JPH081732A - Detecting method of starting timing of post-processing in injection molding machine - Google Patents
Detecting method of starting timing of post-processing in injection molding machineInfo
- Publication number
- JPH081732A JPH081732A JP15964494A JP15964494A JPH081732A JP H081732 A JPH081732 A JP H081732A JP 15964494 A JP15964494 A JP 15964494A JP 15964494 A JP15964494 A JP 15964494A JP H081732 A JPH081732 A JP H081732A
- Authority
- JP
- Japan
- Prior art keywords
- post
- start timing
- processing
- resin
- timing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012805 post-processing Methods 0.000 title claims abstract description 140
- 238000000034 method Methods 0.000 title claims abstract description 52
- 238000001746 injection moulding Methods 0.000 title claims abstract description 51
- 239000011347 resin Substances 0.000 claims abstract description 172
- 229920005989 resin Polymers 0.000 claims abstract description 172
- 238000000465 moulding Methods 0.000 claims abstract description 65
- 238000003754 machining Methods 0.000 claims description 37
- 230000008569 process Effects 0.000 claims description 30
- 238000001514 detection method Methods 0.000 claims description 26
- 230000007423 decrease Effects 0.000 claims description 12
- 238000007711 solidification Methods 0.000 claims description 10
- 230000008023 solidification Effects 0.000 claims description 10
- 238000005520 cutting process Methods 0.000 description 58
- 238000012545 processing Methods 0.000 description 40
- 238000003860 storage Methods 0.000 description 15
- 238000002347 injection Methods 0.000 description 12
- 239000007924 injection Substances 0.000 description 12
- 239000000047 product Substances 0.000 description 11
- 238000010586 diagram Methods 0.000 description 7
- 238000005070 sampling Methods 0.000 description 7
- 238000001816 cooling Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 238000004904 shortening Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000002950 deficient Effects 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 239000013256 coordination polymer Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000004898 kneading Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000012778 molding material Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Landscapes
- Injection Moulding Of Plastics Or The Like (AREA)
- Moulds For Moulding Plastics Or The Like (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、射出成形機における後
加工開始タイミング検出方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a post-processing start timing detecting method in an injection molding machine.
【0002】[0002]
【従来の技術】金型内部にゲートカット用の移動部材を
設け、射出完了後、金型内の樹脂が適当に固化した状態
でこれを駆動することにより型開き開始前に成形品のゲ
ートカットを行ったり、また、金型内部に圧力印加用の
移動部材を設け、射出完了後の適当なタイミングでこれ
を駆動することにより金型内の樹脂に圧力を印加して成
形品のヒケを防止するようにした射出成形機の後加工技
術が公知である。2. Description of the Related Art A moving member for gate cutting is provided in a mold, and after completion of injection, the resin in the mold is driven in an appropriately solidified state to drive the gate to cut the molded product before starting the mold opening. Also, by providing a moving member for pressure application inside the mold and driving this at an appropriate timing after completion of injection, pressure is applied to the resin in the mold to prevent sinking of the molded product. The post-processing technology of an injection molding machine which is designed to do so is known.
【0003】ゲートカットの後加工を行う場合、移動部
材を駆動するタイミングが早すぎると樹脂の固化が不十
分であるためにゲートの切断が不完全となり、また、そ
のタイミングが遅ければゲートの切断自体は適確に行う
ことができるが、後加工開始までの待機時間が長くなる
ために成形サイクルが増長されて生産性が悪くなるとい
う弊害がある。一方、移動部材を駆動してヒケ防止のた
めの圧力印加を行う場合では、移動部材を駆動するタイ
ミングが遅いと樹脂が必要以上に固化してしまうために
金型内の樹脂に適確に圧力を印加することができず、ま
た、そのタイミングが早すぎてゲートシールが完了する
前にこの操作を行って移動部材をストロークエンドまで
移動させてしまうと、ゲートシール完了後に移動部材を
駆動して樹脂に圧力を印加することができなくなる問題
がある。When post-processing the gate cut, if the timing of driving the moving member is too early, the resin will not be sufficiently solidified, resulting in incomplete cutting of the gate. If the timing is late, the gate will be cut. Although the process itself can be performed accurately, there is a problem that the waiting time until the start of post-processing becomes long, the molding cycle is increased, and the productivity is deteriorated. On the other hand, when the moving member is driven and pressure is applied to prevent sink marks, if the timing of driving the moving member is late, the resin will solidify more than necessary, so the pressure inside the mold will not be properly applied. Cannot be applied, and if the timing is too early and the moving member is moved to the stroke end by performing this operation before the gate sealing is completed, the moving member is driven after the gate sealing is completed. There is a problem that pressure cannot be applied to the resin.
【0004】これらの問題を解消するためには樹脂の固
化状態を適確に知って後加工の開始タイミングを設定す
る必要があるが、これまでの所、金型内の樹脂の固化状
態を適確に検出する手段はなく、タイミングの設定はオ
ペレータの勘に頼って試行錯誤的に行われていた。その
ため、適当な後加工開始タイミングを求めるためには相
当の時間を要し、また、後加工の不良が続く間にゲート
切断の不手際を原因とする成形品の離型不良や挟み込み
等により金型に損傷を生じたり、ヒケが続出したりして
成形材料や作業時間が無駄になる恐れもあった。In order to solve these problems, it is necessary to accurately know the solidified state of the resin and set the start timing of the post-processing, but so far, the solidified state of the resin in the mold has to be appropriate. There is no means to detect it accurately, and the timing is set by trial and error depending on the intuition of the operator. Therefore, it takes a considerable amount of time to find an appropriate start timing for the post-processing, and the mold may be released from the mold due to the failure of the gate cutting while the post-processing continues to be defective, or the mold may be pinched. There is also a risk that the molding material and work time will be wasted due to damage to the product or continuous sink marks.
【0005】[0005]
【発明が解決しようとする課題】そこで、本発明の目的
は、前記従来技術の欠点を解消し、所望する後加工に適
した後加工開始タイミングを迅速かつ確実に求めること
のできる射出成形機の後加工開始タイミング検出方法を
提供することにある。SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide an injection molding machine which solves the above-mentioned drawbacks of the prior art and can promptly and surely obtain a post-processing start timing suitable for desired post-processing. It is to provide a method for detecting a post-processing start timing.
【0006】[0006]
【課題を解決するための手段】本発明は、各成形サイク
ル毎にタイミングをずらせて後加工のための移動部材を
駆動して該移動部材に作用する樹脂反力を検出すること
により各タイミングにおける樹脂の固化状態を検出し、
所望する後加工処理に適した樹脂の固化状態に対応する
後加工開始タイミングを求めることを特徴とする構成に
より前記目的を達成した。According to the present invention, by shifting the timing for each molding cycle and driving a moving member for post-processing to detect a resin reaction force acting on the moving member, the timing at each timing is detected. Detects the solidification state of the resin,
The above object is achieved by a configuration characterized in that a post-processing start timing corresponding to a solidified state of a resin suitable for a desired post-processing treatment is obtained.
【0007】また、一実施態様としての後加工開始タイ
ミング検出方法においては、樹脂が完全に固化するタイ
ミングを後加工開始タイミングの初期値として射出成形
機に設定すると共に後加工開始タイミングを早めるため
の時間の刻み幅を射出成形機に予め設定し、成形サイク
ル毎に前記時間の刻み幅で後加工開始タイミングを早め
て成形作業および後加工の連続運転を行わせ、設定され
た樹脂反力の低下が最初に検出される成形サイクルにお
ける後加工開始タイミングを検出することにより同様の
目的を達成した。Further, in the post-processing start timing detecting method according to one embodiment, the timing at which the resin is completely solidified is set in the injection molding machine as an initial value of the post-processing start timing, and the post-processing start timing is advanced. The time step width is set in advance in the injection molding machine, the post-processing start timing is advanced by the time step width for each molding cycle, and the continuous molding operation and post-processing operations are performed to reduce the set resin reaction force. The same object was achieved by detecting the post-processing start timing in the molding cycle in which is first detected.
【0008】更に、設定された樹脂反力の低下が最初に
検出される成形サイクルを求める度にその成形サイクル
の1サイクル前の成形サイクルにおける後加工開始タイ
ミングを新たな初期値として再設定し、後加工開始タイ
ミングを早めるための時間の刻み幅をより短い時間に再
設定して設定回数だけ同様の処理を繰り返し実行するこ
とにより、所望する後加工に適した樹脂の固化状態に対
応する後加工開始タイミングをより精密に求められるよ
うにした。Further, every time a molding cycle in which the set resin reaction force decrease is first detected is obtained, the post-processing start timing in the molding cycle one cycle before the molding cycle is reset as a new initial value, The post-processing corresponding to the solidified state of the resin suitable for the desired post-processing is performed by resetting the time step width for accelerating the post-processing start time to a shorter time and repeating the same processing for the set number of times. Made the start timing more accurate.
【0009】また、成形サイクル毎に後加工開始タイミ
ングを変えるかわりに、複数の成形サイクルに亘り同一
のタイミングで後加工を行って移動部材に作用する樹脂
反力の平均値を求めてからタイミングをずらせるように
することで、樹脂反力の検出に影響を与える外乱の変動
を取り除くようにし、所望する後加工に適した樹脂の固
化状態に対応する後加工開始タイミングをより一層精密
に求められるようにした。Further, instead of changing the post-processing start timing for each molding cycle, the post-processing is performed at the same timing over a plurality of molding cycles to obtain the average value of the resin reaction force acting on the moving member, and then the timing is changed. By offsetting the fluctuations of the disturbance that affect the detection of the resin reaction force, the post-processing start timing corresponding to the solidified state of the resin suitable for the desired post-processing can be obtained more precisely. I did it.
【0010】[0010]
【作用】樹脂が完全に固化するタイミングを後加工開始
タイミングの初期値として射出成形機に設定すると共
に、後加工開始タイミングを早めるための時間の刻み幅
を射出成形機に設定する。射出成形機は、成形サイクル
毎に前記時間の刻み幅で後加工開始タイミングを早めて
成形作業および後加工の連続運転を行い、設定された樹
脂反力の低下が最初に検出される成形サイクルにおける
後加工開始タイミングを検出する。以下、射出成形機
は、最初に検出された樹脂反力を基準として設定された
樹脂反力の低下が検出される度に、その成形サイクルの
1サイクル前の成形サイクルにおける後加工開始タイミ
ングを新たな初期値として再設定し、後加工開始タイミ
ングを早めるための時間の刻み幅をより短い時間に再設
定して設定回数だけ同様の処理を繰り返し実行し、所望
する後加工に適した樹脂の固化状態に対応する後加工開
始タイミングを精密に求める。Function: The timing at which the resin is completely solidified is set in the injection molding machine as the initial value of the post-processing start timing, and the time step width for advancing the post-processing start timing is set in the injection molding machine. The injection molding machine performs the continuous operation of molding work and post-processing by advancing the post-processing start timing by the step size of each time in each molding cycle, and in the molding cycle in which the decrease of the set resin reaction force is first detected. The post-processing start timing is detected. Hereinafter, the injection molding machine renews the post-processing start timing in the molding cycle one cycle before the molding cycle, whenever a decrease in the resin reaction force set based on the initially detected resin reaction force is detected. The initial setting value is set again, the time step size for accelerating the post-processing start timing is reset to a shorter time, and the same processing is repeatedly executed for the set number of times to solidify the resin suitable for the desired post-processing. The post-machining start timing corresponding to the state is precisely obtained.
【0011】移動部材に作用する樹脂反力を検出するこ
とにより樹脂の固化状態を検出するようにしたため、様
々な後加工開始タイミングにおける樹脂の固化状態を適
確に知ることができ、所望する後加工に適した樹脂の固
化状態に対応する後加工開始タイミングを容易に選択で
きるようになる。また、樹脂が完全に固化するタイミン
グを後加工開始タイミングの初期値として設定すると共
に徐々に後加工開始タイミングを早める方向にだけタイ
ミングを変化させて成形作業および後加工の連続運転を
行わせて適当な後加工開始タイミングを検出するように
しているので、タイミングをずらせる方向性を特定せず
に試行錯誤的なタイミング設定を行って最適の加工開始
タイミングを検出する場合に比べ、後加工開始タイミン
グ検出のための所要時間を短縮できる。更に、最初に検
出された樹脂反力を基準として設定された樹脂反力の低
下が検出される度に、その成形サイクルの1サイクル前
の成形サイクルにおける後加工開始タイミングに戻り、
より短い時間幅で時間を短縮して最適な後加工開始タイ
ミングを検出するようにしているので、最初から僅かな
時間間隔でタイミングを変えて最適の後加工開始タイミ
ングを検出しようとする場合に比べてタイミング検出に
必要とされる所要時間が短縮され、しかも、最初から僅
かな時間間隔でタイミングを変えて最適の後加工開始タ
イミングを検出する場合と同様、最適の後加工開始タイ
ミングを十分に精密に検出することができる。また、複
数の成形サイクルに亘り同一のタイミングで後加工を行
って移動部材に作用する樹脂反力の平均値を求めるよう
にしたので、変動する外乱の影響を取り除いて樹脂の固
化状態をより適確に検出することができ、所望する後加
工に適した樹脂の固化状態に対応する後加工開始タイミ
ングをより精密に求めることができる。Since the solidified state of the resin is detected by detecting the reaction force of the resin acting on the moving member, the solidified state of the resin at various start timings of the post-processing can be accurately known, and the desired post-processing can be performed. The post-processing start timing corresponding to the solidified state of the resin suitable for processing can be easily selected. In addition, the timing at which the resin is completely solidified is set as the initial value of the post-processing start timing, and the timing is gradually changed only in the direction of advancing the post-processing start timing, and the molding operation and the post-processing continuous operation are performed appropriately. Since the post-machining start timing is detected, the post-machining start timing can be compared with the case where the optimum machining start timing is detected by performing trial and error timing setting without specifying the directionality that shifts the timing. The time required for detection can be shortened. Furthermore, every time a decrease in the resin reaction force set with the initially detected resin reaction force as the reference is detected, the post-processing start timing in the molding cycle one cycle before the molding cycle is returned to,
Since the optimum time for starting post-machining is detected by shortening the time with a shorter time width, it is possible to detect the optimum time for starting post-machining by changing the timing at a slight time interval from the beginning. The time required for timing detection is shortened, and moreover, the optimum post-machining start timing is sufficiently precise as in the case where the timing is changed from the beginning at a slight time interval to detect the optimum post-machining start timing. Can be detected. Further, since the post-processing is performed at the same timing over a plurality of molding cycles to obtain the average value of the resin reaction force acting on the moving member, the influence of fluctuating disturbance is removed and the solidified state of the resin is more suitable. The post-processing start timing corresponding to the solidified state of the resin suitable for the desired post-processing can be detected more accurately and can be obtained more accurately.
【0012】[0012]
【実施例】以下、図面を参照して本発明の実施例を説明
する。図1は一実施例の射出成形機の主要な機構部の概
略の構成、および、該射出成形機の制御系の要部を示す
ブロック図である。図1においてはエジェクタ機構の周
辺のみを図示しているが、他の各軸、例えば、射出軸や
スクリュー回転軸,型締軸,型厚調整軸等に関する構成
は従来の電動式射出成形機と同様である。まず、概略に
ついて簡単に説明すると、図1における符号1は射出成
形機の射出シリンダ、符号4は射出成形機の固定プラテ
ンに取付けられた固定側金型、符号3は射出成形機の可
動プラテンに取付けられた可動側金型(合わせて金型と
いう)であり、固定側金型4と可動側金型3との間の間
隙に形成されたキャビティ5によって製品形状が形成さ
れる。従来と同様、射出シリンダ1から射出される溶融
樹脂は、固定側金型4のスプルーブッシュ9を介して固
定側金型4と可動側金型3との間に彫込まれたランナー
6に流入し、キャビティ5とランナー6とを連絡するゲ
ート部7を介してキャビティ5に入る。Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing a schematic configuration of main mechanical parts of an injection molding machine according to an embodiment and a main part of a control system of the injection molding machine. In FIG. 1, only the periphery of the ejector mechanism is shown, but the other shafts, such as the injection shaft, the screw rotation shaft, the mold clamping shaft, and the mold thickness adjusting shaft, are the same as those of the conventional electric injection molding machine. It is the same. First, a brief explanation will be given. In FIG. 1, reference numeral 1 is an injection cylinder of an injection molding machine, reference numeral 4 is a fixed side mold attached to a fixed platen of the injection molding machine, and reference numeral 3 is a movable platen of the injection molding machine. It is a movable die attached (collectively referred to as a die), and a product shape is formed by a cavity 5 formed in a gap between the fixed die 4 and the movable die 3. As in the conventional case, the molten resin injected from the injection cylinder 1 flows into the runner 6 engraved between the fixed side mold 4 and the movable side mold 3 via the sprue bush 9 of the fixed side mold 4. Then, it enters the cavity 5 through the gate portion 7 that connects the cavity 5 and the runner 6.
【0013】可動側金型3にはゲート部7の位置に対応
してロッド材等から成るゲートカット用の移動部材8が
摺動自在に設けられ、移動部材8の基部を植設した摺動
盤2の可動側金型3に対する接離動作に連動して移動部
材8の先端が金型内のゲート部7に出没するようになっ
ている。移動部材8の突出限度は最終的に固定側金型4
のパーティング面によって規制され、移動部材8の先端
が固定側金型4のパーティング面に当接して押切り状態
となったときにゲート部7の樹脂が完全に剪断されて後
加工としてのゲートカット作業が完了する。A movable member 8 for gate cutting made of a rod material or the like is slidably provided on the movable mold 3 in correspondence with the position of the gate portion 7, and a base portion of the movable member 8 is slid. The tip of the moving member 8 is adapted to be projected and retracted in the gate portion 7 in the mold in association with the contact and separation operation of the board 2 with respect to the movable mold 3. The protrusion limit of the moving member 8 is finally the fixed side mold 4
Of the moving member 8 comes into contact with the parting surface of the fixed-side mold 4 and is in a push-cut state, the resin of the gate portion 7 is completely sheared and the post-processing is performed. Gate cutting work is completed.
【0014】この実施例の場合、可動プラテンに設けら
れた標準装備のエジェクタロッドによって摺動盤2が駆
動されるようになっているため、更に、エジェクタピン
を植設したりストリッパプレートを連設したエジェクタ
プレートをエジェクタロッドによって駆動して最終的な
製品離型作業を行わせようとするのであれば、ある程度
の工夫が必要である。移動部材8を駆動して行うゲート
カット作業は金型3,4を閉じた状態で行う必要がある
のに対し、エジェクタピン等を駆動して行う製品離型作
業は金型3,4を開いてから行う必要があるため、エジ
ェクタロッドの動作に摺動盤2とエジェクタプレートと
が同時に追従してしまうと、ゲートカット作業および製
品離型作業を共に支障なく行うということができなくな
るからである。しかし、当業者であれば容易に想定し得
るように、このような問題は以下に示すような手法によ
り容易に解消し得る。In the case of this embodiment, since the sliding board 2 is driven by the ejector rods provided as standard equipment on the movable platen, further ejector pins are arranged and stripper plates are continuously arranged. If the ejector plate is to be driven by the ejector rod to perform the final product release work, some measures must be taken. The gate cutting work performed by driving the moving member 8 needs to be performed with the molds 3 and 4 closed, whereas the product release work performed by driving the ejector pins and the like opens the molds 3 and 4. This is because it is necessary to perform the operation after the ejector rod, and if the sliding board 2 and the ejector plate simultaneously follow the operation of the ejector rod, it becomes impossible to perform both the gate cutting work and the product releasing work without any trouble. . However, as a person skilled in the art can easily assume, such a problem can be easily solved by the following method.
【0015】最も簡単な方法は、摺動盤2とエジェクタ
プレートとを個別に構成し、単一のエジェクタロッドに
より、これらを作用上実質的に独立して駆動させること
である。例えば、エジェクタプレートを可動側金型3の
裏面に比較的接近して配備し、エジェクタプレートを付
勢するリターンスプリングを可動側金型3の裏面とエジ
ェクタプレートとの間に介装してエジェクタピン等が可
動側金型3のパーティングから縮退する方向にエジェク
タプレートを付勢し、更に、可動側金型3に対するエジ
ェクタプレートの離間限度をメカニカルストッパにより
規制する。そして更に、エジェクタプレートから離間す
る方向に一定の間隔を空け、該エジェクタプレートに摺
動盤2が重合するようにして摺動盤2を配備し、縮退状
態にあるエジェクタロッドの先端に摺動盤2を取付ける
のである。The simplest way is to construct the slide board 2 and the ejector plate separately and to drive them substantially independently by a single ejector rod. For example, the ejector plate is arranged relatively close to the back surface of the movable die 3 and a return spring for urging the ejector plate is interposed between the back surface of the movable die 3 and the ejector plate to eject the ejector pin. Urges the ejector plate in a direction in which the movable mold 3 is retracted from the parting of the movable mold 3, and further restricts the separation limit of the ejector plate from the movable mold 3 with a mechanical stopper. Further, the sliding plate 2 is arranged so that the sliding plate 2 is superposed on the ejector plate at a certain distance in the direction away from the ejector plate, and the sliding plate is attached to the tip of the ejector rod in the retracted state. Install 2.
【0016】この構成によれば、エジェクタロッドを縮
退状態から所定の範囲、つまり、摺動盤2がエジェクタ
プレートに当接するまでの範囲で伸縮することにより、
金型3,4を閉じた状態で移動部材8のみを駆動してゲ
ートカット作業を行わせることができ、また、金型3,
4を開いた状態でその範囲を越えてエジェクタロッドを
突出させれば、摺動盤2と重なったエジェクタプレート
を駆動してエジェクタピン等による製品離型作業を行わ
せることもできる。この構成でゆくと製品離型作業の段
階においては移動部材8が相当に突出することになる
が、この段階では既に可動側金型3が型開き完了位置ま
たは型開き動作中の位置にあるので、移動部材8の突出
を妨げるものはなく、格別の問題は生じない。当然、ゲ
ートカット作業のためのエジェクタロッドの突出ストロ
ークと製品離型作業のためのエジェクタロッドの突出ス
トロークとを個別に設定する必要があるが、そのような
設定および制御は、数値制御装置やサーボモータを備え
た射出成形機においては容易である。図1におけるMは
射出成形機の可動プラテンに標準装備されたエジェクタ
ロッドの突出量を制御するエジェクタ軸用のサーボモー
タであり、位置検出手段としてのパルスコーダPを備え
る。なお、摺動盤2を可動プラテン側のエジェクタロッ
ドに直に取付ける代わりにエジェクタプレートの場合と
同様のリターンスプリング仕様とし、移動部材8の突き
出し動作のみをエジェクタロッドによって行わせること
も可能であるが、ゲートカット作業中に移動部材8に作
用する樹脂反力をサーボモータMに流れる駆動電流やオ
ブザーバ出力によって検出する場合には、不用意な負荷
変動が全体に占める割合を少なくするためにも、外乱と
なるスプリング等の要素は排除しておいたほうがよい。
無論、前述の構成では、ゲートカット作業の間にエジェ
クタプレートのリターンスプリングが圧縮されるという
ことはない。According to this structure, the ejector rod is expanded and contracted in a predetermined range from the retracted state, that is, until the sliding plate 2 contacts the ejector plate,
With the molds 3 and 4 closed, only the moving member 8 can be driven to perform the gate cutting work.
If the ejector rod is projected beyond the range in the state where 4 is opened, it is possible to drive the ejector plate which overlaps with the sliding board 2 to perform the product releasing work by the ejector pin or the like. With this configuration, the moving member 8 considerably projects at the stage of product release work, but at this stage, the movable side mold 3 is already at the mold opening completion position or the position during the mold opening operation. Since there is nothing that prevents the moving member 8 from protruding, no particular problem occurs. Naturally, it is necessary to separately set the ejector rod protrusion stroke for gate cutting work and the ejector rod protrusion stroke for product demolding work, but such setting and control is performed by a numerical controller or a servo. This is easy in an injection molding machine equipped with a motor. M in FIG. 1 is a servomotor for an ejector shaft, which is provided as a standard on a movable platen of an injection molding machine, for controlling the amount of protrusion of an ejector rod, and includes a pulse coder P as position detecting means. Instead of directly attaching the sliding board 2 to the ejector rod on the movable platen side, it is possible to use the same return spring specifications as in the case of the ejector plate, and only the ejecting operation of the moving member 8 can be performed by the ejector rod. When the resin reaction force acting on the moving member 8 during the gate cutting work is detected by the drive current flowing through the servo motor M or the observer output, in order to reduce the proportion of unintentional load fluctuation in the whole, Elements such as springs that cause disturbance should be eliminated.
Of course, with the above arrangement, the return spring of the ejector plate is not compressed during the gate cutting operation.
【0017】以上、ゲートカット作業のための移動部材
8と製品離型作業のためのエジェクタピン等を単一のサ
ーボモータMで駆動する場合の最も簡単な構成例につい
て説明したが、当然、公知の機械要素や機構学等を適当
に運用して他の構成を採用することも可能であり、更に
は、移動部材8のみを駆動する他のモータやサーボモー
タを設けることにより、移動部材8とエジェクタピン等
を完全に独立させて駆動するようにしてもよい。The simplest structural example in which the moving member 8 for the gate cutting work and the ejector pin for the product releasing work are driven by the single servo motor M has been described above. It is also possible to appropriately operate the mechanical elements and the mechanics of the above, and to adopt another configuration. Furthermore, by providing another motor or a servo motor that drives only the moving member 8, The ejector pins and the like may be driven completely independently.
【0018】射出成形機を駆動制御する数値制御装置1
0は、数値制御用のマイクロプロセッサであるCNC用
CPU25、プログラマブルマシンコントローラ用のマ
イクロプロセッサであるPMC用CPU18、サーボ制
御用のマイクロプロセッサであるサーボCPU20、お
よび、圧力モニタ用CPU17を有し、バス22を介し
て相互の入出力を選択することにより各マイクロプロセ
ッサ間での情報伝達が行えるようになっている。なお、
圧力モニタ用CPU17はA/D変換器16および図示
しない射出スクリュー側の圧力検出器を介して射出保圧
圧力やスクリュー背圧のサンプリング処理を行うための
モニタ用CPUであって、少なくとも、この実施例に関
する限り、移動部材8に作用する樹脂反力を検出するた
めの構成とは無関係である。Numerical control device 1 for driving and controlling an injection molding machine 1
Reference numeral 0 denotes a CNC CPU 25 which is a numerical control microprocessor, a PMC CPU 18 which is a programmable machine controller microprocessor, a servo CPU 20 which is a servo control microprocessor, and a pressure monitoring CPU 17, and a bus. Information can be transmitted between the microprocessors by selecting mutual input / output via 22. In addition,
The pressure monitoring CPU 17 is a monitoring CPU for performing a sampling process of the injection holding pressure and the screw back pressure via the A / D converter 16 and the pressure detector on the injection screw side (not shown). As far as the example is concerned, it is irrelevant to the configuration for detecting the resin reaction force acting on the moving member 8.
【0019】PMC用CPU18には射出成形機のシー
ケンス動作を制御するシーケンスプログラム等を記憶し
たROM13および演算データの一時記憶等に用いられ
るRAM14が接続され、CNC用CPU25には、射
出成形機を全体的に制御するプログラム等を記憶したR
OM27および演算データの一時記憶等に用いられるR
AM28が接続されている。The PMC CPU 18 is connected to the ROM 13 which stores a sequence program for controlling the sequence operation of the injection molding machine and the RAM 14 which is used for temporary storage of operation data. The CNC CPU 25 is connected to the entire injection molding machine. R storing a program for controlling the program
R used for temporary storage of OM27 and operation data
AM28 is connected.
【0020】また、サーボCPU20および圧力モニタ
用CPU17の各々には、サーボ制御専用の制御プログ
ラムを格納したROM21やデータの一時記憶に用いら
れるRAM19、および、前述した圧力データのサンプ
リング処理等に関する制御プログラムを格納したROM
11やデータの一時記憶に用いられるRAM12が接続
されている。更に、サーボCPU20には、該CPU2
0からの指令に基いて型締用,射出用,スクリュー回転
用等の各軸のサーボモータ(以上、図示せず)およびエ
ジェクタ軸用のサーボモータMを駆動するサーボアンプ
15が接続され、各軸のサーボモータに配備したパルス
コーダからの出力の各々がサーボCPU20に帰還さ
れ、パルスコーダからのフィードバックパルスに基いて
サーボCPU20により算出された各軸の現在位置や移
動速度がRAM19の現在位置記憶レジスタおよび現在
速度記憶レジスタの各々に逐次更新記憶されるようにな
っている。更に、本実施例においては、エジェクタ軸用
のサーボモータMに作用する負荷トルクを推定するため
のオブザーバ60が組まれ、該オブザーバ60によって
推定された負荷トルクの現在値Td2が逐次RAM19の
負荷トルク記憶レジスタに更新記憶されるようになって
いる。Further, each of the servo CPU 20 and the pressure monitoring CPU 17 has a ROM 21 storing a control program dedicated to servo control, a RAM 19 used for temporary storage of data, and a control program relating to the above-mentioned pressure data sampling processing and the like. ROM that stores
11 and a RAM 12 used for temporary storage of data are connected. Further, the servo CPU 20 has the CPU 2
Based on a command from 0, a servo amplifier 15 for driving a servo motor (not shown) for each axis for mold clamping, injection, screw rotation, etc. and a servo motor M for an ejector axis is connected, and Each of the outputs from the pulse coder provided to the axis servo motor is fed back to the servo CPU 20, and the current position and movement speed of each axis calculated by the servo CPU 20 based on the feedback pulse from the pulse coder are stored in the current position storage register of the RAM 19 and At present, each of the speed storage registers is sequentially updated and stored. Further, in the present embodiment, an observer 60 for estimating the load torque acting on the servomotor M for the ejector shaft is incorporated, and the present value Td2 of the load torque estimated by the observer 60 is successively read by the load torque of the RAM 19. It is adapted to be updated and stored in the storage register.
【0021】図8はエジェクタ軸用のサーボモータMに
作用する負荷トルク、即ち、ゲートカット作業中におい
ては移動部材8に作用する樹脂反力となる値を検出する
ためのオブザーバ60の構成の概略を示す機能ブロック
図である。図8において、uはサーボCPU20の速度
ループ処理によって得られたトルク指令、要素52、5
3はサーボモータMの伝達関数の要素で、要素52のK
tはサーボモータMのトルク定数であり、Jはイナーシ
ャ、Sはラプラス演算子である。また、要素61、65
の「b」はこのサーボモータMのトルク定数Ktとイナ
ーシャJの推定比率、即ち(Kt/J)の推定値であ
る。また要素62,63のK1、K2はこのオブザーバ
60のパラメータ、Sはラプラス演算子であり、要素6
4は積分要素を表している。図8のオブザーバ60のブ
ロック図をb=Kt/Jとして解析すると、最終的に、 Td2=Td1・(1/b)=(Td /J)・(J/Kt )
=(Td /Kt ) となり、負荷トルクTd (に比例する値)の推定値Td
2、即ち、負荷トルクTdをトルク指令(電流指令)の
単位で求めた値が求められる(Td をトルク定数で割れ
ば、トルク指令uと次元が同じものが得られる)。FIG. 8 is a schematic view of the structure of an observer 60 for detecting a load torque acting on the servomotor M for the ejector shaft, that is, a value which is a resin reaction force acting on the moving member 8 during the gate cutting work. It is a functional block diagram showing. In FIG. 8, u is a torque command obtained by the speed loop processing of the servo CPU 20, elements 52, 5
3 is an element of the transfer function of the servomotor M, which is K of the element 52.
t is the torque constant of the servomotor M, J is the inertia, and S is the Laplace operator. Also, the elements 61, 65
"B" is the estimated ratio of the torque constant Kt of the servomotor M and the inertia J, that is, the estimated value of (Kt / J). Further, K1 and K2 of the elements 62 and 63 are parameters of this observer 60, S is a Laplace operator, and element 6
Reference numeral 4 represents an integral element. When the block diagram of the observer 60 of FIG. 8 is analyzed with b = Kt / J, finally, Td2 = Td1. (1 / b) = (Td / J). (J / Kt)
= (Td / Kt) and the estimated value Td of the load torque Td (proportional to it)
2, that is, the value obtained by calculating the load torque Td in units of the torque command (current command) is obtained (if Td is divided by the torque constant, the same dimension as the torque command u is obtained).
【0022】このようにして、エジェクタ軸用サーボモ
ータMのサーボCPUが行う所定周期(位置,速度ルー
プ処理の処理周期)毎のオブザーバ60の処理によって
該モータMにかかる負荷トルクTd を求め、移動部材8
に作用する樹脂反力を測定し、RAM19に順次書き込
む。なお、サーボCPU20による実質的な処理動作に
関しては、本出願人が平成6年5月2日付で提出した型
内圧測定方法の特許願において詳しく説明されているの
で、詳細な説明に関しては割愛する。他の実施例とし
て、エジェクタ軸用サーボモータMの駆動電流を直接検
出したり、また、移動部材8や摺動盤2に圧力検出器を
直接取り付けることによって移動部材8に作用する樹脂
反力を検出することも可能である。In this way, the load torque Td applied to the motor M is obtained by the processing of the observer 60 for each predetermined cycle (processing cycle of the position / speed loop processing) performed by the servo CPU of the servomotor M for the ejector axis. Member 8
The resin reaction force acting on is measured and sequentially written in the RAM 19. The substantial processing operation by the servo CPU 20 is described in detail in the patent application of the method for measuring the mold internal pressure submitted by the present applicant on May 2, 1994, so the detailed description will be omitted. As another embodiment, the drive current of the ejector shaft servomotor M is directly detected, and the resin reaction force acting on the moving member 8 by directly attaching a pressure detector to the moving member 8 or the sliding board 2 is used. It is also possible to detect.
【0023】また、インターフェイス23は射出成形機
の各部に配備したリミットスイッチや操作盤からの信号
を受信したり射出成形機の周辺機器等に各種の指令を伝
達したりするための入出力インターフェイスである。デ
ィスプレイ付手動データ入力装置29はCRT表示回路
26を介してバス22に接続され、モニタ表示画面や機
能メニューの選択および各種データの入力操作等が行え
るようになっており、数値データ入力用のテンキーおよ
び各種のファンクションキー等が設けられている。The interface 23 is an input / output interface for receiving signals from limit switches and operation panels provided in various parts of the injection molding machine and for transmitting various commands to peripheral equipment of the injection molding machine. is there. A manual data input device 29 with a display is connected to the bus 22 via a CRT display circuit 26 so that a monitor display screen, a function menu can be selected and various data input operations can be performed. Also, various function keys and the like are provided.
【0024】不揮発性メモリ24は射出成形作業に関す
る成形条件(射出保圧条件,計量混練り条件等)と各種
設定値,パラメータ,マクロ変数等を記憶する成形デー
タ保存用のメモリである。The non-volatile memory 24 is a memory for storing molding data for storing molding conditions (injection pressure holding condition, metering and kneading condition, etc.) and various set values, parameters, macro variables and the like related to injection molding work.
【0025】以上の構成により、PMC用CPU18が
射出成形機全体のシーケンス制御を行う一方、CNC用
CPU25がROM27の制御プログラムに基いて各軸
のサーボモータに対してパルス分配を行い、サーボCP
U20は各軸に対してパルス分配された移動指令とパル
スコーダ等の検出器で検出された位置のフィードバック
信号および速度のフィードバック信号に基いて、従来と
同様に位置ループ制御,速度ループ制御,電流ループ制
御、更に、オブザーバの処理等のサーボ制御を行い、い
わゆるディジタルサーボ処理を実行する。With the above configuration, the PMC CPU 18 controls the sequence of the entire injection molding machine, while the CNC CPU 25 distributes the pulses to the servo motors of the respective axes based on the control program of the ROM 27, and the servo CP.
U20 is a position loop control, speed loop control, current loop similar to the conventional one based on the movement command distributed to each axis, the position feedback signal detected by a detector such as a pulse coder, and the speed feedback signal. Control and servo control such as observer processing are performed, and so-called digital servo processing is executed.
【0026】以下、前述の構成に基いて本実施例におけ
る後加工開始タイミング検出方法について説明する。な
お、この実施例は、保圧開始(射出完了)からの経過時
間、要するに、樹脂の充填完了時点を基準とする経過時
間により、後加工開始タイミングの初期値を予め遅め
(少なくとも樹脂が完全に固化するまでの所要時間)に
設定しておき、徐々に後加工開始タイミングを早めるこ
とによりゲートカット作業に最適の後加工開始タイミン
グを自動的に求めるようにしたものであり、後加工開始
タイミングを早めるための時間の刻み幅は、より適した
後加工開始タイミングを検出するために長から短へと自
動的に2段階に切替わるようになっており、これらの処
理に必要とされる後加工開始タイミングの初期値やタイ
ミングを早めるための時間の刻み幅Δt1(長),Δt
2(短)の各々は予め不揮発性メモリ24に格納されて
いる。The method for detecting the post-machining start timing in this embodiment will be described below based on the above-mentioned configuration. In this embodiment, the initial value of the post-processing start timing is delayed in advance by at least the elapsed time from the start of pressure holding (injection completion), that is, the elapsed time based on the completion point of resin filling (at least when the resin is completely The required time until solidification is set) and the post-machining start timing is gradually increased to automatically obtain the optimum post-machining start timing for the gate cutting work. The time step size for speeding up the process is automatically switched in two steps from long to short in order to detect a more suitable post-processing start timing. Initial value of machining start timing or time step width Δt1 (long), Δt for advancing the timing
Each of 2 (short) is stored in the non-volatile memory 24 in advance.
【0027】また、ゲートカット作業中に移動部材8に
作用する樹脂反力(負荷トルクTd2)を検出して樹脂の
固化状態を特定するための方法としては、 移動部材8が移動してストローク区間の所定位置に
到達したときの負荷トルクTd2をサンプリングしてゲー
トカット作業中に移動部材8に作用する樹脂反力Raを
代表させる方法、 移動部材8が移動を開始してから所定時間が経過し
たときの負荷トルクTd2をサンプリングしてゲートカッ
ト作業中に移動部材8に作用する樹脂反力Raを代表さ
せる方法(この場合、当然、所定時間は移動部材8の全
ストローク移動所要時間よりも短く設定する)、 移動部材8がストローク区間上に設定された第1の
所定位置から第2の所定位置にまで移動する間に検出さ
れた負荷トルクTd2の平均値によってゲートカット作業
中に移動部材8に作用する樹脂反力Raを代表させる方
法、 移動部材8がストローク区間上に設定された第1の
所定位置から第2の所定位置にまで移動する間に検出さ
れた負荷トルクTd2の最大値によってゲートカット作業
中に移動部材8に作用する樹脂反力Raを代表させる方
法、 移動部材8が移動を開始して第1の所定時間が経過
したときから第2の所定時間が経過するまでに検出され
た負荷トルクTd2の平均値によってゲートカット作業中
に移動部材8に作用する樹脂反力Raを代表させる方法
(この場合、当然、第1,第2の所定時間は移動部材8
の全ストローク移動所要時間よりも短く設定する)、 移動部材8が移動を開始して第1の所定時間が経過
したときから第2の所定時間が経過するまでに検出され
た負荷トルクTd2の最大値によってゲートカット作業中
に移動部材8に作用する樹脂反力Raを代表させる方法
(この場合、当然、第1,第2の所定時間は移動部材8
の全ストローク移動所要時間よりも短く設定する)等が
ある。Further, as a method for detecting the resin reaction force (load torque Td2) acting on the moving member 8 during the gate cutting work and specifying the solidified state of the resin, the moving member 8 moves and the stroke section Method for sampling the load torque Td2 when reaching the predetermined position to represent the resin reaction force Ra acting on the moving member 8 during the gate cutting work, and a predetermined time has elapsed since the moving member 8 started moving. The load torque Td2 at this time is sampled to represent the resin reaction force Ra acting on the moving member 8 during the gate cutting work (in this case, of course, the predetermined time is set shorter than the total stroke moving time of the moving member 8). According to the average value of the load torque Td2 detected while the moving member 8 moves from the first predetermined position set on the stroke section to the second predetermined position. Method for representing the resin reaction force Ra acting on the moving member 8 during the gate cutting work, and detecting while the moving member 8 moves from the first predetermined position set on the stroke section to the second predetermined position. Method for representing the resin reaction force Ra acting on the moving member 8 during the gate cutting operation by the maximum value of the applied load torque Td2, the second from the time when the moving member 8 starts moving and the first predetermined time elapses. Method in which the resin reaction force Ra acting on the moving member 8 during the gate cutting work is represented by the average value of the load torque Td2 detected until the predetermined time elapses (in this case, of course, the first and second predetermined values). Time is moving member 8
Of the maximum load torque Td2 detected from the time when the first predetermined time elapses after the moving member 8 starts moving until the second predetermined time elapses. A method of representing the resin reaction force Ra acting on the moving member 8 during the gate cutting work by the value (in this case, the moving member 8 is naturally used for the first and second predetermined times.
Set shorter than the total stroke movement required time).
【0028】この内、樹脂の固化状態を表すものとして
何を選択するかは任意であり、また、金型構造や樹脂の
特性等により、必要に応じてその選択を変更したい場合
もある。そこで、本実施例においては、このような必要
を満たすため、移動部材8の移動開始後の経過時間i・
t0(t0=負荷トルクTd2のサンプリング周期、i=
0,1,2,3,・・・)に対応させてその時点におけ
る移動部材8の位置Pnおよび樹脂反力Rn(Rn=負
荷トルクTd2)を記憶するためのファイル手段(図6
(a)参照)をRAM14に設けている。また、前述の
〜の各方法を選択的に実施して固化状態を表す樹脂
反力Raを求めるための副プログラム(後述する処理の
ステップS14に対応)がROM13に格納されている
が、ファイル上の特定のデータ種別の値を参照して他の
データを検索したり、また、平均値や最大値を求めたり
するための処理に関してはコンピュータ関係の周辺技術
において既に公知であるから、内容自体に関しては特に
説明しない。[0028] Of these, what is selected to represent the solidified state of the resin is arbitrary, and depending on the mold structure, the characteristics of the resin, etc., the selection may be changed as necessary. Therefore, in the present embodiment, in order to satisfy such a need, the elapsed time i.
t0 (t0 = sampling cycle of load torque Td2, i =
0, 1, 2, 3, ...), and a file means (FIG. 6) for storing the position Pn of the moving member 8 and the resin reaction force Rn (Rn = load torque Td2) at that time in correspondence with 0, 1, 2, 3 ,.
(See (a)) is provided in the RAM 14. Further, although a sub-program (corresponding to step S14 of the process described later) for selectively carrying out each of the above-mentioned methods (1) to obtain the resin reaction force Ra indicating the solidified state is stored in the ROM 13, Regarding the processing for searching other data by referring to the value of the specific data type of, and obtaining the average value or the maximum value, it is already known in the peripheral technology related to the computer, so the content itself Will not be explained.
【0029】図2〜図5は本実施例における後加工開始
タイミング検出処理の概略を示すフローチャートであ
り、この処理は、ゲートカット作業のための後加工開始
タイミングを求めるための射出成形作業が行われる間、
保圧の開始が確認される度にPMC用CPU18によっ
て繰り返し実行されるもので、ゲートカット作業のため
の移動部材8の突き出し制御を含む。また、この後加工
開始タイミング検出処理が完了すると、PMC用CPU
18は従来と同様の通常のシーケンス制御へと復帰し、
型開き以降のシーケンス制御を従来と同様にして継続し
て行うようになっている。2 to 5 are flowcharts showing the outline of the post-processing start timing detection processing in this embodiment. This processing is performed by the injection molding operation for obtaining the post-processing start timing for the gate cutting work. While being seen
It is repeatedly executed by the PMC CPU 18 each time the start of the holding pressure is confirmed, and includes the protrusion control of the moving member 8 for the gate cutting work. When the processing start timing detection process is completed after this, the PMC CPU
18 returns to the normal sequence control similar to the conventional one,
The sequence control after mold opening is continuously performed in the same manner as the conventional one.
【0030】そこで、保圧の開始を確認して後加工開始
タイミング検出処理を開始したPMC用CPU18は、
まず、保圧開始から樹脂が完全に固化するまでに必要と
される所要時間を待機時間T0の初期値としてタイマT
に設定した後(ステップS1)、該タイマTによる経過
時間の測定を開始し(ステップS2)、設定時間T0が
経過するまで、つまり、金型内の樹脂が完全に固化する
まで待機して(ステップS3)、ロッド移動開始指令を
CNC用CPU25に出力し、エジェクタ軸用サーボモ
ータMの駆動を開始させ、移動部材8の突出動作による
ゲートカット作業を開始させる(ステップS4)。Therefore, the PMC CPU 18 which has confirmed the start of the holding pressure and started the post-processing start timing detection processing,
First, the time required from the start of pressure holding until the resin is completely solidified is set as the initial value of the waiting time T0 by the timer T.
(Step S1), measurement of the elapsed time by the timer T is started (step S2), and the process waits until the set time T0 elapses, that is, until the resin in the mold is completely solidified ( In step S3), a rod movement start command is output to the CPU 25 for CNC, driving of the ejector shaft servomotor M is started, and gate cutting work by the projecting operation of the moving member 8 is started (step S4).
【0031】次いで、PMC用CPU18は、前述のフ
ァイル手段のアドレスを指定するために用いる指標iに
初期値0をセットし(ステップS5)、タイマTにサン
プリング周期t0を再設定して経過時間の測定を開始し
(ステップS6,ステップS7)、更に、樹脂反力Rn
(Rn=負荷トルクTd2)の現在値と移動部材8の現在
位置Pnをサーボ制御用CPU20を介してRAM19
から読み込んで前記ファイル手段(図6(a)参照)に
おけるアドレスiの記憶領域R(i),P(i)に格納
し(ステップS8,ステップS9)、移動部材8の現在
位置Pnが最終目標位置に達しているか否かを判別する
(ステップS10)。ここでいう最終目標位置とは、い
うまでもなく、ゲートカット作業のためのエジェクタロ
ッドの突出ストロークに対応する値である。移動部材8
の現在位置Pnが最終目標位置に達していなければ、P
MC用CPU18は指標iの値を1インクリメントして
(ステップS11)、タイマTの設定時間が経過するま
で、つまり、1サンプリング周期が経過するまで待機し
(ステップS12)、再びステップS6の処理へと移行
して、以下、前記と同様の処理を繰り返し実行する。Next, the PMC CPU 18 sets an initial value 0 to the index i used for designating the address of the above-mentioned file means (step S5), resets the sampling cycle t0 to the timer T, and sets the elapsed time. Measurement is started (step S6, step S7), and the resin reaction force Rn
The current value of (Rn = load torque Td2) and the current position Pn of the moving member 8 are transferred to the RAM 19 via the servo control CPU 20.
Read from the file means (see FIG. 6A) and stored in the storage areas R (i) and P (i) of the address i (steps S8 and S9), and the current position Pn of the moving member 8 is the final target. It is determined whether or not the position has been reached (step S10). Needless to say, the final target position referred to here is a value corresponding to the ejection stroke of the ejector rod for the gate cutting work. Moving member 8
If the current position Pn of P has not reached the final target position, P
The MC CPU 18 increments the value of the index i by 1 (step S11), waits until the set time of the timer T elapses, that is, until one sampling period elapses (step S12), and returns to the process of step S6. Then, the same processing as described above is repeatedly executed.
【0032】この結果、移動部材8の突出動作によるゲ
ートカット作業開始時点から所定のサンプリング周期t
0毎に、その時点で移動部材8に作用している樹脂反力
Rnおよび移動部材8の位置Pnがサンプリングされ、
前記ファイル手段に順次書き込まれてゆくことになる。As a result, a predetermined sampling period t from the start of the gate cutting work by the protruding operation of the moving member 8
For each 0, the resin reaction force Rn acting on the moving member 8 at that time and the position Pn of the moving member 8 are sampled,
The data is sequentially written in the file means.
【0033】このような処理が繰り返し実行される間に
移動部材8の位置Pnが最終目標位置に達し、移動部材
8の先端が固定側金型4のパーティング面に当接してゲ
ート部7の樹脂が完全に剪断されたことが確認されると
(ステップS10)、PMC用CPU18はCNC用C
PU25にロッド復帰指令を出力してエジェクタ軸用サ
ーボモータMを逆転させ、移動部材8を縮退状態の原位
置に復帰させてゲートカット作業を終了させ(ステップ
S13)、予めオペレータによって選択された前記〜
のいずれかの方法に従って副プログラムを実行してゲ
ートカット作業中に移動部材8に作用した樹脂反力の代
表値Raの値を求める(ステップS14)。While the above processing is repeatedly executed, the position Pn of the moving member 8 reaches the final target position, the tip of the moving member 8 abuts the parting surface of the stationary mold 4, and the gate portion 7 moves. When it is confirmed that the resin has been completely sheared (step S10), the PMC CPU 18 sets the CNC C
A rod return command is output to the PU 25 to cause the ejector shaft servomotor M to rotate in the reverse direction to return the moving member 8 to the original position in the retracted state to end the gate cutting work (step S13). ~
The subprogram is executed according to any one of the above methods to obtain the representative value Ra of the resin reaction force acting on the moving member 8 during the gate cutting work (step S14).
【0034】次いで、PMC用CPU18は判別基準値
記憶レジスタRの現在値が0であるか否かを判別するが
(ステップS15)、後加工開始タイミングを求めるた
めの射出成形作業開始直後の現段階においては判別基準
値記憶レジスタRの値が初期値0に保持されているの
で、必然的にステップS15の判別結果は真となる。そ
こで、PMC用CPU18は今回求められた樹脂反力R
a、即ち、後加工開始タイミングを求めるための射出成
形作業開始後の最初のゲートカット作業で検出された樹
脂反力Raの値を基準として判別基準値を求め、その値
を判別基準値記憶レジスタRに更新記憶する(ステップ
S16)。この処理によって更新された判別基準値R
は、最初のゲートカット作業で検出された樹脂反力Ra
からゲートカットを適切に行うことが可能な樹脂の硬度
低下の最大許容範囲に対応する樹脂反力の設定値αを減
じた値として求められる。既に従来技術の項で説明した
通り、ゲートカットの後加工を行う場合には樹脂の固化
が不十分であるとゲートの切断が不完全となる問題があ
る。そこで、この実施例の場合、前述の処理によって完
全に固化した樹脂を剪断するのに要する移動部材8の駆
動力、要するに、完全に固化した樹脂を剪断した時に移
動部材8に実際に作用した樹脂反力Raを最初に求めて
おき、その値から前記設定値αを減じることにより、ゲ
ートカットを適切に行うことが可能な樹脂の硬度の下限
に対応する樹脂反力R、つまり、判別基準値Rを求める
のである。この場合、いうまでもなく、設定値αの値が
設定された樹脂反力の低下に対応する。Next, the PMC CPU 18 determines whether or not the current value of the determination reference value storage register R is 0 (step S15), but at the present stage immediately after the start of the injection molding work for obtaining the post-processing start timing. In the above, since the value of the discrimination reference value storage register R is held at the initial value 0, the discrimination result of step S15 is inevitably true. Therefore, the PMC CPU 18 uses the resin reaction force R calculated this time.
a, that is, a discrimination reference value is obtained with the value of the resin reaction force Ra detected in the first gate cutting work after the injection molding work for obtaining the post-processing start timing as a reference, and the value is the discrimination reference value storage register. The data is updated and stored in R (step S16). Discrimination reference value R updated by this process
Is the resin reaction force Ra detected in the first gate cutting work.
Can be obtained as a value obtained by subtracting the set value α of the resin reaction force corresponding to the maximum allowable range of resin hardness reduction that allows appropriate gate cutting. As already described in the section of the prior art, when post-processing the gate cut, there is a problem that the cutting of the gate is incomplete if the resin is not sufficiently solidified. Therefore, in the case of this embodiment, the driving force of the moving member 8 required to shear the resin completely solidified by the above-mentioned treatment, that is, the resin actually acting on the moving member 8 when the completely solidified resin is sheared The reaction force Ra is first obtained, and by subtracting the set value α from the value, the resin reaction force R corresponding to the lower limit of the hardness of the resin capable of appropriately performing the gate cut, that is, the determination reference value. Find R. In this case, needless to say, the set value α corresponds to a decrease in the set resin reaction force.
【0035】判別基準値Rを求めたPMC用CPU18
は、次いで、後加工開始タイミングを早めるための時間
の刻み幅を記憶する刻み幅記憶レジスタΔTに前述の大
きな方の刻み幅設定値Δt1を設定すると共に(ステッ
プS17)、待機時間T0の値をT0−ΔTに更新設定
して次の成形サイクルにおけるゲートカット作業の待機
時間を短縮し(ステップS19)、この周期の後加工開
始タイミング検出処理を終了して通常のシーケンス制御
へと復帰し、型開き以降のシーケンス制御を従来と同様
に継続して行い、更に、1成形サイクル分のシーケンス
制御が全て終了すると、次の成形サイクルのシーケンス
制御を開始する。PMC CPU 18 for determining the discrimination reference value R
Next, while setting the larger step size setting value Δt1 in the step size storage register ΔT that stores the step size of the time for advancing the post-processing start timing (step S17), the value of the waiting time T0 is set. By updating the setting to T0-ΔT, the waiting time for the gate cutting work in the next molding cycle is shortened (step S19), the post-machining start timing detection process of this cycle is finished, and the normal sequence control is resumed. The sequence control after the opening is continuously performed as in the conventional case, and when the sequence control for one molding cycle is completed, the sequence control for the next molding cycle is started.
【0036】そして、再び保圧の開始が確認されると、
PMC用CPU18は前記と同様にして後加工開始タイ
ミング検出処理を開始する。前周期におけるステップS
19の処理で待機時間T0に関する更新設定作業が行わ
れているので、当然、ロッド移動開始指令の出力で始ま
るゲートカット作業は、その前の成形サイクルに比べて
ΔT(=Δt1)だけ早いタイミングで開始されること
になる。以下、PMC用CPU18は前記と同様の処理
を繰り返し実行して、今回のゲートカット作業中に移動
部材8に作用した樹脂反力Raの値を求めることになる
(以上、ステップS1〜ステップS14)。When it is confirmed that the holding pressure is started again,
The PMC CPU 18 starts the post-machining start timing detection process in the same manner as described above. Step S in the previous cycle
Since the update setting work related to the waiting time T0 is performed in the process of 19, the gate cutting work started by the output of the rod movement start command is naturally at a timing ΔT (= Δt1) earlier than the previous molding cycle. Will be started. Hereinafter, the PMC CPU 18 repeatedly executes the same processing as described above to obtain the value of the resin reaction force Ra that has acted on the moving member 8 during the current gate cutting work (above, step S1 to step S14). .
【0037】今回のゲートカット作業中に移動部材8に
作用した樹脂反力Raの値を求めたPMC用CPU18
は、次いで、判別基準値記憶レジスタRの現在値が0で
あるか否かを判別するが(ステップS15)、判別基準
値記憶レジスタRには、既にR>0の判別基準値が設定
されているので、ステップS15の判別結果が偽とな
り、PMC用CPU18は、今回求められた樹脂反力R
aの値が判別基準値Rを下回っているか否か、つまり、
樹脂の硬度がゲートカットを適切に行うことが可能な範
囲よりも低くなってしまっているか否かを判別する(ス
テップS18)。樹脂反力Raの値が判別基準値R以上
であれば、ゲートカット作業開始の待機時間を更に短く
設定して樹脂の硬度を下げてしまっても正常なゲートカ
ット作業を行うことが可能であることを意味するので、
PMC用CPU18は、前記と同様にして待機時間T0
の値をT0−ΔT(ΔT=Δt1)に短縮し(ステップ
S19)、この周期の後加工開始タイミング検出処理を
終了する。The PMC CPU 18 which has obtained the value of the resin reaction force Ra acting on the moving member 8 during the current gate cutting work.
Then, it is determined whether or not the current value of the discrimination reference value storage register R is 0 (step S15), but the discrimination reference value of R> 0 has already been set in the discrimination reference value storage register R. Therefore, the determination result of step S15 becomes false, and the PMC CPU 18 determines that the resin reaction force R obtained this time is R.
Whether or not the value of a is below the discrimination reference value R, that is,
It is determined whether the hardness of the resin is lower than the range in which the gate cut can be appropriately performed (step S18). If the value of the resin reaction force Ra is equal to or greater than the determination reference value R, it is possible to perform the normal gate cutting work even if the waiting time for starting the gate cutting work is set to be shorter to lower the hardness of the resin. Because it means that
The PMC CPU 18 waits for the waiting time T0 in the same manner as described above.
Is shortened to T0-ΔT (ΔT = Δt1) (step S19), and the post-machining start timing detection process of this cycle is ended.
【0038】そして、このようにして射出成形作業およ
びそれに伴うゲートカット作業を繰り返し実行している
間に、遂には、待機時間T0の値が必要以上に短縮され
てしまい、後加工開始タイミング検出処理におけるステ
ップS18の判別結果が真となるとき(設定された樹脂
反力の低下が最初に検出されるとき)がくる。Then, while the injection molding work and the gate cutting work accompanying it are repeatedly executed in this way, the value of the waiting time T0 is finally shortened more than necessary, and the post-processing start timing detection processing is performed. When the result of the determination in step S18 in step 3 is true (when the set decrease in the resin reaction force is first detected).
【0039】例えば、図7(b)に示すようにして、保
圧開始から樹脂が完全に固化するまでに必要とされる所
要時間を初期値とした待機時間T0を刻み幅ΔT(=Δ
t1)で徐々に短縮してゆけば、ある時点(図7(b)
の例ではT05 )で樹脂反力Raの値が判別基準値Rよ
りも小さくなり、樹脂の硬度がゲートカットを適切に行
うことが可能な範囲よりも低くなってしまう。樹脂反力
Raの値が判別基準値Rよりも大きい場合にのみゲート
カット作業を適切に行うことができるのであるから、Δ
T(=Δt1)の刻み幅が大きい場合には、当然、Ra
<Rとなってしまったときの待機時間T0(図7(b)
の例ではT05 )を後加工開始タイミングの待機時間と
して選択するのは不適であり、また、樹脂反力Raの値
が判別基準値Rと一致するときのT0の値(ゲートカッ
トを適切に行うことが可能な範囲の待機時間T0の最小
値)を厳密に検出するために刻み幅ΔT(=Δt1)を
あまりに短く設定してしまうと、最適の待機時間T0を
検出するまでに相当数の成形サイクルを繰り返し実行し
なければならず、時間が浪費されてしまう。このような
問題を解決するためには、ある程度に荒い刻み幅(Δt
1)で待機時間を短縮していってRa<RとなるT0を
求めた後、更に、刻み幅ΔTをより短い値(Δt2)に
再設定して、Ra<Rとなる現象が生じる区間の近傍で
のみRaの変化を厳密に検出し、樹脂反力Raの値が判
別基準値Rと略一致するときのT0の値を求めるのが合
理的である。荒い刻み幅ΔT(=Δt1)によって待機
時間を短縮しているときに、どの時点でRa<Rとなる
現象が生じるかを予め予測することは困難であるから、
荒い刻み幅(Δt1)によりRa<Rとなる時点を実際
に検出してから、Ra>Rの条件を満たしているその前
周期の待機時間に戻り、その待機時間を初期値として小
さな刻み幅ΔT(=Δt2)によって少しずつ待機時間
を短縮して同様の処理を繰り返すことにより、樹脂反力
Raの値が判別基準値Rと略一致するときのT0の値を
求めるのである。For example, as shown in FIG. 7 (b), a waiting time T0 having a required time required from the start of holding pressure to the complete solidification of the resin as an initial value is divided by a step width ΔT (= Δ
If it is gradually shortened at t1), then at some point (Fig. 7 (b))
In the above example, the value of the resin reaction force Ra becomes smaller than the determination reference value R at T0 5 ) and the hardness of the resin becomes lower than the range in which the gate cut can be appropriately performed. Since the gate cutting work can be appropriately performed only when the value of the resin reaction force Ra is larger than the determination reference value R, Δ
When the step size of T (= Δt1) is large, naturally, Ra
Wait time T0 when <R (Fig. 7 (b)
In the above example, it is not appropriate to select T0 5 ) as the waiting time of the post-processing start timing, and the value of T0 when the value of the resin reaction force Ra agrees with the determination reference value R (gate cut properly If the step width ΔT (= Δt1) is set too short in order to exactly detect the minimum value of the waiting time T0 within the feasible range, a considerable number of times will be required until the optimum waiting time T0 is detected. The molding cycle must be repeated and time is wasted. In order to solve such a problem, the step width (Δt
After the waiting time is shortened in 1) and T0 that Ra <R is obtained, the step width ΔT is reset to a shorter value (Δt2), and the phenomenon in which Ra <R occurs is detected. It is rational to strictly detect the change in Ra only in the vicinity and obtain the value of T0 when the value of the resin reaction force Ra substantially coincides with the discrimination reference value R. When the waiting time is shortened by the rough step width ΔT (= Δt1), it is difficult to predict in advance when the phenomenon that Ra <R will occur.
After the time when Ra <R is actually detected by the rough step size (Δt1), the standby time of the previous cycle satisfying the condition of Ra> R is returned, and the standby time is set as the initial value and the small step size ΔT is set. The value of T0 when the value of the resin reaction force Ra substantially agrees with the determination reference value R is obtained by shortening the waiting time little by little by (= Δt2) and repeating the same processing.
【0040】そこで、ステップS18の判別結果によ
り、樹脂反力Raの値が判別基準値Rを下回ったことが
検出されると、PMC用CPU18は、まず、切り替え
完了フラグFがセットされているか否か、つまり、刻み
幅ΔTの切り替え作業が完了しているか否かを判別する
(ステップS20)。フラグFは初期段階で未設定状態
にあるから、当然、最初にステップS20の処理が行わ
れたときの判別結果は真となる。そこで、PMC用CP
U18は、刻み幅記憶レジスタΔTに前述の小さな方の
刻み幅設定値Δt2を再設定し(ステップS21)、待
機時間T0の現在値にΔt1−ΔT(ΔT=Δt2)の
値を加算して、前回の成形サイクルにおける待機時間
(ゲートカットを適切に行うことが十分に可能な待機時
間であって、図7(b)の例ではT04 に対応する)か
らΔT(ΔT=Δt2)だけ短縮された待機時間を求
め、次の成形サイクルにおける待機時間T0として更新
設定した後(ステップS22)、切り替え完了フラグF
をセットして(ステップS23)、この周期の後加工開
始タイミング検出処理を終了する。このとき設定された
待機時間T0が、刻み幅Δt2で待機時間を短縮してゆ
くときの新たな初期値である。次いでPMC用CPU1
8は通常のシーケンス制御へと復帰し、型開き以降のシ
ーケンス制御を従来と同様に継続して行い、更に、1成
形サイクル分のシーケンス制御が全て終了すると、次の
成形サイクルのシーケンス制御を開始する。Therefore, when it is detected from the determination result of step S18 that the value of the resin reaction force Ra is below the determination reference value R, the PMC CPU 18 first determines whether or not the switching completion flag F is set. That is, it is determined whether or not the work of switching the step width ΔT is completed (step S20). Since the flag F is in the unset state at the initial stage, naturally the determination result when the process of step S20 is first performed is true. So CP for PMC
U18 resets the smaller step size setting value Δt2 in the step size storage register ΔT (step S21), and adds the value of Δt1−ΔT (ΔT = Δt2) to the current value of the waiting time T0, The waiting time in the previous molding cycle (the waiting time that allows adequate gate cutting, which corresponds to T0 4 in the example of FIG. 7B) is shortened by ΔT (ΔT = Δt2). After the waiting time is calculated and updated and set as the waiting time T0 in the next molding cycle (step S22), the switching completion flag F is set.
Is set (step S23), and the post-machining start timing detection process of this cycle ends. The waiting time T0 set at this time is a new initial value when the waiting time is shortened by the step size Δt2. Then PMC CPU1
8 returns to the normal sequence control, continues the sequence control after the mold opening as in the conventional method, and when the sequence control for one molding cycle is completed, starts the sequence control for the next molding cycle. To do.
【0041】そして、再び保圧の開始が確認されると、
PMC用CPU18は前記と同様にして後加工開始タイ
ミング検出処理を開始するが、前周期におけるステップ
S21およびステップS22の処理で待機時間T0に関
する更新設定作業が行われているので、当然、ロッド移
動開始指令の出力で始まるゲートカット作業は、その前
の前の成形サイクルの待機時間、つまり、ゲートカット
を適切に行うことが十分に可能な待機時間に比べてΔT
(=Δt2)だけ僅かに早いタイミングで開始されるこ
とになる。以下、PMC用CPU18は前記と同様の処
理を繰り返し実行して、今回のゲートカット作業中に移
動部材8に作用した樹脂反力Raの値を求め(以上、ス
テップS1〜ステップS14)、ステップS15の判別
処理を行った後、今回求められた樹脂反力Raの値が判
別基準値Rを下回っているか否かを判別する(ステップ
S18)。樹脂反力Raの値が判別基準値R以上であれ
ば、ゲートカット作業開始の待機時間を更に短く設定す
ることが可能であるので、PMC用CPU18は、前記
と同様にして待機時間T0の値をT0−ΔT(ΔT=Δ
t2)に短縮し(ステップS19)、この周期の後加工
開始タイミング検出処理を終了して、以下、前記と同様
にして射出成形作業およびそれに伴うゲートカット作業
を繰り返し実行する。Then, when the start of the holding pressure is confirmed again,
The PMC CPU 18 starts the post-machining start timing detection process in the same manner as described above, but of course the update setting work regarding the standby time T0 is performed in the processes of steps S21 and S22 in the previous cycle, so naturally the rod movement start The gate cutting work that starts with the output of the command is ΔT compared to the waiting time of the previous molding cycle, that is, the waiting time when it is possible to properly perform the gate cutting.
It will be started at a slightly earlier timing by (= Δt2). Hereinafter, the PMC CPU 18 repeatedly executes the same processing as described above to obtain the value of the resin reaction force Ra applied to the moving member 8 during the current gate cutting work (above, step S1 to step S14), step S15. After performing the determination process of No., it is determined whether the value of the resin reaction force Ra obtained this time is less than the determination reference value R (step S18). If the value of the resin reaction force Ra is greater than or equal to the determination reference value R, it is possible to set the waiting time for starting the gate cutting work even shorter, so the PMC CPU 18 sets the value of the waiting time T0 in the same manner as described above. To T0-ΔT (ΔT = Δ
The time is shortened to t2) (step S19), the post-processing start timing detection process of this cycle is ended, and thereafter, the injection molding work and the gate cutting work associated therewith are repeatedly executed in the same manner as described above.
【0042】そして、このようにして射出成形作業およ
びそれに伴うゲートカット作業を繰り返し実行している
間に、再び、ステップS18の判別結果が真となって、
樹脂反力Raの値が判別基準値Rを下回る時点T0が検
出される(図7(b)の例ではA点の時間データに対
応)。すると、PMC用CPU18は、切り替え完了フ
ラグFがセットされているか否かを再び判別するが(ス
テップS20)、この場合、切り替え完了フラグFが既
にセットされているのでステップS20の判別結果は偽
となる。これは、ゲートカットを適切に行うことが可能
な範囲の待機時間の最小値に十分に近似する待機時間T
0が、Δt2による微小な刻み幅を単位として検出され
たことを意味するものであって、この時点における待機
時間T0をゲートカット作業に最適な後加工開始タイミ
ングとして利用することに何らの支障もない。そこで、
PMC用CPU18は、この時点における待機時間T0
の現在値をゲートカット作業に最適な後加工開始タイミ
ングとしてディスプレイ付手動データ入力装置29に表
示してオペレータに知らせると共に、その値を後加工開
始タイミングとして保存し(ステップS24)、それ以
降に行われるゲートカット作業の待機時間として適用す
る。一旦待機時間T0が確定してしまえば改めてこれを
求める必要はないので、以降の処理周期においては、ス
テップS1〜ステップS3の待機処理とステップS4の
ゲートカット作業開始指令の出力、および、ステップS
10に対応するゲートカット作業完了待ちの待機処理と
ステップS13における移動部材8の復帰処理のみを実
施すればよい。Then, while the injection molding work and the gate cutting work accompanying it are repeatedly executed in this way, the determination result of step S18 becomes true again,
A time point T0 at which the value of the resin reaction force Ra falls below the determination reference value R is detected (corresponding to time data at point A in the example of FIG. 7B). Then, the PMC CPU 18 determines again whether or not the switching completion flag F is set (step S20). In this case, however, since the switching completion flag F has already been set, the determination result of step S20 is false. Become. This is the waiting time T that is sufficiently close to the minimum waiting time in the range in which the gate cut can be appropriately performed.
0 means that a minute step width by Δt2 is detected as a unit, and there is no obstacle to using the waiting time T0 at this time as the optimum post-machining start timing for the gate cutting work. Absent. Therefore,
The PMC CPU 18 waits for the waiting time T0 at this point.
The present value of is displayed on the manual data input device with display 29 as the optimum post-machining start timing for the gate cutting work to inform the operator, and the value is saved as the post-machining start timing (step S24), and the subsequent processing is performed. It is applied as the waiting time for gate cut work. Once the waiting time T0 is fixed, it is not necessary to obtain it again. Therefore, in the subsequent processing cycles, the waiting processing of steps S1 to S3 and the output of the gate cutting work start command of step S4, and the step S4 are performed.
It suffices to perform only the waiting process for waiting for the completion of the gate cutting work corresponding to 10 and the returning process of the moving member 8 in step S13.
【0043】なお、より厳密にいえば、最終的なT0が
求められた段階で既にRa<Rとなってしまってはいる
が(図7(b)ではA点の反力データに対応)、Δt2
の刻み幅が十分に小さい点、および、樹脂の硬度が僅か
の冷却時間の差によって著しく変動することは実際には
有り得ないという点から見て、Δt2を上限として生ず
る可能性のある最適待機時間の誤差は無視しても差支え
ない。この点がどうしても気になるようであれば、前述
したステップS19と同様の手法により、最終的に求め
られたT0の値にΔt2を加算した値を最適待機時間T
0としてステップS24の処理で保存するようにして、
“ゲートカットを適切に行うことが可能な範囲の待機時
間の最小値”というT0に関する文言上の条件を満足さ
せればよい。Strictly speaking, although Ra <R has already been satisfied when the final T0 is obtained (corresponding to the reaction force data at point A in FIG. 7B), Δt2
In view of the fact that the step size of Δ is sufficiently small and that the hardness of the resin does not fluctuate significantly due to a slight difference in the cooling time, it is possible that the optimum waiting time may occur with Δt2 as the upper limit. The error of can be ignored. If this point is inevitable, the value obtained by adding Δt2 to the value of T0 finally obtained is added to the optimum waiting time T by the same method as in step S19 described above.
It is set to 0 and saved in the process of step S24,
It suffices to satisfy the wording condition regarding T0 of "the minimum value of the waiting time within the range in which the gate cut can be appropriately performed".
【0044】前述の実施例とは逆に、待機時間T0の初
期値を短めに設定しておいて徐々にこれを延長すること
により最適の後加工開始タイミングT0を求めることも
理論上では可能だが、その場合、最適の後加工開始タイ
ミングT0が検出されるまでに成形された製品にはゲー
トカットの不良が生じる可能性が著しく高くなり、ま
た、離型不良等を原因として生じる金型や射出成形機の
損傷を防止するためにも、オペレータが付ききりで射出
成形機を監視する必要が生じる。従って、ゲートカット
作業のための後加工開始タイミングを求める場合には、
樹脂が完全に固化するまでに必要とされる所要時間、も
しくは、それよりも長い時間(特に、樹脂の完全固化に
必要とされる所要時間が不明である場合)を初期値とし
て待機時間を設定し、これを可能な限り短縮して成形サ
イクルの所要時間を短縮するというのが最も合理的な方
法である(当然、ゲートカット以外の後加工、例えば、
ヒケ防止の後加工等を行うための後加工開始タイミング
を求める場合では他の方法の方が合理的な場合もあ
る)。Contrary to the above-mentioned embodiment, it is theoretically possible to obtain the optimum post-machining start timing T0 by setting the initial value of the waiting time T0 to be short and gradually extending it. In that case, there is a high possibility that a defective gate cut will occur in the product molded by the time when the optimum post-processing start timing T0 is detected, and the mold or the injection caused by the defective mold release or the like. In order to prevent damage to the molding machine, it becomes necessary for the operator to monitor the injection molding machine on a continuous basis. Therefore, when obtaining the post-processing start timing for gate cutting work,
Set the waiting time with the required time required for the resin to completely solidify or a longer time (especially when the required time for complete resin solidification is unknown) as the initial value However, it is the most rational method to shorten the time required for the molding cycle by shortening this as much as possible (of course, post-processing other than gate cutting, for example,
Other methods may be more rational when determining the timing for starting post-processing for post-processing such as sink prevention).
【0045】また、前述の実施例では完全に固化した樹
脂を剪断するときの樹脂反力を基準として、この基準値
からゲートカットを適切に行うことが可能な樹脂の硬度
低下の最大許容範囲に対応する樹脂反力の設定値αを減
じて判別基準値Rを求めるようにしたが、判別基準値R
の値が既知であれば、その値を初めから判別基準値Rと
して制御装置10に設定するようにしてもよい。Further, in the above-mentioned embodiment, the resin reaction force when shearing the completely solidified resin is used as a reference, and from this reference value, the maximum allowable range of the decrease in the hardness of the resin that can be appropriately gate-cut is obtained. Although the determination reference value R is obtained by subtracting the set value α of the corresponding resin reaction force, the determination reference value R
If the value of is known, the value may be set in the control device 10 as the determination reference value R from the beginning.
【0046】ゲートカットを適切に行うことが可能な樹
脂の硬度低下の最大許容範囲に対応する樹脂反力の設定
値αは樹脂の種類やゲート径等によっても相違するの
で、その正確な値を予め正確に求めておくことは必ずし
も容易でない。しかし、一般的にいって、冷却時間と樹
脂の固化状態との関係においては、図7(b)の例に示
すように、冷却時間を徐々に増加させてゆけばこれに追
従して樹脂の硬度も徐々に増大するが、ある時点を越え
ると幾ら冷却時間を延ばしても樹脂の硬度が増加しなく
なるという限界点があるので、αの値を比較的小さな値
として設定することにより、大体において良好な結果を
得ることができる。その端的な例は、最初の待機時間を
樹脂の完全硬化所要時間に比べて相当に長く設定してし
まった場合である。この場合、樹脂の完全硬化後の待機
時間は全くの無駄であって、成形サイクルを延長させる
という悪影響しかもたらさないが、設定値αをシビアな
値に設定して前述の実施例の処理を行えば、樹脂の完全
硬化に必要とされる待機時間が適確に検出され、完全硬
化後の無駄な待機時間を全て省くことができる。当然、
樹脂が完全硬化する前にゲートカット作業を行っても支
障のないものに関しては、αの値をある程度大きめに設
定することが許される。The set value α of the resin reaction force corresponding to the maximum permissible range of the resin hardness reduction that can appropriately perform the gate cut differs depending on the type of the resin, the gate diameter, etc. It is not always easy to accurately obtain it beforehand. However, generally speaking, regarding the relationship between the cooling time and the solidified state of the resin, as shown in the example of FIG. 7B, if the cooling time is gradually increased, the resin will follow the cooling time. Although the hardness gradually increases, there is a limit point that the hardness of the resin does not increase even if the cooling time is extended beyond a certain point, so by setting the value of α as a relatively small value Good results can be obtained. A straightforward example is when the initial waiting time is set to be considerably longer than the time required for complete curing of the resin. In this case, the waiting time after the resin is completely cured is completely wasted, and it has an adverse effect of extending the molding cycle, but the setting value α is set to a severe value to perform the processing of the above-described embodiment. For example, the waiting time required for the complete curing of the resin can be accurately detected, and all the unnecessary waiting time after the complete curing can be omitted. Of course,
It is permissible to set the value of α to a relatively large value for those that do not interfere with the gate cutting work before the resin is completely cured.
【0047】また、前述の実施例では1回の成形サイク
ルおよび後加工の完了毎に樹脂反力Raを求め、その値
を判別基準値Rと比較して樹脂の固化状態を判定し、そ
の判定結果に応じて待機時間T0を短縮するようにした
が、待機時間T0を変化させない状態で数回の成形サイ
クルおよび後加工を実施させてその都度樹脂反力Raを
測定し、この数回の成形サイクルおよび後加工によって
得た樹脂反力Raの平均値を求めて判別基準値Rと比較
し、その判定結果に応じて待機時間T0を短縮するよう
にしてもよい。このようにして樹脂反力Raを同一条件
の待機時間で複数回サンプリングして平均値を求めるこ
とにより、変動する外乱の影響を取り除いて更に適確に
樹脂の固化状態を判定することができる。Further, in the above-mentioned embodiment, the resin reaction force Ra is obtained each time one molding cycle and post-processing are completed, and the value is compared with the determination reference value R to determine the solidified state of the resin. Although the waiting time T0 was shortened according to the result, the resin reaction force Ra was measured each time several molding cycles and post-processing were performed in a state where the waiting time T0 was not changed, and the molding was performed several times. The average value of the resin reaction force Ra obtained by the cycle and the post-processing may be obtained and compared with the determination reference value R, and the waiting time T0 may be shortened according to the determination result. In this way, the resin reaction force Ra is sampled a plurality of times during the standby time under the same condition and the average value is obtained, whereby the influence of fluctuating disturbance can be removed and the solidified state of the resin can be determined more accurately.
【0048】このような処理は、図2〜図5に示すよう
な前記実施例の処理に幾つかのステップを付加すること
により容易に実施可能である。一例として、同一待機時
間でN回の成形サイクルおよび後加工を行って樹脂反力
Ra1〜RaNの平均を求める場合の実施例について説
明する。Such processing can be easily implemented by adding some steps to the processing of the above-described embodiment as shown in FIGS. As an example, an example in which N molding cycles and post-processing are performed with the same waiting time to obtain the average of the resin reaction forces Ra1 to RaN will be described.
【0049】この場合、まず、前記実施例のステップS
1の前に、初期値0のカウンタjを1インクリメントす
る処理(ステップs01)、カウンタjの値がNと一致
しているか否かを判別する処理(ステップs02)、カ
ウンタjの値がNと一致していればカウンタjを0にリ
セットする処理(ステップs03)を挿入し、ステップ
s02の処理でカウンタjの値がNと一致していないと
判別された場合およびステップs03の処理が完了した
場合に前記実施例のステップS1以降の処理を開始さ
せ、ステップS14の処理では、前記実施例と同様にし
て樹脂反力Raの値を求めた後、更に、その値をレジス
タRa(j)に記憶させるようにする(但し、j=0〜
N−1)。In this case, first, step S of the above embodiment.
Before 1, the counter j having an initial value of 0 is incremented by 1 (step s01), the process of determining whether the value of the counter j matches N (step s02), the value of the counter j is set to N. If they match, a process of resetting the counter j to 0 (step s03) is inserted. If it is determined in the process of step s02 that the value of the counter j does not match N, and the process of step s03 is completed. In this case, the processing after step S1 of the embodiment is started, and in the processing of step S14, after the value of the resin reaction force Ra is obtained in the same manner as in the embodiment, the value is further stored in the register Ra (j). To be stored (however, j = 0 to
N-1).
【0050】従って、同一待機時間による最初の後加工
で得た樹脂反力RaはレジスタRa(1)に記憶され、
以下同様に、同一待機時間の第2回目の後加工で得た樹
脂反力RaはレジスタRa(2)に、同一待機時間の第
3回目の後加工で得た樹脂反力RaはレジスタRa
(3)に、・・・と記憶され、同一待機時間による最後
の後加工、即ち、同一待機時間による第N回目の後加工
で得た樹脂反力RaはレジスタRa(0)に記憶される
ことになる。Therefore, the resin reaction force Ra obtained in the first post-processing with the same waiting time is stored in the register Ra (1),
Similarly, the resin reaction force Ra obtained in the second post-processing with the same waiting time is in the register Ra (2), and the resin reaction force Ra obtained in the third post-processing with the same waiting time is in the register Ra.
Is stored in (3), and the resin reaction force Ra obtained by the last post-processing with the same waiting time, that is, the N-th post-processing with the same waiting time is stored in the register Ra (0). It will be.
【0051】そこで、更に、前記実施例のステップS1
4の処理とステップS15の処理との間に、カウンタj
の値が0と一致しているか否かを判別する処理(ステッ
プs04)を挿入し、カウンタjの値が0と一致してい
れば〔Ra(1)+Ra(2)+Ra(3)+・・・+
Ra(N−1)+Ra(0)〕/Nの演算式を実行して
樹脂反力の平均値Raを求めてレジスタRaに記憶させ
(ステップs05)、続けて前記実施例のステップS1
5以降の処理を実行させるようにする一方、ステップs
04の判別処理でカウンタjの値が0と一致していない
と判別された場合にはステップs05およびステップS
15以降の処理をキャンセルして当該周期の後加工開始
タイミング検出処理を終了させるようにする。Therefore, further, step S1 of the above embodiment.
4 and the process of step S15, the counter j
Is inserted (step s04), and if the value of the counter j matches 0, [Ra (1) + Ra (2) + Ra (3) +.・ ・ +
Ra (N-1) + Ra (0)] / N is executed to obtain the average value Ra of the resin reaction force and stored in the register Ra (step s05), and then step S1 of the above embodiment.
While executing the processing of 5 and subsequent steps, step s
When it is determined in the determination processing of 04 that the value of the counter j does not match 0, step s05 and step S
The processing after 15 is canceled and the post-processing start timing detection processing of the cycle is ended.
【0052】この結果、同一待機時間でN回の成形サイ
クルおよび後加工を行い、その最後の後加工の完了時点
でそれまでのN回の後加工における樹脂反力の平均値R
aが求められ、該平均値Raと判別基準値Rとの関係に
応じて待機時間の短縮または最適タイミングの検出完了
が判定されるようになる。As a result, N molding cycles and post-processing are performed with the same waiting time, and at the time of the completion of the last post-processing, the average value R of the resin reaction force in the N post-processings up to that time
a is obtained, and it is judged whether the waiting time is shortened or the detection of the optimum timing is completed according to the relationship between the average value Ra and the discrimination reference value R.
【0053】以上、ゲートカット作業の後加工開始タイ
ミングとなる最適待機時間を自動的に求めて制御装置1
0に自動設定するようにした一実施例について説明した
が、最適待機時間を求めるためのデータをディスプレイ
付手動データ入力装置29に表示させ、オペレータの判
断によって最適待機時間を求めるようにしてもよい。例
えば、前述の実施例におけるステップS1〜ステップS
14およびステップS19の処理のみを繰り返し実行
し、各成形サイクルにおける後加工開始タイミング(保
圧開始からゲートカット開始までの待機時間)T0と樹
脂反力Raとの関係を図7(a)のようなファイル手段
に記憶させ、これを図7(b)の例のようにしてディス
プレイ付手動データ入力装置29にグラフ表示させれ
ば、オペレータは、このグラフ表示を参照して最適の後
加工開始タイミングT0を求めることができる。この場
合、後加工開始タイミングと樹脂の固化状態(樹脂反
力)との関連を直接視覚的に確認することができるの
で、ゲートカットを適切に行うことが可能な樹脂の硬度
低下の最大許容範囲(前述のα)というものが分からな
いような場合であっても、グラフの傾きの変化により、
ゲートカットを適切に行うことができる待機時間の最小
値というものを比較的容易に検出することが可能であ
る。また、この際、ステップS19に見られるような待
機時間の自動短縮処理に代えて、オペレータ自らがT0
の値を手動で設定変更するようにしてもよい。As described above, the controller 1 automatically obtains the optimum waiting time which is the timing for starting the processing after the gate cutting work.
Although one embodiment in which the automatic standby time is set to 0 has been described, data for determining the optimal standby time may be displayed on the manual data input device 29 with a display, and the optimal standby time may be determined by the operator's judgment. . For example, step S1 to step S in the above embodiment
14 and step S19 are repeatedly performed, and the relationship between the post-processing start timing (waiting time from the start of holding pressure to the start of gate cutting) T0 and the resin reaction force Ra in each molding cycle is shown in FIG. 7 (a). If the file is stored in a different file means and is displayed as a graph on the display-equipped manual data input device 29 as in the example of FIG. 7B, the operator refers to this graph display to determine the optimum post-processing start timing. It is possible to obtain T0. In this case, it is possible to directly visually check the relationship between the post-processing start timing and the resin solidification state (resin reaction force). Therefore, the maximum allowable range of resin hardness reduction that allows proper gate cutting. Even if you do not understand (α above), due to the change in the slope of the graph,
It is possible to relatively easily detect the minimum value of the waiting time that can appropriately perform the gate cut. Further, at this time, instead of the automatic shortening process of the waiting time as seen in step S19, the operator himself / herself uses T0.
The value of may be changed manually.
【0054】更に、各成形サイクルのゲートカット作業
時に検出されるデータ、つまり、移動部材8の移動開始
後の経過時間と移動部材8の位置、および、移動部材8
の移動開始後の経過時間と樹脂反力との関係を示すグラ
フを、1成形サイクル毎に、例えば、図6(b)に示さ
れるようにしてディスプレイ付手動データ入力装置29
に重ね描き表示させ、待機時間の異なる成形サイクル間
のグラフの傾きの変動を観察することによって最適の待
機時間T0を求めることもできる。つまり、待機時間を
徐々に短縮してグラフの傾きの変動が始まった時点が樹
脂反力が著しく変化した時点、要するに、樹脂の剪断の
容易性が変化した時点である。Further, the data detected during the gate cutting work in each molding cycle, that is, the elapsed time after the movement of the moving member 8 is started, the position of the moving member 8, and the moving member 8 are detected.
A graph showing the relationship between the elapsed time after the start of the movement of the resin and the resin reaction force is shown for each molding cycle, for example, as shown in FIG.
It is also possible to determine the optimum waiting time T0 by superimposing it on the display and observing the variation of the slope of the graph between molding cycles having different waiting times. That is, the time at which the waiting time is gradually shortened and the inclination of the graph begins to change is the time at which the resin reaction force changes significantly, that is, the time at which the ease of shearing the resin changes.
【0055】最適待機時間を自動的に求めて制御装置1
0に自動設定するための図2〜図7のような処理を行い
ながら図6(b)および図7(b)に示されるようなグ
ラフ表示を同時に行わせるようにすることも容易に実施
可能である。The controller 1 automatically obtains the optimum waiting time.
It is possible to easily perform the graph display as shown in FIG. 6B and FIG. 7B at the same time while performing the processing as shown in FIGS. 2 to 7 for automatically setting to 0. Is.
【0056】[0056]
【発明の効果】本発明は、移動部材に作用する樹脂反力
を検出することにより樹脂の固化状態を検出するように
しているので、様々な後加工開始タイミングにおける樹
脂の固化状態を適確に知ることができ、所望する後加工
に適した樹脂の固化状態に対応する後加工開始タイミン
グを容易に選択することができる。また、樹脂が完全に
固化するタイミングを後加工開始タイミングの初期値と
して設定すると共に徐々に後加工開始タイミングを早め
る方向にだけタイミングを変化させて成形作業および後
加工の連続運転を行わせて適当な後加工開始タイミング
を検出するようにしているので、タイミングをずらせる
方向性を特定せずに試行錯誤的なタイミング設定を行っ
て最適の加工開始タイミングを検出する場合に比べ、後
加工開始タイミング検出のための所要時間を短縮でき
る。更に、樹脂が完全に固化した状態を基準として検出
された樹脂反力を基準として設定した樹脂反力の低下が
検出される度に、その成形サイクルの1サイクル前の成
形サイクルにおける後加工開始タイミングに戻り、より
短い時間幅でタイミングを短縮して最適な後加工開始タ
イミングを検出するようにしているので、最初から僅か
な時間間隔でタイミングを変えて最適の後加工開始タイ
ミングを検出しようとする場合に比べて後加工開始タイ
ミング検出に必要とされる所要時間が短縮され、しか
も、最初から僅かな時間間隔でタイミングを変えて最適
の後加工開始タイミングを検出する場合と同様、最適の
後加工開始タイミングを十分に精密に検出することがで
きる。また、複数の成形サイクルに亘り同一のタイミン
グで後加工を行って移動部材に作用する樹脂反力の平均
値を求めるようにしているので、樹脂反力の検出に影響
を与える外乱の変動が取り除かれ、所望する後加工に適
した樹脂の固化状態に対応する後加工開始タイミングを
より一層精密に求めることができる。According to the present invention, the solidified state of the resin is detected by detecting the resin reaction force acting on the moving member. Therefore, the solidified state of the resin at various start timings of post-processing can be accurately measured. The post-processing start timing corresponding to the solidified state of the resin suitable for the desired post-processing can be easily selected and can be easily selected. In addition, the timing at which the resin is completely solidified is set as the initial value of the post-processing start timing, and the timing is gradually changed only in the direction of advancing the post-processing start timing, and the molding operation and the post-processing continuous operation are performed appropriately. Since the post-machining start timing is detected, the post-machining start timing can be compared with the case where the optimum machining start timing is detected by performing trial and error timing setting without specifying the directionality that shifts the timing. The time required for detection can be shortened. Further, every time a decrease in the resin reaction force set based on the resin reaction force detected based on the completely solidified state of the resin is detected, the post-processing start timing in the molding cycle one cycle before the molding cycle is detected. Since the timing is shortened with a shorter time width to detect the optimum post-machining start timing, the timing is changed at a slight time interval from the beginning to detect the optimum post-machining start timing. Compared to the case, the time required to detect the post-machining start timing is shortened, and moreover, the optimum post-machining is detected in the same way as when the optimum post-machining start timing is detected by changing the timing at a slight time interval from the beginning. The start timing can be detected with sufficient precision. Further, since the post-processing is performed at the same timing over a plurality of molding cycles to obtain the average value of the resin reaction force acting on the moving member, it is possible to remove the fluctuation of the disturbance that affects the detection of the resin reaction force. Therefore, the post-processing start timing corresponding to the solidified state of the resin suitable for the desired post-processing can be obtained more accurately.
【図1】本発明の方法を適用した一実施例の射出成形機
の主要な機構部と制御系の要部を示すブロック図であ
る。FIG. 1 is a block diagram showing a main mechanical portion and a main portion of a control system of an injection molding machine according to an embodiment to which the method of the present invention is applied.
【図2】同実施例における後加工開始タイミング検出処
理の概略を示すフローチャートである。FIG. 2 is a flowchart showing an outline of post-processing start timing detection processing in the same embodiment.
【図3】後加工開始タイミング検出処理の概略を示すフ
ローチャートの続きである。FIG. 3 is a continuation of the flowchart showing the outline of the post-processing start timing detection processing.
【図4】後加工開始タイミング検出処理の概略を示すフ
ローチャートの続きである。FIG. 4 is a continuation of the flowchart showing the outline of the post-processing start timing detection processing.
【図5】後加工開始タイミング検出処理の概略を示すフ
ローチャートの続きである。FIG. 5 is a continuation of the flowchart showing the outline of the post-processing start timing detection processing.
【図6】ファイル手段およびデータ表示の一例を示す図
である。FIG. 6 is a diagram showing an example of file means and data display.
【図7】ファイル手段およびデータ表示の一例を示す図
である。FIG. 7 is a diagram showing an example of file means and data display.
【図8】移動部材に作用する樹脂反力を検出するための
オブザーバの構成を示す機能ブロック図である。FIG. 8 is a functional block diagram showing a configuration of an observer for detecting a resin reaction force acting on a moving member.
1 射出シリンダ 2 摺動盤 3 可動側金型 4 固定側金型 5 キャビティ 6 ランナー 7 ゲート 8 移動部材 10 数値制御装置 18 PMC用CPU 20 サーボCPU 1 Injection Cylinder 2 Sliding Plate 3 Movable Side Mold 4 Fixed Side Mold 5 Cavity 6 Runner 7 Gate 8 Moving Member 10 Numerical Control Device 18 PMC CPU 20 Servo CPU
Claims (6)
部に設けられた移動部材を駆動することによって金型内
部の樹脂に後加工を施すようにした射出成形機におい
て、各成形サイクル毎にタイミングをずらせて前記移動
部材を駆動して該移動部材に作用する樹脂反力を検出す
ることにより各タイミングにおける樹脂の固化状態を検
出し、所望する後加工処理に適した樹脂の固化状態に対
応する後加工開始タイミングを求めることを特徴とした
射出成形機における後加工開始タイミング検出方法。1. An injection molding machine configured to perform post-processing on resin inside a mold by driving a moving member provided inside the mold after completion of filling the resin into the mold, at each molding cycle. The resin solidification state at each timing is detected by driving the moving member at different timings to detect the resin reaction force acting on the moving member, and the resin solidification state suitable for the desired post-processing is obtained. A post-processing start timing detection method in an injection molding machine, characterized by obtaining a corresponding post-processing start timing.
部に設けられた移動部材を駆動することによって金型内
部の樹脂に後加工を施すようにした射出成形機におい
て、複数の成形サイクルに亘り同一のタイミングで前記
移動部材を駆動して後加工を施すことにより該移動部材
に作用する樹脂反力をその都度検出して前記タイミング
に対応する樹脂反力の平均を求めることにより樹脂の固
化状態を求める作業を逐次前記タイミングを変更して実
施することにより各タイミングにおける樹脂の固化状態
を求め、所望する後加工処理に適した樹脂の固化状態に
対応する後加工開始タイミングを求めることを特徴とし
た射出成形機における後加工開始タイミング検出方法。2. A plurality of molding cycles in an injection molding machine in which after the resin is filled in the mold, the moving member provided inside the mold is driven to post-process the resin inside the mold. By driving the moving member at the same timing over time to perform post-processing, the resin reaction force acting on the moving member is detected each time, and the average of the resin reaction force corresponding to the timing is obtained to determine the resin The solidification state of the resin at each timing is obtained by sequentially performing the work for obtaining the solidification state by changing the timing, and the post-processing start timing corresponding to the solidification state of the resin suitable for the desired post-processing treatment is obtained. A post-processing start timing detection method for a characteristic injection molding machine.
工開始タイミングの初期値として射出成形機に設定する
と共に後加工開始タイミングを早めるための時間の刻み
幅を射出成形機に予め設定し、成形サイクル毎に前記時
間の刻み幅で後加工開始タイミングを早めて成形作業お
よび後加工の連続運転を行わせ、設定された樹脂反力の
低下が最初に検出される成形サイクルにおける後加工開
始タイミングを検出することによって後加工開始タイミ
ングを求めるようにした請求項1記載の射出成形機にお
ける後加工開始タイミング検出方法。3. The timing at which the resin is completely solidified is set in the injection molding machine as an initial value of the post-processing start timing, and the time step width for accelerating the post-processing start timing is set in advance in the injection molding machine. For each cycle, advance the post-processing start timing by the above-mentioned step size to perform the molding operation and the post-processing continuous operation, and set the post-processing start timing in the molding cycle where the set resin reaction force decrease is first detected. The post-processing start timing detection method for an injection molding machine according to claim 1, wherein the post-processing start timing is obtained by detecting the post-processing start timing.
工開始タイミングの初期値として射出成形機に設定する
と共に後加工開始タイミングを早めるための時間の刻み
幅を射出成形機に予め設定し、予め決められた回数の成
形サイクル毎に前記時間の刻み幅で後加工開始タイミン
グを早めて前記予め決められた回数の成形作業および後
加工の連続運転を行わせて同一タイミング毎の樹脂反力
の平均値を求め、該平均値が設定量低下したときの後加
工開始タイミングを検出することによって後加工開始タ
イミングを求めるようにした請求項2記載の射出成形機
における後加工開始タイミング検出方法。4. The timing at which the resin is completely solidified is set in the injection molding machine as an initial value of the post-processing start timing, and the time step width for advancing the post-processing start timing is set in advance in the injection molding machine. For each predetermined number of molding cycles, the post-processing start timing is advanced by the step size of the time, and the predetermined number of molding operations and the post-processing continuous operation are performed to average the resin reaction force at the same timing. The post-processing start timing detecting method for an injection molding machine according to claim 2, wherein the post-processing start timing is calculated by obtaining a value and detecting the post-processing start timing when the average value decreases by a set amount.
る後加工開始タイミング検出方法。 工程1.樹脂が完全に固化するタイミングを後加工開始
タイミングの初期値として射出成形機に設定すると共に
後加工開始タイミングを早めるための時間の刻み幅を射
出成形機に設定する工程。 工程2.成形サイクル毎に設定された時間の刻み幅で後
加工開始タイミングを早めて成形作業および後加工の連
続運転を行わせ、後加工のための移動部材を駆動して該
移動部材に作用する樹脂反力を検出し、設定された樹脂
反力の低下が最初に検出される成形サイクルを求める工
程。 工程3.工程2で求められた成形サイクルの1サイクル
前の成形サイクルにおける後加工開始タイミングを新た
な初期値として再設定し、後加工開始タイミングを早め
るための時間の刻み幅をより短い時間に再設定する工
程。 工程4.工程2および工程3を設定回数繰り返し実行す
る工程。 工程5.工程4で検出された成形サイクルの後加工開始
タイミングによって後加工開始タイミングを求める工
程。5. A post-processing start timing detection method in an injection molding machine comprising the following steps. Step 1. The step of setting the timing at which the resin is completely solidified as the initial value of the post-processing start timing in the injection molding machine and setting the step size of the time for advancing the post-processing start timing in the injection molding machine. Step 2. The post-processing start timing is advanced by the time width set for each molding cycle to allow continuous operation of the molding work and the post-processing, and the moving member for the post-processing is driven to cause the resin reaction that acts on the moving member. The process of detecting the force and determining the molding cycle in which the set decrease of the resin reaction force is first detected. Step 3. The post-machining start timing in the molding cycle one cycle before the molding cycle obtained in step 2 is reset as a new initial value, and the time step size for advancing the post-machining start timing is reset to a shorter time. Process. Step 4. A step of repeatedly performing step 2 and step 3 a set number of times. Step 5. A step of obtaining the post-processing start timing based on the post-processing start timing of the molding cycle detected in step 4.
る後加工開始タイミング検出方法。 工程1.樹脂が完全に固化するタイミングを後加工開始
タイミングの初期値として射出成形機に設定すると共に
後加工開始タイミングを早めるための時間の刻み幅を射
出成形機に設定する工程。 工程2.所定回数の成形サイクル実行毎に設定刻み幅で
後加工開始タイミングを早めて成形作業および後加工の
連続運転を行わせ、各成形サイクル毎に後加工のための
移動部材を駆動して該移動部材に作用する樹脂反力を検
出して一時記憶し、前記所定回数の成形サイクルにおけ
る前記樹脂反力の平均値を求め、該平均値が設定量低下
したときの後加工開始タイミングを求める工程。 工程3.工程2で求められた後加工開始タイミングの直
前に適用されていた後加工開始タイミングを新たな初期
値として再設定し、後加工開始タイミングを早めるため
の時間の刻み幅をより短い時間に再設定する工程。 工程4.工程2および工程3を設定回数繰り返し実行す
る工程。 工程5.工程4で検出された後加工開始タイミングによ
って後加開始タイミングを求める工程。6. A post-processing start timing detection method in an injection molding machine comprising the following steps. Step 1. The step of setting the timing at which the resin is completely solidified as the initial value of the post-processing start timing in the injection molding machine and setting the step size of the time for advancing the post-processing start timing in the injection molding machine. Step 2. Each time the molding cycle is executed a predetermined number of times, the post-machining start timing is advanced by the set step width to perform the continuous molding operation and the post-machining operation, and the moving member for the post-machining is driven for each molding cycle. A step of detecting and temporarily storing a resin reaction force acting on the resin, obtaining an average value of the resin reaction force in the molding cycle of the predetermined number of times, and obtaining a post-processing start timing when the average value decreases by a set amount. Step 3. The post-machining start timing that was applied immediately before the post-machining start timing obtained in step 2 is reset as a new initial value, and the time step width for advancing the post-machining start timing is reset to a shorter time. The process of doing. Step 4. A step of repeatedly performing step 2 and step 3 a set number of times. Step 5. A step of obtaining a post-addition start timing based on the post-processing start timing detected in step 4.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15964494A JP3291129B2 (en) | 1994-06-20 | 1994-06-20 | Post-processing start timing detection method for injection molding machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15964494A JP3291129B2 (en) | 1994-06-20 | 1994-06-20 | Post-processing start timing detection method for injection molding machine |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH081732A true JPH081732A (en) | 1996-01-09 |
| JP3291129B2 JP3291129B2 (en) | 2002-06-10 |
Family
ID=15698222
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP15964494A Expired - Fee Related JP3291129B2 (en) | 1994-06-20 | 1994-06-20 | Post-processing start timing detection method for injection molding machine |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3291129B2 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2016129952A (en) * | 2015-01-13 | 2016-07-21 | ファナック株式会社 | Compression control device for injection molding machine |
| JP6956303B1 (en) * | 2020-06-08 | 2021-11-02 | ファナック株式会社 | Control device for injection molding machine and control method for injection molding machine |
| WO2021251249A1 (en) * | 2020-06-08 | 2021-12-16 | ファナック株式会社 | Control device for injection molding machine and control method for injection molding machine |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6830723B2 (en) | 2001-10-01 | 2004-12-14 | Alcan International Limited | Apparatus for treating molten metal having a sealed treatment zone |
-
1994
- 1994-06-20 JP JP15964494A patent/JP3291129B2/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2016129952A (en) * | 2015-01-13 | 2016-07-21 | ファナック株式会社 | Compression control device for injection molding machine |
| JP6956303B1 (en) * | 2020-06-08 | 2021-11-02 | ファナック株式会社 | Control device for injection molding machine and control method for injection molding machine |
| WO2021251249A1 (en) * | 2020-06-08 | 2021-12-16 | ファナック株式会社 | Control device for injection molding machine and control method for injection molding machine |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3291129B2 (en) | 2002-06-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3459631B2 (en) | Method and apparatus for measuring mold release force | |
| US4131596A (en) | Sensing system and method for plastic injection molding | |
| CN105936112B (en) | Pressure control device for injection molding machine | |
| JP5770317B2 (en) | Mold clamping force setting device and mold clamping force setting method for injection molding machine | |
| JP2002172670A (en) | Method of detecting foreign substance of injection molding machine | |
| US5251146A (en) | Injection compression molding method and an apparatus therefor | |
| JP3590163B2 (en) | Mold clamping control device of injection molding machine | |
| JP2545465B2 (en) | Method for automatically setting upper and lower limits of molding conditions of molding machine | |
| JP2694485B2 (en) | Nozzle touch method | |
| JP3291129B2 (en) | Post-processing start timing detection method for injection molding machine | |
| JPH0712612B2 (en) | Method for detecting mold clamping abnormality of toggle type mold clamping device | |
| JP2002248665A (en) | Method and device for controlling injection molding machine | |
| US20050181088A1 (en) | Load determining device for an electrically-operated injection molding machine | |
| US5063008A (en) | Method for precision volumetric control of a moldable material in an injection molding process | |
| JP3035524B2 (en) | Control device for injection molding machine | |
| CN101850596B (en) | Auxiliary engine operation control device and auxiliary engine operation control method | |
| EP0362395B1 (en) | Method and apparatus for injection compression molding | |
| JPH06226787A (en) | Nozzle touch method | |
| US20160200021A1 (en) | Compression controller of injection molding machine | |
| JPH07106588B2 (en) | Holding pressure / measurement control method of injection molding machine | |
| JP2923710B2 (en) | Mold protection device and automatic setting method thereof | |
| JP2678700B2 (en) | Method of measuring mold thickness of injection molding machine | |
| JP2604272B2 (en) | Sprue extension device | |
| JPH0716896A (en) | Method of controlling mold opening of injection molding machine | |
| JPH05177674A (en) | Method for distributing molded product and sprue runner in injection molding machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20020305 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |