JPH083457Y2 - Water revetment construction for hydrophilic rivers - Google Patents

Water revetment construction for hydrophilic rivers

Info

Publication number
JPH083457Y2
JPH083457Y2 JP1991038811U JP3881191U JPH083457Y2 JP H083457 Y2 JPH083457 Y2 JP H083457Y2 JP 1991038811 U JP1991038811 U JP 1991038811U JP 3881191 U JP3881191 U JP 3881191U JP H083457 Y2 JPH083457 Y2 JP H083457Y2
Authority
JP
Japan
Prior art keywords
ring
partition plate
concrete partition
shaped
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1991038811U
Other languages
Japanese (ja)
Other versions
JPH04126926U (en
Inventor
正夫 石渡
昌之 中田
Original Assignee
川鉄建材工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 川鉄建材工業株式会社 filed Critical 川鉄建材工業株式会社
Priority to JP1991038811U priority Critical patent/JPH083457Y2/en
Publication of JPH04126926U publication Critical patent/JPH04126926U/en
Application granted granted Critical
Publication of JPH083457Y2 publication Critical patent/JPH083457Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は親水河川用護岸工構造に
係り、詳しくは、河床から堤防までの河岸に中詰石など
を配置した護岸工に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a water revetment structure for hydrophilic rivers, and more particularly to a revetment work in which a filling stone is placed on the river bank from the riverbed to the embankment.

【0002】[0002]

【従来の技術】河床や河岸の堤防などにおいては、流水
や波浪による侵食から保護するための護岸工を築造する
場合、屈撓性があり比較的安価な蛇籠やふとん籠を採用
することが多い。蛇籠は、通常金網に詰石をした袋状体
であり、それらの多数を河岸近傍の河床から堤防の斜面
にわたって並行して設置される。また、ふとん籠は、箱
状の金網に詰石を行い、河床から堤防の斜面にわたって
積み重ねられる。
2. Description of the Related Art In riverbeds and banks of riverbanks, when constructing a seawall to protect against erosion due to running water or waves, flexible gabions and futon baskets are often used. . A gabion is usually a bag-shaped body in which wire mesh is filled with stones, and many of them are installed in parallel from the riverbed near the riverbank to the slope of the embankment. In addition, the futon basket is made by filling a box-shaped wire mesh with stones and stacking it from the riverbed to the slope of the embankment.

【0003】[0003]

【考案が解決しようとする課題】ところで、蛇籠は人力
による詰石作業を前提として設計されており、玉石など
を詰め込む投入口の口径が小さくなっているため、作業
能率が悪いものとなる。したがって、近頃では、小規模
な護岸工事にのみ限定して使用される場合が多くなって
いる。一方、大規模な護岸工事に蛇籠やふとん籠を用い
ると、その詰石作業のみならず、護岸工事自体に多大の
労力が必要となってしまう。すなわち、蛇籠やふとん籠
を使用する場合、バックホーやバケットなどでは蛇籠や
ふとん籠の扱いが容易でなく、そのような機械を用いた
施工が困難となることが多いからである。たとえ、機械
化作業が可能であったとしても、ふとん籠の場合、中詰
石を投入すると護岸工に設けた仕切壁などの変形が著し
くなり、ふた網取付作業が非常に困難となるなどの欠点
がある。そのために、護岸工の規模が大きいときには、
ブロック護岸工とされることがあるが、資材が高価であ
ること、ブロックが重く施工に規模の大きいクレーンを
使用しなければならないことなどのために、工期やコス
トの面で、その採用に限度がある。また、河岸の景観を
損なうといったこともあり、安価な資材で自然景観を維
持することができるような網構造の護岸工の開発が望ま
れる。本考案は上述の問題に鑑みなされたもので、その
目的は、規模の大小を問わず護岸工の施工を機械化でき
るようにして連続した石詰作業を可能にすること、規模
に応じた護岸工とすることができるように柔軟な対応性
のある護岸工構成品とすること、河床などの小さな起伏
にも順応し、かつ、自然の景観をも維持させておくこと
ができる護岸工とすること、を実現する親水河川用護岸
工構造を提供することである。
[Problems to be Solved by the Invention] By the way, the gabion is designed on the premise of the work of filling stones by human power, and the diameter of the charging port for filling the cobblestones is small, resulting in poor work efficiency. Therefore, recently, it is often used only for small-scale revetment work. On the other hand, if a gabion or a futon basket is used for a large-scale revetment work, a great deal of labor will be required not only for the work of the stones but also for the revetment work itself. That is, when a gabion or a futon basket is used, it is difficult to handle the gabion or the futon basket with a backhoe or a bucket, and it is often difficult to perform construction using such a machine. Even if mechanized work is possible, in the case of a futon basket, when a filling stone is put in, the partition wall etc. provided on the revetment work will be significantly deformed, making it very difficult to install the lid net. There is. Therefore, when the seawall construction is large,
It is sometimes called a block revetment, but due to the high cost of materials and the large blocks that require the use of a large-scale crane, it is limited in terms of construction period and cost. There is. In addition, it may damage the landscape of the riverbank, so it is desirable to develop a revetment work with a net structure that can maintain the natural landscape with inexpensive materials. The present invention has been made in view of the above problems, and its purpose is to mechanize the construction of revetment construction work regardless of the size, to enable continuous stone filling work, and revetment construction work according to scale. To be a revetment construction component that has a flexible response so that it can be used, and to be a revetment that can adapt to small ups and downs such as river beds and also maintain a natural landscape The purpose is to provide a revetment structure for hydrophilic rivers that realizes.

【0004】[0004]

【課題を解決するための手段】本考案は、河床や河岸さ
らには堤防を流水による侵食から保護するための護岸工
として構築される護岸用構造物に適用される。その特徴
とするところは、図面を参照して、菱形金網の列線端部
4m,4n(図1参照)にカール加工された複数のリン
グ状フック4a,4bを備え、護岸工設置領域に敷設す
るためリング状フック4a,4bに骨線6を挿通して相
互に接続される底網4が設けられる。リング状フック7
a〜7d(図4参照)が端縁部に形成され、リング状フ
ック7c,7dに骨線6(図6参照)を挿通し左右端縁
部が相互に接続されて底網4上に中詰石9(図8参照)
を投入する区画部10を画成するために立設して縦横に
配置されると共に、下端縁部に形成したリング状フック
7b(図4参照)と底網4とに骨線6を挿通して底網4
に接続される複数のコンクリート隔壁板7(図4参照)
準備される。そして、菱形金網の列線端部13m,1
3n(図1参照)にカール加工された複数のリング状フ
ック13a,13bを備え、中詰石9が投入された区画
部10を覆うためリング状フック13a,13bに骨線
6を挿通して相互に接続されると共に、コンクリート隔
壁板7の上端縁部に設けたリング状フック7aに骨線6
を挿通してコンクリート隔壁板7に接続されるふた網1
3が使用される。なお、上記のコンクリート隔壁板7
に、流水を通過させるための開口16(図4参照)を設
けるようにしておいてもよい。前記したコンクリート隔
壁板7に代えて、図13に示す溶接鉄筋隔壁板17とす
ることもできる。
The present invention is applied to a revetment structure constructed as a revetment for protecting river beds, banks, and levees from erosion due to running water. The feature is that, with reference to the drawings, a plurality of ring-shaped hooks 4a and 4b that are curled at the row line ends 4m and 4n (see FIG. 1) of the diamond-shaped wire mesh are installed in the revetment installation area. You
Insert the bone wire 6 into the ring-shaped hooks 4a and 4b for
Bottom grid 4 is provided et al are to be mutually connected. Ring-shaped hook 7
a to 7d (see FIG. 4) are formed on the edge, and the ring-shaped flap is formed.
Insert the bone wire 6 (see FIG. 6) into the hooks 7c and 7d, and the left and right edges
The parts are connected to each other and the filling stone 9 is placed on the bottom net 4 (see FIG. 8).
Vertically and horizontally and vertically in order to define a ward image section 10 you put
A ring-shaped hook that is placed and formed on the lower edge
7b (see FIG. 4) and the bottom net 4 to insert the bone wire 6 into the bottom net 4
A plurality of concrete partition plates 7 (see FIG. 4) connected to
Is prepared . Their to, diamond wire mesh column line ends 13m, 1
A section in which a plurality of ring-shaped hooks 13a and 13b curled to 3n (see FIG. 1) are provided and the filling stone 9 is put therein
The ring-shaped hooks 13a and 13b are covered with bone lines to cover the part 10.
6 and are connected to each other, and
The bone wire 6 is attached to the ring-shaped hook 7a provided at the upper edge of the wall plate 7.
A lid net 1 which is inserted through and is connected to a concrete partition plate 7.
3 is used. The concrete partition plate 7
Alternatively, an opening 16 (see FIG. 4) for passing running water may be provided. Instead of the concrete partition plate 7 described above, a welded reinforcing bar partition plate 17 shown in FIG. 13 may be used.

【0005】[0005]

【作用】護岸工事の対象とする領域に、多数の底網4を
仮置きする。そして、隣接する底網4A,4Bの列線端
部4m,4nに形成されたリング状フック4a,4bに
骨線6を挿通して接続する。この敷設された底網4の上
面に、コンクリート隔壁板7を縦横に設置する(図9参
照)。そして、それぞれのコンクリート隔壁板7の下面
に取り付けられた複数のリング状フック7bと、底網4
のリング状フック4a,4bとを重ね合わせ(図6参
照)、骨線6を挿通する。さらに、隣接するコンクリー
ト隔壁板7A,7Bの側端縁部に設けられたリング状フ
ック7c,7dを重ね合わせ、それにも骨線6が挿通さ
れる。このようにして、底網4,4に固定したコンクリ
ート隔壁板7,7により、区画部10を形成する(図9
参照)。次に、中詰石9をバケット12(図8参照)で
各区画部10に投入する。その際、区画部10を外囲す
るコンクリート隔壁板7の剛性は高く、中詰石9の投入
による衝撃を受けても、また、投入された中詰石9の押
圧力を受けても従来のふとん籠のように変形することが
ない。区画部10に投入された中詰石9の流出を阻止す
るため、複数のふた網13をコンクリート隔壁板7の上
面に載置する。そして、隣接するふた網13A,13B
(図1参照)のリング状フック13a,13bを介して
骨線6で接続する。コンクリート隔壁板7が位置してい
るところでは、その上端縁部に取り付けられたリング状
フック7aとふた網13のリング状フック13a,13
bとに骨線6を挿通して、ふた網13をコンクリート隔
壁板7に固定する(図7参照)。このようにして完成し
た護岸工において、図4に示す開口16が設けられたコ
ンクリート隔壁板7を河床2の底網4などに立設してお
けば、中詰石9,9間を流通する流水の動きを促進する
ことができる。上記したコンクリート隔壁板7に代え
て、溶接鉄筋隔壁板17(図13参照)を採用した場合
も、コンクリート隔壁板7を採用したときと同じ要領
で、親水河川用護岸工構造を実現することができる。
[Function] A large number of bottom nets 4 are temporarily placed in an area targeted for revetment work. Then, the bone wire 6 is inserted and connected to the ring-shaped hooks 4a and 4b formed at the column line ends 4m and 4n of the adjacent bottom nets 4A and 4B. The concrete partition plate 7 is installed vertically and horizontally on the upper surface of the laid bottom net 4 (see FIG. 9). Then, a plurality of ring-shaped hooks 7b attached to the lower surface of each concrete partition wall plate 7 and the bottom net 4
The ring-shaped hooks 4a and 4b are overlapped (see FIG. 6) and the bone line 6 is inserted. Further, ring-shaped hooks 7c and 7d provided on the side edge portions of the adjacent concrete partition walls 7A and 7B are overlapped with each other, and the bone line 6 is also inserted therein. In this way, the partition 10 is formed by the concrete partition plates 7 and 7 fixed to the bottom nets 4 and 4 (see FIG. 9).
reference). Next, the filling stone 9 is put into each partition 10 with the bucket 12 (see FIG. 8). At that time, the rigidity of the concrete partition wall plate 7 surrounding the partition 10 is high, and even if the concrete partition plate 7 receives a shock due to the throwing of the filling stone 9 or the pressing force of the thrown filling stone 9, Does not deform like a futon basket. A plurality of lid nets 13 are placed on the upper surface of the concrete partition plate 7 in order to prevent the outflow of the filling stones 9 put into the compartment 10. And the adjacent lid nets 13A, 13B
The bone wire 6 is connected through the ring-shaped hooks 13a and 13b (see FIG. 1). Where the concrete partition plate 7 is located, the ring-shaped hook 7a attached to the upper edge of the concrete partition plate 7 and the ring-shaped hooks 13a, 13 of the lid net 13 are provided.
The bone wire 6 is inserted through b and the lid net 13 is fixed to the concrete partition plate 7 (see FIG. 7). In the revetment completed in this way, if the concrete partition plate 7 having the opening 16 shown in FIG. 4 is erected on the bottom net 4 of the river bed 2 or the like, it will flow between the filling stones 9, 9. The movement of running water can be promoted. Even if a welded reinforcing bar partition plate 17 (see FIG. 13) is used instead of the concrete partition wall plate 7 described above, it is possible to realize a water revetment structure for hydrophilic rivers in the same manner as when the concrete partition wall plate 7 is adopted. it can.

【0006】[0006]

【考案の効果】本考案によれば、護岸工事の対象域とす
る河岸近傍の河床から堤防にわたる全面に、菱形金網の
底網を多数簡便に敷設し相互に接続することができる。
その底網の上面に、剛性の高いコンクリート隔壁板を縦
横に設置し、相互に骨線で接続して底網に簡単に固定で
き、中詰石を充填するための区画部を迅速に形成させる
ことができる。護岸工の規模が異なっても、使用する底
網,コンクリート隔壁板やふた網の数を適宜選択すれ
ば、施工作業は同様の要領で行うことができ、構成部品
の共通化や量産化が図られる。そして、バックホーやバ
ケットなどの機械を用いて、各区画部へ中詰石を連続し
て能率よく投入することができ、機械化された投入作業
で護岸工事の迅速化が実現される。中詰石の投入された
各区画部のコンクリート隔壁板は、従来のふとん籠のよ
うに投入時の衝撃や中詰石による押圧力で変形すること
がなく、護岸用構造物として極めて強固であり、形崩れ
のしないものとなる。その各区画部を形成するコンクリ
ート隔壁板は、ふとん籠の仕切板よりも施工中の変形が
小さく、中詰石の流出を防止するふた網を簡単に固定す
ることができる。その底網やふた網は菱形金網であるこ
とから、護岸用構造物に必要な屈撓性を失うことなく河
床や堤防の地盤などの小さな起伏にも馴染み、その侵食
が十分抑制される。このように、護岸工事の全体作業の
簡便化,省力化,迅速化が図られ、工期の大幅な短縮と
工費の節減が可能となり、護岸工による河川の自然景観
を維持することができる。なお、コンクリート隔壁板に
開口を設けておけば、中詰石間の流水も円滑に流通させ
ることができ、流水や波浪による侵食を一層防止でき、
また、清水状態も維持される。上記のコンクリート隔壁
板に代えて溶接鉄筋隔壁板を使用しても、コンクリート
隔壁板を採用した場合と同様の効果が発揮される。
EFFECTS OF THE INVENTION According to the present invention, a large number of lozenge-shaped wire nets can be easily laid and connected to each other over the entire surface of the riverbank in the vicinity of the riverbank, which is the target area for revetment work, and the bank.
Highly rigid concrete partition plates are installed vertically and horizontally on the top surface of the bottom net, and they can be easily fixed to the bottom net by connecting to each other with bone lines, and quickly form compartments for filling filling stones. be able to. Even if the scale of revetment works is different, if the number of bottom nets, concrete partition plates and lid nets to be used is appropriately selected, the construction work can be performed in the same manner, and the commonization and mass production of the components can be achieved. To be Then, by using a machine such as a backhoe or a bucket, the filling stones can be continuously and efficiently loaded into each compartment, and the mechanized loading work can speed up the revetment work. The concrete partition plate of each partition where the filling stones are thrown in does not deform due to the impact at the time of throwing in and the pressing force of the filling stones unlike the conventional futon basket, and is extremely strong as a revetment structure. , It will not lose its shape. The concrete partition plate forming each partition part has less deformation during construction than the partition plate of the futon basket, and the lid net for preventing the outflow of the filling stone can be easily fixed. Since the bottom net and lid net are rhombic metal nets, they can adapt to small undulations such as riverbeds and the ground of levees without losing the flexibility required for revetment structures, and their erosion is sufficiently suppressed. In this way, the overall work of the revetment work can be simplified, labor-saving, and speeded up, the construction period can be greatly shortened, the construction cost can be reduced, and the natural landscape of the river by the revetment work can be maintained. In addition, if an opening is provided in the concrete partition plate, the running water between the filling stones can be smoothly circulated, and the erosion due to running water or waves can be further prevented,
Also, the fresh water condition is maintained. Even if a welded reinforcing bar partition plate is used in place of the above concrete partition plate, the same effect as when the concrete partition plate is adopted is exhibited.

【0007】[0007]

【実施例】以下に、本考案をその実施例に基づいて、詳
細に説明する。図3に示す河岸1に近い河床2から斜め
に立ち上がる堤防3に沿って底網4が敷設されるが、そ
の底網4は、図1に示すように、多数の列線5が捩じり
合わされた菱形金網が採用されている。一枚の底網4は
適当な広さの面積とされ、各底網4A,4Bの列線端部
4m,4nはカール加工されて、例えば二巻で構成され
たリング状フック4a,4bを形成している。したがっ
て、隣接する二つ底網4A,4Bは、図2のように接続
位置でリング状フック4a,4bが一致するように位置
合わせされた後、棒状の骨線6を挿通させることによっ
て、向き合う列線端部4m,4nが簡単に接続されるよ
うになっている。すなわち、底網4を四方に順次接続す
れば、図3に示すように、護岸工の施工領域を覆うまで
拡張することができる。図4は鉄筋入りの矩形状のコン
クリート隔壁板7の単体を示しており、例えば高さ0.
7m,長さ2.5m,厚さ0.2mに成形され、図3の
ように敷設された底網4の上面に立設した姿勢で固定さ
れるものである。そのために、コンクリート隔壁板7の
上下の端縁部には、図5に示すリング状フック7a,7
bが上方または下方に向くように突設されている。そし
て、図6に示すように、リング状フック7bと底網4の
リング状フック4a,4bとに骨線6を水平に縦通させ
ると、コンクリート隔壁板7は底網4に固定され、リン
グ状フック7aと後述するふた網13のリング状フック
13a,13bに骨線6を縦通させると、コンクリート
隔壁板7にふた網13を固定することができる(図7参
照)。なお、コンクリート隔壁板7が底網4に固定され
かつ図8のように中詰石9が投入された時点では、コン
クリート隔壁板7の重みと中詰石9の重みとで、底網4
は河床2や堤防3の斜面3aなどに押し付けられて動く
ことがない。コンクリート隔壁板7の左右の端縁部に
も、図4に示すリング状フック7c,7dが一体化され
ている。図6に示すように、隣接する二つのコンクリー
ト隔壁板7A,7Bのリング状フック7c,7dを重ね
合わせ、骨線6を鉛直方向に挿通すれば両コンクリート
隔壁板7A,7Bを接続することができ、図9に示す区
画部10を形成させることができる。その接続のため
に、リング状フック7cとリング状フック7dとは、そ
の上下方向の位置がややずらされている(図6参照)。
なお、リング状フック7c,7d自体の厚みが大きくな
い場合には、そのずれを特に設けていなくても、施工上
接続作業が不可能となるというようなことはない。区画
部10を形成するにおいて、図10に示すように、河床
2と斜面3aとの間に予め決められた地盤の折れ部11
Aを存在させている場合には、斜面側のコンクリート隔
壁板7Cの一方の端縁部7mは河床2に対して垂直とな
るように成形されおり、隣接する二つのコンクリート隔
壁板7C,7Dの接続においても骨線6を鉛直に挿通さ
せることができるようにしている。図示しないが、斜面
3aと堤防3の平坦な頂面3b(図9参照)とにおける
地盤折れ部11Bにおいても骨線6が鉛直に挿通される
ように、斜面3aに設置のコンクリート隔壁板7の一方
の端縁部が、頂面3bに垂直となるように配慮される。
このようにすれば、図9中に示したコンクリート隔壁板
7の各列の交差部P,Q,R,Sにおいても、骨線6を
鉛直に挿通させることができ、しかも、河川の流れ方向
に並ぶコンクリート隔壁板縦列7M,7Nを垂直な姿勢
で設置することができる。なお、斜面3aの途中に図示
しないコンクリート隔壁板縦列を設ける場合にも、図9
中に二点鎖線7nで示した端縁部の形状としておけば、
同様の思想を適用することができる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below based on its embodiments. A bottom net 4 is laid along a bank 3 that rises diagonally from a river bed 2 near the riverbank 1 shown in FIG. 3. The bottom net 4 has a large number of row lines 5 twisted as shown in FIG. Combined diamond-shaped wire mesh is used. One piece of bottom net 4 has an appropriate area, and column line ends 4m and 4n of the bottom nets 4A and 4B are curled to form ring-shaped hooks 4a and 4b composed of, for example, two turns. Is forming. Therefore, the adjacent two bottom nets 4A and 4B face each other by inserting the rod-shaped bone wire 6 after the ring-shaped hooks 4a and 4b are aligned so as to match at the connection position as shown in FIG. The column line ends 4m and 4n are easily connected. That is, if the bottom net 4 is sequentially connected in four directions, as shown in FIG. 3, it can be expanded to cover the construction area of the revetment work. FIG. 4 shows a single rectangular concrete partition plate 7 with reinforcing bars, for example, a height of 0.
It is molded to have a length of 7 m, a length of 2.5 m, and a thickness of 0.2 m, and is fixed in an upright position on the upper surface of the bottom net 4 laid as shown in FIG. Therefore, the ring-shaped hooks 7a, 7 shown in FIG.
b is projected so as to face upward or downward. Then, as shown in FIG. 6, when the bone wire 6 is vertically passed through the ring-shaped hook 7b and the ring-shaped hooks 4a, 4b of the bottom net 4, the concrete partition plate 7 is fixed to the bottom net 4, The bone net 6 can be fixed to the concrete partition plate 7 by vertically passing the bone wire 6 between the circular hook 7a and the ring-shaped hooks 13a and 13b of the lid net 13 described later (see FIG. 7). In addition, when the concrete partition plate 7 is fixed to the bottom net 4 and the filling stone 9 is put in as shown in FIG. 8, the weight of the concrete partition plate 7 and the weight of the filling stone 9 make the bottom net 4
Never move attached press, such as the slope 3a of the bed 2 and the embankment 3. Ring-shaped hooks 7c and 7d shown in FIG. 4 are also integrated at the left and right edges of the concrete partition plate 7. As shown in FIG. 6, if the ring-shaped hooks 7c and 7d of two adjacent concrete partition walls 7A and 7B are overlapped and the bone line 6 is inserted in the vertical direction, both concrete partition walls 7A and 7B can be connected. Therefore, the partition 10 shown in FIG. 9 can be formed. Due to the connection, the vertical positions of the ring-shaped hook 7c and the ring-shaped hook 7d are slightly displaced (see FIG. 6).
If the ring-shaped hooks 7c and 7d themselves are not large in thickness, the connection work will not be impossible due to the construction even if the deviation is not provided. In forming the partition portion 10, as shown in FIG. 10, the ground bent portion 11 that is predetermined between the riverbed 2 and the slope 3a.
When A is present, one edge portion 7m of the concrete partition plate 7C on the slope side is formed so as to be perpendicular to the river bed 2, and the two adjacent concrete partition plates 7C and 7D are The bone wire 6 can be inserted vertically also in connection. Although not shown, the concrete partition plate 7 installed on the slope 3a is arranged so that the bone line 6 is vertically inserted also in the ground break portion 11B on the slope 3a and the flat top surface 3b (see FIG. 9) of the embankment 3. It is considered that one edge is perpendicular to the top surface 3b.
By doing so, the bone line 6 can be inserted vertically even at the intersections P, Q, R, S of the respective rows of the concrete partition plate 7 shown in FIG. It is possible to install the concrete partition wall plate columns 7M and 7N arranged in a vertical posture. In addition, in the case where a concrete partition wall plate column (not shown) is provided in the middle of the slope 3 a,
If the shape of the edge shown by the two-dot chain line 7n is set in the inside,
Similar ideas can be applied.

【0008】ところで、上記した十字状の交差部P,Q
などでは、図10に示すように、二点鎖線で示す縦列で
隣接する二つのコンクリート隔壁板7A,7Bの接合部
と、実線の横列で隣接する二つのコンクリート隔壁板7
C,7Dの各リング状フック7c,7d,7c,7dが
重ねられる。一方、T字状の交差部R,S(図9参照)
などでは、各リング状フック7c,7d,7cが重ねら
れ、それに一本の骨線6を挿通させるだけで、相互の接
続が達成される。また、そのような接続によってコンク
リート隔壁板7の立設状態の維持も図られる。そして、
その後に、図8に示したごとく、各区画部10にバック
ホーやバケット12などの機械によって中詰石9が投入
されると、その中詰石9の押圧力によって、交差部を形
成しないコンクリート隔壁板7においても、隣接する区
画への投入を交互に行うことにより、その自立が助長さ
れる。区画部10に詰め込まれた中詰石9を図11のよ
うに覆うふた網13が、コンクリート隔壁板7の上端縁
部に固定される。そのふた網13は、矢印14方向の流
れによって中詰石9が押し流されないようにするための
ものである。そして、底網4と同じ構造であり、図1に
示したように、その列線端部13m,13nはカール加
工され、リング状フック13a,13bが形成される。
なお、一枚のふた網13は底網4と同じ面積でなければ
ならないというものではないが、底網4のリング状フッ
ク4a,4bが位置する個所に、コンクリート隔壁板
7,7が立設され、その上にふた網13が被せられるこ
とから、リング状フック4a,4bとリング状フック1
3a,13bとは、施工現場で同じ位置となることが好
ましい。しかし、菱形金網で製作されている底網4もふ
た網13も、図2に示すように列線5が上下立体的に交
錯して空間15を残しているので、リング状フック4
a,4b,13a,13bの存在しない個所において、
図12に示すコンクリート隔壁板7のリング状フック7
aと空間15の間、および、リング状フック7bと空間
15との間に、それぞれ骨線6を挿通するなどしても差
し支えない。ちなみに、図9に示すように、河床2に位
置して横方向に延びるコンクリート隔壁板横列7K,7
Lは、河川の流水方向14に加わる力を受けやすい。し
たがって、押し流されにくくすると共に中詰石9,9間
の流水をも円滑に流通させるために、図4に二点鎖線で
示したような開口16を、コンクリート隔壁板7に多数
設けるようにしてもよい。なお、開口16は円形に限ら
ず矩形や三角形など種々の形状としておけばよく、要
は、中詰石9が区画部10から流出しない寸法や形状で
あればよい。
By the way, the above-mentioned cross-shaped intersections P and Q
In FIG. 10, as shown in FIG. 10, a joint between two concrete partition boards 7A and 7B adjacent in a column indicated by a chain double-dashed line and two concrete partition boards 7 adjacent in a row indicated by a solid line.
The ring hooks 7c, 7d, 7c, 7d of C and 7D are overlapped. On the other hand, T-shaped intersections R and S (see FIG. 9)
In such a case, the ring-shaped hooks 7c, 7d, 7c are overlapped, and only one bone wire 6 is inserted therethrough to achieve mutual connection. Further, such a connection can also maintain the standing state of the concrete partition plate 7. And
After that, as shown in FIG. 8, when the filling stone 9 is thrown into each division 10 by a machine such as a backhoe or a bucket 12, the pressing force of the filling stone 9 causes a concrete partition wall that does not form an intersection. Also in the plate 7, the independence of the plate 7 is promoted by alternately charging the adjacent blocks. A lid net 13 for covering the filling stones 9 packed in the partition 10 as shown in FIG. 11 is fixed to the upper edge of the concrete partition plate 7. The lid net 13 is for preventing the filling stone 9 from being swept away by the flow in the direction of the arrow 14. Then, it has the same structure as the bottom net 4, and as shown in FIG. 1, its column line ends 13m and 13n are curled to form ring-shaped hooks 13a and 13b.
It should be noted that one lid net 13 does not have to have the same area as the bottom net 4, but concrete partition plates 7 and 7 are erected at the locations where the ring-shaped hooks 4a and 4b of the bottom net 4 are located. Since the lid net 13 is put on the ring-shaped hooks 4a and 4b and the ring-shaped hook 1
3a and 13b are preferably at the same position on the construction site. However, in both the bottom net 4 and the lid net 13 which are made of diamond-shaped wire netting, the column lines 5 cross three-dimensionally vertically and leave a space 15 as shown in FIG.
where a, 4b, 13a, 13b do not exist,
Ring-shaped hook 7 of concrete partition plate 7 shown in FIG.
The bone wire 6 may be inserted between a and the space 15 and between the ring-shaped hook 7b and the space 15, respectively. By the way, as shown in FIG. 9, the concrete partition plate rows 7K, 7 located in the riverbed 2 and extending in the lateral direction.
L is susceptible to the force applied in the flowing direction 14 of the river. Therefore, in order to make it difficult for the concrete to be swept away and to allow the flowing water between the filling stones 9 and 9 to flow smoothly, a large number of openings 16 as shown by the chain double-dashed line in FIG. Good. The opening 16 is not limited to a circular shape and may have various shapes such as a rectangular shape and a triangular shape. In short, the opening 16 may have any size and shape so that the filling stone 9 does not flow out from the partition portion 10.

【0009】このような構成の護岸用構造物は、次のよ
うにして構築される。護岸工事の対象とする河岸1の近
傍の流水を一時的に堰き止め、河床2を露出させる。そ
の河床2とそれに続く斜面を有する堤防3に、多数の底
網4,4が持ち込まれて仮置きされる。コンクリート隔
壁板7が立設されない個所においては、それぞれの列線
端部4m,4nのリング状フック4a,4b(図1およ
び図2参照)を相互に重ね合わせ、それに骨線6を水平
方向に挿通して接続し、護岸工事の対象域全面に底網4
を敷設する。次に、多数のコンクリート隔壁板7,7を
持ち込み、順次底網4の上面に設置する。その下面のリ
ング状フック7bをいまだ接続されていない隣接した二
つの底網4A,4Bのリング状フック4a,4bと相互
に重ね合わす。そして、リング状フック4a,4b,7
bに骨線6を挿通すると、底網4の上面に仕切壁として
のコンクリート隔壁板7が固定される(図7参照)。こ
の固定作業を、順次河川に沿った縦方向および堤防3に
向かう横方向に続ける。交差部P,Q,R,S(図9参
照)における接続ともあいまって、コンクリート隔壁板
7の自立が維持される。なお、コンクリート隔壁板7を
底網4に接続する際に個々のコンクリート隔壁板7が倒
れそうなときには、必要に応じて支えをかませておけば
よい。このようにして縦横に設置されたコンクリート隔
壁板縦列7M,7Nやコンクリート隔壁板横列7K,7
Lによって、底網4の上面には、中詰石9を充填するた
めの区画部10が多数形成される(図9参照)。さら
に、バケット12を用いて、トラックなどで搬入された
玉石などの中詰石9を、各区画部10へ順次投入する
(図8参照)。なお、中詰石9が充填された区画部10
は、剛性の高いコンクリート隔壁板7,7に外囲され、
しかも、コンクリート隔壁板7は中詰石9の押圧力で立
設状態が維持され、相互に強固な敷き詰め状態となる。
したがって、従来から用いられているふとん籠のように
変形するようなこともない。なお、堤防3の上部位に位
置する区画部10から順次投入するようにすれば、バケ
ット12が施工済みの区画部10上を移動して、河床2
まで、順次機械的作業でもって中詰石9を投入すること
ができる。最後に、中詰石9やコンクリート隔壁板7の
上にふた網13を載せ、列線端部13m,13nに形成
されたのリング状フック13a,13bを重ね合わせる
と同時に、コンクリート隔壁板7の位置するところで
は、そのリング状フック7aをも合わせ、骨線6を挿通
して順次接続すれば、ふた網13の固定は確実なものと
なる(図6および図7参照)。このふた網13によっ
て、洪水時の濁流などで中詰石9が押し流されるといっ
たことはなくなる。コンクリート隔壁板7に図4に二点
鎖線で示した開口16が設けられていれば、流水を円滑
に流通させることができ、流水や波浪による侵食をより
少なくすることができる。なお、上で述べた骨線6をそ
れぞれのリング状フックなどに挿通させた際、その骨線
6が位置ずれしないように、必要ならばその端部を折り
曲げるなどしておけば、流水の力による流失なども防止
することができる。
The revetment structure having such a structure is constructed as follows. The running water near the riverbank 1 that is the target of the revetment work is temporarily dammed to expose the riverbed 2. A large number of bottom nets 4 and 4 are brought in and temporarily placed on the river bed 2 and the dyke 3 having a slope following it. At locations where the concrete partition plate 7 is not erected, the ring-shaped hooks 4a and 4b (see FIGS. 1 and 2) of the end portions 4m and 4n of the respective column lines are overlapped with each other, and the bone line 6 is horizontally arranged on the hooks. It is inserted and connected, and the bottom net 4 covers the entire target area of the revetment work.
To lay. Next, a large number of concrete partition plates 7, 7 are brought in and sequentially installed on the upper surface of the bottom net 4. The ring-shaped hook 7b on the lower surface is superposed on the ring-shaped hooks 4a and 4b of two adjacent bottom nets 4A and 4B which are not yet connected. Then, the ring-shaped hooks 4a, 4b, 7
When the bone wire 6 is inserted into b, the concrete partition plate 7 as a partition wall is fixed to the upper surface of the bottom net 4 (see FIG. 7). This fixing work is sequentially continued in the vertical direction along the river and in the horizontal direction toward the embankment 3. Together with the connection at the intersections P, Q, R, S (see FIG. 9), the self-supporting concrete partition plate 7 is maintained. In addition, when each concrete partition wall plate 7 is likely to fall down when connecting the concrete partition wall plate 7 to the bottom net 4, a support may be provided as needed. The concrete partition board columns 7M and 7N and the concrete partition board rows 7K and 7 installed vertically and horizontally in this manner.
Due to L, a large number of partition portions 10 for filling the filling stones 9 are formed on the upper surface of the bottom net 4 (see FIG. 9). Further, using the bucket 12, the filling stones 9 such as cobblestones carried in by a truck or the like are sequentially loaded into each partition 10 (see FIG. 8). In addition, the partition portion 10 filled with the filling stone 9
Is surrounded by concrete partition plates 7 and 7 with high rigidity,
Moreover, the concrete partition plate 7 is maintained in an upright state by the pressing force of the filling stones 9 and is in a firmly laid state with each other.
Therefore, it does not deform like the futon basket conventionally used. In addition, if it is made to throw in sequentially from the division part 10 located in the upper part of the bank 3, the bucket 12 will move on the completed division part 10 and the river bed 2
Up to this, the filling stone 9 can be sequentially introduced by mechanical work. Finally, the lid net 13 is placed on the filling stone 9 and the concrete partition plate 7, and the ring-shaped hooks 13a and 13b formed at the end portions 13m and 13n of the row lines are overlapped with each other. If the ring-shaped hook 7a is aligned at the position, and the bone wire 6 is inserted and sequentially connected, the lid net 13 can be fixed securely (see FIGS. 6 and 7). The lid net 13 prevents the filling stones 9 from being washed away by a muddy flow at the time of flood. If the concrete partition plate 7 is provided with the opening 16 shown by the chain double-dashed line in FIG. 4, running water can be smoothly circulated, and erosion due to running water or waves can be further reduced. In addition, when the bone line 6 described above is inserted into each ring-shaped hook or the like, the end of the bone line 6 may be bent if necessary so that the bone line 6 does not shift its position. It is also possible to prevent spillage due to.

【0010】図13は、鉄筋を縦横に並べて溶接した面
状の溶接鉄筋隔壁板17の単体を示し、前述したコンク
リート隔壁板7に代えて使用することができるものであ
る。これは、例えば16mm径の鉄筋を用いて、格子間
隔0.1m,高さ0.5m,長さ2.0mの矩形に形成
され、図3の場合と同様に、敷設された底網4の上面に
立設した姿勢で固定される。そのために、溶接鉄筋隔壁
板17の上下の端縁部には、図14にも示すリング状フ
ック17a,17bが上方または下方に向くように突設
され、左右の端縁部にも、リング状フック17c,17
dが一体化される。そして、図6に示した場合と同じ要
領で、隣接する二つの溶接鉄筋隔壁板17,17のリン
グ状フック17c,17dを重ね合わせ、骨線6を鉛直
方向に挿通すれば接続することができる。区画部10を
形成するにおいて、図15に示すように、河床2と斜面
3aとの間に予め決められた地盤の折れ部11Aを存在
させている場合には、斜面側の溶接鉄筋隔壁板17Cの
一方の端縁部17mは河床2に対して垂直となるように
成形されおり、隣接する二つの溶接鉄筋隔壁板17C,
17Dの接続においても骨線6を鉛直に挿通させること
ができる。そして、図9示した交差部P,Q,R,Sに
おいても、図15に示すように、溶接鉄筋隔壁板17A
ないし17Dが接続され、その自立が維持される。この
ような接続作業を含めて、いずれの接続作業も、コンク
リート隔壁板7の場合と変わるところがない。ちなみ
に、河床2に位置して横方向へ延びる溶接鉄筋隔壁板横
列(図9におけるコンクリート隔壁板7の場合の横列7
K,7Lに相当する列)は、鉄筋の格子間隔を変えるこ
とにより、河川の流水方向14に加わる力に対して押し
流されにくくすると共に、中詰石9,9間の流水をも円
滑に流通させることができる。そのために、中詰石9が
区画部10から流出しない格子の寸法や形状としておけ
ばよいことは述べるまでもない。
FIG. 13 shows a single piece of a planar welded reinforcing bar partition plate 17 in which reinforcing bars are arranged vertically and horizontally and welded, and can be used in place of the concrete partition wall plate 7 described above. This is formed into a rectangle with a grid spacing of 0.1 m, a height of 0.5 m, and a length of 2.0 m by using, for example, a rebar having a diameter of 16 mm, and, like the case of FIG. It is fixed in an upright position. Therefore, ring-shaped hooks 17a and 17b also shown in FIG. 14 are provided on the upper and lower edge portions of the welded reinforcing bar partition plate 17 so as to face upward or downward, and the left and right edge portions also have ring-shaped hooks. Hooks 17c, 17
d is integrated. Then, in the same manner as in the case shown in FIG. 6, the ring-shaped hooks 17c and 17d of two adjacent welded reinforcing bar partition plates 17 and 17 are overlapped with each other, and the bone wire 6 can be connected by being inserted in the vertical direction. . In forming the partitioning portion 10, as shown in FIG. 15, when a predetermined ground bent portion 11A is present between the river bed 2 and the slope 3a, the welded reinforcing bar partition plate 17C on the slope side is provided. One edge portion 17m of the one is formed to be perpendicular to the river bed 2, and two adjacent welded reinforcing bar partition plates 17C,
Even in the connection of 17D, the bone line 6 can be inserted vertically. Then, also at the intersections P, Q, R, and S shown in FIG. 9, as shown in FIG.
Through 17D are connected to maintain their independence. Any connection work including such connection work is no different from the case of the concrete partition plate 7. By the way, a row of welded reinforcing bar partition plates located in the river bed 2 and extending in the lateral direction (in the case of the concrete partition plate 7 in FIG.
By changing the lattice spacing of the reinforcing bars, the columns corresponding to K and 7L are less likely to be washed away by the force applied in the flowing direction 14 of the river, and the flowing water between the filling stones 9 and 9 also flows smoothly. Can be made. Therefore, it goes without saying that the size and shape of the lattice in which the filling stone 9 does not flow out from the partition portion 10 may be set.

【0011】以上の説明から分かるように、護岸用構造
物の上下面に菱形金網の底網やふた網を採用しているの
で、一般的に用いられているブロック護岸用構造物に比
べて安価なものとなる。その護岸工の施工に機械を使用
でき、工期の短縮も実現される。底網やふた網さらには
コンクリート隔壁板または溶接鉄筋隔壁板は、その護岸
工の規模に応じた数を採用すればよいので、規模の大小
にかかわりなく、本構造を適用することができる。した
がって、護岸工を形成する構成部品の共通化や量産化も
図られる。また、底網などは、護岸用構造物に必要な屈
撓性を有しており、河床や堤防における地盤の小さな起
伏にも馴染み、その保護効果が一層発揮される。さらに
は、この護岸工構造では、ブロックなどを採用した場合
に比べ、河川における自然景観を維持することもできる
利点がある。
As can be seen from the above description, since the bottom net and the lid net of the diamond-shaped wire net are adopted on the upper and lower surfaces of the revetment structure, it is cheaper than the generally used block revetment structure. It will be The machine can be used for the construction of the seawall, and the construction period can be shortened. Since the number of bottom nets, lid nets, concrete partition plates or welded reinforcing bar partition plates may be adopted according to the scale of the revetment work, this structure can be applied regardless of the scale. Therefore, the components forming the seawall can be standardized and mass-produced. In addition, bottom nets, etc. have the flexibility required for revetment structures, and are well adapted to small ups and downs of the ground on river beds and levees, and their protective effect is further exerted. Furthermore, this revetment construction structure has an advantage that the natural landscape of the river can be maintained as compared with the case where blocks are adopted.

【図面の簡単な説明】[Brief description of drawings]

【図1】 底網もしくはふた網の相互の接続部位の部分
平面図。
FIG. 1 is a partial plan view of a mutual connecting portion of a bottom net or a lid net.

【図2】 図1のA−A線矢視図。FIG. 2 is a view taken along the line AA of FIG.

【図3】 河床および堤防に敷設された底網の斜視図。FIG. 3 is a perspective view of a bottom net laid on a river bed and an embankment.

【図4】 区画部を画成するためコンクリート隔壁板の
正面図。
FIG. 4 is a front view of a concrete partition plate for defining a partition.

【図5】 図4のB−B線矢視におけるコンクリート隔
壁板の左面図。
5 is a left side view of the concrete partition plate taken along the line BB of FIG.

【図6】 底網およびふた網とコンクリート隔壁板との
接続説明図。
FIG. 6 is an explanatory view of the connection between the bottom net and the lid net and the concrete partition plate.

【図7】 図6のC−C線矢視断面図。7 is a cross-sectional view taken along the line CC of FIG.

【図8】 区画部への中詰石の投入説明図。FIG. 8 is an explanatory diagram of how the filling stone is put into the compartment.

【図9】 底網に固定されコンクリート隔壁板で画成し
た区画部に中詰石を投入する前の状態図。
FIG. 9 is a state diagram before charging the filling stones into the partition section fixed to the bottom net and defined by the concrete partition plate.

【図10】 地盤折れ部におけるコンクリート隔壁板の
十字状交差位置における接続状態説明図。
FIG. 10 is an explanatory view of a connection state at a cross-shaped crossing position of concrete partition plates in a ground break portion.

【図11】 区画部の全上面がふた網で覆われた護岸工
の斜視図。
FIG. 11 is a perspective view of a seawall in which the entire upper surface of the partition is covered with a lid net.

【図12】 コンクリート隔壁板を底網およびふた網の
リング状フックを使用しないで接続した場合の説明図。
FIG. 12 is an explanatory view when concrete partition plates are connected without using ring hooks of a bottom net and a lid net.

【図13】 区画部を画成するため溶接鉄筋隔壁板の正
面図。
FIG. 13 is a front view of a welded reinforcing bar partition plate for defining a partition.

【図14】 図13のD−D線矢視における溶接鉄筋隔
壁板の左面図。
14 is a left side view of the welded reinforcing bar partition plate taken along the line DD in FIG.

【図15】 地盤折れ部における溶接鉄筋隔壁板の十字
状交差位置における接続状態説明図。
FIG. 15 is an explanatory view of a connection state at a cross-shaped crossing position of the welded reinforcing bar partition plate in the ground bent portion.

【符号の説明】[Explanation of symbols]

1…河岸、2…河床、3…堤防、4,4A,4B…底
網、4m,4n…列線端部、4a,4b…リング状フッ
ク、6…骨線、7,7A〜7D…コンクリート隔壁板、
7a〜7d…リング状フック、9…中詰石、10…区画
部、13,13A,13B…ふた網、13m,13n…
列線端部、13a,13b…リング状フック、16…開
口、17,17C,17D…溶接鉄筋隔壁板、17a〜
17d…リング状フック。
1 ... Riverbank, 2 ... Riverbed, 3 ... Levee, 4, 4A, 4B ... Bottom net, 4m, 4n ... Row line ends, 4a, 4b ... Ring hook, 6 ... Bone line, 7, 7A-7D ... Concrete Partition plate,
7a to 7d ... Ring-shaped hook, 9 ... Inner stone, 10 ... Partition, 13, 13A, 13B ... Lid net, 13m, 13n ...
Column line ends, 13a, 13b ... Ring hooks, 16 ... Openings, 17, 17C, 17D ... Welded reinforcing bar partition plates, 17a ...
17d ... Ring-shaped hook.

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 河床や河岸さらには堤防を流水による侵
食から保護するための護岸工として構築される護岸用構
造物において、 菱形金網の列線端部にカール加工された複数のリング状
フックを備え、護岸工設置領域に敷設するため当該リン
グ状フックに骨線を挿通して相互に接続される底網と、 リング状フックが端縁部に形成され、該リング状フック
に骨線を挿通し左右端縁部が相互に接続されて前記底網
上に中詰石を投入する区画部を画成するために立設して
縦横に配置されると共に、下端縁部に形成したリング状
フックと前記底網とに骨線を挿通して該底網に接続され
複数のコンクリート隔壁板と、 菱形金網の列線端部にカール加工された複数のリング状
フックを備え、上記中詰石が投入された区画部を覆うた
当該リング状フックに骨線を挿通して相互に接続され
ると共に、前記コンクリート隔壁板の上端縁部に設けた
リング状フックに骨線を挿通して前記コンクリート隔壁
板に接続されるふた網と 備えることを特徴とする親水河川用護岸工構造。
1. The riverbed, riverbank, and levees are invaded by running water.
Seawall construction constructed as a seawall protection to protect from food
In the structure, a plurality of ring-shaped curls at the end of the row line of the diamond-shaped wire mesh
Equipped with hooks and laid in the revetment installation areaIn order to do the phosphorus
Insert the bone wire into the hook and connect to each otherThe bottom net and the ring-shaped hook are formed on the edge,The ring-shaped hook
The bone wire is inserted into theThe bottom net
Standing up to define a compartment to put the filling stones on
Arranged vertically and horizontallyAlong with the ring shape formed on the lower edge
The bone wire is inserted through the hook and the bottom net and is connected to the bottom net.
RuMultiple concrete partition plates and multiple ring-shaped curls at the ends of the row lines of the diamond wire mesh
It is equipped with a hook to cover the compartment where the above filling stone is put.
MeThe bone wire is inserted into the ring-shaped hook and connected to each other.
And provided on the upper edge of the concrete partition plate.
Insert the bone wire into the ring-shaped hook to insert the concrete partition wall.
Connected to the boardWith a lid net, To A water revetment structure for hydrophilic rivers, which is characterized by being provided.
【請求項2】 上記コンクリート隔壁板には、流水を通
過させるための開口が設けられていることを特徴とする
請求項1に記載の親水河川用護岸工構造。
2. The hydrophilic river bank protection structure according to claim 1, wherein the concrete partition plate is provided with an opening for allowing running water to pass therethrough.
【請求項3】 請求項1におけるコンクリート隔壁板に
代えて、溶接鉄筋隔壁板としたことを特徴とする請求項
1に記載の親水河川用護岸工構造。
3. The water revetment structure for hydrophilic rivers according to claim 1, wherein the concrete partition plate in claim 1 is a welded reinforcing bar partition plate.
JP1991038811U 1991-04-26 1991-04-26 Water revetment construction for hydrophilic rivers Expired - Lifetime JPH083457Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991038811U JPH083457Y2 (en) 1991-04-26 1991-04-26 Water revetment construction for hydrophilic rivers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991038811U JPH083457Y2 (en) 1991-04-26 1991-04-26 Water revetment construction for hydrophilic rivers

Publications (2)

Publication Number Publication Date
JPH04126926U JPH04126926U (en) 1992-11-19
JPH083457Y2 true JPH083457Y2 (en) 1996-01-31

Family

ID=31920227

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991038811U Expired - Lifetime JPH083457Y2 (en) 1991-04-26 1991-04-26 Water revetment construction for hydrophilic rivers

Country Status (1)

Country Link
JP (1) JPH083457Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7402518B2 (en) * 2020-04-08 2023-12-21 株式会社ダイクレ Root hardening method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53129802U (en) * 1977-12-19 1978-10-14
JPS5628915A (en) * 1980-04-28 1981-03-23 Matsui Kanaami Kogyo Kk Wire cylinder

Also Published As

Publication number Publication date
JPH04126926U (en) 1992-11-19

Similar Documents

Publication Publication Date Title
US20100024343A1 (en) Gabion
JP3639864B2 (en) Beach stabilization structure
KR101162548B1 (en) Reinforcement gabion for afforestation environment and construction method
JP2001064937A (en) Gabion work for civil engineering work, protection work using the same, and filling method for filler
JP3032496B2 (en) Structured wall for sloped land and construction method
JP7368279B2 (en) Rubble stone structures and their construction methods
JPS6140914A (en) Erosion control dam and its construction
JPH04126926U (en) Bank protection structure for hydrophilic rivers
JP7221366B2 (en) Anti-scouring structures and crushing units
JPH05339920A (en) Construction method for fish path in river by using bedding cage
JP3038565B2 (en) Construction method of revetment
JP6923282B2 (en) Rubble stone structure and its construction method
KR100644358B1 (en) Method of producing natural stone panel
JP3514377B2 (en) Construction method of stone-filled mat and concrete member used therefor
RU206317U1 (en) MODULE OF ASSEMBLY HYDRAULIC STRUCTURE
JPH1181270A (en) Mattress shaped gabion for revetment
JP2586691Y2 (en) Stone basket
JPH03241112A (en) Execution method of revetment
JPH06313309A (en) Stone cramming basket mat and its construction method
KR20060004413A (en) Prefabricated frame construction structure for all directions or revetment construction and eco-friendly revetment construction by this
JPH0348271Y2 (en)
JP3210919B2 (en) Metal net cage for seawall construction
JP3796689B2 (en) Multi-natural assembly block
JP2004263407A (en) Futon basket
JP2647564B2 (en) Construction method of reinforcing embankment and net basket for embankment

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term