JPH0830207B2 - Induction induction hardening equipment - Google Patents
Induction induction hardening equipmentInfo
- Publication number
- JPH0830207B2 JPH0830207B2 JP2212006A JP21200690A JPH0830207B2 JP H0830207 B2 JPH0830207 B2 JP H0830207B2 JP 2212006 A JP2212006 A JP 2212006A JP 21200690 A JP21200690 A JP 21200690A JP H0830207 B2 JPH0830207 B2 JP H0830207B2
- Authority
- JP
- Japan
- Prior art keywords
- work
- quenching
- heating coil
- center pin
- moving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/25—Process efficiency
Landscapes
- Heat Treatment Of Articles (AREA)
Description
【発明の詳細な説明】 〈産業上の利用分野〉 本発明は、同径異長の長尺状のワークを順序不同に焼
入する高周波自動焼入装置(以下単に高周波焼入装置と
いう)に関する。DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to an induction automatic quenching apparatus (hereinafter simply referred to as an induction hardening apparatus) for quenching long workpieces having the same diameter and different lengths in any order. .
〈従来の技術〉 従来、同径異長のワークがある場合に、これらワーク
を1台の高周波焼入装置で焼入するには、予め、ワーク
を長さごとに区分けしておき、同一長さのワークを全て
高周波焼入してから、別の長さのワークを高周波焼入し
ている。<Prior Art> Conventionally, when there are works with the same diameter and different length, in order to quench these works with one induction hardening device, the works are divided into lengths in advance and the same length is used. Induction hardening is performed on all the workpieces, and then another length of workpiece is induction hardened.
〈発明が解決しようとする課題〉 従って、前記ワークの区分けするための手間がかか
る。<Problems to be Solved by the Invention> Therefore, it takes time and effort to classify the work.
本発明は上述事情に鑑みて創案されたものであって、
同径異長のワークを焼入するに際し、ワークを区分けす
ることなく、それぞれのワークの焼入仕様に対応して自
動的に焼入ができる高周波焼入装置を提供することを目
的としている。The present invention was created in view of the above circumstances,
It is an object of the present invention to provide an induction hardening apparatus capable of automatically quenching a work having the same diameter and different length, without dividing the work and corresponding to the quenching specification of each work.
〈課題を解決するための手段〉 上記問題を解決するために、本発明装置は同径異長の
棒状のワークを順不同に自動焼入する高周波焼入装置で
あって、前記装置はワーク搬送機構と、ワーク保持回転
機構と、焼入機構と、制御装置を具備しており、 前記ワーク搬送機構は、ワーク軸に平行に設けた複数
列の固定ビームと、この固定ビームに干渉しないように
ワーク軸に平行に設けた複数列の移動ビームを有してお
り、移動ビームの昇降及び搬送方向への進退によって固
定ビーム上のワークを焼入用固定ビームへ移し換える機
能を有しており、 前記焼入機構はワークを焼入する加熱コイルと、加熱
コイルをワークの軸方向に移動させるコイル移動手段
と、移動した該加熱コイルのワーク上での位置を検出す
る加熱コイル位置検出手段を有しており、 前記ワーク保持回転機構はワークの一端を保持するヘ
ッドセンターピンと、他端を保持するテールセンターピ
ンと、テールセンターピンのワーク側への移動距離を検
出する移動距離検出手段と、ワーク回転手段を有してお
り、 前記制御装置はワーク搬送機構の駆動、ヘッドセンタ
ーピン及びテールセンターピンによるワークの保持、前
記移動距離の検出に基づくワークの長さの判断、加熱コ
イルの焼入開始地点への移動、焼入開始地点から焼入終
了地点までのワーク焼入を制御するように構成したもの
である。<Means for Solving the Problems> In order to solve the above problems, the device of the present invention is an induction hardening device for automatically quenching rod-shaped works having the same diameter and different lengths in random order, and the device is a work transfer mechanism. And a work holding / rotating mechanism, a quenching mechanism, and a control device. The work transfer mechanism includes a plurality of rows of fixed beams provided in parallel with the work axis, and the work beams so as not to interfere with the fixed beams. It has a plurality of rows of moving beams provided in parallel to the axis, and has a function of transferring a work on a fixed beam to a hardening fixed beam by moving the moving beam up and down and moving it back and forth in the transport direction, The quenching mechanism has a heating coil for quenching a work, a coil moving means for moving the heating coil in the axial direction of the work, and a heating coil position detecting means for detecting the position of the moved heating coil on the work. Oh The work holding / rotating mechanism includes a head center pin that holds one end of the work, a tail center pin that holds the other end, a moving distance detecting unit that detects a moving distance of the tail center pin to the work side, and a work rotating unit. The control device drives the work transfer mechanism, holds the work by the head center pin and the tail center pin, determines the work length based on the detection of the moving distance, and moves the heating coil to the quenching start point. The work quenching from the quenching start point to the quenching end point is controlled.
〈作用〉 ワーク搬送機構によりワークが焼入用固定ビームまで
搬送されて来て、ヘッドセンターピン、テールセンター
ピンによりワークの両端が保持されると、テールセンタ
ーピンの移動距離が移動距離検出手段から検出され、制
御装置内に記憶したワークの長さが判る。そこで、ワー
クの長さに対応した焼入仕様が呼び出され、この仕様に
従って加熱コイルがテールセンターピン側へ移動して焼
入開始地点で一旦停止する。引き続き、加熱コイルの反
対の方向(ヘッドセンターピン方向)に移動を開始し焼
入終了地点に至るまで焼入が行われる。<Operation> When the work is conveyed to the fixed beam for quenching by the work conveyance mechanism and both ends of the work are held by the head center pin and the tail center pin, the movement distance of the tail center pin changes from the movement distance detection means. The length of the work that is detected and stored in the control device is known. Therefore, the quenching specification corresponding to the length of the work is called, and the heating coil moves to the tail center pin side according to this specification and temporarily stops at the quenching start point. Subsequently, the movement is started in the direction opposite to the heating coil (head center pin direction), and quenching is performed until the quenching end point is reached.
〈実施例〉 以下、図面を参照して本発明の一実施例を説明する。
第1図〜第4図は本発明の一実施例を説明するための図
面であって、第1図は正面図、第2図は平面図、第3図
はワーク搬送機構の側面図、第4図は高周波加熱コイル
の説明図であって、第4図(a)は正面図、第4図
(b)は側面図、第4図(c)は第4図(a)のA−A
線矢視断面図である。<Example> Hereinafter, an example of the present invention will be described with reference to the drawings.
1 to 4 are drawings for explaining one embodiment of the present invention. FIG. 1 is a front view, FIG. 2 is a plan view, and FIG. 3 is a side view of a work transfer mechanism. FIG. 4 is an explanatory view of the high-frequency heating coil. FIG. 4 (a) is a front view, FIG. 4 (b) is a side view, and FIG. 4 (c) is A-A in FIG. 4 (a).
FIG.
本発明に係る高周波焼入装置は、ワーク搬送機構と、
ワークを焼入する焼入機構と、ワーク保持回転機構と、
制御装置を備えている。An induction hardening apparatus according to the present invention includes a work transfer mechanism,
A quenching mechanism that quenches the work, a work holding and rotating mechanism,
It is equipped with a control device.
まず焼入機構について説明する。焼入機構は、加熱コ
イルと、加熱コイルをワークの軸方向に移動させるコイ
ル移動手段と、移動した該加熱コイルのワーク上の位置
を検出する加熱コイル位置検出手段を有している。First, the quenching mechanism will be described. The quenching mechanism includes a heating coil, a coil moving unit that moves the heating coil in the axial direction of the work, and a heating coil position detection unit that detects the position of the moved heating coil on the work.
第1図において、902は天板であり、共通台900に立設
した4本の柱901で支持されている。13はコイル移動手
段としてのボールネジであって、このボールネジ13は天
板902の下部に隔設した一対のブラケット17a、17b間に
橋架されている。このボールネジ13の一端にはボールネ
ジ13上の加熱コイルの位置を検出する加熱コイル位置検
出手段としてのロータリエンコーダ19が取付けられてい
る。In FIG. 1, reference numeral 902 is a top plate, which is supported by four columns 901 standing on a common base 900. Reference numeral 13 denotes a ball screw as a coil moving means, and the ball screw 13 is bridged between a pair of brackets 17a and 17b which are spaced from each other on the lower portion of the top plate 902. A rotary encoder 19 as a heating coil position detecting means for detecting the position of the heating coil on the ball screw 13 is attached to one end of the ball screw 13.
10はカレントトランスであり、このカレントトランス
10は前記ボールネジ13に螺合する部材12(ただし第1図
には煩雑をさけるため、部材12は図示されていない。第
2図に図示されている)に接続された平板11上に固定さ
れている。そしてトランス10の重量を支えるため、平板
11の下部にはスライダ15が取付けられており、このスラ
イダ15がブラケット17a、17b間に橋架された2本の案内
レール14に摺動自在に挿入されている。(第2図参
照)。16はボールネジ回転用モータであってL型部材18
を介して天板902に取付けられている。このモータの正
逆回転により、ボールネジ13が回転して部材12を移動さ
せるので、加熱コイル20はワークの軸に沿って左右に移
動する。カレントトランス10の2次側から導出された加
熱コイル給電用導体21の先端には加熱コイル20が取付け
られている。10 is a current transformer, this current transformer
10 is fixed on a flat plate 11 connected to a member 12 screwed to the ball screw 13 (however, the member 12 is not shown in FIG. 1 for the sake of simplicity). ing. And to support the weight of the transformer 10, a flat plate
A slider 15 is attached to the lower part of 11 and is slidably inserted into two guide rails 14 bridged between brackets 17a and 17b. (See Figure 2). 16 is a ball screw rotating motor, which is an L-shaped member 18
It is attached to the top plate 902 via. The forward and reverse rotations of the motor rotate the ball screw 13 to move the member 12, so that the heating coil 20 moves left and right along the axis of the work. The heating coil 20 is attached to the tip of the heating coil power supply conductor 21 led out from the secondary side of the current transformer 10.
ここで、本実施例における加熱コイルを第4図に従っ
て詳しく説明する。第4図において、22、22は一対の端
子で、これら端子22の下部には、リード口導体23、23が
接続され、さらに環状導体26が接続されている。25は冷
却液供給用接続金物である。なお、端子22、22間、リー
ド口導体23、23間および環状導体26の両端間には絶縁板
24を介在させてある。Here, the heating coil in this embodiment will be described in detail with reference to FIG. In FIG. 4, reference numerals 22 and 22 are a pair of terminals. Lead port conductors 23 and 23 are connected to the lower portions of these terminals 22, and an annular conductor 26 is further connected. Numeral 25 is a connection hardware for supplying the cooling liquid. An insulating plate is provided between the terminals 22 and 22, between the lead port conductors 23 and 23, and between both ends of the annular conductor 26.
24 is interposed.
冷却液(環状導体冷却用兼焼入用冷却液)を流通させ
るために、端子22とリード口導体23には図示しない中空
部分が、環状導体26には第4図(a)、(c)に示すよ
うな環状の中空部分27が設けられており、環状導体26の
一方の側面には、中空部分27に導通する複数の冷却液噴
射孔28が設けられている。実施例としてコイル本体とし
て環状導体を示したが、必ずしもこれに限定されず、例
えばコイル本体として鞍型コイルであってもかまわない
ものである。In order to circulate the cooling liquid (cooling liquid for cooling and quenching the annular conductor), the terminal 22 and the lead port conductor 23 have hollow portions (not shown), and the annular conductor 26 is shown in FIGS. 4 (a) and 4 (c). An annular hollow portion 27 as shown in FIG. 2 is provided, and one side surface of the annular conductor 26 is provided with a plurality of cooling liquid injection holes 28 that are electrically connected to the hollow portion 27. Although the annular conductor is shown as the coil main body as an example, the present invention is not limited to this, and a saddle type coil may be used as the coil main body.
つぎに、ワーク保持回転機構について説明する。ワー
ク保持回転機構は、ワークの一端を保持するヘッドセン
ターピンと、他端を保持するテールセンターピンと、テ
ールセンターピンのワーク側への移動距離を検出する移
動距離検出手段と、ワーク回転手段を有している。Next, the work holding and rotating mechanism will be described. The work holding / rotating mechanism has a head center pin that holds one end of the work, a tail center pin that holds the other end, a moving distance detecting unit that detects a moving distance of the tail center pin to the work side, and a work rotating unit. ing.
31はワーク100の一端を保持するヘッドセンターピン
であり、32はヘッドセンターピン31を保持するヘッドセ
ンターである。34は2本の平行なロッドで、これにスラ
イダ33が摺動自在に取付けられている。36は油圧シリン
ダで、油圧シリンダ36によって進退する図外のロッドを
介して前記ヘッドセンター32がワークの軸方向に進退す
る。支持部材35は共通台900上に設けたベース903上に固
定され、前記ロッド34を橋架している。なお、ヘッドセ
ンターピン31は前記加熱コイル20の環状導体26に環状導
体26と接触することのないように挿入されている。Reference numeral 31 is a head center pin that holds one end of the work 100, and 32 is a head center that holds the head center pin 31. 34 is two parallel rods to which the slider 33 is slidably attached. Reference numeral 36 denotes a hydraulic cylinder, and the head center 32 moves back and forth in the axial direction of the work through a rod (not shown) that moves forward and backward by the hydraulic cylinder 36. The support member 35 is fixed on a base 903 provided on the common base 900 and bridges the rod 34. The head center pin 31 is inserted into the annular conductor 26 of the heating coil 20 so as not to come into contact with the annular conductor 26.
つぎにテールセンターピン側の説明を行う。第2図に
おいて、43は油圧シリンダ、44は油圧シリンダ43のロッ
ドで、このロッド44にはスライダ42が接続される。2本
の平行なロッド41はブラケット17a、17b間に橋架されて
おり、このロッド41にスライダ42が摺動自在に挿入され
ている。スライダ42の下にはテールセンター45が固定さ
れており、さらにその先端にはテールセンターピン46が
固定されている。48はテールセンターピン46のワーク側
への移動距離を検出する移動距離検出手段としての移動
距離検出装置であり、例えば商品名「バリリミット」が
用いられる。なお、47はワーク回転手段としてのシリン
ダであり、このシリンダの内部には回転羽根があり、こ
の羽根の回転によりテールセンターピン46が回転しワー
ク100を回転させる。Next, the tail center pin side will be described. In FIG. 2, 43 is a hydraulic cylinder, 44 is a rod of the hydraulic cylinder 43, and a slider 42 is connected to the rod 44. Two parallel rods 41 are bridged between brackets 17a and 17b, and a slider 42 is slidably inserted in the rods 41. A tail center 45 is fixed below the slider 42, and a tail center pin 46 is fixed to the tip of the tail center 45. Reference numeral 48 is a moving distance detecting device as a moving distance detecting means for detecting a moving distance of the tail center pin 46 to the work side, and for example, a trade name “Vari Limit” is used. Reference numeral 47 is a cylinder as a work rotating means, and there is a rotary blade inside the cylinder, and the tail center pin 46 rotates by the rotation of the blade to rotate the work 100.
次にワーク搬送機構について説明する。実施例におけ
るワーク搬送機構はワーク軸に平行に設けた固定ビーム
と、この固定ビームに干渉しないように、同じくワーク
軸に平行に設けた移動ビームを有しており、移動ビーム
の昇降及び搬送方向への進退によって固定ビーム上に載
置したワークを持ち上げて、これを順次前方の固定ビー
ムへ移し換える構成になっている。実施例においては、
5列あるうちの真ん中の固定ビームが焼入用固定ビーム
であり、それより図面上(第3図)右側にある固定ビー
ムは焼入が完了したワークの取り出し用のものである。Next, the work transfer mechanism will be described. The work transfer mechanism in the embodiment has a fixed beam provided parallel to the work axis and a moving beam also provided parallel to the work axis so as not to interfere with the fixed beam. The work placed on the fixed beam is lifted by advancing and retreating to and is sequentially transferred to the front fixed beam. In the example,
The center fixed beam of the five rows is the quenching fixed beam, and the fixed beam on the right side of the drawing (Fig. 3) is for taking out the workpiece after quenching.
この機構をさらに詳しく説明すると、まず第1図にお
いて、904はベースであって、このベース904上に固定ビ
ームが取付けられている。すなわち、51、52、53はワー
ク100の軸に平行に設けた固定ビームであって、この固
定ビーム51、52、53の上にはワーク100を載置するため
にVブロック51a、52a及び53aが取付けられている。This mechanism will be described in more detail. First, in FIG. 1, 904 is a base on which a fixed beam is mounted. That is, 51, 52 and 53 are fixed beams provided parallel to the axis of the work 100, and V blocks 51a, 52a and 53a for mounting the work 100 on the fixed beams 51, 52 and 53. Is installed.
前記固定ビーム51、52、53は第3図に示すように、ワ
ーク100の軸に直交する方向に、すなわち、ワーク100の
搬送方向に複数列(図面では5列)等間隔に並んでい
る。ここで、図面上、中央の固定ビーム53は焼入用固定
ビームである。すなわち、この固定ビームはセンターピ
ンの真下にあり、従って、この固定ビーム53の上に載置
されたワーク100はセンターピンに保持される位置にあ
る。As shown in FIG. 3, the fixed beams 51, 52, and 53 are arranged at equal intervals in a plurality of rows (five rows in the drawing) in the direction orthogonal to the axis of the work 100, that is, in the conveyance direction of the work 100. Here, in the drawing, the central fixed beam 53 is a quenching fixed beam. That is, the fixed beam is directly below the center pin, and therefore the work 100 placed on the fixed beam 53 is in a position to be held by the center pin.
再び第1図に戻って、69、69、69は3本の移動ビーム
であって、この移動ビーム69、69、69は平板68上におい
て前記固定ビーム51、52、53に干渉しない位置に設けら
れている。移動ビーム69、69、69上にもワーク100を載
置するためのVブロック69a、69a、69aが取付けられて
おり、4列等間隔に並んでいる。ワーク100の搬送を考
慮してこの間隔は前記固定ビームの間隔と同じなってい
る。Returning to FIG. 1 again, 69, 69, 69 are three moving beams, and these moving beams 69, 69, 69 are provided on the flat plate 68 at positions where they do not interfere with the fixed beams 51, 52, 53. Has been. V blocks 69a, 69a, 69a for mounting the work 100 are also mounted on the moving beams 69, 69, 69, and arranged in four rows at equal intervals. Considering the transportation of the work 100, this distance is the same as the distance between the fixed beams.
前記平板68は油圧シリンダ65のロッド66に直結されて
いて、油圧シリンダ65の作動によってこれが上下するよ
うになっている。さらに油圧シリンダ65はスライダ62に
取付けられていて、スライダ62はブラケット905、905間
に橋架された案内レール61、61にガイドされて油圧シリ
ンダ63の作動(ロッド64の進退)によって搬送方向に移
動するようにしている。なお67、67は前記油圧シリンダ
65用の案内レールである。また55は全ての固定ビームの
Vブロック上に取りつけた近接スイッチであり、この近
接スイッチ55により固定ビーム上にワーク100が載置さ
れたことを検知するものである。The flat plate 68 is directly connected to the rod 66 of the hydraulic cylinder 65, and is moved up and down by the operation of the hydraulic cylinder 65. Further, the hydraulic cylinder 65 is attached to the slider 62, and the slider 62 is guided by guide rails 61, 61 bridged between the brackets 905, 905 to move in the carrying direction by the operation of the hydraulic cylinder 63 (advance and retreat of the rod 64). I am trying to do it. 67, 67 are the hydraulic cylinders
It is a guide rail for 65. Further, 55 is a proximity switch mounted on the V blocks of all the fixed beams, and this proximity switch 55 detects that the work 100 is placed on the fixed beam.
80は制御装置であって、ワーク搬送機構の作動、ワー
クのセンターピンによる保持、ワーク100の長さの判
断、制御装置内に記憶したワークの長さに対応する焼入
仕様に基づく加熱コイルのテールセンターピン側への移
動、ワークの焼入等の制御等を行う機能を有している。Reference numeral 80 denotes a control device which operates the work transfer mechanism, holds the work by a center pin, determines the length of the work 100, and controls the heating coil based on the quenching specifications corresponding to the work length stored in the control device. It has the functions of moving to the tail center pin side and controlling the hardening of the work.
次に、本実施例の動作を説明する。 Next, the operation of this embodiment will be described.
スライダ62は第3図に示すように、一番左側に位置
しており、従って移動ビーム69も図のように一番左側に
位置しているものとする。It is assumed that the slider 62 is located on the leftmost side as shown in FIG. 3, and therefore the moving beam 69 is also located on the leftmost side as shown.
第3図において、一番左側のVブロック51a、52a、
53aにワーク100が載置されると、近接スイッチ55がワー
ク100の載置を検知して、制御装置80に信号を送る。In FIG. 3, the leftmost V blocks 51a, 52a,
When the work 100 is placed on the 53a, the proximity switch 55 detects the placement of the work 100 and sends a signal to the control device 80.
制御装置80は前記信号を受けて油圧シリンダ65を作
動し、このワーク100を持ち上げる。すなわち、一番左
のVブロック69aにワーク100が乗る。The controller 80 receives the signal and operates the hydraulic cylinder 65 to lift the work 100. That is, the work 100 rides on the leftmost V block 69a.
つぎに油圧シリンダ63が作動してスライダ62をワン
ピッチ右側に移動させ、油圧シリンダ65を移動して該ワ
ーク100を左から2番目の固定ビーム上に移し換える。Next, the hydraulic cylinder 63 operates to move the slider 62 to the right by one pitch, and the hydraulic cylinder 65 is moved to transfer the work 100 onto the second fixed beam from the left.
以下同様にして、ワーク100は全ての固定ビーム上
に載置される。In the same manner, the work 100 is placed on all fixed beams.
ワーク100が焼入用固定ビーム上に載置したことをそ
れに設けた近接スイッチ55が検出すると、制御装置80は
シリンダ36を作動させてヘッドセンタ32を、即ちヘッド
センターピン31を所定距離だけ前進(第1図で左方)さ
せると共に、シリンダ43を動作させてテールセンター4
5、即ちテールセンターピン46を前進(第1図で右方)
させテールセンターピン46がワーク100の端部の凹部に
挿入されて、ワーク100は両センターピンに保持され
る。When the proximity switch 55 provided therein detects that the work 100 is placed on the quenching fixed beam, the controller 80 operates the cylinder 36 to advance the head center 32, that is, the head center pin 31 by a predetermined distance. (To the left in FIG. 1), the cylinder 43 is operated to move the tail center 4
5, the tail center pin 46 forward (right in Fig. 1)
Then, the tail center pin 46 is inserted into the concave portion at the end of the work 100, and the work 100 is held by both center pins.
この際、スライダ33および42の移動開始前の位置が制
御装置80によって記憶されているので、移動距離検出装
置48によってスライダ42の移動距離が判ると、ワーク10
0の長さを判断することができる。At this time, since the control device 80 stores the positions of the sliders 33 and 42 before the start of the movement, when the movement distance detecting device 48 knows the movement distance of the slider 42, the work 10
The length of 0 can be determined.
制御装置80はセンターピンに保持されたワーク100
の所定範囲にわたって硬化層を形成するために、加熱コ
イル移動用モータ16を起動しボールネジ13を回転させ、
スライダ15を介して加熱コイル20をワーク100の焼入開
始地点まで進出移動(第1図で左方へ移動)させ、一旦
停止させる。The control device 80 is the work 100 held by the center pin.
In order to form a hardened layer over a predetermined range, the heating coil moving motor 16 is started and the ball screw 13 is rotated,
The heating coil 20 is moved forward (moved to the left in FIG. 1) to the quenching start point of the workpiece 100 via the slider 15, and is temporarily stopped.
次いで加熱コイル20を逆方向へ引き返しながら、所
定の大きさの高周波電流を加熱コイル20に通電すると共
に、加熱コイル20の冷却液噴射孔28から冷却液を噴射す
る。加熱コイル20の環状導体26が焼入終了地点に到達す
ると、高周波電流を断ち、冷却液の噴射を終えるように
高周波電源や焼入冷却液系統の図示しない電磁弁等を制
御する。Next, while returning the heating coil 20 in the opposite direction, a high-frequency current of a predetermined magnitude is applied to the heating coil 20 and the cooling liquid is injected from the cooling liquid injection hole 28 of the heating coil 20. When the annular conductor 26 of the heating coil 20 reaches the quenching end point, the high-frequency current is cut off, and the high-frequency power source and the solenoid valve (not shown) of the quenching coolant system are controlled so as to finish the injection of the coolant.
〈発明の効果〉 以上説明したように、本発明の高周波焼入装置は、ワ
ーク搬送機構と、焼入機構と、ワーク保持回転機構と、
制御装置を具備しており、テールセンターピンのワーク
側への移動に伴って、その移動距離を検出することによ
りワークの長さを判断している。さらに加熱コイルをワ
ークの軸方向に移動させる手段と移動した加熱コイルの
ワーク上での位置を検出する加熱コイル位置検出手段を
有している。また制御装置は上記したようにワーク搬送
機構を駆動せしめるとともに、テールセンターピンをワ
ーク側へ移動させ、その移動距離を移動距離検出手段か
ら検出することにより、ワークの長さを判断し、制御装
置内に記憶したワークの長さに対応する焼入仕様に基づ
いて加熱コイルをテールセンターピン側へ移動せしめ、
加熱コイル位置検出手段によりワークの焼入開始地点に
加熱コイルを定置せしめ、前記記憶した焼入仕様に従っ
てワークを焼入しつつ焼入終了地点まで加熱コイルをヘ
ッドセンターピン側へ移動するように構成している。<Effects of the Invention> As described above, the induction hardening apparatus of the present invention includes a work transfer mechanism, a hardening mechanism, a work holding and rotating mechanism,
A control device is provided, and the length of the work is determined by detecting the movement distance of the tail center pin as it moves to the work side. Further, it has means for moving the heating coil in the axial direction of the work and heating coil position detection means for detecting the position of the moved heating coil on the work. Further, the control device drives the work transfer mechanism as described above, moves the tail center pin to the work side, and detects the moving distance from the moving distance detecting means, thereby determining the length of the work, and the control device Move the heating coil to the tail center pin side based on the quenching specification corresponding to the length of the work stored in the inside,
The heating coil position detection means places the heating coil at the quenching start point of the workpiece, and while quenching the workpiece according to the stored quenching specifications, moves the heating coil to the head center pin side to the quenching end point. are doing.
従って、本発明の高周波焼入装置は、長さの異なる複
数の長尺状のワークを焼入するに際し、高周波焼入装置
に順次供給されるワークの種類がアトランダムであって
もワークごとにそのワークの焼入仕様に従った焼入を全
自動的に行うことができる。Therefore, the induction hardening apparatus of the present invention, when quenching a plurality of long-sized workpieces having different lengths, even if the type of workpieces sequentially supplied to the induction hardening apparatus is at random, it is for each workpiece. Quenching can be performed automatically according to the quenching specifications of the work.
第1図〜第4図は本発明の一実施例を説明するための図
面であって、第1図は正面図、第2図は平面図、第3図
はワーク搬送機構の側面図、第4図は高周波加熱コイル
の説明図であって、第4図(a)は正面図、第4図
(b)は側面図、第4図(c)は第4図(a)のA−A
線矢視断面図である。 10……カレントトランス 13……ボールネジ 16……ボールネジ回転用モータ 19……ロータリエンコーダ 20……加熱コイル 31……ヘッドセンターピン 46……テールセンターピン 48……移動距離検出手段 100……ワーク1 to 4 are drawings for explaining one embodiment of the present invention. FIG. 1 is a front view, FIG. 2 is a plan view, and FIG. 3 is a side view of a work transfer mechanism. FIG. 4 is an explanatory view of the high-frequency heating coil. FIG. 4 (a) is a front view, FIG. 4 (b) is a side view, and FIG. 4 (c) is A-A in FIG. 4 (a).
FIG. 10 …… Current transformer 13 …… Ball screw 16 …… Ball screw rotating motor 19 …… Rotary encoder 20 …… Heating coil 31 …… Head center pin 46 …… Tail center pin 48 …… Movement distance detection means 100 …… Workpiece
フロントページの続き (72)発明者 栗林 幸久 大阪府八尾市老原4丁目16番地 富士電子 工業株式会社内 (56)参考文献 特開 昭52−133814(JP,A) 特開 昭57−126922(JP,A) 特開 昭57−140826(JP,A) 特公 昭55−36248(JP,B2)Front page continuation (72) Inventor Yukisa Kuribayashi 4-16, Obara, Yao-shi, Osaka Prefecture Fuji Electronics Industry Co., Ltd. (56) Reference JP-A-52-133814 (JP, A) JP-A-57-126922 ( JP, A) JP 57-140826 (JP, A) JP 55-36248 (JP, B2)
Claims (1)
入する高周波焼入装置であって、前記装置はワーク搬送
機構と、ワーク保持回転機構と、焼入機構と、制御装置
を具備しており、 前記ワーク搬送機構は、ワーク軸に平行に設けた複数列
の固定ビームと、この固定ビームに干渉しないようにワ
ーク軸に平行に設けた複数列の移動ビームを有してお
り、移動ビームの昇降及び搬送方向への進退によって固
定ビーム上のワークを焼入用固定ビームへ移し換える機
能を有しており、 前記焼入機構はワークを焼入する加熱コイルと、加熱コ
イルをワークの軸方向に移動させるコイル移動手段と、
移動した該加熱コイルのワーク上での位置を検出する加
熱コイル位置検出手段を有しており、 前記ワーク保持回転機構はワークの一端を保持するヘッ
ドセンターピンと、他端を保持するテールセンターピン
と、テールセンターピンのワーク側への移動距離を検出
する移動距離検出手段と、ワーク回転手段を有してお
り、 前記制御装置はワーク搬送機構の駆動、ヘッドセンター
ピン及びテールセンターピンによるワークの保持、前記
移動距離の検出に基づくワークの長さの判断、加熱コイ
ルの焼入開始地点への移動、焼入開始地点から焼入終了
地点までのワーク焼入を制御するものであることを特徴
とする高周波自動焼入装置。1. An induction hardening apparatus for automatically quenching rod-shaped works having the same diameter and different lengths in random order, said apparatus comprising a work transfer mechanism, a work holding and rotating mechanism, a hardening mechanism, and a controller. The work transfer mechanism has a plurality of rows of fixed beams provided parallel to the work axis and a plurality of rows of movable beams provided parallel to the work axis so as not to interfere with the fixed beams. , Has a function of transferring the work on the fixed beam to the fixed beam for quenching by moving the moving beam up and down and moving back and forth in the transport direction, and the quenching mechanism includes a heating coil for quenching the work and a heating coil. Coil moving means for moving in the axial direction of the work,
The heating coil position detecting means for detecting the position of the moved heating coil on the work, the work holding and rotating mechanism, a head center pin holding one end of the work, a tail center pin holding the other end, A moving distance detecting means for detecting a moving distance of the tail center pin to the work side and a work rotating means are provided, and the control device drives the work conveying mechanism, holds the work by the head center pin and the tail center pin, It is characterized by controlling the determination of the length of the work based on the detection of the movement distance, the movement of the heating coil to the quenching start point, and the work quenching from the quenching start point to the quenching end point. Induction hardening equipment.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2212006A JPH0830207B2 (en) | 1990-08-10 | 1990-08-10 | Induction induction hardening equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2212006A JPH0830207B2 (en) | 1990-08-10 | 1990-08-10 | Induction induction hardening equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0499220A JPH0499220A (en) | 1992-03-31 |
| JPH0830207B2 true JPH0830207B2 (en) | 1996-03-27 |
Family
ID=16615327
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2212006A Expired - Fee Related JPH0830207B2 (en) | 1990-08-10 | 1990-08-10 | Induction induction hardening equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0830207B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4826291B2 (en) * | 2005-04-14 | 2011-11-30 | 日産自動車株式会社 | Induction hardening apparatus and induction hardening method |
| JP2007005203A (en) * | 2005-06-27 | 2007-01-11 | Denki Kogyo Co Ltd | Closing device |
| JP4538433B2 (en) * | 2006-08-21 | 2010-09-08 | 昭信 原田 | Quenching equipment |
| CN114032363B (en) * | 2021-11-05 | 2024-07-09 | 瓦房店轴承集团国家轴承工程技术研究中心有限公司 | Operating mechanism and method for surface induction quenching of large-curvature raceway sliding block |
| CN115747455A (en) * | 2022-11-26 | 2023-03-07 | 聊城大学 | Automatic tempering device for gradient heat treatment of hob ring |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52133814A (en) * | 1976-05-06 | 1977-11-09 | Koshuha Netsuren Kk | Process for lowwstrain quenching of shaft provided with mechanism for forced rotation |
| JPS5536248A (en) * | 1978-09-08 | 1980-03-13 | Teijin Ltd | Resin composition |
| JPS57126922A (en) * | 1981-01-30 | 1982-08-06 | High Frequency Heattreat Co Ltd | Apparatus for quenching flanged shaft |
| JPS57140826A (en) * | 1981-02-25 | 1982-08-31 | High Frequency Heattreat Co Ltd | Method and device for detection of revolution of work in hardening device of shaft or the like |
-
1990
- 1990-08-10 JP JP2212006A patent/JPH0830207B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0499220A (en) | 1992-03-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105082117B (en) | Gantry type double-arm truss robot and machining method for arc-shaped plate | |
| US20020152619A1 (en) | Printed circuit board processing machine | |
| US6031202A (en) | Laser marking apparatus and method for controlling same | |
| JPH0830207B2 (en) | Induction induction hardening equipment | |
| JP4095726B2 (en) | Induction hardening equipment | |
| US4802311A (en) | Method of grinding rotary workpieces | |
| JP4220763B2 (en) | Induction hardening equipment for constant velocity joints | |
| JP3735216B2 (en) | Work positioning method | |
| CN211540430U (en) | External presetting device for product to be processed | |
| KR910001066B1 (en) | Continuous finishing system of automatic winding | |
| JPH05214436A (en) | Method and apparatus for executing high frequency induction quenching | |
| JP3025523B2 (en) | Automatic coil changer for induction hardening equipment | |
| JP2564441B2 (en) | Work pallet transfer device | |
| JPH0798974B2 (en) | Induction hardening equipment | |
| JPH0123250B2 (en) | ||
| JP2709558B2 (en) | Induction hardening device for crankshaft | |
| JP2528960Y2 (en) | Induction hardening equipment for multiple types of axial workpieces | |
| JP2764673B2 (en) | Induction hardening device for crankshaft | |
| KR100196396B1 (en) | Non-contact soldering apparatus and method | |
| JP2684484B2 (en) | High-frequency heating device for axial work | |
| JP3373229B2 (en) | Work positioning device for work stocker | |
| US3501355A (en) | Method for heat treating elongated workpieces | |
| JPH0524074A (en) | Exchange method of mold of injection molding machine | |
| JPS5968936A (en) | Pellet bonding method | |
| JPH0724198Y2 (en) | Work feeding device and work feeding chute for processing machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080327 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090327 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100327 Year of fee payment: 14 |
|
| LAPS | Cancellation because of no payment of annual fees |