JPH09170904A JP34939695A JP34939695A JPH09170904A JP H09170904 A JPH09170904 A JP H09170904A JP 34939695 A JP34939695 A JP 34939695A JP 34939695 A JP34939695 A JP 34939695A JP H09170904 A JPH09170904 A JP H09170904A
Authority
JP
Japan
Prior art keywords
weight
measuring
hollow body
top end
soil cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34939695A
Other languages
Japanese (ja)
Other versions
JP2907769B2 (en
Inventor
Kaoru Hirose
馨 弘瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiyou Kiko Kogyo Kk
Original Assignee
Daiyou Kiko Kogyo Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiyou Kiko Kogyo Kk filed Critical Daiyou Kiko Kogyo Kk
Priority to JP7349396A priority Critical patent/JP2907769B2/en
Publication of JPH09170904A publication Critical patent/JPH09170904A/en
Application granted granted Critical
Publication of JP2907769B2 publication Critical patent/JP2907769B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a measure weight performing precise top end position measurement without causing variation in a measurement value due to specific gravity and viscosity of soil cement, etc., during placing, in constructing subsurface structure. SOLUTION: A measure weight 3 comprises a hollow body of specified volume in which optional pieces of steel balls are charged, and a supporting member which suspends the hollow body, and, the measure weight is so constituted that weight per unit volume is varied according to the number of charge steel balls. The hollow body comprises a sphere 4, and the supporting member comprises a cylindrical socket 6 fix-attached to an opening part 4a, a plug 7 screwed in the socket 6, and an eye bolt 9 provided with a screw part 9b screwed in a tapping hole 7c of the plug 7.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は建築物や構築物の基
礎工事において場所打ち杭や地中連続壁等の地下構造物
を構築するに際して、打設途中の生コンクリートやソイ
ルセメントの天端を正確に測定するための検尺錘に関
し、特に打設する生コンクリートやソイルセメントの硬
軟度とか比重及び粘性に応じて単位体積当りの重量を自
由に変えることができる検尺錘に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention accurately determines the top end of ready-mixed concrete or soil cement when constructing an underground structure such as cast-in-place pile or underground wall in foundation work of buildings and structures. More particularly, the present invention relates to a measuring weight that can freely change the weight per unit volume according to the hardness and softness of fresh concrete or soil cement to be placed, the specific gravity and the viscosity.

【0002】[0002]

【従来の技術】近年、産業廃棄物の処理場不足が深刻と
なり、建設工事においても残土としての掘削土の処分地
不足問題に対処して、このような掘削土の有効利用をは
かる技術が種々開発されている。その一つに泥土モルタ
ルの利用、即ち掘削土にセメントと水を加えて混練し
て、堅固な支持盤とか基礎杭、土留め壁等に利用する方
法が開発されている。この泥土モルタルは、別名ソイル
セメントとも呼称され、掘削土またはこれに補足材料を
加えたものに数%のセメントを添加して最適含水比付近
で締め固めることにより、強度,耐久性の面でも満足す
る特性が得られている。
2. Description of the Related Art In recent years, a shortage of industrial waste treatment facilities has become serious, and various techniques have been proposed to effectively use the excavated soil by coping with the problem of shortage of excavated soil as a residual soil during construction work. Being developed. One of them is the use of mud mortar, that is, a method of adding cement and water to excavated soil and kneading it to use it for a solid support board, foundation piles, earth retaining walls, etc. This mud mortar is also called soil cement, and it is also satisfactory in terms of strength and durability by adding a few percent of cement to excavated soil or its supplementary material and compacting it near the optimum water content ratio. The characteristics to be obtained are obtained.

【0003】基礎工事としての場所打ち杭はベノト工
法、アースドリル工法、リバース工法等の工法により先
ず数十〜数百メートルの深さまで地中孔を掘削する。こ
の地中孔掘削に際しては孔壁の安定等のため掘削孔に安
定液としての泥水を満たして掘削作業を行っている。そ
して掘削完了後に地中孔中に鉄筋篭を建込み、次にトレ
ミー管を建込んで、生コンクリートやソイルセメントを
打設して泥水と置換して構築している。
As a foundation work, a cast-in-place pile is first constructed by excavating an underground hole to a depth of several tens to several hundreds of meters by a construction method such as a benot construction method, an earth drill construction method and a reverse construction method. At the time of excavation of this underground hole, the excavation work is performed by filling the excavation hole with mud water as a stabilizing liquid in order to stabilize the hole wall. After the excavation is completed, a reinforced cage is installed in the underground hole, a tremie pipe is then installed, and fresh concrete and soil cement are placed to replace mud water.

【0004】トレミー工法には底ぶた式とかプランジャ
ー式、ボールパッキン式などの方法があるが、一般的に
プランジャー式が多く用いられている。これはトレミー
管の建込み後にプランジャーを建込み、プランジャーを
ワイヤで吊り下ろす工法である。トレミー工法による生
コンクリートやソイルセメント打設はスライムとかレイ
タンス等異物の混入によっても品質が低下する虞がある
ため、施行精度は充分に高く保つ必要がある。
There are methods such as a bottom lid type, a plunger type, and a ball packing type in the tremie method, but the plunger type is generally widely used. This is a construction method in which a plunger is installed after the tremie pipe is installed and the plunger is hung with a wire. Since the quality of ready-mixed concrete or soil cement pouring by the tremy method may deteriorate due to the inclusion of foreign matter such as slime or laitance, it is necessary to keep the execution accuracy sufficiently high.

【0005】施行時には通常の生コンクリート、流動性
を高めた生コンクリート、或は別途にセメントサイロで
セメントと水とを攪拌して得た一定量のセメントミルク
を掘削土とともにミキサーに送り込んで十分に混練して
ソイルセメントを製造し、打設時に前記トレミー管先端
より5m程度の高さまで生コンクリートやソイルセメン
トを打設してからトレミー管を3mほど引き上げ、再び
3〜5mほど生コンクリートやソイルセメントを打設し
てからトレミー管を引き上げる操作を繰り返すことによ
り、常にトレミー管の先端が生コンクリートやソイルセ
メントの天端から2m程度下方に位置するようにしてセ
メントミルクの吹き上げを防止しながら順次打設作業を
遂行する必要がある。
[0005] At the time of execution, ordinary ready-mixed concrete, ready-mixed concrete with improved fluidity, or a certain amount of cement milk obtained by separately agitating cement and water in a cement silo is sent to a mixer together with the excavated soil to a sufficient degree. After kneading to produce soil cement, when pouring, raw concrete or soil cement is placed up to a height of about 5 m from the tip of the tremie pipe, and then the tremie pipe is pulled up by about 3 m, and then about 3 to 5 m of raw concrete or soil cement is re-applied. By repeating the operation of pulling up the tremie pipe after placing it, the tip of the tremie pipe is always positioned about 2 m below the top of the fresh concrete or soil cement, and the cement milk is blown up sequentially while preventing it from blowing up. It is necessary to carry out the installation work.

【0006】上記の工法では生コンクリートやソイルセ
メントの打設途中の天端位置と、最終打設時の天端位置
とを正確に測定することがとりわけ要求される。そのた
め従来は図3に示したように鉄製の検尺錘1をコード2
で懸垂して地中孔中に降下させ、検尺錘1の下面を生コ
ンクリートやソイルセメントの天端に当ててワイヤ2の
降下長さから天端位置を測定する方法が用いられてい
る。尚、センサを吊ったメジャー付きコードをドラムに
巻き付けた界面計を用いてスライムとの境界面を感知
し、生コンクリートの天端を測定する方法もある。
In the above-mentioned construction method, it is particularly required to accurately measure the top end position of the fresh concrete or soil cement during the pouring and the top end position at the final pouring. Therefore, conventionally, as shown in FIG.
A method is used in which the lower end of the measuring weight 1 is applied to the top end of ready-mixed concrete or soil cement to measure the top end position from the drop length of the wire 2. There is also a method of measuring the top end of green concrete by sensing the boundary surface with slime by using an interface meter in which a cord with a measure with a sensor suspended is wound around a drum.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、このよ
うな鉄製の検尺錘を用いた場合、生コンクリートやソイ
ルセメントの比重とか粘性によって検尺錘の貫入に伴う
測定値のばらつきが生じやすく、正確な天端位置測定を
行うことができないという課題がある。
However, when such an iron measuring weight is used, the measured value tends to vary due to the penetration of the measuring weight due to the specific gravity or viscosity of green concrete or soil cement, and the accuracy is There is a problem that it is not possible to perform accurate top end position measurement.

【0008】例えば通常の生コンクリートは砕石等の骨
材を含んでおり、スランプが15〜20cm程度あるた
めに単位体積当りの重量が7.8の鉄製錘でも生コンク
リート中への貫入量は少なく、測定誤差が30〜50c
m程度の許容範囲内にあるが、前記したようにソイルセ
メントは生コンクリートと異なって骨材を含まず、粘性
が低くて比重も1.5と小さいため、前記鉄製の検尺錘
を用いると、検尺錘が天端から3〜5メートルもソイル
セメント中に貫入してしまい、誤差が大きくなって正確
な測定を行うことができない。
For example, ordinary ready-mixed concrete contains aggregates such as crushed stone, and since the slump is about 15 to 20 cm, even an iron weight having a weight per unit volume of 7.8 has a small amount of penetration into the ready-mixed concrete. , Measurement error is 30-50c
Although it is within the permissible range of about m, as mentioned above, soil cement, unlike fresh concrete, does not contain aggregate, has low viscosity and specific gravity as small as 1.5. However, the measuring weight penetrates into the soil cement 3 to 5 meters from the top, and the error becomes large, and accurate measurement cannot be performed.

【0009】尚、上記スランプとはまだ固まっていない
コンクリートを指し、通常スランプ試験として鉄製コー
ンに測定しようとするコンクリートを詰めてコーンを鉛
直に引き上げた時のコンクリートの上端の下がりをcm
で計ってスランプ何cmと呼称している。
The above slump refers to concrete that has not solidified yet. Normally, in the slump test, the iron cone is filled with concrete to be measured, and when the cone is pulled up vertically, the fall of the concrete top is measured by cm.
It is called "Slump cm".

【0010】また、近時の地中連続壁用コンクリートは
高強度が要求されるため、生コンクリートのセメント量
を増やして流動性を高めたものが使用されており、従っ
てソイルセメントを用いた場合と同様に検尺錘が生コン
クリート中に貫入してしまうケースがある。上記に対処
して任意の鋼製パイプ等に打設材料を入れて硬化させた
ものを検尺錘として用いる手段もあるが、比重の微調整
ができないために生コンクリートやソイルセメントと泥
水との接触部分のゲルによって検尺錘が浮いてしまう場
合があり、満足する結果が得られていないのが実状であ
る。
Further, since recent concrete for underground walls is required to have high strength, a concrete having an increased fluidity by increasing the amount of cement is used. Therefore, when soil cement is used. In some cases, the measuring weight penetrates into the ready-mixed concrete as in the above. In response to the above, there is also a means to use as a measuring weight the one in which the casting material is put into an arbitrary steel pipe and hardened, but since the specific gravity cannot be finely adjusted, it is not possible In some cases, the measuring weight may float due to the gel in the contact area, and the satisfactory result has not been obtained.

【0011】そこで本発明は上記に鑑みて、生コンクリ
ートやソイルセメントの比重とか粘性によって測定値に
ばらつきが生じることなく、正確な天端位置測定を行う
ことができる検尺錘を提供することを目的とするもので
ある。
Therefore, in view of the above, the present invention provides a measuring weight capable of performing accurate top end position measurement without variation in measured values due to specific gravity or viscosity of green concrete or soil cement. It is intended.

【0012】[0012]

【課題を解決するための手段】本発明は上記目的を達成
するために、地中孔内で打設途中の生コンクリートやソ
イルセメントの天端に当てて天端位置を測定するための
検尺錘において、上記検尺錘は単位体積当りの重量を変
更できる検尺錘、所定の体積を有する中空体と、中空体
をコードで懸垂する支持部材とから成り、中空体へ充填
物を投入することによって単位体積当りの重量を変更す
る検尺錘、上記検尺錘は、所定の体積を有して任意個数
の鋼球が投入された中空体と、中空体をコードで懸垂す
る支持部材とから成り、前記鋼球の投入個数によって単
位体積当りの重量を変更するようにした検尺錘を提供す
る。
In order to achieve the above object, the present invention provides a measuring scale for measuring the top end position by hitting the top end of ready-mixed concrete or soil cement in the middle of pouring. In the weight, the above-mentioned measuring weight is composed of a measuring weight whose weight per unit volume can be changed, a hollow body having a predetermined volume, and a supporting member suspending the hollow body with a cord, and the filler is put into the hollow body. A scale weight for changing the weight per unit volume by the above, the scale weight, a hollow body having a predetermined volume into which an arbitrary number of steel balls are charged, and a support member for suspending the hollow body with a cord. According to another aspect of the present invention, there is provided a measuring weight, wherein the weight per unit volume is changed according to the number of steel balls charged.

【0013】上記充填物として適量の流体或は固形物を
用い、又流体として水を用い、中空体は球体で構成され
ており、支持部材は中空体の開口部に固着された筒状の
ソケットと、ソケットに螺合固定されたプラグと、プラ
グの螺子切り穴内に螺挿される螺子軸を持つアイボルト
から構成されている。
An appropriate amount of fluid or solid is used as the filling material, water is used as the fluid, the hollow body is a sphere, and the supporting member is a cylindrical socket fixed to the opening of the hollow body. And an eyebolt having a screw shaft that is screwed into a threaded hole of the plug.

【0014】かかる検尺錘によれば、使用時に中空体の
開口部に固着されたソケットを通して流体や固形物の充
填物や任意個数の鋼球を投入し、このソケットにプラグ
を螺合固定してからアイボルトの螺子軸を螺挿し、この
アイボルトにコードを連結懸垂して、地下構造物を構築
する現場で地中孔中に降下させ、検尺錘の下面を生コン
クリートやソイルセメントの天端に当ててコードの降下
長さから天端位置を測定する。この時に中空体内に投入
した流体や固形物の充填物や鋼球の個数によって単位体
積当りの重量が変更可能であるため、生コンクリートや
ソイルセメントの比重とか粘性に応じて鋼球の投入個数
を変更することにより、検尺錘の貫入量は極めて少なく
なり、測定誤差が許容範囲内に収められるという作用が
得られる。
According to such a measuring weight, at the time of use, a fluid or solid filling or an arbitrary number of steel balls is introduced through the socket fixed to the opening of the hollow body, and the plug is screwed and fixed to this socket. Then insert the eyebolt's screw shaft, connect the cord to this eyebolt, and hang it down into the underground hole at the site where the underground structure is to be built.The bottom surface of the measuring weight is the top end of fresh concrete or soil cement. And measure the top end position from the descent length of the cord. At this time, the weight per unit volume can be changed depending on the number of fluids or solid fillings and steel balls charged in the hollow body, so the number of steel balls charged can be changed according to the specific gravity or viscosity of fresh concrete or soil cement. By changing the amount, the penetration amount of the measuring weight becomes extremely small, and the effect that the measurement error is kept within the allowable range is obtained.

【0015】従って本検尺錘は、通常の生コンクリート
を使用する時よりも比重が小さなソイルセメントとか、
セメント量を増やして流動性を高めた生コンクリートを
用いた工法での天端位置測定に用いて特に有用である。
Therefore, this measuring weight is made of soil cement whose specific gravity is smaller than that when using normal ready-mixed concrete,
It is especially useful for measuring the crown position in the construction method using ready-mixed concrete in which the amount of cement is increased to improve the fluidity.

【0016】[0016]

【発明の実施の形態】以下図面に基づいて本発明にかか
る検尺錘の実施形態を説明する。図1は本実施形態を適
用した検尺錘3を示す要部断面図であり、図中の4は所
定の体積を有する中空体としての中空状の球体であっ
て、この球体4内には予め決定した任意個数の鋼球5,
5が投入されている。従って鋼球5,5の投入個数を選
択することによって球体4の単位体積当りの重量を変更
することが可能となっている。中空状の球体4は予め用
意した2個の碗状体を溶接部10によって溶着固定する
ことによって容易に製作することが出来る。尚、球体4
の形状は図示の形状に限定されるものではなく、中空体
であれば角状等の他の形状であってもよい。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of a measuring weight according to the present invention will be described below with reference to the drawings. FIG. 1 is a sectional view of an essential part showing a measuring weight 3 to which the present embodiment is applied. In the figure, 4 is a hollow spherical body as a hollow body having a predetermined volume. A predetermined number of steel balls 5,
5 has been thrown in. Therefore, the weight per unit volume of the spherical body 4 can be changed by selecting the number of steel balls 5 and 5 to be charged. The hollow spherical body 4 can be easily manufactured by welding and fixing two bowl-shaped bodies prepared in advance by the welding portion 10. In addition, sphere 4
The shape is not limited to the shape shown in the figure, and may be another shape such as a square shape as long as it is a hollow body.

【0017】球体4の単位体積当りの重量を変更するた
めに球体4内に投入する物は鋼球5,5のみだけでな
く、他の充填物でもよい。充填物としては特に限定はな
く、水その他の適量の流体、或は作業現場の適宜の鋼材
や石その他の任意の固形物を用いることができる。要は
球体4に充填することにより、検尺錘3の重量を打設す
る生コンクリートやソイルセメントに応じた最適の単位
体積当たりの重量とすることができれば良い。
Not only the steel balls 5 and 5 but also other filling materials may be put into the sphere 4 in order to change the weight per unit volume of the sphere 4. The filling material is not particularly limited, and water or other suitable amount of fluid, or appropriate steel material, stone, or any other solid material at the work site can be used. The point is that by filling the spherical body 4, the weight of the measuring weight 3 can be set to an optimum weight per unit volume according to the ready-mixed concrete or soil cement to be placed.

【0018】次に上記中空状の球体4をコードで懸垂す
る支持部材について説明する。即ち、6は球体4の開口
部4aに溶接等により固着された筒状のソケットであ
り、このソケット6にOリング8を介在してプラグ7が
螺合固定されている。図2に示したようにプラグ7は本
体7aとヘッド部7bとで構成され、ヘッド部7bの表
面部分から本体7a内にかけて螺子切り穴7cが螺設さ
れている。9はアイボルトであって、このアイボルト9
の基部9aに設けられた螺子軸9bが上記プラグ7の螺
子切り穴7c内に螺挿されている。
Next, a support member for suspending the hollow sphere 4 with a cord will be described. That is, 6 is a cylindrical socket fixed to the opening 4a of the spherical body 4 by welding or the like, and the plug 7 is screwed and fixed to this socket 6 with the O-ring 8 interposed. As shown in FIG. 2, the plug 7 is composed of a body 7a and a head portion 7b, and a threaded hole 7c is screwed from the surface portion of the head portion 7b to the inside of the body 7a. 9 is an eyebolt, and this eyebolt 9
A screw shaft 9b provided on the base portion 9a of the above is screwed into the threaded hole 7c of the plug 7.

【0019】上記球体4、ソケット6、プラグ7及びア
イボルト9の材質は特に限定されず、適宜に選択すれば
よいが、整備面とか維持管理の面から防錆能力が高いス
テンレス鋼を用いることが好ましい。また、鋼球5とし
てステンレス球を用いても良い。
The materials of the sphere 4, the socket 6, the plug 7 and the eyebolt 9 are not particularly limited and may be appropriately selected. However, stainless steel having a high rust preventive ability is used in terms of maintenance and maintenance. preferable. Alternatively, stainless steel balls may be used as the steel balls 5.

【0020】かかる検尺錘3によれば、使用時に現場で
球体4の開口部4aに固着された筒状のソケット6を通
して任意個数の鋼球5,5を投入し、次にソケット6に
Oリング8を介在してプラグ7を螺合固定してからアイ
ボルト9の基部9aに設けられた螺子軸9bをプラグ7
の螺子切り穴7c内に螺挿し、このアイボルト9に図外
の計測コードを連結して懸垂する。
According to such a measuring weight 3, an arbitrary number of steel balls 5 and 5 are put in through the cylindrical socket 6 fixed to the opening 4a of the sphere 4 at the time of use, and then O is inserted into the socket 6. After the plug 7 is screwed and fixed with the ring 8 interposed, the screw shaft 9b provided on the base portion 9a of the eyebolt 9 is attached to the plug 7
It is screwed into the threaded hole 7c, and a measuring cord (not shown) is connected to the eyebolt 9 and suspended.

【0021】そして場所打ち杭や地中連続壁等の地下構
造物を構築するための公知の工法で数十〜数百メートル
の深さまで掘削された地中孔中に鉄筋篭とトレミー管を
建込み、安定液としての泥水との置換によって生コンク
リートやソイルセメントを打設してから本発明にかかる
検尺錘3を地中孔中に降下させ、検尺錘3の下面を生コ
ンクリートやソイルセメントの天端に当てて計測コード
の降下長さから天端位置を測定する。
Then, a rebar cage and a tremie pipe are built in the underground hole excavated to a depth of several tens to several hundreds of meters by a known construction method for constructing an underground structure such as a cast-in-place pile or an underground continuous wall. After pouring the fresh concrete or soil cement into it by substituting it with mud water as a stabilizing liquid, the measuring weight 3 according to the present invention is lowered into the underground hole, and the lower surface of the measuring weight 3 is placed on the raw concrete or soil. It is applied to the top of the cement and the top position is measured from the length of descent of the measurement cord.

【0022】上記測定値に基づいてトレミー管先端より
5m程度の高さまで生コンクリートやソイルセメントを
打設してからトレミー管を3mほど引き上げ、再び3〜
5mの生コンクリートやソイルセメントを打設してから
検尺錘3を用いて天端位置を測定し、再度トレミー管を
引き上げる操作を繰り返す。そしてトレミー管の先端が
生コンクリートやソイルセメントの天端から2m程度下
方に位置するようにして打設作業を継続する。
Based on the above-mentioned measured values, after pouring fresh concrete or soil cement up to a height of about 5 m from the tip of the tremie pipe, the tremie pipe is pulled up by about 3 m, and again 3 to
After pouring 5 m of fresh concrete or soil cement, the top end position is measured using the measuring weight 3, and the operation of pulling up the tremie pipe again is repeated. Then, the pouring work is continued so that the tip of the tremie pipe is located about 2 m below the top of the ready-mixed concrete or soil cement.

【0023】上記の説明は通常の生コンクリートやソイ
ルセメントを用いて地下杭用のコンクリートを打設する
工事例について述べたが、これらに代えて流動性を高め
た生コンクリートを用いる場合でも同様にして本実施例
にかかる検尺錘3を使用することができる。
Although the above description has described the construction example of placing concrete for underground piles using ordinary ready-mixed concrete or soil cement, the same applies to the case of using ready-mixed concrete with improved fluidity instead of these. The measuring weight 3 according to the present embodiment can be used.

【0024】上記の作業時において、前記したように検
尺錘3の中空状の球体4内に投入した鋼球5,5の個数
によって、或は充填物によって球体4の単位体積当りの
重量を変更することが可能であるため、生コンクリート
やソイルセメントの比重とか粘性に応じて鋼球5,5の
投入個数や充填物の量や種類を変更することにより、天
端位置の測定にばらつきが生じることなく、正確な測定
を行うことができる。
During the above-mentioned work, the weight per unit volume of the spherical body 4 depends on the number of the steel balls 5 and 5 charged in the hollow spherical body 4 of the measuring weight 3 as described above or by the filling material. Since it is possible to change, the number of steel balls 5 and 5 and the amount and type of fillers can be changed according to the specific gravity and viscosity of ready-mixed concrete and soil cement, and the measurement of the top end position will vary. Accurate measurements can be made without this occurring.

【0025】即ち、通常の生コンクリートを使用する時
よりもソイルセメントを用いる場合に鋼球5,5の投入
個数や充填物の投入量を少なくする。すると検尺錘3の
単位体積当りの重量が減少するので、ソイルセメントに
対する検尺錘3の貫入量は極めて少なくなり、測定誤差
を許容範囲内に収めることが出来る。従って本実施例の
検尺錘3は骨材を含む通常の生コンクリートよりも骨材
を含まずに比重も小さなソイルセメントとか、地中連続
壁用コンクリートのように高強度が求められ、セメント
量を増やして流動性を高めた生コンクリートを用いた工
法での天端位置測定に用いて特に有効である。
That is, when soil cement is used, the number of steel balls 5 and 5 and the amount of filler to be charged are reduced as compared with the case of using normal ready-mixed concrete. Then, since the weight of the measuring weight 3 per unit volume is reduced, the amount of the measuring weight 3 penetrating into the soil cement is extremely small, and the measurement error can be kept within the allowable range. Therefore, the scale weight 3 of the present embodiment is required to have high strength such as soil cement which does not contain aggregate and has a smaller specific gravity than normal ready-mixed concrete containing aggregate, or concrete for underground continuous wall. It is particularly effective for measuring the top position in the construction method using ready-mixed concrete with increased flowability.

【0026】尚、検尺錘3の単位体積当りの重量を変更
するための鋼球5,5の投入個数を変更する手段に代え
て、球体4内に流体や固形物からなる充填物を計量して
投入する手段を用いても同様な作用が得られる。
In place of the means for changing the number of steel balls 5, 5 for changing the weight per unit volume of the measuring weight 3, a filling material made of a fluid or solid is measured in the spherical body 4. The same effect can be obtained by using a means for charging after that.

【0027】[0027]

【発明の効果】以上詳細に説明したように、本発明にか
かる検尺錘は使用時に中空体内に任意個数の鋼球とか適
量の充填剤を入れ、支持部材及びコードで懸垂して地下
構造物を構築する現場で地中孔中に降下させ、検尺錘の
下面をソイルセメントもしくは生コンクリートの天端に
当ててコードの降下長さから天端位置が測定する際に、
中空体内に投入した鋼球の個数とか水量によって単位体
積当りの重量が変更可能であるため、生コンクリートや
ソイルセメントの比重とか粘性に関係なく検尺錘の貫入
量は極めて少なくなり、測定誤差は最小限になるという
効果が得られる。
As described in detail above, the measuring weight according to the present invention is used in the underground structure by putting an arbitrary number of steel balls or an appropriate amount of filler in the hollow body and suspending it with a supporting member and a cord. When descending into the underground hole at the construction site, and applying the lower surface of the measuring weight to the top of soil cement or ready-mixed concrete to measure the top position from the descent length of the cord,
Since the weight per unit volume can be changed depending on the number of steel balls and the amount of water put into the hollow body, the penetration amount of the measuring weight is extremely small regardless of the specific gravity or viscosity of fresh concrete or soil cement, and the measurement error The effect of being minimal is obtained.

【0028】特にソイルセメントは生コンクリートと異
なって骨材を含まず、粘性が低くて比重も小さいために
鉄製の検尺錘が天端から3〜5メートルも貫入すること
によって正確な測定を行うことができないという難点が
あったが、本発明にかかる検尺錘は上記問題点を解消す
ることによってコンクリート打設工事の精度を高めるこ
とができる。
In particular, soil cement, unlike fresh concrete, does not contain aggregates, has low viscosity and low specific gravity, and therefore an iron measuring weight penetrates 3 to 5 meters from the top for accurate measurement. However, the measuring weight according to the present invention can improve the accuracy of concrete pouring work by solving the above problems.

【0029】更に中空体内に入れる鋼球の個数とか流体
や固形物からなる充填物を変えることによって比重の微
調整が可能であり、生コンクリートやソイルセメントと
泥水との接触部分のゲルによって検尺錘が浮く等の現象
もなく、常に正確な天端位置測定を行うことができる検
尺錘が提供されるという大きな効果を発揮する。
Further, the specific gravity can be finely adjusted by changing the number of steel balls to be put in the hollow body or the filling material composed of fluid or solid matter, and the specific gravity can be measured by gel at the contact portion between fresh concrete or soil cement and muddy water. A great effect is provided that a measuring weight is provided that can always perform accurate top end position measurement without the phenomenon that the weight floats.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本実施例を適用した検尺錘を示す要部断面図。FIG. 1 is a sectional view of an essential part showing a measuring weight to which this embodiment is applied.

【図2】本実施例で用いたプラグの構造を示す側面図。FIG. 2 is a side view showing the structure of the plug used in this embodiment.

【図3】従来の鉄製検尺錘の使用時の状態を示す側面
図。
FIG. 3 is a side view showing a state when a conventional iron measuring weight is used.

【符号の説明】[Explanation of symbols]

3…検尺錘 4…球体 5…鋼球 6…ソケット 7…プラグ 7a…本体 7b…ヘッド 7c…螺子切り穴 8…Oリング 9…アイボルト 9a…基部 9b…螺子軸 10…溶接部 3 ... Measuring weight 4 ... Sphere 5 ... Steel ball 6 ... Socket 7 ... Plug 7a ... Main body 7b ... Head 7c ... Screw cutting hole 8 ... O-ring 9 ... Eye bolt 9a ... Base 9b ... Screw shaft 10 ... Welding part

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 地中孔内で打設途中の生コンクリートや
ソイルセメントの天端に当てて天端位置を測定するため
の検尺錘において、 上記検尺錘は単位体積当りの重量を変更できることを特
徴とする検尺錘。
1. A scale weight for measuring the top end position by hitting the top end of ready-mixed concrete or soil cement in the process of pouring in the underground hole, wherein the scale weight is changed in weight per unit volume. A scale weight that can be used.
【請求項2】 地中孔内で打設途中の生コンクリートや
ソイルセメントの天端に当てて天端位置を測定するため
の検尺錘において、 上記検尺錘は、所定の体積を有する中空体と、中空体を
コードで懸垂する支持部材とから成り、中空体へ充填物
を投入することによって単位体積当りの重量を変更する
ことを特徴とする検尺錘。
2. A measuring weight for measuring the top end position by hitting the top end of ready-mixed concrete or soil cement in the process of pouring in the underground hole, wherein the measuring weight is a hollow having a predetermined volume. A measuring weight comprising a body and a supporting member suspending a hollow body with a cord, and changing a weight per unit volume by charging a filling material into the hollow body.
【請求項3】 地中孔内で打設途中の生コンクリートや
ソイルセメントの天端に当てて天端位置を測定するため
の検尺錘において、 上記検尺錘は、所定の体積を有して任意個数の鋼球が投
入された中空体と、中空体をコードで懸垂する支持部材
とから成り、前記鋼球の投入個数によって単位体積当り
の重量を変更することを特徴とする検尺錘。
3. A scale weight for measuring the top end position by hitting the top end of ready-mixed concrete or soil cement in the process of pouring in the underground hole, wherein the scale weight has a predetermined volume. And a supporting member for suspending the hollow body with a cord, and the weight per unit volume is changed depending on the number of the steel balls charged. .
【請求項4】 充填物として適量の流体を用いた請求項
2記載の検尺錘。
4. The measuring weight according to claim 2, wherein an appropriate amount of fluid is used as the filling material.
【請求項5】 充填物として固形物を用いた請求項2記
載の検尺錘。
5. The measuring weight according to claim 2, wherein a solid material is used as the filling material.
【請求項6】 流体として水を用いた請求項4記載の検
尺錘。
6. The measuring weight according to claim 4, wherein water is used as the fluid.
【請求項7】 前記中空体が球体で構成された請求項
2,3,4,5又は6記載の検尺錘。
7. The scale weight according to claim 2, 3, 4, 5 or 6, wherein the hollow body is a sphere.
【請求項8】 上記支持部材は、中空体の開口部に固着
された筒状のソケットと、ソケットに螺合固定されたプ
ラグと、プラグの螺子切り穴内に螺挿される螺子軸を持
つアイボルトから成る請求項2,3,4,5,6又は7
記載の検尺錘。
8. The support member comprises an eyebolt having a cylindrical socket fixed to an opening of a hollow body, a plug screwed into the socket, and a screw shaft screwed into a threaded hole of the plug. Claims 2, 3, 4, 5, 6 or 7
The scale weight shown.
【請求項9】 鋼球、球体、ソケット、プラグ及びアイ
ボルトの材質としてステンレス鋼を用いた請求項8記載
の検尺錘。
9. The measuring weight according to claim 8, wherein stainless steel is used as a material for the steel ball, sphere, socket, plug and eyebolt.
JP7349396A 1995-12-19 1995-12-19 Weighing scale Expired - Lifetime JP2907769B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7349396A JP2907769B2 (en) 1995-12-19 1995-12-19 Weighing scale

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7349396A JP2907769B2 (en) 1995-12-19 1995-12-19 Weighing scale

Publications (2)

Publication Number Publication Date
JPH09170904A true JPH09170904A (en) 1997-06-30
JP2907769B2 JP2907769B2 (en) 1999-06-21

Family

ID=18403474

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7349396A Expired - Lifetime JP2907769B2 (en) 1995-12-19 1995-12-19 Weighing scale

Country Status (1)

Country Link
JP (1) JP2907769B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014101710A (en) * 2012-11-21 2014-06-05 Kajima Corp Continuous wall construction method
JP2021110133A (en) * 2020-01-09 2021-08-02 大成建設株式会社 Concrete switching confirmation device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6343864B1 (en) * 2017-01-19 2018-06-20 ジャパンパイル株式会社 QUALITY CONTROL DEVICE AND QUALITY CONTROL METHOD FOR PACKED PACK Filled In A Hole Excavated In Ground

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61106539U (en) * 1984-12-20 1986-07-07
JPS62111049U (en) * 1985-12-27 1987-07-15
JPH0652454U (en) * 1992-12-28 1994-07-19 牧 晴司 Weights for fishing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61106539U (en) * 1984-12-20 1986-07-07
JPS62111049U (en) * 1985-12-27 1987-07-15
JPH0652454U (en) * 1992-12-28 1994-07-19 牧 晴司 Weights for fishing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014101710A (en) * 2012-11-21 2014-06-05 Kajima Corp Continuous wall construction method
JP2021110133A (en) * 2020-01-09 2021-08-02 大成建設株式会社 Concrete switching confirmation device

Also Published As

Publication number Publication date
JP2907769B2 (en) 1999-06-21

Similar Documents

Publication Publication Date Title
CN107246006B (en) The pile-filling method of concrete-pile
CN106638719B (en) Bored pile piling quality automatic monitoring controller and method
CN107675734B (en) A kind of underwater directional vehicle construction dynamic monitoring method
Fattah et al. Bearing capacity of closed and open ended pipe piles installed in loose sand with emphasis on soil plug
CN104110028B (en) A kind of dry operation boring is without the cast-in-place pile construction method of water law concrete perfusion
JPS6248009B2 (en)
CN115045270A (en) Method for constructing cast-in-situ bored pile
CN110374094A (en) Construction method of mechanical pore-forming cast-in-place pile
JP2022138557A (en) Low strength sand pile construction method
CN109295981A (en) Water proof stud structure, preparation method and the construction method that bored concrete pile is poured using it
CN113404040A (en) Construction method of bored pile foundation
CN106908349A (en) It is determined that the simple method with sandy gravel maximum dry density of building a dam
JP3807658B2 (en) Underground cavity filling method
CN116180819B (en) A indoor test method for scour protection of pile foundation solidified soil
JP2907769B2 (en) Weighing scale
CN101831910B (en) Construction method of reinforced concrete flange reaming type filling pile
CN103267464A (en) Tool for measuring concrete pouring height
CN108035357A (en) Filling pile construction scheme and its funnel
CN117647467A (en) Fluidized solidified soil fluidity detection device and method
CN111576505A (en) Device and method for testing pile top position of concrete cast-in-place pile
JP2015140609A (en) Hydraulic setting solidification material liquid substitution column construction method, and column construction device used for construction method
CN111175209B (en) Device and method for testing water resistance of pile side grouting fluid while drilling
JP5052010B2 (en) Hollow filler
CN219757347U (en) Plumb bob
JP7719454B2 (en) As-built management method, core material pouring or erection method, as-built management device and core material