JPH09209573A - Wall suspending locking structure and wall suspending method - Google Patents

Wall suspending locking structure and wall suspending method

Info

Publication number
JPH09209573A
JPH09209573A JP2000096A JP2000096A JPH09209573A JP H09209573 A JPH09209573 A JP H09209573A JP 2000096 A JP2000096 A JP 2000096A JP 2000096 A JP2000096 A JP 2000096A JP H09209573 A JPH09209573 A JP H09209573A
Authority
JP
Japan
Prior art keywords
wall
locking
panel
wall body
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000096A
Other languages
Japanese (ja)
Inventor
Tomoyasu Sato
友泰 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2000096A priority Critical patent/JPH09209573A/en
Publication of JPH09209573A publication Critical patent/JPH09209573A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a wall locking structure and wall suspending method which enables the suspending of a large panel without providing a suspension reinforcing member for the large panel as a wall. SOLUTION: A large panel (a wall) 1 has a vertical insertion hole 18 in a vertical bar 6. It also has a locking hole 19 perpendicular to the insertion hole 18. The insertion hole 18 and the locking hole 19 are obtained by forming vertical grooves and lateral grooves in the vertical joint ends of the wall panels constituting the large panel 1 and jointing the wall panels together. A cross fixture 11 is inserted into the insertion hole 18 and the locking pieces 11b, 11b of the cross fixture 11 are protruded to be insert into the locking holes 19, 19. In this way, the cross fixture 11 is locked to the vertical bar 6 of the large panel 1 to suspend the large panel 1. When the large panel 1 is suspended, load of the large panel 1 is applied to the vertical bar 6 and so the large panel 1 can be suspended without reinforcing the bar 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、住宅等の建築物の
構築において、壁体を形成した後に、建築物の壁部分に
壁体を据え付ける場合に、壁体を吊り上げるための壁体
の吊り上げ用係止構造及び壁体の吊り上げ方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to hoisting a wall body for hoisting the wall body when the wall body is installed on the wall portion of the building after the wall body is formed in the construction of a building such as a house. The present invention relates to a locking structure for a vehicle and a method for lifting a wall.

【0002】[0002]

【従来の技術】一般に、棧材からなる矩形枠状の枠体の
少なくとも一方の面に面材が貼設された木製パネルを予
め作成しておき、建築現場において、上記木製パネルを
組み付けることにより、住宅等の建築物の床、壁、屋根
等を構築することで、現場での施工を省力化したパネル
工法が知られている。
2. Description of the Related Art Generally, a wooden panel in which a face material is attached to at least one surface of a rectangular frame body made of a cauldron is prepared in advance, and the wooden panel is assembled at a construction site by assembling the wooden panel. A panel construction method is known in which the construction at the site is labor-saving by constructing floors, walls, roofs, etc. of buildings such as houses.

【0003】また、パネル工法において、予め複数の上
記木製パネルを組み付けて大型パネルを形成し、該大型
パネルを建築現場に設置することで建築物を構築するこ
とにより、さらに現場での施工を省力化したパネル工法
が知られている。上記大型パネル(壁用)1は、図8に
示すように、例えば、4つの木製パネル(壁パネル2
(2a、2b、2c、2d))から構成されている。な
お、図8に示す大型パネル1は、中央部に窓用の開口部
3が形成され、開口部3の両測部に方立4、4が配置さ
れたものである。
Further, in the panel construction method, a plurality of the above-mentioned wooden panels are assembled in advance to form a large-sized panel, and the large-sized panel is installed at a building site to construct a building. An improved panel construction method is known. The large-sized panel (for wall) 1 is, for example, four wooden panels (wall panel 2) as shown in FIG.
(2a, 2b, 2c, 2d)). The large-sized panel 1 shown in FIG. 8 has an opening 3 for a window formed in the center thereof, and the uprights 4 and 4 are arranged at both measurement portions of the opening 3.

【0004】また、図9は、上記大型パネル1の上部
を、各壁パネル2の面材(図8に図示)5(5a、5
b、5c)を取り除いた状態で示したものである。そし
て、大型パネル1においては、各壁パネル2…の棧材6
…からなる枠体7(7a、7b、7c)が上下に延在す
る左右側部の棧材6(6r、6l)の部分で接合され、
大型パネル1の枠組8を形成している。また、各壁パネ
ル2…の面材5から大型パネル1の面を構成する板材1
0が形成されている。なお、上記大型パネル1により壁
を構築する場合には、建築現場において大型パネル1を
立てた状態で設置する必要があるが、パネルが大型化し
て重くなるにしたがって、作業員の手作業による施工が
困難になる。
In addition, FIG. 9 shows that the upper surface of the large-sized panel 1 is provided with face materials (shown in FIG. 8) 5 (5a, 5a) of each wall panel 2.
b) and 5c) are removed. Then, in the large-sized panel 1, the wall material 6 of each wall panel 2 ...
The frame body 7 (7a, 7b, 7c) made of ... Is joined at the left and right side portions of the rod material 6 (6r, 6l),
The frame 8 of the large panel 1 is formed. Further, the plate material 1 that constitutes the surface of the large-sized panel 1 from the surface material 5 of each wall panel 2 ...
0 is formed. In addition, when constructing a wall with the large-sized panel 1, it is necessary to install the large-sized panel 1 in an upright state at a construction site. However, as the panel becomes larger and heavier, the work is manually performed by a worker. Becomes difficult.

【0005】したがって、上記大型パネル1により壁を
構築する場合においては、基本的に、クレーン等の吊り
上げ装置により大型パネル1を立てた状態に吊り上げ
て、構築すべき壁の部分に大型パネル1を設置してい
る。上記クレーンにより大型パネル1を吊り上げる際に
は、図8に示すようにクレーンの牽引用の掛止具として
パネルハンガー9と呼ばれるものを用いている。
Therefore, when constructing a wall with the large-sized panel 1, basically, the large-sized panel 1 is hoisted up by a hoisting device such as a crane and the large-sized panel 1 is placed on the wall to be built. It is installed. When the large-sized panel 1 is lifted by the crane, a so-called panel hanger 9 is used as a hooking tool for pulling the crane as shown in FIG.

【0006】上記パネルハンガー9は、引き上げられた
際に水平に配置される支持棒9aと、該支持棒9aをク
レーンのワイヤWのフックFに掛けるための支持ワイヤ
9bと、上記支持棒9aの左右両端部からそれぞれ垂下
された二本の吊り上げチェーン9c、9cと、これら二
本の吊り上げチェーン9c、9cの先端部にそれぞれ取
り付けられた十手金具11、11とからなるものであ
る。
The panel hanger 9 has a supporting rod 9a which is horizontally arranged when pulled up, a supporting wire 9b for hanging the supporting rod 9a on a hook F of a wire W of a crane, and the supporting rod 9a. It is composed of two hoisting chains 9c and 9c hanging from both left and right ends, and ten-hand metal fittings 11 and 11 attached to the tips of these two hoisting chains 9c and 9c, respectively.

【0007】上記十手金具11は、上記吊り上げチェー
ン9cに接続されて垂直に配置される棒体11aと、該
棒体11aの先端部から左右にそれぞれ出没自在とされ
る係止片(実施例の図1に図示)11b、11bと、該
係止片11b、11bの出没を操作するレバー11c
と、該レバー11cに接合されて離れた場所からレバー
11cの操作を可能とするチェーン11dとからなる。
The ten-hand metal fitting 11 is connected to the lifting chain 9c and arranged vertically, and a locking piece that can be retracted from the tip of the rod 11a to the left and right, respectively. 1b) and 11b, and a lever 11c for operating the engagement / disengagement of the locking pieces 11b, 11b.
And a chain 11d joined to the lever 11c to enable the lever 11c to be operated from a remote place.

【0008】そして、従来、大型パネル1には、大型パ
ネル1の上端面を構成する框材(図9の棧材6(6
u))に上記二つの十手金具11、11の間隔と略同じ
間隔で二つの貫通孔(図示略)が形成されていた。そし
て、大型パネル1においては、上記二つの貫通孔に十手
金具11、11の先端部を挿入し、上記框材(棧材6
u)の下側で十手金具11の係止片11b、11bを左
右に突出させることで、上記框材(棧材6u)に十手金
具11、11を掛止できるようになっていた。そして、
上述のように十手金具11、11を掛止させた状態で、
パネルハンガー9をクレーンで引き上げることにより、
図8に示すように壁体となる大型パネル1を立てた状態
に吊り上げていた。
Conventionally, the large-sized panel 1 has a frame member (the rod member 6 (6 in FIG. 9) constituting the upper end surface of the large-sized panel 1.
In u)), two through-holes (not shown) were formed at substantially the same intervals as the intervals between the two metal fittings 11, 11. Then, in the large-sized panel 1, the tip portions of the metal fittings 11, 11 are inserted into the two through-holes, and the frame member (the rod member 6) is inserted.
By projecting the locking pieces 11b, 11b of the ten-hand metal fitting 11 to the left and right on the lower side of u), the ten-hand metal fitting 11, 11 can be hooked on the above-mentioned frame member (rod material 6u). And
With the ten-hand metal fittings 11, 11 hooked as described above,
By pulling up the panel hanger 9 with a crane,
As shown in FIG. 8, the large panel 1 serving as a wall was hung up in a standing state.

【0009】[0009]

【発明が解決しようとする課題】ところで、上述のよう
に十手金具11、11を大型パネル1の上端面を構成す
る框材(棧材6u)に掛止した場合には、大型パネル1
を吊り上げた際に、上記框材(棧材6u)に大型パネル
1の荷重がかかることになり、框材(棧材6u)に比較
的大きな曲げ応力がかかることになる。
By the way, when the ten metal fittings 11 and 11 are hooked on the frame (rod 6u) constituting the upper end surface of the large-sized panel 1 as described above, the large-sized panel 1
When the frame is lifted, the load of the large-sized panel 1 is applied to the rod (rod 6u), and a relatively large bending stress is applied to the rod (rod 6u).

【0010】そして、上述のように大型パネル1を吊り
上げる際に、框材(棧材6u)において必要充分な強度
は、建築部材として框材(棧材6u)において必要充分
な強度より大きくなる可能性がある。したがって、上記
従来の大型パネル1においては、框材(棧材6u)の上
記貫通孔が形成された部分の下側に、埋木12、12を
接合して框材(棧材6u)の補強を図っていた。
When the large-sized panel 1 is lifted as described above, the strength required for the frame (rod 6u) can be greater than the strength required for the frame (rod 6u) as a building member. There is a nature. Therefore, in the conventional large-sized panel 1 described above, the burying trees 12, 12 are joined to the lower side of the portion of the stile member (the rod member 6u) where the through holes are formed to reinforce the stile member (the rod member 6u). I was trying.

【0011】上記埋木12、12は、大型パネル1を吊
り上げるために取り付けられたものであり、大型パネル
1を住宅の躯体として用いる際には必要のないものであ
る。そして、上述のように埋木12、12を用いること
により、大型パネル1の製造の手間が増えるとともに、
大型パネル1のコストが上がる可能性があった。
The above-mentioned embedded trees 12, 12 are attached for hoisting the large-sized panel 1, and are not necessary when the large-sized panel 1 is used as a frame of a house. Then, by using the embedded trees 12, 12 as described above, the labor for manufacturing the large-sized panel 1 is increased, and
The cost of the large panel 1 may increase.

【0012】本発明は、上記事情に基づいてなされたも
のであり、壁体となる大型パネルに吊り上げ用の補強部
材を設けることなく、大型パネルを吊り上げることが可
能な壁体の吊り上げ用係止構造及び壁体の吊り上げ方法
を提供することを目的とするものである。
The present invention has been made in view of the above circumstances and is capable of hoisting a large-sized panel which is a wall without providing a reinforcing member for hoisting the large-sized panel which is a wall. An object of the present invention is to provide a structure and a method for lifting a wall.

【0013】[0013]

【課題を解決するための手段】本発明の請求項1記載の
壁体の吊り上げ用係止構造は、図1に示すように、複数
の棧材6からなる枠組8と該枠組8の少なくとも一方の
面に貼設された板材(図8に図示)10とを具備してな
る壁体(大型パネル1)に、吊り上げ装置の係止部材
(十手金具11)を係止して、上記壁体(大型パネル
1)を吊り上げるためのものであり、上記枠組8の略上
下に延在する棧材6に、上記吊り上げ装置の係止部材
(十手金具11)が係止可能な係止部14が形成される
とともに、上記壁体(大型パネル1)の上端部に開口
し、かつ、上記棧材6の係止部14まで上記吊り上げ装
置の係止部材(十手金具11)を挿入可能な開口部15
が形成されていることを上記課題の解決手段とした。
As shown in FIG. 1, a wall structure for suspending and suspending a wall according to claim 1 of the present invention includes a frame 8 composed of a plurality of rods 6 and at least one of the frames 8. The wall (large-sized panel 1) having a plate material (illustrated in FIG. 8) affixed to the surface of the wall is locked with the locking member (the ten-hand metal fitting 11) of the lifting device, A locking portion for lifting a body (large panel 1), and a locking member (ten-metal fitting 11) of the lifting device can be locked to a rod 6 extending substantially up and down of the frame 8. 14 is formed and opens at the upper end of the wall body (large-sized panel 1), and the locking member (ten-metal fitting 11) of the lifting device can be inserted up to the locking portion 14 of the rod member 6. Opening 15
Is formed as a means for solving the above problems.

【0014】上記構成によれば、吊り上げ装置の係止部
材(十手金具11)は、壁体(大型パネル1)の開口部
15から壁体(大型パネル1)の略上下方向に延在する
棧材6の係止部14に係止されることになる。したがっ
て、吊り上げ装置により壁体(大型パネル1)を吊り上
げた際には、上下方向に延在する棧材6に壁体(大型パ
ネル1)の荷重がかかることになる。そして、上下方向
に延在する棧材6には、上述のように壁体(大型パネル
1)の水平方向に延在する棧材(図9に図示)6uであ
る框材に壁体(大型パネル1)の荷重がかかった場合の
ように大きな曲げ応力がかかることがない。
According to the above structure, the locking member (ten-metal fitting 11) of the lifting device extends from the opening 15 of the wall body (large panel 1) in a substantially vertical direction of the wall body (large panel 1). It will be locked to the locking portion 14 of the rod material 6. Therefore, when the wall body (large panel 1) is hoisted by the hoisting device, the load of the wall body (large panel 1) is applied to the vertically extending rod material 6. And, as described above, in the horizontal member 6 that extends in the vertical direction, the wall member (large size) No large bending stress is applied unlike when a load is applied to panel 1).

【0015】すなわち、上下に延在する棧材6に下方向
に向かう壁体(大型パネル1)の荷重がかかった場合に
は、棧材6に対して主に引っ張り応力がかかることにな
るが、曲げ応力はあまりかからず、棧材6を補強しなく
とも充分かつ安全に壁体(大型パネル1)を吊り上げる
ことが可能となる。したがって、従来のように、壁体
(大型パネル1)を吊り上げるためだけに強度を補強す
る何らかの補強部材を壁体(大型パネル1)に付加する
必要がなく、壁体(大型パネル1)の製造の省力化及び
コストダウンを図ることができる。
That is, when a downwardly directed load of the wall body (large-sized panel 1) is applied to the vertically extending rod material 6, a tensile stress is mainly applied to the rod material 6. Bending stress is not so great, and the wall body (large-sized panel 1) can be lifted sufficiently and safely without reinforcing the rod material 6. Therefore, unlike the prior art, it is not necessary to add any reinforcing member to the wall body (large panel 1) to reinforce the strength only for lifting the wall body (large panel 1), and the wall body (large panel 1) is manufactured. It is possible to save labor and reduce costs.

【0016】なお、上記壁体は、棧材からなる枠組と板
材とからなり、設置に際してクレーン等の吊り上げ装置
により吊り上げられる場合があるものならば特に限定さ
れるものではなく、例えば、従来例で述べた木製パネル
や、該木製パネルからなる大型パネルや、その他の木製
の枠組と板材とからなる木製のものや、木材以外の材料
を用いたものなどでも良い。
The wall is composed of a frame made of a board and a plate, and is not particularly limited as long as it may be lifted by a lifting device such as a crane at the time of installation. For example, in the conventional example. The wooden panel described above, a large panel made of the wooden panel, a wooden panel made of other wooden frame and plate material, or a panel made of a material other than wood may be used.

【0017】また、これらの壁体が他の壁体や床体など
とユニット化されていた場合でも、ユニットの壁体部分
を吊り上げるのに、本発明を応用することができる。ま
た、上記開口部は、上記係止部まで上記吊り上げ装置の
係止部材を壁体の上端部から挿入することができれば、
どのような構成でも良く、例えば、上記棧材に設けられ
た挿入孔や貫通孔、上記板材に設けられた切り欠き部な
どでも良い。
Further, even when these wall bodies are unitized with other wall bodies or floor bodies, the present invention can be applied to suspend the wall body portion of the unit. Further, the opening portion, if the locking member of the lifting device can be inserted from the upper end portion of the wall body to the locking portion,
It may have any configuration, and for example, it may be an insertion hole or a through hole provided in the rod material, a cutout portion provided in the plate material, or the like.

【0018】また、上記係止部は、吊り上げ装置の係止
部材を係止できるものならばどのような構成でも良く、
例えば、壁体の棧材に設けられた孔、溝、段差、突出片
などでも良く、さらに、係止可能な部材を棧材に接合し
たものでも良い。また、上記吊り上げ装置は、例えば、
周知の各種クレーン等のように壁体を吊り上げ可能なも
のならば、特に限定されるものではない。
The locking portion may have any structure as long as it can lock the locking member of the lifting device.
For example, a hole, a groove, a step, a protruding piece or the like provided in the wall material of the wall body may be used, and further, a member that can be locked may be joined to the base material. Also, the lifting device, for example,
There is no particular limitation as long as the wall can be lifted up, such as various known cranes.

【0019】また、吊り上げ装置の係止部材は、吊り上
げ装置の牽引用ワイヤの先端部もしくは牽引用ワイヤの
先端部に設けれた他のの部材に接合され、かつ、上記壁
体の開口部から挿入されて上記棧材の係止部に係止可能
なものならばどのようなもので良く、例えば、各種のフ
ックや、上記従来例で述べた十手金具などを用いること
ができる。
The locking member of the hoisting device is joined to the tip of the pulling wire of the hoisting device or another member provided at the tip of the pulling wire, and from the opening of the wall body. Any material may be used as long as it can be inserted and locked in the locking portion of the rod material, for example, various hooks and the ten-hand metal fitting described in the above-mentioned conventional example can be used.

【0020】また、十手金具のように係止部分が出没自
在となっていれば、開口部が狭くても比較的容易に係止
部材を係止部まで挿入できるとともに、係止部分を引っ
込めることにより、容易に係止を解除して、係止部材を
壁体から外すことができるので、係止部材はその係止部
分が出没自在となっていることが好ましい。
Further, if the locking portion can be retracted and retracted like a ten-handed metal fitting, the locking member can be relatively easily inserted up to the locking portion and the locking portion can be retracted even if the opening is narrow. By doing so, the locking can be easily released and the locking member can be removed from the wall body. Therefore, it is preferable that the locking portion of the locking member is retractable.

【0021】本発明の請求項2記載の壁体の吊り上げ用
係止構造は、上記壁体(大型パネル1)が、棧材6から
形成された矩形枠状の枠体(図3に図示)7と、該枠体
7の少なくとも一方の面に貼設された面材(図8に図
示)5とを具備してなる複数の壁パネル2を、互いに上
記枠体7の外側側面からなる接合端面同士で接合するこ
とにより形成され、かつ、上記壁体(大型パネル1)の
枠組8が上記壁パネル2の枠体7から形成され、左右に
隣接する上記壁パネル2、2同士の接合部に配置されて
互いに接合される棧材6に上記係止部14が形成されて
いることを上記課題の解決手段とした。
According to a second aspect of the present invention, there is provided a locking structure for lifting a wall body, wherein the wall body (large-sized panel 1) is a rectangular frame-like frame body (shown in FIG. 3) formed of a rod material 6. 7 and a plurality of wall panels 2 each including a face material (shown in FIG. 8) 5 attached to at least one surface of the frame body 7 are joined to each other by the outer side surfaces of the frame body 7. The frame 8 of the wall body (large-sized panel 1) is formed by joining the end faces to each other, and is formed from the frame body 7 of the wall panel 2, and the joint portion between the wall panels 2 and 2 adjacent to each other on the left and right sides. The engaging portion 14 is formed on the joint members 6 which are arranged in the above and are joined to each other.

【0022】上記構成によれば、上記壁体(大型パネル
1)は複数の壁パネル2を接合したものとなり、壁体
(大型パネル1)の枠組8は、壁パネル2の棧材6から
形成される枠体7からなることになる。また、左右に隣
接される上記壁パネル2は、(図3に示すように)枠体
7の側面同士が接合されることになり、壁パネル2同士
の接合部分では、枠体7を構成する上下に延在する棧材
6同士が接合された状態となっている。
According to the above structure, the wall body (large-sized panel 1) is formed by joining a plurality of wall panels 2, and the frame 8 of the wall body (large-sized panel 1) is formed from the rod material 6 of the wall panel 2. It will be composed of the frame body 7 to be. Further, the side walls of the frame bodies 7 of the wall panels 2 adjacent to each other on the left and right sides are joined to each other (as shown in FIG. 3), and the joint portions of the wall panels 2 form the frame body 7. The vertical bars 6 are joined together.

【0023】すなわち、壁パネル2同士の接合部分で
は、二本の上下に延在する棧材6が接合されて互いに補
強しあっているので、他の棧材6より高い強度を有する
状態となっている。したがって、左右に隣接する上記壁
パネル2の接合部に配置されて互いに接合される棧材に
上記係止部14を形成すれば、壁体(大型パネル1)を
吊り上げた際に、互いに接合されて高い強度を有する棧
材6に壁体(大型パネル1)の荷重がかかるので、棧材
6を補強することなく、充分かつ安全に壁体(大型パネ
ル1)を吊り上げることができる。
That is, at the joint portion between the wall panels 2, the two vertically extending cauldron members 6 are joined to reinforce each other, so that the caulking member 6 has a higher strength than the other cauldron members 6. ing. Therefore, if the locking portions 14 are formed on the joint members that are arranged at the joint portions of the wall panels 2 that are adjacent to each other on the left and right and are joined to each other, they are joined to each other when the wall body (large panel 1) is lifted. Since the load of the wall body (large-sized panel 1) is applied to the cauldron 6 having high strength, the wall-shaped body (large-sized panel 1) can be lifted sufficiently and safely without reinforcing the cauldron 6.

【0024】本発明の請求項3記載の壁体の吊り上げ用
係止構造は、図3に示すように、上記壁パネル2を左右
に並べて接合して上記壁体(大型パネル1)を形成する
際に、上記壁パネル2の接合端面となる壁パネル2の枠
体7の側面に、図2に示すように、上記壁パネル2同士
を接合した際に上記係止部材(十手金具11)を挿入可
能な開口部15となり、かつ、上記壁パネル2の上面側
に開口する略上下方向の縦溝16と、上記壁パネル2同
士を接合した際に上記係止部14となり、かつ、上記縦
溝16から略水平方向に延出する横溝17とが形成され
ていることを上記課題の解決手段とした。
In the suspending structure for lifting a wall according to claim 3 of the present invention, as shown in FIG. 3, the wall panels 2 are arranged side by side and joined to form the wall body (large panel 1). At this time, as shown in FIG. 2, on the side surface of the frame body 7 of the wall panel 2 which is the joint end surface of the wall panel 2, when the wall panels 2 are joined together, the locking member (ten-metal fitting 11). An opening 15 into which the wall panel 2 can be inserted, and a vertical groove 16 that is open in the upper surface side of the wall panel 2 in the substantially vertical direction and serves as the locking portion 14 when the wall panels 2 are joined to each other. The formation of the horizontal groove 17 extending from the vertical groove 16 in a substantially horizontal direction is a means for solving the above problems.

【0025】上記構成によれば、上記壁パネル2の接合
端面を構成する壁パネル2の枠体7の側面、すなわち、
上述のように互いに接合されるとともに上下に延在する
棧材6の接合面に、壁パネル2の上面側に開口する略上
下方向の縦溝16と、上記縦溝16から略水平方向に延
出する横溝17とが形成されることになる。
According to the above construction, the side surface of the frame body 7 of the wall panel 2 constituting the joint end surface of the wall panel 2, that is,
As described above, a vertical groove 16 that is open in the upper surface side of the wall panel 2 and that extends substantially horizontally from the vertical groove 16 is formed on the joint surface of the bars 6 that are vertically joined and that are joined to each other. The protruding lateral groove 17 is formed.

【0026】そして、上述のように壁パネル2を接合し
た場合には、図1及び図3に示すように、上述の上下に
延在する棧材6同士が接合され、ほぼ一つの棧材6、6
となるが、この際に、上記縦溝16は、接合されて形成
されたほぼ一つの棧材6の上面から上記横溝17まで達
する挿入孔18、すなわち上記開口部15となる。ま
た、上記横溝17は、上記挿入孔18から横方向に延出
する係止孔19、すなわち、上記係止部14となり、上
記吊り上げ装置の係止部材(十手金具11)を上記縦溝
16からなる開口部15から挿入して係止部14に掛止
することが可能なものとなる。
When the wall panel 2 is joined as described above, as shown in FIGS. 1 and 3, the above-mentioned vertically extending rods 6 are joined together to form almost one rod 6. , 6
At this time, however, the vertical groove 16 serves as the insertion hole 18 that extends from the upper surface of substantially one of the joint members 6 formed to be joined to the lateral groove 17, that is, the opening 15. Further, the lateral groove 17 serves as a locking hole 19 that extends laterally from the insertion hole 18, that is, the locking portion 14, and the locking member (ten-metal fitting 11) of the lifting device serves as the vertical groove 16. It can be inserted into the opening 15 and can be hooked on the locking portion 14.

【0027】すなわち、壁体(大型パネル1)とされる
前の壁パネル2の接合端面に上述のような縦溝16と横
溝17とを形成する簡単な方法により、上記請求項1及
び2記載の構成と同様の効果を奏する壁体(大型パネル
1)の吊り上げ用係止構造を設けることが可能となる。
なお、上記縦溝及び横溝は、互いに接合される二つの接
合端面の両側に設けても良いし、片側だけに設けても良
い。
That is, the method according to claims 1 and 2 by a simple method of forming the vertical groove 16 and the horizontal groove 17 on the joint end surface of the wall panel 2 before being made into the wall body (large panel 1). It is possible to provide a hanging structure for lifting the wall body (large-sized panel 1), which has the same effect as that of the above configuration.
The vertical groove and the horizontal groove may be provided on both sides of the two joining end surfaces joined to each other, or may be provided on only one side.

【0028】本発明の請求項4記載の壁体の吊り上げ用
係止構造は、図4に示すように、上記壁体(大型パネル
1)を形成するに際して左右に並べて接合される上記壁
パネル2の接合端面を構成する壁パネル2の枠体7の側
面に、上記係止部14となる係止孔20が形成されると
ともに、上記壁体(大型パネル1)の上端面から上記係
止孔20に至るように上記開口部15となる挿入孔21
が形成されていることを上記課題の解決手段とした。
As shown in FIG. 4, in the suspending structure for lifting a wall body according to a fourth aspect of the present invention, the wall panel 2 is joined side by side when forming the wall body (large panel 1). Is formed on the side surface of the frame body 7 of the wall panel 2 constituting the joint end surface of the above, and the engagement hole 20 is formed from the upper end surface of the wall body (large panel 1). The insertion hole 21 which becomes the opening 15 so as to reach 20
Is formed as a means for solving the above problems.

【0029】上記構成によれば、上記壁体(大型パネル
1)とされる前の壁パネル2の接合端面に係止孔20を
形成し、次いで、壁パネル2同士を接合して壁体(大型
パネル1)を形成するとともに、壁体(大型パネル1)
の上端面から上記係止孔20に至り、かつ上記開口部1
5となる挿入孔21を形成することにより、簡単に上記
請求項1及び2記載の構成と同様の効果を奏する壁体の
吊り上げ用係止構造を設けることが可能となる。
According to the above structure, the locking hole 20 is formed in the joint end surface of the wall panel 2 before the wall body (large panel 1) is formed, and then the wall panels 2 are joined to each other to form the wall body ( Forming a large panel 1) and forming a wall (large panel 1)
From the upper end surface of the opening to the locking hole 20 and the opening 1
By forming the insertion hole 21 to be 5, it becomes possible to easily provide a suspending structure for lifting the wall body, which has the same effects as the configurations of the above-mentioned claims 1 and 2.

【0030】なお、上記係止孔は、壁パネルの枠体とな
る棧材を貫通するように形成しても良いし、また、壁パ
ネル2の互いに接合される接合端面の両方に形成するも
のとしても良いし、片方に形成するものとしても良い。
また、上記挿入孔は、互い接合された棧材の上端から上
記係止孔に至るように上記棧材に形成しても良いし、上
記壁体の上辺を構成する棧材に上記挿入孔となる貫通孔
を形成し、該貫通孔から係止部材を挿入して、係止孔に
係止するものとしても良い。
The locking holes may be formed so as to penetrate through the rod material that serves as the frame body of the wall panel, or may be formed on both of the joint end surfaces of the wall panel 2 which are joined to each other. It is also possible to form one of them.
Further, the insertion hole may be formed in the cauldron so as to reach the locking hole from the upper end of the caulking material joined to each other, or the cauldron material constituting the upper side of the wall body may be formed with the insertion hole. The through hole may be formed, and the locking member may be inserted from the through hole to lock the locking hole.

【0031】本発明の請求項5記載の壁体の吊り上げ方
法は、図1に示すように、上記請求項1、2、3または
4記載の壁体の吊り上げ用係止構造を用いて上記壁体
(大型パネル1)を吊り上げる壁体(大型パネル1)の
吊り上げ方法であって、上記吊り上げ装置の係止部材
(十手金具11)を上記壁体(大型パネル1)の上端部
に開口する上記開口部15に挿入するとともに、上記係
止部材(十手金具11)を上記壁体(大型パネル1)の
枠組8の略上下方向に沿った棧材6の係止部14に係止
させ、次いで、上記係止部材(十手金具11)を引き上
げることにより、上記壁体(大型パネル1)を立てた状
態に吊り上げることを上記課題の解決手段とした。
According to a fifth aspect of the present invention, there is provided a method for hoisting a wall body, as shown in FIG. 1, using the wall body hoisting locking structure according to the first, second, third or fourth aspect. A method for hoisting a wall body (large panel 1) for hoisting a body (large panel 1), in which a locking member (ten-metal fitting 11) of the hoisting device is opened at an upper end portion of the wall body (large panel 1). While being inserted into the opening 15, the locking member (the metal fitting 11) is locked to the locking portion 14 of the cauldron 6 along the substantially vertical direction of the frame 8 of the wall body (large panel 1). Then, the above-mentioned problem was solved by lifting the above-mentioned locking member (ten-metal fitting 11) to lift the above-mentioned wall body (large-sized panel 1) in an upright state.

【0032】上記構成によれば、壁体(大型パネル1)
を吊り上げた際に、上記請求項1〜4記載の構成と同様
に、縦方向に沿った棧材6に壁体の荷重がかかることに
なり、棧材6に対して主に引っ張り応力がかかることに
なるが、曲げ応力はあまりかからず、棧材6を補強しな
くとも充分かつ確実に壁体(大型パネル1)を吊り上げ
ることが可能となる。
According to the above construction, the wall body (large panel 1)
When the hoist is lifted, the load of the wall body is applied to the cavernous material 6 along the longitudinal direction, and a tensile stress is mainly applied to the cavernous material 6, as in the configurations according to the above-mentioned claims 1 to 4. However, the bending stress is not so great, and the wall body (large-sized panel 1) can be hung sufficiently and reliably without reinforcing the rod material 6.

【0033】[0033]

【発明の実施の形態】以下に、本発明の実施の形態の第
一例の壁体の吊り上げ用係止構造及び壁体の吊り上げ方
法を図面を参照して説明する。なお、第一例で吊り上げ
られる壁体は、基本的に本発明に係わる吊り上げ用係止
構造を除いて、上記従来例で述べた木製パネル(壁パネ
ル)からなる大型パネルと同様の構成を有するものであ
り、従来例と同様の構成要素に同一の符号を付して、壁
体の吊り上げ用係止構造以外の部分の説明を省略する。
また、第一例の壁体の吊り上げ方法においては、上記従
来例で述べたクレーン及び十手金具(係止部材)を有す
るパネルハンガーとほぼ同様のものが用いられるので、
従来例と同様の構成要素に同一の符号を付してこれらの
吊り上げ装置の説明を省略する。
BEST MODE FOR CARRYING OUT THE INVENTION A lock structure for lifting a wall and a method for lifting a wall according to a first example of an embodiment of the present invention will be described below with reference to the drawings. The wall body to be lifted in the first example basically has the same structure as the large-sized panel made of the wooden panel (wall panel) described in the above-mentioned conventional example except for the lifting locking structure according to the present invention. Therefore, the same components as those of the conventional example are designated by the same reference numerals, and the description of the portions other than the locking structure for lifting the wall is omitted.
Further, in the method of hoisting the wall body of the first example, since almost the same thing as the crane and the panel hanger having the ten-hand metal fitting (locking member) described in the above-mentioned conventional example is used,
The same components as those in the conventional example are designated by the same reference numerals, and the description of these lifting devices will be omitted.

【0034】図1に示すように、第一例の大型パネル
(壁体)1の上端部には、その枠組8の上下方向に沿っ
た棧材6の部分に、上記従来例で述べた十手金具11の
棒体11aを大型パネル1の上端面から挿入するための
挿入孔(開口部15)18と、該挿入孔18からほぼ水
平方向に延出する係止孔(係止部14)19、19とが
形成され、これられが吊り上げ用係止構造を構成してい
る。
As shown in FIG. 1, at the upper end portion of the large-sized panel (wall body) 1 of the first example, at the portion of the rod material 6 along the vertical direction of the frame 8, the above-mentioned conventional example is used. An insertion hole (opening 15) 18 for inserting the rod 11a of the hand fitting 11 from the upper end surface of the large-sized panel 1, and a locking hole (locking part 14) extending substantially horizontally from the insertion hole 18. 19 and 19 are formed, and these form the lifting locking structure.

【0035】上記挿入孔18は、大型パネル1の上端面
に開口し、かつ、上記係止孔19、19に至るように形
成されたものである。また、上記係止孔19、19は、
上記挿入孔18から上記大型パネル1の厚み方向に沿っ
て、前後に延出するように形成されたものである。
The insertion hole 18 is formed so as to open on the upper end surface of the large-sized panel 1 and reach the locking holes 19, 19. The locking holes 19 and 19 are
It is formed so as to extend forward and backward from the insertion hole 18 along the thickness direction of the large-sized panel 1.

【0036】また、挿入孔18は、係止孔19、19の
位置より僅かに深く形成されているが、これは、後述す
るように挿入孔18に十手金具11を挿入し、十手金具
11の下端が挿入孔18の底部に当接した段階で、十手
金具11の係止片11b、11bを突出させた際に、十
手金具11の係止片11b、11bがちょうど係止孔1
9、19に挿入された状態となるようにしたものであ
る。
Further, the insertion hole 18 is formed slightly deeper than the positions of the locking holes 19, 19, which is formed by inserting the metal fitting 11 into the insertion hole 18 as will be described later. When the locking pieces 11b, 11b of the clasp 11 are projected at the stage where the lower end of 11 contacts the bottom of the insertion hole 18, the locking pieces 11b, 11b of the clasp 11 are just the locking holes. 1
9 and 19 are inserted.

【0037】また、図3に示すように、これら挿入孔1
8及び係止孔19、19は、壁パネル2から大型パネル
1を形成する際に、左右に隣接して配置される壁パネル
2のうちの一方の壁パネル2の枠体7の上下に延在する
棧材6と他方の壁パネル2の上下に延在する棧材6とが
接合された部分に形成されたものである。すなわち、上
記挿入孔18及び係止孔19、19は、左右の壁パネル
2同士の接合部分で一体に接合された二本の棧材6、6
の中央部分に形成されたものである。また、大型パネル
1には、上述の挿入孔18及び係止孔19、19が左右
対称に少なくとも二つ形成されている。
Further, as shown in FIG. 3, these insertion holes 1
When forming the large-sized panel 1 from the wall panel 2, the locking holes 8 and 19 extend above and below the frame body 7 of one of the wall panels 2 arranged adjacent to each other on the left and right. It is formed in a portion where the existing strip 6 and the strip 6 extending up and down on the other wall panel 2 are joined. That is, the insertion hole 18 and the locking holes 19, 19 are two joint members 6, 6 integrally joined at the joints between the left and right wall panels 2.
It is formed in the central part of. In addition, the large-sized panel 1 is provided with at least two insertion holes 18 and locking holes 19 and 19 described above that are bilaterally symmetrical.

【0038】次に、上記吊り上げ用係止構造の形成方法
について説明する。上記挿入孔18及び係止孔19、1
9からなる吊り上げ用係止構造を形成する際には、図2
に示すように、複数の壁パネル2を同一平面ないで互い
に接合して大型パネル1を形成する前に、大型パネル1
内で左右に隣接して配置される壁パネル2の接合端面に
縦溝16と横溝17とを形成する。
Next, a method of forming the above-mentioned lifting locking structure will be described. The insertion hole 18 and the locking holes 19, 1
When forming the lifting locking structure consisting of 9 shown in FIG.
As shown in FIG. 1, before joining a plurality of wall panels 2 to each other in a non-planar manner to form a large panel 1, the large panel 1
The vertical groove 16 and the horizontal groove 17 are formed in the joint end surface of the wall panel 2 which is adjacently arranged in the left and right inside.

【0039】なお、上記壁パネル2の接合端面とは、壁
パネル2の枠体7であり、かつ、上下に延在する棧材6
の外側面である。上記縦溝16は、接合端面となる上記
棧材6の外側面に、その上端から横溝17の僅かに下方
の部分まで形成された断面略半円形状のものである。ま
た、上記縦溝16は、上記壁パネル2の上端面側に突き
抜けて開口した状態となっている。
The joint end surface of the wall panel 2 is the frame body 7 of the wall panel 2 and extends vertically.
Is the outer surface of. The vertical groove 16 has a substantially semicircular cross-section formed on the outer surface of the rod material 6 serving as the joining end surface from the upper end thereof to a portion slightly below the lateral groove 17. Further, the vertical groove 16 is in a state of penetrating and opening toward the upper end surface side of the wall panel 2.

【0040】上記横溝17は、接合端面となる上記棧材
6の外側面に、上記縦溝16の下端部において、上記縦
溝16と直交するように、壁パネル2の厚み方向に沿っ
て形成されている。また、上記横溝17は、断面略半円
形状のものである。次に、図3に示すように、接合端面
にそれぞれ上記縦溝16及び横溝(図3では図示されて
いない)17が形成された壁パネル2、2同士を接合し
て大型パネル1を形成する。
The horizontal groove 17 is formed along the thickness direction of the wall panel 2 at the lower end of the vertical groove 16 so as to be orthogonal to the vertical groove 16 on the outer surface of the rod member 6 serving as the joining end surface. Has been done. The lateral groove 17 has a substantially semicircular cross section. Next, as shown in FIG. 3, the large-sized panel 1 is formed by joining the wall panels 2 and 2 each having the vertical groove 16 and the horizontal groove (not shown in FIG. 3) 17 formed on the joint end face. .

【0041】なお、互いに接合される壁パネル2の接合
端面に形成された縦溝16及び横溝17は、壁パネル
2、2同士を接合した際に、互い合わさるように形成さ
れている。したがって、上述のように大型パネル1を形
成した際に、互いに左右に接合された壁パネル2、2同
士の接合部分において、接合された二本の棧材6、6の
長さ方向に沿って、上端面に開口する略円形状の挿入孔
18が形成されるとともに、該挿入孔18と直交するよ
うに左右に延出するとともに、大型パネル1の厚み方向
に沿った略円形状の係止孔19、19が形成される。
The vertical groove 16 and the horizontal groove 17 formed on the joint end surface of the wall panel 2 to be joined to each other are formed so as to be aligned with each other when the wall panels 2 and 2 are joined to each other. Therefore, when the large-sized panel 1 is formed as described above, in the joint portion of the wall panels 2 and 2 that are joined to each other on the left and right sides, along the length direction of the joined two joint members 6 and 6. A substantially circular insertion hole 18 having an opening at the upper end surface is formed, and extends substantially to the right and left so as to be orthogonal to the insertion hole 18, and has a substantially circular engagement along the thickness direction of the large-sized panel 1. The holes 19, 19 are formed.

【0042】すなわち、予め、壁パネル2の接合端面に
上記縦溝16と横溝17とを形成するという簡単な作業
により、壁パネル2から大型パネル1を形成した際に、
該大型パネル1に上記挿入孔18と係止孔19、19と
からなる吊り上げ用の係止構造が形成されることにな
る。次に、上述のように形成された大型パネル(壁体)
1の吊り上げ用係止構造を用いた大型パネル(壁体)1
の吊り上げ方法について説明する。
That is, when the large-sized panel 1 is formed from the wall panel 2 by the simple work of forming the vertical groove 16 and the horizontal groove 17 on the joint end surface of the wall panel 2 in advance,
The large-sized panel 1 is formed with a lifting locking structure including the insertion hole 18 and the locking holes 19 and 19. Next, a large panel (wall body) formed as described above
Large-sized panel (wall body) 1 using the locking structure for lifting 1
The method of hoisting will be described.

【0043】大型パネル1の吊り上げにおいては、上記
従来例と同様に吊り上げ装置としてクレーン(図示略)
を用いるとともに、上記十手金具11を有するパネルハ
ンガー(従来例の図8に図示)9を用いる。なお、上記
パネルハンガー9は、基本的に従来例で用いられたもの
と同様のものであるが、状況によりパネルハンガー9の
二つの十手金具11、11の間隔が異なるものが用いら
れる。
When hoisting the large-sized panel 1, a crane (not shown) is used as a hoisting device as in the conventional example.
In addition to the above, a panel hanger (shown in FIG. 8 of a conventional example) 9 having the above-mentioned metal fitting 11 is used. The panel hanger 9 is basically the same as that used in the conventional example, but the panel hanger 9 may have a different interval between the two metal fittings 11, 11 depending on the situation.

【0044】そして、パネルハンガー9の十手金具11
を、その係止片11b、11bが引き込んだ状態で、上
記大型パネル1の挿入孔18に挿入し、十手金具11の
下端部が挿入孔18の底部に接したところで、十手金具
11のレバー11cを操作して、係止片11b、11b
を突出させ、係止片11b、11bを係止孔19、19
に挿入した状態とする。これにより、十手金具11が大
型パネル1の上述のように互いに接合された二本の上下
方向に沿った棧材6、6に係止された状態となる。
Then, the ten-hand fitting 11 of the panel hanger 9
Is inserted into the insertion hole 18 of the large-sized panel 1 with the locking pieces 11b, 11b retracted, and when the lower end of the ten-hand metal fitting 11 contacts the bottom of the insertion hole 18, the ten-metal fitting 11 of By operating the lever 11c, the locking pieces 11b, 11b
To project the locking pieces 11b, 11b into the locking holes 19, 19
Inserted into the. As a result, the ten-hand metal fitting 11 is in a state of being locked to the two rod members 6, 6 joined to each other in the vertical direction of the large-sized panel 1 as described above.

【0045】この状態で、パネルハンガー9をクレーン
により引き上げることにより、大型パネル1を立てた状
態に吊り上げることができる。この場合には、十手金具
11が、上下方向に沿い、かつ、互いに接合された二本
の棧材6、6の部分に係止されているので、この棧材
6、6に大型パネル1の荷重がかかることになるが、上
下方向に沿った棧材6、6において、下向きの荷重がか
った場合には、荷重が主に引っ張り応力として作用する
ので、従来例のように水平方向の棧材6に下向きの荷重
をかけた場合のように棧材6に大きな曲げ応力がかかる
ことがない。
In this state, by pulling up the panel hanger 9 with a crane, the large panel 1 can be lifted upright. In this case, since the ten-hand metal fitting 11 is locked to the portions of the two boards 6 and 6 which are joined to each other along the vertical direction, the large panel 1 is attached to the boards 6 and 6. However, when a downward load is exerted on the joint members 6, 6 along the vertical direction, the load mainly acts as a tensile stress, so that the horizontal joints as in the conventional example. Unlike the case where a downward load is applied to the material 6, a large bending stress is not applied to the board material 6.

【0046】そして、棧材6は、曲げ応力よりも、引っ
張り応力に対して強いので、従来例のように、棧材6を
埋木により補強しなくとも、充分に大型パネル1を吊り
上げることが可能となる。また、十手金具11が係止さ
れた部分は、上述のように二本の棧材6、6が接合され
た状態となっているので、一本の棧材6の部分より大き
な強度を有する状態、すなわち、補強された状態となっ
ており、吊り上げに対して必要充分な状態を超える強度
を有し、より確実に大型パネル1を吊り上げることがで
きる。
Since the cauldron 6 is stronger against the tensile stress than the bending stress, the large panel 1 can be sufficiently lifted up without reinforcing the cauldron 6 with the embedded wood as in the conventional example. Becomes In addition, the part where the ten-hand metal fitting 11 is locked has a greater strength than the part of the single rod 6 because the two rods 6 and 6 are joined as described above. The state, that is, the reinforced state, has a strength exceeding a necessary and sufficient state for hoisting, and the large-sized panel 1 can be hoisted more reliably.

【0047】また、上述のように挿入孔18及び係止孔
19、19からなる吊り上げ用係止構造が形成される部
分は、二本の棧材6、6が接合された部分なので、挿入
孔18や係止孔19、19を形成することにより、棧材
6の強度が多少低下しても、吊り上げ用係止構造及び建
物の躯体として充分な強度を有する状態を保つことがで
きる。
Further, as described above, the portion where the lifting locking structure composed of the insertion hole 18 and the locking holes 19 and 19 is formed is the portion where the two rod members 6 and 6 are joined, so that the insertion hole By forming 18 and the locking holes 19 and 19, even if the strength of the cauldron 6 is lowered to some extent, it is possible to maintain a state having sufficient strength as a lifting locking structure and a building frame.

【0048】したがって、棧材6に埋木等の補強を施す
ことなく、大型パネル1を確実に吊り上げることができ
るので、大型パネル1の製造において、埋木等を施す手
間を省くことができるとともに、大型パネル1のコスト
ダウンを図ることができる。なお、上記第一例において
は、互いに接合される壁パネル2、2のそれぞれの接合
端面に縦溝16及び横溝17を形成するものとしたが、
棧材6の強度上問題がなければ、どちらか一方の壁パネ
ル2にだけ縦溝16と横溝17とを形成し、壁パネル
2、2を接合することで、一つずつの縦溝16と横溝1
7とをそれぞれ挿入孔18と係止孔19、19としても
良い。また、上記縦溝16及び横溝17の断面形状は半
円形に限定されるものではない。
Therefore, since the large-sized panel 1 can be reliably lifted up without reinforcing the paddle material 6 with the embedded wood or the like, it is possible to save the labor of applying the embedded wood or the like in the manufacture of the large-sized panel 1. The cost of the panel 1 can be reduced. In the first example described above, the vertical groove 16 and the horizontal groove 17 are formed on the joint end surfaces of the wall panels 2 and 2 which are joined to each other.
If there is no problem in the strength of the board 6, the vertical groove 16 and the horizontal groove 17 are formed only on one of the wall panels 2 and the wall panels 2 and 2 are joined to form the vertical groove 16 one by one. Lateral groove 1
7 may be the insertion hole 18 and the locking holes 19 and 19, respectively. The cross-sectional shape of the vertical groove 16 and the horizontal groove 17 is not limited to the semicircle.

【0049】次に、本発明の実施の形態の第二例の壁体
の吊り上げ用係止構造及び壁体の吊り上げ方法を図面を
参照して説明する。なお、第二例で吊り上げられる壁体
は、第一例と同様に、基本的に本発明に係わる吊り上げ
用係止構造を除いて、上記従来例で述べた壁パネルから
なる大型パネルと同様の構成を有するものであり、従来
例と同様の構成要素に同一の符号を付して、壁体の吊り
上げ用係止構造以外の部分の説明を省略する。また、第
二例の壁体の吊り上げ方法は、基本的に第一例と同様の
ものであり、第一例と同様の構成要素に同一の符号を付
して、その説明を簡略化する。
Next, with reference to the drawings, a suspending structure for suspending a wall and a method for suspending a wall according to a second example of the embodiment of the present invention will be described. Incidentally, the wall body to be lifted in the second example is basically the same as the large-sized panel composed of the wall panel described in the above-mentioned conventional example except for the lifting locking structure according to the present invention, as in the first example. Since the structure is the same, the same components as those in the conventional example are denoted by the same reference numerals, and the description of the parts other than the wall-body hanging locking structure is omitted. In addition, the method of hoisting the wall body of the second example is basically the same as that of the first example, and the same components as those of the first example are designated by the same reference numerals to simplify the description.

【0050】図4に示すように、本発明の大型パネル
(壁体)1の上端部には、その枠組8の上下方向に沿っ
た棧材6の部分に、上記従来例で述べた十手金具11の
棒体11aを大型パネル1の上端面から挿入するための
挿入孔(開口部15)21と、該挿入孔21から延出す
る係止孔(係止部14)20、20とが形成され、これ
られが吊り上げ用係止構造を構成している。上記挿入孔
21は、大型パネル1の上端面に開口し、かつ、上記係
止孔20、20に至るように形成されたものである。
As shown in FIG. 4, at the upper end portion of the large-sized panel (wall body) 1 of the present invention, at the portion of the rod member 6 along the vertical direction of the frame 8, the ten hands described in the above-mentioned conventional example. An insertion hole (opening 15) 21 for inserting the rod 11a of the metal fitting 11 from the upper end surface of the large-sized panel 1 and locking holes (locking parts 14) 20, 20 extending from the insertion hole 21 are provided. It is formed, which constitutes a lifting locking structure. The insertion hole 21 is formed so as to open on the upper end surface of the large-sized panel 1 and reach the locking holes 20, 20.

【0051】また、上記係止孔20、20は、上記挿入
孔21から上記大型パネル1の面方向に沿って、左右に
延出するように形成されたものである。また、挿入孔2
1は、係止孔20、20の位置より僅かに深く形成され
ているが、これは、第一例の場合と同様に挿入孔21に
十手金具11を挿入し、十手金具11の下端が挿入孔2
1の底部に当接した段階で、十手金具11の係止片11
b、11bを突出させた際に、十手金具11の係止片1
1b,11bがちょうど係止孔20、20に挿入された
状態となるようにしたものである。
The locking holes 20, 20 are formed so as to extend from the insertion hole 21 to the left and right along the surface direction of the large-sized panel 1. In addition, the insertion hole 2
1 is formed slightly deeper than the positions of the locking holes 20, 20, but this is similar to the case of the first example in that the ten-hand metal fitting 11 is inserted into the insertion hole 21 and the lower end of the ten-hand metal fitting 11 is inserted. Is the insertion hole 2
At the stage of abutting on the bottom of 1, the locking piece 11 of the metal fitting 11
When the b and 11b are projected, the locking piece 1 of the ten-hand fitting 11
1b and 11b are just inserted into the locking holes 20 and 20.

【0052】また、これら挿入孔21及び係止孔20、
20は、壁パネル2から大型パネル1を形成する際に、
左右に隣接して配置される壁パネル2、2のうちの一方
の壁パネル2の枠体7の上下に延在する棧材6と他方の
壁パネル2の上下に延在する棧材6とが接合された部分
に形成されたものである。また、大型パネル1には、上
述の挿入孔21及び係止孔20、20が左右対称に少な
くとも二つ形成されている。
Further, the insertion hole 21 and the locking hole 20,
20 is for forming the large-sized panel 1 from the wall panel 2,
A wall 6 extending vertically above and below a frame 7 of one wall panel 2 of the wall panels 2, 2 arranged adjacent to each other on the left and right, and a tree 6 extending vertically above the other wall panel 2. Is formed in the joined portion. Further, in the large-sized panel 1, at least two insertion holes 21 and locking holes 20, 20 described above are formed symmetrically.

【0053】次に、上記吊り上げ用係止構造の形成方法
について説明する。上記挿入孔21及び係止孔20、2
0からなる吊り上げ用係止構造を形成する際には、複数
の壁パネル2、2を同一平面ないで互いに接合して大型
パネル1を形成する前に、図5及び図6に示すように、
大型パネル1内で左右に隣接して配置される壁パネル2
の接合端面を形成する上下方向に沿った棧材6に、接合
端面側から壁パネル2内に貫通する断面略円形の係止孔
20を形成する。
Next, a method of forming the above-mentioned lifting locking structure will be described. The insertion hole 21 and the locking holes 20, 2
When forming the lifting locking structure consisting of 0, as shown in FIG. 5 and FIG. 6, before forming the large-sized panel 1 by joining the plurality of wall panels 2, 2 to each other without being flush with each other,
A wall panel 2 that is arranged on the left and right of the large panel 1
An engaging hole 20 having a substantially circular cross section is formed in the wall 6 along the up-down direction that forms the joint end surface of 1.

【0054】次に、図6及び図7に示すように、接合端
面にそれぞれ上記係止孔20が形成された壁パネル2、
2同士を接合して大型パネル1を形成する。なお、互い
に接合される壁パネル2、2の接合端面にそれぞれ形成
された係止孔20、20は、壁パネル2、2同士を接合
した際に、互い合わさって連通するように形成されてお
り、それぞれの壁パネル2、2に形成された係止孔2
0、20は大型パネル1を形成した際に一連の係止孔2
0、20となる。
Next, as shown in FIGS. 6 and 7, the wall panel 2 having the engaging holes 20 formed on the joint end faces,
The two panels are joined together to form a large panel 1. In addition, the locking holes 20 and 20 respectively formed in the joint end surfaces of the wall panels 2 and 2 to be joined to each other are formed so as to communicate with each other when the wall panels 2 and 2 are joined to each other. , Locking holes 2 formed in each wall panel 2, 2
0 and 20 are a series of locking holes 2 when the large panel 1 is formed.
It becomes 0 and 20.

【0055】次に、図4に示すように、上記互いに接合
された二本の棧材6、6の上端面から上記係止孔20、
20に直交するように上下方向に沿った挿入孔21を形
成する。したがって、予め、壁パネル2、2の接合端面
に係止孔20、20を形成し、かつ、大型パネル1を形
成した後に、該係止孔20、20に直交する挿入孔21
を形成するという簡単な作業により、壁パネル2、2か
ら大型パネル1を形成した際に、該大型パネル1に上記
挿入孔21と係止孔20、20とからなる吊り上げ用の
係止孔20が形成されることになる。
Next, as shown in FIG. 4, from the upper end surfaces of the two joint members 6, 6 joined to each other, the engaging hole 20,
An insertion hole 21 is formed along the vertical direction so as to be orthogonal to 20. Therefore, after the locking holes 20 and 20 are formed in the joint end surfaces of the wall panels 2 and 2 and the large-sized panel 1 is formed in advance, the insertion holes 21 orthogonal to the locking holes 20 and 20 are formed.
When the large-sized panel 1 is formed from the wall panels 2 and 2 by a simple operation of forming Will be formed.

【0056】次に、上述のように形成された大型パネル
(壁体)1の吊り上げ用係止構造を用いた、大型パネル
(壁体)1の吊り上げ方法について説明する。この場合
には、第一例と同様に、パネルハンガー(従来例の図8
に図示)9の十手金具11を、その係止片11b、11
bが引き込んだ状態で、上記大型パネル1の挿入孔21
に挿入し、十手金具11の下端部が挿入孔21の底部に
接したところで、十手金具11のレバー11cを操作し
て、係止片11b、11bを突出させ、係止片11b、
11bを係止孔20、20に挿入した状態とし、この状
態で、パネルハンガー9をクレーンにより引き上げるこ
とにより、大型パネル1を立てた状態に吊り上げること
ができる。
Next, a method of hoisting the large-sized panel (wall) 1 using the hanging structure for hoisting the large-sized panel (wall) 1 formed as described above will be described. In this case, similar to the first example, the panel hanger (see FIG.
The ten hand metal fitting 11 of 9 is attached to the locking pieces 11b, 11
The insertion hole 21 of the large-sized panel 1 in the state where b is retracted
When the lower end of the metal fitting 11 is in contact with the bottom of the insertion hole 21, the lever 11c of the metal fitting 11 is operated to project the locking pieces 11b, 11b, and the locking piece 11b,
The large panel 1 can be lifted in an upright state by pulling the panel hanger 9 in this state with 11b inserted into the locking holes 20 and 20 by a crane in this state.

【0057】この場合には、第一例の場合と同様に、棧
材6に埋木等の補強を施すことなく、大型パネル1を安
全に吊り上げることができるので、大型パネル1の製造
において、埋木等を施す手間を省くことができるととも
に、大型パネル1のコストダウンを図ることができる。
なお、上記第二例においては、係止孔20が棧材6を貫
通しているものとしたが、十手金具11の係止片11b
の突出長さによっては、必ずしも棧材6を貫通する必要
がない。また、係止孔20の断面形状も円形である必要
はない。また、上記第二例においては、大型パネル1を
形成した後に、挿入孔21を形成するものとしたが、上
記第一例と同様に、大型パネル1を形成する前に壁パネ
ル2の接合端面に挿入孔21となる溝を形成しても良
い。
In this case, as in the case of the first example, the large-sized panel 1 can be safely lifted up without the reinforcement of the embedded material such as the embankment 6. It is possible to save time and labor for performing the above and reduce the cost of the large-sized panel 1.
In the second example, the locking hole 20 penetrates the rod material 6, but the locking piece 11b of the ten-hand metal fitting 11 is used.
It is not always necessary to penetrate the rod material 6 depending on the protruding length of the. Further, the cross-sectional shape of the locking hole 20 does not have to be circular. In addition, in the second example, the insertion hole 21 is formed after the large-sized panel 1 is formed. However, similarly to the first example, the joint end surface of the wall panel 2 is formed before the large-sized panel 1 is formed. Alternatively, a groove to be the insertion hole 21 may be formed.

【0058】また、第一例及び第二例においては、吊り
上げ装置としてクレーンと十手金具11を有するパネル
ハンガー9を用いたが、特に吊り上げ装置は限定される
ものではない。特に係止部材は、十手金具11に限定さ
れるものではなく、第一例及び第二例の挿入孔(開口部
15)18、21に挿入して係止孔(係止部14)1
9、20に係止できるものならばどのようなものでも良
く、例えば、係止片11b、11bが左右両方ではな
く、一方だけに突出するようなもので良い。
In the first and second examples, the crane and the panel hanger 9 having the ten-hand fitting 11 are used as the hoisting device, but the hoisting device is not particularly limited. In particular, the locking member is not limited to the ten-hand metal fitting 11, but is inserted into the insertion holes (openings 15) 18 and 21 of the first and second examples to lock the locking hole (locking portion 14) 1.
Any material may be used as long as it can be locked to 9, 20, and for example, the locking pieces 11b, 11b may be projected only on one side, not on both sides.

【0059】また、第一例及び第二例において、係止片
11b、11bが一方だけに突出するものを用いるもの
とすれば、係止孔(係止部14)19、20と挿入孔
(開口部15)18、21が直交し、挿入孔(開口部1
5)18、21の左右に係止孔(係止部14)19、2
0が延出している必要はなく、挿入孔(開口部15)1
8、21から一方向に係止孔(係止部14)19、20
が延出した状態となっていても良い。また、第二例にお
いては、係止孔20に至る挿入孔21を互いに接合され
た二本の棧材6、6の部分に形成したが、大型パネル1
の上端面を構成する水平な棧材6に、上記係止孔6が設
けられた棧材6の近傍で貫通するように挿入孔を設ける
ものとしても良い。
Further, in the first and second examples, if the locking pieces 11b, 11b projecting to only one side are used, the locking holes (locking portions 14) 19, 20 and the insertion holes ( The openings 15) 18 and 21 are orthogonal to each other, and the insertion hole (opening 1
5) Locking holes (locking portions 14) 19 and 2 on the left and right of 18 and 21
0 does not have to extend, and insertion hole (opening 15) 1
Locking holes (locking portions 14) 19, 20 in one direction from 8, 21
May be in an extended state. In addition, in the second example, the insertion hole 21 reaching the locking hole 20 is formed in the portion of the two joint members 6, 6 joined to each other.
It is also possible to provide an insertion hole so as to pass through the horizontal cauldron 6 that constitutes the upper end surface of the cauldron 6 in the vicinity of the cauldron 6 provided with the locking hole 6.

【0060】この場合には、係止部材を上記水平な棧材
6に設けれた挿入孔から挿入し、そして、挿入された係
止部材を、上下方向に延在する互いに接合された二本の
棧材6、6の係止孔20に係止することができる。さら
に、第一例及び第二例においては、壁体を壁パネル2か
らなる大型パネル1としたが、枠組と板材とからなる壁
体であれば、特に限定されるものではない。
In this case, the locking member is inserted through the insertion hole provided in the horizontal rod member 6, and the inserted locking member is joined to the two vertically extending members. It can be locked in the locking holes 20 of the rod members 6, 6. Furthermore, in the first example and the second example, the wall body is the large-sized panel 1 including the wall panel 2, but the wall body is not particularly limited as long as the wall body includes the frame and the plate material.

【0061】[0061]

【発明の効果】本発明の請求項1記載の壁体の吊り上げ
用係止構造によれば、上下に延在する棧材に壁体の荷重
がかかることになり、この場合には、棧材に対して主に
引っ張り応力がかかることになるが、曲げ応力はあまり
かからず、従来のように大きな曲げ応力に対応するため
に棧材を補強しなくとも充分に壁体を吊り上げることが
可能となる。したがって、従来のように、壁体を吊り上
げるためだけに強度を補強する何らかの補強部材を壁体
に付加する必要がなく、壁体の製造の省力化及びコスト
ダウンを図ることができる。
According to the suspending structure for suspending a wall body according to the first aspect of the present invention, the load of the wall body is applied to the vertically extending rod material. In this case, the rod material is However, the tensile stress is mainly applied to the wall, but the bending stress is not so large, and the wall can be sufficiently lifted without the need to reinforce the caulking material to cope with the large bending stress as in the past. Becomes Therefore, unlike the conventional case, it is not necessary to add any reinforcing member for reinforcing the strength only for lifting the wall body to the wall body, and labor saving and cost reduction in manufacturing the wall body can be achieved.

【0062】本発明の請求項2記載の壁体の吊り上げ用
係止構造によれば、左右に隣接する上記壁パネルの接合
部分において、互いに接合された棧材に上記係止部が形
成されることにより、壁体を吊り上げた際に、互いに接
合されて高い強度を有する棧材に壁体の荷重がかかるこ
とになるので、棧材を補強することなく、充分に壁体を
吊り上げることができる。
According to the suspending structure for suspending a wall body according to claim 2 of the present invention, the engaging portions are formed on the jointed members at the joining portions of the wall panels adjacent to each other on the left and right. As a result, when the wall body is lifted, the load of the wall body is applied to the coffin materials that are joined to each other and have high strength, so that the wall body can be sufficiently hoisted without reinforcing the coffin material. .

【0063】本発明の請求項3記載の壁体の吊り上げ用
係止構造によれば、壁体とされる前の壁パネルの接合端
面に上述のような縦溝と横溝とを形成する簡単な方法に
より、上記請求項1及び2記載の構成と同様の効果を奏
する壁体の吊り上げ用係止構造を設けることが可能とな
る。
According to the suspending structure for lifting a wall body according to claim 3 of the present invention, the vertical groove and the horizontal groove as described above are simply formed in the joint end surface of the wall panel before being made into the wall body. According to the method, it is possible to provide the hanging structure for lifting the wall body, which has the same effect as that of the structure according to claims 1 and 2.

【0064】本発明の請求項4記載の壁体の吊り上げ用
係止構造によれば、上記壁体とされる前の壁パネルの接
合端面に係止孔を形成し、次いで、壁パネル同士を接合
して壁体を形成するとともに、壁体の上端面から上記係
止孔に至り、かつ上記開口部となる挿入孔を形成するこ
とにより、簡単に上記請求項1及び2記載の構成と同様
の効果を奏する壁体の吊り上げ用係止構造を設けること
が可能となる。
According to the suspending structure for suspending a wall body according to claim 4 of the present invention, a suspending hole is formed in the joint end surface of the wall panel before being made into the wall body, and then the wall panels are joined to each other. By forming the wall body by joining and forming the insertion hole which reaches the locking hole from the upper end surface of the wall body and serves as the opening, the same as the structure according to claim 1 or 2 It is possible to provide a locking structure for lifting the wall body that exerts the effect of.

【0065】本発明の請求項5記載の壁体の吊り上げ方
法によれば、壁体を吊り上げた際に、上記請求項1〜4
記載の構成と同様に、縦方向に沿った棧材に壁体の荷重
がかかることになり、棧材に対して主に引っ張り応力が
かかることになるが、曲げ応力はあまりかからず、棧材
を補強しなくとも充分かつ確実に壁体を吊り上げること
が可能となる。
According to the wall body hoisting method of the fifth aspect of the present invention, when the wall body is hoisted, the above-mentioned first to fourth aspects are carried out.
Similar to the configuration described, the load of the wall body is applied to the board along the longitudinal direction, so that tensile stress is mainly applied to the board, but bending stress is not so great, It is possible to hang the wall body sufficiently and reliably without reinforcing the material.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態の第一例の壁体の吊り上げ
用係止構造を示す壁体の要部側面図である。
FIG. 1 is a side view of a main part of a wall body showing a suspending structure for lifting a wall body according to a first example of an embodiment of the present invention.

【図2】上記第一例の壁体の吊り上げ用係止構造の形成
方法を説明するための壁パネルの要部斜視図である。
FIG. 2 is a perspective view of a main part of a wall panel for explaining a method of forming the lifting structure for suspending a wall of the first example.

【図3】上記第一例の壁体の吊り上げ用係止構造を示す
板材を取り除いた壁体の要部正面図である。
FIG. 3 is a front view of the main part of the wall body, from which the plate material has been removed, showing the lifting structure for suspending the wall body in the first example.

【図4】本発明の実施の形態の第二例の壁体の吊り上げ
用係止構造を示す板材を取り除いた壁体の要部正面図で
ある。
FIG. 4 is a front view of the main part of the wall body from which the plate member has been removed, showing the suspending structure for lifting the wall body according to the second example of the embodiment of the present invention.

【図5】上記第二例の壁体の吊り上げ用係止構造の形成
方法を説明するための面材を取り除いた壁パネルの要部
斜視図である。
FIG. 5 is a perspective view of a main part of a wall panel from which a face material has been removed for explaining a method of forming a hanging structure for lifting a wall of the second example.

【図6】上記第二例の壁体の吊り上げ用係止構造の形成
方法を説明するための壁パネルの面材を取り除いた要部
正面図である。
FIG. 6 is a front view of a main part of a wall panel, in which a face material is removed, for explaining a method of forming a hanging structure for lifting a wall according to the second example.

【図7】上記第二例の壁体の吊り上げ用係止構造を示す
板材を取り除いた壁体の要部正面図である。
FIG. 7 is a front view of the main part of the wall body from which the plate material has been removed, showing the lifting structure for suspending the wall body in the second example.

【図8】従来の壁体の吊り上げ方法を説明するための吊
り上げられた壁体の正面図である。
FIG. 8 is a front view of a suspended wall body for explaining a conventional method of suspending a wall body.

【図9】従来の壁体の吊り上げにおける壁体の補強を説
明するための板材を取り除いた壁体の要部正面図であ
る。
FIG. 9 is a front view of a main part of the wall body from which a plate material has been removed for explaining the reinforcement of the wall body in the conventional suspension of the wall body.

【符号の説明】[Explanation of symbols]

1 大型パネル(壁体) 2 壁パネル 5 壁パネルの面材 6 棧材 7 壁パネルの枠体 8 大型パネルの枠組 10 大型パネルの板材 11 十手金具(係止部材) 14 係止部 15 開口部 16 縦溝 17 横溝 18 挿入孔(開口部) 19 係止孔(係止部) 20 係止孔(係止部) 21 挿入孔(開口部) DESCRIPTION OF SYMBOLS 1 Large panel (wall body) 2 Wall panel 5 Wall panel face material 6 Board material 7 Wall panel frame body 8 Large panel frame structure 10 Large panel plate material 11 Ten metal fittings (locking member) 14 Locking part 15 Opening Part 16 Vertical groove 17 Horizontal groove 18 Insertion hole (opening) 19 Locking hole (locking part) 20 Locking hole (locking part) 21 Insertion hole (opening)

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E04B 2/56 642 E04B 2/56 642A ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI Technical display location E04B 2/56 642 E04B 2/56 642A

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 複数の棧材からなる枠組と該枠組の少な
くとも一方の面に貼設された板材とを具備してなる壁体
に、吊り上げ装置の係止部材を係止して、上記壁体を吊
り上げるための壁体の吊り上げ用係止構造であって、 上記枠組の略上下に延在する棧材に、上記吊り上げ装置
の係止部材が係止可能な係止部が形成されるとともに、 上記壁体の上端部に開口し、かつ、上記棧材の係止部ま
で上記吊り上げ装置の係止部材を挿入可能な開口部が形
成されていることを特徴とする壁体の吊り上げ用係止構
造。
1. A wall member comprising a frame composed of a plurality of boards and a plate material adhered to at least one surface of the frame, and a locking member of a lifting device is locked to the wall, whereby the wall is formed. A suspending structure for suspending a wall for suspending a body, wherein a locking portion capable of locking a locking member of the lifting device is formed on a rod material extending substantially up and down of the frame. A lifting member for a wall body, which is formed at an upper end portion of the wall body, and has an opening portion into which a locking member of the lifting device can be inserted up to a locking portion of the rod member. Stop structure.
【請求項2】 上記壁体は、棧材から形成された矩形枠
状の枠体と、該枠体の少なくとも一方の面に貼設された
面材とを具備してなる複数の壁パネルを、互いに上記枠
体の外側側面からなる接合端面同士で接合することによ
り形成され、かつ、上記壁体の枠組が上記壁パネルの枠
体から形成され、 左右に隣接する上記壁パネル同士の接合部に配置されて
互いに接合される棧材に上記係止部が形成されているこ
とを特徴とする請求項1記載の壁体の吊り上げ用係止構
造。
2. The plurality of wall panels, wherein the wall body includes a rectangular frame-shaped frame body formed of a wood material and a face material attached to at least one surface of the frame body. , The joints of the wall bodies are formed by joining the joint end surfaces formed of the outer side surfaces of the frame body to each other, and the frame of the wall body is formed of the frame body of the wall panel The suspending structure for lifting a wall body according to claim 1, wherein the retaining portions are formed on the boards arranged in the space and joined to each other.
【請求項3】 上記壁パネルを左右に並べて接合して上
記壁体を形成する際に、上記壁パネルの接合端面となる
壁パネルの枠体の側面に、 上記壁パネル同士を接合した際に上記係止部材を挿入可
能な開口部となり、かつ、上記壁パネルの上面側に開口
する略上下方向の縦溝と、 上記壁パネル同士を接合した際に上記係止部となり、か
つ、上記縦溝から略水平方向に延出する横溝とが形成さ
れていることを特徴とする請求項2記載の壁体の吊り上
げ用係止構造。
3. When the wall panels are joined to each other on the side surface of the frame body of the wall panel which is a joint end face of the wall panel when the wall panels are joined side by side to form the wall body. It becomes an opening into which the locking member can be inserted, and becomes a locking part when the vertical groove that opens in the upper surface side of the wall panel and the wall panels are joined, and the vertical groove. The locking structure for lifting a wall body according to claim 2, wherein a lateral groove extending from the groove in a substantially horizontal direction is formed.
【請求項4】 上記壁パネルを左右に並べて接合して上
記壁体を形成する際に、上記壁パネルの接合端面となる
壁パネルの枠体の側面に、上記係止部となる係止孔が形
成されるとともに、上記壁体の上端面から上記係止孔に
至るように上記開口部となる挿入孔が形成されているこ
とを特徴とする請求項2記載の壁体の吊り上げ用係止構
造。
4. A locking hole serving as the locking portion is provided on a side surface of a frame body of the wall panel which is a joint end surface of the wall panel when the wall panels are joined side by side to form the wall body. 3. The lock for lifting a wall body according to claim 2, wherein an insertion hole serving as the opening is formed so as to extend from the upper end surface of the wall body to the lock hole. Construction.
【請求項5】 上記請求項1、2、3または4記載の壁
体の吊り上げ用係止構造を用いて上記壁体を吊り上げる
壁体の吊り上げ方法であって、 上記吊り上げ装置の係止部材を上記壁体の上端部に開口
する上記開口部に挿入するとともに、上記係止部材を上
記壁体の枠組の略上下方向に沿った棧材の係止部に係止
させ、 次いで、上記係止部材を引き上げることにより、上記壁
体を立てた状態に吊り上げることを特徴とする壁体の吊
り上げ方法。
5. A method of hoisting a wall body by using the hoisting structure for hoisting a wall body according to claim 1, 2, 3 or 4, wherein a locking member of the hoisting device is used. The locking member is inserted into the opening opening at the upper end of the wall body, and the locking member is locked to the locking portion of the rod material along the substantially vertical direction of the framework of the wall body, and then the locking is performed. A method of hoisting a wall, wherein the member is hoisted to hoist the wall.
JP2000096A 1996-02-06 1996-02-06 Wall suspending locking structure and wall suspending method Pending JPH09209573A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000096A JPH09209573A (en) 1996-02-06 1996-02-06 Wall suspending locking structure and wall suspending method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000096A JPH09209573A (en) 1996-02-06 1996-02-06 Wall suspending locking structure and wall suspending method

Publications (1)

Publication Number Publication Date
JPH09209573A true JPH09209573A (en) 1997-08-12

Family

ID=12014889

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000096A Pending JPH09209573A (en) 1996-02-06 1996-02-06 Wall suspending locking structure and wall suspending method

Country Status (1)

Country Link
JP (1) JPH09209573A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3505685A4 (en) * 2016-08-24 2020-05-13 Sang Gi Kim CONCRETE BLOCK CONSTRUCTION METHOD AND GUIDING ELEMENT FOR INSTALLING A CONCRETE BLOCK

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3505685A4 (en) * 2016-08-24 2020-05-13 Sang Gi Kim CONCRETE BLOCK CONSTRUCTION METHOD AND GUIDING ELEMENT FOR INSTALLING A CONCRETE BLOCK

Similar Documents

Publication Publication Date Title
JPH09209573A (en) Wall suspending locking structure and wall suspending method
CN218375577U (en) Box type building
CN215211972U (en) Prefabricated scissors stair
JP2000186382A (en) Lifting jig, panel and large-sized connecting panel with the same and installing method of these panel and large- sized connecting panel
JP7670084B2 (en) Window structure, sash installation method and metal fittings
CN220666602U (en) Assembled integral partition wall top and full prefabricated toilet fixed connection structure
JPH0533618Y2 (en)
CN220014134U (en) Mounting structure of unit curtain wall at bottom of ceiling
JPS6113645Y2 (en)
JPH0978684A (en) PC balcony member and balcony construction method
JPH11256831A (en) Panel hanging jig, hanging jig-attached panel, hanging jig-attached large-sized panel, installation method of hanging jigattached panel, and installation method of hanging jig-attached large-sized panel
JP2510794B2 (en) Sling for roof panel
JP2007113193A (en) Lifting method of PC slab and suspension jig used therefor
JP2957167B1 (en) Escalator truss lifting jig
JPS60148959A (en) Hanging method of panel body
JPH10266358A (en) Roof unit and its lifting method
JPH08284440A (en) Building unit
JPH09256472A (en) Housing unit and method of assembling the same
JP3018528U (en) Temporary stage
JPH1181648A (en) H-shaped frame scaffold
JPH08302888A (en) Ceiling panel and method for constructing house using the same
JP2575574Y2 (en) Building panel reinforcement structure
JPH082268Y2 (en) Panel with hangers
JPH09144139A (en) Building unit
JPS6123164Y2 (en)