JPH084000A - Method for setting pile - Google Patents

Method for setting pile

Info

Publication number
JPH084000A
JPH084000A JP13467394A JP13467394A JPH084000A JP H084000 A JPH084000 A JP H084000A JP 13467394 A JP13467394 A JP 13467394A JP 13467394 A JP13467394 A JP 13467394A JP H084000 A JPH084000 A JP H084000A
Authority
JP
Japan
Prior art keywords
pile
piles
hole
support base
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13467394A
Other languages
Japanese (ja)
Inventor
Sadayasu Washimi
定泰 鷲見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP13467394A priority Critical patent/JPH084000A/en
Publication of JPH084000A publication Critical patent/JPH084000A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To temporaily fix piles in a safe and sure manner when the piles are connected to each other so that workability of temporarily fixing work and welding work can be improved and the work can be performed even in a relatively narrow space. CONSTITUTION:In a method for setting a pile wherein a plurality of piles 11, 12 are lowered into a pile hole 10 excavated from the upper side of the ground, while the piles 11, 12 are axially connected, thus embedding the piles in the hole, a supporting base 20 having therein a clearance S larger than the diameter of the pile 11 is prepared. The base 20 is set on the ground in such a manner that the clearance S is aligned with the pile hole 10, and in order to connect the upper pile 12 to the lower pile 11 to each other, a piece of rope 30 is wound around the pile 11 and a portion thereof is hung on a hook provided on the base 20. Thus, the lower pile 11 will be positioned halfway down the hole 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋コンクリート杭や
鋼杭の打設工法の中でも、特に、削孔した杭孔内に、複
数本の杭を上下に順次接続しながら埋設して施工する工
法に利用した場合に好適な杭の施工方法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for placing reinforced concrete piles and steel piles, and in particular, a construction method in which a plurality of piles are buried in a drilled pile hole while sequentially connecting them vertically. The present invention relates to a method of constructing a pile that is suitable for use in.

【0002】[0002]

【従来の技術】例えば、建築物や土木構造物等の構築に
おいて、地盤が地耐力の小さい、いわゆる軟弱地盤であ
る場合には、基礎スラブの補強用などとして、鉄筋コン
クリート杭や鋼杭などが多く施工されている。この種の
杭は、通常、地盤深部の硬質地盤に達する深さまで施工
されるので、杭の深さも数十メートルに達する場合も多
々ある。したがって、このような深さの杭の施工に際し
ては、複数本の杭を軸方向に順次接続しながら施工する
方法が採られている。
2. Description of the Related Art For example, in the construction of buildings and civil engineering structures, when the ground is so-called soft ground having a small bearing capacity, reinforced concrete piles and steel piles are often used for reinforcement of foundation slabs. Has been constructed. Since the piles of this type are usually constructed up to a depth reaching the hard ground deep in the ground, the depth of the piles often reaches several tens of meters. Therefore, when constructing piles having such a depth, a method is employed in which a plurality of piles are sequentially connected in the axial direction.

【0003】ところで、この種の杭の施工方法として、
予め杭孔を削孔してから打ち込むプレボーリング工法が
ある。この工法は、例えば図3および図4に示すよう
に、アースオーガ等により削孔した杭孔1内に、図示し
ない杭打ち機等により縦に吊り上げた1本目の鉄筋コン
クリート杭2の下端を挿入してこれを回転させながら降
下させ、次いで、この杭2に対して2本目の鉄筋コンク
リート杭3を接続する際に、1本目の杭2にワイヤー等
の策具4の一端側を図4に示すように巻き付け、他端側
を図3に示すようにバックホー等の重量車両5に掛け止
めしておくことによりその杭2を杭孔1内の途中に位置
決め(仮固定)して落下を防止し、そしてこの状態で、
新たに吊り上げた2本目の杭3の下端を1本目の杭2の
上端に溶接して接続した後、一体化された2本の杭2、
3をさらに降下させ、同様にして3本目の鉄筋コンクリ
ート杭(図示せず)を接続する、といった方法が採られ
ている。
By the way, as a method of constructing this type of pile,
There is a pre-boring method in which a pile hole is drilled in advance and then driven. This construction method, for example, as shown in FIGS. 3 and 4, inserts the lower end of the first reinforced concrete pile 2 vertically lifted by a pile driver (not shown) into the pile hole 1 drilled with an earth auger or the like. And lowering it while rotating it, and then connecting the second reinforced concrete pile 3 to this pile 2, one end side of the tool 4 such as a wire is attached to the first pile 2 as shown in FIG. 3, and the other end side is hung on a heavy vehicle 5 such as a backhoe as shown in FIG. 3 so that the pile 2 is positioned (temporarily fixed) in the pile hole 1 to prevent falling. And in this state,
After welding the lower end of the newly lifted second pile 3 to the upper end of the first pile 2 and connecting them, two integrated piles 2,
3 is further lowered, and a third reinforced concrete pile (not shown) is connected in the same manner.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、このよ
うに杭どうしの接続時に、下方の杭2に巻き付けた策具
4の他端を重量車両5に掛け止めしてその下方の杭2を
仮固定する方法では、接続する上方の杭を吊り上げてい
る杭打ち機のオペレータ、重量車両5のオペレータ、溶
接作業者といった、作業者相互間の連係作業が難しく、
作業性が悪いという問題がある上に、不注意による重量
車両5の移動などにより策具4に緩みが生じたりする場
合があり、杭の落下防止のための安全対策上からも十分
な方法とは言い難い問題があった。
However, when the piles are thus connected to each other, the other end of the tool 4 wound around the lower pile 2 is hooked on the heavy vehicle 5 and the lower pile 2 is temporarily fixed. In the method described above, it is difficult to connect workers such as an operator of a pile driver that lifts the upper pile to be connected, an operator of the heavy vehicle 5, and a welding operator,
In addition to the problem of poor workability, the measure 4 may be loosened due to the careless movement of the heavy vehicle 5 or the like, which is a sufficient method from the viewpoint of safety measures for preventing the pile from falling. I had a difficult problem to say.

【0005】また、杭どうしの溶接作業時に、足元が不
安定で作業性が悪く、作業者が杭孔1内に落ちる危険性
もあるといった不具合いがあり、さらに、杭の仮固定用
として重量車両5を配置するための広いスペースを必要
とするなどの問題もあり、したがって、従来からこれら
に対する何らかの対策が望まれていた。
Further, when welding the piles to each other, there is a problem that the feet are unstable and the workability is poor, and there is a risk that an operator falls into the pile hole 1, and further, the weight is used for temporarily fixing the piles. There is also a problem that a wide space for arranging the vehicle 5 is required, and therefore some measure against these has been conventionally desired.

【0006】本発明は、以上のような点を考慮してなさ
れたもので、杭どうしの接続時に杭を安全かつ確実に仮
固定することができるとともに、その仮固定のための作
業や溶接作業などの作業性も良好であり、さらに比較的
狭いスペースでも作業を可能にすることができる杭の施
工方法を提供しようとするものである。
The present invention has been made in consideration of the above points, and it is possible to temporarily and safely fix the piles when the piles are connected to each other, and work for the temporary fixing and welding work. It is intended to provide a method for constructing a pile, which has good workability such as that, and can work even in a relatively narrow space.

【0007】[0007]

【課題を解決するための手段】請求項1に係る発明は、
地盤上から削孔した杭孔内に、複数本の杭を軸方向に接
続しながら降下させて埋設する杭の施工方法であって、
前記杭の直径よりも大きな間隔の間隙を持つ支持台を、
その支持台の間隙と杭孔とを合致させた状態で前記地盤
上に設置し、上下の杭どうしの接続時に下方の杭に策具
を捲回してその策具の一部を支持台に設けたフックに掛
け止めすることにより下方の杭を杭孔の途中に位置決め
しておくことを特徴としている。
The invention according to claim 1 is
In the pile hole drilled from above the ground, it is a method of constructing a pile that descends and is buried while connecting multiple piles in the axial direction,
A support base with a gap with a spacing larger than the diameter of the pile,
It is installed on the ground with the gap of the support base and the pile hole matched, and when connecting the upper and lower piles, the device is wound around the lower pile and a part of the device is provided on the support base. It is characterized in that the lower pile is positioned in the middle of the pile hole by hanging it on the hook.

【0008】[0008]

【作用】請求項1記載の杭の施工方法によれば、支持台
は、地盤上に設置されて安定した状態になる。したがっ
て、上下の杭の接続時における下方の杭の仮固定を、こ
の支持台を利用して行なうことにより、下方の杭の位置
決めや落下防止作用が確実なものとなる。この場合、支
持台に設けたフックに策具を介して杭を固定することに
より、杭の自重に基づく策具の引っ張り角度が安定した
状態となる。また、支持台20の上面は安定な作業足場
として利用可能になる。また、支持台は、杭孔の直上に
設置するので、策具を介しての杭の仮固定にこの支持第
を用いても、狭い作業スペースで済むことになる。
According to the pile construction method of the first aspect, the support base is installed on the ground and is in a stable state. Therefore, by temporarily fixing the lower piles when connecting the upper and lower piles by using this support base, the positioning of the lower piles and the fall prevention action can be ensured. In this case, by fixing the pile to the hook provided on the support base via the implement, the pulling angle of the implement based on the weight of the pile becomes stable. Further, the upper surface of the support base 20 can be used as a stable work scaffold. Further, since the support base is installed right above the pile holes, even if this support first is used for temporarily fixing the piles with the aid of a tool, a small work space is required.

【0009】[0009]

【実施例】以下、本発明の好適な実施例を添付の図1お
よび図2を参照して説明する。本実施例による杭の施工
方法は、地盤G上から削孔した杭孔10内に、複数本の
杭11、12を軸方向に接続しながら降下させて埋設す
る杭の施工方法において、前記杭11の直径よりも大き
な間隔の間隙Sを持つ支持台20を準備し、その支持台
20の間隙Sと杭孔10とを合致させた状態で前記地盤
G上に設置し、上下の杭11、12どうしの接続時に下
方の杭11に策具30を捲回してその策具30の一部を
支持台20に設けたフックに掛け止めすることにより下
方の杭11を杭孔10の途中に位置決め(仮固定)して
おく方法を採用したものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT A preferred embodiment of the present invention will be described below with reference to the accompanying FIGS. The method of constructing a pile according to the present embodiment is the method of constructing a pile in which a plurality of piles 11 and 12 are axially connected in a pile hole 10 drilled from the ground G while being lowered to be embedded. A support base 20 having a gap S with a gap larger than the diameter of 11 is prepared, and the gap S of the support base 20 and the pile hole 10 are installed on the ground G in a state of being matched with each other, and the upper and lower piles 11, 12 When the two are connected, the lower pile 11 is positioned in the middle of the pile hole 10 by winding the countermeasure tool 30 around the lower pile 11 and hooking a part of the countermeasure tool 30 on the hook provided on the support base 20. The method of (temporary fixing) is adopted.

【0010】次いで、これらの詳細について説明する
と、本実施例で用いた前記支持台20は、図1に示すよ
うに互いに平行に延在する一対の基台部21、21と、
これら基台部21、21を連結する結合部22とを備
え、全体として平面コ字形のいわゆる馬蹄形のような形
状に構成されている。したがって、間隙Sは、両基台部
21、21間に形成されたスリットのような形態の間隙
として形成されている。
Next, the details thereof will be described. The support base 20 used in this embodiment has a pair of base parts 21, 21 extending in parallel with each other as shown in FIG.
It is provided with a base 22 and a connecting portion 22 that connects the bases 21, and is configured as a so-called horseshoe shape having a generally U-shaped plan. Therefore, the gap S is formed as a gap having a shape like a slit formed between the two base parts 21, 21.

【0011】支持台20自体は、例えば鉄筋やその他の
補強材入りのコンクリート製支持台として、あるいは軽
量化の点を考慮して、鋼鈑等により内部を中空に形成し
た鋼製の支持台等として構成されている。また、この支
持台20の上面は作業足場として利用できるように平坦
な面に形成され、下面についても設置安定性を考慮して
平坦な面に形成されている。
The support base 20 itself is, for example, a concrete support base containing reinforcing bars or other reinforcing materials, or a steel support base having a hollow interior made of steel plate or the like in consideration of weight reduction. Is configured as. Further, the upper surface of the support base 20 is formed into a flat surface so that it can be used as a work scaffold, and the lower surface is also formed into a flat surface in consideration of installation stability.

【0012】前記間隙Sの大きさ、即ち、両基台部2
1、21間の間隔αは、杭11の直径dよりも大きく設
計されており、したがって、図1に示すように、間隙S
部分に杭11が起立状態で位置することができるととも
に、杭11自体が上下に移動可能なように考慮されてい
る。
The size of the gap S, that is, both base parts 2
The spacing α between the first and the second 21 is designed to be larger than the diameter d of the pile 11, and therefore, as shown in FIG.
It is considered that the pile 11 can be positioned upright in the part and that the pile 11 itself can be moved up and down.

【0013】連結部22の上面中央部には、大重量に耐
え得る構造の大型のフック23が設けられ、このフック
23に対して、杭11に巻き付けた策具30の一部が、
図示例では両端が掛け止めされる構成となっている。な
お、符号24は、支持台20を吊り上げて設置したり移
動させたりするための吊り策であり、この吊り策の両端
は支持台20の上面の重心位置に設けられたアイボルト
25、25にそれぞれ取り付けられている。
A large hook 23 having a structure capable of withstanding a large weight is provided at the center of the upper surface of the connecting portion 22, and a part of the tool 30 wound around the pile 11 is attached to the hook 23.
In the illustrated example, both ends are hooked. Reference numeral 24 is a hanging measure for hoisting and installing or moving the supporting base 20, and both ends of this hanging measure are respectively attached to eyebolts 25, 25 provided at the center of gravity of the upper surface of the supporting base 20. It is installed.

【0014】このように構成された支持台20を用いて
杭を施工するには、まず図2に示すように、アースオー
ガ等により杭孔10を削孔する。次に、吊り策24を利
用して支持台20を吊り上げ、支持台20の間隙Sと前
記杭孔10とが合致するるように、即ち、杭孔10の直
上に間隙Sが位置するように調整しながら地盤G上に設
置する。
In order to construct a pile using the support base 20 constructed as described above, first, as shown in FIG. 2, the pile hole 10 is drilled with an earth auger or the like. Next, the supporting table 20 is hoisted by using the suspending means 24 so that the gap S of the supporting table 20 and the pile hole 10 coincide with each other, that is, the gap S is located immediately above the pile hole 10. Install on the ground G while adjusting.

【0015】次に、図示しない杭打ち機等により縦に吊
り上げた1本目の杭11の下端を挿入してこれを回転さ
せながら降下させ、次いで、この杭11に対して2本目
の杭12を接続する際に、1本目の杭2に策具30の中
央部を巻き付け、両端を支持台20のフック23に掛け
止めしておくことによりその杭11を杭孔10内の途中
に位置決め(仮固定)して落下を防止しておく。そし
て、この状態で、杭打ち機等により新たに吊り上げた2
本目の杭12の下端を1本目の杭11の上端に溶接して
接続した後、一体化された2本の杭11、12をさらに
降下させ、同様にして3本目の杭(図示せず)を接続す
る。
Next, the lower end of the first pile 11 which is vertically lifted by a pile driving machine (not shown) is inserted and lowered while rotating it, and then the second pile 12 is attached to the pile 11. When connecting, the central part of the device 30 is wound around the first pile 2 and both ends are hooked on the hooks 23 of the support base 20 to position the pile 11 in the middle of the pile hole 10 (temporary). (Fix it) to prevent it from falling. Then, in this state, 2 was newly lifted by a pile driver or the like.
After the lower end of the second pile 12 is welded to the upper end of the first pile 11 and connected, the two integrated piles 11 and 12 are further lowered, and similarly, the third pile (not shown) Connect.

【0016】上記の作業において、支持台20は、地盤
G上に設置されて安定した状態にあるので、上下の杭1
1、12の接続時における下方の杭11の仮固定を、こ
の支持台20を利用して行なうことにより、下方の杭1
1の位置決めや落下防止を確実かつ容易に行なうことが
できる。この場合、支持台20に設けたフック23に策
具30を介して杭11を固定することにより、杭の自重
に基づく策具30の引っ張り角度が安定した状態とな
り、したがってこの点からも杭の位置決めおよび仮固定
状態がより確実なものとなる。
In the above work, since the support base 20 is installed on the ground G and is in a stable state, the upper and lower piles 1
By temporarily fixing the lower pile 11 when connecting 1 and 12 by using this support base 20, the lower pile 1
Positioning of 1 and prevention of drop can be performed reliably and easily. In this case, by fixing the pile 11 to the hook 23 provided on the support base 20 via the tack tool 30, the pulling angle of the tack tool 30 based on the weight of the pile becomes stable, and therefore from this point as well, Positioning and temporary fixing are more reliable.

【0017】また、策具30の中央部を杭に巻き付けて
両端をフック23に掛け止めする作業や、上下の杭1
1、12どうしを溶接する作業などは、支持台20の平
坦な上面で行なうことにより、足場のしっかりした状態
での作業が可能になり、したがってその分、作業性や作
業効率が良くなる。
Further, a work of winding the central portion of the countermeasure tool 30 around a pile and hooking both ends thereof to the hooks 23, and the upper and lower piles 1
When the work of welding 1 and 12 is performed on the flat upper surface of the support 20, work with a firm scaffold can be performed, and workability and work efficiency are improved accordingly.

【0018】また、支持台20は、杭孔10の直上に設
置するので、策具30を介しての杭の仮固定にこの支持
第20を用いても、狭い作業スペースで済み、したがっ
て、従来のように重量車両を用いる場合に比べて極めて
狭いスペースでも作業を実施することができるので、重
量車両の設置スペースのない作業現場でも施工すること
ができる。
Further, since the support base 20 is installed right above the pile hole 10, even if the support 20 is used for temporarily fixing the pile through the countermeasure tool 30, a small working space is required, and therefore, the conventional work is not required. Since the work can be performed in an extremely narrow space as compared with the case where the heavy vehicle is used as described above, the work can be performed at a work site where there is no installation space for the heavy vehicle.

【0019】なお、実施例においては、杭の仮固定に用
いる支持台20を平面U字状に形成した例を示したが、
例えば平面U字状や口字状、あるいはH状など、要する
に間隙Sを有する形状であれば良く、上記実施例に限定
されるものではない。また、支持台20の構造やその構
造材としても、鋼鈑やコンクリートに限らず、運搬性等
を考慮して軽量構造あるいは軽量材料で構成してもよ
い。
In the embodiment, the example in which the support base 20 used for temporarily fixing the pile is formed in a U-shape in a plane is shown.
For example, it may have any shape as long as it has a gap S, such as a plane U shape, a square shape, or an H shape, and is not limited to the above embodiment. Further, the structure of the support base 20 and the structural material thereof are not limited to steel plate and concrete, and may be a lightweight structure or a lightweight material in consideration of transportability and the like.

【0020】[0020]

【発明の効果】以上説明したように、本発明に係る杭の
施工方法によれば、以下のような優れた効果を奏する。
As described above, according to the pile construction method of the present invention, the following excellent effects are obtained.

【0021】請求項1に係る発明においては、地盤上か
ら削孔した杭孔内に、複数本の杭を軸方向に接続しなが
ら降下させて埋設する杭の施工方法であって、前記杭の
直径よりも大きな間隔の間隙を持つ支持台を、その支持
台の間隙と杭孔とを合致させた状態で前記地盤上に設置
し、上下の杭どうしの接続時に下方の杭に策具を捲回し
てその策具の一部を支持台に設けたフックに掛け止めす
ることにより下方の杭を杭孔の途中に位置決めしておく
方法としたから、杭どうしの接続時に、地盤上に設置し
て安定状態とした支持台を利用することで、杭を安全か
つ確実に仮固定することができるとともに、支持台を作
業足場に利用できるので、その仮固定のための作業や溶
接作業などの作業性も極めて良好にすることができ、さ
らに、仮固定のために重量車両が不要となるので、比較
的狭いスペースでも作業を可能にすることができる。
In the invention according to claim 1, there is provided a method for constructing a pile in which a plurality of piles are axially connected and lowered to be embedded in a pile hole drilled from the ground, wherein A support base with a gap larger than the diameter is installed on the ground with the gap of the support base and the pile holes aligned, and when connecting the upper and lower piles, wind the tool on the lower pile. Since the lower pile is positioned in the middle of the pile hole by turning and hooking a part of the tool to the hook provided on the support base, install it on the ground when connecting the piles. By using a stable and stable support base, the piles can be safely and reliably temporarily fixed, and the support base can be used as a work scaffold, so work such as temporary fixing work and welding work can be performed. It is also possible to make it extremely good, The weight vehicle is not required, it is possible to enable work in a relatively small space.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例を示す斜視図である。FIG. 1 is a perspective view showing an embodiment of the present invention.

【図2】本発明の実施例を示す一部断面図である。FIG. 2 is a partial cross-sectional view showing an embodiment of the present invention.

【図3】従来例を示す一部断面図である。FIG. 3 is a partial sectional view showing a conventional example.

【図4】従来例を示す部分側面図である。FIG. 4 is a partial side view showing a conventional example.

【符号の説明】[Explanation of symbols]

10 杭孔 11 杭(下方の杭) 12 杭(上方の杭) 20 支持台 21 基台部 22 連結部 23 フック 24 吊り策 30 策具 S 間隙 10 Pile Hole 11 Pile (Lower Pile) 12 Pile (Upper Pile) 20 Support Base 21 Base Part 22 Connection Part 23 Hook 24 Suspension Measure 30 Measure Tool S Gap

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 地盤上から削孔した杭孔内に、複数本の
杭を軸方向に接続しながら降下させて埋設する杭の施工
方法であって、前記杭の直径よりも大きな間隔の間隙を
持つ支持台を、その支持台の間隙と杭孔とを合致させた
状態で前記地盤上に設置し、上下の杭どうしの接続時に
下方の杭に策具を捲回してその策具の一部を支持台に設
けたフックに掛け止めすることにより下方の杭を杭孔の
途中に位置決めしておくことを特徴とする杭の施工方
法。
1. A method of constructing a pile in which a plurality of piles are axially connected and lowered while being buried in a pile hole drilled from the ground, the gap having a gap larger than the diameter of the pile. Is installed on the ground with the clearance of the support and the hole of the pile matched, and when connecting the upper and lower piles, the measure is wound around the lower pile and one of the measures is A method for constructing a pile, characterized in that a lower pile is positioned in the middle of a pile hole by hooking a portion to a hook provided on a support base.
JP13467394A 1994-06-16 1994-06-16 Method for setting pile Pending JPH084000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13467394A JPH084000A (en) 1994-06-16 1994-06-16 Method for setting pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13467394A JPH084000A (en) 1994-06-16 1994-06-16 Method for setting pile

Publications (1)

Publication Number Publication Date
JPH084000A true JPH084000A (en) 1996-01-09

Family

ID=15133895

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13467394A Pending JPH084000A (en) 1994-06-16 1994-06-16 Method for setting pile

Country Status (1)

Country Link
JP (1) JPH084000A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6956186B1 (en) 1999-08-09 2005-10-18 Ibiden Co., Ltd. Ceramic heater
JP2021173031A (en) * 2020-04-23 2021-11-01 株式会社フジタ How to remove existing piles

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6956186B1 (en) 1999-08-09 2005-10-18 Ibiden Co., Ltd. Ceramic heater
JP2021173031A (en) * 2020-04-23 2021-11-01 株式会社フジタ How to remove existing piles

Similar Documents

Publication Publication Date Title
JP6397751B2 (en) Construction method of rebar reinforcement assembly, rebar reinforcement, and cast-in-place pile
JP6078196B1 (en) How to build steel columns
JP2012162862A (en) Scaffold for pier construction and pier construction method
JP2017210840A (en) Temporary cut-off method, temporary cut-off structure
CN110904956A (en) Cast-in-place pile construction process
JP2684155B2 (en) Excavation method used for construction of underground structures
JP2019007232A (en) Installation method of support structure
KR101150597B1 (en) Apparatus for file construction corresponding height restriction to and the method thereof
JPH084000A (en) Method for setting pile
CN211172008U (en) Anchor cable supporting structure without waist beam
JP4362824B2 (en) Reverse strike method
JP2780571B2 (en) Reinforcing cage construction equipment
CN111021343A (en) Construction method of upright post pile
JP2002038475A (en) Construction method of caisson type pile
CN113089654B (en) Construction process of hole digging pile in complex soil layer and steel casing for construction
CN213296330U (en) Pile splicing construction device under quicksand geological conditions
JP2016075083A (en) Hanging jig used when erecting core material of continuous underground wall, erection method for core material of continuous underground wall, erection system for core material of continuous underground wall, and construction method for continuous underground wall
JP2000017643A (en) Pile head construction method for angled piles
KR100802164B1 (en) Steel pipe pile head reinforcement structure of expansion foundation
JP2011220009A (en) Erection method of permanent sub-substructural column
JP3293796B2 (en) Pile driver
CN214653051U (en) Manual hole digging pile lifting device
JPH0687557U (en) Scaffolding for deep foundation work
CN222525808U (en) The interlocking structure of the high-position casing and the working platform of the full-casing wall cast-in-place pile hole
JP2000017641A (en) Pile head construction method for angled piles