JPH0830968B2 - Work initial condition setting device for flexible manufacturing equipment - Google Patents

Work initial condition setting device for flexible manufacturing equipment

Info

Publication number
JPH0830968B2
JPH0830968B2 JP63021735A JP2173588A JPH0830968B2 JP H0830968 B2 JPH0830968 B2 JP H0830968B2 JP 63021735 A JP63021735 A JP 63021735A JP 2173588 A JP2173588 A JP 2173588A JP H0830968 B2 JPH0830968 B2 JP H0830968B2
Authority
JP
Japan
Prior art keywords
work
model
information
setting
pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63021735A
Other languages
Japanese (ja)
Other versions
JPH01196603A (en
Inventor
秀之 若井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP63021735A priority Critical patent/JPH0830968B2/en
Publication of JPH01196603A publication Critical patent/JPH01196603A/en
Publication of JPH0830968B2 publication Critical patent/JPH0830968B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Control By Computers (AREA)
  • Multi-Process Working Machines And Systems (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、電子計算機を用いて高能率に多品種中小
量生産を実現するフレキシブル生産システムに関し、特
に、上記電子計算機(制御装置)の電源立ち上げ等に際
してこれに初期値入力を行なう方式の改善に関する。
Description: TECHNICAL FIELD The present invention relates to a flexible production system that realizes high-efficiency, high-mix low-volume production with high efficiency using an electronic computer, and in particular, a power source for the electronic computer (control device). The present invention relates to the improvement of the method of inputting initial values when starting the system.

〔従来の技術〕 周知のように、フレキシブル生産システム(FMS)と
は、基本情報として予め設定される各種ワーク(加工
物)についての長期的な加工計画および各ワーク毎の工
程設計内容に基づいて、各種工作機械をはじめとする段
取装置や洗浄装置、自動倉庫、搬送装置等、各種自動生
産設備の運転スケジュールを作成し、この作成した運転
スケジュールに応じてこれら設備の総括的な運転制御を
実行する柔軟性を持った自動生産システムであり、近年
の電子計算機の普及に伴って急速にその真価が認められ
つつある。
[Prior Art] As is well known, a flexible manufacturing system (FMS) is based on a long-term machining plan for various workpieces (workpieces) preset as basic information and process design contents for each workpiece. , Create an operation schedule for various automatic production equipment such as setup equipment including various machine tools, cleaning equipment, automatic warehouse, transfer equipment, etc., and perform comprehensive operation control of these equipment according to the created operation schedule. It is an automatic production system that has the flexibility to execute, and its value is rapidly being recognized with the spread of electronic computers in recent years.

ところで、上記の各種設備を総括的に運転制御する電
子計算機並びにその周辺装置を含んで構成されて、その
都度指定される「素材」を指定される手順で加工して
「完品」に仕上げる、該システムの制御装置(FMS制御
装置)にあっては、その性質上、 1).休日などの電源が落とされ、稼働日に再び電源が
投入される場合。
By the way, it is configured to include an electronic computer and its peripheral devices that comprehensively control the operation of the various equipments described above, and the "material" specified each time is processed in the specified procedure to complete the "finished product". In the control device (FMS control device) of the system, 1). When the power is turned off, such as on a holiday, and then turned on again on working days.

2).事故などにより電源が落ちた際に、その直前の状
態から作業を続行すべく電源が立ち上げ直される場合。
2). When the power is turned off due to an accident or the like, the power is restarted to continue the work from the state just before that.

3).設備や計算機周辺装置に故障が起きた際などに、
電源が一旦落とされてその原因が取り除かれた後再び投
入され、立ち上げ直される場合。
3). When a failure occurs in equipment or computer peripherals,
When the power is turned off and the cause is removed, then turned on again and restarted.

等々、には、こうして電源が立ち上げ直される都度、ワ
ークのある場所、またはこれが取り付けられるパレット
(加工盤)のある場所などの初期値が何らかの方法で正
しく入力される必要がある。もしも、運転制御が再開さ
れたときの制御装置自信の内部記憶システム状態(主に
ワークおよびパレットのある場所やワークの工程進捗状
況を示す)と実際のシステム状態とに食い違いが生じて
いるような場合には、間違った制御が行なわれ、上記
「完品」として、所望とする製品を得ることすら覚束な
いものとなる。
For example, every time the power is restarted, the initial value of the place where the work is located, or the place where the pallet (working board) to which the work is attached is to be input correctly in some way. If there is a discrepancy between the actual state of the internal storage system (mainly showing the work and pallet location and the progress status of the work) of the control device when the operation control is restarted. In this case, wrong control is performed, and even if a desired product is obtained, the above-mentioned “complete product” cannot be obtained.

従来は、制御装置に対しこうしたシステム状態に関し
ての初期値を登録入力する手段として、キーボード等の
入力装置を用いるのが普通であった。
Conventionally, an input device such as a keyboard is usually used as a means for registering and inputting an initial value regarding the system state to the control device.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

確かに、上記キーボード等の入力装置によれば、ワー
クおよびパレットの場所やワークの工程進捗状況等に関
する状態データを制御装置に対して事細かに指示入力す
ることができる。しかし、こうしたキーボード等の操作
には相当の熟練を要し、これを用いて実際のシステムの
状態と制御装置内部に初期設定すべき状態とを一致させ
ることは、通常の工場内部のオペレータにとっては至難
の作業であった。
Certainly, according to the input device such as the keyboard, it is possible to finely instruct and input the state data regarding the locations of the work and the pallet, the process progress status of the work and the like to the control device. However, operation of such a keyboard requires a considerable amount of skill, and using it to match the actual system state with the state that should be initialized in the control unit is not necessary for an operator inside a normal factory. It was a difficult task.

この発明は、こうした実情に鑑みてなされたものであ
り、不慣れな作業者であっても、制御装置に対する上述
した初期設定を容易かつ的確に行なうことのできるフレ
キシブル生産システムのワーク初期状態設定装置を提供
することを目的とする。
The present invention has been made in view of such circumstances, and provides a work initial state setting device of a flexible production system capable of easily and accurately performing the above-described initial setting for a control device even by an inexperienced operator. The purpose is to provide.

〔問題点を解決するための手段〕 この発明では、あらかじめ設定される各種ワークにつ
いての長期的な加工計画および各ワーク毎の工程設計内
容に基づき各種自動生産設備の運転スケジュールを作成
し、この作成した運転スケジュールに応じて前記設備の
総括的な運転制御を実行する制御装置に対し前記自動生
産設備における各ワーク格納場所でのワークの状態に関
する初期入力設定を実行するフレキシブル生産システム
のワーク初期状態設定装置において、前記各設備を模擬
縮小した実体設備模型と、前記実体設備模型の各ワーク
格納場所に収容される、前記各種ワークを模擬縮小した
実体ワーク模型と、前記実体設備模型の各ワーク格納場
所で、ワークの存在の有無をそれぞれ検出するワーク検
出手段と、前記各ワーク格納場所毎に設けられ、各ワー
ク格納場所に収容されるワークの種類、進捗状況をそれ
ぞれ設定するワークデータ設定手段と、前記ワーク検出
手段の検出内容および前記ワークデータ設定手段の設定
内容を用いて前記制御装置に対して各ワーク格納場所で
のワークの状態に関する初期入力設定を行う初期値入力
設定手段とを具えるようにする。
[Means for Solving Problems] In the present invention, an operation schedule of various automatic production equipment is created based on a preset long-term machining plan for various works and process design contents for each work, and this creation is performed. Work initial state setting of flexible manufacturing system for executing initial input setting regarding the state of the work at each work storage location in the automatic production equipment to the control device that executes overall operation control of the equipment according to the operation schedule In the apparatus, a physical equipment model in which each of the equipment is simulated and reduced, a physical work model in which each of the various workpieces is simulated and reduced, which is housed in each of the work storage locations of the physical equipment model, and each work storage location of the physical equipment model The work detection means for detecting the presence or absence of a work, and the work storage means are provided for each work storage location. And the work data setting means for setting the type and progress of the work accommodated in each work storage location, and the detection content of the work detection means and the setting content of the work data setting means to the control device. And an initial value input setting means for performing an initial input setting relating to the state of the work in each work storage location.

〔作用〕[Action]

すなわち、この発明では、コンピュータの表示画面上
などに表示される実体を持たないシステムモデル画面を
用いるのではなく、FMSシステムの各自動生産設備を模
擬縮小した実体設備模型を用いて各自動生産設備におけ
る各ワーク格納場所でのワークの状態に関する初期入力
設定を実行するようにしている。
That is, according to the present invention, instead of using a system model screen that does not have an entity displayed on a display screen of a computer or the like, each automated production facility is simulated by reducing each automated production facility of the FMS system. The initial input setting relating to the state of the work at each work storage location in is executed.

したがって、オペレータは、前記実体設備模型の各ワ
ーク格納場所に実体ワーク模型を実際に配置することに
よってワークの存在位置に関するデータを前記制御装置
に対し初期設定する。またこの際に、オペレータは、前
記ワークデータ設定手段を用いてワークの種類、進捗状
況に関するデータを前記制御装置に対し初期設定する。
Therefore, the operator initializes the data regarding the existing position of the work in the control device by actually arranging the real work model in each work storage location of the real equipment model. At this time, the operator uses the work data setting means to initialize the data regarding the type of work and the progress status in the control device.

〔実施例〕〔Example〕

第4図〜第6図、および第1図〜第3図に、この発明
にかかるフレキシブル生産システムのワーク初期状態設
定装置一実施例を示す。
FIG. 4 to FIG. 6 and FIG. 1 to FIG. 3 show an embodiment of the work initial state setting device of the flexible production system according to the present invention.

まず第4図は、この実施例システムにおいて前提とす
るFMS(フレキシブル生産システム)ラインを例示した
ものである。
First, FIG. 4 exemplifies an FMS (flexible manufacturing system) line as a premise in the system of this embodiment.

同図に示すように、このFMSラインは、素材の搬入や
完品の搬出を行なうための入出庫ステーションIE、この
入出庫ステーションIEにあって、適宜の表示手段を通じ
て随時の入出庫情報を作業者に報告、指示したり、適宜
の操作入力手段を通じて作業の完了入力を受け付けたり
するための入出庫ステーション作業指示装置IET、パレ
ット(加工盤:図示せず)の一時保管と治具(図示せ
ず)の一時保管を行なうための倉庫として、この例では
横16列に図示したものが上下にも3段あり計48個の棚か
らなるとする自動倉庫(STORAGE)STR、ワーク(加工
物:図示せず)のパレットへの取り付け、取り外し並び
に治具のパレットへの組みつけ、分解を行なう第1およ
び第2の段取装置LS1およびLS2、この段取装置LS1およ
びLS2の置かれる部所にあって、適宜の表示手段を通じ
て随時の段取作業手順を作業者に示したり、適宜の操作
入力手段を通じて作業の完了入力を受け付けたりするた
めの段取ステーション作業指示装置LST、実際の加工の
ための設備として、パレットに取り付けられたワークの
旋削加工、穴ある加工、フライス加工等、各種加工を分
担して若しくは1台で複合して行なう3台の工作機械
(NC制御工作機械を想定する)MC1,MC2およびMC3、パレ
ットの反転機能等をも有してこれに取り付けられたワー
クを該パレットごと洗浄する洗浄装置(WASHER)WS、そ
して水平、垂直方向の2次元の移動が可能であって、上
記各設備の間でワークやパレット、治具等を自動搬送す
る搬送装置SC1、からなる自動生産設備と、中央制御室1
00内に置かれる主電子計算機(以下これを中央処理装置
という)およびその周辺装置、並びにこの中央処理装置
から上記各生産設備に対して出力される制御指令を中継
したり、同各生産設備の状態を監視してその情報を中央
処理装置に伝えたりする中継処理装置210,220,230,240
および250からなって、上記各生産設備を総括的に運転
制御するFMS制御装置と、をそれぞれ有して構成されて
いる。
As shown in the figure, this FMS line is a loading / unloading station IE for loading and unloading raw materials, and in this loading / unloading station IE, the loading / unloading information at any time is processed through an appropriate display means. Temporary storage of a loading / unloading station work instruction device IET, a pallet (working plate: not shown) and a jig (not shown) for reporting and instructing a worker, and receiving a work completion input through an appropriate operation input means. As a warehouse for the temporary storage of ()), in this example, the one shown in 16 rows horizontally has 3 shelves at the top and bottom, consisting of a total of 48 shelves (STORAGE) STR, work (workpiece: figure) The first and second setup devices LS1 and LS2 for mounting and dismounting (not shown) on the pallet, assembling and disassembling the jig on the pallet, and at the place where the setup devices LS1 and LS2 are placed. And an appropriate table Set-up station work instruction device LST for showing the operator the setup work procedure at any time through the means and accepting the completion input of the work through the appropriate operation input means, as a facility for actual processing, on the pallet Three machine tools (assuming NC controlled machine tools) MC1, MC2 and MC3, which perform various kinds of machining such as turning, hole machining, milling etc. of the attached work or are combined in one machine. A washing device (WASHER) WS that also has a pallet reversing function and that cleans the workpieces attached to this pallet, and two-dimensional horizontal and vertical movements are possible between the above equipments. Central control room 1 with an automatic production facility consisting of a transfer device SC1 that automatically transfers workpieces, pallets, jigs, etc.
Main computer (hereinafter referred to as central processing unit) located in 00 and its peripheral devices, and relays control commands output from the central processing unit to the above-mentioned production facilities, and Relay processors 210, 220, 230, 240 that monitor the status and transmit that information to the central processing unit
And 250, and an FMS control device for controlling the overall operation of each of the above-mentioned production facilities.

また第5図は、このFMSラインにおける上記中央制御
室100の内部装置、並びに上記中継処理装置210〜250や
各生産設備についての電気的な連係態様を示したもので
ある。
FIG. 5 shows an internal device of the central control room 100 in the FMS line, and an electric connection mode of the relay processing devices 210 to 250 and each production facility.

すなわちこのFMSラインにおいては、同第5図に示す
ように、中央制御室100は、その内部に、FMS制御装置本
体としての上述した中央処理装置110をはじめ、その周
辺装置として、前述した加工計画や工程設計等の基本情
報その他をこの中央処理装置110(正確にはその後述す
る外部情報記憶部113)に登録するための手操作入力装
置101、メニュー画面等の文字画面を表示するための文
字画面表示装置102、システムの現状やシミュレーショ
ン結果の描画画面を表示するための描画画面表示装置10
3、帳票類の印刷を行なうための印刷装置104、およびNC
テープの入出力を行なうための紙テープ入出力装置10
5、および図示しない電源の立ち上げ時等に上記中央処
理装置110に対してワークおよびパレットの場所やワー
クの工程進捗状況等のシステム状態データを初期設定す
るための初期状態入力模型106をそれぞれ具えて構成さ
れており、また上記中央処理装置110と各生産設備との
間での制御指令や状態情報等の中継を行なう上記の中継
処理装置210〜250は、その第1中継処理装置210が、搬
送装置SC1および入出庫ステーション作業指示装置IETに
関しての上記中継処理を実行し、第2中継処理装置220
が、洗浄装置WSおよび段取装置LS1,LS2および段取ステ
ーション作業指示装置LSTに関しての上記中継処理を実
行し、第3〜第5中継処理装置230〜250が、各々第1〜
第3工作機械MC1〜MC3に関しての上記中継処理を実行す
るよう、予めその分担が設定されている。
That is, in this FMS line, as shown in FIG. 5, the central control room 100 includes therein the above-mentioned central processing unit 110 as an FMS control unit main body and the above-described processing plan as its peripheral unit. Input device 101 for registering basic information such as process information and process design in the central processing unit 110 (exactly, an external information storage unit 113 described later), and characters for displaying a character screen such as a menu screen Screen display device 102, a drawing screen display device 10 for displaying a drawing screen of the current state of the system and a simulation result
3, printing device 104 for printing forms, and NC
Paper tape input / output device for tape input / output 10
5, and an initial state input model 106 for initializing the system state data such as the location of the work and the pallet and the process progress status of the work in the central processing unit 110 when the power source (not shown) is turned on. The relay processing devices 210 to 250 for relaying control commands and status information between the central processing device 110 and each production facility are the first relay processing device 210. The relay process is executed for the transfer device SC1 and the loading / unloading station work instruction device IET, and the second relay processing device 220
Performs the above-mentioned relay process for the cleaning device WS, the setup devices LS1, LS2, and the setup station work instruction device LST, and the third to fifth relay processing devices 230-250 respectively
The assignment is set in advance so as to execute the above-mentioned relay processing for the third machine tools MC1 to MC3.

なお、これら各中継処理装置210〜250は、基本的に第
6図に示す内部構成を有する電子計算機からなり、上記
制御対象となる各生産設備との間で、搬送装置SC1、洗
浄装置WS、段取装置LS1およびLS2、第1〜第3工作機械
MC1〜MC3の各設備に関しては、制御情報および事象(状
態変化)についての同第6図に示す態様での授受を行な
い、入出庫ステーション作業指示装置IET、段取ステー
ション作業指示装置LSTの各設備に関しては、作業指示
情報および作業要求についての同第6図に示す態様での
授受を行なう。ここに、該中継処理装置における処理手
順記憶部21とは、中継処理装置としての処理手順である
プログラムが予格納された記憶部であり、また内部情報
記憶部材22とは、情報加工(計算)を行なうときに基礎
となる情報が格納される記憶部であり、情報加工部(中
央演算装置、CPU)23とは、上記処理手順記憶部21に格
納されたプログラムを順次読み出しつつ、その書かれた
処理手順に従って、情報の入出力や内部情報記憶部22の
記憶情報をもとに情報の加工(計算)を行なう部分であ
り、情報変換部24とは、中央処理装置110から伝送され
る制御指令(制御所望とする生産設備並びに該設備に関
係する中継処理装置を指定するための情報、および同生
産設備の所望とする制御内容に対応したコード情報等を
含んで構成される)については、自局(自中継処理装
置)が指定されたことを条件に、これを上記加工のため
の共通の情報に変換して上記情報加工部23に加え、情報
加工部23から加えられる加工情報(自局並びに各該当す
る生産設備の識別情報、および同生産設備の上述した
「事象」や「作業要求」についてその内容に対応したコ
ード情報等を含んで構成される)については、これを情
報通信のための所要の形態に変換して中央処理装置110
へ転送する部分であり、そして情報変換部25とは、情報
加工部23から加えられる加工情報(各該当する生産設備
への上述した「制御情報」や「作業指示情報」について
中央処理装置から伝送されるコード情報に対応した具体
内容を示す情報等を含んで構成される)については、こ
れを情報通信のための所要の形態に変換して各該当する
生産設備へ転送し、各該当する生産設備から伝送される
上記の「事象」や「作業要求」等の設備状態情報につい
ては、これを上記加工のための共通の情報に変換して上
記情報加工部23に加える部分である。
It should be noted that each of these relay processing devices 210 to 250 is basically composed of an electronic computer having the internal configuration shown in FIG. 6, and the transfer device SC1, the cleaning device WS, and the production device to be controlled are connected to each other. Setup devices LS1 and LS2, first to third machine tools
Regarding each equipment of MC1 to MC3, the control information and the event (change of state) are exchanged in the manner shown in FIG. 6, and each equipment of the loading / unloading station work instruction device IET and the setup station work instruction device LST. With respect to, the work instruction information and the work request are exchanged in the manner shown in FIG. Here, the processing procedure storage unit 21 in the relay processing device is a storage unit in which a program as a processing procedure as the relay processing device is pre-stored, and the internal information storage member 22 is information processing (calculation). The information processing unit (central processing unit, CPU) 23 is a storage unit that stores basic information when performing the In accordance with the processing procedure described above, information is input / output and information is processed (calculated) based on the information stored in the internal information storage unit 22. The information conversion unit 24 is a control transmitted from the central processing unit 110. Regarding the command (which includes information for designating the production equipment to be controlled and the relay processing device related to the equipment, and code information corresponding to the desired control contents of the production equipment), Own station On the condition that the continuous processing device) is specified, this is converted into common information for the above processing and added to the above information processing section 23, and the processing information (own station and each corresponding information) added from the information processing section 23. The production equipment identification information and the code information corresponding to the contents of the “event” and “work request” of the production equipment described above are included in the information required for information communication. Central processing unit 110 converted to form
The information converting unit 25 is the processing information added from the information processing unit 23 (the above-mentioned “control information” and “work instruction information” for each corresponding production facility are transmitted from the central processing unit). (Including information indicating concrete contents corresponding to the code information), which is converted into a required form for information communication and transferred to each corresponding production facility, each corresponding production The equipment state information such as the above-mentioned “event” and “work request” transmitted from the equipment is a portion which is converted into common information for the above processing and added to the information processing section 23.

さて、第1図は、中央制御室100における上記中央処
理装置110の内部構成と、上記初期状態入力模型106の構
成概念とを主に示したものであり、以下、これらの具体
的な構成並びに機能について詳述する。
Now, FIG. 1 mainly shows an internal configuration of the central processing unit 110 in the central control room 100 and a configuration concept of the initial state input model 106. Hereinafter, specific configurations thereof will be described. The function will be described in detail.

まず、上記の中央処理装置110は、基本的に同第1図
に示す内部構成を有する電子計算機からなり、前述した
各周辺装置(手操作入力装置101、文字画面表示装置10
2、描画画面表示装置103、印刷装置104、紙テープ入出
力装置105、および初期状態入力模型106)並びに上記中
継処理装置210〜250との間で、各々同第1図に示す態様
での必要情報の授受を行なう。ここに、該中央処理装置
110における処理手順記憶部111とは、中央処理装置とし
ての処理手順であるプログラムが予格納された記憶部で
あり、また内部情報記憶部112とは、前述したシステム
状態データをはじめとする情報加工(計算)を行なうと
きに基礎となる情報が格納される記憶部であり、外部情
報記憶部113とは、正確には同中央処理装置110の外部に
配される磁気ディスク装置等からなって、前述の如く
「加工計画」や「工程設計」等の基本情報その他が登録
される記憶部であり、情報加工部(中央演算装置、CP
U)114とは、上記処理手順記憶部111に格納されたプロ
グラムを順次読み出しつつ、その書かれた処理手順に従
って、情報の入出力や内部情報記憶部112あるいは外部
情報記憶部113の記憶情報をもとに情報の加工(計算)
を行なう部分であり、そして情報変換部115とは、手操
作入力装置101から加えられる入力情報(基本情報やそ
の都度の手操作情報)、あるいは紙テープ入出力装置10
5から加えられる入力情報(NC制御情報)、あるいは初
期状態入力模型106から加えられる入力情報(システム
状態データ初期値)、あるいは中継処理装置210〜250か
ら転送される中継情報(各該当する中継処理装置並びに
生産設備の識別情報、および当該生産設備の上述した
「事象」や「作業要求」についてその内容に対応したコ
ード情報等を含んだもの)については、これを上記加工
のための共通の情報に変換して上記情報加工部114に加
え、情報加工部114から加えられる加工情報(文字画面
表示装置102や描画画面表示装置103に対する各々所要の
表示指示装置、印刷装置104に対する所要の印字指示情
報、紙テープ入出力装置105に対する所要のNC制御情
報、中継処理装置210〜250に対する前述した「制御指
令」、等々)については、これをそれぞれ相手先に応じ
て情報通信のための所要の形態に変換して所望先へ転送
する部分である。
First, the central processing unit 110 basically comprises an electronic computer having the internal configuration shown in FIG. 1, and the above-mentioned peripheral devices (the manual operation input device 101, the character screen display device 10).
2, drawing screen display device 103, printing device 104, paper tape input / output device 105, and initial state input model 106) and required information in the mode shown in FIG. Give and receive. Here, the central processing unit
The processing procedure storage unit 111 in 110 is a storage unit in which a program, which is a processing procedure as a central processing unit, is pre-stored, and the internal information storage unit 112 is an information processing unit including the system state data described above. The external information storage unit 113 is a storage unit that stores basic information when performing (calculation). To be exact, the external information storage unit 113 includes a magnetic disk device or the like arranged outside the central processing unit 110. As described above, this is a storage unit that stores basic information such as "machining plan" and "process design", and other information processing unit (central processing unit, CP
U) 114 refers to the input / output of information and the storage information of the internal information storage unit 112 or the external information storage unit 113 according to the written processing procedure while sequentially reading the programs stored in the processing procedure storage unit 111. Based on information processing (calculation)
The information conversion unit 115 is the input information (basic information or manual operation information at each time) added from the manual operation input device 101, or the paper tape input / output device 10.
Input information added from 5 (NC control information), input information added from the initial state input model 106 (system state data initial value), or relay information transferred from the relay processing devices 210 to 250 (each corresponding relay processing). This includes common information for the above-mentioned processing, including identification information of equipment and production equipment, and code information corresponding to the contents of the above-mentioned "event" and "work request" of the production equipment). In addition to the above information processing unit 114, processing information added from the information processing unit 114 (required display instruction device for the character screen display device 102 and the drawing screen display device 103, required print instruction information for the printing device 104, respectively) , The required NC control information for the paper tape input / output device 105, the above-mentioned “control command” for the relay processing devices 210 to 250, etc.) Depending on the previously converted into the required form for information communication is a part to be transferred to the desired destination.

因みに、この中央処理装置110は、上記の処理手順記
憶部111、情報加工部114および情報変換部115によって
いわゆる情報処理部が構成され、この情報処理部が、前
記各設備の運転制御を実現する際に、加工計画および工
程設計内容を示す基本情報(予め手操作入力装置101等
を通じて外部情報記憶部113に登録される)、更には各
設備やワークのモデル(これも上記入力装置101等の適
宜の入力手段を通じて外部情報記憶部113に登録され
る)およびワークの現在の位置や加工進捗状況を示す現
状データ(各中継処理装置からの中継情報に基づき外部
情報記憶部113に登録されるデータであって必要に応じ
て更新される)を用いた素材、治具、工具等の手配並び
に各ワークの加工設備や加工順序に関する例えば実時間
でのシミュレーション、該シミュレーション結果に基づ
く各設備の運転スケジュールの制定、そして該制定され
た運転スケジュールに基づく各設備の実際の運転制御、
等をそれぞれ実行する。
Incidentally, in the central processing unit 110, a so-called information processing unit is configured by the processing procedure storage unit 111, the information processing unit 114, and the information conversion unit 115, and this information processing unit realizes operation control of each of the facilities. At this time, basic information indicating a machining plan and process design contents (previously registered in the external information storage unit 113 through the manual operation input device 101 or the like), and further, a model of each facility or work (this is also the input device 101 or the like. Registered in the external information storage unit 113 through appropriate input means) and current data indicating the current position of the workpiece and the processing progress status (data registered in the external information storage unit 113 based on relay information from each relay processing device) , Which is updated as necessary), for example, real-time simulation of material, jigs, tools, etc. Enactment of the equipment operation schedule based on the emission results and the actual operation control for each facility based on the enacted operation schedule,
And so on.

また、初期状態入力模型106は、同第1図にその構成
概念を示すように、全体として、当該システムにおける
前記各設備(第4図参照)を適宜に模擬縮小した形状を
有するシステム模型として構成されている。因みにこの
実施例においては、先の第1および第2の段取装置LS1
およびLS2の模型である第1および第2の段取装置模型L
S1′およびLS2′、同じく第1〜第3の工作機械MC1〜MC
3の模型である第1〜第3の工作機械模型MC1′〜MC
3′、同じく洗浄装置WSの模型である洗浄装置模型W
S′、同じく搬送装置SC1の模型である搬送装置模型SC
1′、同じく自動倉庫STRの模型である自動倉庫模型ST
R′、更には前述したワーク、パレットおよび治具につ
いての模型であるワーク模型W、パレット模型P、およ
び治具模型Gをそれぞれ具えて、この入力模型106が構
成されている。なお、これらワーク、パレット、治具の
各模型W,P,Gについては、便宜上各1つのみを図示した
が、実際には、当該実施例システムにおいて同時処理可
能なこれらワーク、パレット、治具の数に応じて、その
模型W,P,Gも各々複数個ずつ用意されるものとする。ま
た、上記段取装置模型LS1′,LS2′、工作機械模型MC1′
〜MC3′、洗浄装置模型WS′、搬送装置模型SC1′および
自動倉庫模型STR′の各模型は、実際のこれら各設備に
おけるワークの格納場所を単位としてこれを模擬するよ
う構成されていて、それぞれこれらワーク格納場所の模
擬部分において、上記ワーク模型W、パレット模型Pお
よび治具模型Gの3つの模型を同時に収納できる構造に
なっているとする。
The initial state input model 106 is configured as a system model having a shape obtained by appropriately simulating and reducing each facility (see FIG. 4) in the system as a whole, as the configuration concept is shown in FIG. Has been done. Incidentally, in this embodiment, the first and second setup devices LS1 described above are used.
1st and 2nd setup device model L which is a model of LS2 and LS2
S1 'and LS2', similarly the first to third machine tools MC1 to MC
The first to third machine tool models MC1 ′ to MC, which are three models
3 ', a washing machine model W which is also a model of the washing machine WS
S ', a carrier model SC that is also a model of carrier SC1
1 ', Automatic warehouse model ST which is also a model of automatic warehouse STR
The input model 106 is constituted by R ′, and further, the work model W, the pallet model P, and the jig model G, which are models of the work, the pallet, and the jig described above, respectively. Although only one of each of the models W, P, G of the work, the pallet, and the jig is shown for the sake of convenience, in reality, the work, the pallet, and the jig that can be simultaneously processed in the embodiment system. A plurality of models W, P, and G are prepared according to the number of. In addition, the setup device models LS1 ', LS2', machine tool model MC1 '
~ MC3 ', cleaning device model WS', transfer device model SC1 ', and automatic warehouse model STR' are configured to simulate the actual work storage location in each of these facilities as a unit. It is assumed that the simulated parts of these work storage locations have a structure capable of simultaneously storing the three models of the work model W, the pallet model P, and the jig model G.

第2図は、上記各模型のうち自動倉庫模型STR′の一
部を例として、こうした模型の構造を具体的に示したも
のであり、この第2図を参照して同模型構造を更に詳述
する。
FIG. 2 shows a concrete structure of such a model by taking a part of the automatic warehouse model STR ′ among the above models as an example. Further details of the model structure will be given with reference to FIG. I will describe.

第2図に示されるように、模型各部のワーク格納場所
(第2図の例では自動倉庫模型STR′のK番目の棚STR′
kおよびその周囲のワーク格納場所のみを便宜的に示し
ている)は3つの領域に仕切られていて(必ずしも仕切
る必要はないが)、それぞれ上記のワーク模型W、パレ
ット模型Pおよび治具模型Gの3つの模型を、オペレー
タによる矢印F1〜F3方向へのセット(差し込み)操作に
よって同時に、しかも選択的に収納できるようになって
いる。ただし、これら3つの収納領域において、上記3
つの模型W,PおよびGが各々収納されるべき位置は予め
決められているものとする。このための手法として例え
ば、上記3つの模型W,PおよびGの各形状(凸部あるい
は凹部の配設等をも含む)または大きさを違えておくと
ともに、上記3つの収納領域の各形状(凹部あるいは凸
部の配設等をも含む)または大きさをもこれら模型に合
わせて違えておく構造、すなわちこれらの専ら対応する
関係でしかセットし得ないような構造を採用してもよ
い。
As shown in FIG. 2, the work storage place of each part of the model (in the example of FIG. 2, the Kth shelf STR ′ of the automatic warehouse model STR ′)
Only k and the work storage areas around it are shown for convenience), but they are divided into three areas (though not necessarily divided), and the work model W, the pallet model P, and the jig model G are respectively defined. The three models can be stored at the same time and selectively by the operator's setting (inserting) operation in the directions of arrows F1 to F3. However, in these three storage areas,
The positions where the two models W, P, and G are to be stored are predetermined. As a method for this, for example, the shapes (including the arrangement of the convex portion or the concave portion) or the sizes of the three models W, P, and G are different, and the shapes of the three storage areas ( It is also possible to employ a structure in which recesses or protrusions are included) or the size thereof is made different according to these models, that is, a structure in which they can be set only in a corresponding relationship.

また、同第2図に示されるように、上記のワーク模型
Wには、前記制御装置(中央処理装置110)に対してワ
ークの種類を指定するための識別子である「ワークコー
ド」を設定するためのワークコード設定ダイヤルWCD、
ワークの位置を制御装置内で認識するためにその加工手
順に応じて自動的に付けられる番号である「工程番号」
を設定するための工程番号設定ダイヤルNOD、およびこ
の設定された番号の工程が「開始前」、「処理中」、
「終了」のいずれにあるかこの別を設定するための工程
進捗状況設定ダイヤルBSE、がそれぞれ設けられてい
る。すなわちオペレータは、これらダイヤルWCD,CODお
よびBSEを通じて、当該ワーク模型に、これら「ワーク
コード」、「工程番号」および該工程の「開始前」、処
理中」、「終了」の別を登録設定することができる。同
様に、上記のパレット模型Pには、制御装置(中央処理
装置110)に対して使用するパレットを指定するための
識別子である「パレットコード」を設定するためのパレ
ットコード設定ダイヤルPCDが、また上記の治具模型G
には、制御装置に対して使用する治具を指定するための
識別子である「治具コード」を設定するための治具コー
ド設定ダイヤルGCDがそれぞれ設けられていて、オペレ
ータによるこれらダイヤルの操作に基づき、当該パレッ
ト模型あるいは当該治具模型に、それぞれ「パレットコ
ード」あるいは「治具コード」を登録設定できるように
なっている。
Further, as shown in FIG. 2, a "work code", which is an identifier for designating the type of work, is set in the work model W for the control device (central processing unit 110). Work code setting dial for WCD,
"Process number", which is a number automatically assigned according to the machining procedure in order to recognize the position of the work in the control device
Process number setting dial NOD for setting, and the process of this set number is "Before start", "In process",
A process progress setting dial BSE, which is used to set whether it is “finished” or not, is provided. That is, the operator registers and sets the "work code", "process number", and "pre-start", "processing", and "end" of the process in the work model through these dials WCD, COD, and BSE. be able to. Similarly, in the pallet model P, a pallet code setting dial PCD for setting a "pallet code" which is an identifier for designating a pallet to be used for the control device (central processing unit 110), Jig model G above
Each is equipped with a jig code setting dial GCD for setting the "jig code" that is an identifier for specifying the jig to be used for the control device, and the operator can operate these dials. Based on this, the "pallet code" or "jig code" can be registered and set in the pallet model or the jig model, respectively.

各模型に設定されたこれらのコードその他の内容は、
各模型がそれぞれその該当する収納領域にセットされた
とき、これら各収納領域に予め配設されている同第2図
に図示の各該当するセンサ(ワークセンサWSE、パレッ
トセンサPSEおよび治具センサGSE)によって自動的に読
み取られる。
These codes and other contents set for each model are
When each model is set in its corresponding storage area, each corresponding sensor (work sensor WSE, pallet sensor PSE and jig sensor GSE) shown in FIG. ) Automatically read by.

なお、上記の模型に対する各ダイヤルを通じてのコー
ドその他の登録手法、並びにこの登録されたコードその
他の上記センサを通じての読み取り手法は任意であり、
例えば光センサ技術等を応用した周知のディジタル技術
を用いても、これを実現することは容易である。ただ
し、上記各センサWSE,PSEおよびGSEの構成に際しては、
その該当する収納領域に該当する模型がセットされない
場合、その旨示す予め決められた情報(例えば「0」)
を自動出力するようその動作特性が決められるものとす
る。
It should be noted that a code or other registration method through each dial for the above model and a method of reading the registered code or the like through the sensor are arbitrary,
For example, it is easy to realize this by using a well-known digital technology to which an optical sensor technology or the like is applied. However, when configuring the above sensors WSE, PSE and GSE,
If the corresponding model is not set in the corresponding storage area, predetermined information indicating that (for example, "0")
The operating characteristics shall be determined so as to automatically output.

第3図に、同初期状態入力模型106におけるこれら各
センサ部の構成を抽出して示す。
FIG. 3 shows an extracted structure of each of these sensor units in the initial state input model 106.

すなわちこの第3図において、各2つのワークセンサ
WSEI1〜2、パレットセンサPSEL1〜2および治具センサGS
EI1〜2は、2つの段取装置模型LS1′およびLS2′のワー
ク格納場所にそれぞれ配されるセンサを示し、各9つの
ワークセンサWSEM1〜9、パレットセンサPSEM1〜9および
治具センサGSEM1〜9は、3つの工作機械模型MC1′〜MC
3′におけるそれぞれ3箇所のワーク格納場所、すなわ
ち実際の工作機械MC1〜MC3における各入出庫口、中間退
避場および加工台に対応するワーク格納場所にそれぞれ
配されるセンサを示し、各1つのワークセンサWSEW、パ
レットセンサPSEWおよび治具センサGSEWは、洗浄装置模
型WS′のワーク格納場所に配されるセンサを示し、同じ
く各1つのワークセンサWSESC、パレットセンサPSESCお
よび治具センサGSESCは、搬送装置模型SC1′のワーク格
納場所に配されるセンサを示し、そして各48のワークセ
ンサWSES1〜48、パレットセンサPSES1〜48および治具セ
ンサGSES1〜48は、自動倉庫模型STR′の前述した48の棚
にそれぞれ配されるセンサを示す。そして、これらセン
サのうち、各ワークセンサWSEは、その該当する収納領
域に前記のワーク模型Wがセットされたとき、その前記
「ワークコード」、「工程番号」および「工程進捗状況
(当該工程の「開始前」、「処理中」、「終了」の
別)」を読み取ってこれをコード処理部CPへ出力し、各
パレットセンサPSEは、その該当する収納領域に前記の
パレット模型Pがセットされたとき、その前記「パレッ
トコード」を読み取ってこれをコード処理部CPへ出力
し、各治具センサGSEは、その該当する収納領域に前記
の治具模型Gがセットされたとき、その前記「治具コー
ド」を読み取ってこれをコード処理部CPへ出力する。ま
た上述の如く、模型がセットされていない収納領域に対
応するセンサからは、例えば「0」等の予設定情報が同
コード処理部CPへ出力される。
That is, in FIG. 3, two work sensors each are provided.
WSE I1 ~ 2 , Pallet sensor PSE L1 ~ 2 and jig sensor GS
E I1 to 2 are sensors arranged in the work storage locations of the two setup device models LS1 'and LS2', respectively, and each of the nine work sensors WSE M1 to 9 , pallet sensor PSE M1 to 9 and jig sensor. GSE M1 ~ 9 is, three of the machine tool model MC1'~MC
3'shows sensors arranged at each of three work storage locations, that is, each storage port corresponding to each loading / unloading port, intermediate evacuation area, and processing table in the actual machine tools MC1 to MC3, one work each. A sensor WSE W , a pallet sensor PSE W and a jig sensor GSE W indicate sensors arranged in the work storage location of the cleaning device model WS ′, and also one work sensor WSE SC , pallet sensor PSE SC and jig sensor. GSE SC indicates a sensor arranged in the work storage location of the transfer device model SC1 ′, and each of the 48 work sensors WSE S1 to 48 , pallet sensor PSE S1 to 48 and jig sensor GSE S1 to 48 is an automatic warehouse. The sensors arranged on the above-mentioned 48 shelves of the model STR 'are shown. Then, among these sensors, each work sensor WSE, when the work model W is set in its corresponding storage area, has its “work code”, “process number”, and “process progress status (of the process concerned)”. "Before start", "in process", "end") are read and output to the code processing unit CP, and each pallet sensor PSE sets the pallet model P in the corresponding storage area. When the jig model G is set in the corresponding storage area, each jig sensor GSE reads the “pallet code” and outputs it to the code processing unit CP. It reads the "jig code" and outputs it to the code processing section CP. Further, as described above, the preset information such as "0" is output to the same code processing unit CP from the sensor corresponding to the storage area where the model is not set.

コード処理部CPは、こうして加えられる各センサから
の出力を、その入力番地(各センサの配設位置)の識
別、認識のもとに整理して、前記の「システム状態デー
タ」を形成するとともに、例えばオペレータによるセッ
ト完了キーSEKの操作に基づいて、この形成した「シス
テム状態データ」を中央処理装置110の前記情報変換部1
15へ転送するよう動作する部分である。初期状態入力模
型106(正確にはこのコード処理部PCP)からこうして
「システム状態データ」が転送されることにより、中央
処理装置110では、これを実際のシステムにおける現在
の状態を示すデータとして受け取り、その内部情報記憶
部112の該当する記憶領域にあるデータをこの受け取っ
た「システム状態データ」によって初期化する。そして
その後は、先の運転スケジュールとの対照のもとに、こ
の「システム状態データ」によって示される内容を当該
システムの初期状態として前記各設備に対する以降の運
転制御を開始する。
The code processing unit CP organizes the output from each sensor thus added based on the identification and recognition of the input address (position of each sensor) to form the above-mentioned "system state data". , For example, based on the operation of the set completion key SEK by the operator, the formed “system state data” is converted into the information conversion unit 1 of the central processing unit 110.
This is the part that operates to transfer to 15. By transferring the "system state data" from the initial state input model 106 (to be exact, this code processing unit PCP), the central processing unit 110 receives this as data indicating the current state in the actual system, The data in the corresponding storage area of the internal information storage unit 112 is initialized by the received "system state data". Then, thereafter, in contrast with the previous operation schedule, the contents indicated by the “system state data” are set as the initial state of the system, and the subsequent operation control for the respective facilities is started.

このように、この実施例によれば、初期状態入力模型
106を用いての、 ワーク模型W、パレット模型Pおよび治具模型Gに対
する各ダイヤルを通じた必要情報(「ワークコード」、
「工程番号」、「工程進捗状況」、「パレットコード」
および「治具コード」)のセット。
Thus, according to this embodiment, the initial state input model
Necessary information (“work code”, “work code”, for each of the work model W, pallet model P and jig model G using 106.
"Process number", "Process progress", "Pallet code"
And "Jig code") set.

これら情報セットしたワーク模型W、パレット模型P
および治具模型Gの各種設備模型内ワーク格納場所(収
納領域)への選択的な収納(差し込み)。
Work model W and pallet model P with these information sets
Also, the jig model G is selectively stored (inserted) in a work storage area (storage area) in various equipment models.

といった簡単な作業を通じて、制御装置(中央処理装置
110)に対するシステム状態の初期設定を自動的に行な
うことができる。
Through simple operations such as
The initial setting of the system state for 110) can be automatically performed.

なお、上記実施例の初期状態入力模型106において
は、ワーク模型W、パレット模型Pおよび治具模型Gの
各模型と、ワークセンサWSE、パレットセンサPSEおよび
治具センサGSEとが専ら対応付けられていて、これら模
型が収納されるべき位置は予め決められているとした
が、こうした対応関係についてはこれを自由化すること
も可能である。すなわちこれには、前記各模型W,Pおよ
びGに、当該模型がワーク模型、パレット模型および治
具模型のうちのいずれであるかを前記コード処理部CPに
識別させるための識別コードを前記各センサが検出でき
る態様で予登録しておき、それぞれダイヤルを通じてセ
ットされる前述したコードその他に併わせて、この識別
コードもセンサ出力として前記コード処理部CPに取り込
ませる構成とすればよい。勿論この場合、前記各センサ
としては全て同一の仕様のものが用いられる。
In the initial state input model 106 of the above embodiment, the work model W, the pallet model P, and the jig model G are exclusively associated with the work sensor WSE, the pallet sensor PSE, and the jig sensor GSE. Although the positions at which these models should be stored are predetermined, it is possible to liberate such correspondence. That is, this includes an identification code for causing each of the models W, P and G to identify the model to which the model is a work model, a pallet model or a jig model. Pre-registration may be carried out in such a manner that the sensor can detect it, and this identification code may be taken into the code processing unit CP as a sensor output together with the above-mentioned code and the like set through the dial. Of course, in this case, the sensors each having the same specifications are used.

また、これらワーク模型W、パレット模型Pおよび治
具模型G、更にはワークセンサWSE、パレットセンサPSE
および治具センサGSEについては、必ずしもこれらを用
いて構成とする必要はない。すなわち、これら模型やセ
ンサに代えて、適宜のスイッチ手段を前記各設備の模型
のワーク格納場所に設け、これらスイッチ手段のオン−
オフ態様によってワーク、パレットおよび治具の存在の
有無を指定するようにすることもできる。この場合、前
記の「ワークコード」、「パレットコード」等の情報
も、各設備の模型のワーク格納場所その他に配されると
する適宜のダイヤル手段を通じて別途に入力されるもの
とする。
Further, the work model W, the pallet model P, the jig model G, the work sensor WSE, and the pallet sensor PSE.
The jig sensor GSE does not necessarily have to be configured using these. That is, instead of these models and sensors, appropriate switch means are provided in the work storage place of the model of each of the above facilities, and these switch means are turned on.
The presence / absence of a work, a pallet, and a jig can be designated depending on the off mode. In this case, the information such as the "work code" and the "pallet code" described above is separately input through an appropriate dial means which is arranged in the work storage place of the model of each facility.

また、上記の実施例では、好適な例として、中継処理
装置を介して各生産設備の運転制御並びに状態把握(事
象報告)を行なうようにしたが、上記の初期状態入力模
型106および中央処理装置110におけるシステム状態デー
タの初期設定が、こうした中継処理装置の配設の有無と
は直接に係わることなく達成され得ることは勿論であ
る。すなわち、上記の初期状態入力模型106は、中継処
理装置を持たないフレキシブル生産システムについても
同様に適用、搭載することができる。
Further, in the above embodiment, as a preferred example, the operation control of each production facility and the status grasp (event report) are performed through the relay processing device, but the initial state input model 106 and the central processing unit are also provided. It goes without saying that the initial setting of the system state data in 110 can be achieved without being directly related to the presence or absence of such a relay processing device. That is, the initial state input model 106 described above can be similarly applied and installed in a flexible production system having no relay processing device.

またさらには、同実施例システムにおいて扱われる各
種の情報についての記憶手段並びに記憶手法、あるいは
入力手段、入力手法等も上記実施例にて例示した手段、
手法に限られることなく任意であり、要は、前述したよ
うな各種内容、構造を有する情報について、これらが的
確に登録、保持、あるいは入力されるものであれば、い
かなる手段、手法の採用も妨げられない。
Furthermore, storage means and storage methods for various types of information handled in the system of the embodiment, or input means, input methods, and the like are also exemplified in the above embodiments,
The method is not limited to any method, and the point is that any means or method can be adopted as long as the information having various contents and structures described above can be accurately registered, held, or input. I can't be disturbed.

〔発明の効果〕〔The invention's effect〕

以上説明したように、この発明によれば、感覚的にと
らえ易いシステム実体模型を通じて、制御装置に対する
システム状態の初期設定を非常に簡単に、しかも的確に
行なうことができる。
As described above, according to the present invention, it is possible to very easily and accurately perform the initial setting of the system state for the control device through the system entity model which is easily perceived.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの発明の一実施例についてその制御装置並び
に周辺装置構成を示すブロック図、第2図は第1図に示
したブロック図中の特に初期状態入力模型についてその
構造の具体例を示す斜視図、第3図は同初期状態入力模
型のセンサ部構成を示すブロック図、第4図はこの発明
の一実施例において前提とするFMSラインのライン構成
を示す略図、第5図はこのFMSラインの電気的な連係態
様を示すブロック図、第6図は第5図に示したブロック
図中の特に中継処理装置についてその基本内部構成を示
すブロック図である。 100…中央制御室、101…手操作入力装置、102…文字画
面表示装置、103…描画画面表示装置、104…印刷装置、
105…紙テープ入出力装置、106…初期状態入力模型、11
0…中央処理装置、111…処理手順記憶部、112…内部情
報記憶部、113…外部情報記憶部、114…情報加工部、11
5…情報交換部、210〜250…中継処理装置、IE…入出庫
ステーション、IET…入出庫ステーション作業指示装
置、STR…自動倉庫、SC1…搬送装置、LS1,LS2…段取装
置、LST…段取ステーション作業指示装置、MC1〜MC3…
工作機械、WS…洗浄装置、STR′…自動倉庫模型、SC1′
…搬送装置模型、LS1′,LS2′…段取装置模型、MC1′〜
MC3′…工作機械模型、WS′…洗浄装置模型、W…ワー
ク模型、P…パレット模型、G…治具模型、WSE…ワー
クセンサ、PSE…パレットセンサ、GSE…治具センサ、CP
…コード処理部。
FIG. 1 is a block diagram showing the configuration of a control device and peripheral devices for one embodiment of the present invention, and FIG. 2 shows a specific example of the structure of the initial state input model in the block diagram shown in FIG. FIG. 3 is a perspective view, FIG. 3 is a block diagram showing the configuration of the sensor unit of the same initial state input model, FIG. 4 is a schematic diagram showing the line configuration of an FMS line presumed in one embodiment of the present invention, and FIG. 5 is this FMS. FIG. 6 is a block diagram showing an electrical connection mode of the lines, and FIG. 6 is a block diagram showing a basic internal configuration of a relay processing device in the block diagram shown in FIG. 100 ... Central control room, 101 ... Manual operation input device, 102 ... Character screen display device, 103 ... Drawing screen display device, 104 ... Printing device,
105… Paper tape input / output device, 106… Initial state input model, 11
0 ... Central processing unit, 111 ... Processing procedure storage unit, 112 ... Internal information storage unit, 113 ... External information storage unit, 114 ... Information processing unit, 11
5 ... Information exchange unit, 210 to 250 ... Relay processing device, IE ... Storage / receipt station, IET ... Storage / receipt station work instruction device, STR ... Automatic warehouse, SC1 ... Conveying device, LS1, LS2 ... Setup device, LST ... Setup Taking station work instruction device, MC1 to MC3 ...
Machine tools, WS ... Cleaning equipment, STR '... Automatic warehouse model, SC1'
... Conveyor model, LS1 ', LS2' ... Setup device model, MC1 '~
MC3 '... Machine tool model, WS' ... Cleaning device model, W ... Work model, P ... Pallet model, G ... Jig model, WSE ... Work sensor, PSE ... Pallet sensor, GSE ... Jig sensor, CP
… Code processing section.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】あらかじめ設定される各種ワークについて
の長期的な加工計画および各ワーク毎の工程設計内容に
基づき各種自動生産設備の運転スケジュールを作成し、
この作成した運転スケジュールに応じて前記設備の統括
的な運転制御を実行する制御装置に対し前記自動生産設
備における各ワーク格納場所でのワークの状態に関する
初期入力設定を実行するフレキシブル生産システムのワ
ーク初期状態設定装置において、 前記各設備を模擬縮小した実体設備模型と、 前記実体設備模型の各ワーク格納場所に収容される、前
記各種ワークを模擬縮小した実体ワーク模型と、 前記実体設備模型の各ワーク格納場所で、ワークの存在
の有無をそれぞれ検出するワーク検出手段と、 前記各ワーク格納場所毎に設けられ、各ワーク格納場所
に収容されるワークの種類、進捗状況をそれぞれ設定す
るワークデータ設定手段と、 前記ワーク検出手段の検出内容および前記ワークデータ
設定手段の設定内容を用いて前記制御装置に対して各ワ
ーク格納場所でのワークの状態に関する初期入力設定を
行う初期値入力設定手段と、 を具えることを特徴とするフレキシブル生産システムの
ワーク初期状態設定装置。
1. An operation schedule for various automatic production facilities is created based on a preset long-term machining plan for various workpieces and process design contents for each workpiece.
Work initial of a flexible production system that executes initial input setting regarding the state of the work at each work storage location in the automatic production equipment to the control device that executes comprehensive operation control of the equipment according to the created operation schedule In the state setting device, a physical equipment model in which each of the equipment is simulated and reduced, a physical work model in which each of the various workpieces is simulated and reduced, which is housed in each work storage location of the physical equipment model, and each work of the physical equipment model Work detection means for detecting the presence or absence of a work in the storage location, and work data setting means provided for each work storage location and setting the type and progress of the work accommodated in each work storage location. And using the detection content of the work detection means and the setting content of the work data setting means, Work initial state setting unit of the flexible manufacturing system, wherein an initial value input setting means for performing an initial input setting on the status of the work, in that it comprises the in each work location relative control device.
JP63021735A 1988-02-01 1988-02-01 Work initial condition setting device for flexible manufacturing equipment Expired - Lifetime JPH0830968B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63021735A JPH0830968B2 (en) 1988-02-01 1988-02-01 Work initial condition setting device for flexible manufacturing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63021735A JPH0830968B2 (en) 1988-02-01 1988-02-01 Work initial condition setting device for flexible manufacturing equipment

Publications (2)

Publication Number Publication Date
JPH01196603A JPH01196603A (en) 1989-08-08
JPH0830968B2 true JPH0830968B2 (en) 1996-03-27

Family

ID=12063335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63021735A Expired - Lifetime JPH0830968B2 (en) 1988-02-01 1988-02-01 Work initial condition setting device for flexible manufacturing equipment

Country Status (1)

Country Link
JP (1) JPH0830968B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6197771A (en) * 1984-10-17 1986-05-16 Fujitsu Ltd Power restoration system of commodity transportation system
JPS6246302A (en) * 1985-08-26 1987-02-28 Mitsubishi Electric Corp Data setting method using crt
JPS62202904A (en) * 1986-03-03 1987-09-07 株式会社日立製作所 Boiler controller
JPS62210509A (en) * 1986-03-12 1987-09-16 Mitsubishi Electric Corp Simulator for program controller
JPS62288904A (en) * 1986-06-09 1987-12-15 Hitachi Ltd Remote control system

Also Published As

Publication number Publication date
JPH01196603A (en) 1989-08-08

Similar Documents

Publication Publication Date Title
EP3828654B1 (en) Control system, controller and control method
US20170329295A1 (en) Production module for implementing a production function on a product
RU2670553C1 (en) Production module for implementation of production function
US7069105B2 (en) Process module for a handling station, handling station and procedure for the line-up of a handling station
CN110303495A (en) Comprehensive simulation system that improves operability
JP2003162304A (en) Equipment control simulation method and apparatus
JP2732061B2 (en) Flexible production system
KR100434433B1 (en) Administration control device for factory automation, and its method
JP7508238B2 (en) A robot system, a control method, a robot, a workbench, a cart, a control program, a recording medium, and a method for manufacturing an article.
JPH01183344A (en) flexible production system
JP7374867B2 (en) Control system, local controller and control method
US5323308A (en) Programmable control system
JPH01196603A (en) Work initial state setting device for flexible production equipment
JPH06277990A (en) Cell controller
JPH09104003A (en) Precut wood processing equipment
CN112297671B (en) Robot code printing method, device and system
JPH1044073A (en) Remote teaching method and system thereof
JPH01211004A (en) Flexible production system
JP2004351531A (en) Production instruction device for production line facility and constructing method thereof
JP2579214B2 (en) Flexible production system
JPH06274499A (en) Production system
JPH0628025A (en) Simulation system for fms
KR200314298Y1 (en) IT-based miniature flexible mamuturing system (FMS) training kit
JPH0430927A (en) Actuating device of working machine in working line
JPH01194008A (en) Flexible production system