JPH0892949A - 加圧装置 - Google Patents
加圧装置Info
- Publication number
- JPH0892949A JPH0892949A JP33101194A JP33101194A JPH0892949A JP H0892949 A JPH0892949 A JP H0892949A JP 33101194 A JP33101194 A JP 33101194A JP 33101194 A JP33101194 A JP 33101194A JP H0892949 A JPH0892949 A JP H0892949A
- Authority
- JP
- Japan
- Prior art keywords
- cylinder
- pressurizing device
- pile
- inner cylinder
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
Abstract
る。 【構成】 内外周シリンダに夫々段部を設けて噛合うよ
うに形成し、両段部間に加圧流体を導入する送圧管を内
外周シリンダのいずれかに設け、外周シリンダの段部の
下側にOリングを内周シリンダの段部の上側にOリング
を取付け、外周シリンダと内周シリンダとの下端を、先
端に切欠きを有する複数個のシアボルトで結合し、外周
シリンダと内周シリンダとを回転止めボルトで結合し、
内周シリンダの回転ボルト用穴の下面を下端を開口した
通過溝で形成した加圧装置。
Description
ある。
圧装置として特開平1−284611号を先に本特許出
願人が提案している。
上に分割した上下シリンダC、Dを設け、上下シリンダ
C、D間に伸長の少ない作動膜Eの端部Fを固定し、作
動膜Eと共に昇降するピストンGを上杭Bの下端に固定
し、ピストンGの中央に取付けた送圧管Hから加圧流体
をシリンダピストン間に流入させるようになっている。
この加圧装置は上下の支持力を相互反力にして杭の載荷
試験を行うようになっている。
オーガを挿入して施工する中掘り工法による埋込み杭に
は適用できない。又、トレミー管を挿入してコンクリー
トを打込む、場所打ち杭では、この加圧装置を設置する
深度までコンクリートを先に打込んだ後、加圧装置を設
置し、この加圧装置上に鉄筋籠を降下させてトレミー管
によりコンクリートを打込む必要がある。
打ち込まなければならないが、この場合、加圧装置の下
方に不良なコンクリートが残るという問題が生じる。そ
こで、本発明は中空状で且つ各種の用途に適合すること
ができる加圧装置を提供しようとするものである。
に、本発明においては、内外周シリンダに夫々段部を設
けて噛合うように形成し、両段部間に加圧流体を導入す
る送圧管を内外周シリンダのいずれかに設けた加圧装置
を構成する。
を内周シリンダの段部の上側にOリングを取付け、外周
シリンダと内周シリンダとの下端を、先端に切欠きを有
する複数個のシアボルトで結合した加圧装置を構成す
る。
転止めボルトで結合し、内周シリンダの回転ボルト用穴
の下面を下端を開口した通過溝で形成した加圧装置を構
成する。
めボルトで内外周シリンダは結合しているため、両シリ
ンダは共に回転する。そして、送圧管から加圧流体が段
部間に流入すると、シアボルトの切欠き部が切れ、内外
周シリンダが夫々昇降する。
合について、図1乃至図4に基いて詳細に説明する。加
圧装置1は中空状の外周シリンダ2と、この外周シリン
ダ2に嵌合する中空状の内周シリンダ3とで構成されて
おり、内外周シリンダ3、2に夫々段部4、5を設けて
噛合うように形成し、外周シリンダ2の段部5の下側内
周にOリング6を嵌入するOリング嵌入溝7を設け、内
周シリンダ3の段部4の上側外周にOリング8を嵌入す
るOリング嵌入溝9を設け、内周シリンダ3に送圧管1
0を設けて、両段部4、5間に加圧流体を流入させて、
内外周シリンダ3、2を相互に上下動させるようになっ
ている。又、内周シリンダ3の上端外周には外周シリン
ダ2の上端を覆うように突出部11を設けている。尚、
送圧管10は外周シリンダ2に設けてもよいものであ
る。
工法の埋込み杭に適用する場合について説明すると、内
外周シリン3、2を杭に装着する際に、加圧装置1下の
下杭12の自重で伸長しないように図4に示すように計
4本のシアボルト13,13,13,13を通して内外
周シリンダ3、2を仮固定する。又、シアボルト13は
図5に示すように上杭14の下端に設けた切欠き部25
に頭部を位置させ、内外周シリンダ3,2の上面を仮固
定するようにしてもよいものである。尚、このシアボル
ト13,13,…は図5に示すように切欠き部26を設
けて、低加圧により切断されるようになっている。
際に、上杭14と加圧装置1とが一体となって回転する
ように外周シリンダ2の下端2個所に回転止めボルト1
5,15と取付ける。この際、内周シリンダ3の下端に
は回転ボルト用穴16を設け、その下面に下端を開口し
た通過溝17を設けて内周シリンダ3と外周シリンダ2
とは別体に昇降できるようになっている。
示すように複数個のストッパー18,18,…が内周シ
リンダ3の突出部11を通って上杭14内に突出し、内
周シリンダ3の上面に設けたストッパー溝24にストッ
パー18の頭部を嵌入して内周シリンダ3の上昇を停止
させるようになっている。図3中19は上杭14内に設
けたカバーである。
3の突出部11の上面には図2に示すように夫々複数本
の変位ロッド20,20,20a,20a,…を取付
け、夫々変位計21,21aに接続している。
送圧ホース22を設け、ポンプ23に接続して内外周シ
リンダ3、2の段部4、5間に加圧流体を供給するよう
になっている。
ポンプ23を駆動して送圧ホース22を介して内外周シ
リンダ3、2の段部4、5間に加圧流体を供給すると、
シアボルト13,13,…の切欠き部26を切断して図
2の(b)に示すように、内外周シリンダ3、2が上下
に変位し、上向き変位yj 、下向き変位Sj 、加圧装置
荷重Pj 、先端支持力Rp 、周面支持力Rf を夫々測定
する。そして、測定後にセメントミルクあるいは樹脂モ
ルタルのような硬化性流体を送圧ホース22に注入する
ようになっている。
流体の口を上にしてもよい。又、本実施例は既製コンク
リート杭に装着する際について説明したが、鋼管杭や場
所打ちコンクリート杭の鉄筋籠にも同じ要領で装着でき
る。
ことができるだけでなく、グランドアンカーの引張試験
等の各種の加圧装置として用いることができるものであ
る。
えば杭を用いた際にも、杭の中心部にオーガを挿入して
施工する中掘り工法による埋込みや、トレミー管の昇降
に支障を来さない。
に回り込むので、空胴を生じたり、不良なコンクリート
が残る心配がない。
ンダの移動を抑止できるので、加圧装置の装着が容易で
ある。
験に用いた断面図。
(b)は加圧後の状態を示す。
Claims (4)
- 【請求項1】 内外周シリンダに夫々段部を設けて噛合
うように形成し、両段部間に加圧流体を導入する送圧管
を内外周シリンダのいずれかに設けたことを特徴とする
加圧装置。 - 【請求項2】 外周シリンダの段部の下側にOリングを
内周シリンダの段部の上側にOリングを取付けたことを
特徴とする請求項1記載の加圧装置。 - 【請求項3】 外周シリンダと内周シリンダとの下端
を、先端に切欠きを有する複数個のシアボルトで結合し
たことを特徴とする請求項1、2のいずれかに記載の加
圧装置。 - 【請求項4】 外周シリンダと内周シリンダとを回転止
めボルトで結合し、内周シリンダの回転ボルト用穴の下
面を下端を開口した通過溝で形成したことを特徴とする
請求項1、2、3のいずれかに記載の加圧装置。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6331011A JP2780077B2 (ja) | 1994-07-26 | 1994-12-09 | 加圧装置 |
| US08/492,309 US5608169A (en) | 1994-07-26 | 1995-06-19 | Device and method for testing the bearing capacity of piles |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19267894 | 1994-07-26 | ||
| JP6-192678 | 1994-07-26 | ||
| JP6331011A JP2780077B2 (ja) | 1994-07-26 | 1994-12-09 | 加圧装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0892949A true JPH0892949A (ja) | 1996-04-09 |
| JP2780077B2 JP2780077B2 (ja) | 1998-07-23 |
Family
ID=26507469
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6331011A Expired - Lifetime JP2780077B2 (ja) | 1994-07-26 | 1994-12-09 | 加圧装置 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2780077B2 (ja) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010513764A (ja) * | 2006-12-19 | 2010-04-30 | ロードテスト インコーポレイテッド | リングセルを使用して荷重負担能力を試験する方法および装置 |
| KR101429064B1 (ko) * | 2013-01-28 | 2014-08-13 | 한국건설기술연구원 | 연직 재하시험이 가능한 선단구조를 가지는 강관말뚝, 이를 이용한 강관말뚝의 연직 재하시험방법 및 강관말뚝의 지지력 측정방법 |
| CN105424487A (zh) * | 2016-01-11 | 2016-03-23 | 中国科学院武汉岩土力学研究所 | 模拟围压条件下静压钢管桩沉桩过程的试验装置及其方法 |
| CN105735378A (zh) * | 2016-04-11 | 2016-07-06 | 湖北工业大学 | 一种桩基竖向承载力试验反向自平衡法及试验装置 |
| CN109653262A (zh) * | 2019-01-22 | 2019-04-19 | 浙江大学 | 一种可用于测定桩阻力及评估内部土塞的多层套管开口桩 |
| CN118547730A (zh) * | 2024-07-24 | 2024-08-27 | 江苏神禹港务工程有限公司 | 一种phc混凝土管桩抗裂性能试验装置 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01150688U (ja) * | 1988-04-05 | 1989-10-18 | ||
| JPH0718965A (ja) * | 1993-06-30 | 1995-01-20 | Kenji Ishihara | 掘削オーガー |
-
1994
- 1994-12-09 JP JP6331011A patent/JP2780077B2/ja not_active Expired - Lifetime
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01150688U (ja) * | 1988-04-05 | 1989-10-18 | ||
| JPH0718965A (ja) * | 1993-06-30 | 1995-01-20 | Kenji Ishihara | 掘削オーガー |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010513764A (ja) * | 2006-12-19 | 2010-04-30 | ロードテスト インコーポレイテッド | リングセルを使用して荷重負担能力を試験する方法および装置 |
| KR101429064B1 (ko) * | 2013-01-28 | 2014-08-13 | 한국건설기술연구원 | 연직 재하시험이 가능한 선단구조를 가지는 강관말뚝, 이를 이용한 강관말뚝의 연직 재하시험방법 및 강관말뚝의 지지력 측정방법 |
| CN105424487A (zh) * | 2016-01-11 | 2016-03-23 | 中国科学院武汉岩土力学研究所 | 模拟围压条件下静压钢管桩沉桩过程的试验装置及其方法 |
| CN105735378A (zh) * | 2016-04-11 | 2016-07-06 | 湖北工业大学 | 一种桩基竖向承载力试验反向自平衡法及试验装置 |
| CN109653262A (zh) * | 2019-01-22 | 2019-04-19 | 浙江大学 | 一种可用于测定桩阻力及评估内部土塞的多层套管开口桩 |
| CN118547730A (zh) * | 2024-07-24 | 2024-08-27 | 江苏神禹港务工程有限公司 | 一种phc混凝土管桩抗裂性能试验装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2780077B2 (ja) | 1998-07-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5608169A (en) | Device and method for testing the bearing capacity of piles | |
| US6264402B1 (en) | Method and apparatus for forming piles in place | |
| JP5277174B2 (ja) | リングセルを使用して荷重負担能力を試験する方法および装置 | |
| US6942429B1 (en) | Post-stressed pile | |
| CN111691439B (zh) | 一种边坡锚固结构和使用该结构的框格梁支护施工方法 | |
| US7909541B1 (en) | Apparatus and method for improved grout containment in post-grouting applications | |
| CN101939493A (zh) | 用于升起建筑物结构的方法和系统 | |
| NL2030784B1 (en) | Rapid construction device and method for prestressed basalt fiber anchor rod | |
| US5542786A (en) | Apparatus for monitoring grout pressure during construction of auger pressure grouted piling | |
| JPH0892949A (ja) | 加圧装置 | |
| US4771530A (en) | Application of inwardly directed prestressing pressure to concrete members | |
| JP2551800B2 (ja) | 杭の載荷試験方法及び装置 | |
| DE2740960A1 (de) | Verfahren zum positionieren und abstuetzen einer maschine | |
| JP4144667B2 (ja) | ジャケット構造体と杭の接合方法 | |
| JPH01116424A (ja) | 杭の載荷試験方法及び装置 | |
| JPH0610344A (ja) | 場所打ち杭の支持力の確認と増加方法 | |
| US10704252B2 (en) | Method for lifting and supporting a new slab foundation with hydraulic jacks | |
| JP3386941B2 (ja) | 基礎杭における地中載荷試験用ジャッキ装置 | |
| CN1026395C (zh) | 预制空心混凝土桩的制作方法和制作装置 | |
| JPH08144255A (ja) | 杭の加力装置 | |
| JPH01284611A (ja) | 打設杭の支持力確認装置 | |
| FR2892136A1 (fr) | Griffe de maintien de tete de micropieu, installation de test a l'arrachement comprenant une telle griffe | |
| JPH06306832A (ja) | 鋼矢板を用いた護岸構造 | |
| JP2003056286A (ja) | 裏込注入圧計測装置 | |
| JPS61250219A (ja) | 杭の載荷試験方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080515 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090515 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090515 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100515 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110515 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110515 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120515 Year of fee payment: 14 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120515 Year of fee payment: 14 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130515 Year of fee payment: 15 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140515 Year of fee payment: 16 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |