JPH0816206A - Method and apparatus for determining start order - Google Patents
Method and apparatus for determining start orderInfo
- Publication number
- JPH0816206A JPH0816206A JP14285894A JP14285894A JPH0816206A JP H0816206 A JPH0816206 A JP H0816206A JP 14285894 A JP14285894 A JP 14285894A JP 14285894 A JP14285894 A JP 14285894A JP H0816206 A JPH0816206 A JP H0816206A
- Authority
- JP
- Japan
- Prior art keywords
- order
- rule
- starting
- processing
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Feedback Control In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
- General Factory Administration (AREA)
Abstract
(57)【要約】
【目的】本発明の目的は、生産ラインまたは処理設備の
状況に応じた着工順序の決定方法及び装置を提供するこ
とにある。
【構成】処理設備毎に設定した着工順序決定ルール(1
02)に基づいて、生産ラインに仕掛かっている被処理
物の情報(105)を参照して制御部(101)が着工
順序を決定する。
【効果】本発明により、処理設備毎に設定される着工順
序を決定するルールや作業者等により指定された着工順
序は、生産ラインを停止することなく設定または変更が
可能となり、また生産計画の変更、設備の故障などの変
動に即応可能な着工順序を決定できる。
(57) [Summary] [Object] It is an object of the present invention to provide a method and an apparatus for determining the starting order according to the situation of a production line or processing equipment. [Structure] Construction start order determination rule (1
02), the control unit (101) determines the construction order by referring to the information (105) of the work in process on the production line. [Effects] According to the present invention, the rules for determining the starting order set for each processing facility and the starting order specified by the operator can be set or changed without stopping the production line, and the production plan can be changed. It is possible to determine the starting order that can respond immediately to changes such as changes and equipment failures.
Description
【0001】[0001]
【産業上の利用分野】本発明は、被処理物群を複数の処
理設備群で生産処理を行う製造ラインにおいて、被処理
物群の着工の順序を決定する装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for determining the starting order of a group of objects to be processed in a production line for producing the group of objects to be processed by a plurality of processing equipment groups.
【0002】[0002]
【従来の技術】複数の被処理物群を複数の処理設備群で
生産処理を行う製造ラインにおいて、生産ラインに仕掛
かっている被処理物群は通常バッファリング機能を有す
る受払いユニット等に一時保管され処理設備に順次搬送
され着工されるが、該被処理物群の着工順序の決定は、
特開平4-13548に示されるように評価項目を予めいくつ
か設けた該着工順序を決定するためのルールを用いて、
被処理物毎に評価指数の算出を行ってその累計値の大き
いものから着工順序として求めていた。生産ラインに同
じ処理を行う処理設備が複数存在する場合は全設備を対
象とした予め固定した該ルールをもとに着工順序を決定
していた。2. Description of the Related Art In a production line in which a plurality of processing object groups are produced and processed by a plurality of processing equipment groups, the processing object group that is in process on the production line is usually temporarily stored in a receiving / paying unit having a buffering function. The work is sequentially conveyed to the processing facility and the construction is started.
As shown in JP-A-4-13548, using a rule for determining the construction order in which some evaluation items are provided in advance,
The evaluation index was calculated for each object to be processed, and the work order was calculated from the largest cumulative value. When there are a plurality of processing equipments that perform the same processing on the production line, the starting order is determined based on the rule fixed in advance for all the equipments.
【0003】[0003]
【発明が解決しようとする課題】前記のように全設備を
対象とした予め固定されたルールでは個々の処理設備の
特性に応じた着工順序の決定を行うことが出来ず、また
着工順序を決定するルールを変更する場合該ルールの対
象が全ての設備群あるため生産ラインの設備群全ての処
理を止めてから変更しなければならず該ルールの変更が
容易ではないため生産状況や設備の故障に応じた迅速な
対応が行えず、生産効率の低下を招く問題がある。As described above, it is not possible to determine the starting order according to the characteristics of individual processing facilities by the fixed rule for all facilities, and the starting order is determined. When changing the rule, the target of the rule is all the equipment groups, so it is necessary to stop the processing of all the equipment groups on the production line before changing the rules. However, there is a problem that production efficiency may be reduced due to the inability to promptly respond to the situation.
【0004】本発明は前記問題点を解決するため、生産
ラインにおいて各処理設備の特性が十分生かされる着工
順序の決定方法及び生産状況に応じたルールの設定方法
を提供することを目的とする。In order to solve the above-mentioned problems, it is an object of the present invention to provide a method of determining the starting sequence and a method of setting a rule according to the production situation in which the characteristics of each processing facility are fully utilized in the production line.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
本発明に係る着工順序決定装置は、被処理物の着工順序
を決定するための複数の個別ルールを記憶する手段と、
少なくとも一つの個別ルールを設備毎に設定し着工順序
決定ルールの設定を入力する手段と、その入力により設
備ごとに設定された着工順序決定ルールを記憶する手段
と、被処理物の着工順序を算出するために必要な被処理
物群の情報を記憶する手段と、着工順序決定ルールと被
処理物の情報から着工順序を決定する手段を備えてい
る。In order to achieve the above object, a work order determining apparatus according to the present invention comprises means for storing a plurality of individual rules for deciding the work order of a workpiece.
A means for setting at least one individual rule for each equipment and inputting the setting of the construction order determination rule, a means for storing the construction order determination rule set for each equipment by the input, and calculating the construction order of the workpieces It is provided with a means for storing the information on the group of objects to be processed, and a means for deciding the starting order from the starting order determination rule and the information on the objects.
【0006】[0006]
【作用】本発明に係る着工順序決定装置においては、着
工順序を決定するためのルールを処理設備毎に設定する
ことにより、個々の処理設備の特性に応じた着工順序を
決定することが出来る。また処理設備毎に必要に応じた
数の着工順序決定ルールを設定できることにより、きめ
細かい着工順序を算出することができる。さらに着工順
序決定ルールの設定の変更を行うとき、着工順序を決定
するためのルールを処理設備毎に設定しているため、生
産ラインを停止させることなく変更が可能となり生産状
況や処理設備の状況にあわせた着工順序決定ルールや着
工順序の変更を容易に行うことを可能とする。In the apparatus for determining the starting order according to the present invention, by setting the rule for determining the starting order for each processing facility, the starting order can be determined according to the characteristics of each processing facility. Further, since it is possible to set as many start order determination rules as necessary for each processing facility, it is possible to calculate a fine start order. Furthermore, when changing the setting of the start order determination rule, the rule for determining the start order is set for each processing facility, so it can be changed without stopping the production line, and the production status and processing equipment status It is possible to easily change the starting order determination rule and the starting order according to the above.
【0007】また本発明における被処理物とは、加工や
組立が行こなわれる機械部品もしくは物理化学現象を応
用した薄膜形成や薄膜の微細加工が行おこなわれる半導
体等の製品、半製品などの生産ラインにとどまらず、検
査設備において検査が行われる検査ライン等における処
理の順序を決定する全てのラインにおいて適用可能であ
る。The object to be treated in the present invention means a mechanical component to be processed or assembled, or a product such as a semiconductor or a semi-finished product in which thin film formation or fine processing of a thin film is performed by applying a physicochemical phenomenon. The present invention is applicable not only to lines but also to all lines that determine the order of processing in an inspection line where inspection is performed in inspection equipment.
【0008】[0008]
【実施例】以下、本発明の実施例を図面を用いて説明す
る。Embodiments of the present invention will be described below with reference to the drawings.
【0009】図1は本発明の着工順序決定装置の一実施
例である。生産ラインにおいて、2は被処理物が他の工
程等から搬送されてきたときや処理設備で処理の終わっ
た処理加工物を回収するとき収納することとができる受
払いユニットで、4は被処理物の処理を行う処理設備群
で、3は受払いユニット2および処理設備群4の間にお
いて被処理物の搬送を行う搬送設備であり、1は受け払
いユニット2の情報や処理設備群4の状態から着工順序
決定ルールに基づいた被処理物の着工順序を処理設備群
4毎に決定する着工順序決定装置である。FIG. 1 shows an embodiment of the construction sequence determining apparatus of the present invention. In the production line, 2 is a receiving and paying unit that can be stored when the processed product is conveyed from another process or when the processed product that has been processed by the processing facility is collected, and 4 is the processed product. Processing equipment group 3 for carrying out the processing, 3 is a transportation equipment for carrying the object to be processed between the receiving and paying unit 2 and the processing equipment group 4, and 1 is information from the receiving and paying unit 2 and the state of the processing equipment group 4. This is a start-up order determination device that determines the start-up order of the workpieces based on the start-up order determination rule for each processing facility group 4.
【0010】図1において着工順序設定ルールの設定手
順について説明する。着工順序決定装置1と通信回線な
どにより接続されている処理設備群4のうち、処理設備
401の着工順序決定ルールの設定を行う場合、処理設
備401の制御モードを制御モード設定入力部110に
よりローカルに変更し、着工順序決定ルールの設定を行
う。該制御モードとは、着工順序決定装置1と生産ライ
ンの処理設備群4との通信回線をつないだ状態で着工順
序決定装置1から設備に着工開始指示等の指示を出すか
否かを決定する制御モードであり、設備毎に設定されて
おり、ローカルとリモートがある。ローカルとは着工順
序決定装置1から新たな被処理物の着工開始指示は出さ
ない制御モードで、リモートとは着工開始指示が行える
制御モードであり、前記制御モードの変更は被処理物群
や設備群の状態に係わることなく変更が可能である。例
えば処理中に制御モードをリモートからローカルに変更
しても、既に着工を行っている被処理物の処理は続行さ
せる。また、変更を行う設備以外の他の設備群の制御や
運転を止めることはない。設備毎の制御モードの状態は
制御モード記憶手段109に記憶している。The procedure for setting the work order setting rule will be described with reference to FIG. When setting the start order determination rule of the processing equipment 401 of the processing equipment group 4 connected to the start order determination device 1 by a communication line or the like, the control mode of the processing equipment 401 is set locally by the control mode setting input unit 110. Change to, and set the start order determination rule. The control mode determines whether or not to issue an instruction such as a start start instruction to the equipment from the construction order determination device 1 with the communication line between the construction order determination device 1 and the processing equipment group 4 of the production line being connected. It is a control mode and is set for each facility, and there are local and remote. The local mode is a control mode in which a new process start instruction is not issued from the process sequence determining device 1, and the remote mode is a control mode in which a new process start instruction can be issued. Changes can be made regardless of the state of the group. For example, even if the control mode is changed from remote to local during processing, the processing of the object to be processed already started is continued. In addition, it does not stop the control or operation of equipment other than the equipment to be changed. The state of the control mode for each facility is stored in the control mode storage unit 109.
【0011】次に着工順序設定ルールの決定方法につい
て説明する。個別ルール記憶部102に予めいくつか登
録されている個別ルールから、作業者は着工順序決定ル
ール設定入力部107を用いて処理設備毎に着工順序決
定ルールの設定作業を行いその結果を処理設備毎の着工
順序決定ルール記憶部103に保存させる。前記の着工
順序決定ルールの設定において、設定する個別ルールの
数は任意の数だけ設定できるので処理設備群4または生
産ラインの状況に応じた設定が可能となる。また着工順
序決定ルールを設定しない処理設備は自動的に先入れ先
だし(生産ラインに到着した順序で着工する)ルールを
割付ける。Next, a method for determining the construction order setting rule will be described. From some individual rules registered in advance in the individual rule storage unit 102, the worker uses the starting sequence determination rule setting input unit 107 to set the starting sequence determination rule for each processing facility, and the result is set for each processing facility. The start order determination rule storage unit 103 of FIG. In the setting of the start order determination rule, the number of individual rules to be set can be set to an arbitrary number, so that it can be set according to the situation of the processing facility group 4 or the production line. In addition, processing equipment that does not set the start order determination rule is automatically assigned a first-in first-out (starting work in the order in which it arrives on the production line) rule.
【0012】次に、着工順序の決定方法について説明す
る。まず処理設備毎の着工順序決定ルール記憶部103
をもとに現在仕掛かっている被処理物の情報(被処理物
No.、品種・工程、処理条件等)を保持している被処理
物群情報記憶部105からの情報を参照して制御部10
1で被処理物の着工順序を設備毎に算出する。前記着工
順序を決定する際は着工順序決定ルールを設定するとき
に個別ルールの設定した順序で制御部101は判断す
る。そして算出された着工順序の結果を着工順序記憶部
104に保持する。Next, a method of determining the starting order will be described. First, the construction order determination rule storage unit 103 for each processing facility
The control unit referring to the information from the processed object group information storage unit 105 that holds information on the processed object (processed object No., product type / process, processing condition, etc.) based on 10
In step 1, the work order of the workpiece is calculated for each equipment. When determining the work order, the control unit 101 determines in the order set by the individual rule when setting the work order determination rule. Then, the result of the calculated start order is held in the start order storage unit 104.
【0013】次に着工時の動作について説明する。処理
設備401が着工可能である場合、着工順序決定装置は
着工順序記憶部104から該処理設備の着工順序算出結
果である着工すべき被処理物の情報を取得し指示手段1
08を介して該被処理物の搬送指示を出し、被処理物は
受払いユニット2から取り出され搬送設備3に渡され該
処理設備401に搬送され、処理が行われる。処理を終
了した該被処理物は再度搬送設備3により受払いユニッ
ト2に搬送され一時保管された後、次の工程へ運ばれ
る。Next, the operation at the time of construction will be described. When the processing equipment 401 is capable of starting construction, the construction order determination device acquires from the construction sequence storage unit 104 the information on the object to be constructed which is the construction sequence calculation result of the processing equipment, and instructing means 1
A transfer instruction of the object to be processed is issued via 08, the object to be processed is taken out from the accepting and accepting unit 2, transferred to the transfer facility 3, transferred to the processing facility 401, and processed. The object to be processed, which has been processed, is again transferred to the receiving and paying unit 2 by the transfer facility 3 and temporarily stored, and then transferred to the next step.
【0014】前記の実施例の個別ルールの例として、優
先度(生産の進度上の被処理物の普通、特急、超特急)
ルールと被処理物まとめ(段取り替えを抑えるため予め
設定された被処理物のまとめ数を最大とするような同品
種、同工程のグループとする)ルールを用いて着工順序
の決定方法について説明する。生産ラインに、品種1工
程2優先度普通(被処理物番号1)、品種3工程4優先
度普通(被処理物番号2)、品種5工程6優先度超特急
(被処理物番号3)、品種3工程4優先度普通(被処理
物番号4)、品種1工程2優先度特急(被処理物番号
5)の順で被処理物が運ばれて受払いユニットに一時保
管されているとき、生産ラインには品種1工程2、品種
5工程6を処理可能な処理設備401と、該処理設備4
01に加え品種3工程4を処理可能な処理設備402が
存在する。着工順序決定ルール設定入力部107によ
り、処理設備401には優先度ルールのみを、処理設備
402には被処理物まとめルールと、優先度ルールの順
で着工順序決定ルールを設定する。ただし該処理設備4
01の被処理物まとめルールのまとめ数は2個である。
そして制御部101により着工順序を算出しその結果を
図2に示す。まず処理設備401の着工順序の決定につ
いて説明する。処理設備401の処理可能な被処理物は
被処理物番号1、被処理物番号3、被処理物番号5、で
あり前記被処理物の優先度はそれぞれ普通、超特急、特
急であるので優先度順に並び変えると被処理物番号3、
被処理物番号5、被処理物番号1となりこれが処理設備
401の着工順序決定ルールである優先度ルールに従っ
た着工順序となる。次に処理設備402の着工順序の決
定について説明する。処理設備の着工可能な被処理物は
前記の全てであり、そのうち一番目の着工順序決定ルー
ルである被処理物まとめルールの該当する被処理物は、
被処理物まとめ数2に達している品種1工程2、品種3
工程4の被処理物である。そのどちらの品種工程の被処
理物が先に着工されるかは、次に設定されている優先度
ルールに従い、優先度が特急の被処理物がある品種1工
程2が品種3工程4より着工順序が早くなる。そして品
種1工程2のまとめグループ内の着工順序の決定にも該
優先度ルールが適応されて被処理物番号5、被処理物番
号1の順になり、次の品種3工程4も同様にして優先度
ルールが適応されるがどちらの被処理物も優先度が普通
であるので該優先度ルールでは判定できない。そこで前
記のように設定した着工順序決定ルールで着工順序を判
定できない場合は自動的に先入れ先だしルールが適応さ
れ、前記の場合には被処理物番号2、被処理物番号4の
順になる。そして該被処理物まとめルールで該当しなか
った被処理物番号3が最後に着工する被処理物となる。
以上により処理設備401、処理設備402の着工順序
が決定されるが、互いに共通の被処理物を着工順序算出
結果として保持しているが、一方の処理設備で処理が行
われた場合他方の処理設備の被処理物の情報は消去され
る。前記の例であれば処理設備401ではじめに被処理
物番号3のものを処理開始した場合処理設備402で着
工順序が5番目である被加工番号3の情報は消去され
る。As an example of the individual rule of the above-mentioned embodiment, priority (normal, limited express, super limited express of the object to be processed in terms of production progress)
A method for determining the starting order will be described using rules and processing object grouping rules (groups of the same product type and process that maximize the number of objects to be processed set in advance in order to prevent setup changes) are used. . In the production line, product type 1 process 2 priority normal (processed object number 1), product type 3 process 4 priority normal (processed object number 2), product type 5 process 6 priority super express (processed object number 3), Product 3 Process 4 Priority Normal (processed item number 4), Product 1 process 2 priority limited express (processed item number 5) In the line, a processing facility 401 capable of processing type 1 process 2 and type 5 process 6 and the processing facility 4
In addition to 01, there is a processing facility 402 capable of processing 3 types of processes. The work order determination rule setting input unit 107 sets only the priority rule in the processing equipment 401, and sets the work processing order determination rule in the processing equipment 402 in the order of the processed object summary rule and the priority rule. However, the processing equipment 4
The number of processed object grouping rules of 01 is two.
Then, the control unit 101 calculates the starting order, and the result is shown in FIG. First, the determination of the starting order of the processing equipment 401 will be described. The objects that can be processed by the processing equipment 401 are the object number 1, the object number 3, and the object number 5, and the priorities of the object items are normal, super-express, and express, respectively, so priority is given. If you sort them in order,
The processed object number is 5 and the processed object number is 1, which is the starting order according to the priority rule which is the starting order determination rule of the processing equipment 401. Next, the determination of the starting order of the processing equipment 402 will be described. The objects that can be started in the processing equipment are all of the above, and the applicable objects of the object summary rule that is the first starting order determination rule among them are:
Type 1 process 2 and type 3 that have reached the number of processed objects 2
It is an object to be processed in step 4. According to the priority rule that is set next, it is determined which product process of which product process is to be started first. The order gets faster. Then, the priority rule is also applied to the determination of the start order within the group of the product type 1 process 2 and the processed product number 5 and the processed product number 1 are in this order, and the next product type 3 process 4 is similarly prioritized. The priority rule is applied, but the priority of both of the objects to be processed is normal, and therefore it cannot be determined by the priority rule. Therefore, if the start order determination rule set as described above cannot determine the start order, the first-in first-out rule is automatically applied, and in the above case, the processed object number 2 and the processed object number 4 are in order. . Then, the processed object number 3 which does not correspond to the processed object summary rule becomes the processed object to be finally started.
Although the work order of the processing equipment 401 and the processing equipment 402 is determined by the above, the common workpieces are held as the work order calculation result, but when the processing is performed by one processing equipment, the other processing is performed. Information on the object to be processed in the facility is deleted. In the above example, when the processing equipment 401 first starts the processing of the processing object number 3, the processing equipment 402 erases the information of the processing number 3 which is the fifth starting order.
【0015】次に着工順序決定ルールの変更方法につい
て説明する。この場合前記着工順序決定ルール設定と同
様にして処理設備401の着工順序決定ルールの変更を
行う場合、制御部101において処理設備401の着工
順序算出や新たなる被処理物の処理設備401への搬送
着工指示を行わない制御状態にするため制御モード設定
入力部110により処理設備401の制御モードをロー
カルに変更し、着工順序決定ルールの変更を着工順序決
定ルール設定入力部107で行う。この時他の処理設備
402、403の制御は通常通り行われており被処理物
は処理設備毎の着工順序決定ルールに従って順次着工さ
れている。そして処理設備401の制御モードを制御モ
ード設定入力部110によりリモートにした時、制御部
101は処理設備401の新たに設定された着工順序設
定ルールに従って被処理物の着工順序を算出し順次処理
設備401に対して搬送や着工指示を出す。Next, a method of changing the work order determination rule will be described. In this case, when the construction order determination rule of the processing equipment 401 is changed in the same manner as the construction order determination rule setting, the control unit 101 calculates the construction order of the processing equipment 401 and conveys a new processed object to the processing equipment 401. The control mode setting input unit 110 changes the control mode of the processing equipment 401 to the local mode in order to set the control state in which no work instruction is given, and the work sequence determination rule setting input unit 107 changes the work sequence determination rule. At this time, the other processing equipments 402 and 403 are controlled as usual, and the objects to be processed are sequentially started according to the starting order determination rule for each processing equipment. When the control mode of the processing equipment 401 is set to the remote mode by the control mode setting input unit 110, the control unit 101 calculates the starting order of the workpieces according to the newly set starting order setting rule of the processing equipment 401, and sequentially processes the processing equipment. An instruction to convey or start construction is issued to 401.
【0016】また着工順序決定ルールをもとに制御部1
01によって着工順序を算出するだけでなく、着工する
被処理物の着工する順番を任意に設定することも可能で
ある。被処理物群情報記憶部105から受払いユニット
2の仕掛かり情報を表示部106に表示させ作業者によ
る判断で被処理物の着工順序を一つ一つ着工順序決定ル
ール設定入力部107から設定しこの情報を着工順序記
憶部104に記憶させることにより、制御部101によ
る着工順序の算出は行わず入力した着工順序で搬送、着
工させる。さらに前記のごとく一つ一つ被処理物を着工
順序決定ルール設定入力部107により設定するだけで
なく、被処理物の品種や工程等といった被処理物のグル
ープ分けをする情報を作業者により着工順序決定ルール
設定入力部107により指定しなおかつ被処理物の優先
度ルールなどの通常の着工順決定ルールも設定すること
も可能で、作業者の変則的な要求にも答えられる着工順
序が決定可能となる。Further, the control unit 1 is based on the construction order determination rule.
It is possible not only to calculate the starting order by 01, but also to set the starting order of the workpieces to be started. The work-in-process information of the payment / receipt unit 2 is displayed on the display unit 106 from the processed object group information storage unit 105, and the start order of the processed objects is set one by one from the start order determination rule setting input unit 107 according to the operator's judgment. By storing this information in the work order storage unit 104, the control unit 101 does not calculate the work order and the conveyed work is started in the input work order. Further, as described above, not only is the object to be processed set by the starting order determination rule setting input unit 107, but the operator also starts the information for grouping the objects such as the type and process of the objects to be processed. It is also possible to set a normal start order determination rule such as the priority rule of the workpiece, which is specified by the order determination rule setting input unit 107, and a start order that can answer irregular requests from workers can be determined. Becomes
【0017】また着工順序決定装置1による算出や作業
者により指示され着工順序記憶部104に記憶されてい
る着工順序を、着工順序決定ルール設定入力部107に
より該着工順序の追加、削除、並び替え等も行うことが
出来る。In addition, the start order stored in the start order storage unit 104, which is calculated by the start order determining apparatus 1 and stored in the start order storage unit 104, is added, deleted, or rearranged by the start order determination rule setting input unit 107. And so on.
【0018】図3は着工順序決定装置が生産進行管理装
置5と接続した図である。前記の着工順序決定ルールや
被処理物の着工順序の設定は作業者からの入力だけでは
なく本発明の装置と通信ケーブル等で接続した他の生産
ラインの状況を管理している生産進行管理装置等5から
の指示によって設定や変更が可能である。FIG. 3 is a diagram in which the construction order determining device is connected to the production progress management device 5. The above-mentioned starting order determination rule and the setting of the starting order of the workpieces are not only input by the operator, but also a production progress management apparatus that manages the situation of another production line connected to the apparatus of the present invention by a communication cable or the like. It is possible to make settings and changes according to instructions from 5, etc.
【0019】また図4に示す通り本発明において搬送設
備が作業者であっても良い。この場合搬送指示を行う場
合表示部106に設備毎の着工順序記憶部104から着
工する被処理物を表示させ、指示部108においてブザ
ーなどにより作業者に搬送指示のあることを知らせ被処
理物を搬送させることになる。Further, as shown in FIG. 4, in the present invention, the transportation facility may be an operator. In this case, when a transfer instruction is given, the display unit 106 displays the object to be processed from the start order storage unit 104 for each facility, and the instruction unit 108 informs the operator by a buzzer that there is a transfer instruction and displays the object to be processed. Will be transported.
【0020】図1の実施例のごとく受払いユニット2と
処理設備群4との間の着工順序決定だけではなく本発明
は処理設備群4どうしの間の着工順序または受払いユニ
ット2どうしの間の着工順序を決定する状況でも前記の
ごとく可能である。As in the embodiment of FIG. 1, not only is the start order determined between the receiving and paying unit 2 and the processing equipment group 4, but the present invention is the starting order between the processing equipment groups 4 or the starting work between the receiving and paying units 2. The situation where the order is determined is also possible as described above.
【0021】[0021]
【発明の効果】本発明によれば、着工順序決定ルールを
処理設備毎に設定することにより個々の処理設備特有の
着工方法に対応した処理が可能となる。また、必要に応
じた数の着工順序決定ルールを設定できることにより生
産状況にあった着工順序を決定することができる。さら
に、着工順序決定ルールを処理設備毎に設定することに
より生産ラインを停止することなく着工順序決定ルール
の変更が可能となり、生産計画の変更、設備の故障など
の変動に即応できる。According to the present invention, by setting the construction order determination rule for each processing equipment, the processing corresponding to the construction method peculiar to each processing equipment becomes possible. Further, by setting as many start order determination rules as necessary, the start order suitable for the production situation can be determined. Further, by setting the start-up order determination rule for each processing facility, the start-up order determination rule can be changed without stopping the production line, and it is possible to immediately respond to a change such as a change in the production plan or equipment failure.
【図1】本発明の一実施例における被処理物の着工順序
決定装置と生産ラインの設備群を示す図である。FIG. 1 is a diagram showing a starting sequence determination device for an object to be processed and a facility group of a production line according to an embodiment of the present invention.
【図2】本発明の一実施例における被処理物の着工順序
決定ルールとその結果を示す図である。FIG. 2 is a diagram showing a work order determination rule of a workpiece and its result in one embodiment of the present invention.
【図3】他の実施例における被処理物の着工順序決定装
置と生産ラインの設備群と生産進行管理装置を示す図で
ある。FIG. 3 is a diagram showing an apparatus for deciding a starting order of objects to be processed, an equipment group of a production line, and a production progress management apparatus in another embodiment.
【図4】さらに他の実施例における被処理物の着工順序
決定装置と作業者が被処理物の運搬を行う生産ラインの
設備群を示す図である。FIG. 4 is a diagram showing a work order deciding device for a processed object and a facility group of a production line where an operator conveys the processed object in still another embodiment.
1…着工順序決定装置、 101…制御部、 102…着工順序決定ルール記憶部、 103…着工順序決定ルール設定記憶部、 104…着工順序記憶部、 105…被処理物群情報記憶部、 106…表示部、 107…着工順序決定ルール設定入力部、 108…指示部、 109…制御モード記憶部、 110…制御モード設定入力部、 2…受払いユニット、 3…搬送設備、 4…処理設備群。 DESCRIPTION OF SYMBOLS 1 ... Start-up order determination device, 101 ... Control part, 102 ... Start-up order determination rule storage part, 103 ... Start-up order determination rule setting storage part, 104 ... Start-up order storage part, 105 ... Processed object group information storage part, 106 ... Display unit 107 ... Construction order determination rule setting input unit, 108 ... Instructing unit, 109 ... Control mode storage unit, 110 ... Control mode setting input unit, 2 ... Payment unit, 3 ... Transport facility, 4 ... Processing facility group.
Claims (5)
を行う生産ラインにおいて、 被処理物の着工順序を決定するために予め定められた複
数の個別ルールが定めてあり、 少なくとも一つの該個別ルールを選択し設備毎に着工順
序決定ルールの設定を行い、被処理物群の情報から該着
工順序決定ルールの内容に沿うような着工順序を決定す
ることを特徴とする着工順序決定方法。1. In a production line in which a group of processing objects is produced by a plurality of processing equipment groups, a plurality of individual rules are set in advance for determining the starting order of the processing objects, and at least one of them is defined. The starting order determination is characterized by selecting one of the individual rules and setting the starting order determination rule for each facility, and determining the starting order from the information of the workpiece group in accordance with the contents of the starting order determination rule. Method.
を行う生産ラインにおいて、 被処理物の着工順序を決定するために予め定められた複
数の個別ルールを記憶する手段と、 該個別ルール記憶手段に記憶された少なくとも一つの個
別ルールを選択し設備毎に着工順序決定ルールの設定を
行う入力手段と、 該着工順序決定ルール設定入力手段により設備毎に設定
された着工順序決定ルールを記憶する手段と、 該着工順序決定ルール記憶手段により記憶された設備ご
との着工順序決定ルールに従って着工順序を算出するた
めに必要な被処理物群の情報を記憶する手段と、 該被処理物群の情報から該着工順序決定ルールの内容に
沿うような着工順序を決定する手段を具備することを特
徴とする着工順序決定装置。2. A production line for producing a group of objects to be processed by a plurality of processing equipment groups, and means for storing a plurality of individual rules predetermined for determining the order of starting the objects to be processed, Input means for selecting at least one individual rule stored in the individual rule storage means to set the construction order determination rule for each facility, and the construction sequence determination rule set for each equipment by the construction sequence determination rule setting input means And a means for storing the information of the processing object group necessary for calculating the construction order according to the construction order determination rule for each facility stored by the construction order determination rule storage means, and the processing object. A starting order deciding device, comprising means for deciding a starting order that conforms to the contents of the starting order decision rule from group information.
序の決定結果を記憶する手段を具備することを特徴とす
る請求項2記載の着工順序決定装置。3. The start order determining apparatus according to claim 2, further comprising means for storing a result of the start order determination in accordance with the start order determination.
序決定ルールの設定状況または着工順序決定結果を表示
する手段を具備することを特徴とする請求項2記載の着
工順序決定装置。4. The start order deciding device according to claim 2, further comprising means for displaying a setting status of the start order determining rule or a start order determining result in accordance with the start order determination.
装置を通信回線等により接続し、着工順序決定ルールや
作業者等により指定した着工順序の設定、変更等にとも
ない着工指示を行うか否かを処理設備毎に規定する制御
モードにおいて、 各処理設備における現状の制御モードを記憶する手段
と、該制御モードの切り替えを行う手段を具備する請求
項2記載の着工順序決定装置。5. Whether or not to issue a start instruction in accordance with the start order determination rule or the start order specified by an operator by connecting the equipment group and the start order determining device in the production line through a communication line or the like. 3. The start-up sequence determining apparatus according to claim 2, further comprising: a means for storing a current control mode in each processing facility in a control mode defining each processing facility, and a means for switching the control mode.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14285894A JPH0816206A (en) | 1994-06-24 | 1994-06-24 | Method and apparatus for determining start order |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14285894A JPH0816206A (en) | 1994-06-24 | 1994-06-24 | Method and apparatus for determining start order |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0816206A true JPH0816206A (en) | 1996-01-19 |
Family
ID=15325258
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14285894A Pending JPH0816206A (en) | 1994-06-24 | 1994-06-24 | Method and apparatus for determining start order |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0816206A (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005084826A (en) * | 2003-09-05 | 2005-03-31 | Ntt Docomo Inc | Server apparatus and information providing method |
| JP2006339662A (en) * | 2006-06-14 | 2006-12-14 | Hitachi Kokusai Electric Inc | Troubleshooting system for semiconductor manufacturing equipment |
| JP2007233579A (en) * | 2006-02-28 | 2007-09-13 | Elpida Memory Inc | Production management method and production management system |
| JP2022092608A (en) * | 2020-12-10 | 2022-06-22 | 株式会社日立製作所 | Methods, programs and equipment for managing multiple systems, including multiple sensors |
| WO2023228748A1 (en) * | 2022-05-24 | 2023-11-30 | 株式会社アマダ | Scheduling device, scheduling method, and scheduling program |
| JP2023171080A (en) * | 2022-05-20 | 2023-12-01 | 株式会社日立製作所 | Control rule generation device, performance reflection device, and control rule generation system |
| JP2024032260A (en) * | 2022-08-29 | 2024-03-12 | 株式会社神戸製鋼所 | Work procedure creation system, work procedure creation method, and program for maintenance of production goods machinery |
| WO2024142340A1 (en) * | 2022-12-27 | 2024-07-04 | 富士通株式会社 | Information processing program, information processing method, and information processing device |
-
1994
- 1994-06-24 JP JP14285894A patent/JPH0816206A/en active Pending
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005084826A (en) * | 2003-09-05 | 2005-03-31 | Ntt Docomo Inc | Server apparatus and information providing method |
| JP2007233579A (en) * | 2006-02-28 | 2007-09-13 | Elpida Memory Inc | Production management method and production management system |
| JP2006339662A (en) * | 2006-06-14 | 2006-12-14 | Hitachi Kokusai Electric Inc | Troubleshooting system for semiconductor manufacturing equipment |
| JP2022092608A (en) * | 2020-12-10 | 2022-06-22 | 株式会社日立製作所 | Methods, programs and equipment for managing multiple systems, including multiple sensors |
| JP2023171080A (en) * | 2022-05-20 | 2023-12-01 | 株式会社日立製作所 | Control rule generation device, performance reflection device, and control rule generation system |
| WO2023228748A1 (en) * | 2022-05-24 | 2023-11-30 | 株式会社アマダ | Scheduling device, scheduling method, and scheduling program |
| JP2023172499A (en) * | 2022-05-24 | 2023-12-06 | 株式会社アマダ | Scheduling device, scheduling method, and scheduling program |
| JP2024032260A (en) * | 2022-08-29 | 2024-03-12 | 株式会社神戸製鋼所 | Work procedure creation system, work procedure creation method, and program for maintenance of production goods machinery |
| WO2024142340A1 (en) * | 2022-12-27 | 2024-07-04 | 富士通株式会社 | Information processing program, information processing method, and information processing device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6434440B1 (en) | Production estimate management system | |
| US5867388A (en) | Controller of conveyance system | |
| EP1426842B1 (en) | Production cell comprising an information processing device for commanding work tasks | |
| WO2020003588A1 (en) | Picking assistance system and assistance method | |
| JPH0816206A (en) | Method and apparatus for determining start order | |
| Gupta et al. | The effect of sudden material handling system breakdown on the performance of a JIT system | |
| US6463350B2 (en) | Production system for manufacturing semiconductor devices by lot | |
| JPH10190299A (en) | Electronic component mounting line and electronic component mounting method | |
| JP2000236008A (en) | Transfer control method in automatic wafer transfer system | |
| JPH0573574A (en) | Production controller | |
| JP4490124B2 (en) | Transport status presentation system and method, program, and information storage medium | |
| JPH06262496A (en) | Control device for numerically controlled machine tool group | |
| JP2009054051A (en) | Operating status display system, operating status display method, and operating status display program | |
| JPH03239460A (en) | Production completion schedule calculating method and device | |
| JP3250457B2 (en) | Distribution control method and distribution control device | |
| JPH10244447A (en) | Work management system | |
| JPH0440145B2 (en) | ||
| JP3612786B2 (en) | Process control method and apparatus for automatic manufacturing factory | |
| JPH11262843A (en) | Logistics control device | |
| JPH0435853A (en) | Production control device | |
| JPH06262495A (en) | Control device for numerically controlled machine tool group | |
| JPH02100861A (en) | Production control method | |
| JP2002116812A (en) | Dispatching method and its device | |
| JP2581252B2 (en) | Load management method | |
| JP2891101B2 (en) | Palletizing robot control method |