部芯材4aの長手方向、すなわち上下方向に
加えられる。よって、荷重が上芯材に加えられる方式の
従来例に比べ、吊り上げ時の荷重に対する耐力が格段に
向上し、側部芯材4aあるいはユニット1の変形が防止さ
れる。したがって、従来のように補強プレートなどを用
いることなく、予め規格に基づいて製作された標準仕様
の部材をそのまま使用できて、経済的に有利である。In this way, according to the unit with hanging equipment of the present embodiment,
Since the suspending tool 12 having the above-described configuration is attached to the upper end portion of the side core member 4a that is exposed at the side end portion of the side wall panel 4 that constitutes the unit 1, the load at the time of lifting is the suspending tool 12a. Is added in the longitudinal direction of the side core material 4a, that is, in the vertical direction. Therefore, as compared with the conventional example in which the load is applied to the upper core material, the proof stress against the load at the time of lifting is significantly improved, and the deformation of the side core material 4a or the unit 1 is prevented. Therefore, it is economically advantageous that a standard specification member manufactured in advance based on the standard can be used as it is without using a reinforcing plate or the like as in the past.
また、このユニット1を吊り上げて現場の所定位置に設
置した後には、吊り具12の上端部を側部芯材4aの座掘溝
11内に沿わせてスクリュー釘打ちしてしまえば、側部芯
材4aの表面より出っ張ることなく該側部芯材4aに埋設で
きるので、新めて吊り具12を取り外す必要がない。した
がって、現場施工を簡略化することができ、工期の短縮
化を図ることができる。Further, after the unit 1 is lifted and installed at a predetermined position on the site, the upper end portion of the hanging tool 12 is set to the scoring groove of the side core member 4a.
If the nails are screwed along the inside of the side core member 11, the side core member 4a can be embedded in the side core member 4a without protruding from the surface of the side core member 4a. Therefore, on-site construction can be simplified and the construction period can be shortened.
また次に、第5図を参照して、本考案の他の実施例につ
いて説明する。この実施例が前記実施例と異なるのは、
前記ユニット1に代えて直接パネルを吊り上げるように
した点である。Next, another embodiment of the present invention will be described with reference to FIG. This embodiment differs from the previous embodiment in that
The point is that the panel is directly lifted instead of the unit 1.
第5図は、吊り具付きパネルの一例を示すもので、図中
符号20がパネルである。このパネル20は、上芯材、下芯
材および側部芯材によって矩形輪郭に組まれた枠体の表
面に面材を貼設してなるものである。FIG. 5 shows an example of a panel with a hanging tool, in which reference numeral 20 is a panel. This panel 20 is formed by pasting a face material on the surface of a frame body assembled in a rectangular contour by an upper core material, a lower core material and a side core material.
このパネル20の側端部に表出する側部芯材20aの上端部
には、前記実施例と同様に、該側部芯材20aの長手方向
に延びる座掘溝11が該側部芯材20aの上端面に開口して
形成されている。At the upper end portion of the side core material 20a exposed at the side end portion of the panel 20, a slot groove 11 extending in the longitudinal direction of the side core material 20a is provided on the upper end portion of the side core material 20a. The opening is formed in the upper end surface of 20a.
そして、該座掘溝11内には、前記実施例で示したものと
同様の吊り具12が嵌め入れられ、その上端部が該側部芯
材20aの表面より離れる方向に反らされた状態に固定さ
れている。Then, in the recessed groove 11, a suspending tool 12 similar to that shown in the embodiment is fitted, and its upper end is warped in a direction away from the surface of the side core member 20a. It is fixed to.
このような吊り具付きパネルによれば、吊り上げ時の荷
重に十分耐えてパネル20の変形を防止できること、およ
び所定位置に設置した後には吊り具12を座掘溝11内に埋
設してその取り外し作業を省略できることなど、種々の
効果が得られることは、前記実施例と同様である。According to such a panel with a hanger, it is possible to sufficiently withstand the load at the time of hoisting and prevent the panel 20 from being deformed, and after the hanger 12 is installed at a predetermined position, the hanger 12 is buried in the groove 11 and removed. It is the same as the above-described embodiment that various effects can be obtained such that the work can be omitted.
また、パネル20として、面材の貼設されていないスケル
トンパネルを用いる場合にも好適に適用され、従来のよ
うに吊り上げ中に外れてしまうなどといったトラブルが
発生することもなく、荷重に対する十分な耐力を発揮で
きる。Further, as the panel 20, it is also suitably applied when using a skeleton panel to which a face material is not attached, and does not cause a trouble such as coming off during lifting as in the conventional case, and is sufficient for a load. You can demonstrate the proof stress.
なお、本考案の吊り具付きユニットおよびパネルは、前
記実施例で示したものに限られるものではなく、各部材
の形状、寸法、材質等の具体的構成要件は、実施にあた
り適宜変更可能である。It should be noted that the unit with hanging equipment and the panel of the present invention are not limited to those shown in the above-mentioned embodiment, and the specific constitutional requirements such as the shape, size, and material of each member can be appropriately changed upon implementation. .
[考案の効果] 以上説明したように、本考案の吊り具付きユニットおよ
びパネルによれば、その側端部に表出する側部芯材の上
端部に前記構成の吊り具が取り付けられているので、吊
り上げ時の荷重は、この吊り具を介して、該側部芯材の
長手方向、すなわち上下方向に加えられる。よって、吊
り上げ時の荷重に十分耐えて、ユニットあるいはパネル
の変形が防止される。したがって、標準仕様の部材をそ
のまま吊り上げることができ、施工の省力化を図るとと
もに経済的な負担も小さくすることができる。また、こ
のユニットあるいはパネルを吊り上げて現場の所定位置
に設置した後には、吊り具の上端部を芯材の座掘溝内に
沿わせてスクリュー釘打ちすれば、吊り具を該芯材に埋
設してしまうことができる。よって、吊り具の取り外し
作業を省略して、現場施工の簡略化を図ることができ
る。[Advantages of the Invention] As described above, according to the unit with a hanging tool and the panel of the present invention, the hanging tool having the above-described configuration is attached to the upper end portion of the side core member exposed at the side end portion. Therefore, the load at the time of hoisting is applied through the hoisting tool in the longitudinal direction of the side core material, that is, in the vertical direction. Therefore, the load at the time of lifting is sufficiently endured, and the deformation of the unit or panel is prevented. Therefore, the member having the standard specifications can be lifted as it is, the labor of the construction can be saved, and the economical burden can be reduced. Also, after this unit or panel is lifted and installed at a predetermined position on the site, the upper end of the suspender is screwed along the inside of the core groove, and the suspender is embedded in the core. You can do it. Therefore, it is possible to omit the work of removing the hanger and simplify the on-site construction.
第1図ないし第4図は、本考案の一実施例を示すもの
で、第1図は吊り具付きユニットを示す斜視図、第2図
および第3図は吊り具の構成を示す平面図および側断面
図、第4図はこの吊り具付きユニットを吊り上げた状態
を示す斜視図であり、第5図は他の実施例を示すもの
で、吊り具付きパネルを示す斜視図である。 1……バスユニット(ユニット)、4……側部壁パネル
(壁パネル)、4a……側部芯材、11……座掘溝、12……
吊り具、13……掛止孔、20……パネル、20a……側部芯
材。1 to 4 show an embodiment of the present invention. FIG. 1 is a perspective view showing a unit with a lifting tool, and FIGS. 2 and 3 are plan views showing the structure of the lifting tool. FIG. 4 is a side cross-sectional view, and FIG. 4 is a perspective view showing a state in which the unit with a lifting tool is lifted up. FIG. 5 shows another embodiment, and is a perspective view showing a panel with a lifting tool. 1 ... Bath unit (unit), 4 ... side wall panel (wall panel), 4a ... side core material, 11 ... slot groove, 12 ...
Suspension tool, 13 …… Hatch hole, 20 …… Panel, 20a …… Side core material.
Claims (1)
ルの側端部に表出する側部芯材の上端部には、上端面に
開口しかつ上下方向に延びる矩形状の座掘溝を設け、該
座掘溝内には、上端部に吊り上げ用の掛止孔を備えた矩
形板状の吊り具を嵌め入れて、その上端部を側部芯材の
表面より離れる方向に反らせた状態で、下端部を座掘溝
内に固定してなることを特徴とする吊り具付きユニット
およびパネル。1. A rectangular countersunk groove that is open to the upper end surface and extends in the vertical direction is provided at the upper end of a side core member that is exposed at a side end of a wall panel that forms a panel or unit. In the recessed groove, a rectangular plate-shaped suspending tool having a hanging hole for lifting at the upper end is fitted, and the upper end is warped in a direction away from the surface of the side core member, A unit with hanging equipment and a panel, characterized in that the lower end portion is fixed in the slot groove.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12817490U JPH0743361Y2 (en) | 1990-11-30 | 1990-11-30 | Units and panels with slings |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12817490U JPH0743361Y2 (en) | 1990-11-30 | 1990-11-30 | Units and panels with slings |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0484663U JPH0484663U (en) | 1992-07-23 |
| JPH0743361Y2 true JPH0743361Y2 (en) | 1995-10-09 |
Family
ID=31875645
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP12817490U Expired - Lifetime JPH0743361Y2 (en) | 1990-11-30 | 1990-11-30 | Units and panels with slings |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0743361Y2 (en) |
-
1990
- 1990-11-30 JP JP12817490U patent/JPH0743361Y2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0484663U (en) | 1992-07-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0743361Y2 (en) | Units and panels with slings | |
| JPH082267Y2 (en) | Lightweight cellular concrete panel | |
| JPH0312084Y2 (en) | ||
| JPS60119836A (en) | Hanging structure of building unit | |
| JPH082268Y2 (en) | Panel with hangers | |
| JPH0453383Y2 (en) | ||
| JPH0744641Y2 (en) | Unit room connection structure | |
| JP2801787B2 (en) | Roof panel | |
| JP4708636B2 (en) | Ceiling construction method and ceiling panel | |
| JP2500582Y2 (en) | Unit building furniture | |
| JPH0886021A (en) | Balcony mounting structure and method | |
| JPH0732687Y2 (en) | Curtain wall panel | |
| JPH0930774A (en) | Hanging tools | |
| JP2504622B2 (en) | Reinforcement breath for unit lifting | |
| JPH0696916B2 (en) | Construction method of partition wall wall panel for extension | |
| JPS5943344Y2 (en) | Elevator installation equipment | |
| JPH0326181Y2 (en) | ||
| JPS647149Y2 (en) | ||
| JPS6246883Y2 (en) | ||
| JPH06307091A (en) | Structure of hanging part of building unit | |
| JPS63265073A (en) | Upper hanging type temporary laying device for siding | |
| JPH0649996A (en) | Lifting-up of house unit | |
| JPS6033959A (en) | Reinforcing struc ture of room unit by wall type construction method | |
| JPH08302888A (en) | Ceiling panel and method for constructing house using the same | |
| JPH10317588A (en) | Roof ridge bracket |