JPH0830331B2 - Soft ground improvement method - Google Patents

Soft ground improvement method

Info

Publication number
JPH0830331B2
JPH0830331B2 JP23305086A JP23305086A JPH0830331B2 JP H0830331 B2 JPH0830331 B2 JP H0830331B2 JP 23305086 A JP23305086 A JP 23305086A JP 23305086 A JP23305086 A JP 23305086A JP H0830331 B2 JPH0830331 B2 JP H0830331B2
Authority
JP
Japan
Prior art keywords
sand
sand pile
ground
strength
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP23305086A
Other languages
Japanese (ja)
Other versions
JPS6389719A (en
Inventor
知広 磯田
一典 奥山
直裕 杉本
法生 勝原
憲二 河本
毅 河田
英樹 岡本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co Ltd filed Critical Fudo Construction Co Ltd
Priority to JP23305086A priority Critical patent/JPH0830331B2/en
Publication of JPS6389719A publication Critical patent/JPS6389719A/en
Publication of JPH0830331B2 publication Critical patent/JPH0830331B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 (イ)発明の目的 <産業上の利用分野> 本発明は、杭径指示管理による軟弱地盤改良用砂杭の
製造工法に関する。
DETAILED DESCRIPTION OF THE INVENTION (a) Object of the Invention <Industrial field of application> The present invention relates to a method for manufacturing a sand pile for improving soft ground by controlling pile diameter.

<従来の技術> 軟弱地盤改良工事の設計においては従来、改良区域内
の複数地点における土質調査の結果に基いて、たとえば
平均的な設計用原地盤強度を設計し、これに対して想定
される上部構造物の重量、形状等に見合う地盤強度目標
値を割出し、地盤改良後に目標強度が得られるよう造成
砂杭の径と、その施工ピッチとを決定していた。
<Prior art> Conventionally, in designing soft ground improvement work, based on the results of soil surveys at multiple points in the improved area, for example, an average design ground strength is designed and assumed. The ground strength target value corresponding to the weight and shape of the superstructure was indexed, and the diameter of the constructed sand pile and its construction pitch were determined so that the target strength could be obtained after ground improvement.

しかしながら広域の原地盤強度には実際上、限られた
複数地点の事前土質調査結果だけでは把握できない強度
のばらつきがあることを免れ難いから、上述工法による
改良後の地盤強度には、原地盤強度のばらつきが、その
ままの形で現われ、必ずしも均一な地盤改良がなされな
いという問題点があった。
However, it is unavoidable that there is a variation in the strength of the wide area ground that cannot be grasped only by the results of preliminary soil surveys at a limited number of points.Therefore, the ground strength after improvement by the above method is However, there was a problem that the unevenness of the ground appeared as it was and that the ground was not always improved uniformly.

そこで前記の問題点を解決するために各砂杭の造成に
先立って、造成地点の原地盤の土質を検知し、これと設
計用原地盤土質との差に対応して、砂杭の径と強度と
の、一方または双方を変化させることにより各砂杭の造
成を行うようにした施工法(特公昭61−25859号公報参
照)が提案されている。
Therefore, in order to solve the above-mentioned problems, prior to the creation of each sand pile, the soil quality of the original ground at the site of construction was detected, and the diameter of the sand pile and A construction method has been proposed in which each sand pile is constructed by changing one or both of the strength and the strength (see Japanese Patent Publication No. 61-25859).

ところで地盤に貫入した中間管の下端に砂排出兼締固
め部材を設けて前記部材を強制的に上、下動させながら
同管を引抜き、あらかじめ中空管内に充填した砂を地盤
中に排出し、かつ、これを押圧して締固めを行うように
した締固め砂杭造成工法において、 砂排出兼締固め部材の押力;F 原地盤強度;CS 造成砂杭径;AS(面積で代表する) 造成砂杭強度;B(Φ、内部摩擦角で表わす、ノンディ
メンジョン)とすると、これらの間には、次の関係式が
成立つ。
By the way, a sand discharging and compacting member is provided at the lower end of the intermediate pipe penetrating into the ground, and the member is forcibly moved up and down while pulling out the pipe, and discharging the sand previously filled in the hollow pipe into the ground, Moreover, in the compaction sand pile construction method in which it is pressed to perform compaction, the pressing force of the sand discharge and compaction member; F original ground strength; C S construction sand pile diameter; A S (typical in area Constructed sand pile strength; B (Φ, expressed by internal friction angle, non-dimensional), the following relational expression holds between them.

F=K1・AS・B・CS ……(1) ここでK1は地質に関係する係数である。F = K 1 · A S · B · C S …… (1) where K 1 is a coefficient related to geology.

改良後の地盤強度を均一にしようとすれば、上記
(1)式のうちのF値を施工管理の総合指標としてとら
え、F=一定に保つようにCSに対してASまたはBあるい
は、その双方の大きさを管理、施工することにより、自
づと目的を達成できることが判る。
If the ground strength after improvement is to be made uniform, the F value in the above equation (1) should be regarded as a comprehensive index for construction management, and F = A S or B with respect to C S so as to keep it constant, or It can be seen that the purpose can be achieved by managing and constructing both sizes.

この関係式を利用した具体例として、砂排出兼締固め
部材と上、下作動させる油圧(液圧シリンダ)機構のス
トロークエンド直前の液圧に対応する電圧と、あらかじ
め記憶されている液圧シリンダ装置のシリンダ有効断面
積のデータとに基いて、そのときF値を検出する。前記
検出F値と設定(目標)F0値とを比較し両者の値が一致
しないと信号が制御装置に送られ、これから出された制
御信号により造成砂杭径に関係する要素、たとえば中空
管を引抜くための巻取りウインチの巻取り速度が変化す
るよう制御するようにして検出F値を設定F0値に一致さ
せながら中空管を引抜く砂杭造成工法(特開昭58−1648
14号公報参照)も開発されている。
As a specific example using this relational expression, a sand discharge and compaction member, a voltage corresponding to the hydraulic pressure immediately before the stroke end of a hydraulic (hydraulic pressure cylinder) mechanism for operating up and down, and a hydraulic cylinder stored in advance Based on the data of the effective cylinder area of the device, the F value is then detected. The detected F value and the set (target) F 0 value are compared, and if the two values do not match, a signal is sent to the control device, and a control signal issued from this causes an element related to the diameter of the constructed sand pile, such as a hollow. The sand pile construction method of pulling out the hollow pipe while making the detected F value match the set F 0 value by controlling the winding speed of the winding winch for pulling out the pipe (JP-A-58- 1648
No. 14) is also being developed.

<発明が解決しようとする問題点> 上記の工法では、F=一定を保つようにAまたはBあ
るいは、その双方の大きさを管理することを要するが、
第1図示のような比較的に低置換率aS(=AS/A0=10〜3
0%前後、A0;砂杭1本当りの分担面積)の地盤改良、た
とえば砂杭の径に比べて砂杭の施工ピッチが比較的大き
いような場合を想定すると、低置換率の地盤改良の故に
砂杭強度Bは実用上、一定値と考えてもよいから、
(1)式を変形して F/AS=K2・CS ……(2) ただし、K2はK1とは異なる係数、 したがって、この原地盤強度CS(=K・F/AS)に対し
新たな砂杭径Aを指示し、管理することによって、前述
の均一な地盤改良を実現することができる。
<Problems to be Solved by the Invention> In the above construction method, it is necessary to control the size of A or B or both of them so that F = constant.
As shown in the first diagram, a relatively low substitution rate a S (= A S / A 0 = 10 to 3)
Ground improvement of around 0%, A 0 ; shared area per sand pile), assuming a case where the construction pitch of sand piles is relatively large compared to the diameter of sand piles Therefore, the sand pile strength B may be considered to be a constant value in practical use.
F / A S = K 2 · C S …… (2) By modifying equation (1), K 2 is a coefficient different from K 1, and therefore this ground strength C S (= K · F / A By instructing and managing a new sand pile diameter A to S ), the above-mentioned uniform ground improvement can be realized.

本発明工法は、上述の低置換率の砂杭造成に基く地盤
改良における杭径指示管理施工法を提供しようとするも
のである。
The construction method of the present invention is intended to provide a pile diameter instruction management construction method for ground improvement based on the above-mentioned low substitution rate sand pile construction.

ただし、K=1/K2 (ロ)発明の構成 <問題点を解決するための手段> 本発明工法は、上述目的を達成するため、次に記載し
たとおりの構成要件を具備する。
However, K = 1 / K 2 (b) Configuration of the Invention <Means for Solving Problems> The method of the present invention has the following constituent features in order to achieve the above object.

(1)砂杭造成用中空管の下端部に設けた砂排出兼締固
め機構を強制的に上、下動させながら砂杭を造成する
際、砂杭一本当り、その横断面積/分担面積が10〜30%
前後である低置換率改良工法により、砂杭施工中に原地
盤強度を検出しながら中空管を連続的に引抜いて締固め
砂杭を造成する過程において、 原地盤強度と砂杭径との対応関係から、その検出され
た原地盤強度に照らして改良目標値を満足する砂杭径を
算出して、前記算出・指示された砂杭径を形成するよう
制御しつつ締固め砂杭を造成することを特徴とする軟弱
地盤改良工法。
(1) When creating a sand pile while forcibly moving up and down the sand discharge and compaction mechanism provided at the lower end of the hollow pile forming hollow pipe, when creating a sand pile, the cross-sectional area / allocation of each sand pile Area is 10 to 30%
In the process of constructing sand piles by continuously pulling out hollow tubes and compacting them while detecting the ground soil strength during the sand pile construction by the low substitution rate improvement method before and after, From the correspondence, calculate the sand pile diameter that satisfies the improvement target value in light of the detected ground foundation strength, and create a compacted sand pile while controlling to form the calculated and instructed sand pile diameter. A soft ground improvement method characterized by:

<作用> (1)下端部に砂排出兼締固め機構、上端に起振器を搭
載した砂杭造成用中空管をワイヤにより吊下して軟弱地
盤に対して立設した後、起振器を作動させながら徐々に
吊下ワイヤを緩めて、前記中空管を地盤中に貫入する。
<Operation> (1) A sand pile hollow tube with a sand discharging and compacting mechanism at the lower end and an exciter at the upper end is suspended by a wire and erected on soft ground, and then vibration is generated. While operating the vessel, gradually loosen the hanging wire to penetrate the hollow tube into the ground.

(2)中間管を軟弱地盤の所定深さまで貫入させまたは
貫入するまでに、管内に砂材を投入・充填して置き、中
空管を引抜き同時に砂排出兼締固め機構を作動させて管
内の砂材を地盤中に排出・残置させると共に排出砂材を
締め固める。
(2) Inserting and filling sand material into the pipe until the intermediate pipe penetrates to a predetermined depth of the soft ground or until it penetrates, and pulls out the hollow pipe and at the same time activates the sand discharge and compaction mechanism The sand material is discharged and left in the ground, and the discharged sand material is compacted.

このとき得られる原地盤の強度CSに対し、あらかじめ
論理的または実証的に作成した資料に基づき、改良目標
値を満足する砂杭径の指示を受け、締固め砂杭の径を前
記指示径に等しくなるまで制御する。
Based on the material prepared logically or empirically in advance for the strength C S of the original ground obtained at this time, the instruction of the sand pile diameter that satisfies the improvement target value is received, and the diameter of the compacted sand pile is changed to the indicated diameter. Control until it becomes equal to.

その際は、締固め機構を強制的に上、下動させる油圧
装置における上、下ストロークの長さ、またはサイクル
を変えるとか、あるいは中空管の引抜き速さを調整する
等、砂杭径の大きさを制御するための種々の手段が用意
される。
In that case, change the length of the upper and lower strokes or the cycle of the hydraulic device that forcibly moves the compaction mechanism up and down, or adjust the drawing speed of the hollow pipe to adjust the sand pile diameter. Various means are provided for controlling the size.

(3)造成された砂杭径が所望径に達したことを確認し
ながら中空管を連続的に引き抜き、要すれば引抜きを中
止して管内に砂材を補充し、その深さの強度CSに対する
改良目標値を満足させる砂杭径を、その都度、算定して
上記(2)項記載の工程を繰り返す。
(3) While confirming that the diameter of the created sand pile has reached the desired diameter, the hollow tube is continuously drawn out, and if necessary, the drawing is stopped and the sand material is replenished into the tube, and the strength of the depth is increased. The sand pile diameter that satisfies the improvement target value for C S is calculated each time, and the process described in (2) above is repeated.

(4)前記(2)、(3)記載の工程を繰り返すことに
より、原地盤の所定深さから地表まで連続した一つの締
固め砂杭を造成する。
(4) By repeating the steps described in (2) and (3) above, one compacted sand pile that is continuous from the predetermined depth of the original ground to the surface of the ground is created.

なお、上記(1)項記載の中空管貫入時において、 (i)砂排出兼締固め機構に対する地盤の反力を液圧を
介して測り、深さ計に対する原地盤CSおよびその変化量
を測定する。
When the hollow pipe described in (1) above is penetrated, (i) the reaction force of the ground against the sand discharging and compaction mechanism is measured via hydraulic pressure, and the original ground C S and its change amount with respect to the depth gauge are measured. To measure.

(ii)あるいは、中空管下端に設けたコーンテスターに
より中空管の貫入抵抗を電子信号に変換し、地盤の深さ
に対する強度CSおよびその変化を測定する。
(Ii) Alternatively, a cone tester provided at the lower end of the hollow tube is used to convert the penetration resistance of the hollow tube into an electronic signal, and the strength C S with respect to the depth of the ground and its change are measured.

を付加すれば、上記(2)、(3)および(4)項記載
の締め固め砂杭の造成工程においては、その深さの地盤
強度CSは既知となるから、この既知の強度CSを用いて
(2)、(3)および(4)項記載の工程を行うことも
できる。
Is added, the ground strength C S of the depth becomes known in the process of forming the compacted sand pile described in the above (2), (3) and (4), so this known strength C S Can also be used to perform the steps described in (2), (3) and (4).

<実施例> (その1) 第2図は、粘土地盤(滑り破壊の安定対策)の場合を
示すもので、その(a)は地盤改良区域に盛土を施した
ときの断面略図であり、このとき盛土を完全に施工する
ことができるかどうかを検査するために滑り破壊に対す
る完全率FSを求める。
<Example> (No. 1) FIG. 2 shows the case of clay ground (stable measure against slippage failure), and (a) is a schematic cross-sectional view when embankment is applied to the ground improvement area. Sometimes the complete rate F S for slip failure is determined in order to inspect whether the embankment can be completely constructed.

盛土の高さ、形、土質が確定していれば、このFSは粘
土地盤の強度CSと置換率aSから得ることができ、この関
係を示したものが、その(b)記載のCS〜FS〜A(A0を
固定すればaSとASとは同義)関係図である。
If the height, shape, and soil quality of the embankment are fixed, this F S can be obtained from the strength C S of the clay ground and the substitution rate a S , and this relationship is shown in (b) above. (if fixing the a 0 and a S and a S synonymous) C S ~F S ~A is a relationship diagram.

その(b)図で、x軸にCS、y軸の正方向にFS、負方
向にASを採り、今、あるCS、たとえばSに対してFS=
1.2を満足するような一定のAS(s)を計算で求めた
とする。
In the (b) Figure, C S in the x-axis, F in the positive direction of the y-axis S, take the A S in a negative direction, now in C S, for example F against S S =
It is assumed that a constant A S (s) that satisfies 1.2 is calculated.

ここでCSが種々に、たとえば、(b)図に示した正規
分布曲線のように変化した場合、AS=一定値(S)と
すると(図中m′線)、計算結果としてのFSは、CSが小
さなときはFS=1.2よりも小さくなり、CSが大のとき
は、1.2よりも過大となる(l′線参照)。
Here, when C S changes variously, for example, like the normal distribution curve shown in FIG. 7B, if A S = constant value ( S ) (m ′ line in the figure), then F as the calculation result is obtained. S is smaller than F S = 1.2 when C S is small, and is larger than 1.2 when C S is large (see the l ′ line).

一方、逆にCSが変化する場合に、常にFS=1.2(l
線)を満たすようにするにはCSとASとの関係が、(b)
図のm線上にあるようにしなければならない。
On the other hand, when C S changes, F S = 1.2 (l
To satisfy the condition (line), the relationship between C S and A S is (b)
It must be on line m in the figure.

(i)施工現場毎に、あらかじめ第2図(b)関係図に
おけるl線に対応するm線を求め、記憶させておく。
(I) For each construction site, the m line corresponding to the l line in the relationship diagram of FIG. 2 (b) is obtained and stored in advance.

また、(2)式より CS=K3・F/AS ……(3) (3)式において、係数K3は事前試験施工または施工
実績から実証により設定しておく。
In addition, from equation (2), C S = K 3 · F / A S …… (3) In equation (3), the coefficient K 3 is set by pre-test construction or empirical verification from construction results.

(ii)砂杭の造成開始(最深部の)において、まず砂排
出兼締固め部材の最初の駆動により標準的AS(たとえば
S)を施工し、同時に砂排出兼締固め部材の押力F1の
値を得る。このASとF1とにより(3)式で、その施工深
度近傍の原地盤強度CS1を演算する。
(Ii) At the start of the formation of the sand pile (at the deepest part), first the standard AS (eg
S ) is performed, and at the same time, the value of the pressing force F 1 of the sand discharging and compacting member is obtained. Using this A S and F 1 , formula (3) is used to calculate the original ground strength C S1 near the construction depth.

上記CS1に対応するAS1をCS〜FS〜A関係図のm線から
読取り、次の砂排出兼締固め部材の駆動により、このA
S1を施工する。そのとき同時に新たな押力F2を得て、再
び(3)式により新たなCS2を演算し、CS〜FS〜A関係
図のm線から新たなAS2を見出して、次の駆動において
新たなAS2を実現させる。
A S1 corresponding to the above C S1 is read from the m line in the C S 〜 F S 〜 A relationship diagram, and the next sand discharge and compaction member is driven to
Install S1 . At that time, a new pressing force F 2 is obtained at the same time, a new C S2 is calculated again by the equation (3), a new A S2 is found from the m line of the C S 〜F S 〜A relationship diagram, and the next Realize new A S2 in driving.

以下、この手順を極めて多数回繰返して施工し、その
都度、更新されたAsの砂杭を連続して実現することによ
って一本の砂杭の造成を終了する。
After this, this procedure is repeated a great number of times, and each time, the renewed As sand pile is continuously realized, and the construction of one sand pile is completed.

(iii)上述中、ASを変更する手段としては、たとえ
ば、 (a)中空管の引抜き速さの調節、すなわち、中空管の
ウインチ巻上げ速度の調整、 (b)砂排出兼締固め部材の作動ストロークの調節、ま
たは (c)砂排出兼締固め部材の作動サイクルの調節 等の方法が挙げられる。
(Iii) In the above, as a means for changing A S , for example, (a) adjustment of the drawing speed of the hollow tube, that is, adjustment of the winch winding speed of the hollow tube, (b) sand discharge and compaction Examples of such methods include adjusting the operation stroke of the member, or (c) adjusting the operation cycle of the sand discharging and compacting member.

(その2) 第3図は、砂地盤(液状化防止対策)の場合を示し、
原地盤強度NSが、ばらついているときに改良目標を満足
させる杭断面積Aを求める関係図を理論的にまたは実証
的に求めて、あらかじめ作成しておく。
(Part 2) Fig. 3 shows the case of sand ground (liquefaction prevention measures),
The relationship diagram for obtaining the pile cross-sectional area A that satisfies the improvement target when the original ground strength N S varies is theoretically or empirically obtained and created in advance.

図は、x軸には原地盤強度N0(=CS)、y軸には改良
地盤強度N1を採って、特定の砂杭径造成時におけるN0と
N1との関係を表示したもので、図中、φ600で表示され
た曲線は60cm径の砂杭を造成したときの原地盤強度に対
する地盤改良強度の関係を示している。φ700,φ800で
示す曲線も同様である。
The figure shows the original ground strength N 0 (= C S ) on the x-axis and the improved ground strength N 1 on the y-axis, and the N 0 at the time of constructing a specific sand pile diameter.
The relationship with N 1 is displayed. In the figure, the curve indicated by φ600 shows the relationship between the ground improvement strength and the ground improvement strength when a 60 cm diameter sand pile is constructed. The same applies to the curves indicated by φ700 and φ800.

x軸に平行な線N2=15は、この場合における改良目標
を示し、同線と各砂杭径曲線との交点、N3,N4およびN5
は、それぞれ地盤改良目標N2に対し、原地盤強度がN3の
ときにはφ80cmの砂杭を、N4の場合はφ70cmの砂杭を、
また、N5の際はφ60cmの砂杭を造成することにより地盤
改良目標を達成可能である事を示すものである。
The line N 2 = 15 parallel to the x-axis shows the improvement target in this case, the intersection of the line and each sand pile diameter curve, N 3 , N 4 and N 5
For the ground improvement target N 2 , respectively, a sand pile of φ80 cm when the original ground strength is N 3 and a sand pile of φ70 cm when N 4 is used,
In addition, in case of N 5 , it shows that it is possible to achieve the ground improvement target by constructing sand piles of φ60 cm.

そこで、 (i)中空管を地盤中に貫入する際、深さに対する砂排
出兼締固め部材の押力Fを計測することにより深度に対
する原地盤の強度N0(=CS)および、その変化量を測定
する。
Therefore, (i) when the hollow pipe penetrates into the ground, the pressing force F of the sand discharging / compacting member with respect to the depth is measured to measure the strength N 0 (= C S ) of the original ground with respect to the depth, and Measure the amount of change.

(ii)既に得ている第3図示関係図に基いて、そのN0の
ときに改良目標を満足させ得る杭径(断面積AS)を算出
する。
(Ii) Calculate the pile diameter (cross-sectional area A S ) that can satisfy the improvement target at N 0 based on the already-obtained third diagrammatic relational diagram.

(iii)改良地盤の深さに対応する地盤強度毎に算出さ
れた砂杭径を造成する。
(Iii) Create a sand pile diameter calculated for each soil strength corresponding to the depth of the improved soil.

(ハ)発明の効果 本発明工法によれば、低置換率aS(=10〜30%前後)
の砂杭造成に基く軟弱地盤改良技術の場合、あらかじめ
原地盤強度CSに対し改良目標を満足する砂杭径ASを求め
る関係図を理論的または実証的に求め作成しておくこと
によって、砂杭の造成中、前記関係図の指示する砂杭径
の大きさを管理・施工することのみで、強度に、ばらつ
きのある原地盤を所要の均一な改良地盤に造成して提供
することができる。
(C) Effect of the Invention According to the method of the present invention, a low substitution rate a S (= about 10 to 30%)
In the case of the soft ground improvement technology based on the sand pile construction of, by theoretically or empirically obtaining a relational diagram for obtaining the sand pile diameter A S that satisfies the improvement target for the original ground strength C S in advance, During the formation of sand piles, it is possible to construct and provide the ground with unevenness in strength to the required uniform improved ground simply by managing and constructing the diameter of the sand piles indicated in the above relationship diagram. it can.

【図面の簡単な説明】[Brief description of drawings]

第1図は、置換率の説明図、第2図は、粘土地盤の場合
のCS〜FS〜A関係図を示し、その(a)は地盤改良区域
と盛土との関係断面図、その(b)はCS〜FS〜A関係
図、第3図は、砂地盤の場合のN0〜N1〜A関係図を示す
ものである。
Figure 1 is a diagram depicting the replacement rate, the second figure shows C S to F S to A relationship diagram in the case of clay soil, the (a) the relationship between cross-sectional view of a soil improvement areas and fill, the (b) the C S to F S to a relationship diagram, FIG. 3 shows a N 0 to N 1 to a relationship diagram in the case of sand.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 勝原 法生 東京都台東区台東1丁目2番1号 不動建 設株式会社内 (72)発明者 河本 憲二 東京都台東区台東1丁目2番1号 不動建 設株式会社内 (72)発明者 河田 毅 東京都台東区台東1丁目2番1号 不動建 設株式会社内 (72)発明者 岡本 英樹 東京都台東区台東1丁目2番1号 不動建 設株式会社内 (56)参考文献 特開 昭58−113415(JP,A) 特開 昭59−173416(JP,A) ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Norio Katsuhara 1-2-1 Taito, Taito-ku, Tokyo Within Fudo Construction Co., Ltd. (72) Kenji Kawamoto 1-2-1 Taito, Taito-ku, Tokyo Fudo Construction Co., Ltd. (72) Inventor Takeshi Kawata 1-2-1 Taito, Taito-ku, Tokyo Fudo Construction Co., Ltd. (72) Inventor Hideki Okamoto 1-2-1 Taito, Taito-ku, Tokyo Fudo Construction (56) References JP-A-58-113415 (JP, A) JP-A-59-173416 (JP, A)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】砂杭造成用中空管の下端部に設けた砂排出
兼締固め機構を強制的に上、下動させながら砂杭を造成
する際、砂杭一本当り、その横断面積/分担面積が10〜
30%前後である低置換率改良工法により、砂杭施工中に
原地盤強度を検出しながら中空管を連続的に引抜いて締
固め砂杭を造成する過程において、 原地盤強度と砂杭径との対応関係から、その検出された
原地盤強度に照らして改良目標値を満足する砂杭径を算
出して、前記算出・指示された砂杭径を形成するよう制
御しつつ締固め砂杭を造成することを特徴とする軟弱地
盤改良工法。
1. When a sand pile is formed while forcibly moving up and down a sand discharge and compaction mechanism provided at the lower end of a hollow tube for sand pile formation, the cross-sectional area of each sand pile is / Shared area is 10 ~
By the low displacement rate improvement method of around 30%, the hollow pipe is continuously drawn out during the construction of sand piles while the hollow pipes are continuously extracted to compact the sand piles. From the correspondence relationship with, the sand pile diameter that satisfies the improvement target value is calculated in light of the detected original ground strength, and the compacted sand pile is controlled while controlling to form the calculated and instructed sand pile diameter. A soft ground improvement method characterized by creating
JP23305086A 1986-09-30 1986-09-30 Soft ground improvement method Expired - Fee Related JPH0830331B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23305086A JPH0830331B2 (en) 1986-09-30 1986-09-30 Soft ground improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23305086A JPH0830331B2 (en) 1986-09-30 1986-09-30 Soft ground improvement method

Publications (2)

Publication Number Publication Date
JPS6389719A JPS6389719A (en) 1988-04-20
JPH0830331B2 true JPH0830331B2 (en) 1996-03-27

Family

ID=16949011

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23305086A Expired - Fee Related JPH0830331B2 (en) 1986-09-30 1986-09-30 Soft ground improvement method

Country Status (1)

Country Link
JP (1) JPH0830331B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113957935B (en) * 2021-12-06 2022-10-28 张文斌 Construction site pile foundation strength detection device

Also Published As

Publication number Publication date
JPS6389719A (en) 1988-04-20

Similar Documents

Publication Publication Date Title
US10385530B1 (en) Method for compaction detection and control when compacting a soil with a deep vibrator
CN114134879A (en) Method for determining compaction current and vibration retention time of vibroflotation construction
US4487524A (en) Method and apparatus of forming sand piles for improving a soft ground
JPS6248009B2 (en)
CN1303290C (en) Method and test setup for determining the bearing behaviour of displacement piles
US6881013B2 (en) Sand pile driving method
DE4408173C5 (en) Method of stabilizing the substrate and removing structural and traffic loads
JP2005009170A (en) Compaction pile construction method
DE4130339C2 (en) Process for improving a building site
JP4583730B2 (en) Compaction pile construction method
JPH02292409A (en) Quality control method in construction of foundation improvement pile
JPS6389719A (en) Soft ground improving work
JPS642725B2 (en)
CN116124551A (en) Sand and pebble stratum drilling model test platform for drilling tool selection and use method
JP2597833B2 (en) Complex improvement method for soft ground
CN112012199A (en) A new type of BNT carrier pile and its construction equipment construction method
CN113026714B (en) Construction method for compaction pre-feeding replacement material dynamic compaction replacement of vibrating pipe-sinking pile machine
JPS6125859B2 (en)
JPH10252053A (en) Sand pile strength measurement method
CN1030208C (en) Construction method of foundation pile
JP3759235B2 (en) Construction management equipment for medium digging method
DE2012457A1 (en) Method of compacting soil
JPS642726B2 (en)
DE2619431A1 (en) On site concrete pile prodn. - has casing with releasable ram foot rammed into soil and pipe filled with setting concrete
US1847024A (en) Method of filling pits

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees