JPH09124272A - Floor material suspending device and floor material laying method - Google Patents

Floor material suspending device and floor material laying method

Info

Publication number
JPH09124272A
JPH09124272A JP30501795A JP30501795A JPH09124272A JP H09124272 A JPH09124272 A JP H09124272A JP 30501795 A JP30501795 A JP 30501795A JP 30501795 A JP30501795 A JP 30501795A JP H09124272 A JPH09124272 A JP H09124272A
Authority
JP
Japan
Prior art keywords
floor material
floor
laying
unit
suspending device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP30501795A
Other languages
Japanese (ja)
Inventor
Toshinori Suetsugi
敏則 末続
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP30501795A priority Critical patent/JPH09124272A/en
Publication of JPH09124272A publication Critical patent/JPH09124272A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

(57)【要約】 【課題】 小人数で効率的に床材を敷設することがで
き、しかも作業の安全性を向上させることが可能となる
床材の吊込み装置および当該吊込み装置を用いた床材の
敷設方法を得る。 【解決手段】 複数本の柱2間に、床材を敷設すべき空
間を間に挟んで対向する一対のワイヤ1を張設するとと
もに、各ワイヤ1に滑車3を組込み、滑車3にワイヤ1
間に配設されたビーム4の両端部を連結することによ
り、ビーム4をワイヤ1に沿って移動自在に設け、この
ビーム4に床材の揚重手段7をビーム4に沿って移動自
在に設けた床材の吊込み装置によって、ユニットフロア
13上の床材14を順次吊り上げて、ユニットフロア1
3と大梁10との間に敷設する。
(57) 【Abstract】 PROBLEM TO BE SOLVED: To use a floor material suspending device capable of efficiently laying a floor material with a small number of people and further improving work safety. Get the method of laying the existing flooring. SOLUTION: A pair of wires 1 facing each other are sandwiched between a plurality of columns 2 with a space in which a floor material is to be laid therebetween, and a pulley 3 is incorporated in each wire 1, and the wire 1 is attached to the pulley 3.
By connecting both ends of the beam 4 arranged between them, the beam 4 is movably provided along the wire 1, and the lifting means 7 for the floor material is movably provided on the beam 4 along the beam 4. The floor material suspending device provided is used to sequentially lift up the floor material 14 on the unit floor 13 to obtain the unit floor 1
It is laid between 3 and the girder 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、梁間にデッキプレ
ート等の各種床材を敷設する際に用いられる床材の吊込
み装置および当該吊込み装置を用いた床材の敷設方法に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a floor material suspending device used when laying various floor materials such as deck plates between beams, and a floor material laying method using the suspending device. .

【0002】[0002]

【従来の技術】従来、柱間に架設した大梁および小梁間
に、デッキプレートやファブデッキ等の床鉄筋組込み型
枠などの床材を敷設する場合には、一般にこれらの床材
を上記梁上に揚重して、もっぱら人手によって順次上記
床材を梁間に敷設している。
2. Description of the Related Art Conventionally, when laying floor materials such as deck plates and fab decks with built-in floor rebar forms between large beams and small beams erected between columns, these floor materials are generally installed on the beams. The floor materials are laid between the beams in sequence by hand.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記床
材の敷設方法にあっては、梁上での敷設作業に多数の人
員を必要とするとともに、床材の重量が嵩むために比較
的重労働となり、総じて多大の手間を要して作業能率に
劣るという問題点があった。
However, in the method of laying a floor material described above, a large number of personnel are required for the laying work on the beam, and the weight of the floor material increases, which is relatively heavy labor. There is a problem that the work efficiency is poor and the work efficiency is poor as a whole.

【0004】本発明は、上記従来の床材の敷設方法が有
する課題を有効に解決すべくなされたもので、小人数で
効率的に床材を敷設することができ、しかも作業の安全
性を向上させることが可能となる床材の吊込み装置およ
び当該吊込み装置を用いた床材の敷設方法を提供するこ
とを目的とするものである。
The present invention has been made to effectively solve the problems of the conventional floor laying methods described above. A small number of people can lay a floor efficiently, and work safety is improved. An object of the present invention is to provide a floor material suspending device that can be improved and a method of laying a floor material using the hanging device.

【0005】[0005]

【課題を解決するための手段】請求項1に記載の本発明
に係る床材の吊込み装置は、複数本の柱間に、床材を敷
設すべき空間を間に挟んで対向する一対のワイヤを張設
するとともに、これら一対のワイヤに滑車を組込み、各
滑車に上記ワイヤ間に配設されたビームの両端部を連結
することにより、上記ビームをワイヤに沿って移動自在
に設け、このビームに上記床材の揚重手段を当該ビーム
に沿って移動自在に設けたことを特徴とするものであ
る。
According to a first aspect of the present invention, there is provided a floor material suspending device according to a first aspect of the present invention, in which a pair of columns are opposed to each other with a space for laying the floor material interposed therebetween. Wires are stretched, pulleys are incorporated into the pair of wires, and both ends of the beam disposed between the wires are connected to each pulley, whereby the beam is movably provided along the wire. The above-mentioned floor material lifting means is provided on the beam so as to be movable along the beam.

【0006】また、請求項2に記載の本発明に係る床材
の敷設方法は、柱間に大梁を架設するとともに、別途上
記大梁間に架設する小梁にこの小梁上の床材を取付けた
ユニットフロアを先行地組みし、このユニットフロア上
に当該ユニットフロアと上記大梁または小梁との間に敷
設される床材を仮置きし、次いで上記ユニットフロアを
揚重して上記梁間に取付けた後に、上記請求項1に記載
の床材の吊込み装置によって、ユニットフロア上の床材
を順次吊り上げて、上記ユニットフロアと上記梁との間
に敷設して行くことを特徴とするものである。
According to a second aspect of the present invention, in the method for laying a flooring material according to the present invention, a girder is erected between columns, and a floor material on the girder is attached to a girder separately erected between the girders. The unit floor is grounded in advance, and the floor material laid between the unit floor and the large beam or beam is temporarily placed on this unit floor, and then the unit floor is lifted and mounted between the beams. After that, the flooring material suspending device according to claim 1 is used to sequentially lift up the flooring material on the unit floor and lay it between the unit floor and the beam. is there.

【0007】請求項1に記載の床材の吊込み装置および
これを用いた請求項2に記載の床材の敷設方法によれ
ば、予め床材を敷設すべき空間に揚重した床材を、揚重
手段によって順次吊り上げ、これを上記ビームに沿って
走行させるとともに、上記ビームをワイヤに沿って横行
させて所定位置に敷設して行くことにより、上記床材が
重量物であっても、容易に所定の位置に移動させて敷設
することができるため、簡易な吊込み装置によって従来
よりも小人数で、しかも少ない労力で効率的に上記床材
の敷設を行なうことができるとともに、上記吊込み装置
を用いて床材を敷設して行くにしたがって、順次作業床
が形成されて行くので、敷設作業の安全性を大幅に向上
させることが可能となる。
According to the floor material suspending device of the first aspect and the floor material laying method of the second aspect using the floor material suspending device, the floor material lifted in advance in the space where the floor material should be laid is provided. , Sequentially lifting by lifting means, while running along the beam, by laying the beam at a predetermined position by traversing the beam, even if the floor material is a heavy object, Since it can be easily moved to a predetermined position and laid, the floor material can be laid efficiently by a simple suspending device with a smaller number of people and with less labor than the conventional one. Since the work floor is sequentially formed as the floor material is laid by using the siding device, it is possible to significantly improve the safety of the laying work.

【0008】この際に、特に請求項2に記載の床材の敷
設方法にあっては、予め小梁にこの小梁上の床材を取付
けたユニットフロアを先行地組みして、上記大梁間に取
付けているので、敷設作業開始時に当該ユニットフロア
により充分な広さの作業ステージを確保することがで
き、よって一層作業の安全性を向上させることができる
とともに、作業全体に要する工期の短縮化も併せて図る
ことができる。
In this case, in particular, in the method of laying a floor material according to claim 2, the unit floor in which the floor material on the beam is attached to the beam in advance is installed in advance, and the space between the girders is formed. Since it is attached to the unit, it is possible to secure a sufficiently large work stage on the unit floor at the start of laying work, thus further improving work safety and shortening the construction period required for the whole work. Can also be planned.

【0009】[0009]

【発明の実施の形態】図1〜図3は、本発明の床材の吊
込み装置の一実施形態を示すもので、図中符号1、1
は、2本の上階柱2、2間の1スパンにわたって張られ
た一対のワイヤである。これらワイヤ1、1は、上記柱
2、2間の床材を敷設すべき空間を間に挟んで対向する
ように張られており、図示を省略したレバーブロックに
より所定の張力を付加された状態で張設されている。そ
して、上記各ワイヤ1には、滑車3が組込まれており、
この滑車3に、フックを介して上記ワイヤ1、1間の下
方に配設されたビーム4の両端部が連結されている。こ
れにより、上記ビーム4は、ワイヤ1に沿って横行自在
に吊設されている。
1 to 3 show an embodiment of a floor material suspending apparatus according to the present invention.
Is a pair of wires stretched over a span between the two upper columns 2 and 2. The wires 1 and 1 are stretched so as to face each other with a space between the pillars 2 and 2 on which a floor material is to be laid, and a predetermined tension is applied by a lever block (not shown). It is stretched in. A pulley 3 is incorporated in each of the wires 1,
Both ends of a beam 4 disposed below the wires 1 and 1 are connected to the pulley 3 via hooks. As a result, the beam 4 is suspended along the wire 1 so as to traverse.

【0010】このビーム4は、図2に示すように、溝部
を下方に向けた溝形鋼によって構成されたもので、上記
溝部を画成する両側のリップがレール4aとされてい
る。そして、このビーム4の溝部内に、T字状金物5が
上記レール4a上をビーム4の長手方向に沿って移動自
在に挿通されている。また、上記ビーム4の両端部に
は、T字状金物5の移動を係止して脱落を防止するため
のストッパ6が固定されている。そして、上記T字状金
物5の下端部に小型ホイスト(揚重手段)7が吊設され
ている。これにより、上記小型ホイスト7は、ビーム4
の長手方向に沿って走行自在に設けられている。
As shown in FIG. 2, the beam 4 is made of grooved steel with the groove portion facing downward, and the lips on both sides that define the groove portion are rails 4a. A T-shaped metal 5 is inserted into the groove of the beam 4 so as to be movable on the rail 4a along the longitudinal direction of the beam 4. Further, stoppers 6 for locking the movement of the T-shaped metal 5 and preventing the T-shaped metal 5 from falling off are fixed to both ends of the beam 4. A small hoist (lifting means) 7 is hung on the lower end of the T-shaped hardware 5. As a result, the small hoist 7 is connected to the beam 4
It is provided so as to run along the longitudinal direction of the.

【0011】次に、以上の構成からなる床材の吊込み装
置を用いた本発明の床材の敷設方法の一実施形態につい
て説明する。先ず、柱2、2間に大梁10を架設すると
ともに、他方地上において、上記大梁10、10間に架
設する小梁11、11にファブデッキ(床材)12を取
付けたユニットフロア13を先組みし、さらにこのユニ
ットフロア13上に、このユニットフロア13と上記大
梁10との間に敷設されるファブデッキ(床材)14を
積層状態に仮置きしてチェーン(図示を略す)によって
固定する。次いで、図1および図3に示すように、上記
ファブデッキ14を仮置きしたユニットフロア13を揚
重して、上記大梁10、10間に取付けた後に、これを
作業足場として利用しつつ上記構成の床材の吊込み装置
を上階柱2、2間に仮設する。
Next, an embodiment of the method for laying a flooring material according to the present invention using the flooring material suspending apparatus constructed as described above will be described. First, the large beam 10 is erected between the columns 2 and 2, and on the other hand, the unit floor 13 in which the fab deck (floor material) 12 is attached to the small beams 11 and 11 to be erected between the large beams 10 and 10 on the ground is pre-assembled. Then, a fab deck (floor material) 14 laid between the unit floor 13 and the girder 10 is temporarily placed on the unit floor 13 in a laminated state and fixed by a chain (not shown). Next, as shown in FIGS. 1 and 3, the unit floor 13 on which the fab deck 14 is temporarily placed is lifted up and mounted between the girders 10 and 10 and then used as a work scaffolding as described above. The floor material suspending device is temporarily installed between the upper columns 2 and 2.

【0012】次に、ファブデッキ14を固定しているチ
ェーンを解いた後に、小型ホイスト7のフック7aにワ
イヤ16を掛けて仮置きした最上部のファブデッキ14
を吊り上げ、上記小型ホイスト7をビーム4に沿って走
行させるとともに、ビーム4を滑車4を介してワイヤ1
に沿って横行させて、図1に鎖線で示すように、所定の
位置に上記ファブデッキ14を敷設する。そして、積層
状態にある上記ファブデッキ14…を、順次以上の手順
により、図3に矢印で示すように、ユニットフロア13
と大梁10との間に敷設して行く。このようにして、柱
2、2間の1スパンにおけるファブデッキ14…の敷設
が完了した後に、上記吊込み装置を隣接する柱2、2間
に移動させて、同様に隣の1スパンに上記ファブデッキ
14…を敷設して行く。
Next, after unraveling the chain fixing the fab deck 14, the wire 7 is hooked on the hook 7a of the small hoist 7, and the uppermost fab deck 14 is temporarily placed.
And the small hoist 7 is run along the beam 4, and the beam 4 is moved through the pulley 4 to the wire 1.
The fab deck 14 is laid at a predetermined position as shown by a chain line in FIG. Then, the fab decks 14 ...
And lay between the girder and the girder 10. In this way, after the laying of the fab deck 14 in one span between the columns 2 and 2 is completed, the suspending device is moved between the adjacent columns 2 and 2 and the above-described one span is similarly moved to the adjacent one span. Laying the fab deck 14 ...

【0013】このように、上記構成からなる床材の吊込
み装置およびこれを用いた床材の敷設方法にあっては、
予め柱2、2間に揚重したファブデッキ(床材)14…
を、小型ホイスト7によって順次吊り上げ、これを上記
ビーム4に沿って走行させるとともに、さらにビーム4
をワイヤ1に沿って横行させることにより、上記ファブ
デッキ14を容易に所定の位置に移動させて敷設するこ
とができるため、簡易な吊込み装置によって従来よりも
小人数で、しかも少ない労力で効率的に上記ファグデッ
キ14…の敷設を行なうことができるとともに、上記吊
込み装置を用いてファグデッキ14を敷設して行くにし
たがって、順次作業床が形成されて行くので、多数の作
業員が直接上記ファブデッキ14を搬送する従来の方法
と比較して、敷設作業の安全性を大幅に向上させること
が可能となる。
As described above, the flooring material suspending apparatus having the above-described structure and the flooring material laying method using the same are as follows:
A fab deck (floor material) 14 that has been lifted in advance between columns 2 and 2 ...
Are successively lifted by a small hoist 7 and run along the beam 4, and the beam 4
By traversing the wire 1 along the wire 1, the fab deck 14 can be easily moved to a predetermined position and laid, so that a simple suspending device can be used by a smaller number of people than before and with less labor and efficiency. The fag decks 14 can be laid in a desired manner, and work floors are sequentially formed as the fag decks 14 are laid using the suspending device. Compared with the conventional method of transporting the deck 14, it is possible to greatly improve the safety of the laying work.

【0014】また、特に上述した床材の敷設方法にあっ
ては、予め小梁11にこの小梁11上のファブデッキ1
2を取付けたユニットフロア13を先行地組みして、こ
れを上記大梁10、10間に取付けているので、先ずユ
ニットフロア13により充分な広さの作業ステージを確
保することができ、よって一層作業の安全性を向上させ
ることができるうえに、さらに上記ユニットフロア13
の先行地組みにより、構築作業全体に要する工期の短縮
化も図ることができる。
Further, particularly in the above-mentioned floor material laying method, the fab deck 1 on the beam 11 is previously provided on the beam 11.
Since the unit floor 13 to which 2 is attached is grounded in advance and attached between the large beams 10 and 10, the unit floor 13 can first secure a work stage of a sufficient size, and thus further work can be performed. Can improve the safety of the
Due to the preceding ground construction, the construction period required for the entire construction work can be shortened.

【0015】なお、上記実施の形態の説明においては、
床材がファブデッキ12、14である場合についてのみ
説明したが、これに限定されるものではなく、フラット
デッキプレートやALC板、あるいはオムニア板等の合
成床板用デッキプレートを敷設する場合に適用しても、
同様の作用効果を得ることができる。
In the description of the embodiment,
Only the case where the floor material is the fab decks 12 and 14 has been described, but the present invention is not limited to this, and it is applied when laying a flat deck plate, an ALC plate, or a deck plate for a synthetic floor plate such as an Omnia plate. Even
The same effect can be obtained.

【0016】[0016]

【発明の効果】以上説明したように、請求項1に記載の
床材の吊込み装置およびこれを用いた請求項2に記載の
床材の敷設方法によれば、簡易な吊込み装置によって従
来よりも小人数で、かつ少ない労力で、効率的に床材の
敷設を行なうことができるとともに、多数の作業員が直
接上記床材を搬送する従来の方法と比較して、敷設作業
の安全性を大幅に向上させることができ、特に請求項2
に記載の床材の敷設方法によれば、先行地組みして上記
大梁間に取付けたユニットフロアにより、予め作業ステ
ージを確保することができ、この結果より一層の工期の
短縮化と安全性の向上を図ることができるといった効果
が得られる。
As described above, according to the floor material suspending apparatus of claim 1 and the floor material laying method of claim 2 using the floor material suspending apparatus, a simple suspending apparatus is used. The floor material can be laid efficiently with a smaller number of people and less labor than the conventional method in which a large number of workers directly convey the floor material. Can be significantly improved, and in particular claim 2
According to the floor material laying method described in (1), the work floor can be secured in advance by the unit floor installed in the preceding ground and attached between the girders. As a result, the work period can be further shortened and safety can be improved. The effect that it can improve is acquired.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る床材の吊込み装置の一実施形態を
示す側面図である。
FIG. 1 is a side view showing an embodiment of a floor material suspending device according to the present invention.

【図2】図1の要部の拡大図である。FIG. 2 is an enlarged view of a main part of FIG.

【図3】図1の斜視図である。FIG. 3 is a perspective view of FIG. 1;

【符号の説明】[Explanation of symbols]

1 ワイヤ 2 柱 3 滑車 4 ビーム 7 小型ホイスト(揚重手段) 10 大梁 11 小梁 12 ファブデッキ(床材) 13 ユニットフロア 14 ファブデッキ(床材) 1 wire 2 pillar 3 pulley 4 beam 7 small hoist (lifting means) 10 large beam 11 small beam 12 fab deck (floor material) 13 unit floor 14 fab deck (floor material)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 複数本の柱間に、床材を敷設すべき空間
を間に挟んで対向する一対のワイヤを張設するととも
に、これら一対のワイヤに滑車を組込み、各滑車に上記
ワイヤ間に配設されたビームの両端部を連結することに
より、上記ビームを上記ワイヤに沿って移動自在に設
け、このビームに上記床材の揚重手段を当該ビームに沿
って移動自在に設けてなることを特徴とする床材の吊込
み装置。
1. A pair of wires which are opposed to each other with a space for laying a floor material therebetween are stretched between a plurality of columns, and pulleys are incorporated in the pair of wires. By connecting both ends of the beam disposed in the beam, the beam is movably provided along the wire, and the lifting means for the floor material is provided movably along the beam in the beam. A floor material suspending device characterized in that
【請求項2】 柱間に大梁を架設するとともに、別途上
記大梁間に架設する小梁にこの小梁上の床材を取付けた
ユニットフロアを先行地組みし、このユニットフロア上
に当該ユニットフロアと上記大梁または小梁との間に敷
設される床材を仮置きし、次いで上記ユニットフロアを
揚重して上記梁間に取付けた後に、請求項1に記載の床
材の吊込み装置によって、上記ユニットフロア上の床材
を順次吊り上げて、上記ユニットフロアと上記梁との間
に敷設して行くことを特徴とする床材の敷設方法。
2. A unit floor in which a girder is erected between columns and a floor material on the girder is separately attached to a girder to be erected between the girders, and the unit floor is constructed on the unit floor. The floor material laid between the beam and the large beam or the small beam is temporarily placed, and then the unit floor is lifted and mounted between the beams, and then by the floor material suspending device according to claim 1, A method of laying a floor material, which comprises sequentially hoisting floor materials on the unit floor and laying the floor material between the unit floor and the beams.
JP30501795A 1995-10-30 1995-10-30 Floor material suspending device and floor material laying method Pending JPH09124272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30501795A JPH09124272A (en) 1995-10-30 1995-10-30 Floor material suspending device and floor material laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30501795A JPH09124272A (en) 1995-10-30 1995-10-30 Floor material suspending device and floor material laying method

Publications (1)

Publication Number Publication Date
JPH09124272A true JPH09124272A (en) 1997-05-13

Family

ID=17940094

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30501795A Pending JPH09124272A (en) 1995-10-30 1995-10-30 Floor material suspending device and floor material laying method

Country Status (1)

Country Link
JP (1) JPH09124272A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012012836A (en) * 2010-06-30 2012-01-19 Shimizu Corp Construction method of floor unit for stock on construction story
CN105967054A (en) * 2016-06-24 2016-09-28 中国冶集团有限公司 Slip rope device for transporting and lifting photovoltaic panels and construction method of slip rope device
JP2023035211A (en) * 2021-08-31 2023-03-13 鹿島建設株式会社 Conveying method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012012836A (en) * 2010-06-30 2012-01-19 Shimizu Corp Construction method of floor unit for stock on construction story
CN105967054A (en) * 2016-06-24 2016-09-28 中国冶集团有限公司 Slip rope device for transporting and lifting photovoltaic panels and construction method of slip rope device
JP2023035211A (en) * 2021-08-31 2023-03-13 鹿島建設株式会社 Conveying method

Similar Documents

Publication Publication Date Title
CN209457364U (en) A movable tool-type suspension unloading platform device
JP3579816B2 (en) Multipurpose stage for building frame
JPH0754491A (en) Exterior curtain wall assembly equipment for buildings
JPH09124272A (en) Floor material suspending device and floor material laying method
KR100583785B1 (en) Building material lifting device installed on the outside of building
JP3994458B2 (en) Operation method of vertical and horizontal transfer device
JPH0437168Y2 (en)
JPH05113026A (en) Temporary scaffold structure
JPH076295B2 (en) Floor slab construction method
CN209797276U (en) Portable overhead hoist
JP2004308155A (en) PC board suspension method and suspension jig
JP2860313B2 (en) Escalator / truss lifting method
JPH07247693A (en) Bar arrangement method for wall reinforcement and bar arranging device used for the method
JPH09296610A (en) Outside curing unit
RU2784844C2 (en) Monorail attachment device
JPH10140839A (en) Device for vertically hoisting form material and pipe support
US1127445A (en) Scaffolding device.
CN217051331U (en) Anchorage top cover plate installation device
JPH07145670A (en) Transport system for underground construction by cableway
JP3179710B2 (en) Structural slide erection method and its work system
JPH07217214A (en) Exterior curtain wall assembly equipment
KR200356598Y1 (en) Construction-material lift being installed at the outside of the construction-structure
JP2000053375A (en) Vertical carrier system corresponding to slewing overhead crane
JPH05162971A (en) Ceiling crane
JPH08169662A (en) Elevator suspending device