JPH0797861A - Construction work management system - Google Patents
Construction work management systemInfo
- Publication number
- JPH0797861A JPH0797861A JP24263693A JP24263693A JPH0797861A JP H0797861 A JPH0797861 A JP H0797861A JP 24263693 A JP24263693 A JP 24263693A JP 24263693 A JP24263693 A JP 24263693A JP H0797861 A JPH0797861 A JP H0797861A
- Authority
- JP
- Japan
- Prior art keywords
- wage
- information
- worker
- work
- work place
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
(57)【要約】
【目的】 作業所ごとに賃金コスト等の集計計算を容易
に行うことができる建設工事作業管理システムを提供す
る。
【構成】 記録カードに記録された情報をキーにして関
連情報を格納するマスターファイル5、記録カードから
読み取った情報に基づきマスターファイルを参照して関
連情報を検索し入場者の解析を行う解析手段4、解析し
た入場者の情報を分類して統計処理を行う処理手段6、
及び処理結果の出力を行う出力手段8、9を備え、処理
手段6では、各作業所からの読み取り情報を収集して作
業所ごとの出勤簿及び賃金台帳を作成する。処理手段6
は、各作業員の賃金総額または賃金を計算するための基
本単価を入力記憶し、各作業員の賃金総額と出勤情報か
ら作業所ごとの賃金の額を計算して賃金台帳を作成す
る。したがって、さまざまな作業員が出勤する建設工事
作業現場においても、各作業員の賃金総額や賃金を計算
するための基本単価を入力することによって、作業所ご
とに簡便に賃金コストを計算することができる。
(57) [Summary] [Purpose] To provide a construction work management system that allows easy calculation of wage costs for each work place. [Structure] A master file 5 for storing related information by using information recorded on a recording card as a key, and an analysis means for referring to the master file on the basis of information read from the recording card to search for related information and analyze visitors. 4, processing means 6 that classifies the analyzed information of the visitors and performs statistical processing,
Also, output means 8 and 9 for outputting the processing result are provided, and the processing means 6 collects the read information from each work place and creates an attendance record and a wage ledger for each work place. Processing means 6
Inputs and stores the total wage of each worker or the basic unit price for calculating the wage, calculates the amount of wage for each workplace from the total wage of each worker and attendance information, and creates a wage ledger. Therefore, even at a construction site where various workers are going to work, the wage cost can be easily calculated for each work site by entering the total wage of each worker and the basic unit price for calculating the wage. it can.
Description
【0001】[0001]
【産業上の利用分野】本発明は、作業所のゲートにカー
ドリーダを設けて入出時に作業員の携帯する磁気カー
ド、光カード、ICカード等のデータ記録媒体(記録カ
ード)を読み取り作業所における労務・工程管理情報や
健康管理情報・災害経歴情報等の作業員各自の固有情報
を処理し管理する大規模作業所管理システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention provides a card reader at a gate of a work place to read a data recording medium (recording card) such as a magnetic card, an optical card, an IC card carried by a worker when entering or exiting the work place. The present invention relates to a large-scale workplace management system that processes and manages unique information of each worker such as labor / process management information, health management information, and disaster history information.
【0002】[0002]
【従来の技術】建設現場等の作業所を管理する場合、一
般には複数の作業所が管理の対象となり、しかも、各作
業所では、正規作業員のほか、応援者、短期就労者、新
規入場者、遅刻者等の様々な作業員がいて日常的な移動
も多い。また、一般に、或る1日についてその日に就労
する作業員の数は、管理対象となる作業員全員のうちの
約1/5程度であるといわれている。2. Description of the Related Art When managing a work site such as a construction site, generally, a plurality of work sites are subject to management. Moreover, at each work site, besides a regular worker, a supporter, a short-term worker, and a new entrance. There are various workers such as workers and late workers, and there are many daily movements. In addition, it is generally said that the number of workers working on a certain day is about 1/5 of all workers to be managed.
【0003】このような就労状況の作業所における労務
管理では、まず、管理対象となる就労者、その日その日
の就労者の把握が必要であるだけでなく、当日の就労者
氏名、入退場者、定時以降の残留者等の把握、確認等が
随時必要であり、管理事項は非常に多岐にわたってい
る。さらには、連絡先や健康状態のチェック、受入教育
の徹底等も必要になってくる。In labor management in a workplace with such a working situation, first, it is necessary to grasp the workers to be managed and the workers on the day and day, as well as the names of the workers on the day and those who are entering and leaving. It is necessary to grasp and confirm the remaining people after the scheduled time, and the management items are very diverse. In addition, it will be necessary to check contact information, health status, and thoroughly conduct education on acceptance.
【0004】作業所毎の作業員の把握、労務管理、工程
管理、安全管理をそれぞれの工事現場の責任者が個別に
行うと、一貫性がないため、各作業所を統括して工事を
総合的に管理することは難しい。そこで、作業員各自の
固有情報を正確に把握し、工程管理、労務管理、安全管
理も含めた総合的な作業所の管理が可能な作業所管理シ
ステムが必要になる。本出願人は、上記のような要請に
応える労務安全管理装置(特開昭61ー42060号公
報参照)や、作業所管理システム(特開昭62ー824
55号公報参照)を提案した。以下にその概要を説明す
る。If the person in charge of each construction site individually grasps the workers at each work place, labor management, process management, and safety management, there is no consistency, so each work place is integrated and the work is integrated. Management is difficult. Therefore, it is necessary to have a work place management system capable of accurately grasping the unique information of each worker and performing comprehensive work place management including process management, labor management, and safety management. The applicant of the present invention has found that a labor safety management device (see Japanese Patent Laid-Open No. 61-42060) and a work place management system (Japanese Laid-Open Patent Publication No. 62-824) that meet the above demands.
55). The outline will be described below.
【0005】図5は従来の作業所管理システムの構成を
示す図であり、41は作業カード、42は作業員IDカ
ード、43はリーダー/ライター、44と45はカード
リーダー、46はプリンター、47はディスプレイ、4
8はCPU、49と50はフロッピィディスク、51と
52はRAM、53は通信回線を示す。FIG. 5 is a diagram showing the construction of a conventional work place management system. 41 is a work card, 42 is a worker ID card, 43 is a reader / writer, 44 and 45 are card readers, 46 is a printer, 47. Is a display, 4
8 is a CPU, 49 and 50 are floppy disks, 51 and 52 are RAMs, and 53 is a communication line.
【0006】作業カード41は、特定のデータ検索、集
計、分類、リスト化の指令データを入力する記録媒体
(記録カード)である。作業員IDカード42は、各作
業員が携帯するのに好適な磁気カードや光カード、IC
カード等の記録媒体(記録カード)で、その作業員の固
有情報を記録しておくものである。リーダー/ライター
43は、作業員IDカード42に作業員の固有情報を記
録したり、その記録した作業員の固有情報を読み取った
りするものであり、カードリーダー44と45は、例え
ば作業所の各ゲートに設置して作業員IDカード42に
記録した作業員の固有情報を読み取るものである。作業
員各自の固有情報としては、例えばその作業員の所属
や本籍、生年月日、氏名、職種等の労務・工程管理情
報、血圧とその測定日、障害その他の健康管理情報、
過去の災害発生内容や災害発生日等の災害予知情報が
記録される。The work card 41 is a recording medium (recording card) for inputting command data for specific data search, tabulation, classification, and listing. The worker ID card 42 is a magnetic card, an optical card, or an IC that is suitable for each worker to carry.
A recording medium (recording card) such as a card records the unique information of the worker. The reader / writer 43 records the unique information of the worker on the worker ID card 42 and reads the recorded unique information of the worker. The card readers 44 and 45 are, for example, each of the work places. This is for reading the unique information of the worker installed in the gate and recorded in the worker ID card 42. As specific information of each worker, for example, labor and process management information such as affiliation and permanent domicile of the worker, date of birth, name, job type, blood pressure and its measurement date, disability and other health management information,
Disaster prediction information such as past disaster occurrence content and disaster occurrence date is recorded.
【0007】フロッピィディスク49、50、RAM5
1、52は、各種の処理プログラムやデータを格納する
ものであり、この処理プログラムに従って所定の処理を
行うのがCPU48である。CPU48は、キー入力手
段や内蔵の記憶部を備え、作業員IDカード42の読み
取りデータの処理及び記録データの処理を行うと共に、
定期的に或いは随時キー入力指令や作業カード41の入
力により蓄積されたデータの検索、集計、分類、リスト
処理を行うものであり、その結果を出力するのがプリン
ター46やディスプレイ47、電話回線などの通信回線
53である。Floppy disks 49, 50, RAM 5
Reference numerals 1 and 52 store various processing programs and data, and the CPU 48 performs predetermined processing according to the processing programs. The CPU 48 is provided with a key input means and a built-in storage unit, processes read data of the worker ID card 42 and records data, and
It searches for, collects, classifies, and processes the data accumulated by key input commands or input of the work card 41 on a regular basis or at any time, and outputs the results to the printer 46, display 47, telephone line, or the like. Is a communication line 53.
【0008】なお、リーダー/ライター43やプリンタ
ー46、ディスプレイ47、CPU48、フロッピィデ
ィスク49、50、RAM51、52からなる作業所管
理ユニットはケースに一体化して収納して各作業所毎に
設置され、カードリーダー44と45が作業所の各ゲー
トに設置される。A work place management unit including a reader / writer 43, a printer 46, a display 47, a CPU 48, floppy disks 49, 50, and RAMs 51, 52 is integrally housed in a case and installed at each work place. Card readers 44 and 45 are installed at each gate of the work place.
【0009】上記作業所管理システムを使った作業所の
管理の概要を説明する。まず、作業員が入場/退場する
際にカードの有無を調べ、カードを有していない場合に
はキー入力手段を使って所定事項の入力処理を行い、カ
ードを有している場合にはカードの読み取り処理を行
う。このカードの読み取り処理では、カード情報読み取
り及びチェックを行い、その内容を画面に表示すると共
に入場者ファイルに書き込む。また、所定事項の入力処
理では、データシートに各作業員の固有情報を記入し、
それに基づいてキー入力する。そして、その入力情報を
入場者ファイル及び管理マスターファイルに登録してカ
ードを発行し、管理マスターと登録簿及びカード発行簿
を出力する。An outline of work place management using the work place management system will be described. First, when the worker enters / exits, the presence / absence of a card is checked. If the card is not possessed, the key input means is used to input predetermined items, and if the card is possessed, the card is admitted. Read processing. In this card reading process, card information is read and checked, and the contents are displayed on the screen and written in the attendee file. Also, in the process of inputting predetermined items, enter the unique information of each worker in the data sheet,
Key in based on that. Then, the input information is registered in the visitor file and the management master file to issue a card, and the management master, the registration list, and the card issue list are output.
【0010】このように入場者ファイルには、その時々
における作業所の入場者に関する情報が格納され、管理
マスターファイルには、過去からの全入場者に関する情
報が格納される。そして、タイマー設定により或いは随
時オペレータの指示により入場者ファイルに登録された
データについて所定のデータ検索、集計、分類を行い、
入場者一覧表その他各種の一覧表をリスト化し出力す
る。As described above, the attendee file stores the information about the attendees of the work place at that time, and the management master file stores information about all the attendees from the past. Then, by performing a predetermined data search, tabulation, and classification for the data registered in the visitor file by setting a timer or by an operator's instruction at any time,
A list of visitors and various other lists are created and output.
【0011】各作業所のデータは、電話回線その他の通
信回線を通して中央のホストシステムに収集され、例え
ば災害情報処理や工程管理情報処理、労務管理情報処
理、健康管理情報処理、作業指示書作成処理、工事日誌
作成処理などが行われる。Data of each work place is collected in a central host system through a telephone line or other communication lines, and for example, disaster information processing, process management information processing, labor management information processing, health management information processing, work instruction sheet preparation processing. , A construction diary creation process is performed.
【0012】このようにホストシステムにおいて複数の
作業所を総括管理し、作業所間を頻繁に移動している作
業員についても常時どこの作業所に就労しているかを把
握することにより、各作業所への災害予知を行い、災害
を未然に防止するための対策を講じることができる。In this way, the host system manages a plurality of work sites as a whole, and even for workers who frequently move between work places, by grasping which work place they are always working, It is possible to anticipate disasters to the place and take measures to prevent disasters.
【0013】[0013]
【発明が解決しようとする課題】一方、工事規模の拡大
に伴い超大規模工事プロジェクトでは、発注状態が大手
ゼネコン、専門工事業者へ単独発注されるようになって
いる。このようなプロジェクトの運用では、作業所内・
外の打合せ折衝等を円滑に進める上で、大手ゼネコン1
社が取りまとめてマネージメントすることが多くなり、
そのための方策・ツールが必要となるが、上記のような
従来の作業所管理システムでは、十分な対応ができない
という問題がある。On the other hand, due to the expansion of the construction scale, in the super-large-scale construction project, the ordering status is being individually ordered to a major general contractor or a specialized contractor. In the operation of such projects,
A major general contractor 1 in order to facilitate smooth external negotiations.
The company manages more and more often,
Although measures and tools are necessary for that purpose, there is a problem that the conventional work place management system as described above cannot sufficiently cope with the problem.
【0014】例えば工事を行うことによる地域経済活性
化の尺度を地元業者への発注状況で判断するための情報
や、計画工程どおりの労務数の確保が図られているか、
また各元請が同一業者偏重による過大な労務負担をさせ
た手配が行われているかを判断するための情報が必要と
なる。[0014] For example, whether information for judging the scale of regional economic revitalization by carrying out the construction is judged by the order status to the local contractor, and the number of labors as planned is secured,
In addition, it is necessary to have information for each main contractor to determine whether or not arrangements are being made that impose an excessive labor burden due to the bias of the same company.
【0015】さらには、1日3000〜4000名もの
様々な会社、業種の作業員が出入りするため、各作業所
ごと、或いは会社ごとに作業員に関する情報の統計、管
理をすることも必要になる。すなわち、建設工事現場で
は、多くの作業員が各作業所に固定されずに複数の作業
所を所謂かけもちで就業し、しかも、賃金も、作業所ご
とではなく各会社ごとに全就業時間に対して支払われて
いるため、作業所単位の正確な賃金コストが計算できな
かった。作業員の流動化がますます活発になっている昨
今においては、このような複数の作業所に就業する会社
や業者を含めた統括的なきめ細かな作業管理が社会的に
も求められている。Further, since workers of various companies and industries such as 3000 to 4000 people go in and out per day, it is also necessary to perform statistics and management of information about workers for each work place or each company. . In other words, at the construction site, many workers are not fixed at each work place and work at multiple work places with a so-called wobble, and wages are not for each work place but for each company for all working hours. The wage cost could not be calculated accurately for each workplace because it was paid. In recent years, when the fluidization of workers is becoming more and more active, there is also a social demand for comprehensive and detailed work management including companies and contractors who work at such multiple work sites.
【0016】本発明は、上記の課題を解決するものであ
って、作業所ごとに賃金コスト等の集計計算を容易に行
うことができる建設工事作業管理システムを提供するこ
とを目的とするものである。The present invention is intended to solve the above-mentioned problems, and an object of the present invention is to provide a construction work management system capable of easily performing aggregate calculation of wage costs and the like for each work place. is there.
【0017】[0017]
【課題を解決するための手段】そのために本発明は、作
業所のゲートにカードリーダを設けて入出時に作業員の
携帯する記録カードを読み取り作業所の管理情報を処理
する建設工事作業管理システムであって、記録カードに
記録された情報をキーにして関連情報を格納するマスタ
ーファイル、記録カードから読み取った情報に基づきマ
スターファイルを参照して関連情報を検索し入場者の解
析を行う解析手段、解析した入場者の情報を分類して統
計処理を行う処理手段、及び処理結果の出力を行う出力
手段を備え、処理手段では、各作業所からの読み取り情
報を収集して作業所ごとの出勤簿及び賃金台帳を作成す
ることを特徴とし、さらに、処理手段は、各作業員の賃
金総額を入力記憶し、各作業員の賃金総額と出勤情報か
ら作業所ごとの賃金の額を按分計算して賃金台帳を作成
し、また、各作業員の賃金を計算するための基本単価を
入力記憶し、各作業員の基本単価と出勤情報から作業所
ごとの賃金の額を計算し賃金台帳を作成することを特徴
とするものである。To this end, the present invention is a construction work management system for installing a card reader at a gate of a work place to read a recording card carried by a worker when entering and exiting and processing management information of the work place. There is a master file that stores related information by using the information recorded on the recording card as a key, an analysis means that searches the related information by referring to the master file based on the information read from the recording card and analyzes the visitors, It is equipped with a processing means for classifying the analyzed information of the attendees and performing a statistical processing, and an output means for outputting the processing result. The processing means collects the reading information from each work place and records attendance records for each work place. In addition, the processing means stores and stores the total wage of each worker, and the wage register of each worker is calculated from the total wage of each worker and attendance information. Is calculated proportionally to create a wage ledger, and the basic unit price for calculating the wage of each worker is entered and stored, and the wage amount for each workplace is calculated from the basic unit price of each worker and attendance information. It is characterized by calculating and creating a wage ledger.
【0018】[0018]
【作用】本発明の建設工事作業管理システムでは、記録
カードに記録された情報をキーにして関連情報を格納す
るマスターファイル、記録カードから読み取った情報に
基づきマスターファイルを参照して関連情報を検索し入
場者の解析を行う解析手段、解析した入場者の情報を分
類して統計処理を行う処理手段、及び処理結果の出力を
行う出力手段を備え、処理手段では、各作業所からの読
み取り情報を収集して作業所ごとの出勤簿及び賃金台帳
を作成するので、さまざまな作業員が出勤する建設工事
作業現場においても、各作業員の賃金総額や賃金を計算
するための基本単価を入力することによって、作業所ご
とに簡便に賃金コストを計算することができる。In the construction work management system of the present invention, the related information is retrieved by referring to the master file that stores the related information using the information recorded on the recording card as a key and the master file based on the information read from the recording card. The analysis means for analyzing the visitors, the processing means for classifying the analyzed information of the visitors and performing the statistical processing, and the output means for outputting the processing result are provided, and the processing means reads information from each work place. Is collected and a work register and a wage ledger are created for each work place, so even at a construction site where various workers are going to work, enter the total wages of each worker and the basic unit price for calculating wages. Thus, the wage cost can be easily calculated for each work place.
【0019】[0019]
【実施例】以下、本発明の実施例を図面を参照しつつ説
明する。図1は本発明に係る建設工事作業管理システム
の1実施例を示す図、図2は統計処理・出力処理手段の
構成例を示す図である。図中、1ー1、1ー2、…はC
RU、2ー1、2ー2、…はCRUコントローラ、3は
中央処理装置、4は入場者解析手段、5はマスターファ
イル、6は統計処理・出力処理手段、7は統計データフ
ァイル、8はディスプレイ、9はプリンタ、11は出勤
簿作成部、12は作業員集計部、13は賃金計算データ
ファイル、14は賃金計算部、15は賃金按分計算部、
16は作業所集計部を示す。Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a diagram showing an embodiment of a construction work management system according to the present invention, and FIG. 2 is a diagram showing a configuration example of statistical processing / output processing means. In the figure, 1-1, 1-2, ... C
RUs, 2-1, 2-2, ... are CRU controllers, 3 are central processing units, 4 are visitor analysis means, 5 are master files, 6 is statistical processing / output processing means, 7 is statistical data files, 8 is A display, 9 is a printer, 11 is a attendance record preparation section, 12 is a worker totalization section, 13 is a wage calculation data file, 14 is a wage calculation section, 15 is a wage apportionment calculation section,
Reference numeral 16 denotes a work place totaling unit.
【0020】図1において、CRU1ー1、1ー2、…
…は、例えば作業所の各ゲート毎に設置され、記録カー
ドに記録された固有の情報を読み取るカードリーダユニ
ットであり、記録カードには、作業員であれば個人のI
D情報が記録され、また、資材搬入トラックであれば資
材名や数量、納入元、納入先等の搬入情報が記録されて
いる。CRUコントローラ2ー1、2ー2、……は、C
RU1ー1、1ー2、……を制御し記録カードの読み取
り情報を各ゲート、カードリーダ、作業所のID(識別
情報)、さらには時計による入場、退場の読み取り時刻
と共に取り込むものである。In FIG. 1, CRUs 1-1, 1-2, ...
Is a card reader unit that is installed at each gate of the work place and reads the unique information recorded on the recording card.
D information is recorded, and in the case of a material loading truck, loading information such as material name, quantity, delivery source, delivery destination, etc. is recorded. CRU controller 2-1, 2-2, ... is C
Controls the RUs 1-1, 1-2, ..., And takes in the read information of the recording card together with the ID (identification information) of each gate, the card reader, the work place, and the entry and exit times by the clock.
【0021】中央処理装置3は、センターに設けられ、
各作業所のCRUコントローラ2ー1、2ー2、……に
よる読み取り情報を、例えば通信回線等を通して収集し
て作業員、作業所ごとに解析、統計処理を行うものであ
り、入場者解析手段4や、マスターファイル5、統計処
理・出力処理手段6、統計データファイル7を有する。
勿論、各CRUコントローラ2ー1、2ー2、……でフ
ロッピィディスクに読み取り情報を記録、蓄積し、これ
をバッチ処理により適宜センターの中央処理装置3のデ
ィスクドライバにセットして読み取ることによって読み
取り情報を収集するものであってもよい。The central processing unit 3 is provided in the center,
The information read by the CRU controllers 2-1, 2-2, ... At each work place is collected through, for example, a communication line and analyzed and statistically processed for each worker and work place. 4, a master file 5, a statistical processing / output processing means 6, and a statistical data file 7.
Of course, the read information is recorded and stored in the floppy disk by each CRU controller 2-1, 2-2, ... And read by setting this in the disk driver of the central processing unit 3 of the center by batch processing and reading it appropriately. The information may be collected.
【0022】マスターファイル5は、各作業員の会社
名、会社の取引先、その元請等の情報を登録するもので
あり、例えば氏名、生年月日、出身地等のIDコードを
キーとして雇用会社コード、雇用会社、取引先コード、
現住所等を登録し、また、会社名(雇用会社名)コード
をキーとして会社名(雇用会社名)、下請系列(取引先
名称、下請次数)や、取引先コード等をキーとして住所
を登録する。The master file 5 is for registering information such as the company name of each worker, the business partner of the company, and the prime contractor thereof. For example, the ID code such as name, date of birth, place of birth, etc. is employed as a key. Company code, employment company, supplier code,
Register the current address, etc., and register the address with the company name (employing company name) code as the key, the company name (employing company name), subcontractor series (supplier name, subcontractor number), and supplier code, etc. .
【0023】入場者解析手段4は、作業員の読み取り情
報からマスターファイル5のデータを参照することによ
り、その作業員の所属する会社名や職長名、さらにその
取引先、元請の情報を検索し付加するものである。この
ようにマスターファイル5を用意することによって、記
録カードからこれらの情報を除くことができ、有用な他
の情報の記録のための領域を確保することができる。By referring to the data in the master file 5 from the information read by the worker, the visitor analysis means 4 retrieves the name of the company to which the worker belongs, the foreman's name, and the information on the business partner and the contractor. It is to be added. By preparing the master file 5 in this manner, these pieces of information can be removed from the recording card, and an area for recording other useful information can be secured.
【0024】統計処理・出力処理手段6は、入場者解析
手段4により解析した情報を統計処理してそのデータを
統計データファイル7に格納すると共に、ディスプレイ
8やプリンタ9から出力するための処理を行うものであ
る。統計データには、各作業員の勤務時間、これらのデ
ータに基づいて作成される作業所ごとの出勤簿、賃金台
帳、各種保険料の計算値、さらには、ゲート別入場者、
単位時間(例えば10分間)入場者、各作業員の勤務期
間、1000番台入場者の検出、元請別入場者、県や市
等の地域別入場者、会社住所別入場者等のリストや数等
がある。The statistical processing / output processing means 6 statistically processes the information analyzed by the visitor analysis means 4, stores the data in the statistical data file 7, and outputs the data from the display 8 or the printer 9. It is something to do. The statistical data includes the working hours of each worker, the attendance record for each work place created based on these data, the wage ledger, the calculated values of various insurance premiums, and also the attendees by gate,
Unit time (for example, 10 minutes) visitors, working period of each worker, detection of 1000-series visitors, former contracted visitors, visitors by region such as prefecture or city, list of visitors by company address, etc. Etc.
【0025】次に、統計処理・出力処理手段の出勤簿及
び賃金台帳を作成する部分の構成を図2により説明す
る。図2において、出勤簿作成部11は、各作業所ごと
に各作業員の出勤日、入退時刻、出勤日数、残業時間を
入力した賃金計算期間、例えば月初から月末までの出勤
簿を作成するものであり、作業員集計部12は、各作業
員の全作業所にわたる出勤日、入退時刻、出勤日数、残
業時間を集計した集計表を作成するものである。賃金計
算データファイル13は、各作業員の賃金計算期間にお
ける全出勤日数及び残業時間とその賃金総額、或いは賃
金を計算するための基本単価を記憶したものである。賃
金計算部14は、賃金計算データファイル13に記憶し
た基本単価と作業員集計部12で作成した集計表に基づ
き各作業員の賃金総額を計算してこの賃金総額から各作
業所の賃金の額を計算するものであり、賃金按分計算部
15は、賃金計算データファイル13に記憶した全出勤
日数及び残業時間とその賃金総額に基づき出勤簿作成部
11で作成した出勤簿の出勤日数、残業時間に応じて各
作業所の賃金の額を計算するものである。作業所集計部
16は、各作業所ごとに全作業員の賃金の額を集計し、
労災保険料やその他の保険料、控除金額等を求めるもの
である。Next, the structure of the part of the statistical processing / output processing means that creates the attendance register and the wage register will be described with reference to FIG. In FIG. 2, the attendance record creation unit 11 creates a wage calculation period in which the attendance date, entry / exit time, number of days worked, and overtime hours of each worker are input for each work place, for example, an attendance record from the beginning of the month to the end of the month. The worker totaling unit 12 creates a totaling table in which the working days, the entry and leaving times, the number of working days, and the overtime hours of all the workers are created. The wage calculation data file 13 stores all working days and overtime hours and the total wage of each worker in the wage calculation period, or a basic unit price for calculating wages. The wage calculation unit 14 calculates the total wage of each worker based on the basic unit price stored in the wage calculation data file 13 and the summary table created by the worker totalization unit 12, and from this total wage, the amount of wages at each workplace. The wage apportioning calculation unit 15 calculates the total number of working days and overtime hours stored in the wage calculation data file 13, and the number of working hours and overtime hours of the work list created by the attendance list creating unit 11 based on the total wage. The wage amount of each work place is calculated in accordance with. The work place totaling unit 16 collects the wages of all the workers for each work place,
Workers' insurance premiums, other insurance premiums, deductions, etc. are requested.
【0026】上記のように各作業所における作業員の賃
金の額は、基本単価か賃金総額により計算される。すな
わち、複数の作業所を管理するシステムであっても、会
社や作業員によっては、このシステムの管理下にない作
業所にも出勤し、それらの出勤日数、残業時間に応じた
賃金が会社から支払われている場合、その会社の作業員
に関する各作業所における賃金の額の計算では、全作業
所における出勤日数、残業時間により賃金が計算され
る。そのため、このような会社においては、賃金計算デ
ータファイル13にその出勤日数、残業時間と賃金総額
が記憶され、各作業所における賃金の額は、賃金按分計
算部15によってその作業所における出勤日数、残業時
間に応じて按分計算している。As described above, the wage amount of the worker at each work place is calculated by the basic unit price or the total wage amount. In other words, even if the system manages multiple worksites, some companies and workers also work at worksites that are not under the control of this system, and the company pays wages according to the number of days worked and overtime hours. If paid, in calculating the amount of wages at each work place for workers of the company, wages are calculated based on the number of days worked and overtime at all work places. Therefore, in such a company, the number of working days, overtime hours, and total wage are stored in the wage calculation data file 13, and the wage amount at each work place is calculated by the wage apportioning calculation unit 15 as the number of work days at that work place. Proportional calculation is made according to overtime hours.
【0027】また、賃金計算データファイル13に記憶
する賃金総額は、このシステムの管理下にある作業所に
のみ勤務して賃金が支払われる会社や作業員に対して
は、作業員集計部12は、作成した集計表で全作業所に
わたる出勤日、入退時刻、出勤日数、残業時間が集計さ
れるので、賃金を計算するための基本単価により賃金総
額を計算することができる。そのため、このような会社
においては、賃金計算データファイル13に賃金を計算
するための基本単価が記憶され、賃金計算部14によっ
て賃金総額を計算した後、各作業所における賃金の額を
計算している。The total wage stored in the wage calculation data file 13 is calculated by the worker totaling section 12 for a company or a worker who works only at a work place under the control of this system and is paid wages. Since the created summary table collects work days, entry / exit times, number of work days, and overtime hours for all work sites, it is possible to calculate the total wage by the basic unit price for calculating wages. Therefore, in such a company, the basic unit price for calculating wages is stored in the wage calculation data file 13, the total wage is calculated by the wage calculation unit 14, and then the wage amount at each work place is calculated. There is.
【0028】図3は本発明に適用される作業所のカード
リーダユニットの1実施例を示す図であり、21と22
は読取ヘッド、23は入退場信号判定部、24はデータ
読取部、25はデータ制御部、26はメモリ、27はホ
ストコンピュータを示す。FIG. 3 is a view showing an embodiment of a card reader unit of a work place applied to the present invention, and 21 and 22.
Is a read head, 23 is an entrance / exit signal determination unit, 24 is a data reading unit, 25 is a data control unit, 26 is a memory, and 27 is a host computer.
【0029】図3において、読取ヘッド21と22は、
一方が入場用(例えば読取ヘッド21)、他方が退場用
(読取ヘッド22)であり、携帯するのに好適な磁気カ
ードや光カード、ICカード等の記録媒体(記録カー
ド)で、各作業員の固有情報を記録した作業員IDカー
ドの記録情報を読み取るものである。入退場信号判定部
23は、カードの読み取り情報が得られたとき、その読
み取りが読取ヘッド21と22のいずれで行われたかに
よって入場か退場かを判定するものである。データ読取
部24は、入退場信号判定部23による判定にしたがっ
て入場又は退場の読取情報として読取処理するものであ
る。例えば読取ヘッド21と22によるカードの読取情
報には、入退場の情報はないので、入退場信号判定部2
3は、入退場判定結果の入場或いは退場信号を付加して
読取情報と共にデータ読取部24に送る。メモリ26
は、読取データを格納するものである。データ制御部2
5は、例えば制御キーで選択されて動作する複数のデー
タ処理モードを有するものである。In FIG. 3, the read heads 21 and 22 are
One is for entry (for example, read head 21) and the other is for exit (read head 22), and each worker uses a recording medium (recording card) such as a magnetic card, an optical card, or an IC card suitable for carrying. The information recorded on the worker ID card in which the unique information is recorded is read. When the card read information is obtained, the entrance / exit signal determination unit 23 determines whether the card is read or entered depending on whether the reading is performed by the read heads 21 or 22. The data reading unit 24 performs a reading process as read information of entry or exit according to the determination by the entry / exit signal determination unit 23. For example, since there is no entry / exit information in the card reading information by the reading heads 21 and 22, the entry / exit signal determination unit 2
3 adds an entry or exit signal of the entry / exit determination result and sends it to the data reading unit 24 together with the read information. Memory 26
Is for storing read data. Data control unit 2
Reference numeral 5 has a plurality of data processing modes which are selected and operated by the control keys, for example.
【0030】データ制御部25のモードとしては、デー
タ読取部24で読取処理されたデータを直接通信回線を
介してホストコンピュータ27に送出するモードと、メ
モリ26に格納するモードを有する。後者のメモリ26
に格納するモードでは、メモリ26に格納したデータ量
が所定量になったことを条件としてホストコンピュータ
27に割り込みをかけ、格納しているデータを一括送信
する。また、通信回線の異常、停電等の場合には、これ
を検出することによって自動的にメモリ26に格納する
モードに切り換え、通信回線の異常、停電等の状態が解
除された場合に一括送信を行うようにしてもよい。な
お、この場合には、バックアップ電源を備えた構成であ
ることはいうまでもない。また、各作業所のゲートに設
置されるカードリーダユニットと中央のホストコンピュ
ータとの間は、公衆回線を利用してオンライン接続して
もよいし、専用のデータ通信ラインを使って接続しても
よいことはいうまでもない。The data control unit 25 has a mode in which the data read by the data reading unit 24 is sent to the host computer 27 via a direct communication line and a mode in which the data is stored in the memory 26. Latter memory 26
In the storage mode, the host computer 27 is interrupted on condition that the amount of data stored in the memory 26 reaches a predetermined amount, and the stored data is collectively transmitted. Further, in the case of an abnormality in the communication line, a power failure, etc., the mode is automatically stored in the memory 26 by detecting this, and when the state of the communication line's failure, power failure, etc. is released, batch transmission is performed. It may be performed. In this case, it goes without saying that the backup power supply is provided. Further, the card reader unit installed at the gate of each work place and the central host computer may be connected online by using a public line or by using a dedicated data communication line. It goes without saying that it is good.
【0031】図4は図3に示すカードリーダユニットの
外観を示す図であり、このカードリーダユニット30で
は、読取ヘッド21と22を並べて配置し、入場用と退
場用がはっきり判るように例えばプレートで文字表示す
ると共に、正常な読み取り操作がなされると点灯するラ
ンプ28、29を設けている。このようにすると、作業
員がプレートの見間違いにより入場時であるにもかかわ
らず退場の読取ヘッド22で記録カードの読み取りを行
わせた場合、その読取ヘッド22の位置に取り付けたラ
ンプ29が点灯するので、その点灯したランプ位置に表
示したプレートの「退場」に視線を引き付け、読取ヘッ
ド22が入場か退場かを再確認させる効果が期待でき
る。また、図3に示す入退場信号判定部23、データ読
取部24、データ制御部25、メモリ26は、カードリ
ーダユニット30の中に収納され、通信回線を介してホ
ストコンピュータに接続される。勿論、読取ヘッド21
と23をそれぞれ別体に構成したものであってもよい。FIG. 4 is a view showing the external appearance of the card reader unit shown in FIG. 3. In this card reader unit 30, the reading heads 21 and 22 are arranged side by side so that the entrance and exit can be clearly seen, for example, a plate. The lamps 28 and 29 are provided to display characters and to turn on when a normal reading operation is performed. With this configuration, when the worker causes the read head 22 to leave the recording card to read the recording card even when the worker is entering due to a wrong plate, the lamp 29 attached to the position of the read head 22 is turned on. Therefore, it is possible to expect an effect of attracting a line of sight to the "exit" of the plate displayed at the position of the lit lamp and reconfirming whether the reading head 22 is entering or leaving. The entrance / exit signal determination unit 23, the data reading unit 24, the data control unit 25, and the memory 26 shown in FIG. 3 are housed in the card reader unit 30 and connected to a host computer via a communication line. Of course, the reading head 21
And 23 may be configured separately.
【0032】なお、本発明は、上記の実施例に限定され
るものではなく、種々の変形が可能である。例えば上記
の実施例では、出勤日数及び残業時間に応じて賃金総額
を計算するように説明したが、宿直手当、日直手当、管
理職手当、寒冷地手当、僻地手当、別居手当、教育手
当、技能手当、特殊作業手当等の各種手当、さらには期
末手当を含めて計算してもよい。また、各作業所ごとに
賃金の額を計算、集計したが、各作業員の勤務時間と作
業種別から各作業工程の作業時間その他の集計情報を求
めるようにしてもよい。The present invention is not limited to the above embodiment, but various modifications can be made. For example, in the above embodiment, the total wage is calculated according to the number of working days and overtime hours, but the night allowance, daily allowance, managerial allowance, cold area allowance, remote area allowance, separate allowance, educational allowance, Various allowances such as skill allowance, special work allowance, etc., as well as the term end allowance may be included in the calculation. Further, although the wage amount is calculated and tabulated for each work place, the work time of each work process and other tabulated information may be obtained from the work time and work type of each worker.
【0033】[0033]
【発明の効果】以上の説明から明らかなように、本発明
によれば、一定の期間に複数の作業所を渡り歩きながら
それぞれの作業所で作業を行う多数の作業員の情報を作
業所ごとに集計すると共に、各作業員について全体の就
業情報を集計するので、作業所のコスト管理や作業員の
就業管理を広範な地域で行うことができる。しかも、従
来は、各現場責任者や会社の責任者に管理を大雑把に任
せてきた建築工事においても、複数の作業所に就業する
会社や業者を含めた統括的なきめ細かな作業管理を行う
ことができる。As is apparent from the above description, according to the present invention, information on a large number of workers who work at each work place while walking across a plurality of work places in a certain period is provided for each work place. Since the total employment information is aggregated for each worker as well as the total, it is possible to perform cost management of the work place and employment management of the worker in a wide area. Moreover, in the past, even in the case of construction work, in which the site managers and company managers have been roughly entrusted with management, comprehensive and detailed work management including companies and contractors who work at multiple work sites must be performed. You can
【図1】 本発明に係る建設工事作業管理システムの1
実施例を示す図である。FIG. 1 is a construction work management system 1 according to the present invention.
It is a figure which shows an Example.
【図2】 統計処理・出力処理手段の構成例を示す図で
ある。FIG. 2 is a diagram showing a configuration example of statistical processing / output processing means.
【図3】 本発明に適用される作業所のカードリーダユ
ニットの1実施例を示す図である。FIG. 3 is a diagram showing an embodiment of a card reader unit at a work place applied to the present invention.
【図4】 図3に示すカードリーダユニットの外観を示
す図である。FIG. 4 is a diagram showing an appearance of the card reader unit shown in FIG.
【図5】 従来の作業所管理システムの構成を示す図で
ある。FIG. 5 is a diagram showing a configuration of a conventional work place management system.
1ー1、1ー2、……CRU、2ー1、2ー2、……C
RUコントローラ、3…中央処理装置、4…入場者解析
手段、5…マスターファイル、6…統計処理・出力処理
手段、7…統計データファイル、8…ディスプレイ、9
…プリンタ1-1, 1-2, CRU, 2-1, 2-2, C
RU controller, 3 ... Central processing unit, 4 ... Visitor analysis means, 5 ... Master file, 6 ... Statistical processing / output processing means, 7 ... Statistical data file, 8 ... Display, 9
… Printer
Claims (3)
入出時に作業員の携帯する記録カードを読み取り作業所
の管理情報を処理する建設工事作業管理システムであっ
て、記録カードに記録された情報をキーにして関連情報
を格納するマスターファイル、記録カードから読み取っ
た情報に基づきマスターファイルを参照して関連情報を
検索し入場者の解析を行う解析手段、解析した入場者の
情報を分類して統計処理を行う処理手段、及び処理結果
の出力を行う出力手段を備え、処理手段では、各作業所
からの読み取り情報を収集して作業所ごとの出勤簿及び
賃金台帳を作成することを特徴とする建設工事作業管理
システム。1. A construction work management system for installing a card reader at a gate of a work place to read a recording card carried by a worker when entering and exiting and processing management information of the work place, the information recorded on the recording card. A master file that stores related information with the key as a key, an analysis means that searches the related information by referring to the master file based on the information read from the recording card and analyzes the visitors, and classifies the analyzed information of the visitors. It is characterized by comprising processing means for performing statistical processing and output means for outputting processing results, and the processing means collects read information from each work place and creates attendance records and wage ledgers for each work place. Construction work management system.
入力記憶し、各作業員の賃金総額と出勤情報から作業所
ごとの賃金の額を按分計算して賃金台帳を作成すること
を特徴とする請求項1記載の建設工事作業管理システ
ム。2. The processing means inputs and stores the total wage of each worker, and proportionally calculates the amount of wage for each work place from the total wage of each worker and attendance information to create a wage ledger. The construction work management system according to claim 1.
するための基本単価を入力記憶し、各作業員の基本単価
と出勤情報から作業所ごとの賃金の額を計算して賃金台
帳を作成することを特徴とする請求項1記載の建設工事
作業管理システム。3. The wage register, wherein the processing means inputs and stores a basic unit price for calculating the wage of each worker, calculates the amount of wage for each workplace from the basic unit price of each worker and attendance information. The construction work management system according to claim 1, wherein:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24263693A JPH0797861A (en) | 1993-09-29 | 1993-09-29 | Construction work management system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24263693A JPH0797861A (en) | 1993-09-29 | 1993-09-29 | Construction work management system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0797861A true JPH0797861A (en) | 1995-04-11 |
Family
ID=17092005
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP24263693A Pending JPH0797861A (en) | 1993-09-29 | 1993-09-29 | Construction work management system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0797861A (en) |
-
1993
- 1993-09-29 JP JP24263693A patent/JPH0797861A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3259232B2 (en) | Card entry / exit management system | |
| JP2780689B2 (en) | Office supplies management system | |
| JP2821227B2 (en) | Building maintenance management system | |
| JP5166743B2 (en) | Differential distribution method, differential distribution apparatus, storage medium, and computer program | |
| JP2005215993A (en) | Attendance system | |
| CN115660475A (en) | A smart card manufacturing enterprise functional department work efficiency management system and method | |
| JPH0797861A (en) | Construction work management system | |
| JP2517223B2 (en) | Work place management system | |
| JP3026119B2 (en) | Large-scale workplace management system | |
| JP2004185158A (en) | Working management system | |
| JPS6142060A (en) | Labor safety managing device | |
| Auxila et al. | Microcomputers as a means to introduce effective management procedures in primary health care: the Haiti experience | |
| JP2022041096A (en) | Stand-by time visualization device, stand-by time visualization method and stand-by time visualization program | |
| JP2003242316A (en) | Worker placement adjustment management system | |
| AU2021107083A4 (en) | System and method of creating and managing time sheets in integrated enterprise environment for construction companies | |
| AU2021107432A4 (en) | Computer implemented system and method for resources management in enterprise environment for construction companies | |
| JPS6142059A (en) | Labor safety managing system | |
| Schmahl et al. | Impact of a decision support and finite scheduling system on | |
| JPH10266583A (en) | Man-hour aggregation system | |
| JP3213893B2 (en) | Equipment management equipment at work sites | |
| JPH0972092A (en) | Entrance / exit management system for construction works | |
| JPH0689284A (en) | Entrance/exit managing device for workshop | |
| Hale et al. | Evaluating the success of safety culture interventions | |
| JPH0724063B2 (en) | Central management system | |
| JP3219905B2 (en) | Time clock with management information creation function |