JPH09194189A - Jib rising and falling device - Google Patents
Jib rising and falling deviceInfo
- Publication number
- JPH09194189A JPH09194189A JP8097598A JP9759896A JPH09194189A JP H09194189 A JPH09194189 A JP H09194189A JP 8097598 A JP8097598 A JP 8097598A JP 9759896 A JP9759896 A JP 9759896A JP H09194189 A JPH09194189 A JP H09194189A
- Authority
- JP
- Japan
- Prior art keywords
- jib
- rope
- mast
- undulating
- hydraulic cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000000630 rising effect Effects 0.000 title abstract 6
- 230000036544 posture Effects 0.000 description 41
- 238000004804 winding Methods 0.000 description 16
- 238000000034 method Methods 0.000 description 5
- 210000001015 abdomen Anatomy 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000008602 contraction Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 206010034719 Personality change Diseases 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明はクレーン等の建設機
械に装備されるジブを起伏させるジブ起伏装置に関する
ものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jib hoisting device for hoisting a jib mounted on a construction machine such as a crane.
【0002】[0002]
【従来の技術】従来、この種のジブ起伏装置としては、
例えば、図12に示すクローラクレーンに用いられてい
るものがある。2. Description of the Related Art Conventionally, as this type of jib undulating device,
For example, there is one used in the crawler crane shown in FIG.
【0003】クローラ式の下部走行体1には旋回フレー
ムを積載した上部旋回体2が搭載されている。この上部
旋回体2の前方にはラチスジブ3が枢支されており、ラ
チスジブ3の先端には荷が掛けられるフック4が吊り下
げられている。また、上部旋回体2の後方にはマスト5
a,5bからなるAフレーム5が取り付けられている。
このAフレーム5の先端にはベイル6が取り付けられて
おり、また、ライブマスト7の先端にはブライドル8が
取り付けられている。これらベイル6およびブライドル
8間には起伏ロープ9が巻回されており、この起伏ロー
プ9の端部は起伏ドラム10に巻かれている。また、ラ
イブマスト7の先端にはペンダントロープ11の一端が
取り付けられており、このペンダントロープ11の他端
はラチスジブ3の先端に取り付けられている。An upper revolving structure 2 having a revolving frame is mounted on a crawler type lower traveling structure 1. A lattice jib 3 is pivotally supported in front of the upper swing body 2, and a hook 4 for hanging a load is hung at the tip of the lattice jib 3. Further, a mast 5 is provided behind the upper swing body 2.
An A frame 5 consisting of a and 5b is attached.
A bail 6 is attached to the tip of the A frame 5, and a bridle 8 is attached to the tip of the live mast 7. An undulating rope 9 is wound between the bail 6 and the bridle 8, and an end of the undulating rope 9 is wound around an undulating drum 10. Further, one end of the pendant rope 11 is attached to the tip of the live mast 7, and the other end of the pendant rope 11 is attached to the tip of the lattice jib 3.
【0004】このような構成において、起伏ドラム10
に起伏ロープ9が巻き取られることにより、ブライドル
8はベイル6側に引き寄せられ、ブライドル8およびベ
イル6間の距離が縮められる。このため、ライブマスト
7がAフレーム5側に引っ張られ、これに連れてペンダ
ントロープ11もAフレーム5側に引っ張られる。この
結果、ラチスジブ3がペンダントロープ11に引っ張ら
れて引き起こされ、ラチスジブ3が起伏される。ラチス
ジブ3が起伏されることにより、クレーンの作業半径R
が調節される。なお、フック4に掛けられる荷は、巻上
げロープ12が主巻ドラム13や補巻ドラム14に巻き
取られることにより、吊り上げ下げされる。また、第三
ドラム15は図示しない補助ジブ巻上げロープ等を巻き
取るものである。In such a structure, the undulating drum 10
By winding the up-and-down rope 9 around the bridle 8, the bridle 8 is pulled toward the bail 6, and the distance between the bridle 8 and the bail 6 is shortened. Therefore, the live mast 7 is pulled to the A frame 5 side, and the pendant rope 11 is also pulled to the A frame 5 side accordingly. As a result, the lattice jib 3 is pulled and caused by the pendant rope 11, and the lattice jib 3 is undulated. When the lattice jib 3 is undulated, the working radius R of the crane is increased.
Is adjusted. The load to be hooked on the hook 4 is hoisted by winding the hoisting rope 12 around the main winding drum 13 and the auxiliary winding drum 14. The third drum 15 is for winding an unillustrated auxiliary jib hoisting rope or the like.
【0005】ライブマスト7は、ラチスジブ3にさらに
図示しないラフィングジブといったジブをつなぎ、ジブ
全長を長くして作業半径Rを大きくする際に使用され
る。作業半径Rをこのように大きくしなくてもよい場合
には、ライブマスト7は使用されない。この場合には、
図13に示すようにブライドル8はペンダントロープ1
1に直接取り付けられる。なお、同図において図12と
同一部分には同一符号を付してその説明は省略する。The live mast 7 is used to further connect a jib such as a luffing jib (not shown) to the lattice jib 3 to lengthen the entire length of the jib and increase the working radius R. If the working radius R does not have to be increased in this way, the live mast 7 is not used. In this case,
As shown in FIG. 13, the bridle 8 is a pendant rope 1.
Attached directly to 1. In the figure, the same parts as those in FIG. 12 are designated by the same reference numerals and the description thereof will be omitted.
【0006】また、このようにラチスジブ3の先端をペ
ンダントロープ11で支持するラチスジブ式クレーンに
おいて、クレーン機体の姿勢を変更するには、起伏ドラ
ム10に巻き取られた起伏ロープ9が繰り出され、ラチ
スジブ3が一旦地上に降ろされる。そして、ラチスジブ
3が必要な長さのジブに分割された後、図14に示すよ
うにブライドル8が例えば下部基本ジブ3aの遊動端に
取り付けられる。なお、同図において図12および図1
3と同一部分には同一符号を付してその説明は省略す
る。この状態で起伏ロープ9が起伏ドラム10に巻き取
られると、ブライドル8およびベイル6間の距離が縮ま
り、下部基本ジブ3aが持ち上げられる。この結果、機
体の姿勢は、図12および図13に示す作業姿勢から同
図に示す輸送姿勢に変更される。Further, in the lattice jib type crane in which the tip of the lattice jib 3 is supported by the pendant rope 11, in order to change the posture of the crane body, the undulating rope 9 wound around the undulating drum 10 is fed out, and the lattice jib is extended. 3 is once dropped to the ground. Then, after the lattice jib 3 is divided into the necessary length of jib, the bridle 8 is attached to, for example, the floating end of the lower basic jib 3a as shown in FIG. Incidentally, in FIG. 12 and FIG.
The same parts as those in 3 are assigned the same reference numerals and explanations thereof will be omitted. When the undulating rope 9 is wound around the undulating drum 10 in this state, the distance between the bridle 8 and the bail 6 is reduced, and the lower basic jib 3a is lifted. As a result, the attitude of the machine body is changed from the working attitude shown in FIGS. 12 and 13 to the transportation attitude shown in FIG.
【0007】[0007]
【発明が解決しようとする課題】上記従来のジブ起伏装
置においては、ブライドル8およびベイル6間で多数の
シーブに掛け回された起伏ロープ9が起伏ドラム10に
巻き取られたり、巻き出されることにより、ラチスジブ
3が上述したように起伏されている。従って、起伏ロー
プ9は多数のシーブと擦り合い、傷みやすい。また、起
伏ロープ9が起伏ドラム10に巻き取られる際、規則正
しく起伏ドラム10に巻き取られず、乱れて起伏ドラム
10に巻き取られることもある。起伏ロープ9がこのよ
うに乱巻されると起伏ロープ9は傷みやすい。このた
め、上記従来のジブ起伏装置の構成においては、起伏ロ
ープ9が疲労して耐久性が低下し、切れてしまうことも
ある。起伏ロープ9が切れてしまうとラチスジブ3を支
持するものがなくなり、ラチスジブ3が倒れて大事故が
発生する。In the above-mentioned conventional jib hoisting device, hoisting ropes 9 wound around a large number of sheaves between bridle 8 and bail 6 are wound or unwound on hoisting drum 10. Thus, the lattice jib 3 is undulated as described above. Therefore, the undulating rope 9 rubs against many sheaves and is easily damaged. Further, when the undulating rope 9 is wound around the undulating drum 10, the undulating rope 9 may not be regularly wound around the undulating drum 10, but may be disorderly wound around the undulating drum 10. When the undulating rope 9 is wound around in this manner, the undulating rope 9 is easily damaged. Therefore, in the configuration of the conventional jib hoisting device, the hoisting rope 9 may be fatigued and its durability may be deteriorated, resulting in breakage. If the undulating rope 9 breaks, there will be nothing to support the lattice jib 3 and the lattice jib 3 will collapse and a major accident will occur.
【0008】[0008]
【課題を解決するための手段】本発明はこのような課題
を解決するためになされたもので、旋回フレームに枢支
されたジブに一端が取り付けられたペンダントロープを
備え、このペンダントロープの他端を引っ張ることによ
ってジブを起伏させるジブ起伏装置において、一端が旋
回フレームに枢支され、遊動する他端にペンダントロー
プの他端が取り付けられたマストと、一端が旋回フレー
ム,他端がこのマストにそれぞれ枢支され、伸縮するこ
とによって上記マストを起伏させるシリンダとを備え、
ジブ起伏装置を構成した。The present invention has been made to solve the above problems, and includes a pendant rope having one end attached to a jib pivotally supported by a swing frame. In a jib hoisting device for hoisting a jib by pulling the end, one end is pivotally supported by the swivel frame, and the other end of the floating is attached to the other end of the pendant rope, one end is the swivel frame, and the other end is this mast. And a cylinder for undulating the mast by expanding and contracting,
The jib undulating device was constructed.
【0009】また、上記マストの遊動端に巻上げロープ
をガイドするシーブを備えた。A sheave for guiding the hoisting rope is provided at the free end of the mast.
【0010】また、一端が、ジブから取り外された上記
ペンダントロープの一端に接続され、他端が、輸送姿勢
に分割されて旋回フレームの前部に残るジブの遊動端に
接続される所定長の延長ロープと、一端が上記マストお
よびシリンダの連結部に接続され、他端が旋回フレーム
の後部に接続される所定長の姿勢保持ロープとをさらに
上記のジブ起伏装置に備え、かつ、上記マストを伸縮自
在なリンクによって構成した。Further, one end is connected to one end of the pendant rope detached from the jib, and the other end is connected to a floating end of the jib which is divided into a transportation posture and remains at the front part of the swing frame. An extension rope and an attitude holding rope having a predetermined length, one end of which is connected to the connecting portion of the mast and the cylinder and the other end of which is connected to the rear portion of the revolving frame, are further provided in the jib hoisting device, and the mast is provided. Composed of elastic links.
【0011】また、上記マストの一端を、旋回フレーム
に代え、それぞれの一端が旋回フレームに枢支されたリ
ンクおよび第2のシリンダの各他端の連結部に枢支させ
る構成とした。Further, one end of the mast is replaced with a revolving frame, and one end of each of the masts is pivotally supported by a link pivotally supported by the revolving frame and a connecting portion of each of the other ends of the second cylinders.
【0012】このような構成によれば、シリンダが伸縮
することによってマストが起伏し、マストが起伏するこ
とによってペンダントロープが引っ張られ、ジブは従来
の起伏ロープおよび起伏ドラムを用いることなく起伏さ
せられる。According to such a construction, the mast is undulated by the expansion and contraction of the cylinder, and the pendant rope is pulled by the mast undulation, and the jib is undulated without using the conventional undulating rope and undulating drum. .
【0013】また、マストにシーブを備えることによ
り、旋回フレーム側からジブ先端に巻上げロープがガイ
ドされ、フック巻上げ経路が形成される。Further, by providing the sheave on the mast, the hoisting rope is guided from the turning frame side to the tip of the jib, and a hook hoisting path is formed.
【0014】また、シリンダを縮めてジブを地面に預
け、ペンダントロープの一端をジブから取り外す。そし
て、取り外したペンダントロープの一端に延長ロープの
一端を接続し、輸送姿勢に分割されて旋回フレームの前
部に残ったジブの遊動端にこの延長ロープの他端を接続
する。次に、シリンダを伸ばし、ペンダントロープおよ
び延長ロープで支えながらシリンダを旋回フレームの後
方へ傾ける。次に、マストを伸縮自在な状態とし、シリ
ンダをその自重によって旋回フレームの後方へ倒しなが
ら、シリンダおよびマストを縮める。これらを縮めると
シリンダおよびマストの連結部が旋回フレームの後部に
近づくため、この連結部と旋回フレームの後部との間に
姿勢保持ロープを接続する。この状態でシリンダを伸ば
すことにより、シリンダの先端は姿勢保持ロープに規制
されながら旋回フレームの後方へ回動する。従って、旋
回フレームの前部に残るジブの遊動端は、シリンダおよ
び姿勢保持ロープの連結部に接続されたペンダントロー
プおよび延長ロープに引っ張られて地面から持ち上げら
れ、機体の姿勢は作業姿勢から輸送姿勢へ変更される。Further, the cylinder is contracted to deposit the jib on the ground, and one end of the pendant rope is removed from the jib. Then, one end of the extension rope is connected to one end of the removed pendant rope, and the other end of the extension rope is connected to the floating end of the jib which is divided in the transportation posture and remains in the front portion of the swing frame. Then, extend the cylinder and tilt the cylinder rearward of the swivel frame, supporting it with the pendant rope and extension rope. Next, the mast is allowed to expand and contract, and the cylinder and the mast are contracted while the cylinder is tilted to the rear of the revolving frame by its own weight. When they are contracted, the connecting portion of the cylinder and the mast approaches the rear portion of the revolving frame, so that the posture holding rope is connected between this connecting portion and the rear portion of the revolving frame. By extending the cylinder in this state, the tip of the cylinder rotates rearward of the revolving frame while being regulated by the posture holding rope. Therefore, the floating end of the jib remaining in the front part of the swing frame is pulled by the pendant rope and the extension rope connected to the connecting portion of the cylinder and the attitude holding rope to be lifted from the ground, and the attitude of the aircraft changes from the working attitude to the transportation attitude. Is changed to.
【0015】輸送姿勢から作業姿勢への機体の姿勢変更
はこの逆の手順で行われる。The attitude change of the machine body from the transport attitude to the work attitude is performed in the reverse procedure.
【0016】また、マストの一端を、旋回フレームに代
えてリンクおよび第2のシリンダの連結部に枢支させ、
第2のシリンダを伸縮させると、リンクおよび第2のシ
リンダの連結部、つまりマストの枢支点は旋回フレーム
の前後に移動する。従って、第2のシリンダを伸縮さ
せ、マストの枢支点を旋回フレームの後方に移動させる
と、起伏シリンダを伸長させることなく、ジブは、マス
トの枢支点が後方へ移動する量に応じた分だけ起き上が
る。よって、ジブが最高位置まで起き上がるのに要する
起伏シリンダの伸長量は少なくて済む。Further, one end of the mast is pivotally supported on the link and the connecting portion of the second cylinder instead of the swing frame.
When the second cylinder is expanded or contracted, the link between the link and the second cylinder, that is, the pivot of the mast moves to the front and the rear of the swing frame. Therefore, when the second cylinder is expanded / contracted and the pivot point of the mast is moved to the rear of the revolving frame, the jib is moved by the amount by which the pivot point of the mast is moved backward without extending the undulating cylinder. get up. Therefore, the amount of extension of the undulating cylinder required for the jib to rise to the highest position can be small.
【0017】また、マストの枢支点が旋回フレームの後
方へ移動すると、マストと起伏シリンダとの成す角度は
大きくなる。マストと起伏シリンダとの連結部にペンダ
ントロープから同じ力が作用しても、この角度が大きい
方がマストと起伏シリンダのそれぞれに加わるモーメン
ト力は小さくなる。When the pivot of the mast moves to the rear of the revolving frame, the angle formed by the mast and the undulating cylinder becomes large. Even if the same force is applied from the pendant rope to the connecting portion between the mast and the undulating cylinder, the larger the angle, the smaller the moment force applied to each of the mast and the undulating cylinder.
【0018】[0018]
【発明の実施の形態】次に、本発明によるジブ起伏装置
をクローラクレーンに適用した第1の実施形態について
説明する。BEST MODE FOR CARRYING OUT THE INVENTION Next, a first embodiment in which the jib hoisting device according to the present invention is applied to a crawler crane will be described.
【0019】図1は本実施形態によるジブ起伏装置を備
えたクローラクレーンの側面図である。クローラ式走行
体21には上部旋回体22が搭載されており、この上部
旋回体22の全機構は一部が図示された旋回フレーム3
0に積載されている。上部旋回体22の前方において、
ラチスジブ23はこの旋回フレーム30に起伏自在に枢
支されている。ラチスジブ23の先端には主巻上げロー
プ24によって主フック25が吊り下げられている。ま
た、補巻上げロープ26によって副フックが吊り下げら
れている。この副フックは同図において主フック25の
陰になっており、図面には現れていない。主巻上げロー
プ24は上部旋回体22に積載された主巻ドラム27に
巻き取られ、補巻上げロープ26は補巻ドラム28に巻
き取られる。FIG. 1 is a side view of a crawler crane having a jib undulating device according to this embodiment. An upper revolving structure 22 is mounted on the crawler-type traveling body 21, and the entire mechanism of the upper revolving structure 22 is partly illustrated in the revolving frame 3
It is loaded with 0. In front of the upper swing body 22,
The lattice jib 23 is rotatably supported on the swivel frame 30. A main hook 25 is suspended by a main hoisting rope 24 at the tip of the lattice jib 23. Further, the auxiliary hook is suspended by the auxiliary hoisting rope 26. This sub-hook is behind the main hook 25 in the figure and is not shown in the drawing. The main hoisting rope 24 is wound on the main hoisting drum 27 loaded on the upper swing body 22, and the auxiliary hoisting rope 26 is wound on the auxiliary hoisting drum 28.
【0020】また、上部旋回体22の後方には起伏マス
ト29が設けられている。この起伏マスト29の一端は
旋回フレーム30に枢支されている。起伏マスト29の
他端はこの枢支点を中心に遊動し、この遊動端にはペン
ダントロープ31の一端が取り付けられている。ペンダ
ントロープ31の他端はラチスジブ23の先端に取り付
けられている。また、起伏マスト29のジブ側中腹部上
方には油圧シリンダ32のロッド端が枢支されており、
そのチューブ端は、ラチスジブ23と起伏マスト29と
の間の旋回フレーム30に枢支されている。この油圧シ
リンダ32は送油されることによって自在に伸縮する。
本実施形態によるジブ起伏装置は、上記の起伏マスト2
9,油圧シリンダ32およびペンダントロープ31によ
って構成されている。An undulating mast 29 is provided behind the upper revolving structure 22. One end of the undulating mast 29 is pivotally supported on the swivel frame 30. The other end of the undulating mast 29 floats around this pivot point, and one end of a pendant rope 31 is attached to this floating end. The other end of the pendant rope 31 is attached to the tip of the lattice jib 23. The rod end of the hydraulic cylinder 32 is pivotally supported above the jib-side middle abdomen of the undulating mast 29.
The tube end is pivotally supported on a swivel frame 30 between the lattice jib 23 and the undulating mast 29. The hydraulic cylinder 32 freely expands and contracts by being fed with oil.
The jib undulating device according to the present embodiment is provided with the undulating mast 2 described above.
9, a hydraulic cylinder 32 and a pendant rope 31.
【0021】また、起伏マスト29の遊動端には第1の
ガイドシーブ33が枢着されており、また、その中腹部
裏側には第2のガイドシーブ34が枢着されている。こ
れらガイドシーブ33,34には補助ジブ巻上げロープ
35が掛けられている。この補助ジブ巻上げロープ35
の一端は上部旋回体22に積載された第三巻ドラム36
に巻かれており、その他端は、ラチスジブ23の先端に
設けられる図示しない補助ジブに導かれる。A first guide sheave 33 is pivotally attached to the free end of the undulating mast 29, and a second guide sheave 34 is pivotally attached to the back side of the middle abdomen. An auxiliary jib winding rope 35 is hung on these guide sheaves 33 and 34. This auxiliary jib hoisting rope 35
One end of the third winding drum 36 loaded on the upper swing body 22.
The other end is guided to an auxiliary jib (not shown) provided at the tip of the lattice jib 23.
【0022】図2は上述した本実施形態によるジブ起伏
装置の詳細を示している。同図(a)は図1に示すクロ
ーラクレーンの側面図であり、同図(b)は矢示のB方
向からペンダントロープ31を見た図である。また、同
図(c)は矢示のC方向から油圧シリンダ32を見た図
であり、同図(d)は矢示のD方向から起伏マスト29
を見た図である。FIG. 2 shows details of the jib undulating apparatus according to the present embodiment described above. 1A is a side view of the crawler crane shown in FIG. 1, and FIG. 1B is a view of the pendant rope 31 viewed from the direction B shown by the arrow. Further, FIG. 7C is a view of the hydraulic cylinder 32 seen from the C direction shown by the arrow, and FIG. 8D shows the undulating mast 29 from the D direction shown by the arrow.
It is the figure which looked at.
【0023】同図(b)に示すように、ペンダントロー
プ31は一対となって張られている。各ペンダントロー
プ31の一端は、起伏マスト29の遊動する先端両脇に
おいてピン41,42によって取り付けられており、他
端はラチスジブ23の先端両脇においてピン43,44
によって取り付けられている。また、各ペンダントロー
プ31間には補助ジブ巻上げロープ35が張られてい
る。この補助ジブ巻上げロープ35は、起伏マスト29
側において第1のガイドシーブ33に掛けられ、ラチス
ジブ23の先端側においてジブポイントアイドラシーブ
45に掛けられている。As shown in FIG. 2B, the pendant ropes 31 are stretched in pairs. One end of each pendant rope 31 is attached by pins 41, 42 on both sides of the free end of the undulating mast 29, and the other end is attached by pins 43, 44 on both sides of the tip of the lattice jib 23.
Installed by. An auxiliary jib winding rope 35 is stretched between the pendant ropes 31. This auxiliary jib hoisting rope 35 is provided with an undulating mast 29.
It is hung on the first guide sheave 33 on the side, and is hung on the jib point idler sheave 45 on the tip side of the lattice jib 23.
【0024】また、同図(c)に示すように、油圧シリ
ンダ32も一対設けられている。各油圧シリンダ32の
チューブ端は旋回フレーム30の側においてピン46,
47によって枢支されており、そのロッド端は起伏マス
ト29のジブ側中腹部上方においてピン48,49によ
って枢支されている。A pair of hydraulic cylinders 32 are also provided, as shown in FIG. The tube end of each hydraulic cylinder 32 has pins 46,
It is pivoted by 47, and the rod end thereof is pivoted by pins 48, 49 above the jib-side middle abdomen of the undulating mast 29.
【0025】また、同図(d)に示すように、起伏マス
ト29は旋回フレーム30側の端部が二股に分かれてお
り、その端部はピン50,51によって旋回フレーム3
0に枢支されている。また、起伏マスト29の中腹部裏
側には、補助ジブ巻上げロープ35が掛けられた第2の
ガイドシーブ34が設けられている。Further, as shown in FIG. 3D, the undulating mast 29 has a bifurcated end on the side of the revolving frame 30, and the end of the revolving mast 29 is pinned by pins 50 and 51.
It is pivoted to zero. A second guide sheave 34 around which an auxiliary jib hoisting rope 35 is hung is provided on the back side of the abdomen of the undulating mast 29.
【0026】図3は本実施形態によるジブ起伏装置によ
ってラチスジブ23が起伏される様子を示す側面図であ
る。なお、同図において図1と同一部分には同一符号を
付してその説明は省略する。ラチスジブ23は位置Aの
水平状態で組み立ておよび分解が通常行われる。この位
置Aで組み立てられたラチスジブ23は、油圧シリンダ
32が伸ばされてマスト29が起こされることにより、
ペンダントロープ31が引っ張られて位置Bまで引き起
こされる。ラチスジブ23は最大位置Cまで引き起こさ
れる。作業範囲aにおいては、油圧シリンダ32を伸縮
させることによってラチスジブ23の引き起こし角度が
調整され、作業半径Rは所望の大きさに設定される。な
お、範囲bはブーム引き起こし範囲であり、クレーン組
み立てに必要な範囲であってこの範囲ではクレーン作業
は行われない。FIG. 3 is a side view showing a state in which the lattice jib 23 is undulated by the jib undulating device according to this embodiment. In this figure, the same parts as those in FIG. 1 are denoted by the same reference numerals, and the description thereof will be omitted. The lattice jib 23 is normally assembled and disassembled in the horizontal position A. In the lattice jib 23 assembled at this position A, the hydraulic cylinder 32 is extended and the mast 29 is raised,
The pendant rope 31 is pulled and raised to the position B. The lattice jib 23 is raised to the maximum position C. In the working range a, the raising angle of the lattice jib 23 is adjusted by expanding and contracting the hydraulic cylinder 32, and the working radius R is set to a desired size. It should be noted that the range b is a range in which the boom is raised and is a range necessary for assembling the crane, and the crane work is not performed in this range.
【0027】このような本実施形態によるジブ起伏装置
によれば、上記のように、油圧シリンダ32が伸縮する
ことによってマスト29が起伏し、マスト29が起伏す
ることによってペンダントロープ31が引っ張られ、ラ
チスジブ23が引き起こされる。従って、本実施形態に
おいては、ラチスジブ23は従来の起伏ロープおよび起
伏ドラムを用いることなく起伏させられる。このため、
本実施形態によるジブ起伏装置においては、従来のよう
に、起伏ロープの磨耗や傷みによって起伏ロープが切れ
るといった事態を生じることはない。According to the jib hoisting device of this embodiment, as described above, the mast 29 is hoisted by the expansion and contraction of the hydraulic cylinder 32, and the pendant rope 31 is pulled by the hoisting of the mast 29. Lattice jib 23 is triggered. Therefore, in this embodiment, the lattice jib 23 is undulated without using the conventional undulating rope and undulating drum. For this reason,
In the jib hoisting device according to the present embodiment, unlike the conventional case, a situation in which the hoisting rope is cut due to wear or damage of the hoisting rope does not occur.
【0028】また、起伏マスト29にシーブ33,34
を備えることにより、補助ジブ巻上げロープ35はこれ
らシーブ33,34によって旋回フレーム30側からラ
チスジブ23の先端までガイドされる。従って、補助フ
ック巻上げ経路が形成され、補助ジブ巻上げロープ35
が第三巻ドラム36に巻き取られることにより、図示し
ない補助フックが吊り上げ下げされる。Further, the sheaves 33, 34 are attached to the undulating mast 29.
With the provision of, the auxiliary jib hoisting rope 35 is guided by the sheaves 33 and 34 from the turning frame 30 side to the tip of the lattice jib 23. Therefore, the auxiliary hook winding path is formed, and the auxiliary jib winding rope 35
Is wound around the third winding drum 36, and an auxiliary hook (not shown) is hung up.
【0029】なお、上記実施形態では本発明によるジブ
起伏装置をクローラクレーンに適用した場合について説
明したが、本発明はこれに限定されることはない。例え
ば、トラッククレーン,フローティングクレーン等の移
動式クレーンをはじめ、固定式クレーンといった建設機
械にも適用することが可能であり、この場合においても
上記実施形態と同様な効果が奏される。In the above embodiment, the case where the jib hoisting device according to the present invention is applied to a crawler crane has been described, but the present invention is not limited to this. For example, it can be applied to construction machines such as fixed cranes as well as mobile cranes such as truck cranes and floating cranes, and in this case, the same effects as those of the above-described embodiment can be obtained.
【0030】次に、本発明によるジブ起伏装置をクロー
ラクレーンに適用した第2の実施形態について説明す
る。Next, a second embodiment in which the jib hoisting device according to the present invention is applied to a crawler crane will be described.
【0031】図4は本実施形態によるジブ起伏装置が適
用されるクローラクレーンの側面図である。本実施形態
によるクローラクレーンおいても、クローラ式走行体6
1に上部旋回体62が搭載されている。上部旋回体62
の前部においては、ラチスジブ63が図示しない旋回フ
レームに起伏自在に枢支されている。このラチスジブ6
3は、下部基本ジブ63aと上部基本ジブ63bとから
構成されている。図示の状態では、ラチスジブ63は最
高の位置まで引き起こされている。FIG. 4 is a side view of a crawler crane to which the jib hoisting device according to this embodiment is applied. Also in the crawler crane according to the present embodiment, the crawler type traveling body 6
The upper revolving structure 62 is mounted on 1. Upper swing body 62
At the front portion of the, a lattice jib 63 is pivotally supported by a swivel frame (not shown) so as to be up and down. This lattice jib 6
3 comprises a lower basic jib 63a and an upper basic jib 63b. In the illustrated state, the lattice jib 63 is raised to the highest position.
【0032】また、上部旋回体62の後方には起伏マス
トを構成するリンク64が設けられている。このリンク
64はピンの抜き差し等によって自在に伸縮させること
が出来る。折り畳むことによって伸縮自在な構成として
もよい。リンク64の一端は旋回フレームに枢支されて
おり、リンク64の他端はこの枢支点を中心に遊動す
る。この遊動端にはペンダントロープ65の一端が取り
付けられており、ペンダントロープ65の他端はラチス
ジブ63の先端に設けられたブラケット66に取り付け
られている。この取り付けは通常連結ピンによって行わ
れている。また、リンク64の遊動端には油圧シリンダ
67のロッド端が枢支されており、そのチューブ端は、
ラチスジブ63とリンク64との間の旋回フレームに枢
支されている。この油圧シリンダ67は送油によって自
在に伸縮する。Further, a link 64 which constitutes an undulating mast is provided behind the upper swing body 62. The link 64 can be freely expanded and contracted by inserting and removing pins. It may be configured to be stretchable by folding. One end of the link 64 is pivotally supported by the swivel frame, and the other end of the link 64 floats around this pivot point. One end of the pendant rope 65 is attached to the floating end, and the other end of the pendant rope 65 is attached to a bracket 66 provided at the tip of the lattice jib 63. This attachment is usually done by connecting pins. Further, the rod end of the hydraulic cylinder 67 is pivotally supported on the floating end of the link 64, and the tube end thereof is
It is pivotally supported on a swivel frame between the lattice jib 63 and the link 64. The hydraulic cylinder 67 freely expands and contracts by feeding oil.
【0033】なお、フックや巻上げロープ等は上述した
実施形態と同様にクレーンに装備されているが、同図で
はこれらが省略されている。The hook, the hoisting rope and the like are mounted on the crane as in the above-mentioned embodiment, but they are omitted in the figure.
【0034】このような本実施形態でも、上記実施形態
と同様、油圧シリンダ67が伸縮することによってリン
ク64が起伏し、リンク64が起伏することによってペ
ンダントロープ65が引っ張られ、ラチスジブ63が引
き起こされる。従って、本実施形態においても、ラチス
ジブ63は従来の起伏ロープおよび起伏ドラムを用いる
ことなく起伏させられ、従来のように、起伏ロープの磨
耗や傷みによって起伏ロープが切れるといった事態を生
じることはない。In this embodiment, as in the above embodiment, the hydraulic cylinder 67 expands and contracts to undulate the link 64, and the undulation of the link 64 pulls the pendant rope 65 to cause the lattice jib 63. . Therefore, also in the present embodiment, the lattice jib 63 is raised and lowered without using the conventional undulating rope and the undulating drum, and the situation in which the undulating rope is cut by abrasion or damage of the undulating rope unlike the conventional case does not occur.
【0035】本実施形態によるジブ起伏装置は、起伏マ
ストが伸縮自在なリンク64によって構成されているの
に加え、後述する所定長の延長ロープ68および姿勢保
持ロープ69がさらに備えられている点が、上述した第
1の実施形態によるジブ起伏装置と相違している。この
ような本実施形態によるジブ起伏装置によれば、クレー
ンの機体姿勢の変更が安全かつ簡易に行える。次に、図
5〜図8を参照し、クレーンの作業姿勢から輸送姿勢へ
の変更手順について説明する。The jib hoisting device according to the present embodiment is configured such that, in addition to the hoisting mast being constituted by the expandable link 64, an extension rope 68 and a posture holding rope 69 having a predetermined length which will be described later are further provided. , Which is different from the jib undulating device according to the first embodiment described above. According to the jib hoisting device according to the present embodiment as described above, the posture of the crane can be changed safely and easily. Next, a procedure for changing the working posture of the crane to the transporting posture will be described with reference to FIGS.
【0036】クレーンの輸送時には、まず、図4に示す
作業姿勢において油圧シリンダ67が縮められ、ラチス
ジブ63が機体前方に倒され、図5に示すように地面7
0に預けられる。次に、ブラケット66とペンダントロ
ープ65とを連結するピンが抜かれ、ラチスジブ63の
先端に取り付けられたペンダントロープ65の一端が外
される。When the crane is transported, first, in the work posture shown in FIG. 4, the hydraulic cylinder 67 is contracted, the lattice jib 63 is tilted forward of the machine, and the ground 7 is moved as shown in FIG.
Deposited at 0. Next, the pin connecting the bracket 66 and the pendant rope 65 is pulled out, and one end of the pendant rope 65 attached to the tip of the lattice jib 63 is removed.
【0037】次に、クレーン作業時に保管されていた延
長ロープ68の一端が、ジブ先端から取り外されたこの
ペンダントロープ65の一端に接続される。そして、延
長ロープ68の他端が図6に示すように、輸送姿勢に分
割されて旋回フレームの前部に残った下部基本ジブ63
aの遊動端に接続される。この接続は、下部基本ジブ6
3aの遊動端に設けられたブラケット71に連結ピンが
挿入されることによって行われる。クレーンの輸送時に
は下部基本ジブ63aのみが機体に残されることが通常
最も多いため、本実施形態では下部基本ジブ63aに延
長ロープ68が接続されている。Next, one end of the extension rope 68 stored at the time of crane work is connected to one end of this pendant rope 65 removed from the tip of the jib. Then, as shown in FIG. 6, the other end of the extension rope 68 is divided into the transportation postures, and the lower basic jib 63 left in the front part of the swing frame is left.
It is connected to the floating end of a. This connection is for the lower basic jib 6
This is performed by inserting a connecting pin into a bracket 71 provided at the floating end of 3a. In most cases, only the lower basic jib 63a is left on the airframe during transportation of the crane. Therefore, the extension rope 68 is connected to the lower basic jib 63a in this embodiment.
【0038】次に、クレーン作業時に延長ロープ68と
共に保管されていた姿勢保持ロープ69の一端が、リン
ク64と油圧シリンダ67との連結部に接続される。こ
の際、吊り下げられた姿勢保持ロープ69の他端は遊動
する状態にある。次に、油圧シリンダ67が伸ばされ
る。この油圧シリンダ67の伸長により、リンク64と
油圧シリンダ67との連結部は、リンク64と旋回フレ
ームとの枢支点を中心とし、リンク64の長さを半径と
する円弧に沿って機体後方へ回動する。リンク64と油
圧シリンダ67との連結部のこの回動により、ペンダン
トロープ65および延長ロープ68は機体後方へ引っ張
られ、下部基本ジブ63aが地面70を離れる直前の図
6に示す状態となる。Next, one end of the posture holding rope 69 stored together with the extension rope 68 during the crane work is connected to the connecting portion between the link 64 and the hydraulic cylinder 67. At this time, the other end of the suspended posture holding rope 69 is in a floating state. Next, the hydraulic cylinder 67 is extended. Due to the extension of the hydraulic cylinder 67, the connecting portion between the link 64 and the hydraulic cylinder 67 rotates rearward of the machine body along an arc having a radius of the length of the link 64 with the pivot point of the link 64 and the swing frame as the center. Move. By this rotation of the connecting portion between the link 64 and the hydraulic cylinder 67, the pendant rope 65 and the extension rope 68 are pulled toward the rear of the machine, and the state shown in FIG. 6 immediately before the lower basic jib 63 a leaves the ground 70 is obtained.
【0039】延長ロープ68は、この状態で、油圧シリ
ンダ67がその自重で機体後方へ十分に倒れる位置に達
する所定長さに設定されている。また、この際油圧シリ
ンダ67は、ペンダントロープ65および延長ロープ6
8の各長さの和とリンク64の長さとの比によって決ま
る一定角度に倒れる位置まで伸ばされる。In this state, the extension rope 68 is set to a predetermined length so that the hydraulic cylinder 67 reaches a position where the hydraulic cylinder 67 is sufficiently tilted rearward of the machine body due to its own weight. Further, at this time, the hydraulic cylinder 67 includes the pendant rope 65 and the extension rope 6
It is extended to a position where it falls at a constant angle determined by the ratio of the sum of the lengths of 8 and the length of the link 64.
【0040】次に、リンク64の長さを固定しているピ
ンが抜かれ、その長さが変えられる状態にされる。次
に、油圧シリンダ67が縮められる。油圧シリンダ67
は、ペンダントロープ65および延長ロープ68に支え
られながらその自重によって機体後方へ倒れる。この際
リンク64は油圧シリンダ67の自重によって同時に縮
められる。油圧シリンダ67は、姿勢保持ロープ69の
遊動端が機体本体の旋回フレームに設けられた接続部7
2に届く図7に示す位置までさらに縮められる。そし
て、姿勢保持ロープ69の遊動端がこの接続部72に連
結される。Next, the pin that fixes the length of the link 64 is pulled out, and the length is changed. Next, the hydraulic cylinder 67 is contracted. Hydraulic cylinder 67
While being supported by the pendant rope 65 and the extension rope 68, the vehicle falls rearward due to its own weight. At this time, the link 64 is simultaneously contracted by the weight of the hydraulic cylinder 67. In the hydraulic cylinder 67, the free end of the posture holding rope 69 is connected to the connecting portion 7 provided on the swing frame of the machine body.
It is further contracted to the position shown in FIG. Then, the free end of the posture holding rope 69 is connected to the connecting portion 72.
【0041】次に、油圧シリンダ67が伸ばされる。こ
の油圧シリンダ67の伸長により、油圧シリンダ67お
よび姿勢保持ロープ69の連結部は、姿勢保持ロープ6
9の旋回フレームへの接続部72を中心とし、姿勢保持
ロープ69の長さを半径とする円弧に沿って機体後方へ
回動する。この際リンク64は油圧シリンダ67の伸長
と同時に伸びる。従って、機体前部にある下部基本ジブ
63aの遊動端は、この連結部に接続されたペンダント
ロープ65および延長ロープ68に引っ張られて地面7
0から持ち上げられる。この結果、クレーンの機体の姿
勢は作業姿勢から輸送姿勢へ変更される。Next, the hydraulic cylinder 67 is extended. Due to the extension of the hydraulic cylinder 67, the connecting portion between the hydraulic cylinder 67 and the posture holding rope 69 is changed to the posture holding rope 6.
Around the connecting portion 72 to the turning frame of 9, the posture holding rope 69 is turned rearward along the arc having the length as the radius. At this time, the link 64 extends simultaneously with the extension of the hydraulic cylinder 67. Therefore, the floating end of the lower basic jib 63a at the front of the machine is pulled by the pendant rope 65 and the extension rope 68 connected to this connecting portion and the ground 7
Lifted from zero. As a result, the attitude of the crane body is changed from the working attitude to the transportation attitude.
【0042】一方、輸送姿勢から作業姿勢への機体姿勢
の変更は、上述した手順の逆の手順に従って行われる。On the other hand, the change of the body posture from the transport posture to the working posture is performed in the reverse order of the above-mentioned procedure.
【0043】つまり、輸送姿勢から作業姿勢への姿勢変
更に際しては、まず油圧シリンダ67が縮められ、図8
に示す持ち上げられた下部基本ジブ63aが、図7に示
すように地面70に預けられる。次に、姿勢保持ロープ
69と機体本体の接続部72との連結が解かれ、姿勢保
持ロープ69が取り外された後、油圧シリンダ67が伸
ばされる。油圧シリンダ67のこの伸長作業の途中、リ
ンク64にピンが挿入され、多段構成のリンク64の長
さが順に固定されていく。リンク64の長さのこの固定
処理は、リンク64へのピン挿入位置が作業台よりあま
り高くならない作業容易な位置で行われる。リンク64
の長さが最大となった時点でリンク64の長さは最終的
に固定され、図6に示す状態となる。That is, when changing the posture from the transportation posture to the working posture, first, the hydraulic cylinder 67 is contracted, and as shown in FIG.
The lifted lower basic jib 63a shown in FIG. 7 is deposited on the ground 70 as shown in FIG. Next, the posture holding rope 69 and the connecting portion 72 of the machine body are disconnected, the posture holding rope 69 is removed, and then the hydraulic cylinder 67 is extended. During the extension work of the hydraulic cylinder 67, a pin is inserted into the link 64, and the length of the multistage link 64 is fixed in order. This fixing process of the length of the link 64 is performed at an easy-to-work position where the pin insertion position on the link 64 does not become much higher than the workbench. Link 64
The length of the link 64 is finally fixed when the length becomes maximum, and the state shown in FIG. 6 is obtained.
【0044】次に、油圧シリンダ67が縮められ、油圧
シリンダ67が図5に示すように機体前方に倒される。
次に、延長ロープ68が取り外され、下部基本ジブ63
aに上部基本ジブ63bがつながれる。そして、ペンダ
ントロープ65の端部が上部基本ジブ63bのブラケッ
ト66に連結される。最後に、油圧シリンダ67が伸ば
されることにより、クレーン機体の姿勢は図4に示す作
業姿勢に変更される。Next, the hydraulic cylinder 67 is contracted, and the hydraulic cylinder 67 is tilted forward as shown in FIG.
Next, the extension rope 68 is removed, and the lower basic jib 63
The upper basic jib 63b is connected to a. The end of the pendant rope 65 is connected to the bracket 66 of the upper basic jib 63b. Finally, the hydraulic cylinder 67 is extended to change the posture of the crane body to the working posture shown in FIG.
【0045】図12および図13に示す従来のジブ起伏
装置を備えたクレーンにおいては、前述のように、固定
長さのジブ起伏ロープをドラムに巻き取り,巻き出すこ
とによって姿勢変更が行えたが、前述した第1の実施形
態ではこのようにドラムに巻き込むロープは存在しな
い。従って、前述した第1の実施形態のジブ起伏装置を
備えたクレーンにおいて機体の姿勢を変更するには、他
の補助クレーンを使用して姿勢変更する必要がある。よ
って、前述した第1の実施形態では簡易に機体の姿勢を
変更することは出来ない。In the conventional crane equipped with the jib hoisting device shown in FIGS. 12 and 13, as described above, the attitude can be changed by winding the jib hoisting rope of the fixed length on the drum and unwinding it. In the above-described first embodiment, there is no rope wound around the drum in this way. Therefore, in order to change the attitude of the machine body in the crane including the jib hoisting device of the first embodiment described above, it is necessary to use another auxiliary crane to change the attitude. Therefore, the posture of the machine body cannot be easily changed in the above-described first embodiment.
【0046】しかし、起伏マストが伸縮自在なリンク6
4によって構成され、延長ロープ68および姿勢保持ロ
ープ69を有する本実施形態によるジブ起伏装置を備え
たクレーンでは、上述のように簡易に機体の姿勢を変更
することが出来る。すなわち、本実施形態によるジブ起
伏装置を備えたクレーンにおいては、機体姿勢の変更時
に他の補助クレーンの力の助けを借りることなく、自力
で簡易にかつ安全に姿勢変更が行える。However, the undulating mast has a flexible link 6
In the crane including the jib hoisting device according to the present embodiment, which is configured by No. 4 and has the extension rope 68 and the posture holding rope 69, the posture of the machine body can be easily changed as described above. That is, in the crane including the jib hoisting device according to the present embodiment, the posture can be easily and safely changed by itself without the help of the force of the other auxiliary cranes when the posture of the machine is changed.
【0047】次に、本発明によるジブ起伏装置をクロー
ラクレーンに適用した第3の実施形態について説明す
る。Next, a third embodiment in which the jib hoisting device according to the present invention is applied to a crawler crane will be described.
【0048】図9は本実施形態によるジブ起伏装置を備
えたクローラクレーンの側面図である。なお、同図にお
いて図4と同一部分には同一符号を付してその説明は省
略する。本実施形態によるジブ起伏装置は、図4に示
す、リンク64,油圧シリンダ67およびペンダントロ
ープ65からなるジブ起伏装置に、さらにリンク81お
よび第2の油圧シリンダ82を備えて構成されている。FIG. 9 is a side view of a crawler crane having a jib undulating device according to this embodiment. 4, the same parts as those in FIG. 4 are denoted by the same reference numerals, and description thereof will be omitted. The jib hoisting device according to the present embodiment is configured by adding a link 81 and a second hydraulic cylinder 82 to the jib hoisting device including the link 64, the hydraulic cylinder 67 and the pendant rope 65 shown in FIG.
【0049】図4に示すジブ起伏装置では、マストを構
成するリンク64の一端は旋回フレームに枢支されてい
たが、本実施形態によるジブ起伏装置では、リンク64
の一端は、リンク81および第2の油圧シリンダ82の
連結部に枢支されている。これらリンク81および第2
の油圧シリンダ82のそれぞれの一端は旋回フレームに
枢支されており、各他端は連結されてリンク64の枢支
点83を構成している。In the jib hoisting device shown in FIG. 4, one end of the link 64 constituting the mast is pivotally supported by the swivel frame, but in the jib hoisting device according to this embodiment, the link 64 is provided.
Has one end pivotally connected to the connecting portion between the link 81 and the second hydraulic cylinder 82. These links 81 and second
One end of each of the hydraulic cylinders 82 is pivotally supported by the revolving frame, and the other ends thereof are connected to each other to form a pivot point 83 of the link 64.
【0050】このようにリンク64の一端を、旋回フレ
ームに代えてリンク81および第2の油圧シリンダ82
の連結部に枢支させ、この第2の油圧シリンダ82を伸
縮させると、リンク64の枢支点83は旋回フレームの
前後に移動する。従って、第2の油圧シリンダ82を伸
長させ、リンク64の枢支点83を旋回フレームの後方
に移動させると、ジブ63は、起伏用の油圧シリンダ6
7を伸長させることなくある程度起き上がる。In this way, one end of the link 64 is replaced by the swing frame, and the link 81 and the second hydraulic cylinder 82 are replaced.
When the second hydraulic cylinder 82 is expanded and contracted by being pivotally supported by the connecting portion of the above, the pivot point 83 of the link 64 moves to the front and rear of the revolving frame. Therefore, when the second hydraulic cylinder 82 is extended and the pivot point 83 of the link 64 is moved to the rear of the swing frame, the jib 63 moves the hydraulic cylinder 6 for undulation.
Get up to some extent without stretching 7.
【0051】図10はクレーン作業の準備状態時におけ
るクローラクレーンの側面図を示している。なお、同図
において図9と同一部分には同一符号を付してその説明
は省略する。同図に示す作業準備状態では、第2の油圧
シリンダ82は縮んだ状態になっている。作業準備状態
の始めには、ジブ63はその先端が地面70に接する位
置にある。この状態から起伏用の油圧シリンダ67を伸
長させていくと、ジブ63の先端は地面70から離れ、
ジブ63と地表水平線との成す角度θaは大きくなる。
クレーン作業はこの角度θaが30度程度より大きくな
ったところから始められる。第2の油圧シリンダ82
は、ジブ63がこの角度に起き上がるまで縮められた状
態に保たれている。FIG. 10 shows a side view of the crawler crane in a state ready for crane work. 9, the same parts as those in FIG. 9 are denoted by the same reference numerals, and the description thereof will be omitted. In the work preparation state shown in the figure, the second hydraulic cylinder 82 is in a contracted state. At the beginning of the work preparation state, the tip of the jib 63 is in a position in contact with the ground 70. When the undulating hydraulic cylinder 67 is extended from this state, the tip of the jib 63 is separated from the ground 70,
The angle θa formed by the jib 63 and the ground horizontal line becomes large.
Crane work can be started when this angle θa becomes larger than about 30 degrees. Second hydraulic cylinder 82
Is held in a retracted position until the jib 63 rises to this angle.
【0052】起伏用油圧シリンダ67が伸ばされ、ジブ
63が作業状態の始まりまで起こされると、起伏用油圧
シリンダ67の作動が停止される。次に、第2の油圧シ
リンダ82が伸ばされる。第2の油圧シリンダ82のこ
の伸長により、リンク64の枢支点83は図11に示す
ように機体後方へ移動し、ジブ63は、枢支点83のこ
の機体後方への移動量に応じた分だけ起き上がる。同図
はクレーン作業状態時におけるクローラクレーンの側面
図を示し、同図において図10と同一部分には同一符号
を付してその説明は省略する。When the undulating hydraulic cylinder 67 is extended and the jib 63 is raised to the beginning of the working state, the operation of the undulating hydraulic cylinder 67 is stopped. Next, the second hydraulic cylinder 82 is extended. By this extension of the second hydraulic cylinder 82, the pivot point 83 of the link 64 moves to the rear of the machine body as shown in FIG. 11, and the jib 63 moves by the amount corresponding to the movement amount of the pivot point 83 to the rear of the machine body. get up. This figure shows a side view of the crawler crane in a crane working state. In the figure, the same parts as those in FIG. 10 are designated by the same reference numerals, and the description thereof will be omitted.
【0053】本実施形態によるジブ起伏装置では、第2
の油圧シリンダ82の伸長によってジブ63がこのよう
に予めある程度引き起こされているため、ジブ63が図
4に示す最高位置と同じ位置まで起き上がるのに要する
起伏用油圧シリンダ67の伸長量は少なくて済む。な
お、ジブ63の最高位置は角度θaが80度程度になる
位置に決められることが多く、ジブ63は、その先端が
地面70に接する最低位置からそのクレーンの性能とし
て定められるこの最高位置の範囲で起伏される。このた
め、ジブ63が最高位置まで起き上がった時に、起伏用
油圧シリンダ67が機体後方へ倒れる角度は小さくな
り、起伏用油圧シリンダ67の先端部が機体後方へ移動
する量は抑制される。In the jib undulating apparatus according to this embodiment, the second
Since the jib 63 has been previously raised to some extent by the extension of the hydraulic cylinder 82, the amount of extension of the undulating hydraulic cylinder 67 required for the jib 63 to rise to the same position as the highest position shown in FIG. 4 is small. . The maximum position of the jib 63 is often set to a position where the angle θa is about 80 degrees, and the jib 63 has a range from the lowest position where the tip of the jib 63 contacts the ground 70 to the highest position determined as the performance of the crane. Is undulated by. Therefore, when the jib 63 rises to the maximum position, the angle at which the undulating hydraulic cylinder 67 falls rearward of the machine body becomes small, and the amount of movement of the tip end portion of the undulating hydraulic cylinder 67 rearward of the machine body is suppressed.
【0054】すなわち、図4に示すジブ起伏装置では、
ジブ63が同図に示す最高位置まで引き起こされると、
起伏用油圧シリンダ67の先端部はクレーン本体の最後
尾よりも後方に位置する。従って、このジブ起伏装置で
は、クレーンのオペレータから視認の困難な、クレーン
本体の後方よりも外側に起伏用油圧シリンダ67の先端
部が位置するようになり、クレーン操作を安全に実施す
る上で好ましくない。That is, in the jib undulating device shown in FIG.
When the jib 63 is raised to the highest position shown in the figure,
The tip of the undulating hydraulic cylinder 67 is located rearward of the rearmost end of the crane body. Therefore, in this jib hoisting device, the tip of the hoisting hydraulic cylinder 67 is located outside the rear of the crane body, which is difficult for the operator of the crane to visually recognize, and is preferable in safely performing the crane operation. Absent.
【0055】しかし、本実施形態によるジブ起伏装置で
は、上記のように、起伏用油圧シリンダ67の先端部が
機体後方へ移動する量は、前述の実施形態によるジブ起
伏装置の場合に比較して抑制され、起伏用油圧シリンダ
67の先端部は常にオペレータの視界の範囲内に留めら
れる。このため、本実施形態によるジブ起伏装置によれ
ば、ラチスジブ63を従来の起伏ロープおよび起伏ドラ
ムを用いることなく起伏させられるばかりでなく、起伏
用油圧シリンダ67の先端部を作業現場周囲の障害物に
衝突させることなく、クレーン操作を安全に実施するこ
とが可能となる。However, in the jib hoisting device according to the present embodiment, as described above, the amount of movement of the tip end portion of the hoisting hydraulic cylinder 67 rearward of the machine body is larger than that in the case of the jib hoisting device according to the above-described embodiment. It is suppressed and the tip of the undulating hydraulic cylinder 67 is always kept within the operator's field of view. Therefore, according to the jib hoisting device according to the present embodiment, not only the lattice jib 63 can be hoisted without using the conventional hoisting rope and hoisting drum, but also the tip end of the hoisting hydraulic cylinder 67 causes the obstacle around the work site. It is possible to safely operate the crane without colliding with the.
【0056】また、リンク64と起伏用油圧シリンダ6
7とが成す、図10に示す角度θbは、上記のようにリ
ンク64の枢支点83が機体の後方へ移動すると、図1
1に示すように大きくなる。リンク64と起伏用油圧シ
リンダ67との連結部にペンダントロープ65から同一
の力が作用しても、この角度θbが大きい方が、リンク
64と起伏用油圧シリンダ67のそれぞれに加わるモー
メント力は小さくなり、各部に働く作用力は軽減され
る。Further, the link 64 and the undulating hydraulic cylinder 6
The angle θb shown in FIG. 10 formed by 7 and 7 is as shown in FIG. 1 when the pivot point 83 of the link 64 moves to the rear of the airframe.
It becomes large as shown in 1. Even if the same force is applied from the pendant rope 65 to the connecting portion between the link 64 and the undulating hydraulic cylinder 67, the larger the angle θb, the smaller the moment force applied to each of the link 64 and the undulating hydraulic cylinder 67. Therefore, the acting force acting on each part is reduced.
【0057】このため、第2の油圧シリンダ82を伸長
させてリンク64の枢支点83を機体後方へ移動させる
ことにより、リンク64および起伏用油圧シリンダ67
の各部品に働く力の限度つまり構造上の強度は、前述の
実施形態によるジブ起伏装置の場合に比較して大きくす
ることが出来る。よって、本実施形態によるジブ起伏装
置では、これら各部品を小型化することが可能である。
また、リンク64および起伏用油圧シリンダ67の各大
きさを従前と同じ大きさに保てば、耐荷重強度の仕様値
を大きくすることが可能となる。Therefore, by extending the second hydraulic cylinder 82 to move the pivot point 83 of the link 64 rearward of the machine body, the link 64 and the undulating hydraulic cylinder 67 are moved.
The limit of the force acting on each of the parts, that is, the structural strength can be increased as compared with the case of the jib undulating device according to the above-described embodiment. Therefore, in the jib undulating device according to the present embodiment, each of these parts can be downsized.
Further, if the sizes of the link 64 and the undulating hydraulic cylinder 67 are maintained at the same size as before, it is possible to increase the specification value of the load bearing strength.
【0058】つまり、図10に示す状態でクレーン作業
をするよりも、リンク64の枢支点83を機体後方へ移
動した、図11に示す状態でクレーン作業をした方が各
部に作用する力が小さくなり、構造上有利である。That is, the force exerted on each part is smaller when the crane work is performed in the state shown in FIG. 11 in which the pivot point 83 of the link 64 is moved to the rear of the machine than when the crane work is performed in the state shown in FIG. And is structurally advantageous.
【0059】また、リンク64の枢支点83が図11に
示すように機体後方に位置したままでは、ジブ63を地
面70に接地させることは出来ない。つまり、枢支点8
3が機体後方に位置したままで、起伏用油圧シリンダ6
7を最小限に縮めても、起伏用油圧シリンダ67の伸縮
範囲の構造上の制限によってジブ63は接地しない。こ
のため、分解組立時等においてジブ63を接地させると
きには、第2の油圧シリンダ82を縮めて枢支点83を
図10に示す作業準備状態の位置に戻す必要があり、そ
の後、起伏用油圧シリンダ67を作動させてジブ63を
地面70に降ろす。Further, the jib 63 cannot be grounded on the ground 70 if the pivot point 83 of the link 64 is left behind the machine body as shown in FIG. In other words, pivot point 8
3 is located at the rear of the fuselage, and the hydraulic cylinder for undulation 6
Even if 7 is contracted to the minimum, the jib 63 does not come into contact with the ground due to the structural limitation of the expansion / contraction range of the undulating hydraulic cylinder 67. For this reason, when the jib 63 is grounded during disassembly and assembly, it is necessary to retract the second hydraulic cylinder 82 to return the pivot point 83 to the position in the work preparation state shown in FIG. To lower the jib 63 to the ground 70.
【0060】なお、上記実施形態では、枢支点83を移
動させる第2の油圧シリンダ82をリンク81よりも機
体の前方に設けた場合について説明した。しかし、第2
の油圧シリンダ82とリンク81との相対位置関係は上
記説明と逆の関係、つまり、リンク81を機体前方,第
2の油圧シリンダ82を機体後方に設ける構成としても
よい。ただし、この場合には、枢支点83を機体後方へ
移動させるためには、第2の油圧シリンダ82を縮めな
ければならない。このようにジブ起伏装置を構成した場
合においても、上記実施形態と同様な作用が奏され、同
様な効果が得られる。In the above embodiment, the case where the second hydraulic cylinder 82 for moving the pivot point 83 is provided in front of the machine body with respect to the link 81 has been described. But the second
The relative positional relationship between the hydraulic cylinder 82 and the link 81 may be opposite to that described above, that is, the link 81 may be provided at the front of the machine body and the second hydraulic cylinder 82 may be provided at the rear of the machine body. However, in this case, the second hydraulic cylinder 82 must be contracted in order to move the pivot point 83 to the rear of the machine body. Even when the jib undulating device is configured as described above, the same operation as that of the above-described embodiment is performed, and the same effect is obtained.
【0061】[0061]
【発明の効果】以上説明したように本発明によれば、シ
リンダが伸縮することによってマストが起伏し、マスト
が起伏することによってペンダントロープが引っ張ら
れ、ジブは従来の起伏ロープおよび起伏ドラムを用いる
ことなく起伏させられる。このため、起伏ロープが切れ
てジブが倒れるといった大事故の発生しない、安全なジ
ブ起伏装置が提供される。As described above, according to the present invention, when the cylinder expands and contracts, the mast is undulated, and when the mast is undulated, the pendant rope is pulled, and the jib uses the conventional undulating rope and undulating drum. Can be undulated without any effort. Therefore, a safe jib hoisting device is provided in which a serious accident such as breakage of the hoisting rope and falling of the jib does not occur.
【0062】また、マストにシーブを備えることによ
り、旋回フレーム側からジブ先端に巻上げロープがガイ
ドされ、フック巻上げ経路が形成される。このため、ジ
ブ起伏機能に加えてフックロープガイド機能が付加され
たジブ起伏装置を提供することが可能となる。Further, by providing the sheave on the mast, the hoisting rope is guided from the turning frame side to the tip of the jib, and the hook hoisting path is formed. Therefore, it is possible to provide a jib hoisting device to which a hook rope guide function is added in addition to the jib hoisting function.
【0063】また、マストを伸縮自在なリンクによって
構成し、延長ロープおよび姿勢保持ロープを備えること
により、安全かつ簡易に機体の姿勢変更を行うことが可
能となる。Further, by constructing the mast with a retractable link and providing the extension rope and the posture holding rope, it is possible to change the posture of the machine body safely and easily.
【0064】また、マストの一端を、旋回フレームに代
えてリンクおよび第2のシリンダの連結部に枢支させ、
第2のシリンダを伸縮させることにより、ジブが最高位
置まで起き上がるのに要する起伏シリンダの伸長量は少
なくて済む。このため、ジブが最高位置まで起き上がっ
た時に、起伏シリンダが後方へ倒れる角度は小さくな
り、機体後部に張り出していた起伏シリンダの先端部
は、常にオペレータの視界の範囲内に留められるように
なる。よって、クレーン操作を安全に行うことが可能と
なる。Further, one end of the mast is pivotally supported on the link and the connecting portion of the second cylinder instead of the swing frame.
By extending and contracting the second cylinder, the amount of extension of the undulating cylinder required for the jib to rise to the highest position can be reduced. For this reason, when the jib rises to the highest position, the angle at which the undulating cylinder falls rearward becomes small, and the tip end of the undulating cylinder protruding to the rear part of the machine body is always kept within the range of the operator's view. Therefore, it is possible to safely operate the crane.
【0065】また、マストの枢支点が旋回フレームの後
方へ移動すると、マストと起伏シリンダとの成す角度は
大きくなり、マストおよび起伏シリンダの各部品に作用
する力は小さくなる。このため、第2のシリンダを伸縮
させてマストの枢支点を旋回フレームの後方へ移動させ
ることにより、マストおよび起伏シリンダの構造上の強
度を大きくすることが出来、これら部品を小型化するこ
とが可能である。また、マストおよび起伏シリンダの大
きさを従前と同じ大きさに保てば、耐荷重強度の仕様値
を大きくすることが可能となる。When the pivot point of the mast moves to the rear of the revolving frame, the angle formed by the mast and the undulating cylinder becomes large, and the force acting on each part of the mast and the undulating cylinder becomes small. Therefore, the structural strength of the mast and the undulating cylinder can be increased by expanding and contracting the second cylinder to move the pivot point of the mast to the rear of the revolving frame, and these parts can be downsized. It is possible. Further, if the sizes of the mast and the undulating cylinder are kept the same as before, the specification value of load bearing strength can be increased.
【図1】本発明の第1の実施形態によるジブ起伏装置を
備えたクローラクレーンの側面図である。FIG. 1 is a side view of a crawler crane including a jib undulating device according to a first embodiment of the present invention.
【図2】第1の実施形態によるジブ起伏装置の詳細を示
す図である。FIG. 2 is a diagram showing details of the jib undulating device according to the first embodiment.
【図3】第1の実施形態によるジブ起伏装置を用いてラ
チスジブが起伏される様子を示す側面図である。FIG. 3 is a side view showing how the lattice jib is undulated using the jib undulating device according to the first embodiment.
【図4】本発明の第2の実施形態によるジブ起伏装置が
適用されるクローラクレーンの側面図である。FIG. 4 is a side view of a crawler crane to which a jib hoisting device according to a second embodiment of the present invention is applied.
【図5】第2の実施形態によるジブ起伏装置を用いた姿
勢変更の第1の過程を示す側面図である。FIG. 5 is a side view showing a first process of posture change using the jib undulating device according to the second embodiment.
【図6】第2の実施形態によるジブ起伏装置を用いた姿
勢変更の第2の過程を示す側面図である。FIG. 6 is a side view showing a second step of posture change using the jib undulating device according to the second embodiment.
【図7】第2の実施形態によるジブ起伏装置を用いた姿
勢変更の第3の過程を示す側面図である。FIG. 7 is a side view showing a third step of posture change using the jib undulating device according to the second embodiment.
【図8】第2の実施形態によるジブ起伏装置を用いた姿
勢変更の第4の過程を示す側面図である。FIG. 8 is a side view showing a fourth step of posture change using the jib undulating device according to the second embodiment.
【図9】本発明の第3の実施形態によるジブ起伏装置を
備えたクローラクレーンの側面図である。FIG. 9 is a side view of a crawler crane including a jib undulating device according to a third embodiment of the present invention.
【図10】第3の実施形態によるジブ起伏装置を備えた
クローラクレーンの作業準備状態時における側面図であ
る。FIG. 10 is a side view of a crawler crane including a jib undulating device according to a third embodiment in a work preparation state.
【図11】第3の実施形態によるジブ起伏装置を備えた
クローラクレーンの作業状態時における側面図である。FIG. 11 is a side view of the crawler crane including the jib undulating device according to the third embodiment in a working state.
【図12】従来のジブ起伏装置を備えたライブマスト付
きクローラクレーンの側面図である。FIG. 12 is a side view of a crawler crane with a live mast including a conventional jib undulating device.
【図13】従来のジブ起伏装置を備えたライブマストを
持たないクローラクレーンの側面図である。FIG. 13 is a side view of a crawler crane without a live mast having a conventional jib undulating device.
【図14】従来のジブ起伏装置を備えたクローラクレー
ンの輸送姿勢時の側面図である。FIG. 14 is a side view of a crawler crane including a conventional jib hoisting device in a transporting posture.
21,61…クローラ式下部走行体 22,62…上部旋回体 23,63…ラチスジブ 24…主巻上げロープ 25…主フック 26…補巻上げロープ 27…主巻ドラム 28…補巻ドラム 29…起伏マスト 30…旋回フレーム 31,65…ペンダントロープ 32,67,82…油圧シリンダ 33,34…ガイドシーブ 35…補助フック巻上げロープ 36…第三巻ドラム 64,81…リンク 68…延長ロープ 69…姿勢保持ロープ 83…リンク64の枢支点 21, 61 ... Crawler-type lower traveling body 22, 62 ... Upper revolving structure 23, 63 ... Lattice jib 24 ... Main hoisting rope 25 ... Main hook 26 ... Supplementary hoisting rope 27 ... Main winding drum 28 ... Supplementary winding drum 29 ... Undulating mast 30 ... Revolving frame 31, 65 ... Pendant rope 32, 67, 82 ... Hydraulic cylinder 33, 34 ... Guide sheave 35 ... Auxiliary hook winding rope 36 ... Third winding drum 64, 81 ... Link 68 ... Extension rope 69 ... Posture holding rope 83 … Link 64 pivot
Claims (4)
取り付けられたペンダントロープを備え、このペンダン
トロープの他端を引っ張ることによって前記ジブを起伏
させるジブ起伏装置において、 一端が前記旋回フレームに枢支され遊動する他端に前記
ペンダントロープの他端が取り付けられたマストと、一
端が前記旋回フレーム,他端が前記マストにそれぞれ枢
支され伸縮することによって前記マストを起伏させるシ
リンダとを備えて構成されたことを特徴とするジブ起伏
装置。1. A jib hoisting device having a pendant rope, one end of which is attached to a jib pivotally supported by a swivel frame, for hoisting the jib by pulling the other end of the pendant rope, wherein one end is attached to the swivel frame. A mast having the other end of the pendant rope attached to the other end that is pivotally supported and floating; one end of the mast; and a cylinder that undulates the mast by expanding and contracting the other end pivotally supported by the mast. A jib undulating device characterized by being configured as follows.
イドするシーブを備えたことを特徴とする請求項1記載
のジブ起伏装置。2. The jib hoisting device according to claim 1, further comprising: a sheave that guides a hoisting rope at a free end of the mast.
ペンダントロープの一端に接続され、他端が、輸送姿勢
に分割されて前記旋回フレームの前部に残るジブの遊動
端に接続される所定長の延長ロープと、 一端が前記マストおよび前記シリンダの連結部に接続さ
れ、他端が前記旋回フレームの後部に接続される所定長
の姿勢保持ロープとをさらに備え、 前記マストは伸縮自在なリンクによって構成されている
ことを特徴とする請求項1記載のジブ起伏装置。3. A predetermined one is connected to one end of the pendant rope detached from the jib, and the other end is connected to a floating end of the jib which is divided into a transportation posture and remains in the front part of the swing frame. The mast further includes a long extension rope and an attitude holding rope having a predetermined length, one end of which is connected to a connecting portion of the mast and the cylinder, and the other end of which is connected to a rear portion of the revolving frame. The jib undulating device according to claim 1, wherein
に代え、それぞれの一端が前記旋回フレームに枢支され
たリンクおよび第2のシリンダの各他端の連結部に枢支
されていることを特徴とする請求項1記載のジブ起伏装
置。4. One end of the mast is pivotally supported instead of the revolving frame, and one end of each of the mast is pivotally supported by a link pivotally supported by the revolving frame and a connecting portion of each of the other ends of the second cylinders. The jib undulating device of claim 1, characterized in that
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8097598A JPH09194189A (en) | 1995-11-13 | 1996-03-27 | Jib rising and falling device |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7-317069 | 1995-11-13 | ||
| JP31706995 | 1995-11-13 | ||
| JP8097598A JPH09194189A (en) | 1995-11-13 | 1996-03-27 | Jib rising and falling device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH09194189A true JPH09194189A (en) | 1997-07-29 |
Family
ID=26438766
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8097598A Pending JPH09194189A (en) | 1995-11-13 | 1996-03-27 | Jib rising and falling device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH09194189A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102491203A (en) * | 2011-12-13 | 2012-06-13 | 三一集团有限公司 | Crane and luffing mechanism thereof |
| CN114641445A (en) * | 2020-02-28 | 2022-06-17 | 利勃海尔工厂埃英根有限公司 | Crane with a jib and method for erecting a jib |
| JP2022104669A (en) * | 2020-12-29 | 2022-07-11 | コベルコ建機株式会社 | Rising-up method of derricking member and crane |
| WO2025073298A1 (en) * | 2024-06-05 | 2025-04-10 | 徐工集团工程机械股份有限公司建设机械分公司 | New crane |
-
1996
- 1996-03-27 JP JP8097598A patent/JPH09194189A/en active Pending
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102491203A (en) * | 2011-12-13 | 2012-06-13 | 三一集团有限公司 | Crane and luffing mechanism thereof |
| CN114641445A (en) * | 2020-02-28 | 2022-06-17 | 利勃海尔工厂埃英根有限公司 | Crane with a jib and method for erecting a jib |
| JP2022104669A (en) * | 2020-12-29 | 2022-07-11 | コベルコ建機株式会社 | Rising-up method of derricking member and crane |
| WO2025073298A1 (en) * | 2024-06-05 | 2025-04-10 | 徐工集团工程机械股份有限公司建设机械分公司 | New crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5475960B2 (en) | Mast raising structure and process for high capacity mobile lift crane | |
| JP5006622B2 (en) | Crane device with telescopic boom | |
| JP3946897B2 (en) | Tower crane with telescopic boom | |
| JP5350896B2 (en) | Roughing jib assembly sheave device | |
| JP4226683B2 (en) | Roughing jib back tension device | |
| US11999599B2 (en) | Backstop position changing device for crane | |
| JPH09194190A (en) | Jib rising and falling device | |
| JP6620334B2 (en) | Boom deflection prevention device | |
| JP6540653B2 (en) | Cylinder fixing device in working machine and cylinder fixing method in working machine | |
| KR20010086288A (en) | Working vehicle with boom support mechanism | |
| JP2018184248A (en) | Mobile crane | |
| JP6327670B2 (en) | crane | |
| JP7031488B2 (en) | How to change the specifications of the crane and the crane whose specifications can be changed | |
| JP5508463B2 (en) | Crane device with telescopic boom | |
| JP7694176B2 (en) | Backstop | |
| JP7826731B2 (en) | crane | |
| JP3949766B2 (en) | Roughing jib support device for boom crane with luffing jib | |
| JP2017145094A (en) | Wheel device of crane | |
| WO2023105982A1 (en) | Crane | |
| JP2020152501A (en) | Front strut backstop | |
| JPH0582981U (en) | Crane with multi-stage jib | |
| JP3611218B2 (en) | Pile driving device and ground improvement device | |
| JP2581976B2 (en) | Suspended load support system for double-link retractable cranes | |
| JP2023084811A (en) | crane | |
| JP4484279B2 (en) | Flexible material guide device for bending and stretching booms |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Effective date: 20041014 Free format text: JAPANESE INTERMEDIATE CODE: A621 |
|
| A977 | Report on retrieval |
Effective date: 20060517 Free format text: JAPANESE INTERMEDIATE CODE: A971007 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060530 |
|
| A521 | Written amendment |
Effective date: 20060720 Free format text: JAPANESE INTERMEDIATE CODE: A523 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20070724 |
|
| A521 | Written amendment |
Effective date: 20070921 Free format text: JAPANESE INTERMEDIATE CODE: A523 |
|
| A911 | Transfer of reconsideration by examiner before appeal (zenchi) |
Effective date: 20071109 Free format text: JAPANESE INTERMEDIATE CODE: A911 |
|
| A912 | Removal of reconsideration by examiner before appeal (zenchi) |
Effective date: 20080307 Free format text: JAPANESE INTERMEDIATE CODE: A912 |