JPH09209355A - Improvement method for soft ground - Google Patents

Improvement method for soft ground

Info

Publication number
JPH09209355A
JPH09209355A JP3756296A JP3756296A JPH09209355A JP H09209355 A JPH09209355 A JP H09209355A JP 3756296 A JP3756296 A JP 3756296A JP 3756296 A JP3756296 A JP 3756296A JP H09209355 A JPH09209355 A JP H09209355A
Authority
JP
Japan
Prior art keywords
ground
sand
casing
hole
drilled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3756296A
Other languages
Japanese (ja)
Inventor
Isao Saikawa
功 才川
Shogo Minagawa
昭吾 皆川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Fudo Tetra Corp
Original Assignee
Maeda Corp
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp, Fudo Construction Co Ltd filed Critical Maeda Corp
Priority to JP3756296A priority Critical patent/JPH09209355A/en
Publication of JPH09209355A publication Critical patent/JPH09209355A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

(57)【要約】 【課題】 地盤中に障害物がある場合にも、必要に応じ
てこれに削孔して砂を埋戻し砂充填部を形成しておくこ
とにより、改良すべき地盤の全体について均一な強度で
造成でき、しかも効率のよい高圧噴射式の地盤改良工法
を採用できるようにした技術を提供する。 【解決手段】 地盤を削孔し、その削孔した孔を砂で埋
め戻して砂充填部17を形成する第1の工程と、その第
1の工程で形成した砂充填部に対しセメント系の固化材
を混入して攪拌する第2の工程とを含む軟弱地盤の改良
工法であって、第1の工程では、削孔機10を用いて筒
状のケーシング11を地盤中に圧入しつつ削孔し、次い
で、その削孔した孔を砂で埋め戻しながら前記ケーシン
グを引き抜く工程を含み、第2の工程では、攪拌翼4の
先端からエアーと固化材を高圧噴射しつつ攪拌翼を回転
させながら引き抜く処理機2を用いる工程を含む。
(57) [Abstract] [Problem] Even if there is an obstacle in the ground, if necessary, a hole is drilled in the ground to form a sand filling area for backfilling the sand to improve the ground. (EN) Provided is a technology capable of constructing a whole with uniform strength and adopting an efficient high-pressure injection type ground improvement method. SOLUTION: The ground is drilled, and the drilled hole is backfilled with sand to form a sand-filled portion 17, and a cement-based material is added to the sand-filled portion formed in the first step. A method for improving soft ground including a second step of mixing and agitating a solidifying material, wherein in the first step, a cylindrical casing 11 is pressed into the ground by using a boring machine 10 and ground. It includes a step of making a hole and then pulling out the casing while backfilling the drilled hole with sand. In the second step, the stirring blade is rotated while high-pressure jetting air and solidifying material from the tip of the stirring blade 4. While including the process using the processor 2 for pulling out.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、例えば埋立工事等
によって造成した軟弱な地盤を改良するための技術に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique for improving a soft ground formed by, for example, land reclamation work.

【0002】[0002]

【従来の技術】埋立工事等によって造成した地盤は地耐
力が弱く、しかも地震等によって液状化現象等が生じや
すいのが一般的である。そのため、こうした地盤につい
ては、必要に応じて地盤改良を行うようにしている。
2. Description of the Related Art Generally, the ground constructed by landfill construction has a weak bearing capacity, and is generally liquified by an earthquake. Therefore, for such ground, the ground is improved as necessary.

【0003】この地盤改良技術としては、従来から種々
の方法が知られているが、その中の一つに高圧噴射式攪
拌工法がある。この工法は、セメント系のスラリー状固
化材を地盤中に噴射式で混入し攪拌するもので、例え
ば、図10(A)〜(G)に示すような手順で行われ
る。
As the ground improvement technique, various methods have been conventionally known, and one of them is a high-pressure jet stirring method. In this method, a cement-based slurry-like solidifying material is mixed into the ground by an injection method and stirred, and is performed, for example, in the procedure shown in FIGS. 10 (A) to (G).

【0004】まず、図10(A)、(B)で示すよう
に、改良すべき地盤1上にセットした処理機2を、その
攪拌軸3の下部より攪拌翼付近に固化材(スラリー)を
吐出しつつ、原地盤土と攪拌しながら貫入する。そし
て、図10(C)で示すように、所定の深度に達した
ら、先端処理を行った後、攪拌翼4の先端からエアーと
固化材を側方に向けて高圧噴射し、処理機2の引き抜き
を開始する。処理機2の引き抜きに際しては、高圧の噴
流を噴射させつつ攪拌翼4を回転させながら引き抜く。
その際、任意の深さで噴流を噴射させ、径を変化させる
ことで、地盤改良領域を変えることができる(図10
(F)参照)。処理機2の引き抜き完了によって、図1
0(G)に示すように、そのポイントでの造成を完了と
し、処理機2を次の改良ポイントに移動させる。
First, as shown in FIGS. 10 (A) and 10 (B), the processor 2 set on the ground 1 to be improved is treated with a solidifying material (slurry) from below the stirring shaft 3 to near the stirring blades. While discharging, it penetrates while stirring with the original ground soil. Then, as shown in FIG. 10 (C), when the predetermined depth is reached, after the tip treatment is performed, the air and the solidifying material are jetted from the tip of the stirring blade 4 to the high pressure sideward, and Start withdrawal. At the time of withdrawing the processing machine 2, the stirring blade 4 is withdrawn while ejecting a high-pressure jet stream.
At that time, the ground improvement area can be changed by injecting the jet at an arbitrary depth and changing the diameter (FIG. 10).
(F)). By the completion of the withdrawal of the processing machine 2, FIG.
As shown in 0 (G), the construction at that point is completed, and the processor 2 is moved to the next improvement point.

【0005】[0005]

【発明が解決しようとする課題】ところで、このように
高圧噴射式攪拌処理機を用いて地盤改良を行う場合、確
かに、従来の個々の機械式攪拌工法や噴射式工法に比べ
て、容易に、しかも早く経済的に地盤改良のためのソイ
ルセメントブロックを地中に形成することができる。し
かしながら、この工法では、地盤中に障害物がある場合
に問題になることが多い。例えば、埋立地においては、
その埋立土砂の中に大きな鉄筋コンクリート魂や岩石な
どが含まれていることも多々あり、これらが改良すべき
地盤中において障害物となる。すなわち、障害物の存在
によって処理機の貫入を途中で行うことができなくなる
ことがあるのである。したがって、こうした障害物は取
り除く必要があるが、障害物自体が地盤中の深い箇所に
存在している場合には、きわめて困難な作業となる。
By the way, when the ground is improved by using the high-pressure injection type agitation processing machine as described above, it is surely easier than the conventional individual mechanical agitation method and injection method. Moreover, a soil cement block for ground improvement can be formed in the ground quickly and economically. However, this method often causes problems when there are obstacles in the ground. For example, in a landfill,
In many cases, large reinforced concrete souls and rocks are contained in the landfill, which becomes obstacles in the ground to be improved. That is, the presence of the obstacle may prevent the processing machine from penetrating in the middle of the process. Therefore, it is necessary to remove such obstacles, but when the obstacles themselves exist at a deep place in the ground, it becomes extremely difficult work.

【0006】本発明は、以上のような点を考慮してなさ
れたもので、地盤中に障害物がある場合にも、必要に応
じてこれに削孔して砂を埋戻し砂充填部を形成しておく
ことにより、改良すべき地盤の全体について均一な強度
で造成でき、しかも効率のよい高圧噴射式の地盤改良工
法を採用できるようにした技術を提供することを目的と
する。
The present invention has been made in consideration of the above points. Even when there are obstacles in the ground, holes are bored in the obstacles as necessary to refill the sand with a sand filling portion. It is an object of the present invention to provide a technique capable of forming a whole ground to be improved with uniform strength by forming it, and adopting an efficient high-pressure injection type ground improvement method.

【0007】[0007]

【課題を解決するための手段】前記課題を解決するた
め、本発明では、地盤に削孔し、その削孔した孔を砂で
埋め戻して砂充填部を形成する第1の工程と、その第1
の工程で形成した砂充填部に対しセメント系の固化材を
混入して攪拌する第2の工程とを含む軟弱地盤の改良工
法であって、第1の工程では、削孔機を用いて筒状のケ
ーシングを地盤中に圧入しつつ削孔し、次いで、その削
孔した孔を砂で埋め戻しながら前記ケーシングを引き抜
く工程を含み、第2の工程では、攪拌翼の先端からエア
ーと固化材を高圧噴射しつつ攪拌翼を回転させながら引
き抜く処理機を用いる工程を含む、軟弱地盤の改良工法
とした。こうした工法とすることで、地盤中に障害物が
存在している場合、第1の工程を行った後に、第2の工
程を行うことで、改良すべき地盤全体としては高圧噴射
式の工法によって均一かつ効率的に地盤改良を行うこと
ができる。
In order to solve the above-mentioned problems, in the present invention, a first step of forming a sand filling portion by boring a hole in the ground and backfilling the boring hole with sand First
And a second step of mixing a cement-based solidifying material with the sand-filled portion formed in the step of mixing and stirring the same, wherein the first step is a cylinder using a boring machine. -Like casing is punched while being pressed into the ground, and then the casing is pulled out while backfilling the drilled hole with sand. In the second step, air and solidifying material are passed from the tip of the stirring blade. It was an improved method for soft ground, including the step of using a treatment machine for injecting high pressure jets while rotating a stirring blade. By adopting this construction method, if there are obstacles in the ground, by performing the first step and then the second step, the entire ground to be improved will be produced by the high-pressure injection method. The ground can be improved uniformly and efficiently.

【0008】ここで、前記第1の工程において、削孔す
べき地盤中に転石やコンクリート等の大きな障害物があ
る場合には、その障害物を掘削可能な刃を先端部に備え
たコアチューブを前記ケーシング内に挿入して削孔する
ようにするのが大変好ましい。そうすることで、障害物
が深い所に位置する場合でも、これを容易に削孔して取
り除くことができるからである。
In the first step, if there is a large obstacle such as boulders or concrete in the ground to be drilled, a core tube having a blade capable of excavating the obstacle at its tip end. It is highly preferable to insert the above into the casing for drilling. By doing so, even if the obstacle is located at a deep place, it can be easily drilled and removed.

【0009】その場合、コアチューブによって所定の深
さだけ削孔してからケーシングを挿入する方法を採用す
るのが好適である。なぜなら、障害物に削孔しておくこ
とによって、ケーシングを挿入する際に、そのケーシン
グによって障害物を掘削しやすくなるからである。した
がって、ケーシングを挿入しつつそのケーシングによっ
て障害物を掘削することができる。
In this case, it is preferable to adopt a method in which the core tube is drilled to a predetermined depth and then the casing is inserted. This is because drilling holes in the obstacle facilitates excavation of the obstacle by the casing when the casing is inserted. Therefore, the obstacle can be excavated by the casing while inserting the casing.

【0010】[0010]

【発明の実施の形態】以下、本発明の好適な実施の形態
について、添付の図1〜図9を参照して詳細に説明す
る。それらのうち、図1は本発明に係る軟弱地盤の改良
工法を実施する際に用いた場合に好適な削孔機の側面
図、図2はケーシングの斜視図、図3はコアチューブの
斜視図、図4〜図6は施工要領を示す工程図、図7は削
孔手順を示すフロー図、図8は埋め戻し手順を示すフロ
ー図、図9は削孔要領を示す断面図である。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying FIGS. Among them, FIG. 1 is a side view of a hole drilling machine suitable for use when carrying out the method for improving soft ground according to the present invention, FIG. 2 is a perspective view of a casing, and FIG. 3 is a perspective view of a core tube. 4 to 6 are process drawings showing a construction procedure, FIG. 7 is a flow chart showing a drilling procedure, FIG. 8 is a flow chart showing a backfilling procedure, and FIG. 9 is a sectional view showing a drilling procedure.

【0011】この実施の形態に係る軟弱地盤の改良工法
では、図1に示すような削孔機10を用いて地盤に削孔
し、その削孔した孔を砂で埋め戻して砂充填部を形成す
る第1の工程と、その第1の工程で形成した砂充填部に
対し、図10に示すような高圧噴射式の処理機2を用い
てセメント系の固化材を混入して攪拌する第2の工程と
を行う。
In the method for improving soft ground according to this embodiment, a hole is drilled in the ground by using a boring machine 10 as shown in FIG. 1, and the drilled hole is backfilled with sand to fill a sand filling portion. A first step of forming and a sand-filled portion formed in the first step are mixed with a cement-based solidifying material using a high-pressure injection type processor 2 as shown in FIG. 10 and stirred. Step 2 is performed.

【0012】前記削孔機10は、切削力が強く、地盤に
適した削孔ツールと組み合わせることにより、玉石層や
岩盤のような硬質地盤の削孔および地中鉄筋コンクリー
ト物等の撤去が可能であり、本体部10a、支持マスト
10b、回転軸10c、オーガードリル10dの他、図
2に示すように地盤1に貫入するケーシングチューブ
(以下ケーシングと称する)11、図3に示すコアチュ
ーブ12等を備える。ケーシング11は肉厚に形成さ
れ、先端に掘削刃11aを備えている。コアチューブ1
2は、ケーシング内に挿入して用いるもので、薄肉に形
成され、先端に切れ味のよい切削刃12を備えている。
ケーシング11の地盤1への貫入や引き抜きは、削孔機
10のロータリーヘッド13、あるいは揺動機等によっ
て行われる。
The hole drilling machine 10 has a strong cutting force, and by combining it with a hole drilling tool suitable for the ground, it is possible to drill holes in hard ground such as cobblestone and rock and to remove underground reinforced concrete materials. Yes, the main body 10a, the support mast 10b, the rotating shaft 10c, the auger drill 10d, a casing tube (hereinafter referred to as a casing) 11 penetrating into the ground 1 as shown in FIG. 2, a core tube 12 shown in FIG. Prepare The casing 11 is formed thick and is provided with a digging blade 11a at its tip. Core tube 1
The reference numeral 2 is used by inserting it into the casing, and is formed to be thin and has a cutting blade 12 having a sharp cutting edge.
The penetration and the extraction of the casing 11 into the ground 1 are performed by the rotary head 13 of the hole drilling machine 10, the rocking machine, or the like.

【0013】前記第1の工程では、こうした機能を持つ
削孔機10を用い、図4(A)に示すように、地盤改良
すべき位置に削孔機10を据え付ける。次に、図4
(B)に示すように、ケーシング11を順次接続し回転
させながら地盤1中に圧入する。次いで、図5(A)に
示すように、オーガードリル10dによりケーシング1
1内を削孔しつつ内部の土砂を排土する。
In the first step, the boring machine 10 having such a function is used, and the boring machine 10 is installed at a position where the ground should be improved, as shown in FIG. 4 (A). Next, FIG.
As shown in (B), the casings 11 are sequentially connected and pressed into the ground 1 while rotating. Next, as shown in FIG. 5 (A), the casing 1 is removed by the auger drill 10d.
While excavating the inside of 1, remove the earth and sand inside.

【0014】ここで、図5(B)に示すように、地盤1
中に転石やコンクリート魂などの障害物Sが存在し、そ
のためケーシング11の圧入あるいはオーガードリル1
0dによる削孔に支障が発生した場合、コアチューブ1
2を使用して削孔し、その削孔により発生したコアを取
り出す。この際、地下水のある場所では、図6(A)に
示すようにバケット15を使用して削孔する。このよう
にして所定の深さまで削孔したら、図6(B)に示すよ
うに、例えばバックホー16を用いてその削孔した孔に
砂を埋め戻して砂充填部17を形成する。以上の工程を
別の場所に移して繰り返すことにより、目的とする地盤
改良領域に砂充填部17を形成する。
Here, as shown in FIG. 5B, the ground 1
There are obstacles S such as boulders and concrete souls, so that the casing 11 is press-fitted or the auger drill 1
If there is a problem with drilling due to 0d, core tube 1
2 is used for drilling, and the core generated by the drilling is taken out. At this time, at a place where there is groundwater, as shown in FIG. 6 (A), the bucket 15 is used to make a hole. After drilling to a predetermined depth in this way, as shown in FIG. 6B, sand is backfilled in the drilled hole using a backhoe 16, for example, to form a sand filling portion 17. By moving the above process to another place and repeating, the sand filling part 17 is formed in the target ground improvement area.

【0015】なお、上記削孔機10を用いた第1の工程
において、地盤1中に障害物Sが存在していてケーシン
グ11の圧入が困難な場合には、図9に示すように、ケ
ーシング11内に挿入したコアチューブ12によってそ
の障害物Sの領域を通過するまで削孔し、しかる後、ケ
ーシング11の掘削刃11aによって障害物Sを切削し
ながらそのケーシング11を圧入する方法を採用すれば
良い。そのようにすれば、仮に障害物Sが鉄筋コンクリ
ート魂などであった場合でも、そこに貫通孔S1が空い
ているので、障害物Sはケーシング11によって部分的
に破砕あるいは切削されて崩れながら貫通孔S1部分へ
と落ちてゆくような現象を起こさせることができる。こ
れにより、ケーシング11の障害物領域での圧入を容易
にしかも継続して行うことができる。すなわち、ケーシ
ング11の圧入においては、ケーシング11を厚肉に形
成しているため、それ自体では切削能力は低いが、先に
貫通孔S1を空けておくことで、ケーシング11の切削
能力を実質的に高めることができる。
In the first step using the boring machine 10, when there is an obstacle S in the ground 1 and it is difficult to press-fit the casing 11, as shown in FIG. A method may be adopted in which the core tube 12 inserted into the hole 11 is drilled until it passes through the region of the obstacle S, and then the casing 11 is press-fitted while the obstacle S is cut by the excavating blade 11a of the casing 11. Good. By doing so, even if the obstacle S is a reinforced concrete soul, since the through hole S1 is vacant there, the obstacle S is partially crushed or cut by the casing 11 while collapsing into the through hole. It is possible to cause a phenomenon such as falling to the S1 portion. Thereby, the press-fitting in the obstacle region of the casing 11 can be performed easily and continuously. That is, in the press-fitting of the casing 11, since the casing 11 is formed to be thick, the cutting ability is low by itself, but the through-hole S1 is opened first to substantially reduce the cutting ability of the casing 11. Can be increased to

【0016】こうした作業手順については、図7および
図8にフロー図として示している。削孔手順を示す図7
においては、地中障害物がオーガー、バケット等にて除
去できない場合、コアチューブ削孔作業を取り入れてコ
アの取り出しを行う。削孔した孔を検尺した結果が良好
(Yes)であれば削孔完了とし、次のポイントの削孔
作業に移る。また、埋め戻し手順を示す図8において
は、バックホーによる埋め戻し作業とケーシング引き抜
き作業を交互に反復して行いながら埋め戻す。
Such a work procedure is shown as a flow chart in FIGS. 7 and 8. FIG. 7 showing a drilling procedure
In (2), if the underground obstacle cannot be removed with an auger, bucket, etc., core tube drilling work is incorporated to take out the core. If the result of measuring the drilled hole is good (Yes), the drilling is completed and the drilling work of the next point is started. Further, in FIG. 8 showing the backfilling procedure, backfilling is performed by alternately repeating backfilling work with the backhoe and casing withdrawing work.

【0017】以上のような作業要領によって第1の工程
を終えたら、次に、噴射式の処理機2を用いて第2の工
程を行う。この第2の工程は、攪拌翼の先端からエアー
と固化材を高圧噴射させつつ攪拌翼を回転させながら引
き抜く作業を行う工程である。すなわち、この第2の工
程では、図10で示したように地盤(砂充填部)上にセ
ットした処理機2を、その攪拌軸3の下端部より固化材
(スラリー)を吐出しつつ、原地盤土と攪拌しながら貫
入する。そして、所定の深度に達したら、先端処理を行
った後、攪拌翼4の先端からエアーと高圧の固化材を噴
射し、処理機2の引き抜きを開始する。処理機2の引き
抜きに際しては、高圧の噴流を噴射させつつ攪拌翼4を
回転させながら引き抜く。処理機2の引き抜き完了後に
は、その処理機2を次のポイントに移動させて、上記と
同様の作業を行う。これを繰り返すことにより、必要な
領域の地盤改良作業を完了とする。
After the first step is completed according to the above work procedure, the second step is then carried out using the jet type processor 2. The second step is a step of performing a work of extracting the air and the solidifying material while rotating the agitating blade while injecting the air and the solidifying material at a high pressure from the tip of the agitating blade. That is, in the second step, the processor 2 set on the ground (sand filling part) as shown in FIG. 10 is discharged from the lower end of the stirring shaft 3 while the solidifying material (slurry) is discharged. Penetrate while stirring with the ground soil. Then, after reaching the predetermined depth, after the tip processing is performed, air and high-pressure solidifying material are jetted from the tip of the stirring blade 4, and the withdrawal of the processor 2 is started. At the time of withdrawing the processing machine 2, the stirring blade 4 is withdrawn while ejecting a high-pressure jet stream. After the processing machine 2 is completely pulled out, the processing machine 2 is moved to the next point and the same work as above is performed. By repeating this, the ground improvement work in the necessary area is completed.

【0018】このようにして改良された地盤は、砂充填
部をセメント系の固化材で固めた地盤となるので、地耐
力も十分な地盤となる。また、地盤中に障害物がある場
合でも、これを削孔して砂を埋戻し砂充填部を形成して
おくことにより、改良すべき地盤の全体について均一な
強度で造成でき、しかも効率のよい高圧噴射式の地盤改
良工法を実施することができる。
The ground improved in this way is a ground in which the sand-filled portion is hardened with a cement-based solidifying material, so that the ground has sufficient bearing capacity. In addition, even if there is an obstacle in the ground, it can be drilled and the sand is backfilled to form a sand-filled portion, so that the entire ground to be improved can be constructed with uniform strength, and efficiency is improved. A good high-pressure injection type ground improvement method can be implemented.

【0019】なお、図10で示すような機械攪拌と高圧
噴射を併用する方法を採用した場合には、一度に大断面
の改良体を造成することができるが、このような2軸タ
イプの攪拌方法に限定される必要はなく、1軸タイプの
攪拌方法を採用しても良い。その場合には、処理機2に
代え、削孔機10によって第1の工程と第2の工程とを
行うようにすることができる。例えば、処理機2の攪拌
軸3および攪拌翼4を備える先端攪拌部分を、削孔機1
0のオーガーに代えて着脱可能な構成としておき、第2
の工程においては、先端攪拌部分を削孔機10に装着し
て、改良体を造成できるようにすることも可能である。
When a method using both mechanical stirring and high-pressure injection as shown in FIG. 10 is adopted, an improved body having a large cross section can be formed at once, but such a biaxial type stirring is used. The method is not limited, and a uniaxial type stirring method may be adopted. In that case, instead of the processing machine 2, the hole drilling machine 10 can be used to perform the first step and the second step. For example, the tip agitating portion including the agitating shaft 3 and the agitating blades 4 of the processor 2 may be replaced by
It has a removable structure instead of the 0 auger.
In the step (1), it is possible to attach the tip stirring portion to the boring machine 10 so that an improved body can be formed.

【0020】また、上記実施の形態においては、削孔機
10を用いて順次砂充填部17を形成するようにした
が、処理機20によって直接地盤改良可能な領域につい
ては、これを行い、障害物の存在する領域についてだ
け、本発明を適用するようにしてもよい。また、砂充填
部17については、必要に応じて一般的な土砂あるいは
その他の地盤置換材などを用いることもできる。
Further, in the above embodiment, the sand filling portion 17 is sequentially formed by using the boring machine 10. However, in the area where the ground can be directly improved by the processing machine 20, this is done, and the obstacle is obstructed. The present invention may be applied only to a region where an object exists. Further, for the sand filling portion 17, general earth and sand or other ground replacement material can be used as required.

【0021】[0021]

【発明の効果】以上のように、本発明によれば、地盤に
削孔し、その削孔した孔を砂で埋め戻して砂充填部を形
成する第1の工程と、その第1の工程で形成した砂充填
部に対しセメント系の固化材を混入して攪拌する第2の
工程とを含む軟弱地盤の改良工法であって、第1の工程
では、削孔機を用いて筒状のケーシングを地盤中に圧入
しつつ削孔し、次いで、その削孔した孔を砂で埋め戻し
ながら前記ケーシングを引き抜く工程を含み、第2の工
程では、攪拌翼の先端からエアーと固化材を高圧噴射し
つつ攪拌翼を回転させながら引き抜く処理機を用いる工
程を含む。したがって、地盤中に障害物が存在している
場合、第1の工程を行った後に、第2の工程を行うこと
で、改良すべき地盤全体としては高圧噴射式攪拌工法に
よって均一にしかも効率的に地盤改良を行うことができ
る。
As described above, according to the present invention, the first step of forming a sand-filled portion by drilling holes in the ground and backfilling the drilled holes with sand, and the first step thereof A method for improving soft ground including a second step of mixing a cement-based solidifying material with the sand-filled portion formed in 1. and stirring the mixture, wherein in the first step, a cylindrical boring machine is used. It includes a step of punching the casing while press-fitting the casing into the ground, and then withdrawing the casing while backfilling the punched hole with sand. In the second step, the air and the solidifying material are pressurized to a high pressure from the tip of the stirring blade. It includes a step of using a processing machine for extracting while rotating the stirring blade while jetting. Therefore, when there is an obstacle in the ground, by performing the first step and then the second step, the whole ground to be improved is uniformly and efficiently by the high-pressure jet stirring method. The ground can be improved.

【0022】また、障害物を掘削可能な刃を先端部に備
えたコアチューブをケーシング内に挿入して削孔するこ
とで、障害物が深い所に位置する場合でも、これを容易
に削孔して取り除くことができる。その場合、コアチュ
ーブによって所定の深さだけ削孔してからケーシングを
挿入する方法を採用することによって、ケーシングを挿
入する際に、そのケーシングによって障害物を掘削しや
すくすることができる。
Further, by inserting a core tube having a blade capable of excavating an obstacle into the casing to make a hole, the hole can be easily made even when the obstacle is located deep. Can be removed. In that case, by adopting a method in which the casing is inserted after drilling a predetermined depth with the core tube, it is possible to facilitate excavation of an obstacle by the casing when the casing is inserted.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明に係る改良工法に好適な削孔機の側面
図である。
FIG. 1 is a side view of a hole drilling machine suitable for an improved construction method according to the present invention.

【図2】 ケーシングの斜視図である。FIG. 2 is a perspective view of a casing.

【図3】 コアチューブの斜視図である。FIG. 3 is a perspective view of a core tube.

【図4】 施工要領を示す工程図である。FIG. 4 is a process diagram showing a construction procedure.

【図5】 施工要領を示す工程図である。FIG. 5 is a process diagram showing a construction procedure.

【図6】 施工要領を示す工程図である。FIG. 6 is a process diagram showing a construction procedure.

【図7】 削孔手順を示すフロー図である。FIG. 7 is a flowchart showing a drilling procedure.

【図8】 埋め戻し手順を示すフロー図である。FIG. 8 is a flowchart showing a backfill procedure.

【図9】 削孔要領を示す断面図である。FIG. 9 is a cross-sectional view showing a drilling procedure.

【図10】 高圧噴射式攪拌処理機による施工要領を示
す工程図である。
FIG. 10 is a process diagram showing a construction procedure by a high-pressure injection type stirring processor.

【符号の説明】[Explanation of symbols]

1 地盤 2 処理機 3 攪拌軸 4 攪拌翼 10 削孔機 11 ケーシング 12 コアチューブ S 障害物 S1 貫通孔 1 Ground 2 Processor 3 Stirring Shaft 4 Stirring Blade 10 Drilling Machine 11 Casing 12 Core Tube S Obstacle S1 Through Hole

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】地盤を削孔し、その削孔した孔を砂で埋め
戻して砂充填部を形成する第1の工程と、その第1の工
程で形成した砂充填部に対しセメント系の固化材を混入
して攪拌する第2の工程とを含む軟弱地盤の改良工法で
あって、前記第1の工程では、削孔機を用いて筒状のケ
ーシングを地盤中に圧入しつつ削孔し、次いで、その削
孔した孔を砂で埋め戻しながら前記ケーシングを引き抜
く工程を含み、前記第2の工程では、攪拌翼の先端から
エアーと固化材を高圧噴射しつつ攪拌翼を回転させなが
ら引き抜く処理機を用いる工程を含むことを特徴とする
軟弱地盤の改良工法。
1. A first step of forming a sand-filled portion by drilling the ground and backfilling the drilled hole with sand, and a cement-based material for the sand-filled portion formed in the first step. A method for improving soft ground including a second step of mixing and stirring a solidifying material, wherein in the first step, a cylindrical casing is pressed into the ground by using a hole drilling machine. Then, including the step of pulling out the casing while backfilling the drilled hole with sand, in the second step, while rotating the stirring blade while injecting high pressure air and solidifying material from the tip of the stirring blade. A method for improving soft ground, characterized by including a step of using a processing machine for pulling out.
【請求項2】 前記第1の工程において、削孔すべき地
盤中に転石やコンクリート等の障害物がある場合には、
その障害物を掘削可能な刃を先端部に備えたコアチュー
ブを前記ケーシング内に挿入して削孔することを特徴と
する請求項1記載の軟弱地盤の改良工法。
2. In the first step, when there are obstacles such as boulders and concrete in the ground to be drilled,
The method for improving soft ground according to claim 1, wherein a core tube having a blade capable of excavating the obstacle at its tip is inserted into the casing for drilling.
【請求項3】 前記コアチューブによって所定の深さだ
け削孔してから前記ケーシングを挿入することを特徴と
する請求項2に記載の軟弱地盤の改良工法。
3. The method for improving soft ground according to claim 2, wherein the casing is inserted after drilling a predetermined depth by the core tube.
【請求項4】 前記ケーシングを圧入しつつそのケーシ
ングによって前記障害物を掘削することを特徴とする請
求項3記載の軟弱地盤の改良工法。
4. The method for improving soft ground according to claim 3, wherein the obstacle is excavated by the casing while press-fitting the casing.
JP3756296A 1996-01-31 1996-01-31 Improvement method for soft ground Pending JPH09209355A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3756296A JPH09209355A (en) 1996-01-31 1996-01-31 Improvement method for soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3756296A JPH09209355A (en) 1996-01-31 1996-01-31 Improvement method for soft ground

Publications (1)

Publication Number Publication Date
JPH09209355A true JPH09209355A (en) 1997-08-12

Family

ID=12500971

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3756296A Pending JPH09209355A (en) 1996-01-31 1996-01-31 Improvement method for soft ground

Country Status (1)

Country Link
JP (1) JPH09209355A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008038411A (en) * 2006-08-03 2008-02-21 Kajima Corp Structure of arch-shaped improved ground and its construction method
JP2016011536A (en) * 2014-06-30 2016-01-21 株式会社竹中工務店 Method for removing underground obstacles and road construction method
JP2021169749A (en) * 2020-04-17 2021-10-28 株式会社フジタ How to improve the ground of the pile pull-out hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008038411A (en) * 2006-08-03 2008-02-21 Kajima Corp Structure of arch-shaped improved ground and its construction method
JP2016011536A (en) * 2014-06-30 2016-01-21 株式会社竹中工務店 Method for removing underground obstacles and road construction method
JP2021169749A (en) * 2020-04-17 2021-10-28 株式会社フジタ How to improve the ground of the pile pull-out hole

Similar Documents

Publication Publication Date Title
KR101527723B1 (en) Complex Ground Improving Devive and Ground Improving Method Using The Same
JP5799474B2 (en) Retaining method for retaining wall
JP2002097629A (en) Mechanical stirring air cement milk mixing and pumping method and equipment
JP2019039140A (en) Method for constructing ground improvement body and method for constructing pile
JPH09209355A (en) Improvement method for soft ground
JP2005273293A (en) Excavating method
KR101620876B1 (en) The device for excavating a ground
KR0148437B1 (en) All floor pile method
JPH0754334A (en) Subterranean excavator
JP2533721B2 (en) Construction method for protection of borehole wall
KR102287362B1 (en) Reinforcement method fot tip of PHC pile using loe fluidity mortar
JP2886365B2 (en) Construction method of pile
JP2575329B2 (en) Tensile reinforcement
JP2000154532A (en) Ground improvement method and its excavation equipment
JPH07269260A (en) Drilling method, pile sinking method, ground improvement method and excavation equipment
JP3524433B2 (en) Improvement method of soft ground with hard layer
KR20030069922A (en) Method for grouting and drilling nail and anchor
JP4372661B2 (en) Construction method of expansion head pile
JP2924355B2 (en) Construction method of pile body
JP2006009468A (en) Driving method of medium digging type steel pipe sheet pile and steel pipe sheet pile used therefor
EP0437262A1 (en) Method for preventive consolidation of the soil for underground minings
JP2002047877A (en) Compaction bit for impact type excavation method and method of burying underground objects using it
JP2836808B2 (en) Drill stirrer for soil cement pile method
JP3552164B2 (en) High pressure jet injection mixing method
JPS6124723A (en) Method of forming pile hole

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050405

A02 Decision of refusal

Effective date: 20050802

Free format text: JAPANESE INTERMEDIATE CODE: A02