JPH08100426A - Anchor body construction method - Google Patents

Anchor body construction method

Info

Publication number
JPH08100426A
JPH08100426A JP23731394A JP23731394A JPH08100426A JP H08100426 A JPH08100426 A JP H08100426A JP 23731394 A JP23731394 A JP 23731394A JP 23731394 A JP23731394 A JP 23731394A JP H08100426 A JPH08100426 A JP H08100426A
Authority
JP
Japan
Prior art keywords
casing pipe
casing
pipe
anchor
seal structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23731394A
Other languages
Japanese (ja)
Other versions
JP3479349B2 (en
Inventor
Masakazu Fujita
雅一 藤田
Yuzo Higuchi
雄三 樋口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HIGUCHI GIKOU KK
Japan Foundation Engineering Co Ltd
Original Assignee
HIGUCHI GIKOU KK
Japan Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HIGUCHI GIKOU KK, Japan Foundation Engineering Co Ltd filed Critical HIGUCHI GIKOU KK
Priority to JP23731394A priority Critical patent/JP3479349B2/en
Publication of JPH08100426A publication Critical patent/JPH08100426A/en
Application granted granted Critical
Publication of JP3479349B2 publication Critical patent/JP3479349B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

(57)【要約】 【目的】 本発明は、アンカー体の造成方法に関し、ケ
ーシング管の回収時に被圧水によるグラウト材の噴出を
防止した造成方法を提供することを目的とする。 【構成】 肉厚なカップリング部を一端に有するケーシ
ング管を削孔深さに応じ順次接続してアンカー孔を削孔
した後、ケーシング管内に引張材を挿入し、接続したケ
ーシング管を1本宛引き上げアンカー孔にグラウト材を
加圧注入して最後端側に接続されたケーシング管を順次
回収していくアンカー体の造成方法に於て、最後端側の
ケーシング管の引き抜き回収時に当該ケーシング管の少
なくとも1本前のケーシング管のカップリング部を閉塞
するようにシール構造体を予め引張材に取り付けて、当
該シール構造体を引張材と共にケーシング管内に挿入
し、ケーシング管の引き抜き回収時に上記シール構造体
でカップリング部を閉塞する。
(57) [Summary] [Object] The present invention relates to a method for forming an anchor body, and an object thereof is to provide a method for forming an anchor body in which spouting of a grout material due to pressurized water is prevented when a casing pipe is recovered. [Structure] Casing pipes having a thick coupling portion at one end are sequentially connected according to the drilling depth to drill anchor holes, and then a tension material is inserted into the casing pipe to connect one casing pipe. In the method of constructing the anchor body in which the grout material is pressure-injected into the pull-up anchor hole and the casing pipes connected to the rearmost end side are sequentially recovered, the casing pipe at the rearmost end side is pulled out and recovered. The seal structure is attached to the tension member in advance so as to close the coupling portion of at least one of the casing pipes, the seal structure body is inserted into the casing pipe together with the tension member, and the seal is removed when the casing pipe is pulled out and recovered. The coupling part is closed by the structure.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、被圧水によるグラウト
材の噴出を防止して、地盤中にアンカー体を造成してい
くアンカー体の造成方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for forming an anchor body for preventing the spouting of grout material due to pressurized water and forming an anchor body in the ground.

【0002】[0002]

【従来の技術】擁壁や橋脚の転倒防止、或いはドック床
板の浮力防止や地スベリ防止等の目的で、従来、アース
アンカー工法が広く用いられている。
2. Description of the Related Art Conventionally, the earth anchor construction method has been widely used for the purpose of preventing falls of retaining walls and bridge piers, buoyancy of dock floor boards, and ground slip.

【0003】このアースアンカー工法は、削孔機に接続
したケーシング管とその先端の削孔ビットで地盤を削孔
した後、ケーシング管内にPC鋼線等の引張材を挿入
し、そして、ケーシング管を引き抜き乍らセメントミル
ク等のグラウト材をアンカー孔に加圧注入して地盤中に
アンカー体を造成していくことにより、構造物と地盤と
の連結を図るものである。
In this earth anchor construction method, a casing pipe connected to a drilling machine and a drill bit at the tip thereof are drilled in the ground, and then a tensile material such as PC steel wire is inserted into the casing pipe, and then the casing pipe. It is intended to connect the structure to the ground by drawing out the grout material such as cement milk into the anchor hole under pressure to form the anchor body in the ground.

【0004】而して、従来、削孔機で削孔を行うには、
削孔深さに応じケーシング管を順次接続し、又、被圧水
のある地盤ではケーシング管の先端に止水用ビットを装
着して止水を図り乍ら削孔を行っている。
Thus, conventionally, in order to carry out drilling with a drilling machine,
Casing pipes are sequentially connected according to the depth of drilling, and in the ground with pressurized water, a bit for stopping water is attached to the tip of the casing pipe to stop the water for drilling.

【0005】そして、アンカー体の造成は、所望深さの
削孔を終えたケーシング管を引き上げ乍ら、最後端側の
ケーシング管の後端に接続したスイベルからアンカー孔
にグラウト材を加圧注入して当該ケーシング管を引き抜
き回収し、そして、次のケーシング管の後端に再びスイ
ベルを接続して再度ケーシング管を1本分毎引き抜き回
収し乍ら、アンカー孔へのグラウト材の加圧注入を繰り
返す方法が採られている。
Then, the anchor body is constructed by pulling up the casing pipe which has been drilled to a desired depth and pressurizing the grout material into the anchor hole from a swivel connected to the rear end of the casing pipe on the rearmost end side. Then, the casing pipe is pulled out and collected, and then a swivel is connected again to the rear end of the next casing pipe to pull out and collect the casing pipe once again, and then the grout material is injected under pressure into the anchor hole. The method of repeating is adopted.

【0006】又、ケーシング管の接続方法としては、従
来、図17に示すように、雄ねじ部1が螺刻された肉厚
なカップリング部3を一端に有するケーシング管5を順
次接続していく方法や、図18に示すようにケーシング
管本体7と筒状のカップリング9とからなるケーシング
管11を、図19の如く順次接続していく方法等が用い
られている。
Further, as a method of connecting the casing pipes, conventionally, as shown in FIG. 17, a casing pipe 5 having a thick coupling portion 3 having a male screw portion 1 threaded at one end is sequentially connected. For example, as shown in FIG. 18, a casing pipe 11 including a casing pipe main body 7 and a tubular coupling 9 is sequentially connected as shown in FIG.

【0007】尚、図17中、13はケーシング管5の他
端に螺刻された雌ねじ部、又、図18中、15はケーシ
ング管本体7の両端に螺刻された雌ねじ部、そして、1
7は上記カップリング9の両端に螺刻された雄ねじ部
で、ケーシング管本体7の一端に当該カップリング9が
螺着される。
In FIG. 17, reference numeral 13 denotes a female thread portion threaded on the other end of the casing tube 5, 15 in FIG. 18, 15 denotes a female thread portion threaded on both ends of the casing tube body 7, and 1
Reference numeral 7 denotes a male screw portion threaded on both ends of the coupling 9, and the coupling 9 is screwed to one end of the casing pipe body 7.

【0008】[0008]

【発明が解決しようとする課題】然し乍ら、従来、被圧
水のある地盤では、最後端側のケーシング管の接続を外
してこれを回収する度に、グラウト材の加圧注入で上昇
していたケーシング管内の圧力が急激に低下するため、
注入したグラウト材が次のケーシング管の後端開口部か
ら被圧水と共に勢いよく噴出してしまう現象が生じてい
た。
However, conventionally, in the ground with pressurized water, every time the casing pipe on the rearmost end side is disconnected and recovered, it rises by the pressure injection of grout material. Since the pressure inside the casing pipe drops sharply,
There was a phenomenon in which the injected grout material was vigorously ejected together with the pressurized water from the rear end opening of the next casing pipe.

【0009】そして、この現象はアンカー定着部のグラ
ウト材の濃度を薄めてしまうため、その解決策が要望さ
れていた。本発明は斯かる実情に鑑み案出されたもの
で、ケーシング管をアンカー孔から引き抜き回収する際
に、被圧水によるグラウト材の噴出を防止したアンカー
体の造成方法を提供することを目的とする。
Since this phenomenon diminishes the concentration of the grout material in the anchor fixing portion, a solution has been demanded. The present invention has been devised in view of the above circumstances, and an object thereof is to provide a method of constructing an anchor body that prevents ejection of grout material due to pressurized water when the casing tube is pulled out from the anchor hole and collected. To do.

【0010】[0010]

【課題を解決するための手段】斯かる目的を達成するた
め、請求項1に係る発明は、肉厚なカップリング部を一
端に有するケーシング管を削孔深さに応じ順次接続して
地盤にアンカー孔を削孔した後、ケーシング管内に引張
材を挿入し、接続したケーシング管を1本宛引き上げ乍
らアンカー孔にグラウト材を加圧注入して最後端側に接
続されたケーシング管を順次回収していくアンカー体の
造成方法に於て、最後端側のケーシング管の引き抜き回
収時に当該ケーシング管の少なくとも1本前のケーシン
グ管のカップリング部を閉塞するようにシール構造体を
予め引張材に取り付けて、当該シール構造体を引張材と
共にケーシング管内に挿入し、ケーシング管の引き抜き
回収時に、上記シール構造体でカップリング部を閉塞し
て被圧水によるグラウト材の噴出を防止することを特徴
とする。
In order to achieve such an object, the invention according to claim 1 relates to the ground by sequentially connecting casing pipes having a thick coupling portion at one end in accordance with the drilling depth. After drilling the anchor hole, insert a tensile material into the casing pipe, pull up the connected casing pipe to one and pressurize the grout material into the anchor hole, and sequentially insert the casing pipes connected to the rear end side. In the method of constructing the anchor body to be recovered, when the casing pipe on the rearmost end side is pulled out and recovered, the seal structure is preliminarily tensioned so as to close the coupling part of the casing pipe at least one before the casing pipe. The seal structure is inserted into the casing pipe together with the tension member, and when the casing pipe is pulled out and recovered, the coupling structure is closed by the seal structure to prevent the water from being compressed. Characterized by preventing the ejection of out material.

【0011】そして、請求項2に係る発明は、請求項1
記載のアンカー体の造成方法に於て、上記シール構造体
を、引張材が挿通し、カップリング部の内周に圧接する
シール部材が外周に装着されたパイプ部材と、パイプ部
材の先端に回動可能に取り付き、引張材が挿通する引張
材挿通孔が形成された先端閉塞部材と、パイプ部材の後
端に回動可能に取り付き、引張材が挿通する引張材挿通
孔が形成された後端閉塞部材と、当該後端閉塞部材の引
張材挿通孔に楔着される楔とで構成したものである。
The invention according to claim 2 is based on claim 1.
In the anchor body construction method described above, a tension member is inserted through the seal structure, and a sealing member that is in pressure contact with the inner circumference of the coupling portion is attached to the outer circumference of the pipe member, and the sealing member is wound around the tip of the pipe member. A front end blocking member that is movably mounted and has a tension material insertion hole through which the tension material is inserted, and a rear end that is rotatably attached to the rear end of the pipe member and that has a tension material insertion hole through which the tension material is inserted. It comprises a closing member and a wedge that is wedged in the tension member insertion hole of the rear end closing member.

【0012】[0012]

【作用】請求項1に係るアンカー体の造成方法によれ
ば、最後端側のケーシング管の引き抜き回収時に当該ケ
ーシング管の少なくとも1本前のケーシング管のカップ
リング部を閉塞するようにシール構造体を予め引張材に
取り付けて、当該シール構造体を引張材と共に、削孔を
終えたケーシング管内に挿入する。
According to the anchor body construction method of the first aspect, at the time of pulling out and recovering the casing pipe on the rearmost end side, the seal structure is constructed so as to close the coupling portion of at least one casing pipe before the casing pipe. Is attached to the tension member in advance, and the seal structure is inserted together with the tension member into the casing pipe after drilling.

【0013】そして、ケーシング管を徐々に引き抜き乍
らグラウト材を加圧注入すれば、グラウト材はシール構
造体とケーシング管の間を通過して地盤中のアンカー定
着部に注入され、アンカー体がアンカー定着部に徐々に
造成されることとなる。
Then, by gradually pulling out the casing tube and injecting the grout material under pressure, the grout material passes through between the seal structure and the casing tube and is injected into the anchor fixing portion in the ground, so that the anchor body is formed. It will be gradually built in the anchor fixing part.

【0014】そして、ケーシング管を徐々に引き抜い
て、最後端側のケーシング管の少なくとも1本前のケー
シング管のカップリング部が所定の位置、即ち、シール
構造体が配置されている位置に来た所で、ケーシング管
の引き抜き及びグラウト材の加圧注入を停止して、最後
端側のケーシング管をネジ切り回収すれば、シール構造
体がカップリング部を閉塞して被圧水によるグラウト材
の噴出を防止する。
Then, the casing pipe is gradually pulled out, and the coupling portion of the casing pipe at least one before the rearmost casing pipe comes to a predetermined position, that is, a position where the seal structure is arranged. At this point, if the casing pipe is not pulled out and the grout material is injected under pressure, and the casing pipe on the rearmost end is threaded and collected, the seal structure closes the coupling part, and the grout material from the pressurized water is removed. Prevent gushing.

【0015】以下同様に、ケーシング管を徐々に引き抜
き乍らグラウト材を加圧注入すれば、グラウト材はシー
ル構造体とケーシング管の間を通過してアンカー定着部
に注入され、そして、最後端側のケーシング管の少なく
とも1本前のケーシング管のカップリング部がシール構
造体の配置されている位置に来た所で、ケーシング管の
引き抜き及びグラウト材の加圧注入を停止して、最後端
側のケーシング管を同様にネジ切り回収すれば、シール
構造体がカップリング部を閉塞して被圧水によるグラウ
ト材の噴出を防止する。
Similarly, if the casing tube is gradually pulled out and the grout material is pressure-injected, the grout material passes through between the seal structure and the casing tube and is injected into the anchor fixing portion, and the rearmost end. At the place where the coupling portion of the casing pipe at least one side before the casing pipe on the side comes to the position where the seal structure is arranged, the withdrawal of the casing pipe and the pressure injection of grout material are stopped, and the rearmost end If the casing pipe on the side is similarly threaded and collected, the sealing structure closes the coupling portion and prevents the spouting of the grout material due to the pressurized water.

【0016】そして、以後、同じ作業を順次繰り返すこ
とで、被圧水によるグラウト材の噴出が防止され乍ら、
地盤中のアンカー定着部にアンカー体が次第に造成され
ていくこととなる。
After that, by repeating the same work in sequence, spouting of the grout material due to the pressurized water is prevented,
The anchor body will be gradually formed in the anchor anchoring portion in the ground.

【0017】又、請求項2によれば、シール構造体のパ
イプ部材の外周に装着したシール部材がケーシング管の
カップリング部に圧接して、被圧水によるグラウト材の
噴出を防止することとなる。
According to the second aspect, the seal member mounted on the outer periphery of the pipe member of the seal structure is brought into pressure contact with the coupling portion of the casing pipe to prevent the grout material from being jetted by the pressurized water. Become.

【0018】[0018]

【実施例】以下、本発明の実施例を図面に基づき詳細に
説明する。尚、本実施例に用いるケーシング管は図18
及び図19に示す従来例と同一であるため、当該従来例
と同一符号を以って表示する。
Embodiments of the present invention will now be described in detail with reference to the drawings. The casing pipe used in this embodiment is shown in FIG.
And, since it is the same as the conventional example shown in FIG. 19, it is indicated by the same reference numeral as the conventional example.

【0019】図1は請求項1に係るアンカー体の造成方
法に用いる請求項2記載のシール構造体の一実施例を示
し、図中、19はシール構造体21を構成する金属製の
パイプ部材で、当該パイプ部材19は、図2に示すよう
に同一の外径を有する4本の分割パイプ23,25,2
7,29を順次螺着して構成されている。
FIG. 1 shows an embodiment of the seal structure according to claim 2 used in the method of constructing the anchor body according to claim 1, in which 19 is a metal pipe member constituting the seal structure 21. The pipe member 19 includes four split pipes 23, 25, 2 having the same outer diameter as shown in FIG.
7, 29 are screwed in order.

【0020】そして、パイプ部材19の先端に位置する
分割パイプ23には、ケーシング管11のカップリング
9の内周9aに圧接する2本のO−リング31が環状溝
33に環装されている。そして、当該分割パイプ23に
接続される分割パイプ25の外周にも、カップリング9
の内周9aに圧接可能な1本のO−リング31が環状溝
35に環装されており、各O−リング31は、少なくと
もその2本が同時にカップリング9の内周9aに圧接す
るように所定間隔を以って配置されている。
In the split pipe 23 located at the tip of the pipe member 19, two O-rings 31 which are in pressure contact with the inner circumference 9a of the coupling 9 of the casing pipe 11 are annularly mounted in the annular groove 33. . The coupling 9 is also attached to the outer circumference of the split pipe 25 connected to the split pipe 23.
One O-ring 31 that can be pressed against the inner circumference 9a of the coupling is mounted in the annular groove 35. At least two of each O-ring 31 are pressed against the inner circumference 9a of the coupling 9 at the same time. Are arranged at predetermined intervals.

【0021】又、図2中、37は分割パイプ23の先端
に回動可能に取り付く鋼製の先端閉塞部材で、当該先端
閉塞部材37はテーパ状に成形された頭部37aと、分
割パイプ23内に挿入可能な筒状の胴部37bとで構成
されている。そして、当該胴部37bの外周には、分割
パイプ23の先端側周壁に90°の間隔を開けて設けた
ねじ孔39に対応して環状のねじ溝41が設けられてお
り、図1に示すように各ねじ孔39に螺着されたねじ4
3の軸部43aが上記ねじ溝41に夫々係合して、先端
閉塞部材37が分割パイプ23に対し回動可能且つ分割
パイプ23からの抜け止め保護が図られている。
In FIG. 2, 37 is a steel tip closing member that is rotatably attached to the tip of the split pipe 23. The tip closing member 37 has a tapered head portion 37a and the split pipe 23. It is composed of a tubular body portion 37b which can be inserted therein. An annular thread groove 41 is provided on the outer circumference of the body portion 37b so as to correspond to the threaded holes 39 provided at the peripheral wall of the tip end side of the split pipe 23 at intervals of 90 °, as shown in FIG. 4 screwed into each screw hole 39
The shaft portions 43a of No. 3 are engaged with the thread grooves 41, respectively, so that the tip closing member 37 is rotatable with respect to the split pipe 23 and is prevented from coming off from the split pipe 23.

【0022】そして、シール構造体21の前方には、注
入されたグラウト材で膨張してアンカー孔を閉塞する周
知の袋状の布製パッカー(図示せず)が配置されている
が、図1乃至図3に示すように先端閉塞部材37の中央
には、当該布製パッカーにグラウト材を注入する注入ホ
ース45が挿通する注入ホース挿通孔47が形成され、
又、ケーシング管11内に挿入する引張材49の本数に
応じた複数の引張材挿通孔51が、注入ホース挿通孔4
7を中心に設けられている。
In front of the seal structure 21, a well-known bag-like cloth packer (not shown) for expanding the injected grout material to close the anchor hole is arranged. As shown in FIG. 3, an injection hose insertion hole 47 through which an injection hose 45 for injecting grout material into the cloth packer is inserted is formed in the center of the tip closing member 37.
In addition, the plurality of tension material insertion holes 51 corresponding to the number of tension materials 49 inserted into the casing pipe 11 are the injection hose insertion holes 4
It is provided around 7.

【0023】一方、図1中、53は分割パイプ29の後
端に取り付く鋼製の後端閉塞部材で、図2に示すように
当該後端閉塞部材53も、テーパ状に成形された頭部5
3aと、分割パイプ29内に挿入可能な筒状の胴部53
bとで構成されている。そして、胴部53bの外周に
は、分割パイプ29の後端側周壁に90°の間隔を開け
て設けたねじ孔55に対応して環状のねじ溝57が設け
られており、各ねじ孔55に螺着されたねじ43の軸部
43aが上記ねじ溝57に係合して、後端閉塞部材53
が分割パイプ29に対し回動可能且つ分割パイプ29か
らの抜け止め保護が図られている。
On the other hand, in FIG. 1, reference numeral 53 denotes a steel rear end closing member attached to the rear end of the split pipe 29. As shown in FIG. 2, the rear end closing member 53 also has a tapered head portion. 5
3a and a tubular body portion 53 that can be inserted into the split pipe 29.
and b. An annular thread groove 57 is provided on the outer periphery of the body portion 53b so as to correspond to the threaded holes 55 provided at the rear end side peripheral wall of the split pipe 29 at intervals of 90 °. The shaft portion 43a of the screw 43 screwed to the rear end closing member 53 engages with the screw groove 57.
Is rotatable with respect to the split pipe 29 and is protected from coming off from the split pipe 29.

【0024】そして、図1,図4及び図5に示すように
上記後端閉塞部材53の中央には、上述した注入ホース
45が挿通する注入ホース挿通孔59が形成されると共
に、ケーシング管11内に挿入する複数本の引張材49
のうち、2本の引張材49が挿通する2つの引張材挿通
孔61が上記注入ホース挿通孔59を挟んで設けられて
いる。そして、図1に示すように引張材49が挿通する
当該引張材挿通孔61には、夫々、一対の楔63が楔着
されており、斯様に引張材挿通孔61に楔63を楔着さ
せることによって、シール構造体21が引張材49に固
着されるようになっている。
As shown in FIGS. 1, 4 and 5, an injection hose insertion hole 59 through which the above-mentioned injection hose 45 is inserted is formed in the center of the rear end closing member 53, and the casing pipe 11 is formed. Plural tension members 49 to be inserted inside
Of these, two tension material insertion holes 61 through which two tension materials 49 are inserted are provided sandwiching the injection hose insertion hole 59. Then, as shown in FIG. 1, a pair of wedges 63 are respectively wedged in the tension material insertion holes 61 through which the tension material 49 is inserted, and thus the wedge 63 is wedged in the tension material insertion holes 61. By doing so, the seal structure 21 is fixed to the tension member 49.

【0025】その他、図1中、65,67はO−リン
グ、又、図6は図1のVI−VI線断面図を示し、図中、6
9は注入ホース45と引張材49を結束する結束具であ
る。本実施例に於けるシール構造体21はこのように構
成されており、斯かるシール構造体21を用いて本実施
例に係るアンカー体の造成方法は以下の如く実施され
る。
In addition, 65 and 67 in FIG. 1 are O-rings, and FIG. 6 is a sectional view taken along line VI-VI of FIG.
Reference numeral 9 denotes a binding tool for binding the injection hose 45 and the tension material 49. The seal structure 21 in this embodiment is configured in this way, and the anchor body construction method according to this embodiment is carried out using the seal structure 21 as described below.

【0026】先ず、図7に示すように削孔深さに応じケ
ーシング管111 ,112 ,113,114 ・・・を順
次接続して地盤71にアンカー孔73を削孔した後、図
7及び図8に示すようにシール構造体21を固着した引
張材49をケーシング管11 1 ,112 ,113 ,11
4 ・・・内に挿入する。
First, as shown in FIG.
Housing tube 111, 112, 113, 11Four... in order
Next, after connecting and drilling the anchor hole 73 in the ground 71,
As shown in FIG. 7 and FIG.
Upholstery material 49 to casing tube 11 1, 112, 113, 11
Four... Insert inside.

【0027】而して、本実施例の特徴は、図9の如き最
後端側のケーシング管111 の引き抜き回収時に、当該
ケーシング管111 の1本前のケーシング管112 のカ
ップリング部、即ち、カップリング92 を閉塞させる位
置(保護壁75からL寸法の位置)にシール構造体21
が配置されるように上記シール構造体21を引張材49
の所定位置に予め取り付けて、これを引張材49と共に
ケーシング管111 ,112 ,113 ,114 ・・・内
に挿入するものである。
[0027] In Thus, features of this embodiment, when the withdrawal collection such as the last end side of the casing pipe 11 1 of Figure 9, the casing tube 11 and second coupling portion of one front of the casing tube 11 1, That is, the seal structure 21 is placed at the position where the coupling 9 2 is closed (position L from the protective wall 75).
The seal structure 21 is attached to the tension member 49 so that
Is attached to the casing pipes 11 1 , 11 2 , 11 3 , 11 4, ... Together with the tension member 49 in advance.

【0028】尚、斯様に引張材49を挿入したとき、本
実施例では、図8に示すように上記シール構造体21
が、先ずケーシング管111 のカップリング91 内に配
置され、図10に示すようにシール構造体21の2本の
O−リング31がカップリング91 の内周91 aに圧接
して当該カップリング91 を閉塞させる。
When the tension member 49 is inserted as described above, in this embodiment, as shown in FIG.
But it is first placed on the casing tube 11 1 coupling 9 1, pressed against the two O- ring 31 the inner periphery 9 1 a coupling 9 1 of the seal structure 21 as shown in FIG. 10 The coupling 9 1 is closed.

【0029】上述の如くシール構造体21を所定位置に
配置した後、次に、最後端側のケーシング管111 の後
端にスイベル(図示せず)を接続して、図11の如くケ
ーシング管111 ,112 ,113 ,114 ・・・を徐
々に引き抜き乍ら、スイベルを介してケーシング管11
1 ,112 ,113 ,114 ・・・内にグラウト材Gを
加圧注入すれば、図12に示すようにカップリング91
がシール構造体21のO−リング31から移動するた
め、グラウト材Gはシール構造体21とケーシング管1
1 ,112 の間を通過して地盤71中のアンカー定着
部に注入され、アンカー体がアンカー定着部に徐々に造
成されることとなる。
After arranging the seal structure 21 at a predetermined position as described above, next, a swivel (not shown) is connected to the rear end of the casing pipe 11 1 on the rearmost end side, and as shown in FIG. The pipes 11 1 , 11 2 , 11 3 , 11 4, ... Are gradually pulled out, and the casing pipe 11 is inserted through a swivel.
1, 11 2, 11 3, 11 4 if the pressure injection of grout G into ..., coupling 9 1 as shown in FIG. 12
Moves from the O-ring 31 of the seal structure 21, so that the grout material G is sealed to the seal structure 21 and the casing pipe 1.
After passing between 1 1 and 11 2 , it is injected into the anchor fixing portion in the ground 71, and the anchor body is gradually formed in the anchor fixing portion.

【0030】そして、ケーシング管111 ,112 ,1
3 ,114 ・・・を徐々に引き抜いて、図9に示すよ
うに最後端側のケーシング管111 の1本前のケーシン
グ管112 のカップリング92 が所定の位置、即ち、シ
ール構造体21が配置されている位置に来た所で、ケー
シング管111 ,112 ,113 ,114 ・・・の引き
抜き及びグラウト材Gの加圧注入を停止して、最後端側
のケーシング管111をネジ切り回収すればよく、この
とき、図13に示すようにシール構造体21の分割パイ
プ23の外周に環装した2本のO−リング31がカップ
リング92 の内周92 aに圧接して被圧水によるグラウ
ト材Gの噴出を防止する。
The casing pipes 11 1 , 11 2 , 1
1 3, 11 4 ... Pull gradually, one front of the casing tube 11 and second coupling 9 2 a predetermined position in the casing pipe 11 1 of the last end side as shown in FIG. 9, i.e., the seal At the position where the structure 21 is arranged, the withdrawal of the casing pipes 11 1 , 11 2 , 11 3 , 11 4 ... And the pressure injection of the grout material G are stopped, and the rearmost end The casing pipe 11 1 may be threaded and collected. At this time, as shown in FIG. 13, two O-rings 31 which are annularly attached to the outer circumference of the split pipe 23 of the seal structure 21 are attached to the inner circumference of the coupling 9 2 . It is pressed against 9 2 a to prevent the grout material G from being jetted by the water under pressure.

【0031】そして、以下同様に、最後端に位置するケ
ーシング管112 の後端にスイベルを再び接続して、図
14の如くケーシング管112 ,113 ,114 ・・・
を徐々に引き抜き乍ら、スイベルを介してケーシング管
112 ,113 ,114 ・・・内にグラウト材Gを加圧
注入すれば、グラウト材Gはシール構造体21とケーシ
ング管112 ,113 の間を通過して地盤71中のアン
カー定着部に注入されていく。そして、図15に示すよ
うに最後端側のケーシング管112 の1本前のケーシン
グ管113 のカップリング93 がシール構造体21が配
置されている位置に来たら、ケーシング管112 ,11
3 ,114 ・・・の引き抜き及びグラウト材Gの加圧注
入を停止して、最後端側のケーシング管112 を同様に
ネジ切り回収すればよく、このとき、シール構造体21
の2本のO−リング31がカップリング93 の内周に圧
接して被圧水によるグラウト材Gの噴出を防止する。
Then, similarly, a swivel is reconnected to the rear end of the casing pipe 11 2 located at the rearmost end, and the casing pipes 11 2 , 11 3 , 11 4, ... As shown in FIG.
Gradually pull notwithstanding et al., If the pressure injection of grout G into the casing tube 11 2, 11 3, 11 4 in ... through the swivel, grout G sealing structure 21 and the casing pipe 11 2, It passes through between 11 3 and is injected into the anchor fixing portion in the ground 71. Then, as shown in FIG. 15, when the coupling 9 3 of the casing pipe 11 3 immediately before the rearmost casing pipe 11 2 comes to the position where the seal structure 21 is arranged, the casing pipe 11 2 , 11
It is sufficient to stop the withdrawal of 3 , 11, 4, ... And the pressure injection of the grout material G, and similarly thread and recover the casing pipe 11 2 on the rearmost end side. At this time, the sealing structure 21
Two O- ring 31 is pressed against the inner circumference of the coupling 9 3 prevents ejection of grout G by the pressure water of.

【0032】以後、再びケーシング管113 の後端にス
イベルを接続して同じ作業を順次繰り返すことで、地盤
71中のアンカー定着部にアンカー体が次第に造成され
ていくこととなる。
Thereafter, the swivel is connected to the rear end of the casing pipe 11 3 again and the same work is repeated in sequence, whereby the anchor body is gradually formed in the anchor fixing portion in the ground 71.

【0033】そして、アンカー体の造成が進み、図示し
ない最後の2本のケーシング管が残った状態で、注入ホ
ース45にグラウト材供給ホースを接続してグラウト材
Gを布製パッカーに注入すると、布製パッカーは膨張し
てアンカー孔73の内壁に圧接し、アンカー孔73を閉
塞する。そして、布製パッカーに供給されたグラウト材
Gは水分が布地から滲み出て速やかに固まり、斯かる状
態で最後の2本のケーシング管をアンカー孔73から順
次引き抜き回収することでアンカー体の造成作業が終了
し、このとき、アンカー孔73は布製パッカーによって
閉塞されているので、アンカー孔73内のグラウト材G
が被圧水によって噴出することがない。
Then, with the construction of the anchor body progressing, with the last two casing pipes (not shown) remaining, the grout material supply hose is connected to the injection hose 45 and the grout material G is injected into the cloth packer. The packer expands and presses against the inner wall of the anchor hole 73 to close the anchor hole 73. Then, in the grout material G supplied to the cloth packer, moisture oozes out from the cloth and quickly solidifies, and in such a state, the last two casing pipes are sequentially pulled out from the anchor holes 73 and collected to construct the anchor body. Since the anchor hole 73 is closed by the cloth packer at this time, the grout material G in the anchor hole 73 is closed.
Will not be ejected by the pressurized water.

【0034】このように、本実施例は、図9に示すよう
に最後端側のケーシング管111 の引き抜き回収時に、
当該ケーシング管111 の1本前のケーシング管112
のカップリング92 を閉塞させる位置にシール構造体2
1が配置されるようにシール構造体21を引張材49の
所定位置に予め取り付けて、これを引張材49と共にケ
ーシング管111 ,112 ,113 ,114 ・・・内に
挿入するものである。
As described above, in this embodiment, as shown in FIG. 9, when the rearmost casing pipe 11 1 is pulled out and collected,
The casing pipe 11 1 of one preceding casing pipe 11 2
The seal structure 2 at a position to close the coupling 9 2 of
1 in which the seal structure 21 is preliminarily attached at a predetermined position of the tension member 49 and is inserted together with the tension member 49 into the casing pipes 11 1 , 11 2 , 11 3 , 11 4 ... Is.

【0035】従って、本実施例によれば、被圧水のある
地盤71でケーシング管111 ,112 ,113 ,11
4 ・・・を引き抜き回収する度に、シール構造体21の
O−リング31がカップリング92 ,93 ,94 ・・・
を完全に閉塞するので、当該シール構造体21により被
圧水によるグラウト材Gの噴出を確実に防止することが
でき、その結果、グラウト材Gの噴出によってアンカー
定着部のグラウト材Gの濃度が薄まってしまうといった
従来の不具合が解消されることとなった。
Therefore, according to the present embodiment, the casing pipes 11 1 , 11 2 , 11 3 , 11 in the ground 71 with the pressurized water are used.
Each time 4 ... is pulled out and collected, the O-ring 31 of the seal structure 21 is coupled to the couplings 9 2 , 9 3 , 9 4 ...
Is completely blocked, the spouting of the grout material G due to the pressurized water can be reliably prevented by the sealing structure 21, and as a result, the spouting of the grout material G can reduce the concentration of the grout material G in the anchor fixing portion. The conventional problem of thinning has been resolved.

【0036】尚、シール構造体21のシール部材は上記
O−リング31に限定されるものではなく、例えば図1
6に示すシール構造体77の如く、パイプ部材79を長
尺な分割パイプ81と、これに順次螺着される分割パイ
プ83,85とで構成して、当該分割パイプ81の外周
に、ケーシング管11のカップリング9の内周9aに圧
接する長尺な筒状のゴム体87を装着してもよい。尚、
シール構造体77のその他の構成は上記シール構造体2
1と同様であるので、同一のものには同一符号を付して
それらの説明は省略する。
The seal member of the seal structure 21 is not limited to the O-ring 31. For example, as shown in FIG.
As in the seal structure 77 shown in FIG. 6, the pipe member 79 is composed of a long split pipe 81 and split pipes 83 and 85 which are sequentially screwed to the split pipe 81, and the casing pipe is provided on the outer periphery of the split pipe 81. Alternatively, a long tubular rubber body 87 that is pressed against the inner circumference 9a of the coupling 9 may be mounted. still,
The other structure of the seal structure 77 is the same as the seal structure 2 described above.
Since it is the same as that of No. 1, the same parts are denoted by the same reference numerals and the description thereof will be omitted.

【0037】而して、斯かるシール構造体77を用いて
も、上記実施例と同様、所期の目的を達成することが可
能である。
Thus, even if such a seal structure 77 is used, the intended purpose can be achieved as in the above-mentioned embodiment.

【0038】[0038]

【発明の効果】以上述べたように、請求項1及び請求項
2に係るアンカー体の造成方法によれば、被圧水のある
地盤でケーシング管を引き抜き回収する度に、シール構
造体がケーシング管のカップリング部を完全に閉塞する
ので、当該シール構造体により被圧水によるグラウト材
の噴出を確実に防止することができ、その結果、グラウ
ト材の噴出によってアンカー定着部のグラウト材の濃度
が薄まってしまうといった従来の不具合が解消されるこ
ととなった。
As described above, according to the anchor body construction method of the first and second aspects, every time the casing pipe is pulled out and collected in the ground with the pressurized water, the seal structure is used as the casing. Since the coupling part of the pipe is completely closed, the spout of the grout material due to the pressurized water can be reliably prevented by the seal structure, and as a result, the spout of the grout material can cause the concentration of the grout material in the anchor fixing part. The conventional problems such as the thinning of the product have been resolved.

【図面の簡単な説明】[Brief description of drawings]

【図1】請求項2に係るシール構造体の一実施例の断面
図である。
FIG. 1 is a cross-sectional view of an embodiment of a seal structure according to claim 2.

【図2】図1に示すシール構造体の分解斜視図である。FIG. 2 is an exploded perspective view of the seal structure shown in FIG.

【図3】図1のIII − III線断面図である。3 is a sectional view taken along line III-III in FIG.

【図4】図1のIV−IV線断面図である。4 is a sectional view taken along line IV-IV in FIG.

【図5】図1のX方向矢視図である。5 is a view taken in the direction of the arrow X in FIG.

【図6】図1のVI−VI線断面図である。6 is a sectional view taken along line VI-VI of FIG.

【図7】ケーシング管へのシール構造体の挿入状態を示
すアンカー体の造成方法の一工程図である。
FIG. 7 is a step diagram of the method of constructing the anchor body showing the insertion state of the seal structure into the casing tube.

【図8】ケーシング管へのシール構造体の挿入状態を示
すアンカー体の造成方法の一工程図である。
FIG. 8 is a step diagram of the method of constructing the anchor body showing the state of insertion of the seal structure into the casing tube.

【図9】最後端側のケーシング管の回収状態を示すアン
カー体の造成方法の一工程図である。
FIG. 9 is a step diagram of the method of constructing the anchor body showing the state of collecting the casing pipe on the rearmost end side.

【図10】シール構造体によるカップリングの閉塞状態
を示すケーシング管とシール構造体の断面図である。
FIG. 10 is a cross-sectional view of the casing pipe and the seal structure showing a closed state of the coupling by the seal structure.

【図11】最後端側のケーシング管の引き抜き状態を示
すアンカー体の造成方法の一工程図である。
FIG. 11 is a process drawing of the method of constructing the anchor body showing the pulled-out state of the casing pipe on the rearmost end side.

【図12】グラウト材の注入状態を示すケーシング管と
シール構造体の断面図である。
FIG. 12 is a cross-sectional view of a casing pipe and a seal structure showing a state of injecting grout material.

【図13】シール構造体によるカップリングの閉塞状態
を示すケーシング管とシール構造体の断面図である。
FIG. 13 is a cross-sectional view of the casing pipe and the seal structure showing a closed state of the coupling by the seal structure.

【図14】最後端側のケーシング管の引き抜き状態を示
すアンカー体の造成方法の一工程図である。
FIG. 14 is a process drawing of the method of constructing the anchor body showing the pulled-out state of the casing pipe on the rearmost end side.

【図15】最後端側のケーシング管の引き抜き状態を示
すアンカー体の造成方法の一工程図である。
FIG. 15 is a step diagram of the method of constructing the anchor body showing the pulled-out state of the casing pipe on the rearmost end side.

【図16】請求項2に係るシール構造体の他の実施例の
断面図である。
FIG. 16 is a sectional view of another embodiment of the seal structure according to claim 2;

【図17】ケーシング管の断面図である。FIG. 17 is a sectional view of a casing tube.

【図18】他のケーシング管の断面図である。FIG. 18 is a cross-sectional view of another casing pipe.

【図19】図18に示すケーシング管の接続方法を示す
ケーシング管の断面図である。
19 is a cross-sectional view of the casing pipe showing the method for connecting the casing pipe shown in FIG.

【符号の説明】[Explanation of symbols]

7 ケーシング管本体 9 カップリング 11 ケーシング管 19,79 パイプ部材 21,77 シール構造体 23,25,27,29,81,83,85 分割パイ
プ 31 O−リング 37 先端閉塞部材 45 注入ホース 49 引張材 53 後端閉塞部材 63 楔 71 地盤 73 アンカー孔 87 ゴム体 G グラウト材
7 Casing Pipe Main Body 9 Coupling 11 Casing Pipe 19,79 Pipe Member 21,77 Seal Structure 23,25,27,29,81,83,85 Split Pipe 31 O-ring 37 Tip Closing Member 45 Injection Hose 49 Tension Material 53 rear end closing member 63 wedge 71 ground 73 anchor hole 87 rubber body G grout material

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 肉厚なカップリング部を一端に有するケ
ーシング管を削孔深さに応じ順次接続して地盤にアンカ
ー孔を削孔した後、ケーシング管内に引張材を挿入し、
接続したケーシング管を1本宛引き上げ乍らアンカー孔
にグラウト材を加圧注入して最後端側に接続されたケー
シング管を順次回収していくアンカー体の造成方法に於
て、 最後端側のケーシング管の引き抜き回収時に当該ケーシ
ング管の少なくとも1本前のケーシング管のカップリン
グ部を閉塞するようにシール構造体を予め引張材に取り
付けて、当該シール構造体を引張材と共にケーシング管
内に挿入し、ケーシング管の引き抜き回収時に、上記シ
ール構造体でカップリング部を閉塞して被圧水によるグ
ラウト材の噴出を防止することを特徴とするアンカー体
の造成方法。
1. A casing pipe having a thick coupling portion at one end is sequentially connected according to a drilling depth to drill an anchor hole in the ground, and then a tensile material is inserted into the casing pipe,
In a method of constructing an anchor body in which the casing pipes connected to the rearmost end side are sequentially recovered by pressure-injecting the grout material into the anchor hole by pulling up the connected casing pipes one by one, When the casing pipe is pulled out and collected, the sealing structure is attached to the tension member in advance so as to close the coupling portion of the casing pipe at least one before the casing pipe, and the sealing structure is inserted into the casing pipe together with the tension member. A method of constructing an anchor body, characterized in that when the casing pipe is pulled out and collected, the coupling portion is closed by the seal structure to prevent the grout material from being jetted by the pressurized water.
【請求項2】 シール構造体は、引張材が挿通し、カッ
プリング部の内周に圧接するシール部材が外周に装着さ
れたパイプ部材と、 パイプ部材の先端に回動可能に取り付き、引張材が挿通
する引張材挿通孔が形成された先端閉塞部材と、 パイプ部材の後端に回動可能に取り付き、引張材が挿通
する引張材挿通孔が形成された後端閉塞部材と、 当該後端閉塞部材の引張材挿通孔に楔着される楔とから
なることを特徴とする請求項1記載のアンカー体の造成
方法。
2. The seal structure comprises: a pipe member having a tension member inserted therein; and a seal member mounted on the outer periphery of the coupling member, the seal member being in pressure contact with the inner periphery of the coupling portion; And a rear end closing member having a tension member insertion hole formed therein and a rear end member rotatably attached to the rear end of the pipe member and formed with a tension member insertion hole through which the tension member is inserted. The method for constructing an anchor body according to claim 1, comprising a wedge that is wedged in the tension member insertion hole of the closing member.
JP23731394A 1994-09-30 1994-09-30 Method of forming anchor body Expired - Lifetime JP3479349B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23731394A JP3479349B2 (en) 1994-09-30 1994-09-30 Method of forming anchor body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23731394A JP3479349B2 (en) 1994-09-30 1994-09-30 Method of forming anchor body

Publications (2)

Publication Number Publication Date
JPH08100426A true JPH08100426A (en) 1996-04-16
JP3479349B2 JP3479349B2 (en) 2003-12-15

Family

ID=17013521

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23731394A Expired - Lifetime JP3479349B2 (en) 1994-09-30 1994-09-30 Method of forming anchor body

Country Status (1)

Country Link
JP (1) JP3479349B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013117100A (en) * 2011-12-01 2013-06-13 Ohbayashi Corp Bag body fixture and natural ground reinforcement material using the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5414924B1 (en) * 2013-04-26 2014-02-12 株式会社大阪防水建設社 Casing pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013117100A (en) * 2011-12-01 2013-06-13 Ohbayashi Corp Bag body fixture and natural ground reinforcement material using the same

Also Published As

Publication number Publication date
JP3479349B2 (en) 2003-12-15

Similar Documents

Publication Publication Date Title
US4893389A (en) Reinstatement of lateral branch connections in relined sewers or pipes
DE60129801T2 (en) METHOD FOR DRIVING SPUNBOILS
JP3493014B2 (en) Tunnel widening method
JP3479349B2 (en) Method of forming anchor body
EP1448866B1 (en) Method and device for boring holes
JP3348749B2 (en) How to collect casing pipes
JPH09177073A (en) Ground anchor method and borig tool
JP2762195B2 (en) Method and apparatus for pulling out casing pipe for anchor
CA2054553A1 (en) Apparatus and technique for installing an elongated rod in an earth formation
JP7173686B2 (en) Self-drilling rock bolt and its construction method
JP5414924B1 (en) Casing pipe
JP3048320B2 (en) Ground anchor construction method
JPH10292361A (en) Driving method of drain member into ground
JP3289753B2 (en) Casing packer
JPH10140999A (en) Seal structure used for forming anchor body
JPH10122432A (en) Replacing method and drawing method for underground embedded pipe
JPH0610348A (en) Anchor body construction method and mouth packer used for this method
JP2865571B2 (en) Anchor construction equipment under pressurized water
JP2865570B2 (en) Casing handling equipment for anchor construction under pressurized water
JP2744773B2 (en) Water stopping device for anchor and jack for pulling out, and casing drawing method using the water stopping device and jack for pulling out
JPH0685429U (en) Mouth packer
JP4246344B2 (en) Tunnel long steel pipe tip receiving method
JPH089945B2 (en) Method of pouring grout material into the ground
JP2881615B2 (en) Device to prevent squirting of cement during construction of earth anchor
JPH0313699A (en) Lock bolt construction method and lock bolt device thereof

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081003

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091003

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101003

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101003

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111003

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111003

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121003

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121003

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131003

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term