JPH084100A - Catch basin and carrying method thereof - Google Patents

Catch basin and carrying method thereof

Info

Publication number
JPH084100A
JPH084100A JP15663694A JP15663694A JPH084100A JP H084100 A JPH084100 A JP H084100A JP 15663694 A JP15663694 A JP 15663694A JP 15663694 A JP15663694 A JP 15663694A JP H084100 A JPH084100 A JP H084100A
Authority
JP
Japan
Prior art keywords
water collecting
collecting basin
insert
main body
corners
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15663694A
Other languages
Japanese (ja)
Inventor
Etsuji Oike
悦二 大池
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oike and Co Ltd
Original Assignee
Oike and Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oike and Co Ltd filed Critical Oike and Co Ltd
Priority to JP15663694A priority Critical patent/JPH084100A/en
Publication of JPH084100A publication Critical patent/JPH084100A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

PURPOSE:To allow a catch basin of a type manufactured in a plant, to be easily carried so as to facilitate the work in the plant and a construction site and reduce the labor in the construction site by a large margin by adopting plant products since the catch basin can be carried easily and positively. CONSTITUTION:Inserts 30 are embedded in an opening 29 formed at the upper part of a box body 11. A cutout 21 for receiving a grating lid 5 is prepared at the opening 20, and an angle 22 for receiving the lid 5 is embedded therein. The inserts 30 are fitted upward to four corners of the angle 22. A catch basin 10 can be raised and lowered positively in a stable attitude by inserting suspension bars into the inserts 30 for hanging.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、側溝や埋設管から雨水
などを集め排出するために道路などに埋設される集水枡
の構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a water collecting basin which is buried in a road or the like in order to collect and discharge rainwater or the like from a gutter or a buried pipe.

【0002】[0002]

【従来の技術】道路脇に設置されている複数の側溝や、
地中の埋設管などを繋げ、これらを流れてくる雨水や排
水などを集めて排出するために集水枡が用いられてい
る。集水枡は、2方、あるいは3方に集水用の側溝など
を接続し、他の2方、あるいは1方に排出用の管などを
接続するものもあるし、単に、側溝などの向きを変える
ために設けられることもある。
2. Description of the Related Art A plurality of gutters installed on the side of a road,
A collecting basin is used to connect underground pipes and to collect and discharge rainwater and drainage flowing through these pipes. Some water collecting basins have water collecting gutters connected to two or three sides and drain pipes connected to the other two or one side. May be provided to change the.

【0003】このような集水枡は、接続される側溝や埋
設管の埋設レベルや位置がさまざまであり、また、側溝
や埋設管などの口径、形状も集水枡ごとに異なることが
多いので、従来は現場にて型枠を組み、その中へコンク
リートを流し込んで製造していた。
In such a water collecting basin, the burying levels and positions of the gutters and the burying pipes to be connected are various, and the caliber and shape of the gutters and the burying pipes are often different for each water collecting basin. Conventionally, the mold was assembled on-site, and concrete was poured into it to manufacture.

【0004】現場で集水枡のように鉛直方向に延びたコ
ンクリート枡を製造するには、集水枡の外側面を形取る
外型枠に加えて、集水枡の内側面を形成する内型枠も現
場で製造して全体の型枠を組み立てなければならない。
内型枠を製造するためには、コンパネ等の型枠材を精度
良く切断し、また組み立てる必要があるので、非常に手
間のかかる作業である。さらに、集水枡の上部は路面な
どに露出するので、現場で集水枡の本体を製造したの
ち、上部を金こて仕上げする必要も発生する。現場で使
用されたコンパネは使い棄てられてしまうので無駄が多
いという問題もある。
In order to manufacture a concrete basin extending vertically like a water collecting basin at the site, in addition to an outer form forming the outer surface of the water collecting basin, an inner surface forming the inner surface of the water collecting basin is formed. The formwork must also be manufactured on site to assemble the entire formwork.
In order to manufacture the inner formwork, it is necessary to accurately cut and assemble formwork materials such as a control panel, which is a very troublesome work. Further, since the upper part of the water collecting basin is exposed to the road surface, it is necessary to finish the upper part of the water collecting basin with a metal iron after manufacturing the main body of the water collecting basin. There is also a problem that the control panel used on site is wasted because it is discarded.

【0005】[0005]

【発明が解決しようとする課題】そこで、集水枡を工場
でプレハブし、現場に搬入後設置することが考えられて
いる。所定の大きさの集水枡を工場でプレハブすれば、
耐久性の型枠を用いて製造できるので、型枠の無駄はな
く、また現場で型枠を組み立てる手間を省くこともでき
る。さらに、工場プレハブして出荷すれば耐久性の型枠
を用いて蒸気養生を行えるので、路面に露出する集水枡
の上部も仕上がった状態で出荷でき、現地での手間を省
くことができる。
Therefore, it is considered that the water collecting basin is prefabricated in a factory and installed after being brought into the field. By prefabricating a water collecting basin of a predetermined size at the factory,
Since the mold can be manufactured using a durable mold, the mold is not wasted, and the work of assembling the mold on site can be omitted. Furthermore, if it is shipped as a factory prefabricated product, steam curing can be performed using a durable formwork, so the upper part of the water collecting basin exposed on the road surface can also be shipped in a finished state, which saves on-site labor.

【0006】工場でプレハブする集水枡においても、現
場での工数を削減するために、この枡の側壁に接続され
る側溝や埋設管のレベルに合わせて箱抜きを用意してお
くことが望ましい。このため、現場によっては、集水枡
の再上部まで箱抜きを形成する必要があったり、側壁の
中央に限らず様々な位置に箱抜きを形成する必要があ
る。従って、従来の工場プレハブ品では、その側壁に吊
り用のインサートを埋設してあるが、集水枡を工場プレ
ハブする際は、上記のような箱抜きと重なる恐れがある
ので、インサートを埋設する位置を決定できない。この
ため、耐久性の型枠を用いて工場プレハブする際はイン
サートを埋設しにくく、インサートに吊りボルトなどを
設置して搬送、横持ちする方法を採用できない。従っ
て、現場や工場において集水枡を持ち運ぶのに手間がか
かる。
Even in a water collecting basin prefabricated in a factory, it is desirable to prepare a box opener in accordance with the level of a gutter or a buried pipe connected to the side wall of the basin in order to reduce the number of steps in the field. . Therefore, depending on the site, it is necessary to form the box open up to the upper part of the water collecting basin, or it is necessary to form the box open at various positions other than the center of the side wall. Therefore, in the conventional factory prefabricated product, the hanging insert is embedded in the side wall, but when the water collecting basin is factory prefabricated, the insert may be embedded because it may overlap with the above box removal. The position cannot be determined. For this reason, when prefabricating a factory using a durable mold, it is difficult to embed the insert, and it is not possible to adopt a method of installing a hanging bolt or the like on the insert to carry and laterally hold it. Therefore, it is troublesome to carry the water collecting basin in the field or in the factory.

【0007】また、現場の側溝や配管のレベルが最終的
に決まった後に発注を受け工場での製造をスタートする
ので、プレハブされた集水枡に十分な養生期間を確保す
ることができないことがある。このようなケースでは、
インサートを埋設しておいても、十分な付着強度を確保
できず、従来と同じ感覚でインサートを用いた搬送や現
場での作業工程を採用することは難しい。
[0007] Further, since the order is received and the manufacturing is started in the factory after the level of the gutter and the piping on the site is finally determined, it is not possible to secure a sufficient curing period for the prefabricated water collecting basin. is there. In such cases,
Even if the insert is buried, sufficient adhesive strength cannot be ensured, and it is difficult to adopt the same transporting process using the insert and the work process on site as in the conventional case.

【0008】そこで、本発明においては、上述したよう
な多くのメリットを備えた工場プレハブされた集水枡を
持ち運びし易くすることによって、現場での施工に気軽
に供することができる集水枡を提供することを目的とし
ている。また、養生期間の不足し易いこのようなコンク
リート製品に対し、確実に、また容易に吊り下げるポイ
ントを用意できる集水枡を提供することも目的としてい
る。そして、このような集水枡を現場や工場で持ち運び
する際に適した方法を提供することも目的としている。
Therefore, in the present invention, by making it easy to carry the factory prefabricated water collecting cell having many advantages as described above, a water collecting cell that can be easily provided for on-site construction is provided. It is intended to be provided. It is also an object of the present invention to provide a water collecting basin capable of reliably and easily providing a hanging point for such a concrete product which is likely to have a short curing period. It is also an object to provide a method suitable for carrying such a water collecting basin at a site or a factory.

【0009】[0009]

【課題を解決するための手段】このように集水枡の側壁
には、現場によって様々な箇所に箱抜きを用意する必要
があるので、工場にて耐久性の型枠を用いて製造する場
合は、側壁の決まった位置にインサートを埋設すること
が難しい。そこで、本発明に係る略4角形の断面を備
え、鉛直方向に延びた略筒状の本体を有する集水枡にお
いては、本体の上部の4隅のうち、対角線に並んだ少な
くとも2つの隅に、本体を吊り下げる際に使用可能なイ
ンサートを上方を向いて埋設するようにしている。本体
上部には、略四角形の開口が開いているが、この開口の
縁回りであればインサートを埋設する箇所を確保でき
る。そして、集水枡のコーナーにまで箱抜きを形成する
ことはないので、この4隅のいずれかに上を向いてイン
サートを埋設すれば、本体のコーナーに沿ってインサー
トを設定できるので十分な埋設深さを確保できる。従っ
て、養生期間が十分にとれずに出荷するような集水枡で
あっても、吊り荷重に耐えられるだけの付着強度を発揮
できる長さのインサートを予め埋設しておくことも可能
となる。さらに、4隅のうち、対角線に並んだ少なくと
も2つの隅にインサートを埋設しておけば、これらのイ
ンサートを用いて集水枡をバランス良く吊れるので、安
定した搬送、横持ちが可能となり、現場での設置も楽に
なる。
[Means for Solving the Problems] Since it is necessary to prepare box openers at various places on the side wall of the water collecting basin depending on the site as described above, when manufacturing using a durable mold in a factory. It is difficult to embed the insert at a fixed position on the side wall. Therefore, in a water collecting basin having a substantially cylindrical main body having a substantially quadrangular cross section according to the present invention, at least two corners arranged diagonally among the four corners at the top of the main body. , The insert that can be used when suspending the main body is embedded facing upward. A substantially rectangular opening is opened in the upper part of the main body, but a place where the insert is embedded can be secured around the edge of this opening. And since the box is not formed even at the corner of the water collecting basin, if you insert the insert facing up in any of these four corners, you can set the insert along the corner of the main body Depth can be secured. Therefore, even in a water collecting basin that is shipped without a sufficient curing period, it is possible to previously bury an insert having a length that can exhibit an adhesive strength sufficient to withstand a suspension load. Furthermore, if the inserts are embedded in at least two corners of the four corners that are diagonally aligned, the water collecting basin can be hung in a well-balanced manner using these inserts, so stable transport and horizontal holding are possible. Installation on site is also easy.

【0010】このように、集水枡の上部の4隅のいずれ
かにインサートを埋設するようにすれば、工場で製造す
るときに決まった場所にインサートを埋設でき、さらに
養生期間が十分とれないケースでもインサートに対し十
分な引抜き強度を確保できる。従って、工場での製造段
階で埋設されたインサートを用いて工場内部での持ち運
びから、搬送、現場への輸送、そして現場における施工
のための持ち運びも行える。このため、現場の省力化を
図れ、無駄がなく、さらに美観に優れた工場製作の集水
枡を採用するうえでネックになっていた持ち運びの問題
を解決できる。従って、工場にて製造された集水枡の採
用を促進でき、現場における作業員の労力の軽減や、工
期の短縮を図れる。
As described above, if the inserts are buried in any of the four corners of the upper part of the water collecting basin, the inserts can be buried in a predetermined place at the time of manufacturing in the factory, and the curing period is not sufficient. Even in the case, sufficient pulling strength can be secured for the insert. Therefore, it is possible to carry from inside the factory by using the insert buried in the manufacturing stage of the factory, to carry, to transport to the site, and to carry out for construction at the site. For this reason, it is possible to save labor in the field, eliminate the waste, and solve the problem of carrying around, which has been a bottleneck in adopting a factory-produced water collecting basin that is aesthetically pleasing. Therefore, the adoption of the water collecting basin manufactured at the factory can be promoted, and the labor of the workers on the site can be reduced and the construction period can be shortened.

【0011】さらに、鉄板製や、グレーチングを蓋を受
けるための切り欠きを本体の上部に用意してある集水枡
においては、この切り欠きの内部に上方を向いてインサ
ートを埋設しておくことが望ましい。インサートを用い
て集水枡を設置した後は、この切り欠きにグレーチング
などの蓋を装着することにより、インサートを隠すこと
ができるからである。従って、現場での施工が終了した
後に、インサートにモルタルを詰める仕上げの作業を省
くことができる。また、この吊り用のインサートをグレ
ーチングなどの固定用に流用することも可能である。
Further, in a water collecting basin which is made of an iron plate or has a cutout for receiving the lid of the grating on the upper part of the main body, the insert is embedded in the cutout facing upward. Is desirable. This is because, after installing the water collecting basin using the insert, the insert can be hidden by attaching a lid such as a grating to the notch. Therefore, it is possible to omit the finishing work of filling the mortar in the insert after the construction on site is completed. It is also possible to use this hanging insert for fixing such as grating.

【0012】さらに、切り欠きに蓋受け用の金物が埋設
してある集水枡では、この金物の4隅のうち、対角線に
並んだ少なくとも2つの隅にインサートを上方を向くよ
うに取り付けておくことも有効である。蓋受け用の金物
と集水枡本体との付着力によって、インサートの付着強
度を増強できるからである。特に、埋設用のアンカーな
どを用いて蓋受け用の金物を集水枡に埋設する場合は、
蓋受け用の金物と本体との間に大きな付着面積を確保で
きる。したがって、この蓋受け用の金物の隅にインサー
トを予め溶接したものを埋設しておけば、養生期間が十
分に確保できない場合であっても、インサートに対し十
分な吊り荷重を期待でき、安定確実な持ち運びが可能と
なる。
Further, in the water collecting basin in which the metal for receiving the lid is buried in the notch, the inserts are attached to at least two corners of the four corners of the metal so as to face upward. That is also effective. This is because the adhesive strength of the insert can be increased by the adhesive force between the metal for receiving the lid and the main body of the water collecting basin. Especially when burying a metal for receiving the lid in the water collecting basin using an anchor for burying,
A large adhesion area can be secured between the lid receiving metal object and the main body. Therefore, if a pre-welded insert is embedded in the corner of the metal object for receiving the lid, a sufficient suspension load can be expected for the insert even if a sufficient curing period cannot be secured, and a stable and stable operation can be expected. It is possible to carry around easily.

【0013】このように本体の上部の4隅のいずれかに
インサートを埋設してある集水枡を用いれば、まず、こ
のインサートに吊り金具を設置し、この吊り金具を用い
て集水枡の本体を吊り下げることができる。従って、工
場内はもちろん、倉庫、輸送時、さらに、現場での施工
時に安定して確実に集水枡を持ち運びできる。
In this way, if a water collecting basin with inserts embedded in any of the four corners of the upper part of the main body is used, a hanging metal fitting is first installed on this insert, and the hanging metal fitting is used to hang the water collecting basin. The main body can be suspended. Therefore, the water collecting basin can be carried in a stable and reliable manner not only in the factory but also in the warehouse, during transportation, and during construction on site.

【0014】[0014]

【実施例】以下に図面を参照して本発明の実施例を説明
する。
Embodiments of the present invention will be described below with reference to the drawings.

【0015】図1に本発明の実施例に係る集水枡10を
示してある。本例の集水枡10は、全体がほぼ直方体を
しており、断面が4角形で鉛直方向に延びたほぼ筒形の
本体11を備えている。本体11の側壁12〜15のう
ち、3方の側壁12、13、14に、この集水枡10と
現場で接続する埋設管1、側溝2および3のそれぞれ適
合した箱抜き16、17、18を予め形成してある。
FIG. 1 shows a water collecting basin 10 according to an embodiment of the present invention. The water collecting basin 10 of this example has a substantially rectangular parallelepiped shape as a whole, and includes a main body 11 having a quadrangular cross section and extending in the vertical direction. Out of the side walls 12 to 15 of the main body 11, on three side walls 12, 13, and 14, the box-opening 16, 17, 18 which is suitable for the buried pipe 1, the side grooves 2 and 3 connected to the water collecting basin 10 at the site, respectively. Is formed in advance.

【0016】本体11の上方には略正方形の開口20が
形成されており、この開口20にグレーチングの蓋5を
装着できるようになっている。開口20の縁の内側に
は、グレーチング蓋5を受ける切り欠き21を設けてあ
り、この切り欠き21に蓋受け用のアングル22を埋設
してある。そして、このアングル22の4隅のそれぞれ
に上方を向いたインサート30を埋設してある。従っ
て、本例の集水枡10は、インサート30に吊り用のボ
ルトを装着すれば、簡単につり上げることができ、輸送
や工場、現場などにおける持ち運びを容易に行えるよう
になっている。
A substantially square opening 20 is formed above the main body 11 and the grating lid 5 can be attached to the opening 20. A notch 21 for receiving the grating lid 5 is provided inside the edge of the opening 20, and an angle 22 for receiving the lid is embedded in the notch 21. Then, inserts 30 facing upward are embedded in each of the four corners of the angle 22. Therefore, the water collecting basin 10 of the present example can be easily lifted by attaching the hanging bolts to the insert 30, and can be easily transported or transported in factories, sites and the like.

【0017】本例の集水枡10は、現場で型枠を組みコ
ンクリートを打設するような手間を省き、熟練工でなく
とも簡単に集水枡を設置できるように工場にて製造し、
現場に搬入してから埋設するタイプである。さらに、現
場での穴開け作業を避けるために、集水枡10を工場に
て製造する際に側壁の所定の箇所へ予め箱抜きお形成し
てある。これらの箱抜き16〜18は、現場で接続され
る埋設配管や側溝の形状に合わせた形状に成形し、ま
た、それぞれの箱抜きの高さも接続する配管や、側溝の
埋設レベルに合致するように調整してある。このように
箱抜きの位置や形状を現場に合わせる必要があるため、
これらの集水枡10は、工場にて受注生産することにな
る。
The water collecting basin 10 of this example is manufactured at a factory so that the water collecting basin can be easily installed by a skilled worker without the trouble of placing a formwork and placing concrete on site.
It is a type that is carried into the site and then buried. Further, in order to avoid the work of making holes in the field, when the water collecting basin 10 is manufactured in a factory, it is formed in advance at a predetermined position on the side wall by punching out a box. These box openers 16 to 18 are formed into shapes that match the shapes of the buried pipes and gutters that are connected at the site, and the heights of the box openers are also matched to the level of the pipes and gutters that are connected. It has been adjusted to. In this way, it is necessary to match the position and shape of the box removal to the site,
These water collecting basins 10 will be made to order at the factory.

【0018】図2に、本例の集水枡10の開口20の構
造を示すために、開口20の近傍の断面を拡大して示し
てある。開口20の切り欠き21には蓋5を受けるため
のアングル22を埋設してある。この蓋受け用のアング
ル22は、L字形の断面をしたアングル材を略正方形に
組み合わせたものである。この正方形の各辺をなすアン
グル材の略中央に鉄棒などで構成したアンカー23を取
り付けてある。本例のアングル22では、略U字形の鉄
棒でアンカー23を構成し、その両端をアングル22の
外側に溶接してある。
FIG. 2 shows an enlarged cross section of the vicinity of the opening 20 in order to show the structure of the opening 20 of the water collecting basin 10 of this example. An angle 22 for receiving the lid 5 is embedded in the notch 21 of the opening 20. The lid receiving angle 22 is formed by combining angle members having an L-shaped cross section into a substantially square shape. An anchor 23 made of an iron rod or the like is attached to the approximate center of the angle member forming each side of the square. In the angle 22 of this example, the anchor 23 is composed of a substantially U-shaped iron bar, and both ends thereof are welded to the outside of the angle 22.

【0019】さらに、本例のアングル22は、その4隅
のそれぞれにインサート30を溶接して埋設してある。
インサート30の溶接してあるアングル22の隅にはイ
ンサート30に対応する径の穴24を開けてあり、この
穴を通ってインサート30の内部に吊り棒などを挿入で
きるようになっている。本例のようにアングル22の隅
にインサート30を溶接して集水枡に埋設しておけば、
インサート30に期待できる強度としては、インサート
30自体の接触面積に加えて、アングル22の接触面積
を算入できる。アングル22はそれ自体でも集水枡の本
体11との接触面積が大きく、さらに、本例の集水枡で
はアンカー23を用いて埋設してあるので、インサート
30の引抜き強度に影響を及ぼす接触面積は非常に大き
い。従って、受注を受けてから生産を開始し、納入まで
十分な養生期間を確保できないような場合であっても、
インサート30として十分に高い実質的な付着強度を確
保できるので、安心して集水枡10の吊り下げに用いる
ことができる。
Further, in the angle 22 of this embodiment, inserts 30 are welded and embedded in each of the four corners.
A hole 24 having a diameter corresponding to the insert 30 is formed at a corner of the welded angle 22 of the insert 30, and a hanging rod or the like can be inserted into the inside of the insert 30 through the hole. If the insert 30 is welded to the corner of the angle 22 and embedded in the water collecting basin as in this example,
As the strength that can be expected for the insert 30, the contact area of the angle 22 can be included in addition to the contact area of the insert 30 itself. The angle 22 itself has a large contact area with the main body 11 of the water collecting basin, and furthermore, since the water collecting basin of this example is embedded by using the anchor 23, the contact area affecting the pull-out strength of the insert 30. Is very large. Therefore, even if it is impossible to secure a sufficient curing period from the start of production after receiving an order to the delivery,
Since a sufficiently high substantial adhesive strength can be secured as the insert 30, it can be used for suspending the water collecting basin 10 without anxiety.

【0020】また、アングル22の隅にインサート30
を上向きに設定してあるので、インサート30は集水枡
の本体11のコーナーの部分に埋設されることになる。
従って、集水枡をつり上げる際の荷重を考慮して長い吊
りボルトを挿入できるように、また、インサート30の
付着面積を十分に確保できるように長いインサート30
を埋設する場合でも、コーナーであれば本体11の側壁
に形成される箱抜きと干渉することはなくインサートを
埋設できる。
Further, the insert 30 is provided at the corner of the angle 22.
Since it is set to face upward, the insert 30 is embedded in the corner portion of the body 11 of the water collecting basin.
Therefore, the long insert 30 can be inserted so that a long hanging bolt can be inserted in consideration of the load at the time of lifting the water collecting basin, and the attachment area of the insert 30 can be sufficiently secured.
Even when burying, the insert can be buried at the corner without interfering with the box removal formed on the side wall of the main body 11.

【0021】さらに、アングル22の隅にインサート3
0を用意しておけば、現場で集水枡を設置したのちは、
単にグレーチングの蓋5を装着するだけで、インサート
30を隠すことができる。集水枡の上部にインサートを
埋設する場合に、例えば、アングル22の外側にインサ
ートを埋設しておくと、集水枡を埋設した後は外観上の
問題からインサートにモルタルなどを詰めておく必要が
ある。しかし、本例のようにアングル22の内部にイン
サート30を埋設しておけば、モルタルを詰めるような
手間も省ける。
Further, the insert 3 is provided at the corner of the angle 22.
If you prepare 0, after installing a water collecting basin on the spot,
The insert 30 can be hidden simply by mounting the grating lid 5. When the insert is embedded in the upper part of the water collecting basin, for example, if the insert is buried outside the angle 22, it is necessary to fill the insert with mortar etc. after the burying the water collecting basin due to the appearance problem. There is. However, by embedding the insert 30 inside the angle 22 as in this example, the trouble of filling the mortar can be saved.

【0022】図3に、本例の集水枡を工場で製造する様
子を示してある。本例の集水枡も他の工場プレハブのコ
ンクリート製品と同様に耐久性の型枠を用いて製造でき
る。まず、台盤41の上に集水枡の内面を規定する内型
枠42を設置し、所定の間隔を開けて集水枡の外面を規
定する外型枠43を設置する。そして、内型枠42の外
側を通してアンカー23とインサート30の溶接された
略正方形のアングル22を台盤41の上に設置する。こ
のように組み立てられた型枠の内部に矢印45に示すよ
うにコンクリートを注入すれば、集水枡を製造できる。
工場にて集水枡を製造すると、鉄板などの耐久性の型枠
を用いて製造でき、また蒸気養生も行えるので、集水枡
の内外面を精度良く、綺麗に仕上げることができる。さ
らに、集水枡が路面などに埋設された後に露出する集水
枡の上部も台盤41に規定されて平面状に仕上あがるの
で、現場で金こて上げを行う手間を省くこともできる。
FIG. 3 shows how the water collecting basin of this example is manufactured in a factory. The water collecting basin of this example can also be manufactured by using a durable formwork like other concrete prefabricated concrete products. First, the inner formwork 42 that defines the inner surface of the water collecting basin is installed on the base 41, and the outer formwork 43 that defines the outer surface of the water collecting basin is installed at a predetermined interval. Then, the substantially square angle 22 in which the anchor 23 and the insert 30 are welded is set on the base 41 through the outside of the inner mold 42. A water collecting basin can be manufactured by injecting concrete into the thus assembled formwork as shown by an arrow 45.
When the water collecting basin is manufactured at the factory, it can be manufactured by using a durable frame such as an iron plate, and also steam curing can be performed, so that the inner and outer surfaces of the water collecting basin can be accurately and cleanly finished. Further, since the upper part of the water collecting basin exposed after the water collecting basin is buried in the road surface or the like is also defined by the base 41 and finished in a flat shape, it is possible to save the labor of raising the iron on the spot.

【0023】集水枡の側壁に箱抜きを用意するために、
外型枠43と内型枠42との間に発泡スチロールなどで
成形した箱抜き用のスリーブ44を入れておく必要があ
る。箱抜きの場所が現場毎に異なるので、スリーブ44
の位置も集水枡毎に異なる。従って、集水枡の側壁にイ
ンサートを埋設しようとするとスリーブ44と干渉する
可能性があり、一定した位置に埋設することはできな
い。しかし、本例のように集水枡の上部にインサートを
埋設するようにしておけば、スリーブ44との干渉はな
く、集水枡を吊るために最適な場所にインサートを設置
できる。さらに、本例では、アングル22にインサート
30を予め溶接してあるので、アングル22を埋設する
だけで所定の位置にインサート30を埋設できるという
メリットもある。
In order to prepare a box opener on the side wall of the water collecting basin,
Between the outer mold 43 and the inner mold 42, it is necessary to put a box-extracting sleeve 44 formed of expanded polystyrene or the like. Since the location of the box removal differs from site to site, the sleeve 44
The position of is also different for each collecting basin. Therefore, if the insert is embedded in the side wall of the water collecting basin, it may interfere with the sleeve 44 and cannot be embedded in a fixed position. However, if the insert is embedded in the upper part of the water collecting basin as in this example, there is no interference with the sleeve 44, and the insert can be installed at an optimum place for suspending the water collecting basin. Further, in this example, since the insert 30 is welded to the angle 22 in advance, there is an advantage that the insert 30 can be embedded at a predetermined position only by embedding the angle 22.

【0024】図4および図5を参照して、本例に集水枡
をつり上げる様子を説明する。本例の集水枡10では、
開口20の縁の4隅にインサート30を埋設してあるの
で、このインサート30のそれぞれに吊りボルトとして
アイボルト35を挿入する。そして、このアイボルト3
5にワイヤー36を掛け、クレーン37などにより集水
枡10を吊り下げ上下に移動する。本例の集水枡は側壁
に用意してある箱抜き16〜18と干渉しないように開
口20の縁を用いてインサート30を埋設し、つり上げ
の際に使用できるようにしてある。このようなインサー
トを埋設してなければ、箱抜きを傷めないように本体1
1をカバーしながらワイヤーを回してつり上げなければ
ならず、ワイヤーをセットするだけでも時間がかかる。
ワイヤーを回してつり上げても、集水枡10は斜めにつ
り上げできるだけなので、吊って間の姿勢も安定しな
い。しかし、本例の集水枡10のように上部にインサー
ト30を埋設しておけば、本体11が鉛直方向に延びた
状態でつり上げ、また吊り下げできる。従って、吊って
いる間の姿勢も安定させられる。さらに、倉庫や、運搬
機、あるいは埋設現場に下ろすときも、本体が鉛直方向
に延びた状態で作業できるので、所定の位置に簡単に持
ち運びできる。また、上げ下ろしをする際に本体11の
一方の角に荷重が集中して本体が欠けたりするトラブル
も防止できる。特に、本例の集水枡のように発注から納
入まで期間が短く、十分な養生期間が取れずに工場内で
本体を慎重に取り扱わざるを得ない製品にとっては、安
定した姿勢で製品をハンドリングできることは重要であ
る。本例の集水枡は、埋設されたインサートを用いてこ
のように簡単・確実につり上げることができるので、搬
送が容易であり、工場内での取扱が容易になると同時に
運搬中や、現場での施工も容易となる。
The manner in which the water collecting basin is lifted up in this example will be described with reference to FIGS. 4 and 5. In the water collecting basin 10 of this example,
Since the inserts 30 are embedded in the four corners of the edge of the opening 20, eye bolts 35 are inserted as hanging bolts into each of the inserts 30. And this eyebolt 3
A wire 36 is hung on 5, and the water collecting basin 10 is suspended by a crane 37 or the like and moved vertically. In the water collecting basin of this example, the insert 30 is embedded by using the edge of the opening 20 so as not to interfere with the box openers 16 to 18 provided on the side wall, so that it can be used at the time of lifting. If you do not bury such an insert, do not damage the box opener 1
You have to turn the wire and lift it while covering 1 and it takes time just to set the wire.
Even if the wire is turned up and lifted up, the water collecting basin 10 can only be lifted up diagonally, so the posture between the hangings is not stable. However, by embedding the insert 30 in the upper part like the water collecting basin 10 of this example, the main body 11 can be lifted and hung while the main body 11 extends in the vertical direction. Therefore, the posture can be stabilized during the suspension. Further, even when the main body is lowered to a warehouse, a transporter, or a burial site, the work can be performed with the main body extending in the vertical direction, so that the main body can be easily carried to a predetermined position. Further, it is possible to prevent the trouble that the load is concentrated on one corner of the main body 11 and the main body is chipped when the main body 11 is raised or lowered. In particular, for products such as the water collecting basin of this example, where the period from ordering to delivery is short, and the body must be handled carefully in the factory without a sufficient curing period, handle the product in a stable posture. What you can do is important. Since the water collecting basin of this example can be lifted easily and securely in this way using the buried insert, it is easy to transport and facilitates handling in the factory, and at the same time during transportation or on site. Will be easy to construct.

【0025】なお、本例の集水枡ではグレーチングの蓋
を例に取って説明しているが、鉄板の蓋などであっても
もちろん良い。また、埋設管などを接続するための箱抜
きの位置、および個数は現場によって自由に選択でき、
3方の側壁に限らず4方でもあるいは2方の側壁に箱抜
きを設けておくことももちろん可能である。さらに、ア
ングルにインサートを溶接しない場合でも、集水枡のコ
ーナーを用いれば、常に十分な付着面積を確保できるよ
うなインサートを箱抜きとの干渉を防止しながら埋設で
きる。また、本例では集水枡の4隅にインサートを埋設
してあるが、対角線に並んだ少なくとも2隅に埋設され
たインサートを用いて吊り下げるようにしておけば、持
ち運びする際に安定した姿勢を保持できる。
In the water collecting basin of this embodiment, the grating lid is described as an example, but an iron plate lid or the like may be used. In addition, the position of the box and the number of boxes for connecting buried pipes can be freely selected depending on the site,
Of course, it is possible to provide not only the side walls of three sides but also the side walls of four sides or two sides with a box opener. Further, even if the insert is not welded to the angle, by using the corner of the water collecting basin, it is possible to bury the insert that can always secure a sufficient adhesion area while preventing interference with the box remover. In addition, in this example, the inserts are embedded in the four corners of the water collecting basin, but if the inserts are embedded in at least two corners lined up diagonally, it is possible to have a stable posture when carrying. Can hold.

【0026】[0026]

【発明の効果】以上に説明したように、本発明に係る集
水枡は、工場にてプレハブして現場にも簡単に、また、
安全確実に搬入できる。このため、従来は現場の状況に
合わせて施工していた集水枡を工場製品に置き換えるこ
とができ、現場での型枠を組み、製造する手間を省け
る。また、表面の仕上げが良好な工場製品を用いて施工
ができるので、現場での仕上げも楽になるなど工期も大
幅に短縮できる。従って、本発明に係る集水枡およびこ
れを用いた施工方法を用いることにより、熟練工の数が
減少し、また、短い工期の中で多くの作業をこなさなけ
ればならない近年の状況に適切に対応できる。そして、
本発明に係る集水枡を用いて、作業員の負荷の軽減を図
りながら、品質の良い集水枡、およびこれを用いた施工
を行える。
As described above, the water collecting basin according to the present invention can be prefabricated at the factory and easily on site, and
Safe and reliable delivery. Therefore, the water collecting basin, which was conventionally constructed according to the situation at the site, can be replaced with a factory product, and the labor of assembling and manufacturing the formwork at the site can be saved. In addition, since the factory products with good surface finishes can be used for construction, the on-site finish will be easier and the construction period will be greatly shortened. Therefore, by using the water collecting basin according to the present invention and the construction method using the same, the number of skilled workers is reduced, and it is possible to appropriately cope with the recent situation in which many works must be performed in a short construction period. it can. And
By using the water collecting basin according to the present invention, it is possible to reduce the load on the worker and to perform good quality water collecting basin and construction using the water collecting basin.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例に係る集水枡の概要と、集水枡
に埋設管などを接続する様子を示す斜視図である。
FIG. 1 is a perspective view showing an outline of a water collecting basin according to an embodiment of the present invention and a state of connecting an embedded pipe or the like to the water collecting basin.

【図2】図1に示す集水枡の開口の近傍の構造を示す断
面図である。
FIG. 2 is a cross-sectional view showing the structure in the vicinity of the opening of the water collecting basin shown in FIG.

【図3】図1に示す集水枡を製造する様子を一部断面を
用いて示す説明図である。
FIG. 3 is an explanatory view showing the state of manufacturing the water collecting basin shown in FIG. 1 with a partial cross section.

【図4】図1に示す集水枡に吊り上げ用のアイボルトを
装着する様子を示す説明図である。
FIG. 4 is an explanatory view showing a state in which eyebolts for lifting are attached to the water collecting basin shown in FIG.

【図5】図4に示すアイボルトを用いて集水枡をつり上
げる様子を示す説明図である。
FIG. 5 is an explanatory view showing how the water collecting basin is lifted up using the eyebolt shown in FIG.

【符号の説明】[Explanation of symbols]

1・・埋設配管 2、3・・側溝 5・・グレーチング蓋 10・・集水枡 11・・本体 12〜15・・側壁 16〜18・・側壁の箱抜き 20・・開口 21・・開口の切り欠き 22・・アングル 23・・アンカー 24・・インサート用の穴 30・・インサート 35・・アイボルト 36・・ワイヤー 37・・クレーン 41・・台盤 42・・内型枠 43・・外型枠 44・・スリーブ 45・・コンクリートの注入 1 ・ ・ Built-in pipe 2, 3 ・ ・ Gutters 5 ・ ・ Grating lid 10 ・ ・ Gathering basin 11 ・ ・ Main body 12-15 ・ ・ Side wall 16-18 ・ ・ Side wall box removal 20 ・ ・ Open 21 ・ ・ Open Notch 22 · Angle 23 · · Anchor 24 · · Insert hole 30 · · Insert 35 · · Eyebolt 36 · · Wire 37 · · Crane 41 · · Base 42 · · Inner form 43 · · Outer form 44 ・ ・ Sleeve 45 ・ ・ Injection of concrete

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 略4角形の断面を備え、鉛直方向に延び
た略筒状の本体を有する集水枡において、前記本体の上
部の4隅のうち、対角線に並んだ少なくとも2つの前記
隅に、前記本体を吊り下げる際に使用可能なインサート
が上方を向いて埋設されていることを特徴とする集水
枡。
1. A water collecting basin having a substantially tubular main body having a substantially quadrangular cross section and extending in a vertical direction, wherein at least two of the four corners of the upper portion of the main body are arranged diagonally. A water collecting basin characterized in that an insert that can be used when suspending the main body is embedded facing upward.
【請求項2】 略4角形の断面を備え、鉛直方向に延び
た略筒状の本体と、この本体の上部に形成された蓋受け
用の切り欠きとを有する集水枡において、前記切り欠き
の4隅のうち、対角線に並んだ少なくとも2つの前記隅
に、前記本体を吊り下げるときに使用可能なインサート
が上方を向いて埋設されていることを特徴とする集水
枡。
2. A water collecting basin having a substantially tubular main body having a substantially quadrangular cross section and extending in the vertical direction, and a notch for receiving a lid formed in an upper portion of the main body, wherein the notch. Of the four corners of the above, at least two corners lined up diagonally, an insert that can be used when suspending the main body is embedded facing upwards.
【請求項3】 請求項2において、前記切り欠きには、
蓋受け用の金物が埋設されており、この金物の4隅のう
ち、対角線に並んだ少なくとも2つの前記隅に前記イン
サートが上方を向いて取付けられていることを特徴とす
る集水枡。
3. The cutout according to claim 2,
A water collecting basin, in which a metal for receiving a lid is embedded, and at least two of the four corners of the metal which are diagonally arranged, the inserts are attached upward.
【請求項4】 略4角形の断面を備え、鉛直方向に延び
た略筒状の本体を有する集水枡を横持ちする際に、前記
本体の上部の4隅のうち、対角線に並んだ少なくとも2
つの前記隅に上方を向いて埋設されたインサートに吊り
金具を設置し、この吊り金具を用いて前記本体を吊り下
げることを特徴とする集水枡の持ち運び方法。
4. When laterally holding a water collecting basin having a substantially cylindrical main body having a substantially quadrangular cross section and extending in the vertical direction, at least four diagonally arranged corners of the upper portion of the main body. Two
A method for carrying a water collecting basin, characterized in that a hanging metal fitting is installed on an insert buried upward in one of the corners, and the main body is hung by using the hanging metal fitting.
JP15663694A 1994-06-15 1994-06-15 Catch basin and carrying method thereof Pending JPH084100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15663694A JPH084100A (en) 1994-06-15 1994-06-15 Catch basin and carrying method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15663694A JPH084100A (en) 1994-06-15 1994-06-15 Catch basin and carrying method thereof

Publications (1)

Publication Number Publication Date
JPH084100A true JPH084100A (en) 1996-01-09

Family

ID=15632007

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15663694A Pending JPH084100A (en) 1994-06-15 1994-06-15 Catch basin and carrying method thereof

Country Status (1)

Country Link
JP (1) JPH084100A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012154131A (en) * 2011-01-28 2012-08-16 Daikure Co Ltd Grating
WO2024006504A1 (en) * 2022-06-30 2024-01-04 Enduro Composites, Inc Waste water cover kit
WO2026075396A1 (en) * 2024-10-02 2026-04-09 (주)바로건설기술 Prefabricated steel sump and construction method therefor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012154131A (en) * 2011-01-28 2012-08-16 Daikure Co Ltd Grating
WO2024006504A1 (en) * 2022-06-30 2024-01-04 Enduro Composites, Inc Waste water cover kit
WO2026075396A1 (en) * 2024-10-02 2026-04-09 (주)바로건설기술 Prefabricated steel sump and construction method therefor

Similar Documents

Publication Publication Date Title
JP6102306B2 (en) How to transport and install the unit room
CN207017294U (en) Equipment anchor bolt buries the construction tool of reserving hole
JPH084100A (en) Catch basin and carrying method thereof
US20180313104A1 (en) Construction method for double-shell tank
CN210659696U (en) Precast concrete window that wafts
EP1757750A1 (en) Construction system based on prefabricated plates
JP7182383B2 (en) Building foundation construction method
US20090151297A1 (en) Method for attaching a cabinet to a ground surface
JPS642003Y2 (en)
JPS5911015B2 (en) How to install shoring in the reverse winding method
KR101052650B1 (en) Head reinforcement structure of pile
JPH0978684A (en) PC balcony member and balcony construction method
KR102662785B1 (en) Chair base integrated casting mold and integrated casting method using the same
JP2872821B2 (en) Concrete foundation structure
CN210917461U (en) Prefabricated well room of integral type
JP2003253768A (en) Anchor nut, fastening structure of unit building and method of fastening unit building
JP2005350928A (en) Concrete structural body
JPH03158519A (en) Direct finishing method by inner-casting of cast-in-place concrete pile
JP2008156922A (en) How to build a balcony or hallway
JP3588523B2 (en) Construction method of underground storage
JP3023760U (en) Foundation pile
CN118958483A (en) Construction method of fully integrated partially cast-in-place container house and container house cluster building structure
JP2002105971A (en) Retaining wall member for septic tank and installation method of the equipment
JPS602066B2 (en) Storage case for evacuation equipment
RU1791561C (en) House building method