JPH08200095A - Combined cycle power plant load control system - Google Patents
Combined cycle power plant load control systemInfo
- Publication number
- JPH08200095A JPH08200095A JP7013499A JP1349995A JPH08200095A JP H08200095 A JPH08200095 A JP H08200095A JP 7013499 A JP7013499 A JP 7013499A JP 1349995 A JP1349995 A JP 1349995A JP H08200095 A JPH08200095 A JP H08200095A
- Authority
- JP
- Japan
- Prior art keywords
- load
- unit
- control system
- stop
- combined cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/16—Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
Landscapes
- Feedback Control In General (AREA)
Abstract
(57)【要約】
【構成】複合サイクル発電プラント負荷制御システム1
000は、必要ユニット決定手段100,ユニット目標
負荷算出手段200,運転中ユニット瞬時目標負荷指令
手段300,最適タイミング算出手段400,起動停止
タイミング修正手段700からなる。
【効果】複合サイクル発電プラントの経済運用を可能に
し、また、プラントから排出されるCO2 やNOxが低
減されるため、環境適合性が高い発電プラントを提供で
きる。
(57) [Summary] [Structure] Combined cycle power plant load control system 1
000 includes required unit determining means 100, unit target load calculating means 200, operating unit instantaneous target load commanding means 300, optimum timing calculating means 400, and start / stop timing correcting means 700. [Effect] Since the combined cycle power plant can be economically operated and CO 2 and NOx emitted from the plant are reduced, a power plant with high environmental compatibility can be provided.
Description
【0001】[0001]
【産業上の利用分野】本発明は、複合サイクル発電プラ
ントの負荷制御システムに係り、特に、複数ユニットか
らなるプラントを、運転ユニット数を変更しながら負荷
変化させるとき、起動停止損失を最小ならしめるための
負荷制御システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a load control system for a combined cycle power generation plant, and more particularly, it minimizes start-stop loss when a load consisting of a plurality of units is changed while changing the number of operating units. Load control system for.
【0002】[0002]
【従来の技術】ガスタービンと,その排ガスエネルギを
回収し蒸気を発生させる排熱回収ボイラと,発生した蒸
気により駆動される蒸気タービンと,ガスタービンと蒸
気タービンにより駆動される発電機とで構成される発電
機器を1ユニットとし、複数ユニットで構成された複合
サイクル発電プラントを外部、例えば中央給電指令所か
らの負荷指令に対応して負荷制御する場合、プラント総
合出力が負荷指令値を満足するために必要な運転ユニッ
ト数となるように幾つかのユニットを起動停止させるこ
とが必要となる。また、ユニットの熱効率特性はユニッ
ト負荷率が高いほど高くなるのが一般的であるため、あ
らゆる負荷帯でプラント総合熱効率を高く維持するため
に、必要最小限のユニット数で運転されることが望まれ
る。そのため、中央給電指令所から負荷変化の予告(こ
れを以下、予告負荷指令値と呼ぶ)があると、予め準備
されたユニット起動停止スケジュールに応じて特定のユ
ニットが起動停止され、その他のユニットは均等負荷制
御される。この場合、ユニットの追加起動が必要となる
負荷上昇時には、追加ユニット負荷が運転中ユニット負
荷と一致した時点で全ユニット均等負荷制御され、ユニ
ットの停止が伴う負荷降下時は、停止ユニット以外は均
等負荷制御がなされる。ここで、ユニット起動停止スケ
ジュールが実行されるとき、従来方式では、プラント負
荷指令値が実際に変化するタイミングに、起動停止スケ
ジュールにおける基準点(以下、基準時刻と呼ぶ)を合
わせるようにユニットが起動停止されていた。基準時刻
とは、起動時にはガスタービン昇速開始時点あるいはガ
スタービン負荷併入時点あるいはガスタービン負荷上昇
開始時点とするのが一般的であり、停止時にはガスター
ビン負荷降下開始時点あるいはガスタービン解列時点と
するのが一般的である。従来方式では、この基準時刻を
固定して、あらゆる負荷変化に対応していた。即ち、運
転中ユニット数や負荷変化幅,起動停止ユニット数に係
らず、常に同じタイミングで起動停止スケジュールを実
行していた。2. Description of the Related Art A gas turbine, an exhaust heat recovery boiler for recovering the exhaust gas energy and generating steam, a steam turbine driven by the generated steam, and a generator driven by the gas turbine and the steam turbine When the combined cycle power plant composed of a plurality of units is used as the external power generator, and the load is controlled in response to the load command from the outside, for example, the central power supply command station, the plant total output satisfies the load command value. Therefore, it is necessary to start and stop some units so that the required number of operating units is reached. In addition, the thermal efficiency characteristics of the unit generally increase as the unit load factor increases, so it is desirable to operate with the minimum number of units required to maintain high overall plant thermal efficiency in all load zones. Be done. Therefore, when there is a notice of load change (hereinafter referred to as a notice load command value) from the central power supply command center, a specific unit is started and stopped according to a unit start / stop schedule prepared in advance, and other units are Equal load control. In this case, when the load increases that requires additional startup of the units, load equalization is controlled for all units when the load of the additional unit matches the operating unit load. Load control is performed. Here, when the unit start / stop schedule is executed, in the conventional method, the unit is started so that the reference point (hereinafter referred to as the reference time) in the start / stop schedule is aligned with the timing when the plant load command value actually changes. It had been stopped. The reference time is generally the start time of gas turbine acceleration, the time of gas turbine load admission or the time of gas turbine load increase at start-up, and the time of stop when gas turbine load starts to fall or gas turbine breaks. Is generally used. In the conventional method, this reference time is fixed and any load change is dealt with. That is, the start / stop schedule is always executed at the same timing regardless of the number of operating units, the load change width, and the number of start / stop units.
【0003】[0003]
【発明が解決しようとする課題】しかし、起動停止スケ
ジュールにおける基準時刻は、ユニット起動停止に伴う
エネルギ損失(以下、起動停止損失と呼ぶ)に着目した
場合、必ずしも常に最適な起動停止タイミングを与える
とは限らない。即ち、負荷上昇時にユニットを追加起動
する場合、起動タイミングが早過ぎると、ユニット当た
りの負荷は低くなり、即ち、効率が低い運転状態が続く
ため起動損失が大きくなり、逆に、起動タイミングが遅
過ぎても、追加ユニットの起動完了が遅れるため起動損
失が大きくなるというプラント特性を有し、この特性は
運転中ユニット数や負荷変化幅,起動ユニット数によっ
て異なるためである。負荷降下時につても同様であり、
停止タイミングが早過ぎると停止の開始から完了までの
時間がかかり、遅過ぎてもユニット当たりの低負荷運転
が長引くことにより停止損失が大きくなる。従って、基
準時刻を固定して、常に同じタイミングで起動停止スケ
ジュールを実行することにより、あらゆる負荷変化に対
応していた従来方式では、負荷変動に伴う起動停止損失
が大きくなるという問題をかかえていた。However, if the reference time in the start-stop schedule is focused on the energy loss associated with unit start-stop (hereinafter referred to as start-stop loss), the optimum start-stop timing is always given. Not necessarily. That is, when the unit is additionally started when the load rises, if the start timing is too early, the load per unit will be low, that is, the start loss will be large because the operating state with low efficiency continues, and conversely the start timing will be delayed. Even if it passes, the plant has the characteristic that the start-up loss increases because the start-up of the additional unit is delayed, and this characteristic varies depending on the number of operating units, the load change width, and the number of starting units. The same applies when the load drops,
If the stop timing is too early, it takes time from the start to the end of the stop, and even if it is too late, the low load operation per unit is prolonged and the stop loss becomes large. Therefore, the conventional method, which fixed the reference time and always executed the start / stop schedule at the same timing to cope with any load change, had a problem that the start / stop loss due to the load change became large. .
【0004】本発明の目的は、運転中ユニット数や負荷
変化幅,起動停止ユニット数に係らず、いかなる負荷変
化においても起動停止損失を最小にするユニット起動停
止タイミングの決定手段を有する負荷制御システムを提
供することにある。また、これにより、プラントから排
出されるCO2 やNOxを低減し、環境適合性の高い制
御システムを提供することにある。An object of the present invention is to provide a load control system having a unit start / stop timing determining means that minimizes start / stop loss under any load change regardless of the number of units in operation, the load change width, and the number of start / stop units. To provide. Further, it is intended to reduce the CO 2 and NOx emitted from the plant, thereby providing a highly environmentally friendly control system.
【0005】[0005]
【課題を解決するための手段】本発明の複合サイクル発
電プラント負荷制御システムは、上記問題を達成するた
めに、必要ユニット決定手段,ユニット目標負荷算出手
段,運転中ユニット瞬時目標負荷指令手段,最適タイミ
ング算出手段,起動停止タイミング修正手段を設けた。The combined cycle power plant load control system of the present invention is, in order to achieve the above-mentioned problems, required unit determining means, unit target load calculating means, operating unit instantaneous target load commanding means, and optimum unit. A timing calculation means and a start / stop timing correction means are provided.
【0006】[0006]
【作用】上記必要ユニット数決定手段では中央給電指令
所から与えられる予告プラント負荷指令値に基づいて運
転が必要となるユニット数を決定し、ユニット目標負荷
算出手段ではユニット当たりの最終目標負荷を算出し、
運転中ユニット瞬時目標負荷指令手段ではユニット当た
りの瞬時目標負荷を算出し、最適タイミング算出手段で
は予め作成されたユニット起動停止スケジュールを実行
するための起動停止タイミングを運転中ユニット初期負
荷,ユニット負荷変化幅,予め規定されたユニット負荷
変化率の関数として決定する。これにより、運転中ユニ
ット数や負荷変化幅,起動停止ユニット数に係わらず、
いかなる負荷変化においても起動停止損失を最小ならし
めるユニット起動停止タイミング決定することができ
る。The required unit number determining means determines the number of units that need to be operated based on the advance notice plant load command value given from the central power supply command station, and the unit target load calculating means calculates the final target load per unit. Then
The operating unit instantaneous target load command means calculates the instantaneous target load per unit, and the optimum timing calculation means sets the start / stop timing for executing the unit start / stop schedule created in advance to the operating unit initial load and unit load change. Width, determined as a function of a predefined unit load change rate. As a result, regardless of the number of operating units, load change range, and number of start / stop units,
The unit start / stop timing that minimizes the start / stop loss under any load change can be determined.
【0007】[0007]
【実施例】図1は、本発明の実施例である複合サイクル
発電プラント負荷制御システム1000の全体構成を示
すとともに、中央給電指令所2000からの負荷指令と
ユニット起動停止スケジュール作成手段3000と発電
プラント4000との関係を示すものである。まず、中
央給電指令所2000から、「時刻t0 においてプラン
ト目標負荷をL1 に変化せよ」という予告プラント負荷
指令(L1,t0)が本負荷制御システムに与えられる。
次に、必要ユニット数決定手段100では予告プラント
負荷指令値L1を満足するために運転が必要となるユニ
ット数NRを決定する。これを受けてユニット目標負荷
算出手段200ではユニット当たりの最終目標負荷L1U
を算出する。運転中ユニット瞬時目標負荷指令手段30
0では運転中ユニット負荷LRUNA,予め規定されたユニ
ット負荷変化率L′及びL1Uにより、ユニット当たりの
瞬時目標負荷指令LUNR を算出し、これを運転中ユニッ
トガスタービン負荷指令手段(以下、運転中ユニットG
T負荷指令手段と略す)500に与えるとともに、時刻
t0における運転中ユニット負荷LOU(=L
RUNA(t0))とユニット当たり負荷変化幅ΔLを算出
し、これらを最適タイミング算出手段400に与える。
最適タイミング算出手段400では、LOU,ΔL及び
L′の関数として最適タイミングΔTOPT を算出する。
このとき使用する関数の特性係数ai は、NRと運転中
ユニット数NRUNを用いた特性係数選択手段600から
与えられる。ユニット起動停止スケジュール作成手段3
000から与えられるガスタービンの速度及び負荷に関
する起動停止スケジュールであるNGTSRO 及びLGTSRO
は、起動停止タイミング修正手段700により時間的に
ΔTOPTだけシフトされ、NGTSR及びLGTSRとなり、こ
れが実際のユニット起動停止に採用される。即ち、N
GTSRが起動停止ユニット制御手段850に、LGTSRが起
動停止ユニットGT負荷指令手段800に与えられる。
起動停止ユニット制御手段850はNGTSRを受けて起動
停止ユニット4100のガスタービン速度を制御すると
ともに、起動停止ユニットGT負荷指令手段800から
のガスタービン負荷指令LGT2Rを受けて同じく起動停止
ユニット4200のガスタービン負荷を制御する。ま
た、運転中ユニット制御手段550は運転中ユニットG
T負荷指令手段500からのガスタービン負荷指令LGT1R
を受けて運転中ユニット4100のガスタービン負荷を
制御する。FIG. 1 shows the overall configuration of a combined cycle power plant load control system 1000 according to an embodiment of the present invention, a load command from a central power feed command station 2000, a unit start / stop schedule creating means 3000, and a power plant. It shows the relationship with 4000. First, the central power feeding command station 2000 gives a notice plant load command (L 1 , t 0 ) “Change the plant target load to L 1 at time t 0 ” to the load control system.
Next, the required unit number determination means 100 determines the number N R of units that must be operated in order to satisfy the notice plant load command value L 1 . In response to this, the unit target load calculation means 200 receives the final target load L 1U per unit.
To calculate. Instantaneous target load command means 30 for operating unit
At 0, the instantaneous target load command L UNR per unit is calculated from the operating unit load L RUNA , the unit load change rates L ′ and L 1U defined in advance, and this is calculated as the operating unit gas turbine load command means (hereinafter, Unit G in operation
T load command means 500) and the operating unit load L OU (= L) at time t 0 .
RUNA (t 0 )) and the load change width ΔL per unit are calculated, and these are given to the optimum timing calculation means 400.
The optimum timing calculation means 400 calculates the optimum timing ΔT OPT as a function of L OU , ΔL and L ′.
The characteristic coefficient a i of the function used at this time is given from the characteristic coefficient selecting means 600 using N R and the number of operating units N RUN . Unit start / stop schedule creation means 3
Start about speed and load of the gas turbine provided 000 a shutdown schedule N GTSRO and L GTSRO
Is shifted in time by ΔT OPT by the start / stop timing correction means 700 to become N GTSR and L GTSR , which are used for actual unit start / stop. That is, N
GTSR is given to the start / stop unit control means 850, and L GTSR is given to the start / stop unit GT load command means 800.
The start / stop unit control means 850 receives the N GTSR to control the gas turbine speed of the start / stop unit 4100, and also receives the gas turbine load command L GT2R from the start / stop unit GT load command means 800 to similarly start / stop the unit 4200. Control gas turbine load. In addition, the operating unit control means 550 controls the operating unit G
Gas turbine load command from the T load command means 500 L GT1R
In response to this, the gas turbine load of the operating unit 4100 is controlled.
【0008】本発明の負荷制御方式を具体的に説明する
前に、ここで起動停止タイミングと起動停止損失を定義
しておく。図2は、ユニットを追加起動する場合を例と
して、起動タイミングΔtと起動損失積算区間の定義を
示す。まず起動タイミングΔtは、プラント目標負荷が
変化開始時点t0 と追加ユニット起動スケジュールの基
準時刻であるガスタービン負荷併入時刻との時間差と定
義する。次に、起動損失は、負荷変化に伴う追加ユニッ
ト起動損失と運転中ユニット損失に関する積算値の和と
定義する。具体的には、追加ユニット起動損失を追加ユ
ニットのガスタービン昇速開始からプラント負荷変化完
了(プラント目標負荷変化量の97%到達をもって負荷
変化完了と定義する)までのエネルギ損失の積算値で定
義し、運転中ユニット損失を追加ユニットのガスタービ
ン負荷併入時点からプラント負荷変化完了(同上)まで
のエネルギ損失の積算値で定義する。ここで、エネルギ
損失とは、ガスタービン燃料として消費したエネルギか
ら電力として得られた有効エネルギを差し引いた量と定
義する。また、図には示さないが、停止タイミングと停
止損失は次のように定義する。まず、停止タイミングΔ
tは、プラント目標負荷が変化終了時点t0 と停止ユニ
ットの停止スケジュールの基準時刻であるガスタービン
解列時刻との時間差と定義する。停止損失は、負荷変化
に伴うユニット停止損失と継続運転ユニット損失に関す
る積算値の和と定義する。具体的には、停止ユニットの
停止損失をガスタービン降下開始からプラント負荷変化
完了(プラント目標負荷変化量の97%到達をもって負
荷変化完了と定義する)までのエネルギ損失の積算値で
定義し、継続運転ユニット損失を停止ユニットのガスタ
ービン負荷降下開始時点からプラント負荷変化完了(同
上)までのエネルギ損失の積算値で定義する。この場合
のエネルギ損失も負荷上昇の場合と同様に、ガスタービ
ン燃料として消費したエネルギから電力として得られた
有効エネルギを差し引いた量と定義する。Before specifically explaining the load control system of the present invention, start-stop timing and start-stop loss will be defined here. FIG. 2 shows the definition of the start timing Δt and the start loss integration section by taking the case of additionally starting the unit as an example. First, the start timing Δt is defined as the time difference between the start time t 0 of the change in the plant target load and the gas turbine load combined time, which is the reference time of the additional unit start schedule. Next, the start-up loss is defined as the sum of the additional unit start-up loss due to the load change and the integrated value regarding the operating unit loss. Specifically, the additional unit startup loss is defined as the integrated value of energy loss from the start of gas turbine acceleration of the additional unit to the completion of plant load change (defined as completion of load change when 97% of the target load change amount of the plant is reached). Then, the unit loss during operation is defined by the integrated value of energy loss from the point of time when the gas turbine load is added to the additional unit to the completion of plant load change (same as above). Here, energy loss is defined as an amount obtained by subtracting effective energy obtained as electric power from energy consumed as gas turbine fuel. Although not shown in the figure, the stop timing and stop loss are defined as follows. First, stop timing Δ
t is defined as a time difference between the time point t 0 at which the target plant load changes and the gas turbine disconnection time, which is the reference time of the stop schedule of the stop unit. Stop loss is defined as the sum of unit stop loss due to load change and integrated value for continuous operation unit loss. Specifically, the stop loss of the stop unit is defined by the integrated value of energy loss from the start of the gas turbine descent to the completion of the plant load change (defined as the load change completion when 97% of the target load change amount of the plant is reached), and continues. The operating unit loss is defined as the integrated value of energy loss from the start of gas turbine load drop of the stop unit to the completion of plant load change (same as above). The energy loss in this case is also defined as the amount obtained by subtracting the effective energy obtained as electric power from the energy consumed as gas turbine fuel, as in the case of load increase.
【0009】次に、本発明の負荷制御方式を具体的に説
明する。図3及び図4は制御システムの各手段における
具体的処理内容を示す。図3は、運転中ユニット瞬時目
標負荷指令信号を算出するための処理内容を示し、図4
は、運転中ユニット及び起動停止ユニットのGT負荷制
御指令信号を算出するための処理内容を示す。まず、図
3において、まず、中央給電指令所2000から予告プ
ラント負荷指令値L1が必要ユニット数決定手段100
に与えられると、予め定めた負荷Lと運転ユニット数N
の関係から、予告プラント負荷指令値L1 を満足するた
めに運転が必要となるユニット数NR を決定する。これ
を受けてユニット目標負荷算出手段200では、負荷変化
終了時のユニット当たりの最終目標負荷L1U(=L1/
NR)を予め算出する。運転中ユニット瞬時目標負荷指
令手段300では、ユニット当たりの瞬時目標負荷指令
LUNRを算出するために、負荷変化開始時刻t0における
運転中ユニット負荷L0Uとユニット当たり負荷変化幅Δ
Lを求め、予め規定されたユニット負荷変化率L′を用
いる。即ち、負荷変化開始時刻t0 における運転中ユニ
ット負荷L0Uは実績値である運転中ユニット負荷LRUNA
をフィードバックすることにより得られ、負荷変化幅Δ
Lは最終目標負荷L1UとL0Uの差で表される。また、こ
の負荷変化幅ΔLとユニット負荷変化率L′により負荷
変化期間ΔtL(=ΔL/L′)をもとめることによ
り、瞬時目標負荷指令LUNR を定義できる。運転中ユニ
ット瞬時目標負荷指令手段300は、瞬時目標負荷指令
LUNR を運転中ユニットGT負荷指令手段500に与え
るとともに、L0UとΔLを最適タイミング算出手段40
0に与える。最適タイミング算出手段400ではL0Uと
ΔL及びL′の関数として最適タイミングΔTOPT を算
出するが、この詳細につては後述する。Next, the load control method of the present invention will be specifically described. 3 and 4 show specific processing contents in each means of the control system. FIG. 3 shows the processing contents for calculating the instantaneous target load command signal of the operating unit, and FIG.
Shows the processing contents for calculating the GT load control command signals of the operating unit and the start / stop unit. First, in FIG. 3, first, the notice plant load command value L 1 from the central power supply command station 2000 is the required unit number determining means 100.
Given to a predetermined load L and the number of operating units N
From the above relationship, the number N R of units that need to be operated to satisfy the notice plant load command value L 1 is determined. In response to this, the unit target load calculating means 200 causes the final target load per unit L 1U (= L 1 /
N R) is calculated in advance. In the operating unit instantaneous target load command means 300, in order to calculate the instantaneous target load command L UNR per unit, the operating unit load L 0U and the load change width per unit Δ at the load change start time t 0 .
L is obtained, and the unit load change rate L'specified in advance is used. That is, the operating unit load L 0U at the load change start time t 0 is the actual value of the operating unit load L RUNA
Obtained by feeding back the load change width Δ
L is represented by the difference between the final target loads L 1U and L 0U . Further, the instantaneous target load command L UNR can be defined by obtaining the load change period Δt L (= ΔL / L ′) from the load change width ΔL and the unit load change rate L ′. The operating unit instantaneous target load command means 300 gives an instantaneous target load command L UNR to the operating unit GT load command means 500, and L 0U and ΔL are optimum timing calculation means 40.
Give to 0. The optimum timing calculation means 400 calculates the optimum timing ΔT OPT as a function of L 0U and ΔL and L ′, the details of which will be described later.
【0010】図4は運転中ユニットGT負荷制御指令手
段500と起動停止ユニットGT負荷制御手段800の
具体的処理内容を示す。前述のように、起動停止タイミ
ング修正手段700により時間的ΔTOPT だけシフトさ
れることにより得られた最適起動停止スケジュールN
GTSR及びLGTSRが、実際のユニット起動停止に採用され
る。運転中ユニットGT負荷制御指令手段500では、
まず、現在運転中のユニット数NRUNとそのユニット負
荷LRUNAから運転中ユニット総合負荷L1ATと、起動停
止されるユニット数NSTRTとそのユニット負荷LSTRTA
から起動停止ユニット総合負荷L2AT を求め、さらにL
1ATとL2ATからプラント総合負荷LPAを求める。次に、
ユニット当たり瞬時目標負荷指令LUNR と現在運転中の
ユニット数NRUN から運転中ユニットに対する総合瞬時
目標負荷指令LPRを求め、プラント総合負荷LPAとの負
荷偏差DLを求める。この負荷偏差DLをユニット当た
りの負荷偏差に換算するために、ユニット起動停止前の
前期負荷偏差算出手段510及びユニット起動停止後の
後期負荷偏差算出手段520により、それぞれ前期負荷
偏差DL1(=DL/NRUN)及び後期負荷偏差DL2(=D
L/(NRUN+NSTRT))が算出される。この2つの負荷偏
差は、後述の切り替え条件のもとで切り替えられながら
PI調節手段530への入力値DLX として採用され
る。また、PI調節手段530からの出力値LGT1Rは運
転中ユニットのガスタービン負荷指令値として運転中ユ
ニット制御手段550に与えられる。この負荷指令値に
従って運転中ユニットのガスタービンは均等負荷制御さ
れる。起動停止ユニットGT負荷制御手段800におい
ては、まず、起動停止スケジュールLGTSRに従ってユニ
ットの負荷上昇もしくは降下される。即ち、起動停止ユ
ニットに対する負荷指令値LGT2Rは、起動時にはLGTSR
を採用し、負荷上昇につれLGT1Rとの偏差|DLGT|
(=|LGT1R−LGTSR|)が所定値e以下となったときL
GT2R=LGT1Rとするとともに、DLX=DL2とすること
により全ユニット均等負荷運転に移行させる。負荷降下
時にはその逆で、停止させるユニットの負荷降下開始と
同時にLGT2R=LGTSR,DLX=DL1とし、運転継続ユ
ニットは均等負荷制御され、停止ユニットは停止スケジ
ュールLGTSRに従って運転継続ユニットとは独立に負荷
降下される。FIG. 4 shows specific processing contents of the operating unit GT load control command means 500 and the start / stop unit GT load control means 800. As described above, the optimum start / stop schedule N obtained by shifting the time ΔT OPT by the start / stop timing correction means 700.
GTSR and L GTSR are adopted for actual unit start / stop. In the operating unit GT load control command means 500,
First, from the number of units N RUN currently in operation and its unit load L RUNA to the unit total load L 1AT in operation, the number of units N STRT to be started and stopped and its unit load L STRTA
Calculate the start / stop unit total load L 2AT from
Calculate the total plant load L PA from 1AT and L 2AT . next,
From the instantaneous target load command L UNR per unit and the number of units N RUN currently in operation, the total instantaneous target load command L PR for the operating units is obtained, and the load deviation DL from the plant total load L PA is obtained. In order to convert the load deviation DL into a load deviation per unit, the first period load deviation calculating means 510 before unit start / stop and the second period load deviation calculating means 520 after unit start / stop are respectively used as the first period load deviation DL 1 (= DL). / N RUN ) and late load deviation DL 2 (= D
L / (N RUN + N STRT )) is calculated. These two load deviations are adopted as the input value DL X to the PI adjusting means 530 while being switched under the switching condition described later. Further, the output value L GT1R from the PI adjusting means 530 is given to the operating unit control means 550 as a gas turbine load command value of the operating unit. According to this load command value, the gas turbine of the operating unit is load-controlled uniformly. In the start / stop unit GT load control means 800, first, the load on the unit is increased or decreased according to the start / stop schedule L GTSR . That is, the load command value L GT2R for the start / stop unit is L GTSR at the start.
Deviation from the L GT1R as load increases | DL GT |
When (= | L GT1R −L GTSR |) is less than or equal to the specified value e, L
Set GT2R = L GT1R and DL X = DL 2 to shift to equal load operation for all units. At the time of load drop, on the contrary, L GT2R = L GTSR , DL X = DL 1 are set at the same time as the load start of the unit to be stopped, the operation continuation unit is controlled by the equal load, and the stop unit becomes the operation continuation unit according to the stop schedule L GTSR. Are independently loaded.
【0011】次に、プラントの起動停止損失及び最適タ
イミング算出手段400について詳細を説明する。図5
は、ユニットを追加起動する場合を例に、プラントの起
動損失特性を説明するとともに最適タイミングの算出例
を示すものである。同図(a)は起動タイミングΔtと起
動損失QLTとの関係を一般的に示すものである。本特性
では最適タイミングはΔtOPTであり、このとき最小起
動損失QLTMINとなる。従って、起動タイミングが早過
ぎると(例えばΔt=Δt1)ユニット当たりの負荷が低
くなり、効率が低い運転状態が続くため起動損失が大き
くなる。逆に、起動タイミングが遅過ぎても(例えばΔ
t=0)追加ユニットの起動が遅れるため起動損失が大
きくなる。同図(b)は、最適タイミングの具体的算出例
を示すもので、ユニット当たりの初期負荷L0Uが85%
/uで3ユニット運転中1ユニットを追加起動する場合
について、ユニット負荷変化率L′(%/min/u)をパ
ラメータとしたときユニット負荷変化幅ΔL(%/u)と
最適タイミングΔtOPT(min)の関係を示す。本図は、ユ
ニット負荷変化幅ΔLが大きいほど、あるいはユニット
負荷変化率L′が大きいほど最適タイミングΔtOPT は
大きいことを示している。そこで、最適タイミング算出
手段400の本発明の実施例では、最適タイミング特性
を次式、即ち、最適タイミングΔtOPTを初期負荷
L0U ,ユニット負荷変化幅ΔL,ユニット負荷変化率
L′を変数とする2次式で近似した。Next, the plant start / stop loss and optimum timing calculation means 400 will be described in detail. Figure 5
FIG. 3 illustrates the starting loss characteristics of the plant and shows an example of calculating the optimum timing, taking the case of additionally starting the unit as an example. FIG. 11A generally shows the relationship between the start timing Δt and the start loss Q LT . In this characteristic, the optimum timing is Δt OPT, which is the minimum starting loss Q LTMIN . Therefore, if the start timing is too early (for example, Δt = Δt 1 ), the load per unit becomes low, and the operating loss remains low, resulting in a large start loss. Conversely, if the startup timing is too late (for example, Δ
(t = 0) The start-up loss increases because the start-up of the additional unit is delayed. The figure (b) shows a concrete example of calculation of the optimum timing, and the initial load L 0U per unit is 85%.
In the case of additionally starting 1 unit while operating 3 units with / u, when unit load change rate L '(% / min / u) is used as a parameter, unit load change width ΔL (% / u) and optimum timing Δt OPT ( min) relationship is shown. This figure shows that the larger the unit load change width ΔL or the larger the unit load change rate L ′, the larger the optimum timing Δt OPT . Therefore, in the embodiment of the optimum timing calculating means 400 of the present invention, the optimum timing characteristic is expressed by the following equation, that is, the optimum timing Δt OPT is the initial load L 0U , the unit load change width ΔL, and the unit load change rate L ′ are variables. It was approximated by a quadratic equation.
【0012】[0012]
【数1】 ΔtOPT=a1(L0U)2+a2L0U+a3(ΔL)2+a4ΔL+a5(L′)2 +a6L′+a7 …(数1) 尚、数1の係数ai(i=1〜7)は、運転中ユニット数
NRUNと必要ユニット数NR に応じて準備されており、
特性係数選択手段600により適宜選択され、最適タイ
ミング算出手段400に渡される。これにより、最適タ
イミングΔtOPTがL0U、ΔL及びL′の関数として一
義的に決定することができる。## EQU1 ## Δt OPT = a 1 (L 0U ) 2 + a 2 L 0U + a 3 (ΔL) 2 + a 4 ΔL + a 5 (L ′) 2 + A 6 L ′ + a 7 (Equation 1) The coefficient a i (i = 1 to 7) of Equation 1 is prepared according to the operating unit number N RUN and the required unit number N R ,
It is appropriately selected by the characteristic coefficient selection means 600 and passed to the optimum timing calculation means 400. This allows the optimum timing Δt OPT to be uniquely determined as a function of L 0U , ΔL and L ′.
【0013】以上、本発明の実施例について詳細に説明
してきたが、本発明を実施するに当たり必ずしもこの通
りに再現する必要はなく、以下に述べる種々の変形もし
くは代案も有効であり、また応用面においても本発明は
本質を変えることなく適用できる。Although the embodiments of the present invention have been described above in detail, it is not always necessary to reproduce the present invention in carrying out the present invention, and various modifications and alternatives described below are effective and applied. Also in this, the present invention can be applied without changing the essence.
【0014】まず、ユニット起動停止スケジュールの基
準時刻については、実施例ではガスタービン負荷併入時
刻としたが、基準時刻とは起動スケジュールを実行する
ための便宜的なものであり、ガスタービンの昇速開始時
刻や負荷上昇開始時刻であっても本発明の本質は変わら
ない。また、ユニット停止の場合は、ガスタービン解列
時刻としたが、ガスタービン負荷降下開始時刻であって
も本発明の本質は変わらない。First, the reference time of the unit start / stop schedule is the gas turbine load adjoining time in the embodiment, but the reference time is a convenience for executing the start schedule, and the reference time of the gas turbine rises. The essence of the present invention does not change even at the quick start time or the load increase start time. Further, when the unit is stopped, the gas turbine disconnection time is set, but the essence of the present invention does not change even at the gas turbine load drop start time.
【0015】実施例における最適タイミング算出手段で
用いる関数は、運転ユニット数に応じて予め特性係数選
択手段から選択された特性係数を用いることを前提とし
たが、運転ユニット数も変数と見做した関数を準備し、
最適タイミングを算出する方式としても本発明の本質を
変えるものではない。The function used by the optimum timing calculating means in the embodiment is premised on using the characteristic coefficient selected in advance from the characteristic coefficient selecting means according to the number of operating units, but the number of operating units is also regarded as a variable. Prepare the function,
The method of calculating the optimum timing does not change the essence of the present invention.
【0016】実施例における最適タイミング算出手段で
は、ユニット初期負荷,ユニット負荷変化幅,ユニット
負荷変化率の関数として一義的に最適タイミングを算出
する方法としたが、起動停止損失をユニット初期負荷,
ユニット負荷変化幅,ユニット負荷変化率及び起動停止
タイミングの関数として表された特性式を用いて、起動
停止損失を最小とする起動停止タイミングを最適値探索
により決定する方法としても本発明の目的を達成するこ
とができる。また、ユニット負荷変化率も可調整パラメ
ータとしたとき、この関数を用いて、ユニット負荷変化
率及び起動停止タイミングの両者の最適組合せを最適値
探索により決定する方法としても本発明の起動停止損失
を最小化するという目的を達成することができる。さら
に、ユニット負荷変化率だけが可調整パラメータである
場合でも、この関数を用いて、ユニット負荷変化率を最
適値探索により決定することにより、本発明の起動停止
損失を最小化するという目的を達成することができる。In the optimum timing calculating means in the embodiment, the optimum timing is uniquely calculated as a function of the unit initial load, the unit load change width, and the unit load change rate.
An object of the present invention is also a method of determining a start / stop timing that minimizes a start / stop loss by using an optimum value search using a characteristic expression expressed as a function of a unit load change width, a unit load change rate and a start / stop timing. Can be achieved. Further, when the unit load change rate is also an adjustable parameter, this function is used to determine the optimum combination of both the unit load change rate and the start / stop timing by the optimum value search. The objective of minimization can be achieved. Furthermore, even when only the unit load change rate is an adjustable parameter, the function of this invention is used to determine the unit load change rate by the optimum value search, thereby achieving the object of minimizing the start-stop loss of the present invention. can do.
【0017】[0017]
【発明の効果】本発明の効果は、複合サイクル発電プラ
ントの負荷制御システムにおいて、運転中ユニット数や
負荷変化幅,起動停止ユニット数に係らず、いかなる負
荷変化でもユニット起動停止に伴うプラント全系の起動
停止損失を最小ならしめるユニット起動停止タイミング
を決定することを可能とすることにより、複合サイクル
発電プラントの経済運用を可能にし、また、これによ
り、プラントから排出されるCO2 やNOxが低減され
るため、環境適合性が高い発電プラントを提供できる。The effect of the present invention is that, in a load control system for a combined cycle power plant, the entire system of the plant accompanying unit start / stop regardless of any load change, regardless of the number of operating units, the load change width, and the number of start / stop units. By enabling to determine the unit start / stop timing that minimizes the start / stop loss, it is possible to economically operate the combined cycle power plant, and this also reduces CO 2 and NOx emitted from the plant. Therefore, a power plant with high environmental compatibility can be provided.
【図1】複合サイクル発電プラント負荷制御システムの
ブロック図。FIG. 1 is a block diagram of a combined cycle power plant load control system.
【図2】ユニット起動タイミングと起動損失積算区間を
定義する説明図。FIG. 2 is an explanatory diagram that defines a unit start timing and a start loss integration section.
【図3】運転中ユニット瞬時目標負荷指令信号を算出す
るための処理内容を示す説明図。FIG. 3 is an explanatory diagram showing the processing contents for calculating an operating unit instantaneous target load command signal.
【図4】運転中ユニット及び起動停止ユニットのGT負
荷制御指令信号を算出するための処理内容を示す説明
図。FIG. 4 is an explanatory diagram showing the processing contents for calculating GT load control command signals for the operating unit and the start / stop unit.
【図5】起動損失特性及び最適タイミング算出例を示す
説明図。FIG. 5 is an explanatory diagram showing a starting loss characteristic and an example of calculating an optimum timing.
100…必要ユニット数算出手段、200…ユニット目
標負荷算出手段、300…運転中ユニット瞬時目標負荷指
令手段、400…最適タイミング算出手段、500…運
転中ユニットガスタービン負荷指令手段。100 ... Necessary unit number calculation means, 200 ... Unit target load calculation means, 300 ... Operating unit instantaneous target load command means, 400 ... Optimal timing calculation means, 500 ... Operating unit gas turbine load command means.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 秋山 孝生 茨城県日立市幸町三丁目1番1号 株式会 社日立製作所日立工場内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Takao Akiyama 3-1-1 1-1 Saiwaicho, Hitachi-shi, Ibaraki Hitachi Ltd. Hitachi factory
Claims (10)
スエネルギを回収するための排熱回収ボイラと,前記排
熱回収ボイラで発生した蒸気により駆動される蒸気ター
ビンと,前記ガスタービンと前記蒸気タービンにより駆
動される発電機とで構成される発電機器を1ユニットと
し、前記発電機器の複数ユニットより構成された複合サ
イクル発電プラントの制御システムであって、前記複合
サイクル発電プラントの総合出力がプラント負荷指令値
に一致するように各ユニットの起動停止と出力制御を行
う負荷制御システムにおいて、 負荷上昇時もしくは負荷降下時には、予め作成されたユ
ニット起動停止スケジュールを実行するための起動停止
タイミングを、負荷変化前の初期負荷と,前記初期負荷
から最終負荷までの負荷変化幅と、その間の負荷変化率
の関数として決定するための最適タイミング算出手段に
より決定することを特徴とする複合サイクル発電プラン
ト負荷制御システム。1. A gas turbine, an exhaust heat recovery boiler for recovering exhaust gas energy of the gas turbine, a steam turbine driven by steam generated in the exhaust heat recovery boiler, the gas turbine and the steam turbine. A control system for a combined cycle power plant comprising a plurality of units of the power generation equipment, wherein the combined output of the combined cycle power generation plant is a plant load. In a load control system that performs start / stop and output control of each unit so that it matches the command value, when the load rises or falls, the start / stop timing for executing the unit start / stop schedule created in advance changes the load. Previous initial load, load change width from the initial load to the final load, and in between The load control system for a combined cycle power plant, characterized in that it is determined by an optimum timing calculating means for determining as a function of the load change rate.
スエネルギを回収するための排熱回収ボイラと,前記排
熱回収ボイラで発生した蒸気により駆動される蒸気ター
ビンと,前記ガスタービンと前記蒸気タービンにより駆
動される発電機とで構成される発電機器を1ユニットと
し、前記発電機器の複数ユニットより構成された複合サ
イクル発電プラントの制御システムであって、前記複合
サイクル発電プラントの総合出力がプラント負荷指令値
に一致するように各ユニットの起動停止と出力制御を行
う負荷制御システムにおいて、 前記負荷制御システムに与えられる予告プラント負荷指
令値に基づいて、運転が必要となるユニット数を決定す
る必要ユニット数決定手段と,ユニット当たりの最終目
標負荷を算出するユニット目標負荷算出手段と,運転中
ユニットのユニット初期負荷とユニット負荷変化幅を算
出するとともにユニット瞬時目標負荷を算出する運転中
ユニット瞬時目標負荷指令手段と,予め作成されたユニ
ット起動停止スケジュールを実行するための起動停止タ
イミングを、前記運転中ユニット初期負荷と,前記ユニ
ット負荷変化幅と,予め規定されたユニット負荷変化率
の関数として決定するための最適タイミング算出手段に
より決定することを特徴とする複合サイクル発電プラン
ト負荷制御システム。2. A gas turbine, an exhaust heat recovery boiler for recovering exhaust gas energy of the gas turbine, a steam turbine driven by steam generated in the exhaust heat recovery boiler, the gas turbine and the steam turbine. A control system for a combined cycle power plant comprising a plurality of units of the power generation equipment, wherein the combined output of the combined cycle power generation plant is a plant load. In a load control system that performs start / stop and output control of each unit so as to match the command value, a necessary unit that determines the number of units that need to be operated based on the notice plant load command value given to the load control system Number determining means and unit target load calculator for calculating the final target load per unit Stage, operating unit instantaneous target load command means for calculating the unit initial load and unit load change width of the operating unit, and the unit instantaneous target load, and starting for executing the unit start / stop schedule created in advance A combined cycle power plant, characterized in that the stop timing is determined by an optimum timing calculation means for determining the initial load of the operating unit, the unit load change width, and a unit load change rate defined in advance. Load control system.
タイミングを、前記ユニット起動停止スケジュールの基
準時刻に対するプラント負荷変化開始時刻との時間差で
定義する複合サイクル発電プラント負荷制御システム。3. The combined cycle power plant load control system according to claim 1, wherein the start / stop timing is defined as a time difference between a reference time of the unit start / stop schedule and a plant load change start time.
ケジュールの前記基準時刻を、起動時には前記ユニット
のガスタービン昇速開始時刻,ガスタービン負荷併入時
刻,ガスタービン負荷上昇開始時刻のいずれかで定義
し、停止時にはガスタービン負荷降下開始時刻もしくは
ガスタービン解列時刻で定義する複合サイクル発電プラ
ント負荷制御システム。4. The unit reference time of the unit start / stop schedule according to claim 3 is any one of a gas turbine acceleration start time, a gas turbine load combined time, and a gas turbine load increase start time of the unit at start-up. The load control system for a combined cycle power plant defined by the gas turbine load drop start time or the gas turbine disconnection time when it is stopped.
ミング算出手段で用いる前記関数は、運転中ユニット初
期負荷と,前記ユニット負荷変化幅と,前記ユニット負
荷変化率を入力パラメータとして前記発電プラントの起
動停止損失を最小ならしめる最適タイミングを出力する
よう作成された複合サイクル発電プラント負荷制御シス
テム。5. The function according to claim 1 or 2, wherein the function used by the optimum timing calculation means is an operating unit initial load, the unit load change width, and the unit load change rate as input parameters of the power plant. A combined cycle power plant load control system created to output optimum timing that minimizes start-stop loss.
ミング算出手段で用いる前記関数は、運転中ユニット初
期負荷と,前記ユニット負荷変化幅と,前記ユニット負
荷変化率と,運転中ユニット数と,追加もしくは停止ユ
ニット数を入力パラメータとして前記発電プラントの起
動停止損失を最小ならしめる最適タイミングを出力する
よう作成された複合サイクル発電プラント負荷制御シス
テム。6. The function according to claim 1 or 2, wherein the function used in the optimum timing calculating means is an initial load of a unit under operation, a width of change of the unit load, a rate of change of the unit load, the number of units under operation, A combined cycle power plant load control system created to output the optimum timing for minimizing the start / stop loss of the power plant by using the number of additional or stopped units as an input parameter.
スエネルギを回収するための排熱回収ボイラと,前記排
熱回収ボイラで発生した蒸気により駆動される蒸気ター
ビンと,前記ガスタービンと前記蒸気タービンにより駆
動される発電機とで構成される発電機器を1ユニットと
し、前記発電機器の複数ユニットより構成された複合サ
イクル発電プラントの制御システムであって、前記複合
サイクル発電プラントの総合出力がプラント負荷指令値
に一致するように各ユニットの起動停止と出力制御を行
う負荷制御システムにおいて、 前記負荷制御システムに与えられる予告プラント負荷指
令値に基づいて、運転が必要となるユニット数を決定す
る必要ユニット数決定手段と,ユニット当たりの最終目
標負荷を算出するユニット目標負荷算出手段と,運転中
ユニットのユニット初期負荷とユニット負荷変化幅を算
出するとともにユニット瞬時目標負荷を算出する運転中
ユニット瞬時目標負荷指令手段と,予め作成されたユニ
ット起動停止スケジュールを実行するための起動停止タ
イミングを、前記運転中ユニット初期負荷と,前記ユニ
ット負荷変化幅と,予め規定されたユニット負荷変化率
を入力し、前記複合サイクル発電プラントの起動停止損
失を最小ならしめるよう最適値探索機能を有する最適タ
イミング算出手段により決定することを特徴とする複合
サイクル発電プラント負荷制御システム。7. A gas turbine, an exhaust heat recovery boiler for recovering exhaust gas energy of the gas turbine, a steam turbine driven by steam generated in the exhaust heat recovery boiler, the gas turbine and the steam turbine. A control system for a combined cycle power plant comprising a plurality of units of the power generation equipment, wherein the combined output of the combined cycle power generation plant is a plant load. In a load control system that performs start / stop and output control of each unit so as to match the command value, a necessary unit that determines the number of units that need to be operated based on the notice plant load command value given to the load control system Number determining means and unit target load calculator for calculating the final target load per unit Stage, operating unit instantaneous target load command means for calculating the unit initial load and unit load change width of the operating unit, and the unit instantaneous target load, and starting for executing the unit start / stop schedule created in advance For the stop timing, the operating unit initial load, the unit load change width, and a unit load change rate specified in advance are input, and an optimum value search function is provided so as to minimize the start-stop loss of the combined cycle power plant. A combined cycle power plant load control system characterized by being determined by an optimum timing calculation means included therein.
スエネルギを回収するための排熱回収ボイラと,前記排
熱回収ボイラで発生した蒸気により駆動される蒸気ター
ビンと,前記ガスタービンと前記蒸気タービンにより駆
動される発電機とで構成される発電機器を1ユニットと
し、前記発電機器の複数ユニットより構成された複合サ
イクル発電プラントの制御システムであって、前記複合
サイクル発電プラントの総合出力がプラント負荷指令値
に一致するように各ユニットの起動停止と出力制御を行
う負荷制御システムにおいて、 前記負荷制御システムに与えられる予告プラント負荷指
令値に基づいて、運転が必要となるユニット数を決定す
る必要ユニット数決定手段と,ユニット当たりの最終目
標負荷を算出するユニット目標負荷算出手段と,運転中
ユニットのユニット初期負荷とユニット負荷変化幅を算
出するとともにユニット瞬時目標負荷を算出する運転中
ユニット瞬時目標負荷指令手段と,予め作成されたユニ
ット起動停止スケジュールを実行するための起動停止タ
イミング及びユニット負荷変化率を、前記運転中ユニッ
ト初期負荷と,前記ユニット負荷変化幅を入力し、前記
複合サイクル発電プラントの起動停止損失を最小ならし
めるよう最適値探索機能を有する最適タイミング算出手
段により決定することを特徴とする複合サイクル発電プ
ラント負荷制御システム。8. A gas turbine, an exhaust heat recovery boiler for recovering exhaust gas energy of the gas turbine, a steam turbine driven by steam generated in the exhaust heat recovery boiler, the gas turbine and the steam turbine. A control system for a combined cycle power plant comprising a plurality of units of the power generation equipment, wherein the combined output of the combined cycle power generation plant is a plant load. In a load control system that performs start / stop and output control of each unit so as to match the command value, a necessary unit that determines the number of units that need to be operated based on the notice plant load command value given to the load control system Number determining means and unit target load calculator for calculating the final target load per unit Stage, operating unit instantaneous target load command means for calculating the unit initial load and unit load change width of the operating unit, and the unit instantaneous target load, and starting for executing the unit start / stop schedule created in advance Optimum timing calculation means having an optimum value search function for inputting stop timing and unit load change rate, the operating unit initial load and the unit load change width, and minimizing the start-stop loss of the combined cycle power plant A combined cycle power plant load control system characterized by being determined by.
スエネルギを回収するための排熱回収ボイラと,前記排
熱回収ボイラで発生した蒸気により駆動される蒸気ター
ビンと,前記ガスタービンと前記蒸気タービンにより駆
動される発電機とで構成される発電機器を1ユニットと
し、前記発電機器の複数ユニットより構成された複合サ
イクル発電プラントの制御システムであって、前記複合
サイクル発電プラントの総合出力がプラント負荷指令値
に一致するように各ユニットの起動停止と出力制御を行
う負荷制御システムにおいて、 前記負荷制御システムに与えられる予告プラント負荷指
令値に基づいて、運転が必要となるユニット数を決定す
る必要ユニット数決定手段と,ユニット当たりの最終目
標負荷を算出するユニット目標負荷算出手段と,運転中
ユニットのユニット初期負荷とユニット負荷変化幅を算
出するとともにユニット瞬時目標負荷を算出する運転中
ユニット瞬時目標負荷指令手段と,予め作成されたユニ
ット起動停止スケジュールを実行するためのユニット負
荷変化率を、前記運転中ユニット初期負荷と,前記ユニ
ット負荷変化幅を入力し、前記複合サイクル発電プラン
トの起動停止損失を最小ならしめるよう最適値探索機能
を有する最適ユニット負荷変化率算出手段により決定す
ることを特徴とする複合サイクル発電プラント負荷制御
システム。9. A gas turbine, an exhaust heat recovery boiler for recovering exhaust gas energy of the gas turbine, a steam turbine driven by steam generated in the exhaust heat recovery boiler, the gas turbine and the steam turbine. A control system for a combined cycle power plant comprising a plurality of units of the power generation equipment, wherein the combined output of the combined cycle power generation plant is a plant load. In a load control system that performs start / stop and output control of each unit so as to match the command value, a necessary unit that determines the number of units that need to be operated based on the notice plant load command value given to the load control system Number determining means and unit target load calculator for calculating the final target load per unit Unit, an operating unit instantaneous target load command means for calculating a unit initial load and a unit load change width of an operating unit, and a unit instantaneous target load, and a unit for executing a unit start / stop schedule created in advance The load change rate is input by the operating unit initial load and the unit load change width, and by the optimum unit load change rate calculating means having an optimum value search function so as to minimize the start-stop loss of the combined cycle power plant. A combined cycle power plant load control system characterized by determining.
複合サイクル発電プラント負荷制御システムにより負荷
制御される複合サイクル発電プラント。10. A combined cycle power plant which is load-controlled by the combined cycle power plant load control system according to claim 1, 2, 7, 8 or 9.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7013499A JPH08200095A (en) | 1995-01-31 | 1995-01-31 | Combined cycle power plant load control system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7013499A JPH08200095A (en) | 1995-01-31 | 1995-01-31 | Combined cycle power plant load control system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH08200095A true JPH08200095A (en) | 1996-08-06 |
Family
ID=11834820
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP7013499A Pending JPH08200095A (en) | 1995-01-31 | 1995-01-31 | Combined cycle power plant load control system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH08200095A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115234327A (en) * | 2022-08-08 | 2022-10-25 | 济南达能动力技术有限责任公司 | Unit unit cooperative operation method and system |
-
1995
- 1995-01-31 JP JP7013499A patent/JPH08200095A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115234327A (en) * | 2022-08-08 | 2022-10-25 | 济南达能动力技术有限责任公司 | Unit unit cooperative operation method and system |
| CN115234327B (en) * | 2022-08-08 | 2023-03-10 | 济南达能动力技术有限责任公司 | Method and system for coordinated operation of unit units |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4550379A (en) | Method of electric power plant operation | |
| JP6987292B1 (en) | Charge / discharge control device, charge / discharge control program | |
| CN105204340A (en) | Improved direct energy balance load coordination control method and system | |
| US20020011063A1 (en) | Gas turbine plant and method of controlling gas turbine plant | |
| JP4948348B2 (en) | Combined cycle power plant | |
| JP6775070B1 (en) | Power plant control device, power plant, and power plant control method | |
| US20110042948A1 (en) | Dummy load for a combined heat and power (chp) system | |
| JPH0627278A (en) | Output control method and apparatus for nuclear power plant | |
| JP2564602B2 (en) | Output control method for coal-fired boiler | |
| JP3792853B2 (en) | Combined cycle control device and gas turbine control device | |
| RU61349U1 (en) | SYSTEM OF AUTOMATIC REGULATION OF POWER OF STEAM-GAS UNIT WITH INFLUENCE ON THE REGULATING BODIES OF THE GAS-TURBINE UNIT AND STEAM TURBINE | |
| JP2000248904A (en) | Output control method of thermal power plant | |
| JP4981509B2 (en) | Combined power plant steam turbine operation control system | |
| JPH11264006A (en) | Control method of blower with steam turbine and electric motor | |
| JP7303696B2 (en) | POWER PLANT CONTROL DEVICE, POWER PLANT, AND POWER PLANT CONTROL METHOD | |
| JPS63210502A (en) | Controller for boiler system | |
| JP2612740B2 (en) | Automatic power plant control system | |
| JPH0719456A (en) | Controller for combined cycle power plant | |
| JP2025067077A (en) | Gas turbine control device and gas turbine control method | |
| JPS6212365B2 (en) | ||
| CN120454112A (en) | Flywheel energy storage self-recovery control method and system considering unit AGC frequency regulation state | |
| JPS6124523B2 (en) | ||
| CN121566506A (en) | Thermal power generating unit AGC frequency modulation performance improving method and system based on boiler heat accumulation compensation | |
| JPS59201102A (en) | Output controller of compound power plant | |
| CN119253669A (en) | A control method for frequency modulation of a compressed air energy storage compressor assisted thermal power unit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Effective date: 20050630 Free format text: JAPANESE INTERMEDIATE CODE: A971007 |
|
| A131 | Notification of reasons for refusal |
Effective date: 20050705 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
| A02 | Decision of refusal |
Effective date: 20051108 Free format text: JAPANESE INTERMEDIATE CODE: A02 |