JPH079065Y2 - Gas leak monitoring device - Google Patents
Gas leak monitoring deviceInfo
- Publication number
- JPH079065Y2 JPH079065Y2 JP1989028492U JP2849289U JPH079065Y2 JP H079065 Y2 JPH079065 Y2 JP H079065Y2 JP 1989028492 U JP1989028492 U JP 1989028492U JP 2849289 U JP2849289 U JP 2849289U JP H079065 Y2 JPH079065 Y2 JP H079065Y2
- Authority
- JP
- Japan
- Prior art keywords
- gas
- flow rate
- amount
- value
- measuring means
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012806 monitoring device Methods 0.000 title claims description 12
- 230000008859 change Effects 0.000 claims description 56
- 238000005259 measurement Methods 0.000 description 32
- 238000000034 method Methods 0.000 description 13
- 230000008569 process Effects 0.000 description 13
- 238000001514 detection method Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000011144 upstream manufacturing Methods 0.000 description 6
- 235000014676 Phragmites communis Nutrition 0.000 description 5
- 230000006837 decompression Effects 0.000 description 5
- 230000004044 response Effects 0.000 description 5
- 239000007788 liquid Substances 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 230000002093 peripheral effect Effects 0.000 description 4
- 230000001105 regulatory effect Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000012447 hatching Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Examining Or Testing Airtightness (AREA)
- Emergency Alarm Devices (AREA)
Description
【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、ガス配管等から生じるガス漏洩を監視するガ
ス漏洩監視装置に係り、より詳細には、LPガスボンベか
らのガスをガス圧力調整器及びガスメータを通じて供給
するLPガス供給システムにおいてガス漏洩を監視するガ
ス漏洩監視装置に関するものである。[Detailed Description of the Invention] [Industrial field of use] The present invention relates to a gas leakage monitoring device for monitoring gas leakage generated from a gas pipe or the like, and more specifically to a gas pressure regulator for gas from an LP gas cylinder. And a gas leakage monitoring device for monitoring gas leakage in an LP gas supply system supplied through a gas meter.
一般にLPガス供給システムは第8図に示すような構成と
なっている。Generally, the LP gas supply system has a structure as shown in FIG.
同図において、2本のガスボンベ11,12は自動切換え機
能付のガス圧力調整器2に接続され、該ガス圧力調整器
2を通じて一方のガスボンベ11又は12よりガスを導出さ
れる。ガスボンベから導出されたガスは、1次側(上流
側)のガス配管3を通じてガスメータ4に供給され、こ
こから更に2次側(下流側)のガス配管5を通じて末端
のガス栓6に導出される。以上により、ガス圧力調整器
2の切換え機能により選択された一方のガスボンベ11又
は12から導出されたガスは、ガス配管3を通じてガスメ
ータ4に供給され、更にガス配管5を通じてガス栓6に
導出され、ガス栓6に接続された図示しないガス燃焼器
によってガスが消費される。In the figure, two gas cylinders 1 1 and 1 2 are connected to a gas pressure regulator 2 having an automatic switching function, and the gas is discharged from one of the gas cylinders 1 1 or 1 2 through the gas pressure regulator 2. The gas discharged from the gas cylinder is supplied to the gas meter 4 through the gas pipe 3 on the primary side (upstream side), and from there is further discharged to the gas stopper 6 at the end through the gas pipe 5 on the secondary side (downstream side). . Thus, the gas pressure regulator 2 switching function by the gas derived from the gas cylinder 1 1 or 1 2 selected one is supplied to the gas meter 4 through the gas pipe 3, further led to the gas valve 6 through the gas pipe 5 Then, the gas is consumed by a gas combustor (not shown) connected to the gas plug 6.
そして、ガス圧力調整器2の切換え機能により選択され
ている一方のガスボンベ例えば11(供給ガスボンベ)の
ガス消費が進み、そのガス残量が少なくなると、ボンベ
内圧が低くなってガス燃焼器において必要な圧力のガス
を供給することができなくなる。そこで、自動切換え機
能付のガス圧力調整器2では、その自動切換え機能によ
り他方のガスボンベ12(補給ガスボンベ)が接続されて
いる導入口を自動的に開いてガス導入を図り、ガス切れ
を起こすことなく必要な圧力のガスを確実に供給できる
ようになっている。When the gas consumption of one of the gas cylinders selected by the switching function of the gas pressure adjuster 2, for example, 11 (supply gas cylinder) progresses, and the remaining amount of the gas decreases, the internal pressure of the cylinder decreases and the gas combustor needs it. It becomes impossible to supply a gas at a proper pressure. Therefore, the gas pressure regulator 2 with automatic switching function, aims to automatically open the gas introduction and the other of the gas cylinder 1 2 opening introduction (supply gas cylinder) is connected by its auto-switching capabilities, causing gas shortage Without fail, the gas of the required pressure can be reliably supplied.
上述のようなガス供給システムにおいて、ガスメータに
流量センサを設け、該流量センサが一定量のガス供給に
応じて発生する流量パルスに基づいて供給ガス流量を監
視し、流量が最大使用量を越えているかどうかを判断し
てガスメータ下流の二次側の大量ガス漏洩を検出するよ
うにしたり、或いは所定時間例えば30日継続して所定流
量例えば3l/時以上のガス流量があったかどうかを判断
してガスメータ下流の二次側の微小漏洩を検出し、該検
出に応じて室内に設置した警報装置を作動して警報を発
生させたり、ガス配給会社に対して報知を行ったりする
ようにしたものものが既に提案されている。In the gas supply system as described above, the gas meter is provided with a flow rate sensor, the flow rate sensor monitors the supply gas flow rate based on a flow rate pulse generated in response to a constant amount of gas supply, and the flow rate exceeds the maximum usage amount. It is determined whether there is a large amount of gas leakage on the secondary side downstream of the gas meter by judging whether there is a gas flow rate, or whether there is a gas flow rate of 3 l / hour or more for a predetermined time such as 30 days continuously. What detects a minute leak on the downstream side of the downstream side, and activates an alarm device installed in the room in response to the detection to generate an alarm, or to notify the gas distribution company. Already proposed.
しかし、上述した従来のガス漏洩監視装置では、ガスメ
ータよりも下流側でのガス漏洩を監視するものであっ
て、ガスメータよりも上流の一次側のガス配管やガス圧
力調整器などでのガス漏洩を監視することができないた
め、十分な監視を行っているとは言い難かった。However, in the conventional gas leak monitoring device described above, the gas leak is monitored on the downstream side of the gas meter, and the gas leak on the gas pipe or the gas pressure regulator on the primary side upstream of the gas meter is monitored. Since it was not possible to monitor it, it was hard to say that they are doing sufficient monitoring.
よって本考案は、上記従来の問題点に鑑み、ガスメータ
よりも上流の一次側でのガス漏洩を十分に監視すること
のできるガス漏洩監視装置を提供するこを課題としてい
る。Therefore, in view of the above conventional problems, it is an object of the present invention to provide a gas leakage monitoring device capable of sufficiently monitoring gas leakage on the primary side upstream of a gas meter.
上記課題を解決するため本考案により成されたガス漏洩
監視装置は、第1図の基本構成図に示す如く、LPガスボ
ンベ111,112からのガスをガス圧力調整器12及びガスメ
ータ13を通じて供給するLPガス供給システムにおいて、
前記ガスメータを通じて所定流量のガスが供給される毎
に発生される流量信号を計数して前記ガスメータを通じ
て供給されるガスの流量を計量する流量計量手段14−1
と、前記LPガスボンベのガス残量を計量する残量計量手
段111と、所定期間を繰り返し計時する計時手段14−2
と、該計時手段により計時される所定期間の開始時に前
記残量計量手段によって計量した前記LPガスボンベのガ
ス残量値を格納するガス残量値格納手段14b−1と、該
格納手段に格納されている前記ガス残量値と前記計時手
段により計時される所定期間の終了時に前記残量計量手
段によって計量した前記LPガスボンベのガス残量値との
差により所定期間内でのガス残量値の変化量を求める残
量変化量検出手段14−3と、前記計時手段により計時さ
れる所定期間の開始時に前記流量計量手段によって計量
したガスの流量計量値を格納する流量計量値格納手段14
b−2と、該流量計量値格納手段に格納されている前記
流量計量値と前記計時手段により計時される所定期間の
終了時に前記流量計量手段により計量したガスの流量計
量値との差により所定期間内での流量計量値の変化量を
求める流量変化量検出手段14−4と、前記残量変化量検
出手段により求めたガス残量値の変化量が前記流量変化
量検出手段により求めた流量計量値の変化量より所定値
以上大きいとき、前記LPガスボンベとガスメータとの間
にガス漏洩があると判定する判定手段14−5とを備える
ことを特徴としている。In order to solve the above problems, the gas leakage monitoring device according to the present invention supplies the gas from the LP gas cylinders 11 1 and 11 2 through the gas pressure regulator 12 and the gas meter 13 as shown in the basic configuration diagram of FIG. In the LP gas supply system to
Flow rate measuring means 14-1 for counting the flow rate signal generated each time a predetermined flow rate of gas is supplied through the gas meter to measure the flow rate of the gas supplied through the gas meter.
And a remaining amount measuring means 111 for measuring the remaining amount of gas in the LP gas cylinder, and a time measuring means 14-2 for repeatedly measuring a predetermined period.
And a gas residual amount storage means 14b-1 for storing the gas residual amount value of the LP gas cylinder measured by the residual amount measuring means at the start of a predetermined period timed by the time measuring means, and stored in the storage means. The difference between the remaining gas amount value and the remaining gas amount value of the LP gas cylinder measured by the remaining amount measuring means at the end of the predetermined period timed by the time measuring means A remaining amount change amount detection means 14-3 for obtaining a change amount, and a flow rate measurement value storage means 14 for storing the flow rate measurement value of the gas measured by the flow rate measurement means at the start of a predetermined period timed by the time measurement means.
b-2 and the difference between the flow rate measurement value stored in the flow rate measurement value storage means and the flow rate measurement value of the gas measured by the flow rate measurement means at the end of the predetermined period timed by the time measurement means The flow rate change amount detecting means 14-4 for obtaining the change amount of the flow rate measured value within the period, and the change amount of the gas remaining amount value obtained by the remaining amount change amount detecting means is the flow rate obtained by the flow amount change amount detecting means. When the amount of change in the measured value is larger than a predetermined value by a predetermined value or more, a determining means 14-5 for determining that there is a gas leak between the LP gas cylinder and the gas meter is provided.
上記構成において、ガスメータ13を通じて所定流量のガ
スが供給される毎に発生される流量信号を計数して流量
計量手段14−1がガスメータを通じて供給されるガスの
流量を計量すると共に、残量計量手段111がLPガスボン
ベのガス残量を計量する。計時手段14−2により繰り返
し計時される所定期間の開始時に残量計量手段によって
計量したLPガスボンベのガス残量値をガス残量値格納手
段14b−1に格納し、この格納されているガス残量値と
計時手段により計時される所定期間の終了時に残量計量
手段によって計量したLPガスボンベのガス残量値との差
により残量変化量検出手段14−3が所定期間内でのガス
残量値の変化量を求める。In the above configuration, the flow rate measuring means 14-1 measures the flow rate of the gas supplied through the gas meter by counting the flow rate signal generated each time a predetermined flow rate of gas is supplied through the gas meter 13, and the residual quantity measuring means. 111 weighs the amount of gas remaining in the LP gas cylinder. The gas residual amount value of the LP gas cylinder measured by the residual amount measuring device at the start of a predetermined period repeatedly measured by the time measuring device 14-2 is stored in the gas residual amount storage device 14b-1, and the stored gas residual amount is stored. The remaining amount change amount detecting means 14-3 determines the remaining gas amount within the predetermined period by the difference between the amount value and the remaining gas amount value of the LP gas cylinder measured by the remaining amount measuring means at the end of the predetermined period timed by the time measuring means. Find the amount of change in the value.
計時手段により計時される所定期間の開始時に流量計量
手段によって計量したガスの流量計量値を流量計量値格
納手段14b−2に格納し、この格納されている流量計量
値と計時手段により計時される所定期間の終了時に流量
計量手段により計量したガスの流量計量値との差により
流量変化量検出手段14−4が所定期間内での流量計量値
の変化量を求める。そして、残量変化量検出手段により
求めたガス残量値の変化量が流量変化量検出手段により
求めた流量計量値の変化量より所定値以上大きいとき、
判定手段14−5がLPガスボンベとガスメータとの間にガ
ス漏洩があると判定するようになっている。The flow rate measurement value of the gas measured by the flow rate measurement means is stored in the flow rate measurement value storage means 14b-2 at the start of a predetermined period timed by the time measurement means, and the stored flow rate measurement value and the time measurement means are timed. At the end of the predetermined period, the flow rate change amount detecting means 14-4 obtains the change amount of the flow rate measured value within the predetermined period based on the difference from the flow rate measured value of the gas measured by the flow rate measuring means. When the amount of change in the remaining gas amount value obtained by the remaining amount change amount detecting means is larger than the amount of change in the flow rate measured value obtained by the flow amount change amount detecting means by a predetermined value or more,
The judging means 14-5 judges that there is a gas leak between the LP gas cylinder and the gas meter.
上述のように流量計量値格納手段14b−2を有し、計時
手段14−2が繰り返し計時する所定期間の開始時に流量
計量手段によって計量したガスの流量計量値を格納し、
この格納されている流量計量値を利用して所定期間の終
了時に所定期間内の流量計量値の変化量、すなわち、ガ
スメータ下流側へのガス供給量を求め、かつガス残量値
格納手段14b−1を有し、計時手段14−2が繰り返し計
時する所定期間の開始時に残量計量手段によって計量し
たLPガスボンベのガス残量値を格納し、この格納されて
いるガス残量値を利用して所定期間の終了時に所定期間
内のガス漏洩値の変化量、すなわち、LPガスボンベから
のガス供給量を求め、ガス残量値の変化量が流量計量値
の変化量より所定値以上大きいときガス漏洩があると判
定するようにしている。As described above, it has the flow rate measured value storage means 14b-2, and stores the flow rate measured value of the gas measured by the flow rate measuring means at the start of a predetermined period in which the time measuring means 14-2 repeatedly measures time,
The stored flow rate measurement value is used to determine the amount of change in the flow rate measurement value within the predetermined period at the end of the predetermined period, that is, the gas supply amount to the gas meter downstream side, and the remaining gas amount value storage means 14b- 1 and stores the gas residual quantity value of the LP gas cylinder measured by the residual quantity measuring means at the start of a predetermined period in which the time measuring means 14-2 repeatedly measures time, and uses the stored gas residual quantity value. At the end of the predetermined period, the change amount of the gas leakage value within the predetermined period, that is, the gas supply amount from the LP gas cylinder is obtained, and when the change amount of the remaining gas value is larger than the change amount of the flow rate measured value by a predetermined value or more, the gas leakage I try to judge that there is.
従って、流量計量手段14−1が所定流量のガスの供給毎
にガスメータ13が発生する流量信号を計数するもので、
単位流量以上の分解能をもって流量を計量することがで
きず、しかもガス漏洩が少ない場合であっても、計時手
段による計時によって決められる所定期間を長くするこ
とによって、所定期間内のガス残量値の変化量と流量計
量値の変化量の比較によって、ガスメータよりも上流の
一次側でのガス漏洩を判定することができる。Therefore, the flow rate measuring means 14-1 counts the flow rate signal generated by the gas meter 13 every time the gas having a predetermined flow rate is supplied,
Even if the flow rate cannot be measured with a resolution equal to or higher than the unit flow rate and the gas leakage is small, by extending the predetermined period determined by the timing by the timing means, By comparing the amount of change and the amount of change in the flow rate measured value, it is possible to determine gas leakage on the primary side upstream of the gas meter.
以下、本考案の実施例を図面に基づいて説明する。 Embodiments of the present invention will be described below with reference to the drawings.
第2図は本考案によるガス漏洩監視装置の一実施例を示
すブロック図であり、同図において、111は供給用のガ
スボンベ、112は補給用のガスボンベ12、12はこれらの
ガスボンベ111及び112が接続される自動切換え機能付の
ガス圧力調整器12、13はガス圧力調整器12により圧力調
整されたガスが供給され、供給ガスの流量を計量するガ
スメータであり、該ガスメータ13には所定流量に応じて
流量信号である1個のパルスを発生する流量センサ13a
を内蔵する。FIG. 2 is a block diagram showing an embodiment of a gas leakage monitoring device according to the present invention. In FIG. 2, 11 1 is a gas cylinder for supply, 11 2 is a gas cylinder for supply 1 2 and 12 is these gas cylinders 11. 1 and 11 2 the gas pressure regulator 12 and 13 with an automatic switching function is connected is supplied with a gas whose pressure is adjusted by the gas pressure regulator 12, a gas meter for measuring the flow rate of the feed gas, the gas meter 13 Is a flow rate sensor 13a that generates one pulse that is a flow rate signal according to a predetermined flow rate.
Built in.
上記ガスボンベ111,112としては、例えば第3図に示す
ようにガスボンベ内の液化ガスの液面を検出し、ガス残
量信号を出力する残量検出装置111を内蔵したものを使
用する。残量検出装置111は、より詳細には、ガスボン
ベ内に設けられた液面変化方向に沿ったガイド棒111a
と、該ガイド棒111aにその長手方向に沿って設けられた
図示しない磁気感知素子と、ガイド棒111aに沿って案内
されたフロード111bと、該フロート111bに取付けられた
図示しないマグネットとから構成され、ガス液面に応じ
てフロート111bが上下動することによって液面レベルに
応じた残量信号を出力する。As the gas cylinder 11 1, 11 2, to use those for example to detect the liquid level of the liquefied gas in the gas cylinder, as shown in FIG. 3, a built-in level detecting unit 111 for outputting a remaining gas amount signal. More specifically, the remaining amount detecting device 111 includes a guide rod 111a provided in the gas cylinder along the liquid level changing direction.
A magnetic sensing element (not shown) provided along the longitudinal direction of the guide rod 111a, a flood 111b guided along the guide rod 111a, and a magnet (not shown) attached to the float 111b. By moving the float 111b up and down according to the liquid level of the gas, a remaining amount signal according to the liquid level is output.
また、ガス圧力調整器12とガスメータ13は第3図に示す
ように前後に並べて一体化され、ガス圧力調整器12のガ
ス出口が何らの配管も介することなく直接ガスメータ13
のガス入口に結合された構成となっている。なお、13b
はガスメータ13のガス出口に接続された配管、13cは計
量表示部、13dは各ガスボンベのガス残量を表示する残
量表示部である。Further, the gas pressure regulator 12 and the gas meter 13 are integrated side by side as shown in FIG. 3, and the gas outlet of the gas pressure regulator 12 is directly connected to the gas meter 13 without any piping.
It is configured to be connected to the gas inlet of. Note that 13b
Is a pipe connected to the gas outlet of the gas meter 13, 13c is a measurement display unit, and 13d is a remaining amount display unit that displays the remaining amount of gas in each gas cylinder.
上記ガス圧力調整器12内には、第4図及び第5図につい
て後述するように、交互にオン、オフしてボンベ切換え
状態、すなわち供給ガスボンベ及び補強ガスボンベの別
を示すスイッチSWI及びSWIIとオフにより補給状態を示
すスイッチSWIIIとが設けられている。Inside the gas pressure regulator 12, as will be described later with reference to FIGS. 4 and 5, the cylinders are switched on and off alternately, that is, switches SWI and SWII indicating the supply gas cylinder and the reinforcement gas cylinder are turned off. Therefore, a switch SWIII indicating the replenishment state is provided.
14はガスボンベ111,112の各々の残量検出装置111と、ガ
ス圧力調整器11のスイッチSWI乃至SWIIIと、流量センサ
12aとが接続されたマイクロコンピュータ(CPU)で、該
CPU14は制御プログラムを記憶しているROM14aと制御プ
ログラムに従って処理した結果などのデータを記憶する
RAM14bを有し、流量センサ13aからの流量信号に基づい
てガス消費量を計量し、この計量値の所定時間内での変
化とガスボンベの残量検出装置111からの残量信号の所
定時間内での変化を比較して、ガス漏洩の有無を検出
し、その結果により警報装置15を作動して警報を発生し
たり、網制御装置(NCU)16及び電話回線17を通じてガ
ス配給会社に報知を行ったりする。Reference numeral 14 is a remaining amount detection device 111 for each of the gas cylinders 11 1 and 11 2 , switches SWI to SWIII of the gas pressure regulator 11, and a flow rate sensor.
A microcomputer (CPU) connected to 12a
The CPU 14 stores data such as the result of processing according to the control program and the ROM 14a that stores the control program.
Having the RAM 14b, the gas consumption is measured based on the flow rate signal from the flow rate sensor 13a, and the change in the measured value within a predetermined time and the remaining amount signal from the remaining amount detection device 111 of the gas cylinder within a predetermined time. Of the gas leakage is detected, and the alarm device 15 is activated according to the result to generate an alarm, or the gas distribution company is notified through the network control unit (NCU) 16 and the telephone line 17. Or
上記自動切換え機能付のガス圧力調整器11の構成例を第
4図及び第5図の断面図に基づいて以下説明する。A configuration example of the gas pressure regulator 11 having the automatic switching function will be described below with reference to the sectional views of FIGS. 4 and 5.
第4図及び第5図の断面図においては、ハウジングにつ
いてのみハッチングを施し、他の部分のハッチングは簡
単のため省略している。図において、自動切換え機能付
のガス圧力調整器12は、一側部両側に一対のガス入口ポ
ート121を、他端部に出口ポート122をそれぞれ形成した
ハウジング123と、このハウジング123の上面一側部に設
けられた切換弁ユニット124と、ハウジング123の上部に
切換弁ユニット124と並列配置した調整弁ユニット125と
からなっている。In the sectional views of FIGS. 4 and 5, only the housing is hatched, and hatching of other portions is omitted for simplicity. In the figure, a gas pressure regulator 12 with an automatic switching function includes a housing 123 having a pair of gas inlet ports 121 formed on both sides of one side and an outlet port 122 formed on the other side, and one side of an upper surface of the housing 123. And a regulating valve unit 125 arranged in parallel with the switching valve unit 124 above the housing 123.
上記ハウジング123の内部は、切換弁ユニット124に接続
する高圧のガス一次側減圧室126と、調整弁ユニット125
に接続するガス二次側減圧室127と、両減圧室126及び12
7間を連通するガス流路128からなっている。Inside the housing 123, a high pressure gas primary pressure reducing chamber 126 connected to the switching valve unit 124 and a regulating valve unit 125.
To the gas secondary side decompression chamber 127, and both decompression chambers 126 and 12
It is composed of a gas flow path 128 that communicates between the seven.
上記切換弁ユニット124及び調整弁ユニット125は共通の
カバー129の一方の凹部129a及び他方側の凹部129bに収
装されている。The switching valve unit 124 and the adjusting valve unit 125 are housed in the recess 129a on one side and the recess 129b on the other side of the common cover 129.
上記切換弁ユニット124は、各入口ポート121の内部にあ
って、各入口ポート121の供給端を開閉する弁体130と、
弁体130を常時閉側に付勢するスプリング131と、弁体13
0の上部に一体に突出したプランジャ132と、各プランジ
ャ132に摺接するカム133を一体化した切換軸134と、中
心に切換軸134を一体に突設すると共に周縁をハウジン
グ123の開口周縁と凹部129aの底面周縁間に挟み付けら
れて一次側減圧室126内を気密にシールするダイヤフラ
ム135と、ダイヤフラム135の上部とカバー129間に介挿
され、ダイヤフラム135を減圧室126側に押付けて、大気
圧とガス圧をバランスするスプリング136と、切換軸134
のカバー129からの突出端上部に設けられた切換操作用
のノブ137とからなっている。The switching valve unit 124 is inside each inlet port 121 and has a valve element 130 that opens and closes a supply end of each inlet port 121,
A spring 131 that normally biases the valve body 130 toward the closing side, and a valve body 13
Plunger 132 that integrally projects at the upper part of 0, switching shaft 134 that integrates cam 133 that slidably contacts with each plunger 132, switching shaft 134 integrally project at the center, and the peripheral edge is recessed with the opening peripheral edge of housing 123. A diaphragm 135 that is sandwiched between the peripheral edges of the bottom surface of 129a and hermetically seals the inside of the primary-side decompression chamber 126, and is inserted between the upper part of the diaphragm 135 and the cover 129. Spring 136 that balances atmospheric pressure and gas pressure, and switching shaft 134
And a knob 137 for switching operation provided on the upper end of the protruding end from the cover 129.
切換軸134とノブ137間には中間スリーブ138が介在され
ている。この中間スリーブ138は凹部129aの中央上部に
回動可能に軸受され、ノブ137に結合している。そし
て、この中間スリーブ138の中央に切換軸134を上下方向
に摺動可能に保持している。中間スリーブ138の上部に
は表示体139が回動可能に枢支され、表示体139は切換軸
134の下降動作に連繋して回動し、ノブ137の上面中央部
嵌合された表示窓140を通じて切換軸134の作動状態を表
示する。An intermediate sleeve 138 is interposed between the switching shaft 134 and the knob 137. The intermediate sleeve 138 is rotatably supported at the upper center of the recess 129a and is coupled to the knob 137. A switching shaft 134 is held at the center of the intermediate sleeve 138 so as to be vertically slidable. A display body 139 is rotatably supported on the upper portion of the intermediate sleeve 138, and the display body 139 is a switching shaft.
The operation state of the switching shaft 134 is displayed through the display window 140 fitted in the central portion of the upper surface of the knob 137 so as to rotate in association with the lowering operation of the 134.
上記スプリング136は各スプリング131のバネ強度より大
きく設定されており、通常状態ではノブ137の切換操作
によって、各弁体130を交互に開閉できる。そして、減
圧室126の一次圧力が低くなると、ダイヤフラム135が下
部側に膨出し、切換軸134が下降し、表示体139が回動す
るので、表示窓140を通じて色その他の機械的表示の変
化に応じて減圧状態が直ちに判断できるようになってい
る。The spring 136 is set to be stronger than the spring strength of each spring 131, and in a normal state, each valve body 130 can be alternately opened and closed by switching operation of the knob 137. Then, when the primary pressure of the decompression chamber 126 becomes low, the diaphragm 135 bulges downward, the switching shaft 134 descends, and the display body 139 rotates, causing a change in color or other mechanical display through the display window 140. Accordingly, the depressurized state can be immediately determined.
上記カム133は円板状をしており、その約半周が大径、
且つ下部側に伸びていて、その下面側に各プランジャ13
2に摺接するカムリードを形成している。図において
は、カムリード面は一方のプランジャ132を押圧し、こ
の結果、一方の弁体130が開き、他方が閉じている。The cam 133 has a disc shape, and a half of the circumference has a large diameter,
It also extends to the lower side and each plunger 13
A cam lead that slides on 2 is formed. In the figure, the cam lead surface presses one plunger 132, so that one valve body 130 is open and the other is closed.
なお、カバー129の上面には、第4図に示すように、ノ
ブ137の2つの切換え位置にそれぞれ対応してリードス
イッチSWI及びSWIIが、ノブ137と一緒に回動される中間
スリーブ138のフランジ138aには、ノブ137を回動したと
きリードスイッチSWI又はSWIIと対向する位置にマグネ
ット141がそれぞれ設けられ、ノブ137の切換え状態がリ
ードスイッチSWI及びSWIIのオン、オフ状態により知る
ことができる。As shown in FIG. 4, on the upper surface of the cover 129, the reed switches SWI and SWII corresponding to the two switching positions of the knob 137 are provided on the flange of the intermediate sleeve 138 which is rotated together with the knob 137. Magnets 141 are provided on 138a at positions facing the reed switch SWI or SWII when the knob 137 is rotated, and the switching state of the knob 137 can be known by the on / off states of the reed switches SWI and SWII.
また、第3図に示すように、カバー129の凹部129a内に
リードスイッチSWIIIが、該リードスイッチSWIIIと対向
するダイヤフラム135の上面部位にはマグネット142がそ
れぞれ設けられ、リードスイッチSWIIIのオフ状態によ
りダイヤフラム135が下降したことが検知でき、この検
知によって補給ガスボンベが接続されているガス入口ポ
ート121側の弁体130が開かれ、補給が開始されたことを
知ることができる。Further, as shown in FIG. 3, a reed switch SWIII is provided in the recess 129a of the cover 129, and a magnet 142 is provided on the upper surface of the diaphragm 135 facing the reed switch SWIII. It is possible to detect that the diaphragm 135 has descended, and by this detection, it is possible to know that the valve body 130 on the gas inlet port 121 side, to which the supply gas cylinder is connected, is opened and supply is started.
今まで補給ガスボンベであったガスボンベを供給ガスボ
ンベに切換えるには、ノブ137を180度回転させればよ
く、カム133のカムリード面が一方のプランジャ132から
外れ、他方のプランジャ132に摺接し、これを押し下げ
る。この切換作用によって一方側が閉じ、他方側が弁開
放状態となる。To switch the gas cylinder that was a replenishment gas cylinder to the supply gas cylinder, turn knob 137 by 180 degrees.The cam lead surface of cam 133 comes off one plunger 132 and slides on the other plunger 132. Push down. This switching action closes one side and opens the other side.
調整弁ユニット125は、カバー129の他方の凹部129bの周
縁部に挟持されて二次側減圧室127と大気圧室を上下に
気密に仕切る調圧ダイヤフラム145と、ダイヤフラム145
を減圧室127側に押圧付勢するスプリング146と、ダイヤ
フラム145の中心に一体に突設された調圧用作動棒147
と、作動棒147の下部に連繋したレバー148と、レバー14
8の下端に摺動可能に接続した調圧用の弁体149とからな
っていて、弁体149は、ガス流路128の終端の設けられた
ノズル150に対向されている。The regulating valve unit 125 is sandwiched by the peripheral edge of the other recess 129b of the cover 129 and vertically and airtightly divides the secondary pressure reducing chamber 127 and the atmospheric pressure chamber into a pressure regulating diaphragm 145 and a diaphragm 145.
A spring 146 for urging the pressure reducing chamber 127 toward the pressure reducing chamber 127 side, and a pressure adjusting actuating rod 147 integrally provided at the center of the diaphragm 145.
, The lever 148 connected to the bottom of the operating rod 147, and the lever 14
The valve body 149 is slidably connected to the lower end of the valve 8, and the valve body 149 faces the nozzle 150 provided at the end of the gas flow path 128.
従って、二次側減圧室127内のガス圧力がスプリング146
の強度より大きくなった状態、すなわち、所定の圧力よ
りも高くなると、ダイヤフラム145は上部側に膨出し、
その結果、作動棒147を引き上げ、レバー148を介して弁
体149を閉側に移動させる。また、低くなった場合には
逆の動作を行う。これによって、二次側減圧室127は常
時所定のガス圧力に保たれる。Therefore, the gas pressure in the secondary side decompression chamber 127 is reduced by the spring 146.
When the strength is higher than the strength of the diaphragm, that is, when the pressure is higher than a predetermined pressure, the diaphragm 145 bulges upward.
As a result, the operating rod 147 is pulled up, and the valve body 149 is moved to the closing side via the lever 148. When it becomes low, the reverse operation is performed. As a result, the secondary pressure reducing chamber 127 is always kept at a predetermined gas pressure.
以上の構造において、通常の使用状態で供給ガスボンベ
の残ガスが減少してガス欠状態となった場合には、切換
棒134が下降して他方のプランジャ132も押し下げられ、
これに応じて回動される表示体139の表示により補給ガ
スボンベからの補給が行われていることが知らされる。
そしてこの表示に対応してノブ137を現状位置から180度
回動操作すれば、他方側ガス入口ポート121が開き、補
給ガスボンベを供給ガスボンベに切換え、新しく接続し
たガスボンベを補給ガスボンベとして使用するようにす
る。In the above structure, when the residual gas in the supply gas cylinder is reduced and the gas is out of gas in a normal use state, the switching rod 134 is lowered and the other plunger 132 is also pushed down.
The display of the display body 139 rotated in response to this informs that replenishment from the replenishment gas cylinder is being performed.
Then, if the knob 137 is rotated 180 degrees from the current position in response to this display, the other gas inlet port 121 is opened, the supplementary gas cylinder is switched to the supply gas cylinder, and the newly connected gas cylinder is used as the supplementary gas cylinder. To do.
以上説明したガス漏洩検出装置の動作の概略を以下説明
する。The outline of the operation of the gas leakage detection device described above will be described below.
第2図において、ガスメータ13を通じて図示しない燃焼
器に所定流量のガスが供給されると、流量センサ13aが
流量パルスを発生してこれがCPU14に入力される。これ
に応じてCPU14はカウンタによりこのパルスを計数して
いく。また、CPU14は、ガスボンベ111,112からの残量信
号により各ガスボンベの残量を監視する。そして、所定
の一定時間毎にカウンタの計数値の変化とガス残量の変
化とを比較し、この比較の結果計数値の変化すなわちガ
ス消費量がガスボンベの残量変化すなわちガスボンベか
らのガス供給量よりも所定値E以上少ないときには、ガ
スメータ14とガスボンベ111,112との間でガス漏洩があ
ると判断し、警報器15を作動して警報を発生したり、NC
U16を通じてガス会社に報知を行う。In FIG. 2, when a gas having a predetermined flow rate is supplied to the combustor (not shown) through the gas meter 13, the flow rate sensor 13 a generates a flow rate pulse, which is input to the CPU 14. In response to this, the CPU 14 counts this pulse by the counter. Further, the CPU 14 monitors the remaining amount of each gas cylinder by the remaining amount signals from the gas cylinders 11 1 and 11 2 . Then, the change in the count value of the counter and the change in the gas remaining amount are compared at predetermined intervals, and as a result of this comparison, the change in the count value, that is, the gas consumption amount is the remaining amount change of the gas cylinder, that is, the gas supply amount from the gas cylinder When it is less than the predetermined value E by more than the predetermined value E, it is determined that there is a gas leak between the gas meter 14 and the gas cylinders 11 1 and 11 2, and the alarm device 15 is activated to issue an alarm or NC
Notify the gas company through U16.
以上概略説明した動作の詳細を第2図中のCPU14が行う
仕事を示す第6図のフローチャート図を参照して以下説
明する。The details of the operation outlined above will be described below with reference to the flowchart of FIG. 6 showing the work performed by the CPU 14 in FIG.
CPU14はその電源投入によって動作をスタートし、その
最初のステップS1においてイニシャライズを行う。この
イニシャライズでは、CPU14内のRAM14bの所定領域に構
成した流量カウンタによる流量計量値を流量計量初期値
C0としてRAM14b中の他の所定領域に形成したレジスタに
格納すると共に、ガスボンベ111及び112からの残量信号
に基づくガス残量計量値をガス残量計量初期値K01及びK
02としてRAM14b中の所定領域に形成したレジスタに格納
し、かつ所定時間でタイムオーバするタイマをリセット
して所定時間の計時を開始させる。The CPU 14 starts its operation when its power is turned on, and initializes in the first step S1. In this initialization, the flow rate measured value by the flow rate counter configured in the predetermined area of RAM14b in CPU14
It is stored in a register formed in another predetermined area in the RAM 14b as C 0 , and the gas residual amount measurement value based on the residual amount signal from the gas cylinders 11 1 and 11 2 is stored as the initial gas residual amount measurement value K 01 and K
As 02 , it is stored in a register formed in a predetermined area in the RAM 14b, and a timer that times out at a predetermined time is reset to start counting a predetermined time.
その後ステップS2に進み、ここで流量センサ13aから流
量パルスが入力されたか否かを判定し、このステップS2
の判定がYESのときにはステップS3に進み、ここで流量
カウンタのカウントアップを行った後ステップS4に進
む。一方、上記ステップS2の判定がNO、すなわち流量パ
ルスの入力がないときにはステップS3を飛ばしてステッ
プS4に進む。ステップS4においては各ガスボンベ111,11
2の残量検出装置111からの残量信号によりガス残量計量
値K1,K2をそれぞれ読込み、該読込んだガス残量計量値K
1及びK2を対応するレジスタにそれぞれ格納する。その
後ステップS5に進み、ここで上記ステップS1においてリ
セットしたタイマがタイムオーバしたか否かを判定し、
判定がNOのときには上記ステップS2に戻る。After that, the process proceeds to step S2, where it is determined whether or not a flow rate pulse is input from the flow rate sensor 13a.
When the determination is YES, the process proceeds to step S3, where the flow rate counter is counted up, and then the process proceeds to step S4. On the other hand, when the determination in step S2 is NO, that is, when the flow rate pulse is not input, step S3 is skipped and the process proceeds to step S4. In step S4, each gas cylinder 11 1 , 11
The gas remaining amount measurement values K 1 and K 2 are respectively read by the remaining amount signal from the remaining amount detection device 111 of 2, and the read gas remaining amount measurement values K 1
Store 1 and K 2 in the corresponding registers. After that, the process proceeds to step S5, where it is determined whether or not the timer reset in step S1 has timed out,
When the determination is NO, the process returns to step S2.
上記ステップS2乃至S5はステップS5の判定がYESとなる
まで繰り返し実行され、ステップS5の判定がYESすなわ
ちタイムオーバとなるとステップS6に進む。ステップS6
においては、補給開始によってオフするスイッチSWIII
がオフしているか否かを判定し、この判定がNOすなわち
まだ補給が開始していないときにはステップS7に進む。
ステップS7においてはオンしているスイッチはスイッチ
SWI,SWIIのどちらであるかを判定する。この判定はガス
圧力調整器13のノブ137によってガスボンベ111,112のど
ちらが供給ガスボンベとなっているかを判断するための
ものである。今、スイッチSWIがオンしていてガスボン
ベ111が供給ガスボンベとなっているときにはステップS
8に進み、ここで上記ステップS1のイニシャライズによ
ってレジスタに格納したガス残量計量初期値K01と上記
ステップS4において最後に読込んでレジスタに格納した
ガスボンベ111ガス残量計量値K1との差ΔKを求めた後
ステップS9に進む。The above steps S2 to S5 are repeatedly executed until the determination in step S5 becomes YES, and when the determination in step S5 becomes YES, that is, the time is over, the process proceeds to step S6. Step S6
, Switch SWIII that turns off when the supply starts
Is turned off, and if this determination is NO, that is, if replenishment has not started yet, the process proceeds to step S7.
In step S7, the switch that is turned on is the switch
Determine whether it is SWI or SWII. This determination is for determining which of the gas cylinders 11 1 and 11 2 is the supply gas cylinder by the knob 137 of the gas pressure regulator 13. Now, if the switch SWI is turned on and the gas cylinder 11 1 is the supply gas cylinder, step S
Proceed to step 8, where the difference between the gas residual quantity initial value K 01 stored in the register by the initialization in step S1 above and the gas cylinder 11 1 gas residual quantity measured value K 1 last read in and stored in the register at step S4 above. After obtaining ΔK, the process proceeds to step S9.
ステップS9においては、上記ステップS1においてレジス
タに格納した流量計量初期値C0と上記ステップS3におい
て流量カウンタをカウントアップして得られている流量
計量値Cとの差ΔCを求めた後ステップS10に進む。ス
テップS10においてはステップS8で求めたΔKすなわち
タイマのタイムオーバ時間の間のガスボンベ111ガス残
量の変化量(ガスボンベ111から供給されたガス量)
と、上記ステップS9で求めたΔCすなわちタイムオーバ
時間の間にガスメータ13を通じて燃焼器に供給されて実
際に消費されたガス量との差Eを求めた後ステップS11
に進む。In step S9, the difference ΔC between the flow rate measurement initial value C 0 stored in the register in step S1 and the flow rate measurement value C obtained by counting up the flow rate counter in step S3 is obtained, and then in step S10. move on. In step S10, ΔK obtained in step S8, that is, the amount of change in the remaining amount of gas in the gas cylinder 11 1 during the time-out time of the timer (the amount of gas supplied from the gas cylinder 11 1 )
And the difference E from the amount of gas actually supplied and consumed by the combustor through the gas meter 13 during the ΔC obtained in step S9, that is, the time-over time, is obtained in step S11.
Proceed to.
ステップS11においては、上記ステップS10で求めたΔK
−ΔC=Eが予め定めた値E0より大きいか否かの判定を
行う。この判定は、ガスボンベ111から供給されたガス
量がガスメータ13において計量したガス量よりも所定値
以上多く、ガスボンベ111とガスメータ13との間でガス
漏洩が生じているかどうかを判断するためのもので、上
記値E0は計量の誤差による判断ミスをなくするものであ
る。In step S11, ΔK obtained in step S10 above
It is determined whether −ΔC = E is larger than a predetermined value E 0 . This determination is for determining whether or not the amount of gas supplied from the gas cylinder 11 1 is larger than the amount of gas measured by the gas meter 13 by a predetermined value or more, and gas leakage occurs between the gas cylinder 11 1 and the gas meter 13. However, the above value E 0 eliminates erroneous judgment due to measurement error.
そして上記ステップS11の判定がYESすなわちガス漏洩が
生じていると判断できる程にガスボンベ111のガス残量
の変化量すなわちガスボンベ111からのガス供給量が多
い場合にはステップS12に進み、ここで警報器15を作動
して警報を発生したり、ガス会社に通報するための警報
信号を出力して動作を停止する。And when the gas supply amount from the amount of change i.e. the gas cylinder 11 1 of the gas remaining in the gas cylinder 11 1 enough to be determined that the determination in step S11 is YES, that gas has leaked often proceeds to step S12, where Activates the alarm device 15 to generate an alarm, or outputs an alarm signal for notifying the gas company to stop the operation.
上記ステップS11の判定がNOすなわちガス漏洩が生じて
いると判断できる程にガスボンベ111からの供給量が多
くない場合にはステップS13に進む。ステップS13ではタ
イマをリセットしてタイマの計時を再スタートさせ、続
くステップS14でガスボンベ111,112の最新のガス残量計
量値K1,K2をそれぞれ対応するレジスタにガス残量計量
初期値K01,K02として格納すると共に最新の流量計量値
Cをレジスタに流量計量初期値C0として格納してから上
記ステップS2に戻る。When the determination in step S11 is NO, that is, when the supply amount from the gas cylinder 11 1 is not large enough to determine that gas leakage has occurred, the process proceeds to step S13. Step S13, resets the timer to restart the counting of the timer, followed by the gas cylinder 11 1 at step S14, 11 2 of the newest gas level metric K 1, K 2, respectively corresponding gas remaining weighed initially register The values K 01 and K 02 are stored, and the latest flow rate measurement value C is stored in the register as the flow rate measurement initial value C 0 , and then the process returns to step S2.
上記ステップS7において、スイッチSWIIがオンしている
と判定されたとき、すなわちガスボンベ112が供給ガス
ボンベとなっているときにはステップS15に進み、ここ
でガス残量計量初期値K02と最新のガス残量計量値K2と
の差ΔKすなわちガスボンベ112のガス残量の変化量を
求めた後上記ステップS9以降に進み、ガスボンベ112か
らの供給量とガスメータ13での計量流量とを比較してガ
ス漏洩の有無を監視する。In the above step S7, when the switch SWII is determined to be ON, i.e. gas cylinder 11 2 proceeds to step S15 when it is a supply gas cylinder, wherein the gas level metric initial value K 02 and the latest gas remaining After obtaining the difference ΔK from the measured amount of gas K 2, that is, the amount of change in the remaining amount of gas in the gas cylinder 11 2 , the process proceeds to step S9 and thereafter, comparing the supply amount from the gas cylinder 11 2 with the measured flow rate in the gas meter 13. Monitor for gas leaks.
また、上記ステップS6の判定がYESすなわちガス補給が
行われているときにはステップS16にすすみ、そこで(K
01-K1)+(K02-K2)=ΔKすなわち両ガスボンベ111及び11
2のガス残量の変化量を求める。そしてこの両ガスボン
ベ111及び112からの供給量とガスメータ13での流量とを
その後のステップS11で比較することによって漏洩の有
無を監視する。If the determination in step S6 is YES, that is, if gas replenishment is being performed, proceed to step S16, where (K
01 -K 1 ) + (K 02 -K 2 ) = ΔK, that is, both gas cylinders 11 1 and 11
Find the amount of change in the remaining gas amount of 2 . Then, the presence or absence of leakage is monitored by comparing the supply amount from both the gas cylinders 11 1 and 112 2 and the flow rate at the gas meter 13 in the subsequent step S11.
以上説明した動作により、ガスメータ13の上流一次側で
のガス漏洩を確実に検出することができるようになる。By the operation described above, it becomes possible to reliably detect the gas leakage on the upstream primary side of the gas meter 13.
第6図を参照して行ったCPU14の処理フローチャートの
説明から明らかなように、CPU14はステップS3の処理に
よりガスメータ13を通じて所定流量のガスが供給される
毎に発生される流量信号を計数して前記ガスメータを通
じて供給されるガスの流量を計量する流量計量手段14−
1として機能する。また、CPU14は、ステップS13の処理
によって所定期間は繰り返し計時する計時手段14−2と
して機能する。更にまた、CPU14はRAM14bに格納されて
いるガス残量値と所定期間の終了時に残量検出装置111
によって計量したLPガスボンベのガス残量値との差によ
り所定期間内でのガス残量値の変化量を求める残量変化
量検出手段14−3として、RAM14bに格納されている流量
計量値と所定期間の終了時に流量計量手段14−1により
計量したガスの流量計量値との差により所定期間内での
流量計量値の変化量を求める流量変化量検出手段14−4
として、そして残量変化量検出手段14−3により求めた
ガス残量値の変化量が流量変化量検出手段14−4により
求めた流量計量値の変化量より大きいとき、LPガスボン
ベとガスメータとの間にガス漏洩があると判定する判定
手段14−5としても機能している。As is clear from the description of the processing flowchart of the CPU 14 performed with reference to FIG. 6, the CPU 14 counts the flow rate signal generated each time a predetermined flow rate of gas is supplied through the gas meter 13 by the processing of step S3. Flow rate measuring means 14-for measuring the flow rate of the gas supplied through the gas meter
It functions as 1. In addition, the CPU 14 functions as a time measuring unit 14-2 that repeatedly measures time for a predetermined period by the process of step S13. Furthermore, the CPU 14 uses the remaining gas amount value stored in the RAM 14b and the remaining amount detecting device 111 at the end of the predetermined period.
As a remaining amount change amount detecting means 14-3 for obtaining a change amount of the remaining gas amount value within a predetermined period based on a difference from the remaining gas amount value of the LP gas cylinder measured by the flow amount measurement value stored in the RAM 14b and a predetermined value. Flow rate change amount detecting means 14-4 for obtaining the amount of change in the flow rate measured value within a predetermined period based on the difference from the flow rate measured value of the gas measured by the flow rate measuring means 14-1 at the end of the period.
As the change amount of the remaining gas amount value obtained by the remaining amount change amount detecting means 14-3 is larger than the change amount of the flow rate measured value obtained by the flow amount change amount detecting means 14-4, the LP gas cylinder and the gas meter are It also functions as a determination means 14-5 for determining that there is a gas leak between them.
なお、上述の実施例では、ガスボンベのガス残量を計量
する手段はガスボンベ内に組み込まれているが、残量計
量装置111としては、第7図に示すように、ガスボンベ1
1を荷重検出器或いはロードセル111cを組み込んだ台111
d上に設置するようにし、ガスボンベ11の重量に応じた
荷重検出器111cの出力信号によりガスボンベ11内のガス
量を計測することによって残量を計量するものであって
もよい。In the above-described embodiment, the means for measuring the remaining amount of gas in the gas cylinder is incorporated in the gas cylinder. However, as the remaining amount measuring device 111, as shown in FIG.
1 is a stand 111 incorporating a load detector or load cell 111c
The remaining amount may be measured by installing on the d and measuring the amount of gas in the gas cylinder 11 by the output signal of the load detector 111c according to the weight of the gas cylinder 11.
以上説明したように本考案によれば、繰り返される所定
期間の開始時に計量したガスの流量計量値を格納し、こ
の格納されている流量計量値を利用して所定期間の終了
時に所定期間内の流量計量値の変化量、すなわち、ガス
メータ下流側へのガス供給量を求め、所定期間の開始時
に計量したLPガスボンベのガス残量値を格納し、この格
納されているガス残量値を利用して所定期間の終了時に
所定期間内のガス残量値の変化量、すなわち、LPガスボ
ンベからのガス供給量を求め、ガス残量値の変化量が流
量計量値の変化量より所定値以上大きいときガス漏洩が
あると判定するので、ガスメータよりも上流の一次側で
のガス漏洩を判定することができる。As described above, according to the present invention, the flow rate measurement value of the gas measured at the start of the repeated predetermined period is stored, and the stored flow rate measurement value is used to determine whether the predetermined period is within the predetermined period at the end of the predetermined period. The amount of change in the flow rate measurement value, that is, the gas supply amount to the downstream side of the gas meter is calculated, the gas residual amount value of the LP gas cylinder measured at the start of the predetermined period is stored, and this stored gas residual amount value is used. At the end of the predetermined period, the amount of change in the residual gas amount within the prescribed period, that is, the amount of gas supplied from the LP gas cylinder is calculated, and the amount of change in the residual gas amount is greater than the amount of change in the flow rate measured value by a prescribed amount or more. Since it is determined that there is a gas leak, the gas leak on the primary side upstream of the gas meter can be determined.
しかも、所定流量のガスの供給毎にガスメータが発生す
る流量信号を計数して流量を計量しているので流量計量
の分解能は高くないが、所定期間の開始時での計量値を
格納して所定期間を長くすることで、ガス漏洩が少ない
場合であっても、所定期間内のガス残量値の変化量と流
量計量値の変化量の比較によって、ガス漏洩を十分に監
視することができるようになっている。Moreover, since the flow rate is measured by counting the flow rate signal generated by the gas meter each time the gas of a predetermined flow rate is supplied, the resolution of the flow rate measurement is not high, but the measured value at the beginning of the predetermined period is stored and stored. By extending the period, even if there is little gas leakage, it is possible to sufficiently monitor gas leakage by comparing the amount of change in the gas residual amount value with the amount of change in the flow rate measured value within a predetermined period. It has become.
第1図は本考案によるガス漏洩監視装置の基本構成を示
すブロック図、 第2図は本考案によるガス漏洩監視装置の一実施例を示
すブロック図、 第3図は本考案によるガス漏洩監視装置に使用されるガ
ス残量計量手段の一例を示す図、 第4図及び第5図は本考案によるガス漏洩監視装置にお
いて使用されるガス圧力調整器の構成例を示す断面図、 第6図は第2図中のCPUが実行する仕事を示すフローチ
ャート図、 第7図はガス残量計量手段の他の例を示す図、 第8図は従来一般のLPガス供給システムの構成例を示す
図である。 111,112…LPガスボンベ、12…圧力調整器、13…ガスメ
ータ、111…残量計量手段(残量計量装置)、14−1…
流量計量手段(CPU)、14−2…計時手段(CPU)、14−
3…残量変化量検出手段(CPU)、14−4…流量変化量
検出手段(CPU)、14−5…判定手段(CPU)、14b−1
…ガス残量値格納手段(RAM)、14b−2…流量計量値格
納手段(RAM)FIG. 1 is a block diagram showing a basic configuration of a gas leakage monitoring device according to the present invention, FIG. 2 is a block diagram showing an embodiment of a gas leakage monitoring device according to the present invention, and FIG. 3 is a gas leakage monitoring device according to the present invention. Showing an example of the gas residual amount measuring means used in the above, FIG. 4 and FIG. 5 are sectional views showing an example of the constitution of the gas pressure regulator used in the gas leakage monitoring device according to the present invention, and FIG. FIG. 2 is a flow chart showing the work executed by the CPU in FIG. 2, FIG. 7 is a diagram showing another example of the gas remaining amount measuring means, and FIG. 8 is a diagram showing a configuration example of a conventional general LP gas supply system. is there. 11 1 , 11 2 ... LP gas cylinder, 12 ... pressure regulator, 13 ... gas meter, 111 ... residual amount measuring means (residual amount measuring device), 14-1 ...
Flow rate measuring means (CPU), 14-2 ... Time measuring means (CPU), 14-
3 ... Remaining amount change amount detecting means (CPU), 14-4 ... Flow rate change amount detecting means (CPU), 14-5 ... Judging means (CPU), 14b-1
... Gas residual amount storage means (RAM), 14b-2 ... Flow rate measured value storage means (RAM)
Claims (1)
及びガスメータを通じて供給するLPガス供給システムに
おいて、 前記ガスメータを通じて所定流量のガスが供給される毎
に発生される流量信号を計数して前記ガスメータを通じ
て供給されるガスの流量を計量する流量計量手段と、 前記LPガスボンベのガス残量を計量する残量計量手段
と、 所定期間を繰り返し計時する計時手段と、 該計時手段により計時される所定期間の開始時に前記残
量計量手段によって計量した前記LPガスボンベのガス残
量値を格納するガス残量値格納手段と、 該格納手段に格納されている前記ガス残量値と前記計時
手段により計時される所定期間の終了時に前記残量計量
手段によって計量した前記LPガスボンベのガス残量値と
の差により所定期間内でのガス残量値の変化量を求める
残量変化量検出手段と、 前記計時手段により計時される所定期間の開始時に前記
流量計量手段によって計量したガスの流量計量値を格納
する流量計量値格納手段と、 該流量計量値格納手段に格納されている前記流量計量値
と前記計時手段により計時される所定期間の終了時に前
記流量計量手段により計量したガスの流量計量値との差
により所定期間内での流量計量値の変化量を求める流量
変化量検出手段と、 前記残量変化量検出手段により求めたガス残量値の変化
量が前記流量変化量検出手段により求めた流量計量値の
変化量より所定値以上大きいとき、前記LPガスボンベと
ガスメータとの間にガス漏洩があると判定する判定手段
と を備えることを特徴とするガス漏洩監視装置。1. An LP gas supply system for supplying gas from an LP gas cylinder through a gas pressure regulator and a gas meter, wherein the gas meter counts a flow rate signal generated each time a gas having a predetermined flow rate is supplied through the gas meter. Flow rate measuring means for measuring the flow rate of the gas supplied through, the residual amount measuring means for measuring the remaining gas amount of the LP gas cylinder, the time measuring means for repeatedly measuring a predetermined period, and the predetermined period measured by the time measuring means. A gas residual amount storage means for storing the gas residual amount value of the LP gas cylinder measured by the residual amount measuring means at the start of, and the gas residual amount value stored in the storage means and the time measuring means. The remaining gas amount value within the predetermined period due to the difference from the remaining gas amount value of the LP gas cylinder measured by the remaining amount measuring means at the end of the predetermined period. A remaining amount change amount detecting means for obtaining a change amount, a flow rate measured value storage means for storing a flow rate measured value of the gas measured by the flow rate measuring means at the start of a predetermined period timed by the time measuring means, and the flow rate measured value. Change in the flow rate measured value within a predetermined period due to the difference between the flow rate measured value stored in the storage means and the flow rate measured value of the gas measured by the flow rate measuring means at the end of the predetermined period timed by the time measuring means Flow rate change amount detecting means for obtaining the amount, when the change amount of the gas remaining amount value obtained by the remaining amount change amount detecting means is larger than the change amount of the flow rate measured value obtained by the flow amount change amount detecting means by a predetermined value or more, A gas leak monitoring device, comprising: a determining unit that determines that there is a gas leak between the LP gas cylinder and the gas meter.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1989028492U JPH079065Y2 (en) | 1989-03-15 | 1989-03-15 | Gas leak monitoring device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1989028492U JPH079065Y2 (en) | 1989-03-15 | 1989-03-15 | Gas leak monitoring device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02120045U JPH02120045U (en) | 1990-09-27 |
| JPH079065Y2 true JPH079065Y2 (en) | 1995-03-06 |
Family
ID=31251903
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1989028492U Expired - Lifetime JPH079065Y2 (en) | 1989-03-15 | 1989-03-15 | Gas leak monitoring device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH079065Y2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110487492A (en) * | 2018-05-15 | 2019-11-22 | 株式会社堀场制作所 | Storage cylinder management system, storage cylinder management method, storage medium and leakage detection system in gas |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7400399B2 (en) * | 2019-11-27 | 2023-12-19 | 株式会社レゾナック | high pressure gas container |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6076691A (en) * | 1983-10-04 | 1985-05-01 | 株式会社東芝 | Liquid-leakage monitor controller |
| JPS61153100A (en) * | 1984-12-25 | 1986-07-11 | Nippon Kokan Kk <Nkk> | Method and device of detecting leak of gas pipe line |
| JPH0774769B2 (en) * | 1984-12-25 | 1995-08-09 | 日本鋼管株式会社 | Gas pipeline leak detection method |
-
1989
- 1989-03-15 JP JP1989028492U patent/JPH079065Y2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110487492A (en) * | 2018-05-15 | 2019-11-22 | 株式会社堀场制作所 | Storage cylinder management system, storage cylinder management method, storage medium and leakage detection system in gas |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02120045U (en) | 1990-09-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4811252A (en) | Leakage test equipment | |
| US3703246A (en) | Liquid level control | |
| JPH0120369B2 (en) | ||
| US3933027A (en) | Apparatus and method for proving meters | |
| JP2512671Y2 (en) | LP gas residual gas detector | |
| US12158368B2 (en) | Method for setting calibrated outflow water of quantitative outflow water faucet, method for processing outflow water, and faucet | |
| CN216791340U (en) | Automatic meter calibration system for high-low temperature flow table | |
| JP2914613B2 (en) | Gas leak detection device | |
| CN109645824B (en) | Liquid level detection device and water dispenser having the same | |
| JPH08240473A (en) | Gas meter inspection device | |
| US4926678A (en) | Method and apparatus for proving electronic gas meters at low flow rates | |
| JP3866975B2 (en) | Gas meter and gas meter inspection method | |
| JP2006200776A (en) | Gas meter | |
| CN2101849U (en) | Fuel consumption measuring instrument | |
| CA1208336A (en) | Level indicator control system for use with capacitance probes in tank containing substances | |
| JPS58156815A (en) | Measuring device for flow rate | |
| CN116687366B (en) | Portable blood pressure monitor with self-checking function | |
| JP3788327B2 (en) | Electronic balance | |
| CN216778759U (en) | Metering kettle with quantitative feeding structure | |
| JPS6331044B2 (en) | ||
| JP2756019B2 (en) | Flow measurement device | |
| JP3033399B2 (en) | Fuel tank residual oil detector | |
| JPS587317Y2 (en) | Differential pressure measuring device | |
| JPH085502A (en) | Gas leak detection device and gas meter having the same | |
| JP2003202258A (en) | Gas meter |